TAMILNADU TRANSMISSION CORPORATION LIMITED

CHENNAI
BIDDING DOCUMENT FOR
ERECTION OF 230KV AND 110KV LINES ASSOCIATED WITH
POIYUR 230KV AIS SUBSTATION(SS) IN TIRUCHY REGION AND
KARUVALUR
230KV AIS SUBSTATION(SS) IN COIMBATORE
REGION ON TOTAL TURNKEY BASIS .
.
(PACKAGE NO.29 )
JAPANESE ODA LOAN No. No ID-P224

TAMILNADU TRANSMISSION SYSTEM IMPROVEMENT PROJECT


BID IDENTIFICATION NUMBER: TANTRANSCO/ T BID NO.T-1798
THIS BID DOCUMENT COMPRISES OF THE FOLLOWING THREE BOUND
VOLUMES:

VOLUME- III
PRICE SCHEDULE

OFFICE OF CHIEF ENGINEER/TRANSMISSION


TAMILNADU TRANSMISSION CORPORATION LIMITED
144, ANNA SALAI
CHENNAI 600 002 (INDIA)
TELEPHONE No. 91-044 2852 1106, 28520131 Extn.2945
FACSIMILE No : 91-044 28552 1107
e-mail: cetr@tnebnet.org, sectr@tnebnet.org.

TABLE OF CONTENTS
Price Schedule for 230 KV & 110 KV lines associated with
Poiyur 230 KV SS in Trichy Region
Schedule

Supply of materials for 230 KV Line

Schedule

II Labour for Erection for 230 KV line

Schedule III Supply of materials for 110 KV Line


Schedule IV Labour for Erection for 110 KV Line

Price Schedule for 230 KV & 110 KV lines associated with


Karuvalur 230 KV SS in Coimbatore Region
Schedule V

Supply of materials for 230 KV Line

Schedule VI Labour for Erection for 230 KV line


Schedule VII Supply of materials for 110 KV Line
Schedule VIII Labour for Erection for 110 KV Line

PRICE SCHEDULE
Price Schedule for 230 KV lines associated with Poiyur 230 KV SS in
Trichy Region SCHEDULE I (SUPPLY OF MATERIAL)
Sl
No.

Quantity

Unit

Description

405.00

MT

Fabrication and supply of GI Tower Parts, DP


Structure as per specification including cost of
all materials, labour, leads, and lifts etc.,
complete.

18.00

MT

Hot dip galvanised bolts and nuts as per IS


conforming to latest issue and as detailed in the
specification (Various size)

71.00

Km

Supply of Zebra ACSR conductor as per IS


specifications and standards

7.00

MT

Supply of GI Earthwire of 7/3.55 mm as per IS


specifications
Supply of disc insulator confirming to latest
issue of IS specification

5
a

1752

Nos

90KN Disc insulator ordinary

1168

Nos

90KN Anti fog insulator

3138

Nos

120KN Disc insulator ordinary

2092

Nos

120KN Anti fog insulator


Supply of hardwares as per IS conforming to
latest issue suitable for Zebra conductor

6
a

222

Set

Single suspension fittings

322

Set

Single Tension fittings

25

Set

Double tension fittings


Supply of
conductor accessories as per
relevant IS of latest issue suitable for ACSR
Zebra conductor

36

Set

Mid span compression joints

26

Set

Repair sleeve

342

Set

Vibration dampers

126

Set

Pre formed Armour rod


Supply of
Earth wire accessories as per
relevant IS of latest issue suitable for 7 /
3.55mm HTGS earth wire

8
a

22

Set

Suspension fitting

57

Set

Tension fitting

Set

Mid span compression joints

78

Set

Aluminium Earth bond

Price Schedule for 230 KV lines associated with Poiyur 230 KV SS in Trichy
Region
Schedule II (Labour for erection)
Sl.No.

Qty

49

100

Unit

Description

Loc

Check survey , pit marking for tower foundation


including cutting of light , heavy jungles including
cost of all T&Ps transport labour, lead and lift, etc.,
complete.

Hrs

Hire charges for Earthmoving equipment (JCB


,Backhoe ) for clearing rubbish, levelling the site
,including cost of hire charges ,fuel charges ,all
labour lead and lift etc. complete.

Earth work excavation including dewatering , cost


of all labour, with initial lead
and lift,etc.,
complete.

2505.00

M3

In Hard stiff clay,block cotton soil , hard red earth


shales murrams, gravel, stoney earth , earth mixed
50% fair sized boulders , hard gravelly soil , sand
or other loose soils, silt, sandy loom and ordinary
soil etc.,complete.

1253.00

M3

In soft disintegrated rock not requiring blasting.

1252.00

M3

In Medium & dense medium rock not requiring


blasting

1253.00

M3

Removal of hard rock by wedging & chiselling/


using compressor and jack hammer.

Nos

Providing Grout holes 40 mm dia , 600mm depth


in hard rock wherever necessary including cost of
all machineries, dewatering, labour, lead and
lift,etc.,complete.

Nos

Cement grouting for anchor rods, including all


cost of materials, dewatering, labour charges
using special tools and plants such as air
compressor/pump etc., complete (excluding
cost of rod )

100

100

Price Schedule for 230 KV lines associated with Poiyur 230 KV SS in Trichy
Region
Schedule II (Labour for erection)
Sl.No.

Qty

4391.00

Unit

M2

Description
Providing shoring and shuttering with country
wood planks/steel sheets for tower foundation ,
including cost of all materials, transport ,T&Ps
,dewatering charges, labour lead and lift, etc.,
complete.
Transport of Template, stub&cleat, assembling,
dismantling after concreting and shifting from
location to location including cost of all T&P's,
labour, dewatering,lead and lift, etc., complete.

21

Loc

GR type with or without extension

11

Loc

KSR type with or without extension

11

Loc

LSR type with or without extension

Loc

LSO type with or without extension

153.00

M3

P.C.C.1:3:6 using 40mm metal for foundation


without form work

92.00

M3

P.C.C.1:3:6 using 40mm metal for foundation with


steel form work

M3

P.C.C.1:3:6 using 12 to 20mm metal for foundation


with
form
work
including
cost of
all
materials,dewatering charges , labour, lead and
lift etc., complete

10

42.00

P.C.C.1:3:6 using 12 to 20mm metal for foundation


without form work including cost of all
materials,dewatering charges , labour, lead and
lift etc., complete

11

52.00

M3

Machine Mix concrete

35.00

M3

Ready Mix concrete

Price Schedule for 230 KV lines associated with Poiyur 230 KV SS in Trichy
Region
Schedule II (Labour for erection)
Sl.No.

Qty

Unit

Description
PCC 1:2:4 using 12 to 20 mm HBG metal including
cost of all materials, labour, curing, form
box,dewatering , lead and lift, etc., complete.with
form box

12

200.00

M3

Machine Mix concrete

133.00

M3

Ready Mix concrete


RCC 1:1.5:3 using 12 to 20 mm HBG metal
including cost of all materials, labour, curing, form
box,dewatering , lead and lift, etc., complete.

13
I
a

Machine Mix concrete


340.00

M3

II
a

With form work for


Ready Mix concrete

227.00

M3

With form work for

14

32.00

MT

Providing steel reinforcement and placing in


position including cost of reinforcement, binding
wire, including cost of all materials, labours, lead
and lift, etc., complete.

15

147.00

Nos

Providing weep holes in RCC retaining wall using


50 mm dia PVC pipe including cost of all material,
lead, labour for cutting and fixing etc., complete.

16

1488.00

M3

Filling with good quality earth of approved quality


for revetment including cost of all materials, labour
charges , curing, lead, lift, etc., complete.

M3

Refilling the foundation with excavated earth other


than sand in layers of 150mm thick, spreading
excess earth, watering, consolidation as per
standard speclification including all labour charges
lead and lifts, etc., complete.

17

5384.00

Price Schedule for 230 KV lines associated with Poiyur 230 KV SS in Trichy
Region
Schedule II (Labour for erection)
Sl.No.

Qty

18

877.00

Unit
M3

Removal of surplus earth wherever necessary


including transport up to 2 km away from the site,
loading and unloading etc., complete.
Transport & erection of tower parts including
sorting out of tower parts at site, tightening,
punching of bolts and nuts, including transport
charges, cost of T&Ps labour
lead, lift etc.,
Complete.

19

Description

383.00

MT

Under Normal Condition


Transport and hoisting of ordinary / Anifog disc
insulator strings and fitting including transport,
cost of T&Ps all labour charges leads, lifts etc.,
complete .

20

219

Set

Single suspension insulator string consisting of 13


Nos 90KN ordinary/Antifog disc insulators

318

Set

Single tension
insulator string consisting of 14
Nos 120KN ordinary/Antifog disc insulators

24

Set

Single tension
insulator string consisting of 15
Nos 120KN ordinary/Antifog disc insulators
Stringing of 6 nos Zebra/ LL-ACSR/AS 490
conductor including paying out, rough sagging,
tensioning
using
tensioner/puller
as
per
specification, clipping, jumpering,
fixing
of
dampers , transport including cost of all T&Ps,
labour lead and lifts etc., complete

21

8.00

KM

10

span

span

For Multi span


For single span under Normal condition
For single span under LC condition

Price Schedule for 230 KV lines associated with Poiyur 230 KV SS in Trichy
Region
Schedule II (Labour for erection)
Sl.No.

Qty

Unit
span

23

Single span for Railway crossing


Stringing of 3 nos Zebra/ LL-ACSR/AS 490
conductor including paying out, rough sagging,
tensioning
using
tensioner/puller
as
per
specification, clipping, jumpering,
fixing
of
dampers , transport including cost of all T&Ps,
labour lead and lifts etc., complete

22

Description

span

span

For single span cut point for jumper span


Labour charges for releasing and restringing of 3
Nos of old ACSR Kundha conductor including rough
sagging, clipping, fixing dampers, jumpers T&P,
lead, lift etc, complete under L.C. condition

Transport and paying out, rough sagging,


tensioning of one No 7/3.55 mm HTGS earth wire
as per specification , clipping, jumpering, labour
charges including cost of T&Ps labour lead, lifts,
etc., complete

24

8.00

KM

10

span

For single span under Normal condition

span

For single span under LC condition.

span

25

span

For Multi span

Single span for Railway crossing


Labour charges for releasing and restringing of 1
No. of GI Earthwire including rough sagging,
clipping, fixing vibration dampers, jumpers T&P,
lead, lift etc, complete under L.C. condition

Price Schedule for 230 KV lines associated with Poiyur 230 KV SS in Trichy
Region
Schedule II (Labour for erection)
Sl.No.

Qty

Unit

Description

26

58550

Nos

Tack welding of all bolts and nuts 1 cm on both


sides from ground level to the bottom cross arm
level of erected towers and painting the nuts after
welding (Welded portion) with 2 coats of best
quality cold galvanising paint having atleast 90% of
zinc content as approved by the Engineers at site
which includes cost of all T&P's required for
welding , labour, lead and lift etc., complete
(welding of one bolt and nut comprises three tacks
of weld)

27

82850

M2

Clearing juliflora jungle with uprooting including all


cost of labour,lead,lift etc., complete.

28

500

Nos

Labour Charges for cutting and removing small


palmyrah / Coconut stumps and other trees in all
respects

29

300

Nos

Labour Charges for cutting and removing large


palmyrah / Coconut stumps and other trees in all
respects

Each

Providing temporary stay during rough sagging and


tensioning including necessary excavation for
burying RSJ cut bits/ concrete block with pipe turn
buckle/ concreting the anchor in slushy area fixing
stay wire and turn buckle, refilling and removal
of stays after tensioning including cost of all
materials, labour, leads, lifts, etc., complete.

Nos

Arranging and availing shutdown


on HT/LT,
dismantling and restringing of HT/LT lines to the
original position after stringing operation including
all labour charges , T&Ps, etc., complete.

Nos

Arranging road block for stringing of power


conductor and earth wire across major road/
Railway crossing including cost of sign boards
and all incidental charges etc.,complete.

30

31

32

33

196

16

Providing special type trussles for P&T, road


crossing with all lead lift etc., complete in all
respects.

Price Schedule for 230 KV lines associated with Poiyur 230 KV SS in Trichy
Region
Schedule II (Labour for erection)
Sl.No.

Qty

Unit

Nos

2 Legged trussles for Railway crossing/Major road


crossings

Nos

Single Legged trussles for Minor road crossings

Nos

Providing Pipe type earthing for tower location


including extra excavation in foundation of towers
for fixing 3m long 25mm dia GI "B" class earth pipe
using 7/3.55mm earth wire of 2.40m long with
lugs on both terminals for connecting the GI pipe
with tower leg refilling with excavated earth mixed
with salt and charcoal as per standard specification
including cost of 25mm GI B class pipe , other
materials, transport all labour leads and lifts, etc.,
complete.

Loc

Providing
earthing in terminal tower as per
standard specification by providing 150mm dia
bore hole for a depth of 3.6m and placing of GI
pipes 50 mm dia GI "C" class 3m long into the bore
including cost of 600 mm dia RCC collar placing
over the earth pipe and connecting the earth pipe
and tower leg using 7/3.55 mm GI earth wire with
lugs including lowering of earth wire from peak of
tower to the bottom and connecting to the pipe
and fixing necessary GI clamp etc., including cost
of GI pipe, drilling of bore cost of all lead and lifts
etc., complete.

Loc

Providing special type earthing in Railway crossing


tower with 2 - Nos. 50mm dia GI "C" Class pipe as
per standard specification, approved drawing and
as directed by the Engineer in charge including
lowering the earth wire from earth peak to the
ground and connecting to the earth pipe,
connecting the tower legs and earth pipes by
7/3.55mm GI earth wire with suitable clamps and
providing 2 Nos. 150mm dia. bore for a depth of
3.6m for each tower location and placing of GI
pipes 50mm dia C class 3m long into the bore,
filling with charcoal and salt in the annular space,
providing 2 Nos. RCC ring 60 cm dia., 50mm thick
for each earth pipe and anti climbing arrangements
using GI barbed wire and device including cost of
all materials labour lead lift etc., complete.

34

35

36

45

Description

Price Schedule for 230 KV lines associated with Poiyur 230 KV SS in Trichy
Region
Schedule II (Labour for erection)
Sl.No.

37

38

Qty

49.00

49

Unit

Description

M3

PCC 1:2:4 using 12 to 20mm HBG metal for


muffing and coping including cost of all materials
labour,form work and plastering in CM 1:3,12mm
thick, all lead lift etc., complete.

Loc

Painting with good quality anticorrosive black paint,


two coats, 1m above coping concrete including
cost of all materials labour lead lift complete.
Supplying and fixing of the following item including
cost of all materials, labour, lead and lift etc.,
complete.

39
a

49

Nos

Number Plate 200mm x 200 mm

30

Nos

Phase Board containing 3 nos phase plates with


colour sequence

30

Nos

Danger Board 500mm x 500mm

20

Nos

Name Board 900mm x 450mm

126

Nos

20mm dia hanger rod

150

Nos

16mm dia U bolts

40

41

42

262.00

100

Providing stacking platform around tower locations


by supplying and filling the sand in empty gunny
bags as directed by the dept. engineer including
cost of all material,labour,lead,lift etc. complete.

Hrs

Providing Lighting arrangements With Genset


during tower erection and stringing works at night
hours including cost of fuel, labour, transport, hire
charges for Genset all lead and lift etc.,complete.

Set

Preparation and submission of Project Report - 5


sets in hard copy "AS BUILT" such as Key plan
,tower schedule ,approch road details for interior
towers, EHTcrossing/Railway/NH/Major Road
crossing, Tower footing resistance, Longitude &
Latitude details of towers and other relevant
details with a soft copy in CD etc.,complete.

10

Price Schedule for 230 KV lines associated with Poiyur 230 KV SS in Trichy
Region
Schedule II (Labour for erection)
Sl.No.

43

Qty

50

Unit

RM

Description
Providing counter poise type earthing wherever
necessary for tower location including earth work
excavation for burrying the earth wire around the
tower and connecting with all the tower leg
refilling with excavated earth mixed with salt and
charcoal as per standard specification including
cost of lugs for connection arrangement all other
materials, transport all labour leads and lifts, etc.,
complete.
Final checking of newly erected tower line to
verify the erection of all tower members and using
correct size of bolts and nuts , hardware fittings ,
insulators with cotter pin ,arching horns as per the
Standard requirement and providing the necessary
vehicle arrangement and Tools and plants to the
TANTRANSCO
authorised
persons before
commissioning of the line

44

49

Loc.

For Tower
Final checking of conductor/earthwire along the
line along with department staff including cost of T
& P's, transport providing the necessary vehicle
arrangement and all other incidental charges etc.,
complete before commissioning of the line.

45

12.00

KM

For Line

11

Price Schedule for 110 KV lines associated with Poiyur 230 KV SS in Trichy Region
Schedule III ( Supply of Materials )
Sl No.

Qty

Unit

483.00

MT

25.00

MT

92.00

Km

15.00

MT

Description
Fabrication and supply of GI Tower Parts/ D.P
structure as per specification including cost of all
materials, labour, leads, and lifts etc., complete.
Hot dip galvanised bolts and nuts as per IS
conforming to latest issue and as detailed in the
specification(Various size)
Supply of LL- ACSR/AS 240 sq.mm conductor, as
per IS specifications and standards
Supply of GI Earthwire of 7/3.55 mm as per IS
specifications
Supply of disc insulator confirming to latest issue of
IS specification

1290

nos

90KN Disc insulator (Ordinary )

860

nos

90KN Disc Insulator (Anti fog)

2159

nos

120KN Disc insulator (Ordinary)

1440

nos

120KN Disc Insulator (Anti fog )


Supply of hardwares as per IS conforming to latest
issue suitable for LL conductor ACSR /AS 240
Sq.mm

6
a

301

set

Single suspension fittings

529

set

Single Tension fittings

13

set

Double Tension fittings


Supply of conductor accessories as per relevant IS of
latest issue suitable for LL conductor ACSR /AS 240
Sq.mm

7
a

72

set

Mid span compression joints

47

set

Repair sleeve

534

set

Vibration dampers

144

set

Armour rod

Supply of Earth wire accessories as per relevant IS


of latest issue suitable for 7/3.55mm HTGS earth
wire

12

Price Schedule for 110 KV lines associated with Poiyur 230 KV SS in Trichy Region
Schedule III ( Supply of Materials )
Sl No.

Qty

Unit

Description

41

set

Suspension fittings

143

set

Tension fitting

20

set

Mid span compression joints

179

set

Aluminium Earth bond

13

Price Schedule for 110 KV lines associated with Poiyur 230 KV SS in Trichy Region
Schedule IV (Labour for erection)
Sl.No.

Qty

Unit

Description

109

Loc

Check survey , pit marking for tower foundation


including cutting of light & heavy jungles,cost of all
T&Ps transport labour, lead and lift, etc., complete.

Hrs

Hire charges for Earthmoving equipment (JCB


,Backhoe ) for clearing rubbish,levelling the site
,including cost of hire charges,fuel charges ,all
labour lead and lift etc. complete.

250

Earth work excavation including dewatering , cost of


all labour, with initial lead and lift,etc., complete.

3606.00

m3

In Hard stiff clay,block cotton soil , hard red earth


shales murrams, gravel, stoney earth , earth mixed
50% fair sized boulders , hard gravelly soil , sand or
other loose soils, silt, sandy loom and ordinary soil
etc.,complete.

1801.00

m3

In soft disintegrated rock not requiring blasting.

1801.00

m3

1803.00

m3

200

200

7222.00

In Medium & dense medium rock not requiring


blasting
Removal of hard rock by wedging & chiselling/ using
compressor and jack hammer.

nos

Providing Grout holes 40 mm dia , 600mm depth in


hard rock wherever necessary including cost of all
machineries,
dewatering,
labour,
lead
and
lift,etc.,complete.

nos

Cement grouting for anchor rods, including all cost


of materials, dewatering, labour charges using
special
tools
and
plants
such
as
air
compressor/pump etc., complete (excluding cost of
rod )

m2

Providing shoring and shuttering with country wood


planks/steel sheets for tower foundation , including
cost of all materials, transport ,T&Ps ,dewatering
charges, labour lead and lift, etc., complete.
Transport of Template, stub & cleat, assembling,
dismantling after concreting and shifting from
location to location including cost of all T&P's,
labour, dewatering, lead and lift, etc., complete.

14

Price Schedule for 110 KV lines associated with Poiyur 230 KV SS in Trichy Region
Schedule IV (Labour for erection)
Sl.No.

Qty

Unit

Description

39

Loc

GCR type with or without extension

24

Loc

HCR type with or without extension

32

Loc

KCR type with or without extension

Loc

KCO type with or without extension

169.00

m3

57.00

m3

P.C.C.1:3:6 using 40mm metal for foundation


without form work including cost of all materials,
dewatering charges , labour, lead and lift etc.,
complete
P.C.C.1:3:6 using 40mm metal for foundation with
form work including cost of all materials,
dewatering charges , labour, lead and lift etc.,
complete
P.C.C.1:3:6 using 12 to 20mm metal for foundation
without form work including cost of all materials,
dewatering charges , labour, lead and lift etc.,
complete

118.00

m3

Machine Mix concrete

79.00

m3

Ready Mix concrete

10

11

P.C.C.1:3:6 using 12 to 20mm metal for foundation


with form work including cost of all materials,
dewatering charges , labour, lead and lift etc.,
complete
PCC 1:2:4 using 12 to 20 mm HBG metal including
cost of all materials, labour, curing, with form box,
dewatering, lead and lift, etc., complete without
form box

9.00

m3

1265.00

m3

Machine Mix concrete

844.00

m3

Ready Mix concrete

12

PCC 1:2:4 using 12 to 20 mm HBG metal including


cost of all materials, labour, curing,without form
box, dewatering , lead and lift, etc., complete with
form box.

13
a

71.00

m3

Machine Mix concrete

15

Price Schedule for 110 KV lines associated with Poiyur 230 KV SS in Trichy Region
Schedule IV (Labour for erection)
Sl.No.

Qty

Unit

Description

14

333

RM

Providing weep holes in PCC retaining wall using 50


mm dia PVC pipe including cost of all
material,lead,labour for cutting and fixing etc.,
complete.

15

2517.00

m3

Filling with good quality earth of approved quality for


revetment including cost of all materials, labour
charges, curing, lead, lift, etc., complete.

16

6403.00

m3

Refilling the foundation with excavated earth other


than sand in layers of 150mm thick, spreading
excess earth, watering, consolidation as per
standard specification including all labour charges
lead and lifts, etc., complete.

17

2608.00

m3

Removal of surplus earth wherever necessary


including transport up to 2 km away from the site,
loading and unloading etc., complete.
Transport & erection of tower parts including sorting
out of tower parts at site, tightening, punching of
bolts and nuts, including transport charges, cost of
T&Ps labour lead, lift etc., Complete.

18
a
19

432.00
27.00

MT

Under Normal Condition

MT

Transport & erection of Double pole structure


including tightening, punching of bolts and nuts,
transport from road side to workspot, cost of all
T&Ps labour lead, lift etc., Complete.
Transporting and hoisting of ordinary / Anifog disc
insulator strings and fitting including transport, cost
of T&Ps all labour charges leads, lifts etc., complete
.

20

300

set

Single suspension insulator stringing consisting of 7


Nos 90KN ordinary/Antifog disc insulators under
Normal condition

420

set

Single tension insulator stringing consisting of 8 Nos


120KN ordinary/Antifog disc insulators under Normal
condition.

12

set

Double tension insulator stringing consisting of 8


Nos 120KN ordinary/Antifog disc insulators under
Normal condition

16

Price Schedule for 110 KV lines associated with Poiyur 230 KV SS in Trichy Region
Schedule IV (Labour for erection)
Sl.No.

Qty

Unit

Description
Stringing of 6 nos LL-ACSR/AS 240 & Panther
conductor including paying out, rough sagging,
tensioning
using
tensioner/puller
as
per
specification, clipping, jumpering,
fixing
of
dampers , transport including cost of all T&Ps,
labour lead and lifts etc., complete

21

4.00

KM

span

span

For Multi span


For single span
For single span cut point from tower to DP and DP to
DP
Stringing of 3 nos LL-ACSR/AS 240 & Panther
conductor including paying out, rough sagging,
tensioning
using
tensioner/puller
as
per
specification, clipping, jumpering,
fixing
of
dampers , transport including cost of all T&Ps,
labour lead and lifts etc., complete

22

12

KM

23

span

For single span cut point

span

For single span cut point for Railway crossing

12

span

23

span

span

For Multi span cut point

For single span cut point from tower to DP and DP to


DP
For take off structure
Labour charges for releasing and restringing of 3
Nos of old ACSR Panther conductor including rough
sagging, clipping, fixing vibration dampers, jumpers
T&P, lead, lift etc, complete under L.C. condition
Transport and paying out, rough sagging, tensioning
of one No 7/3.55 mm HTGS earth wire as per
specification, clipping, jumpering, labour charges
including cost of T&Ps labour lead, lifts, etc.,
complete

24

16.00

KM

For Multi span cut point

31

span

For single span cut point

span

For single span cut point for Railway crossing

17

Price Schedule for 110 KV lines associated with Poiyur 230 KV SS in Trichy Region
Schedule IV (Labour for erection)
Sl.No.

25

Qty

Unit

Description

span

Labour charges for releasing and restringing of 1


No. of GI Earthwire including rough sagging,
clipping, fixing vibration dampers, jumpers T&P,
lead, lift etc, complete under L.C. condition

26

55350

nos

Tack welding of all bolts and nuts 1 cm on both


sides from ground level to the bottom cross arm
level of erected towers and painting the nuts after
welding (Welded portion) with 2 coats of best quality
cold galvanising paint having atleast 90% of zinc
content as approved by the Engineers at site which
includes cost of all T&P's required for welding ,
labour, lead and lift etc., complete (welding of one
bolt and nut comprises three tacks of weld)

27

177660.00

m2

Clearing juliflora jungle with uprooting including all


cost of labour,lead,lift etc., complete

28

800

nos

Labour Charges for cutting and removing small


palmyrah / Coconut stumps and other trees in all
respects

29

350

nos

Labour Charges for cutting and removing large


palmyrah / Coconut stumps and other trees in all
respects

nos

Providing temporary stay during rough sagging and


tensioning including necessary excavation for
burying RSJ cut bits/ concrete block with pipe turn
buckle/ concreting the anchor in slushy area fixing
stay wire and turn buckle, refilling and removal of
stays after tensioning including cost of all materials,
labour, leads, lifts, etc., complete.

nos

Arranging and availing shutdown


on HT/LT,
dismantling and restringing of HT/LT lines to the
original position after stringing operation including
all labour charges, T&Ps, etc., complete.

nos

Arranging road block for stringing of power


conductor and earth wire across major road/ Railway
crossing including cost of all incidental charges
etc.,complete.

30

31

32

285

37

18

Price Schedule for 110 KV lines associated with Poiyur 230 KV SS in Trichy Region
Schedule IV (Labour for erection)
Sl.No.

Qty

Unit

Providing special type trussles for P&T, road


crossing with all lead litt etc., complete in all
respects.

33
34

35

107

nos

2 Legged trussles for Railway crossing/Major road


crossings

nos

Providing Pipe type earthing for tower location


including extra excavation in foundation of towers
for fixing 3m long 25mm dia GI "B" class earth pipe
using 7/3.55mm earth wire of 2.40m long with lugs
on both terminals for connecting the GI pipe with
tower leg refilling with excavated earth mixed with
salt and charcoal as per standard specification
including cost of 25mm GI B class pipe , other
materials, transport all labour leads and lifts, etc.,
complete.
Providing earthing in terminal tower as per standard
specification by providing 150mm dia bore hole for
a depth of 3.6m and placing of GI pipes 50 mm dia
GI "C" class 3m long into the bore including cost of
600 mm dia RCC collar placing over the earth pipe
and connecting the earth pipe and tower leg using
7/3.55 mm GI earth wire with
lugs including
lowering of earth wire from peak of tower to the
bottom and connecting to the pipe and fixing
necessary GI clamp etc., including cost of GI pipe,
drilling of bore cost of all lead and lifts etc.,
complete.

36

Description

Loc

For terminal tower

19

Price Schedule for 110 KV lines associated with Poiyur 230 KV SS in Trichy Region
Schedule IV (Labour for erection)
Sl.No.

Qty

Unit

Providing special type earthing in Railway crossing


tower with 2 - Nos. 50mm dia GI "C" Class pipe as
per standard specification, approved drawing and as
directed by the
Engineer in charge including
lowering the earth wire from earth peak to the
ground and connecting to the earth pipe,
connecting the tower legs and earth pipes by
7/3.55mm GI earth wire with suitable clamps and
providing 2 Nos. 150mm dia. bore for a depth of
3.6m for each tower location and placing of GI pipes
50mm dia C class 3m long into the bore, filling with
charcoal and salt in the annular space, providing 2
Nos. RCC ring 60 cm dia., 50mm thick for each earth
pipe and anti climbing arrangements using GI
barbed wire and device
including cost of all
materials labour lead lift etc., complete.

37

38

Description

540.00

Loc

For Railway crossing Tower

Labour charges for earthwork excavation to a depth


of 0.75 m and burrying the earthwire from DP to DP
and DP to tower, backfilling the excavated earth as
instructed by the engineer at site including all lead,
lift etc. complete

39

70

m3

PCC 1:2:4 using 12 to 20mm HBG metal for muffing


and coping including cost of all materials labour,form
work and plastering in CM 1:3,12mm thick, all lead
lift etc., complete.

40

109

Loc

Painting with good quality anticorrosive black paint,


two coats, 1m above coping concrete including cost
of all materials labour lead lift complete.
Supplying and fixing of the following item including
cost of all materials, labour, lead and lift etc.,
complete.

41
a

109

nos

Number Plate 200mm x 200 mm

45

nos

Phase Board containing 3 nos phase plates with


colour sequence

45

nos

Danger Board 500mm x 500mm

30

nos

Name Board 1500mm x 600mm

20

Price Schedule for 110 KV lines associated with Poiyur 230 KV SS in Trichy Region
Schedule IV (Labour for erection)
Sl.No.

Qty

Unit

144

nos

20mm dia hanger rod

250

nos

16mm dia U Bolt

250

nos

16mm dia D Shackle

200

Kg

Supply of various sizes of bolts and nuts,Eye bolts


and other G.I. Washers, etc.,

m3

Providing stacking platform around tower locations


by supplying and filling the sand in empty gunny
bags as directed by the dept. engineer including cost
of all material,labour,lead,lift etc. complete.

Hrs

Providing Lighting arrangements With Genset during


tower erection and stringing works at night hours
including cost of fuel, labour, tansport, hire charges
for Genset all lead and lift etc.,complete.

set

Preparation and submission of Project Report - 5


sets in hard copy "AS BUILT" such as Key plan
,tower schedule ,approach road details for interior
towers, EHTcrossing/Railway/NH/Major Road
crossing,Tower footing resistance, Longitude &
Latitude details of towers and other relevant details
with a soft copy in CD etc.,complete.

RM

Providing counter poise type earthing wherever


necessary for tower location including earth work
excavation for burrying the earth wire around the
tower and connecting with all the tower leg refilling
with excavated earth mixed with salt and charcoal as
per standard specification including cost of lugs for
connection
arrangement all other materials,
transport all labour leads and lifts, etc., complete.

42

43

44

45

620.00

250

125

Description

21

Price Schedule for 110 KV lines associated with Poiyur 230 KV SS in Trichy Region
Schedule IV (Labour for erection)
Sl.No.

Qty

Unit

Final checking of newly erected tower line to verify


the erection of all tower members and using correct
size of bolts and nuts , hardware fittings , insulators
with cotter pin ,arching horns as per the Standard
requirement and providing the necessary vehicle
arrangement and Tools and plants to the
TANTRANSCO
authorised
persons before
commissioning of the line

46

109

Loc

For Tower
Final checking of conductor/earthwire along the line
along with department staff including cost of T &
P's, transport providing the necessary vehicle
arrangement and all other incidental charges etc.,
complete before commissioning of the line.

47

Description

24.00

KM

For Line

22

Price Schedule for 230 KV lines associated with Karuvalur 230 KV SS in Coimbatore
Region

SCHEDULE V (SUPPLY OF MATERIAL)

Sl No.

Qty

Unit

Description

1194.00

MT

Fabrication and supply of GI Tower Parts as per


specification including cost of all materials, labour,
leads, and lifts etc., complete.

224.00

MT

Fabrication and supply of Multi Circuit Tower Parts


of High tensile Steel (HTS) as per specification
including cost of all materials, labour, leads, and
lifts etc., complete.

51.00

MT

Hot dip galvanised bolts and nuts as per IS


conforming to latest issue and as detailed in the
specification (Various size)

170.00

Km

Supply of Zebra ACSR


conductor as per IS
specifications and standards

5.00

Km

Supply of LL- ACSR /AS 490 conductor as per IS


specifications and standards

21.00

MT

Supply of GI Earthwire of 7/3.55 mm


specifications

Supply of disc insulator confirming to latest issue of


IS specification

7
a
b
c
d

as per IS

5188
1205
7906
2847

Nos

90KN Disc insulator (Ordinary )

Nos

90KN Disc Insulator (Anti fog)

Nos

120KN Disc insulator (Ordinary)

Nos

120KN Disc Insulator (Anti fog )


Supply of hardwares as per IS conforming to latest
issue suitable for Zebra conductor

8
a

456

722

21

Set

Single suspension fittings


Single Tension fittings

Set

Dual suspension fittings

23

Price Schedule for 230 KV lines associated with Karuvalur 230 KV SS in Coimbatore
Region

SCHEDULE V (SUPPLY OF MATERIAL)

Sl No.

Qty

Unit

Description
Supply of hardwares as per IS conforming to latest
issue suitable for LL-ACSR/AS 490 conductor

9
a

19

Set

Single suspension fittings

55

Set

Single Tension fittings


Supply of conductor accessories as per relevant IS
of latest issue suitable for ACSR Zeebra conductor

10
a

161

Set

Mid span compression joints

46

Set

Repair sleeve

719

Set

Vibration dampers

239

Set

Pre formed Armour rod


Supply of conductor accessories as per relevant IS
of latest issue suitable for LL- ACSR /AS 490
conductor

11
a

16

Set

Mid span compression joints

11

Set

Repair sleeve

54

Set

Vibration dampers

Set

Preformed Armour rod


Supply of Earth wire accessories as per relevant IS
of latest issue suitable for 7 / 3.55mm HTGS earth
wire

12
a

78

Set

Suspension fitting

130

Set

Tension fitting

66

Set

Mid span compression joints

202

Set

Aluminium Earth bond

24

Price Schedule for 230 KV lines associated with Karuvalur 230 KV SS in


Coimbatore Region. SCHEDULE VI (Labour for erection)
Sl
No.

Qty

Unit

Description

129

Loc

Check survey , pit marking for tower foundation


including cutting of light & heavy jungles,cost of all
T&Ps transport labour, lead and lift, etc., complete.

Hrs

Hire charges for Earthmoving equipment (JCB ,Backhoe )


for clearing rubbish, levelling the site ,including cost of
hire charges, fuel charges ,all labour lead and lift etc.
complete.

240

Earth work excavation including dewatering , cost of all


labour, with initial lead and lift,etc., complete.

10476.00

M3

In Hard stiff clay,block cotton soil , hard red earth shales


murrams, gravel, stoney earth , earth mixed 50% fair
sized boulders , hard gravelly soil , sand or other loose
soils, silt, sandy loom and ordinary soil etc.,complete.

739.00

M3

In soft disintegrated rock not requiring blasting.

6137.00

M3

In Medium & dense medium rock not requiring blasting

4339.00

M3

Removal of hard rock by wedging & chiseling/ using


compressor and jack hammer.

Nos

Providing Grout holes 40 mm dia , 600mm depth in hard


rock
wherever necessary including cost of all
machineries,dewatering,
labour,
lead
and
lift,etc.,complete.

Nos

Cement grouting for anchor rods, including all cost


of materials, dewatering, labour charges using
special tools and plants such as air compressor/pump
etc., complete (excluding cost of rod )

1280

1280

2890.00

Providing shoring and shuttering with country wood


planks/steel sheets for tower foundation , including cost
of all materials, transport ,T&Ps ,dewatering charges,
labour lead and lift, etc., complete.

25

Price Schedule for 230 KV lines associated with Karuvalur 230 KV SS in


Coimbatore Region. SCHEDULE VI (Labour for erection)
Sl
No.

Qty

Unit

Description
Transport
of
Template,
stub&cleat,
assembling,
dismantling after concreting and shifting from location to
location
including cost of all T&P's, labour,
dewatering,lead and lift, etc., complete.

60

Loc

GR type with or without extension

19

Loc

KSR type with or without extension

15

Loc

LSR type with or without extension

Loc

A type with or without extension

Loc

C type with or without extension

Loc

D type with or without extension

10

Loc

MA type with or without extension

Loc

MC type with or without extension

17

Loc

MD type with or without extension

122.00

M3

17.00

M3

10

498.00

M3

P.C.C.1:3:6 using 12 to 20mm metal for foundation with


steel form work including cost of all materials, dewatering
charges , labour, lead and lift etc., complete

11

1216.00

M3

PCC 1:2:4 using 12 to 20 mm HBG metal including cost of


all materials, labour, curing, form box, dewatering, lead
and lift, etc., complete. Without form box

12

P.C.C.1:3:6 using 40mm metal for foundation without


form work including cost of all materials, dewatering
charges , labour, lead and lift etc., complete
P.C.C.1:3:6 using 40mm metal for foundation with steel
form work including cost of all materials, dewatering
charges , labour, lead and lift etc., complete

Providing RCC 1:1.5:3 Grade using 12 to 20 mm HBG


metal for foundation with steel form work including cost of
cement, all materials, curing, labour, lead and lift etc.,
complete.

26

Price Schedule for 230 KV lines associated with Karuvalur 230 KV SS in


Coimbatore Region. SCHEDULE VI (Labour for erection)
Sl
No.

Qty

Unit

1324.00

M3

Machine Mix concrete

307.00

M3

Ready Mix concrete

MT

Providing steel reinforcement/grout rods and placing


in position including cost of reinforcement, binding
wire, including cost of all materials, labours, lead and
lift, etc., complete.

Nos

Providing weep holes in RCC retaining wall using 50 mm


dia PVC pipe including cost of all material,lead,labour for
cutting and fixing etc., complete.

13

14

15

168.00

480.00

3450.00

Description

Filling with good quality earth of approved quality for


revetment including cost of all materials, labour charges ,
curing, lead, lift, etc., complete.

16

17728.00

M3

Refilling the foundation with excavated earth other than


sand in layers of 150mm thick, spreading excess earth,
watering, consolidation as per standard specification
including all labour charges lead and lifts, etc., complete.

17

3959.00

M3

Removal of surplus earth wherever necessary including


transport up to 2 km away from the site, loading and
unloading etc., complete.
Transporting & erection of tower parts including sorting
out of tower parts at site, tightening, punching of bolts
and nuts, including transport charges, cost of T&Ps labour
lead, lift etc., Complete.

18

19

1367.00

3.00

MT

Under Normal Condition

MT

Transport & erection of Double pole structure including


tightening, punching of bolts and nuts, transport from
road side to workspot, cost of all T&Ps labour lead, lift
etc., Complete.
Transporting and hoisting of ordinary / Anifog disc
insulator strings and fitting including transport, cost of
T&Ps all labour charges leads, lifts etc., complete .

20

501

Set

Single suspension insulator stringing consisting of 13 Nos


90KN ordinary/Antifog disc insulators

27

Price Schedule for 230 KV lines associated with Karuvalur 230 KV SS in


Coimbatore Region. SCHEDULE VI (Labour for erection)
Sl
No.

Qty

Unit

Description

759

Set

Single tension
insulator stringing consisting of 14 Nos
120KN ordinary/Antifog disc insulators

18

set

set

Stringing of 6 nos LL-ACSR/AS 490


conductor
including paying out, rough sagging, tensioning using
tensioner/puller as per specification, clipping, jumpering,
fixing of dampers , transport including cost of all T&Ps,
labour lead and lifts etc., complete

21

span

For single span under Normal condition


Stringing of 6 nos Zebra conductor including paying
out, rough sagging, tensioning using tensioner/puller as
per specification, clipping, jumpering, fixing of dampers
, transport including cost of all T&Ps, labour lead and lifts
etc., complete

22

Double tension insulator stringing consisting of 15 Nos


120KN ordinary/Antifog disc insulators under Normal
condition
Double suspension
insulator stringing consisting of 13
Nos 90KN ordinary/Antifog disc insulators under Normal
condition

5.00

KM

span

For Multi span


For single span cut point for Railway crossing
Stringing of 3 nos LL-ACSR/AS 490 conductor
including paying out, rough sagging, tensioning using
tensioner/puller as per specification, clipping, jumpering,
fixing of dampers , transport including cost of all T&Ps,
labour lead and lifts etc., complete

23

span

For single span Terminal tower to take off structure


Stringing of 3 nos Zebra conductor including paying
out, rough sagging, tensioning using tensioner/puller as
per specification, clipping, jumpering, fixing of dampers
, transport including cost of all T&Ps, labour lead and lifts
etc., complete

24

31.00

KM

For Multi span

44

span

For single span under Normal condition

11

span

For single span under LC condition.

span

For single span for jumper span

28

Price Schedule for 230 KV lines associated with Karuvalur 230 KV SS in


Coimbatore Region. SCHEDULE VI (Labour for erection)
Sl
No.

Qty

25

Unit

span

Description
Labour charges for releasing and restringing of 3 Nos of
old ACSR Kundha conductor including rough sagging,
clipping, fixing dampers, jumpers T&P, lead, lift etc,
complete under L.C. condition
Transport and paying out, rough sagging, tensioning of
one No 7/3.55 mm HTGS earth wire as per specification ,
clipping, jumpering, labour charges including cost of
T&Ps labour lead, lifts, etc., complete

26

29.00

KM

27

span

For single span under Normal condition

11

span

For single span under LC condition.

27

For Multi span

span

Labour charges for releasing and restringing of 1 No. of


GI Earthwire holding with clamp,restringing to the newly
erected tower including rough sagging, clipping, fixing
vibration dampers, jumpers T&P, labour, lead, lift etc,
complete under L.C. condition

28

174215.00

Nos

Tack welding of all bolts and nuts 1 cm on both sides from


ground level to the bottom cross arm level of erected
towers and painting the nuts after welding (Welded
portion) with 2 coats of best quality cold galvanising paint
having atleast 90% of zinc content as approved by the
Engineers at site which includes cost of all T&P's required
for welding , labour, lead and lift etc., complete (welding
of one bolt and nut comprises three tacks of weld)

29

254507.00

M2

Clearing juliflora jungle with uprooting including all cost of


labour,lead,lift etc., complete.

30

565

Nos

Labour Charges for cutting and removing small palmyrah /


Coconut stumps and other trees as per
standard
specification complete in all respects

Nos

Labour Charges for cutting and removing large palmyrah /


Coconut stumps and other trees as per
standard
specification complete in all respects

31

1000

29

Price Schedule for 230 KV lines associated with Karuvalur 230 KV SS in


Coimbatore Region. SCHEDULE VI (Labour for erection)
Sl
No.

32

33

Qty

222.00

122

Unit

Description

Each

Providing temporary stay during rough sagging and


tensioning including necessary excavation for burying RSJ
cut bits/ concrete block with pipe turn buckle/ concreting
the anchor in slushy area fixing stay wire and turn
buckle, refilling and removal of stays after tensioning
including cost of all materials, labour, leads, lifts, etc.,
complete.

Nos

Arranging and availing shutdown on HT/LT, dismantling


and restringing of HT/LT lines to the original position after
stringing operation including all labour charges , T&Ps,
etc., complete.
Providing special type trussles for P&T, road crossing with
all lead litt etc., complete in all respects.

34
a

13

Nos

2 Legged trussles for Railway crossing/Major road


crossings

Nos

Single Legged trussles for Minor road crossings

Nos

Providing Pipe type earthing for tower location including


extra excavation in foundation of towers for fixing 3m
long 25mm dia GI "B" class earth pipe using 7/3.55mm
earth wire of 2.40m long with lugs on both terminals for
connecting the GI pipe with tower leg refilling with
excavated earth mixed with salt and charcoal as per
standard specification including cost of 25mm GI B class
pipe , other materials, transport all labour leads and lifts,
etc., complete.

Loc

Providing earthing in terminal tower as per standard


specification by providing 150mm dia bore hole for a
depth of 3.6m and placing of GI pipes 50 mm dia GI "C"
class 3m long into the bore including cost of 600 mm dia
RCC collar placing over the earth pipe and connecting the
earth pipe and tower leg using 7/3.55 mm GI earth wire
with lugs including lowering of earth wire from peak of
tower to the bottom and connecting to the pipe and
fixing necessary GI clamp etc., including cost of GI pipe,
drilling of bore cost of all lead and lifts etc., complete.

35

36

129

30

Price Schedule for 230 KV lines associated with Karuvalur 230 KV SS in


Coimbatore Region. SCHEDULE VI (Labour for erection)
Sl
No.
37

38

39

Qty

50.00

18.00

133

Unit

Description

Labour charges for earthwork excavation to a depth of


0.75 m and burrying the earthwire from DP to DP and DP
to tower, backfilling the excavated earth as instructed by
the engineer at site including all lead,lift etc. complete

M3

PCC 1:2:4 using 12 to 20mm HBG metal for muffing and


coping including cost of all materials labour,form work and
plastering in CM 1:3,12mm thick, all lead lift etc.,
complete.

Loc

Painting tower legs with two coats of good quality


anticorrosive black paint, two coats, 1m above coping
concrete including cost of all materials labour lead lift
complete.
Supplying and fixing of the following item including cost of
all materials, labour, lead and lift etc., complete.

40
a

133

Nos

Number Plate 200mm x 200 mm

64

Nos

Phase Board containing 3 nos phase plates with colour


sequence

64

Nos

Danger Board 500mm x 500mm

42

Nos

Name Board 900mm x 450mm

330

Nos

20mm dia hanger rod

250

Nos

16mm dia U bolts

280

Kg

16mm Dia D shackle

Hrs

Providing Lighting arangements With Genset during tower


erection and stringing works at night hours including cost
of fuel, labour, tansport, hire charges for Genset all lead
and lift etc.,complete.

41

300

31

Price Schedule for 230 KV lines associated with Karuvalur 230 KV SS in


Coimbatore Region. SCHEDULE VI (Labour for erection)
Sl
No.

Qty

42

43

600

Unit

Set

RM

Description
Preparation and submission of Project Report - 5 sets in
hard copy "AS BUILT" such as Key plan ,tower schedule
,approch road details for inerior towers,
EHTcrossing/Railway/NH/Major Road crossing,Tower
footing resistance, Longitude & Latitude details of towers
and other relevant details with a soft copy in CD
etc.,complete.
Providing counter poise type earthing wherever necessary
for tower location including earth work excavation for
burrying the earth wire around the tower and connecting
with all the tower leg refilling with excavated earth mixed
with salt and charcoal as per standard specification
including cost of lugs for connection arrangement all
other materials, transport all labour leads and lifts, etc.,
complete.
Final checking of newly erected tower line to verify the
erection of all tower members and using correct size of
bolts and nuts , hardware fittings , insulators with cotter
pin ,arching horns as per the Standard requirement and
providing the necessary vehicle arrangement and Tools
and plants to the TANTRANSCO authorised persons
before commissioning of the line

44

133

Loc.

For Tower
Final checking of conductor/earthwire along the line along
with department staff including cost of T & P's, transport
providing the necessary vehicle arrangement and all other
incidental charges etc., complete before commissioning of
the line.

45

45.00

KM

For Line

32

Price Schedule for 110 KV lines associated with Karuvalur 230 KV SS in


Coimbatore Region. SCHEDULE VII ( Supply of Material )
Sl
No.

Qty

Unit

Description

742.00

MT

Fabrication and supply of GI Tower Parts/ D.P


structure as per specification including cost of all
materials, labour, leads, and lifts etc., complete.

43.00

MT

Fabrication and supply of Multi Circuit Tower Parts of


High tensile Steel (HTS) as per specification including
cost of all materials, labour, leads, and lifts etc.,
complete.

36.00

MT

Hot dip galvanised bolts and nuts as per IS


conforming to latest issue and as detailed in the
specification (Various size)

125.00

KM

Supply of PANTHER ACSR conductor, as per IS


specifications and standards

35.00

Km

Supply of LL- ACSR/AS 240 sq.mm conductor, as


per IS specifications and standards

23.00

MT

2384

nos

90KN Disc insulator (Ordinary )

794

nos

90KN Disc Insulator (Anti fog)

4957

nos

120KN Disc insulator (Ordinary)

1652

nos

120KN Disc Insulator (Anti fog )

Supply of GI Earthwire of 7/3.55 mm as per IS


specifications
Supply of disc insulator confirming to latest issue
of IS specification

Supply of hardwares as per IS conforming to


latest issue suitable for LL conductor ACSR /AS
240 Sq.mm

8
a

88

set

Single suspension fittings

237

set

Single Tension fittings


33

Price Schedule for 110 KV lines associated with Karuvalur 230 KV SS in


Coimbatore Region. SCHEDULE VII ( Supply of Material )
Sl
No.

Qty

Unit

Description
Supply of hardwares as per IS conforming to
latest issue suitable for Panther conductor

9
a

410

set

Single suspension fittings

601

set

Single Tension fittings


Supply of conductor accessories as per relevant IS
of latest issue suitable for LL conductor ACSR
/AS 240 Sq.mm

10
a

26

set

Mid span compression joints

16

set

Repair sleeve

234

set

Vibration dampers

24

set

Armour rod
Supply of conductor accessories as per relevant IS
of latest issue suitable for Panther conductor

11
a

97

set

Mid span compression joints

87

set

Repair sleeve

594

set

Vibration dampers

201

set

Armour rod
Supply of Earth wire accessories as per relevant
IS of latest issue suitable for 7/3.55mm HTGS
earth wire

12
a

63

set

Suspension fittings

179

set

Tension fitting

25

set

Mid span comprression joints

234

set

Aluminium Earth bond

34

Price Schedule for 110 KV lines associated with Karuvalur 230 KV SS in


Coimbatore Region. SCHEDULE VIII ( Labour for erection )
Sl
No.
1

Qty

151

200

Unit

Description

Loc

Check survey , pit marking for tower foundation


including cutting of light & heavy jungles,cost of
all T&Ps transport labour, lead and lift, etc.,
complete.

Hrs

Hire charges for Earthmoving equipment (JCB


,Backhoe ) for clearing rubbish,levelling the site
,including cost of hire charges,fuel charges ,all
labour lead and lift etc. complete.

Earth work excavation including dewatering , cost


of all labour, with initial lead
and lift,etc.,
complete.

6125.00

m3

In Hard stiff clay,block cotton soil , hard red earth


shales murrams, gravel, stoney earth , earth
mixed 50% fair sized boulders , hard gravelly soil ,
sand or other loose soils, silt, sandy loom and
ordinary soil etc.,complete.

3060.00

m3

In soft disintegrated rock not requiring blasting.

3060.00

m3

In Medium & dense medium rock not requiring


blasting

3063.00

m3

Removal of hard rock by wedging & chiseling/


using compressor and jack hammer.

nos

Providing Grout holes 40 mm dia , 600mm depth


in hard rock wherever necessary including cost of
all machineries, dewatering, labour, lead and
lift,etc.,complete.

nos

Cement grouting for anchor rods, including all


cost of materials, dewatering, labour charges
using special tools and plants such as air
compressor/pump etc., complete (excluding cost
of rod )

1776

1776

35

Price Schedule for 110 KV lines associated with Karuvalur 230 KV SS in


Coimbatore Region. SCHEDULE VIII ( Labour for erection )
Sl
No.

Qty

8811.00

Unit

Description

m2

Providing shoring and shuttering with country


wood planks/steel sheets for tower foundation ,
including cost of all materials, transport ,T&Ps
,dewatering charges, labour lead and lift, etc.,
complete.
Transport of Template, stub & cleat, assembling,
dismantling after concreting and shifting from
location to location including cost of all T&P's,
labour, dewatering, lead and lift, etc., complete.

60

Loc

GCR type with or without extension

36

Loc

HCR type with or without extension

43

Loc

KCR type with or without extension

Loc

KCO type with or without extension

Loc

LSR type with or without extension

Loc

MA type with or without extension

Loc

MC type with or without extension

Loc

MD type with or without extension

m3

P.C.C.1:3:6 using 40mm metal for foundation


without form work including cost of all materials,
dewatering charges , labour, lead and lift etc.,
complete

m3

P.C.C.1:3:6 using 40mm metal for foundation with


form work including cost of all materials,
dewatering charges , labour, lead and lift etc.,
complete

m3

P.C.C.1:3:6 using 12 to 20mm metal for


foundation without form work including cost of all
materials, dewatering charges , labour, lead and
lift etc., complete

10

428.00

29.00

225.00

36

Price Schedule for 110 KV lines associated with Karuvalur 230 KV SS in


Coimbatore Region. SCHEDULE VIII ( Labour for erection )
Sl
No.
11

Qty

5.00

Unit

Description

m3

P.C.C.1:3:6 using 12 to 20mm metal for


foundation with form work including cost of all
materials, dewatering charges , labour, lead and
lift etc., complete
PCC 1:2:4 using 12 to 20 mm HBG metal including
cost of all materials, labour, curing, form box,
dewatering, lead and lift, etc., complete. Without
form box

12
a

74.00

m3

Machine Mix concrete

6.00

m3

Ready Mix concrete


PCC 1:2:4 using 12 to 20 mm HBG metal
including cost of all materials, labour, curing, form
box,dewatering , lead and lift, etc., complete with
form box.

13
a

1235.00

m3

Machine Mix concrete

408.00

m3

Ready Mix concrete


Providing RCC 1:1.5:3 Grade using 12 to 20 mm HBG
metal for foundation with steel form work including
cost of cement, all materials, curing, labour, lead and
lift etc., complete

14
a

632.00

m3

Machine Mix concrete

209.00

m3

Ready Mix concrete

MT

Providing steel reinforcement/grout rods and


placing in position including cost of reinforcement,
binding wire, including cost of all materials,
labours, lead and lift, etc., complete.

m3

Refilling the foundation with excavated earth other


than sand in layers of 150mm thick, spreading
excess earth, watering, consolidation as per
standard speclification including all labour charges
lead and lifts, etc., complete.

m3

Removal of surplus earth wherever necessary


including transport up to 2 km away from the site,
loading and unloading etc., complete.

15

16

17

84.00

12236.00

2801.00

37

Price Schedule for 110 KV lines associated with Karuvalur 230 KV SS in


Coimbatore Region. SCHEDULE VIII ( Labour for erection )
Sl
No.

Qty

Unit

Transport & erection of tower parts including


sorting out of tower parts at site, tightening,
punching of bolts and nuts, including transport
charges, cost of T&Ps labour lead, lift etc.,
Complete.

18

a
19

730.00
18.00

MT
MT

20

Description

486

798

Under Normal Condition


Transport & erection of Double pole structure
including tightening, punching of bolts and nuts,
transport from road side to workspot, cost of all
T&Ps labour lead, lift etc., Complete.
Transport and hoisting of ordinary / Anifog disc
insulator strings and fitting including transport,
cost of T&Ps all labour charges leads, lifts etc.,
complete .

set

Labour charges for hoisting of Single suspension


insulator string consisting of 7 Nos 90KN
ordinary/Antifog disc insulators under Normal
condition

set

Labour charges for hoisting of Single tension


insulator string consisting of 8 Nos 120KN
ordinary/Antifog disc insulators under Normal
condition
Stringing of 6 nos LL-ACSR/AS 240 conductor
including paying out, rough sagging, tensioning
using tensioner/puller as per specification,
clipping, jumpering,
fixing
of
dampers ,
transport including cost of all T&Ps, labour lead
and lifts etc., complete

21

3.00

KM

13

span

span

For Multi span


For single span
For single span under LC condition

38

Price Schedule for 110 KV lines associated with Karuvalur 230 KV SS in


Coimbatore Region. SCHEDULE VIII ( Labour for erection )
Sl
No.

Qty

Unit

Description
Stringing of 6 nos ACSR Panther conductor
including paying out, rough sagging, tensioning
using tensioner/puller as per specification,
clipping, jumpering, fixing of dampers ,
transport including cost of all T&Ps, labour lead
and lifts etc., complete

22

5.00

KM

For Multi span

span

For single span

span

Labour charges for releasing and restringing of 3


Nos of old ACSR Panther conductor including
rough sagging, clipping, fixing vibration dampers,
jumpers T&P, lead, lift etc, complete under L.C.
condition

23

Stringing of 3 nos ACSR Panther conductor


including paying out, rough sagging, tensioning
using tensioner/puller as per specification,
clipping, jumpering,
fixing
of
dampers ,
transport including cost of all T&Ps, labour lead
and lifts etc., complete

24

19.00

KM

26

span

For single span

12

span

For single span cut ( from tower to DP and DP to


DP )

span

For single span (for jumper span )

span

Stringing of 3 nos LL-ACSR/AS 240


conductor including paying out, rough sagging,
tensioning
using
tensioner/puller
as
per
specification, clipping, jumpering,
fixing
of
dampers , transport including cost of all T&Ps,
labour lead and lifts etc., complete
For single span (for jumper span )

25

For Multi Span

39

Price Schedule for 110 KV lines associated with Karuvalur 230 KV SS in


Coimbatore Region. SCHEDULE VIII ( Labour for erection )
Sl
No.

Qty

Unit

Transport and paying out, rough sagging,


tensioning of one No 7/3.55 mm HTGS earth wire
as per specification, clipping, jumpering, labour
charges including cost of T&Ps labour lead, lifts,
etc., complete

26

27.00

KM

46

span

27

Description

For Multi span


For single span
For single span ( under LC condition )

span

Labour charges for releasing and restringing of 1


No. of GI Earthwire including rough sagging,
clipping, fixing vibration dampers, jumpers T&P,
lead, lift etc, complete under L.C. condition

28

99039

nos

Tack welding of all bolts and nuts 1 cm on both


sides from ground level to the bottom cross arm
level of erected towers and painting the nuts after
welding (Welded portion) with 2 coats of best
quality cold galvanising paint having atleast 90%
of zinc content as approved by the Engineers at
site which includes cost of all T&P's required for
welding , labour, lead and lift etc., complete
(welding of one bolt and nut comprises three tacks
of weld)

29

285083.00

m2

Clearing juliflora jungle with uprooting including all


cost of labour,lead,lift etc., complete

30

1000

nos

Labour Charges for cutting and removing small


palmyrah / Coconut stumps and other trees in all
respects

31

600

nos

Labour Charges for cutting and removing large


palmyrah / Coconut stumps and other trees in all
respects

40

Price Schedule for 110 KV lines associated with Karuvalur 230 KV SS in


Coimbatore Region. SCHEDULE VIII ( Labour for erection )
Sl
No.

32

33

34

Qty

460

79

Unit

Description

nos

Providing temporary stay during rough sagging


and tensioning including necessary excavation for
burying RSJ cut bits/ concrete block with pipe turn
buckle/ concreting the anchor in slushy area
fixing stay wire and turn buckle, refilling and
removal of stays after tensioning including cost of
all materials, labour, leads, lifts, etc., complete.

nos

Arranging and availing shutdown


on HT/LT,
dismantling and restringing of HT/LT lines to the
original position after stringing operation including
all labour charges, T&Ps, etc., complete.

nos

Arranging road block for stringing of power


conductor and earth wire across major road/
Railway crossing including cost of sign boards and
all incidental charges etc.,complete.
Providing special type trussles for P&T, road
crossing with all lead litt etc., complete in all
respects.

35
a

nos

2 Legged trussles for Railway crossing/Major road


crossings

17

nos

Single Legged trussles for Minor road crossings

nos

Providing Pipe type earthing for tower location


including extra excavation in foundation of towers
for fixing 3m long 25mm dia GI "B" class earth
pipe using 7/3.55mm earth wire of 2.40m long
with lugs on both terminals for connecting the GI
pipe with tower leg refilling with excavated earth
mixed with salt and charcoal as per standard
specification including cost of 25mm GI B class
pipe , other materials, transport all labour leads
and lifts, etc., complete.

36

155

41

Price Schedule for 110 KV lines associated with Karuvalur 230 KV SS in


Coimbatore Region. SCHEDULE VIII ( Labour for erection )
Sl
No.

Qty

Unit

Providing
earthing in terminal tower as per
standard specification by providing 150mm dia
bore hole for a depth of 3.6m and placing of GI
pipes 50 mm dia GI "C" class 3m long into the
bore including cost of 600 mm dia RCC collar
placing over the earth pipe and connecting the
earth pipe and tower leg using 7/3.55 mm GI
earth wire with lugs including lowering of earth
wire from peak of tower to the bottom and
connecting to the pipe and fixing necessary GI
clamp etc., including cost of GI pipe, drilling of
bore cost of all lead and lifts etc., complete.

37

38

39

40

Description

440.00

110.00

147

Loc

For terminal tower

RM

Labour charges for earthwork excavation to a


depth of 0.75 m and burrying the earthwire from
DP to DP and DP to tower, backfilling the
excavated earth as instructed by the engineer at
site including all lead,lift etc. complete

m3

PCC 1:2:4 using 12 to 20mm HBG metal for


muffing and coping including cost of all materials
labour,form work and plastering in CM 1:3,12mm
thick, all lead lift etc., complete.

Loc

Painting with good quality anticorrosive black


paint, two coats, 1m above coping concrete
including cost of all materials labour lead lift
complete.
Supplying and fixing of the following item
including cost of all materials, labour, lead and
lift etc., complete.

41
a

147

nos

Number Plate 200mm x 200 mm

70

nos

Phase Board containing 3 nos phase plates with


colour sequence

70

nos

Danger Board 500mm x 500mm

42

Price Schedule for 110 KV lines associated with Karuvalur 230 KV SS in


Coimbatore Region. SCHEDULE VIII ( Labour for erection )
Sl
No.

Qty

Unit

50

nos

Name Board 900mm x 450 mm

210

nos

20mm dia hanger rod

300

nos

16mm dia U Bolt

500

nos

16mm dia D Shackle

100

Kg

Supply of various sizes of bolts and nuts,Eye bolts


and other G.I.Washers,etc.,

42

920.00

RM

43

4736.00

m3

44

45

46

150

600

Description

Providing weep holes in PCC retaining wall using 50


mm dia PVC pipe including
cost of all
material,lead,labour for cutting and fixing etc.,
complete.
Filling with good quality earth of approved quality for
revetment including cost of all materials, labour
charges, curing, lead, lift, etc., complete.

Hrs

Providing Lighting arrangements with Genset


during tower erection and stringing works at night
hours including cost of fuel, labour, transport, hire
charges for Genset all lead and lift etc.,complete.

set

Preparation and submission of Project Report - 5


sets in hard copy "AS BUILT" such as Key plan
,tower schedule ,approach road details for interior
towers, EHTcrossing/Railway/NH/Major Road
crossing,Tower footing resistance, Longitude &
Laittude details of towers and other relavant
details with a soft copy in CD etc.,complete.

RM

Providing counter poise type earthing wherever


necessary for tower location including earth work
excavation for burrying the earth wire around the
tower and connecting with all the tower leg
refilling with excavated earth mixed with salt and
charcoal as per standard specification including
cost of lugs for connection arrangement all other
materials, transport all labour leads and lifts, etc.,
complete.

43

Price Schedule for 110 KV lines associated with Karuvalur 230 KV SS in


Coimbatore Region. SCHEDULE VIII ( Labour for erection )
Sl
No.

Qty

Unit

Final checking of newly erected tower line to


verify the erection of all tower members and
using correct size of bolts and nuts , hardware
fittings , insulators with cotter pin ,arching horns
as per the Standard requirement and providing the
necessary vehicle arrangement and Tools and
plants to the TANTRANSCO authorised persons
before commissioning of the line

47

147

Loc

For Tower
Final checking of conductor/earthwire along the
line along with department staff including cost of
T & P's, transport providing the necessary vehicle
arrangement and all other incidental charges etc.,
complete before commissioning of the line.