CONTROL AIR DRYER

Instruction Manual
of
Refrigerated Type Control Air Dryer

306-1 NAEYU-DONG, DEOGYANG-GU, GOYANG-SI, KYONGGI-DO, KOREA


TEL : 031) 963 - 0080 / 963 - 7832 / 962 - 7830 / 962 - 7837
FAX : 031) 962 - 0180

Copyright KYUNG NAM DRYER CO., LTD.

(120725) Final drawing & manual of air dryer

Page : 1 of 6

10/15

CONTROL AIR DRYER

CONTENTS
. INSTALLATION

. OPERATION

. MAINTENANCE

Copyright KYUNG NAM DRYER CO., LTD.

(120725) Final drawing & manual of air dryer

Page : 2 of 6

11/15

CONTROL AIR DRYER


. INSTALLATION
1. LOCATION
(1) THE DRYER SHOULD BE LOCATED 30 TO 50cm AWAY FROM ADJACENT WALLS
FOR GOOD SUCTION AND DISCHARGE AIR THROUGH CONDENSER.
(2) SHOULD BE VENTILATED WELL AS THE DRYER IS EQUIPPED WITH AIR COOLED
CONDENSER.
(3) EVADE DUSTY AREA, RADIATORS AND DO NOT EXPOSE TO DIRECT SUN RAY.
THIS MAY DECREASE THE COOLING CAPACITOR OF THE DRYER.
(4) IF THE AMBIENT AIR TEMPERATURE EXCEEDS 45, INSTALL A DUCT FOR
PRESENTING FRESH AIR.
ESPECIALLY IF THE VESSLE PASSES TORRID ZONE LIKE THE EQUATOR
IT WOULD BETTER INSTALL A EXTRA FAN TEMPORAILY.
(5) FOUNDATION SHOULD BE FLAT, LEVEL AND STRONG ENOUGH.
IF BOLTING DOWN OF THE DRIER IS NEEDED, UTILIZE THE 12MM HOLES
PROVIDED AT THE BASE.
((6)) WHEN INSTALLED OUTDOORS, CARE SHOULD BE TAKEN NOT TO BE EXPOSED TO
RAIN.

THE LOCATION SHOULD BE PROPERLY DRAINED.

2. FIELD PIPING
(1) ATTACHED AUTO DRAIN TRAP TO THE DRAIN OUTLET.
FOR CONNECTION TO FIELD MAIN DRAIN PIPING, USE PIE RUN TUBES.
(2) INSTALL BY PASS VALVE IN THE AIR PIPING.

3. SPECIAL INSTRUCTIONS FOR PROPER PIPING


(1) FIELD PIPING SHOULD NOT BE SMALLER THAN AIR CONNECTION OF THE DRYER.
(2) SHORT RADIUS ELBOWS AND FITTING WHICH CAUSE MUCH PRESSURE DROPING SHOULD
NOT BE USED.
(3) CLEAN THE PIPING BEFORE INSTALLATION.
(4) VIBRATION FROM AIR COMPRESSOR SHOULD NOT BE TRANSMITTED TO THE DRIER.
(5) INSTALL A SUPPORTER PROPERLY SO THAT PIPING WEIGHT SHOULD NOT BE
IMPOSED TO THE DRYER.

4. POWER WIRING
(1) CHECK AVAILABLE CURRENT FOR MATCHING VOLTAGE.
DRYER NAMEPLATE SHOWS THE POWER SOURCE NEEDED.
VOLTAGE SHOULD BE WITHIN 10
IF VOLTAGE IS TOO LOW, INSTALL A POWER TRANSFORMER.

Copyright KYUNG NAM DRYER CO., LTD.

(120725) Final drawing & manual of air dryer

Page : 3 of 6

12/15

CONTROL AIR DRYER


(2) MAIN SWITCH OR NO FUSED BREAKER SWITCH SHOULD BE INSTALLED IN THE
POWER LINE TO THE DRYER.
(3) SIZE OF ELECTRIC WIRES AND EARTH WIRE MUST BE OF ENOUGH CAPACITY
FOR THE DRIER.
(4) SHOULD BE PROPERY GROUNDED.

.OPERATION
1. OPERATION PRINCIPLE
(1) THE HUMID AIR FLOWS INTO THE AIR INLET, AND PRE-COOLED IN THE
HEAT EXCHANGER, AND ENTERS THE EVAPORATOR.
(2) AS THE AIR PASSES THROUGH THE EVAPORATOR(2) WHITCH WAS COOLED BY
EVAPORATION OF LIQUID REFRIGERANT, TEMPERATURE DROPS DOWN TO 10 (MAX 4)
DEW POINT TEMPERATURE, THEN THE MOISTURE IN THE AIR IS CONDENSED.
(3) CONDEDSED MOISTURE, NOW WATER, IS SEPERATED FROM AIR, AND PURGED OUT OF
THE SYSTEM BY DRAIN, AND DISCHARGED THROUGH OUTLET OF AUTO DRAIN TRAP.
((4)) WHILE PASSING THROUGH EXPANSING VALVE, THE HIGH PRESSURE LIQUID REFRIGERANT
IS EVAPORATED IN THE EVAPORATOR AND PULLED TO COMPRESSOR, COMPRESSED AGAIN.
CONTINUING THE REFRIGERATION CYCLE.

2. START-UP
(1) BEFORE START-UP, CHECK THE FOLLOWING :
- PROPER LOCATION, AIR PIPING AND POWER WIRING.
- CLOSED THE VALVE IN AIR LINE BY- PASS PIPING.
- OPENED THE VALVE IN THE DRAIN PIPING.
- CHECK VALTAGE.
- CHECK FOR PROPER FUSE OR BREAKER.

(2) START-UP
- IF ABOVE CONDITION IS ALL RIGHT, TURN ON THE OPERATING SWITCH,
WITHOUT SUPPLYING COMPRESSED AIR TO THE DRYER.
- AFTER STARTING, INDICATING LAMP LITS, AND IT IS NORMAL
IF THE REFRIGERANT PRESSURE GAGUE INDICATES GREEN AREA AFTER 5 TO 10
MINUTES OPERATIONS. (Low Pressure : 3~6kg/cm 2, High Pressure : 12~25kg/cm 2)
- ALLOWS THE COMPRESSED AIR INTO THE DRYER.
- AUTO DRAIN TRAP WILL BE AUTOMATICLLY DRAIN CONDENCED WATER WHICH
IS FROM EVAPORATOR.

Copyright KYUNG NAM DRYER CO., LTD.

(120725) Final drawing & manual of air dryer

Page : 4 of 6

13/15

CONTROL AIR DRYER


. MAINTENANCE
1. GENERAL
(1) IF THE GAGUE INDICATES AREA ABOVE THE GREEN, IT MEANS THE DRYER
IS OVER-LOADED.
CHECK FOLLOWING.

- IS TEMPERATURE OF ENTERING COMPRESSED AIR TOO HIGH?


- IS AMBIENT AIR TEMPERATURE TOO HIGH?
- IS CONDENSER FAN RUNNING?
- DOES CONDENSER HAVE DIRTY WITH DUST, SO RESTRICT AIR FLOWING?
- IS AIR FLOW INTO CONDENSER WELL?
- ISN'T VOLTAGE IS LOW?

(2) IF THE DRYER STOPS OPERATION BY ONE OF ABOVE REASON,


REF-COMP LAMP TURNS OFF AND ALARM LAMP LIGHTS.
FOR RE-STARTING, AFTER CORRECTION OF TROUBLE, RESET THE PRESSURE
SWITCH AND START OPERATION.

(3) The Way to exchange a compressor and refrigerant injection procedure.


- Turn off the Control Air Dryer.
- Release the refrigerant from Check Joint instralled in the unit.
- Separate the discharge and suction copper tube from the old Ref. Compressor
by using oxygen welding or copper cutter.
- Remove the old Ref. Compressor.
- Install new one and connect to the discharge/suction line.
- Using a Vacuum Pump to make vacuum state.
If you can not make vacuum state, check the welding part to find leak point.
- After completing of vacuum generating, Connect Refrigerant Gas to Check Joint
by using Manifold Gauge.
- Turn on the Control Air Dryer to recharge the refrigerant appox. 0.8kg.
- The refrigerant injection procedure.
1) The proper level of refrigerant liquid is around a half degree at sight glass.
2) The proper temperature of the suction line of compressor is cold enough
not to be frozen.
3) The high side pressure is 13~26 kg/, low side pressure is 3~6 kg/ is
suitable pressure on working.

Copyright KYUNG NAM DRYER CO., LTD.

(120725) Final drawing & manual of air dryer

Page : 5 of 6

14/15

CONTROL AIR DRYER


2. TROUBLESHOOTING
PROBLEM

CAUSE

1. INDICATING LAMP IS OFF

2. TURNS ON THE POWER

SOLUTION

1. POWER IS OFF

1. TURN ON POWER

2. SWITCH OR LAMP ARE INACTIVE

2. REPLACEMENT

1. PRESSURE SWITCH CUT OFF

1-1. HIGH PRESSURE

BUT COMPRESSOR IS NOT

- FIND THE REASON OF ABNORMAL

OPERATING

HIGH PRESSURE AND RESET


1-2. LOW PRESSURE
- CHECK LEAKAGE POINT OF
REFRIGERANT
2. STARTING RELAY OR

2. REPLACEMENT

STARTING CAPACITOR FAILURE

3. DEW POINT TEMPERATURE IS

1. EVAPORATOR IS FROZEN

LOW, BUT NO DRAIN

1. ADJUST HOT GAS BY-PASS V/V

( PRESSURE GAGUE INDICATES


BELOW GREEN AREA )

4. DEW POINT TEMPERATURE IS

2. BLOCKED DRAIN TRAP

2. CLEAN IT

1. HIGH TEMPERATURE INLET AIR

1. LOW IS THROUGH

HIGH, WATER SHOW UP AT AIR

AFTER COOLER

OUTLET

2. EXCESSIVE AIR FLOW

2. ADJUST AIR QUANTITY

3. LOWERED COOLING

3. CHARGE REFRIGERANT

CAPACITY

5. ABNORMAL NOISE OF
COMPRESSOR

4. HIGH AMBIENT TEMP.

4. MAKE LOW TEMP. BY VANTILATION

5. CONDENSER IS BLOCKED

5. CLEAN IT

1. OVERCHARGED

1. PURGE IT AT PROPER PRESSURE

REFRIGERANT

6. REFRIGERANT COMPRESSOR AND


LOW-PRESSURE LINE ARE FROST

7. LOW PRESSURE OF OUTLET AIR

1. BLOCKED HOT GAS BY-PASS

1. CHECK HOT GAS BY-PASS VALVE

VALVE

- ADJUST OR REPLACE

2. BLOCKED FILTER DRYER

2. REPLACEMENT

1. EVAPORATOR IS FROZEN

1. ADJUST HOT GAS BY-PASS V/V

Copyright KYUNG NAM DRYER CO., LTD.

(120725) Final drawing & manual of air dryer

Page : 6 of 6

15/15

You might also like