Professional Documents
Culture Documents
CHENNAI
BIDDING DOCUMENT FOR
ERECTION OF 230KV AND 110KV LINES ASSOCIATED WITH
POIYUR 230KV AIS SUBSTATION(SS) IN TIRUCHY REGION AND
KARUVALUR
230KV AIS SUBSTATION(SS) IN COIMBATORE
REGION ON TOTAL TURNKEY BASIS .
.
(PACKAGE NO.29 )
JAPANESE ODA LOAN No. No ID-P224
VOLUME- III
PRICE SCHEDULE
TABLE OF CONTENTS
Price Schedule for 230 KV & 110 KV lines associated with
Poiyur 230 KV SS in Trichy Region
Schedule
Schedule
PRICE SCHEDULE
Price Schedule for 230 KV lines associated with Poiyur 230 KV SS in
Trichy Region SCHEDULE I (SUPPLY OF MATERIAL)
Sl
No.
Quantity
Unit
Description
405.00
MT
18.00
MT
71.00
Km
7.00
MT
5
a
1752
Nos
1168
Nos
3138
Nos
2092
Nos
6
a
222
Set
322
Set
25
Set
36
Set
26
Set
Repair sleeve
342
Set
Vibration dampers
126
Set
8
a
22
Set
Suspension fitting
57
Set
Tension fitting
Set
78
Set
Price Schedule for 230 KV lines associated with Poiyur 230 KV SS in Trichy
Region
Schedule II (Labour for erection)
Sl.No.
Qty
49
100
Unit
Description
Loc
Hrs
2505.00
M3
1253.00
M3
1252.00
M3
1253.00
M3
Nos
Nos
100
100
Price Schedule for 230 KV lines associated with Poiyur 230 KV SS in Trichy
Region
Schedule II (Labour for erection)
Sl.No.
Qty
4391.00
Unit
M2
Description
Providing shoring and shuttering with country
wood planks/steel sheets for tower foundation ,
including cost of all materials, transport ,T&Ps
,dewatering charges, labour lead and lift, etc.,
complete.
Transport of Template, stub&cleat, assembling,
dismantling after concreting and shifting from
location to location including cost of all T&P's,
labour, dewatering,lead and lift, etc., complete.
21
Loc
11
Loc
11
Loc
Loc
153.00
M3
92.00
M3
M3
10
42.00
11
52.00
M3
35.00
M3
Price Schedule for 230 KV lines associated with Poiyur 230 KV SS in Trichy
Region
Schedule II (Labour for erection)
Sl.No.
Qty
Unit
Description
PCC 1:2:4 using 12 to 20 mm HBG metal including
cost of all materials, labour, curing, form
box,dewatering , lead and lift, etc., complete.with
form box
12
200.00
M3
133.00
M3
13
I
a
M3
II
a
227.00
M3
14
32.00
MT
15
147.00
Nos
16
1488.00
M3
M3
17
5384.00
Price Schedule for 230 KV lines associated with Poiyur 230 KV SS in Trichy
Region
Schedule II (Labour for erection)
Sl.No.
Qty
18
877.00
Unit
M3
19
Description
383.00
MT
20
219
Set
318
Set
Single tension
insulator string consisting of 14
Nos 120KN ordinary/Antifog disc insulators
24
Set
Single tension
insulator string consisting of 15
Nos 120KN ordinary/Antifog disc insulators
Stringing of 6 nos Zebra/ LL-ACSR/AS 490
conductor including paying out, rough sagging,
tensioning
using
tensioner/puller
as
per
specification, clipping, jumpering,
fixing
of
dampers , transport including cost of all T&Ps,
labour lead and lifts etc., complete
21
8.00
KM
10
span
span
Price Schedule for 230 KV lines associated with Poiyur 230 KV SS in Trichy
Region
Schedule II (Labour for erection)
Sl.No.
Qty
Unit
span
23
22
Description
span
span
24
8.00
KM
10
span
span
span
25
span
Price Schedule for 230 KV lines associated with Poiyur 230 KV SS in Trichy
Region
Schedule II (Labour for erection)
Sl.No.
Qty
Unit
Description
26
58550
Nos
27
82850
M2
28
500
Nos
29
300
Nos
Each
Nos
Nos
30
31
32
33
196
16
Price Schedule for 230 KV lines associated with Poiyur 230 KV SS in Trichy
Region
Schedule II (Labour for erection)
Sl.No.
Qty
Unit
Nos
Nos
Nos
Loc
Providing
earthing in terminal tower as per
standard specification by providing 150mm dia
bore hole for a depth of 3.6m and placing of GI
pipes 50 mm dia GI "C" class 3m long into the bore
including cost of 600 mm dia RCC collar placing
over the earth pipe and connecting the earth pipe
and tower leg using 7/3.55 mm GI earth wire with
lugs including lowering of earth wire from peak of
tower to the bottom and connecting to the pipe
and fixing necessary GI clamp etc., including cost
of GI pipe, drilling of bore cost of all lead and lifts
etc., complete.
Loc
34
35
36
45
Description
Price Schedule for 230 KV lines associated with Poiyur 230 KV SS in Trichy
Region
Schedule II (Labour for erection)
Sl.No.
37
38
Qty
49.00
49
Unit
Description
M3
Loc
39
a
49
Nos
30
Nos
30
Nos
20
Nos
126
Nos
150
Nos
40
41
42
262.00
100
Hrs
Set
10
Price Schedule for 230 KV lines associated with Poiyur 230 KV SS in Trichy
Region
Schedule II (Labour for erection)
Sl.No.
43
Qty
50
Unit
RM
Description
Providing counter poise type earthing wherever
necessary for tower location including earth work
excavation for burrying the earth wire around the
tower and connecting with all the tower leg
refilling with excavated earth mixed with salt and
charcoal as per standard specification including
cost of lugs for connection arrangement all other
materials, transport all labour leads and lifts, etc.,
complete.
Final checking of newly erected tower line to
verify the erection of all tower members and using
correct size of bolts and nuts , hardware fittings ,
insulators with cotter pin ,arching horns as per the
Standard requirement and providing the necessary
vehicle arrangement and Tools and plants to the
TANTRANSCO
authorised
persons before
commissioning of the line
44
49
Loc.
For Tower
Final checking of conductor/earthwire along the
line along with department staff including cost of T
& P's, transport providing the necessary vehicle
arrangement and all other incidental charges etc.,
complete before commissioning of the line.
45
12.00
KM
For Line
11
Price Schedule for 110 KV lines associated with Poiyur 230 KV SS in Trichy Region
Schedule III ( Supply of Materials )
Sl No.
Qty
Unit
483.00
MT
25.00
MT
92.00
Km
15.00
MT
Description
Fabrication and supply of GI Tower Parts/ D.P
structure as per specification including cost of all
materials, labour, leads, and lifts etc., complete.
Hot dip galvanised bolts and nuts as per IS
conforming to latest issue and as detailed in the
specification(Various size)
Supply of LL- ACSR/AS 240 sq.mm conductor, as
per IS specifications and standards
Supply of GI Earthwire of 7/3.55 mm as per IS
specifications
Supply of disc insulator confirming to latest issue of
IS specification
1290
nos
860
nos
2159
nos
1440
nos
6
a
301
set
529
set
13
set
7
a
72
set
47
set
Repair sleeve
534
set
Vibration dampers
144
set
Armour rod
12
Price Schedule for 110 KV lines associated with Poiyur 230 KV SS in Trichy Region
Schedule III ( Supply of Materials )
Sl No.
Qty
Unit
Description
41
set
Suspension fittings
143
set
Tension fitting
20
set
179
set
13
Price Schedule for 110 KV lines associated with Poiyur 230 KV SS in Trichy Region
Schedule IV (Labour for erection)
Sl.No.
Qty
Unit
Description
109
Loc
Hrs
250
3606.00
m3
1801.00
m3
1801.00
m3
1803.00
m3
200
200
7222.00
nos
nos
m2
14
Price Schedule for 110 KV lines associated with Poiyur 230 KV SS in Trichy Region
Schedule IV (Labour for erection)
Sl.No.
Qty
Unit
Description
39
Loc
24
Loc
32
Loc
Loc
169.00
m3
57.00
m3
118.00
m3
79.00
m3
10
11
9.00
m3
1265.00
m3
844.00
m3
12
13
a
71.00
m3
15
Price Schedule for 110 KV lines associated with Poiyur 230 KV SS in Trichy Region
Schedule IV (Labour for erection)
Sl.No.
Qty
Unit
Description
14
333
RM
15
2517.00
m3
16
6403.00
m3
17
2608.00
m3
18
a
19
432.00
27.00
MT
MT
20
300
set
420
set
12
set
16
Price Schedule for 110 KV lines associated with Poiyur 230 KV SS in Trichy Region
Schedule IV (Labour for erection)
Sl.No.
Qty
Unit
Description
Stringing of 6 nos LL-ACSR/AS 240 & Panther
conductor including paying out, rough sagging,
tensioning
using
tensioner/puller
as
per
specification, clipping, jumpering,
fixing
of
dampers , transport including cost of all T&Ps,
labour lead and lifts etc., complete
21
4.00
KM
span
span
22
12
KM
23
span
span
12
span
23
span
span
24
16.00
KM
31
span
span
17
Price Schedule for 110 KV lines associated with Poiyur 230 KV SS in Trichy Region
Schedule IV (Labour for erection)
Sl.No.
25
Qty
Unit
Description
span
26
55350
nos
27
177660.00
m2
28
800
nos
29
350
nos
nos
nos
nos
30
31
32
285
37
18
Price Schedule for 110 KV lines associated with Poiyur 230 KV SS in Trichy Region
Schedule IV (Labour for erection)
Sl.No.
Qty
Unit
33
34
35
107
nos
nos
36
Description
Loc
19
Price Schedule for 110 KV lines associated with Poiyur 230 KV SS in Trichy Region
Schedule IV (Labour for erection)
Sl.No.
Qty
Unit
37
38
Description
540.00
Loc
39
70
m3
40
109
Loc
41
a
109
nos
45
nos
45
nos
30
nos
20
Price Schedule for 110 KV lines associated with Poiyur 230 KV SS in Trichy Region
Schedule IV (Labour for erection)
Sl.No.
Qty
Unit
144
nos
250
nos
250
nos
200
Kg
m3
Hrs
set
RM
42
43
44
45
620.00
250
125
Description
21
Price Schedule for 110 KV lines associated with Poiyur 230 KV SS in Trichy Region
Schedule IV (Labour for erection)
Sl.No.
Qty
Unit
46
109
Loc
For Tower
Final checking of conductor/earthwire along the line
along with department staff including cost of T &
P's, transport providing the necessary vehicle
arrangement and all other incidental charges etc.,
complete before commissioning of the line.
47
Description
24.00
KM
For Line
22
Price Schedule for 230 KV lines associated with Karuvalur 230 KV SS in Coimbatore
Region
Sl No.
Qty
Unit
Description
1194.00
MT
224.00
MT
51.00
MT
170.00
Km
5.00
Km
21.00
MT
7
a
b
c
d
as per IS
5188
1205
7906
2847
Nos
Nos
Nos
Nos
8
a
456
722
21
Set
Set
23
Price Schedule for 230 KV lines associated with Karuvalur 230 KV SS in Coimbatore
Region
Sl No.
Qty
Unit
Description
Supply of hardwares as per IS conforming to latest
issue suitable for LL-ACSR/AS 490 conductor
9
a
19
Set
55
Set
10
a
161
Set
46
Set
Repair sleeve
719
Set
Vibration dampers
239
Set
11
a
16
Set
11
Set
Repair sleeve
54
Set
Vibration dampers
Set
12
a
78
Set
Suspension fitting
130
Set
Tension fitting
66
Set
202
Set
24
Qty
Unit
Description
129
Loc
Hrs
240
10476.00
M3
739.00
M3
6137.00
M3
4339.00
M3
Nos
Nos
1280
1280
2890.00
25
Qty
Unit
Description
Transport
of
Template,
stub&cleat,
assembling,
dismantling after concreting and shifting from location to
location
including cost of all T&P's, labour,
dewatering,lead and lift, etc., complete.
60
Loc
19
Loc
15
Loc
Loc
Loc
Loc
10
Loc
Loc
17
Loc
122.00
M3
17.00
M3
10
498.00
M3
11
1216.00
M3
12
26
Qty
Unit
1324.00
M3
307.00
M3
MT
Nos
13
14
15
168.00
480.00
3450.00
Description
16
17728.00
M3
17
3959.00
M3
18
19
1367.00
3.00
MT
MT
20
501
Set
27
Qty
Unit
Description
759
Set
Single tension
insulator stringing consisting of 14 Nos
120KN ordinary/Antifog disc insulators
18
set
set
21
span
22
5.00
KM
span
23
span
24
31.00
KM
44
span
11
span
span
28
Qty
25
Unit
span
Description
Labour charges for releasing and restringing of 3 Nos of
old ACSR Kundha conductor including rough sagging,
clipping, fixing dampers, jumpers T&P, lead, lift etc,
complete under L.C. condition
Transport and paying out, rough sagging, tensioning of
one No 7/3.55 mm HTGS earth wire as per specification ,
clipping, jumpering, labour charges including cost of
T&Ps labour lead, lifts, etc., complete
26
29.00
KM
27
span
11
span
27
span
28
174215.00
Nos
29
254507.00
M2
30
565
Nos
Nos
31
1000
29
32
33
Qty
222.00
122
Unit
Description
Each
Nos
34
a
13
Nos
Nos
Nos
Loc
35
36
129
30
38
39
Qty
50.00
18.00
133
Unit
Description
M3
Loc
40
a
133
Nos
64
Nos
64
Nos
42
Nos
330
Nos
250
Nos
280
Kg
Hrs
41
300
31
Qty
42
43
600
Unit
Set
RM
Description
Preparation and submission of Project Report - 5 sets in
hard copy "AS BUILT" such as Key plan ,tower schedule
,approch road details for inerior towers,
EHTcrossing/Railway/NH/Major Road crossing,Tower
footing resistance, Longitude & Latitude details of towers
and other relevant details with a soft copy in CD
etc.,complete.
Providing counter poise type earthing wherever necessary
for tower location including earth work excavation for
burrying the earth wire around the tower and connecting
with all the tower leg refilling with excavated earth mixed
with salt and charcoal as per standard specification
including cost of lugs for connection arrangement all
other materials, transport all labour leads and lifts, etc.,
complete.
Final checking of newly erected tower line to verify the
erection of all tower members and using correct size of
bolts and nuts , hardware fittings , insulators with cotter
pin ,arching horns as per the Standard requirement and
providing the necessary vehicle arrangement and Tools
and plants to the TANTRANSCO authorised persons
before commissioning of the line
44
133
Loc.
For Tower
Final checking of conductor/earthwire along the line along
with department staff including cost of T & P's, transport
providing the necessary vehicle arrangement and all other
incidental charges etc., complete before commissioning of
the line.
45
45.00
KM
For Line
32
Qty
Unit
Description
742.00
MT
43.00
MT
36.00
MT
125.00
KM
35.00
Km
23.00
MT
2384
nos
794
nos
4957
nos
1652
nos
8
a
88
set
237
set
Qty
Unit
Description
Supply of hardwares as per IS conforming to
latest issue suitable for Panther conductor
9
a
410
set
601
set
10
a
26
set
16
set
Repair sleeve
234
set
Vibration dampers
24
set
Armour rod
Supply of conductor accessories as per relevant IS
of latest issue suitable for Panther conductor
11
a
97
set
87
set
Repair sleeve
594
set
Vibration dampers
201
set
Armour rod
Supply of Earth wire accessories as per relevant
IS of latest issue suitable for 7/3.55mm HTGS
earth wire
12
a
63
set
Suspension fittings
179
set
Tension fitting
25
set
234
set
34
Qty
151
200
Unit
Description
Loc
Hrs
6125.00
m3
3060.00
m3
3060.00
m3
3063.00
m3
nos
nos
1776
1776
35
Qty
8811.00
Unit
Description
m2
60
Loc
36
Loc
43
Loc
Loc
Loc
Loc
Loc
Loc
m3
m3
m3
10
428.00
29.00
225.00
36
Qty
5.00
Unit
Description
m3
12
a
74.00
m3
6.00
m3
13
a
1235.00
m3
408.00
m3
14
a
632.00
m3
209.00
m3
MT
m3
m3
15
16
17
84.00
12236.00
2801.00
37
Qty
Unit
18
a
19
730.00
18.00
MT
MT
20
Description
486
798
set
set
21
3.00
KM
13
span
span
38
Qty
Unit
Description
Stringing of 6 nos ACSR Panther conductor
including paying out, rough sagging, tensioning
using tensioner/puller as per specification,
clipping, jumpering, fixing of dampers ,
transport including cost of all T&Ps, labour lead
and lifts etc., complete
22
5.00
KM
span
span
23
24
19.00
KM
26
span
12
span
span
span
25
39
Qty
Unit
26
27.00
KM
46
span
27
Description
span
28
99039
nos
29
285083.00
m2
30
1000
nos
31
600
nos
40
32
33
34
Qty
460
79
Unit
Description
nos
nos
nos
35
a
nos
17
nos
nos
36
155
41
Qty
Unit
Providing
earthing in terminal tower as per
standard specification by providing 150mm dia
bore hole for a depth of 3.6m and placing of GI
pipes 50 mm dia GI "C" class 3m long into the
bore including cost of 600 mm dia RCC collar
placing over the earth pipe and connecting the
earth pipe and tower leg using 7/3.55 mm GI
earth wire with lugs including lowering of earth
wire from peak of tower to the bottom and
connecting to the pipe and fixing necessary GI
clamp etc., including cost of GI pipe, drilling of
bore cost of all lead and lifts etc., complete.
37
38
39
40
Description
440.00
110.00
147
Loc
RM
m3
Loc
41
a
147
nos
70
nos
70
nos
42
Qty
Unit
50
nos
210
nos
300
nos
500
nos
100
Kg
42
920.00
RM
43
4736.00
m3
44
45
46
150
600
Description
Hrs
set
RM
43
Qty
Unit
47
147
Loc
For Tower
Final checking of conductor/earthwire along the
line along with department staff including cost of
T & P's, transport providing the necessary vehicle
arrangement and all other incidental charges etc.,
complete before commissioning of the line.
48
Description
39.50
KM
For Line
44