Objectives of this CPD




The Purpose of measurement and need for a standardised


approach to measuring.

Introduction to CESSM3 including preparation of BOQ based


on CESSM3.

Detail Discussion of Selected CLASSES.

BY
P.A.D Pushpakumara, B.Sc(QS), MRICS, (AIQSSL)
Associate Nabih Azzam & Partners - UAE

30/09/2013

30/09/2013

Standard Method of Measurements


Provides

Why need Measurement ???

POMI

Why need Standard Method of


Measurement ???
X

CESSM3

Principles of measurement provide a uniform


basis for measuring bills of quantities

Forth Procedure according to which the


BOQ shall be prepared and priced and the
quantities of work expressed and measured.

The objects of bills of


quantities are:

The objects of bills of


quantities are:

To assist in the accurate preparation of


tenders, by providing for measurement of
quantities on a uniform basis

To provide such information of the quantities


of work as to enable tenders to be prepared
efficiently and accurately

To provide a basis for the financial control of


a project, in accordance with the conditions
of contract.

When a contract has been entered into, to


provide for use of the priced BOQ in the
valuation of work executed.

30/09/2013

30/09/2013

30/08/2013

Pipe Laying

Features of BOQ as per CESSM3


Work should be itemised with
 Sufficient detail to distinguish between the different
class of work.

Building
150mm dia Pipe

 Sufficient detail to identify same nature of work in


different locations or other circumstances where give
rise to different consideration of cost. Example pipe
laying

Road

How to measure total pipe length ??


One Item or Two Item, Why ??

 Consistent, Simple and brief as possible .


 Work which is expressly required should be covered.

30/09/2013

50m

100m

30/09/2013

CESMM3 SECTIONS

CESMM3 provide.....

How work is to be divided into separate


items in the BOQ

The Information to be given in Item


description

The unit in which the quantities against each


item are to be expressed

Section 1 :- Definitions
Conditions of Contract: - ICE Conditions of Contract
Expressly required (Drawings, Specification, ordered by the Engineer)
work
Original Surface
Commencing Surface
Excavated Surface
Final Surface
Hyphen

How the work is to be measured for the


purpose of calculating quantities. Ex. Pipe
Length.
30/09/2013

Exceeding - Not Exceeding

30/09/2013

30/08/2013

CESMM3 SECTIONS

CESMM3 SECTIONS
 Section 2

Section 3 :- Application of the Work Classification


Item Description

:- General Principles

Only in Connection with civil engineering works and simple building


works incidental to civil engineering works

26 Class
3 Divisions
8 Descriptive features

Mode of Description
Only component of the item and not tasks to be carried out by the
Contractor.
Separate Item
Component of work which is included in each item does not exhibit
more than one feature from each division of any one class of the work
classification.
Unit of measurement
Measurement Rules
Definition Rules
Coverage rules
Additional Description Rules

30/09/2013

CESMM3 SECTIONS


10

CESMM3 SECTIONS


Section 4 :- Coding and Numbering of items

30/09/2013

Class H precast concrete


First division 1
beams
Second division 3
length 7 - 10m
Third division 6
mass 5 - 10t
(H136)
Item Numbers
Symbol
* all numbers in the appropriate division
9 feature is not listed
0 Division is not applicable

Section 5 :- Preparation of the Bill of Quantities

BOQ Sections
List of Principle Items
Preamble
Day work Schedule
Work Items (group into parts)
Grand Summary

Items with Additional Description

30/09/2013

11

30/09/2013

12

30/08/2013

CESMM3 SECTIONS

CESMM3 SECTIONS

Section 5 :- Preparation of the Bill of Quantities


Work Items

Division of the BOQ into parts 5.8


Heading and sub-headings 5.9
Each part of BOQ - Heading
Group of item within each part - sub heading
A line shall be drawn across the item description
column below the last item to which each heading or
sub-heading applies.

30/09/2013

13

Item Description

Unit

30/09/2013

Qty

Rate

Amount
Number

E422

14

CESMM3 SECTIONS

CESMM3 SECTIONS
Number

Extent of itemization and description 5.10


Description 5.11, 5.12,5.13
Ranges of dimensions 5.14

EARTHWORKS
General Excavation
Material other than topsoil,
rock or artificial hard material,
Maximum depth 0.25-0.5m,
commencing surface 0+200.
m3

E621

Item Description

Unit

Qty

Rate

Amount

EARTHWORKS
Filling
Embankments, excavated
top soil
Filling Ancillaries

E423

E522

Material other than topsoil,


rock or artificial hard material,
Maximum depth 0.5-1.0m,
m3
commencing surface 0+200.

E721

Preparation of filled
surface in top soil

Excavation Ancillaries
Preparation of excavated
surface

30/09/2013

15

30/09/2013

16

30/08/2013

CESMM3 SECTIONS

CESMM3 SECTIONS


Section 5 :- Preparation of the Bill of Quantities


Description

Section 5 :- Preparation of the Bill of Quantities

Supply, deliver, take into store, place in position,


temporarily support, thoroughly clean and cast onto in
situ concrete mild steel channels as specified and in
accordance with the Drawings all to the satisfaction of
the Engineer and clear away all rubbish on completion
rate to allow for all delays and any necessary cutting of
formwork and making good

Prime Cost Items 5.15, Nominated Sub Con. work


Provisional Sums Should not increase the quantities
Specific Contingencies shall be given in the general items of
BOQ
General Contingencies in Grand Summary
Adjustment Item Form and Setting-5.22

Mild steel channels in pump house roof beams as detail


E on drawing 137/66
 General summary 5.24, 5.25,5.26, 5.27
30/09/2013

17

CESMM3 SECTIONS


Section 6.0 :- Completion, Pricing and use of the BOQ

Section 7.0 :- Method Related Charges


(Time Related Charges, Fixed Charges)

The Contractor shall not bound to adopt method


Charges not to be measured shall not subject to admeasurements
Payment preamble
Not to change
Section 8.0
Class A-Z
30/09/2013

18

CLASS

Insert by the Tenderer to cover


Items relating to his intended method of execution of the works,
The cost of which are not to be considered as proportional to the
quantities of the other items
for which he has not allowed in the rates and prices of the other
items.

30/09/2013

19

CLASS A GENERAL ITEMS

CLASS B GROUND INVESTIGATION

CLASS C GEOTECHNICAL AND OTHER SPECIAL


PROCESSES

CLASS E EARTHWORKS

CLASS F IN CONCRETE

CLASS G CONCRETE ANCILLARIES

CLASS I PIPE WORK

CLASS J FITTINGS AND VALVES

CLASS K SUPPORT & PROTECTIONS,


ANCILLARIES TO LAYING AND EXCAVATION

CLASS R ROAD WORK


30/09/2013

20

30/08/2013

How to Identify the Items to be


Measured and Related Classes

CLASS A General Items









CONTRACTUAL REQUIREMENTS
SPECIFIED REQUIREMENTS
METHOD RELATED CHARGES
PROVISIONAL SUMS
NOMINATED SUB-CONTRACTS WHICH
INCLUDES WORK ON THE SITE
NOMINATED SUB-CONTRACTS WHICH DO NOT
INCLUDES WORK ON THE SITE

30/09/2013






21








30/09/2013

Ex. 1 Trial pits and Trenches


Mobilization
Excavation
Support
Backfilling
Removal
Provide Record











30/09/2013

22

How to Identify the Items to be


Measured and Related Classes

How to Identify the Items to be


Measured and Related Classes


Need to understand all activities for the


particular item
Identify the relevant class
Read Includes & Excludes of the class
Read DEFINITION RULES and
COVERAGE RULES

23

Ex. 2 Pipe Laying


Excavation
Preparation
Earthwork support
Bedding
Surrounding
Pipes, fittings
Tapes
Wrapping
Backfilling
Disposal

30/09/2013

24

30/08/2013

How to Identify the Items to be


Measured and Related Classes

How to Identify the Items to be


Measured and Related Classes

Ex. 3 Man Hole


 Excavation
 Preparation
 Earthwork support
 Disposal
 Backfilling
 Concrete
 Cover, ladder, etc.
 Pipe work
 Vales

Ex. 4 NDRC Work


 Pits
 Pipes, fittings
 Special method

30/09/2013

25

CLASS B Ground Investigation







26

CLASS C Geotechnical and Other


Specialist Processes

Trail Pits & Trenches


Samples
Site tests & Observations
Laboratory Tests

30/09/2013

30/09/2013

27

DIAPHRAGM
WALL

30/09/2013

28

30/08/2013

CLASS E Earthworks

CLASS E Earthworks
 Excavation Ancillaries

Excavation by Dredging
Excavation for Cutting
Excavation in or under an embankment,
executed prior to placing of fill.
Excavation for Foundation
General Excavation
Excavation from within borrow pits
(M1, M5, M8, M6, D1, C1, C2 )

30/09/2013

Trimming of excavated surfaces


Preparation of excavated surfaces
Disposal of excavated material
Double handling of excavated material
Dredging to remove silt
Excavation of material below the Final Surface and
replacement with stated material
Timber supports left in
Metal supports left in

29

To structures
Embankments
General
To stated depth or thickness

Cut area 1,000 m2


Fill Volume 2,500m3
Fill area 200 m2
Double Handling 2500 m3

Filling Ancillaries

Road

Trimming of filled surfaces


Preparation of filled surfaces
Geotextiles

30/09/2013

30

CLASS E Earthworks
Work Exercise
Site
Cut Volume -15,000m3

CLASS E Earthworks
 Filling

30/09/2013

31

Cut Volume 1,000m3


Cut area in shoulder 60m2
Cut area in Verge 20m2
Fill Volume 4500m3
Fill area in shoulder 200m2
Fill area in verge 100m2
30/09/2013

32

30/08/2013

CLASS F In situ Concrete

CLASS G Concrete Ancillaries

Provision of Concrete
 Placing of Concrete

 For Voids M4, D3


 Constant cross section m
 Cast against excavated surface preparation (M11
of class E) required

In accordance with paragraph 5.10, the


location of concrete members in the Works
may be stated in item descriptions for Placing
concrete where special characteristics may
affect the methods and rate of placing
concrete.

30/09/2013

Reinforcement
 Joints
 Post tensioned pressurising
 Concrete accessories


33

30/09/2013

34

CLASS I Pipe Work

CLASS F & G -Work Exercise

Reinforcement
Wall
12mm dia, 120kg/m3 and
10mm dia 50kg/m3

Foundation
12mm dia, 60kg/m3 and
10mm dia 40kg/m3
Sulphate resistance
cement

Length of wall 50M

30/09/2013

Formwork

35

Length of Pipes M3 and M5


In Trenches include length of fittings
Not In Trenches exclude length of fittings
Depth D3
 Invert level
 Crown level
Items include C1 & C2
Additional Description Rules

30/09/2013

36

30/08/2013

CLASS J Pipe Work - Fittings and


Valves

CLASS J Pipe Work - Fittings and


Valves


Fittings at Backdrop Manholes M1

Coverage rules C1 & C2


Fittings with different bores D1

30/09/2013

37





30/09/2013

Depth of Manhole D2
Coverage C1, C2, C3, C4
Additional Description Rules
Manhole & other chambers may be measured in
detail as set out in other classes of CESMM3.










30/09/2013

38

CLASS L Pipework - Support and


Protection, Ancillaries to
Laying and Excavation

CLASS K Pipework - Manhole and


Pipework Ancillaries


Straight Specials D2 and M2

39

Extra to excavation and backfilling


Special pipe laying methods
Beds
Haunches
Surrounds
Wrapping and lagging
Concrete stool and trust blocks
Other isolated pipe supports
30/09/2013

40

10

30/08/2013

CLASS R Roads and Pavings

CLASS R Roads and Pavings

Sub-base, flexible road base and surfacing


width of each course M1
Deduction for manholes
 Concrete pavements
 Joints in concrete pavements
 Kerbs, Channels and Edging Coverage rule C3
Excavation may include in this class or M8


30/09/2013

Light duty pavements


 Ancillaries


Traffic Signs
 Excavation included

Surface marking

41