POMI
CESSM3
30/09/2013
30/09/2013
30/08/2013
Pipe Laying
Building
150mm dia Pipe
Road
30/09/2013
50m
100m
30/09/2013
CESMM3 SECTIONS
CESMM3 provide.....
Section 1 :- Definitions
Conditions of Contract: - ICE Conditions of Contract
Expressly required (Drawings, Specification, ordered by the Engineer)
work
Original Surface
Commencing Surface
Excavated Surface
Final Surface
Hyphen
30/09/2013
30/08/2013
CESMM3 SECTIONS
CESMM3 SECTIONS
Section 2
:- General Principles
26 Class
3 Divisions
8 Descriptive features
Mode of Description
Only component of the item and not tasks to be carried out by the
Contractor.
Separate Item
Component of work which is included in each item does not exhibit
more than one feature from each division of any one class of the work
classification.
Unit of measurement
Measurement Rules
Definition Rules
Coverage rules
Additional Description Rules
30/09/2013
CESMM3 SECTIONS
10
CESMM3 SECTIONS
30/09/2013
BOQ Sections
List of Principle Items
Preamble
Day work Schedule
Work Items (group into parts)
Grand Summary
30/09/2013
11
30/09/2013
12
30/08/2013
CESMM3 SECTIONS
CESMM3 SECTIONS
30/09/2013
13
Item Description
Unit
30/09/2013
Qty
Rate
Amount
Number
E422
14
CESMM3 SECTIONS
CESMM3 SECTIONS
Number
EARTHWORKS
General Excavation
Material other than topsoil,
rock or artificial hard material,
Maximum depth 0.25-0.5m,
commencing surface 0+200.
m3
E621
Item Description
Unit
Qty
Rate
Amount
EARTHWORKS
Filling
Embankments, excavated
top soil
Filling Ancillaries
E423
E522
E721
Preparation of filled
surface in top soil
Excavation Ancillaries
Preparation of excavated
surface
30/09/2013
15
30/09/2013
16
30/08/2013
CESMM3 SECTIONS
CESMM3 SECTIONS
17
CESMM3 SECTIONS
18
CLASS
30/09/2013
19
CLASS E EARTHWORKS
CLASS F IN CONCRETE
20
30/08/2013
CONTRACTUAL REQUIREMENTS
SPECIFIED REQUIREMENTS
METHOD RELATED CHARGES
PROVISIONAL SUMS
NOMINATED SUB-CONTRACTS WHICH
INCLUDES WORK ON THE SITE
NOMINATED SUB-CONTRACTS WHICH DO NOT
INCLUDES WORK ON THE SITE
30/09/2013
21
30/09/2013
30/09/2013
22
23
30/09/2013
24
30/08/2013
30/09/2013
25
26
30/09/2013
30/09/2013
27
DIAPHRAGM
WALL
30/09/2013
28
30/08/2013
CLASS E Earthworks
CLASS E Earthworks
Excavation Ancillaries
Excavation by Dredging
Excavation for Cutting
Excavation in or under an embankment,
executed prior to placing of fill.
Excavation for Foundation
General Excavation
Excavation from within borrow pits
(M1, M5, M8, M6, D1, C1, C2 )
30/09/2013
29
To structures
Embankments
General
To stated depth or thickness
Filling Ancillaries
Road
30/09/2013
30
CLASS E Earthworks
Work Exercise
Site
Cut Volume -15,000m3
CLASS E Earthworks
Filling
30/09/2013
31
32
30/08/2013
Provision of Concrete
Placing of Concrete
30/09/2013
Reinforcement
Joints
Post tensioned pressurising
Concrete accessories
33
30/09/2013
34
Reinforcement
Wall
12mm dia, 120kg/m3 and
10mm dia 50kg/m3
Foundation
12mm dia, 60kg/m3 and
10mm dia 40kg/m3
Sulphate resistance
cement
30/09/2013
Formwork
35
30/09/2013
36
30/08/2013
30/09/2013
37
30/09/2013
Depth of Manhole D2
Coverage C1, C2, C3, C4
Additional Description Rules
Manhole & other chambers may be measured in
detail as set out in other classes of CESMM3.
30/09/2013
38
39
40
10
30/08/2013
30/09/2013
Traffic Signs
Excavation included
Surface marking
41
42
THANK YOU!