BAB 2
2.1 Plan Risk Management (PRM)
Needs: Project management plan, project charter, stakeholder register
PRM is a roadmap to 5 risk management process:
- Level of risk, how risk managed, who responsible, amount of time and

cost allocated, risk finding communications


Enterprise environmental Factors: conditions not under immediate control,

example: Politics, marketplace, government standards


How to Plan
o Analytical: define stakeholder, allocate resources
o Expert judge
Components of Risk Management
o Methodology
o Roles and responsibles
o Budgeting: how cost contingency occurs
o Timing: when risk management process start
o Risk categories (Risk Breakdown Structure)
Scope Risk
Quality Risk
Schedule Risk
Cost Risk
o Definitions of risk and probability impact
o Probability and impact matrix
o Revised stakeolders tolerance
o Tracking

Universitas Indonesia

BAB 3
3.1 Identify Risk
Steps: identify consequences, eliminate irrelevant issues, list all risk
Risk identification: risk prob x impact : risk event
Source of Risk: External predict and unpredict, internal, technical legal

Needs to identify risk


o
o
o
o

Risk Management Plan


Cost management plan
Schedule management plan
Human resource management

plan
o Activity cost estimates

o
o
o
o
o
o

Activity duration estimates


Stakeholder register
Project document
Procurement documents
EEF
Operational process assets

o
How to identify risk:
o Documentation reviews
o Delphi techniques: consensus of experts
o Interviewing
o Root Cause Analysis
o Pre-Mortem: review past project (similar)
o Cause and effect/ishikawa/fishbone diagram
o System of process flowchart
o Influence diagram
o FMEA (Failure modes and effect analysis): identify potential failure
o
o
o
o

modes, determine effect of each failure and find mitigation


SWOT Analysis
Expert Judgement
Prompt List: categorize risk to type and areas
OUTPUT: RISK REGISTER

Universitas Indonesia

BAB 4

o
4.1 Qualitative Analysis
o
o

Process of prioritizing risk:


o Assign probability: high, medium low
o Assign impact: high, medium, low
o Calculate severity: probability x impact
o
Activities of qualitative analysis
o Determine risk event warrant a response
o Determine probability and impact
o Determine which risk to analyze
o Document non critical risk
o Determine project overall risk ranking
o
Risk probability and impact assessment
o Estimate probability: 10%-90%
o Estimate impact: High, medium, low
o Calculate Severity: probability x impact
o Use severity to identify
o
o
OUTPUT: PROJECT DOCUMENT UPDATES (RISK REGISTER
UPDATES)

BAB 5

o
5.1 Quantitative Analysis
o
o

Numerically analyzing the effect of identified risk on overall project

objectives
o
Key benefit: produce information to support decision making to reduce
project uncertainty. Drawback: expensive, time consuming
o
Activities of quantiatve analysis
o Determine risk warrant a response
o Determine overall project isk
o Determine quantified probability
o Determine cost and schedule reserve
o Create realistic and achievable cost, schedule or scope target
o
Methods of quantitative analysis
o Beta/PERT distribution
o EMV
o Decision Tree
o Sensitivity Analysis: show effect of
changing variables on an outcome
o Monte Carlo: tool for combining distributions, uses random
number generator
o
o
o
o
o
o
o
o
o
o

o
o
o
o
o
o

o
o
6.1 Plan Risk Response
o

BAB 6