Contract No.
NHDC/
Contact
Description
Employer
Contractor
Purpose
Kick-Off meeting
Venue
Date
././2016
Time
..
Present
Sceneries consult Ltd
Designation
NHDC
Contractor
Item
No.
1.
Description
Introduction
the representatives of the Contractor and congratulated them
on being awarded NHDC/0315/
Action
road
in
asphaltic
concrete
2.
Contract Details
Accepted Contract Amount
Inclusive 5% Contingencies
exclusive VAT
275 days
Commencement date + time
of completion
365 days
28 days after defects
certificate
Validity of insurance Covers
notification period
From commencement date to
issue of performance
Performance security
certificate
10% of accepted contract
amount inclusive of
provisional and contingency
sums
3
3.1
Designation
Engineer
Resident Engineer
Project manager
All formal correspondence to be addressed to the General
manager.
The Engineers address for correspondence is
The General Manager
3.2
Contractor
The contractor is .. represented by
The contractors representative is
Contact Details are as follows:
Name
Designation
E-mail
address
.
4
Contractual Issues
4.1
4.2
Insurances
4.3
Performance Security