Proj. No.

: S14061

Employer: National Guard Health Affairs Request No.


........;2!-:X't.z~M

llffl'I

SHRl-MES-NAP-ELV-00004
REV-(00)

Contractor: Nesma & Partners

Dar al-Handasah

Engineer:

~ oc.::-:ts:E:::-:E?::...

Nesn1ao

dar al-handasah

6 P,...-,:r,ers

shair and partners

Date
11-Jun...:2..0 15

lo,1u i
p.a:,c::...1-"'!l

~?:J~--.i..., l,J ":>


~
A.
<-(-~

Transmittal of Document

--

Riyadh Maternity Hospital

Jeddah Neuroscience Hospital

~~

.Medical Buildings

Site Location/
Area

Jeddah Children Hospital

Qassim Specialized Hospitals

.Non Medical Buildings

RECEIVED \;

PMO Office in Riyadh

..,\\.t

I 'I
--..;.: I

D Tests

Catalogues

D Schedules

Manuals

i; <,

I "~

Others

2. Subject Description
METHOD STATEMENT FOR FIRE ALARM SYSTEM INSALLATION

3. Submittal details
Item Ref

Rev

Nesma/MS/ELVOO 1

Date
11-Jun- 2015

Set

Description

METHOD STATEMENT FOR FIRE ALARM SYSTEM INSALLATION

These are transmitted for:

Your information

QA/QC: I t

...lUH
, ...... ,

Approval

PM:

D Checking

3ee_ AitOLCM~lA
~

Sign :

Eng Signature

..l \.I

'

Review and Comment

Date:

3. Engineer's Repre!;entative comments

~~rm,
'~\........ ~\

DAR QA/QC Engineer

(:fl

.......

---

.11 JUN 2015

1. Document Type

~_
.

--

~~:~V\'D

Approved
Approved as noted
Revise and
Resubmit
Reiected

Date:

Date:

221'1 IZ

Approval shall not relieve Contract or of his liabilities under the Contract or constitute authorization of any change to Contract Documents.

\5

~'\i

-.l

~ D A61--02~
R
(. .

- T a i f Specialized Hospitals

-\ i i/7?r,..._

Proj. No.: 514061

Employer: National Guard Health Affairs Request No.


....., ~ .

-~ =

Engineer:

Dar al-Handasah

SHRl-MES-NAP-ELV-00004

.';"C::c..,,c;..::-; .,

REV- (00)

Contractor: Nesma & Partners

Nessna o

dar al-handasah

&

shair an d p artne r s

p,.;:

rs

0,,1

Date
11-Jun-2015

P-=-'=>,....;

Transmittal of Document

Riyadh - Maternity Hospital

Jeddah - Neuroscience Hospital


.Medical Buildings

Site Location/ Area


-

Jeddah - Children Hospital


Qassim - Specialized Hospitals

.Non Medical Buildings

- T a i f - Specialized Hospitals

PMO Office in Riyadh

1. Document Type

D Catalogues

D Tests

D Schedules

D Manuals

Others

2. Subject Description
METHOD STATEMENT FOR FIRE ALARM SYSTEM INSALLATION

3. Submittal details
Item Ref

Rev

Nesma/MS/ELV-001

'

Date
11-Jun-2015

Set

Descriotion

METHOD STATEMENT FOR FI RE ALARM SYSTEM I NSALLATION

These are transmitted for:

Your information

Approval

QA/QC:

~I 11 lUUA.
,. ,1,, .

::J

Checking

\\4 ~r~h~~,.,~..~~

Review and Comment

PM :

Date:

\
3. Engineer's Representative comments

1. Cables and wires used for Fire Alarm System to


be as per approved materials.
2. Labelling scheme of cables
-- and devices to be
as per approved shop drawings.
and Commissioning method statement
-3.-Testing
to be submitted on a separate basis.
4. Connections of fire alarm panels between
buildings is to be submitted separately.
-different
-DAR QA/QC Engineer

Si gn :

Eng Signature B.HaddadlG.Zoghbi

D
D
D
D

Aooroved
Aooroved as noted
Revise and
Resubmit
Rejected

Date:

Date: 20/07/2015

Approval shall not relieve Contractor of his liabilities under the Contract or constitute authorization of any change t o Contract Documents.

Proj. No.: 514061

Employer: National Guard Health Affairs Request No.


....., ~ .

-~ =

Engineer:

Dar al-Handasah

SHRl-MES-NAP-ELV-00004

.';"C::c..,,c;..::-; .,

REV- (00)

Contractor: Nesma & Partners

Nessna o

dar al-handasah

&

shair an d p artne r s

p,.;:

rs

0,,1

Date
11-Jun-2015

P-=-'=>,....;

Transmittal of Document

Riyadh - Maternity Hospital

Jeddah - Neuroscience Hospital


.Medical Buildings

Site Location/ Area


-

Jeddah - Children Hospital


Qassim - Specialized Hospitals

.Non Medical Buildings

- T a i f - Specialized Hospitals

PMO Office in Riyadh

1. Document Type

D Catalogues

D Tests

D Schedules

D Manuals

Others

2. Subject Description
METHOD STATEMENT FOR FIRE ALARM SYSTEM INSALLATION

3. Submittal details
Item Ref

Rev

Nesma/MS/ELV-001

'

Date
11-Jun-2015

Set

Descriotion

METHOD STATEMENT FOR FI RE ALARM SYSTEM I NSALLATION

These are transmitted for:

Your information

Approval

QA/QC:

~I 11 lUUA.
,. ,1,, .

::J

Checking

\\4 ~r~h~~,.,~..~~

Review and Comment

PM :

Date:

\
3. Engineer's Representative comments

D
D
D

--

Aooroved
Aooroved as noted
Revise and
Resubmit
Rejected

- -- -DAR QA/QC Engineer


Eng Signature

Si gn :

Date:

Date:

Approval shall not relieve Contractor of his liabilities under the Contract or constitute authorization of any change t o Contract Documents.

Nesma o
.. p

.. ,

lall.LJ
~.t -

NATIONAL GUARD HEALTH AFFAIRS SPECIALIZED HOSPITALS


SHR2, SHR3, SHR4, SHRS & SHR6

METHOD STATEMENT FOR FIRE ALARM SYSTEM INSTALLATION


Nesma/MS/ELV - 001/RO

METHOD STATEMENT

FOR

FIRE ALARM SYSTEM INSTALLATION


SHR2, SHR3, SHR4, SHRS & SHR6

Process Owner
(Nesma)

Name

Reviewed by
Unit Head Electrical

Anas Al Athamneh

Reviewed by
Sr. E LV E ngineer

Farouk Rifaat Bayer

A0{6()f5

Reviewed by
ICT Manager

Simon Osenieks

ieft/f 5

Reviewed by
Sr. Q A/QC Manage r

D.K Jaikumar

Io. o~.u:

Approved By
Technical Director

Jay Jacoby

Revision
Date

Date

\l)

Signature

-W--

t/17

ii .od (G

lo, 06. ~ol S-

N esm a
r

.0..11 , J
,...,. .-

NATIONAL GUARD HEALTH AFFAIRS SPECIALIZED HOSPITALS

SHR21 SHR31 SHR41 SHR5 & SHR6


METHOD STATEMENT FOR FIRE ALARM SYSTEM INSTALLATION
Nesma/MS/ELV - 001/RO

INDEX
1. SCOPE

2. REFERENCES

3. RESPONSIBI LITIES
4. TOOLS AND EQU IPMENT

5. MATERIALS
6. HANDLING AND STORAGE
7. SAFETY REQUIREMENTS

8. INSTALLATION REQUIREMENTS
8.1 PRE-INSTALLATION
8.2 DURING IN STALLATION
8.3 POST-INSTALLATION

9. RISK ASSESSMENT
10. ATTACHMENTS

21 10

N esm o
"-..

,...

Q t.a...c.c i.....J
,: ... f'"

.. .. ,_

NATIONAL GUARD HEALTH AFFAIRS SPECIALIZED HOSPITALS


SHR2, SHR3, SHR4, SHRS & SHR6
METHOD STATEMENT FOR FIRE ALARM SYSTEM INSTALLATION
Nesma/MS/ELV- 001/RO

1.

SCOPE

This document serves as a practica l and procedural guideline to the Fire Alarm System
(FAS} insta llation activities carried out in the National Gua rd Healt h Affa irs (NGHA)
Specia lized Hospita ls project. In addition, the purpose of this document is to identify health
and safety risks and to outline the appropriate control methods to minimize these risks for
the herein described job. The job must be executed in compliance to the below mentioned
specifications and all requirements shall be taken into account to ensure a satisfactory
result.

2.

REFERENCES

Number

Description

16701

General Requirements For Communication


Systems

13851

Fire Alarm System

16130

Raceways & Boxes

16140

Wiring Devices
NFPA 72
Latest approved Shop Drawings
Latest approved Materia l Submitta l
Nesma & Partners Qua lity Control
Procedure
Nesma & Partners Project Qua lity Plan
Nesma & Partners Project Safety Plan

3.

RESPONSIBILITIES

Entity
Project Director
Construction Manager
Engineer In Charge

Description

Approves the Method Statement


Reviews the Method Statement and monitors its
implementation on site
Day to day responsibilities for execution, qua lity and safety
works

3 110

N esm a
s.:. J

,..

..

Q
.

La 1u.....J
,..

't

.....

NATIONAL GUARD HEALTH AFFAIRS SPECIALIZED HOSPITALS


SHR21 SHR31 SHR41 SHR5 & SHR6

METHOD STATEMENT FOR FIRE ALARM SYSTEM INSTALLATION


Nesma/MS/ELV - 001/RO

Site Engineer

Site Supervisor

QC Engineer
Safety Officer

4.

5.

Progress monitoring and coordination of works


Responsible for raising the ITR to the QC Departm ent fo r
inspection
Day to day responsibiliti es for site activities (mat erial, drawings,
testing & co mmissioning and resources al location
Day to day responsibilities for civil work complet ion prior to
proceeding with the system installation
Make sure that the work area is clean and safe prior to
carrying out system installation activities
Reports to the Site Engineer
Day to day responsibilities to monitor qua lity requirements and
quality control measures
Responsible for the Health & Safety aspects on site as per the
Main Contractor's safety requirements

TOOLS AND EQUIPMENT

Basic Toolkit

Portable Drilling & Grinding Machine

Spirit Level

Level Threads

Conduits Bending & Thread ing Equipment

Stee l Pulling String/Rope

Ladd ers

Labe l Printer

Multi-meter

MATERIALS

Fire Al arm Contro l Panels (FACP) shall be in line with the approved material

Booster Power Supply shall be in line with the approved materi al

Manual Stations sha ll be in line with the approved material

Smoke Detecto rs shall be in line with the approved material

4 I 10

Nes m a
,.,. r ,rt, ,. .

La ., u ....J
l'U" "" ... -t- ,..

NATIONAL GUARD HEALTH AFFAIRS SPECIALIZED HOSPITALS

SHR2, SHR3, SHR4, SHRS & SHR6


METHOD STATEMENT FOR FIRE ALARM SYSTEM INSTALLATION
Nesma/MS/ELV - 001/RO

Heat Detectors shall be in line with the approved material

Beam Detectors shall be in line with the approved material

Flame Detectors shall be in line with the approved material

Notification Appliances shall be in line with the approved material

Firefighters Telephone Sets shall be in line with the approved materia l

Magnetic Door Holders shall be in line with the approved materia l

Control & Monitors modu les shall be in line with the approved material

Isolator modules shall be in line with the approved material

Interface Appliances sha ll be in line with the approved material

Auto-dialers shall be in line with the approved material

System printers sha ll be in lin e with the approved material

FAS cables sha ll be in line with the approved material

EMT Conduits shall be in line with the approved material

PVC Conduits sha ll be in line with the approved material

Conduits accessories shall be in line with the approved material

Fire cable cl ips shall be in line with the approved material

Note

A Material Inspection Requ est {M IR) must be submitted for rece ived material and approved
submitta l compliance.

6.

HANDLING AND STORAGE

Upon receipt of th e FAS Communication and Power cables on site, necessary preca utions
must be t aken as per manufacturer recommendations for storage and handling activities.

Materials must be carefully hand led to avoid breakage, de nting and scoring
finishes

M ateria ls reaching the site shall be identified as per pac kage list

Materials must be stored in a covered and dry st orage area to avoid


corrosion

5 110

N esm a
6

f'

'>r,

(<'

.a .J....i
J','IH , , ..,.,

NATIONAL GUARD HEALTH AFFAIRS SPECIALIZED HOSPITALS


SHR2, SHR3, SHR4, SHR5 & SHR6
METHOD STATEMENT FOR FIRE ALARM SYSTEM INSTALLATION
Nesma/MS/ELV - 001/RO

Materials must be stored in a safe and secure storage area

Materials must be stored in a ventilated and air-conditioned storage area

Material disappearance must be reported & a replacement action must be


taken

Materials received on site must be inspected for approved material


compliance

Material deviation and discrepancy must be reported for further action

Materials received on site must be inspected for deformity or damages

Damaged material must be reported & a replacement action must be taken

Defective material must be reported & a replacement action must be taken

Any material found not suitable for site use must be rem oved from the site
immediately

Cable drums must be stored carefully to prevent damages

D
D

7.

Fire Panel enclosures shall be properly tagged to avoid mismatch with


other Fire Panel enclosures
Fire Panel internal components shall be properly tagged to avoid mismatch
with other Fire Panel internal components

SAFETY REQUIREMENTS

Safety precautions must be fo llowed as per the established Project Safety


Plan

Instructions must be followed all the time

Workers must be aware of pot ential hazards in t he work area

Workers must be awa re on how to prevent ha zards in the work area

Workers must be aware of the job-specific safety r ules

Workers must be able to explain the safety rules to fellow colleagues

In case of fire, emergency procedure must be followed

All type of injuries must be reported by following the established


procedure

Workers must be fa miliar with t he emerge ncy too ls

Personal Protective Equipment must be used on site as required by the


employer

6 I 10

Nesm.:,
J:..

"

lo u.,,J
, "' - ,

NATIONAL GUARD HEALTH AFFAIRS SPECIALIZED HOSPITALS

SHR2, SHR3, SHR4, SHRS & SHR6


METHOD STATEMENT FOR FIRE ALARM SYSTEM INSTALLATION
Nesma/MS/ELV - 001/RO

Workers must follow the established electrical safety rules

Workers must be aware of how to protect themselves when working


outdoors

8.

INSTALLATION REQUIREMENTS

8.1

PRE-INSTALLATION

Make sure that all civil works related to the installation work area are
completed

Obtain official clearance prior to starting the installation works

Make sure that the installation work area is clean and safe

Obtain the latest approved Shop Drawings for insta llation works reference

Make sure all required material is available on site

D
D

8.2

The insta llation methods described in the Shop Drawings must be approved
by the supplier
Review Shop Drawings and Fire Life Safety Drawings against NFPA
requirements before proceeding with the installation works in the zone
Ceiling access panels shall be provided as per the approved Shop Drawings

DURING INSTALLATION
8.2.1

CONTAINMENT INSTALLATION

Using marking threads, line out the FA cable route as per the approved
Shop Drawings

FA cables must be clipped to ceiling or wa ll surfaces or insta lled in EMT


conduits as per the approved Shop Drawings

In case of services physical cross-over and in order to prevent any damage,


the FA cables must be installed in EMT conduits as per the approved Shop
Drawings

For room penetration sections, FA cables must be install ed in EMT conduits


as per the approved Shop Drawings

Pull boxes must be installed on the ceiling for FAS in-wall drop cable

7 I 10

Nesma o
f". Portr

lou..c i
p.n ~ , , -

NATIONAL GUARD HEALTH AFFAIRS SPECIALIZED HOSPITALS


SHR2J SHR3J SHR4J SHRS & SHR6

METHOD STATEMENT FOR FIRE ALARM SYSTEM INSTALLATION


Nesma/MS/ELV - 001/RO

D
D

D
D

D
D
D
D

D
D
D

In gypsum wa lls, EMT Conduits must be used to route the FAS drop cable
from the Pull Box to the wa ll mounted device
In concrete wa lls, PVC Conduits must be used to route the FAS drop cable
from the Pull Box to the wa ll mounted device
Rigid Stee l Conduits must be used in Mechanical & Electrica l Rooms
In case of expa nsion joints crossings, EMT boxes & flexible EMT Conduits
shall be insta lled as per the approved Deta il Drawings
Where applicable, EMT & RGS Cond uits must be installed accurately in li ne
and leve l
All type of conduits must be clean and interna lly dry prior to cable pulling
The FAS cables insta llation must carri ed out in a proper manner and as per
the applicable standards without damaging the cables
The correct type of back-boxes for all field devices sha ll be instal led as per
the approved Shop Drawings
The junctions boxes height sha ll be verified against t he approved Shop
Drawings
Conduits installation works must be approved by the consultant prior to
pulling the FA cables
The size and type of FAS cables shall be identified and cut to the req uired
length

Proper id entifica tion shall be provided

Ea rth cables to all fi eld devices sha ll be properly terminated with earth
sleeves in the appropriate terminal in order to avoid any earth fault in the
loop

Joints between two fi eld devices are not allowed

Adequate add it iona l cable lengths sha ll be provid ed for the above fa lse
ceiling detectors
In sta ll at least two vertica l cable risers for the FAS in close proxim ity to
each other w ith a minimum of one hour fire rated wall separating them so
that the loss of one rise r does not prevent the rece ipt or the transmission
of the signal from the other floors or zones
Openings in fire-rated wa ll s, flo ors and ceilings shall be properly fire
sto pped

8 110

N esm a
l:'..

r..

Q ta

1...u...J

I""-.--

NATIONAL GUARD HEALTH AFFAIRS SPECIALIZED HOSPITALS


SHR2, SHR3, SHR4, SHR5 & SHR6

METHOD STATEMENT FOR FIRE ALARM SYSTEM INSTALLATION


Nesma/MS/ELV - 001/RO

8.2 .2

EQUIPMENT INSTALLATION

Make sure to use the appropriate termination materials {lugs, glands &
ferrules)

Isolator modules shall be provided every 20 addressable devices

Make sure that the FAS and accessories installation wor ks are ca rried out in
accordance to the manufacturer installation recommendations and as per
the local authority requirements
FACPs, Satellite FACPs, Repeater Panels shall be installed as per the
approved Shop Drawings

All field devices shall be installed as per the approved Shop Drawings and
manufacturer recommendations

Duct Detectors shall be installed as per the approved Shop Drawings

Linear Heat Detectors shall not be installed in such area where the
temperature may increase beyond ambient temperature which can
damage the sensor cable

Beam Detectors shall be installed 500 mm below the false ceiling level

Manual Call Station to Manual Call Station distance shall be maximum 40


meters

8.3
D
D

D
D

POST-INSTALLATION

FAS cables must be labeled as per the approved Label ing Scheme
FAS cables must be properly identified at the Fire Alarm Control Panel prior
to cable termination
All Smoke Detectors shall be covered after installation and before handing
over of the area in order to avoid any physical damage and accumulation of
dust within the detector
During Smoke & Hear Detectors termination wo rks, make sure to isolate
the copper conductor from other terminals in t he device
Boxes and accessories must be water tight
Touch up scratches and marred finish es to match original finish

9 I 10

NATIONAL GUARD HEALTH AFFAIRS SPECIALIZED HOSPITALS

SHR2, SHR3, SHR4, SHRS & SHR6


METHOD STATEMENT FOR FIRE ALARM SYSTEM INSTALLATION
Nesma/MS/ELV- 001/RO

9.

ATIACHMENTS

Inspection Test Plan (Attachment 1}

Installation Check List (Attachment 2)

J>

..

10 110

INSPECTION AND TEST PLAN

f\lesma

For

I.T.P. Ref. No: NESMA/ITP/ELV /001

INSTALLATION OF FIRE ALARM SYSTEM (FAS) I Rev No: 0


& CONTAINMENT WORKS

Date: 30/May/2015

Discipline :
Electrical - Low
Voltage (ELV)
Systems

Project: NATIONAL GUARD HEALTH AFFAIRS SPECIALISED


HOSPITALS IN REGIONS - RIYADH, JEDDAH (CH & NH), TAIF
& QASSIM

Item

Contract No.: SHR.2-323022,SHR.3-323032,


323042,SHR.5-323052,SHR.6-323062
Responsibility

Activity

Acceptance Criteria

Prepared by :
QA/QC

Verification Doc.

Nesma I DAR

DOCUMENT SUBMITIALS
a)

Shop drawings showing detailed floor lay outs of all


outlets and devices with label reference and exact
routing of cabling & wireways.
b) Shop drawings differentiating between
the
manufacturer installed and field installed wiring with
all the terminals of the system and equipment
identified & Interconnection details.
c) Co - Ordination drawings covering the plans,
sections and elevations drawn to scale and the
installation of the smoke detectors in the ducts &
access to them.
d) Co ordination drawings must show the size & location
of ducts including the lining , size & location of piping,
size & arrangement of structural elements & duct
smoke detectors including the air sampling elements.
e) Shall submit test reports of materials related to FAS
Cables & Wires, Systems & Devices.
t) Shall submit Method Statement, ITP and Checklist
for FAS cables & Wires.

Project Engineer (ELV) I


Construction Manager I
(ELV) I QC Engineer

Project Specification
(Division 13, Section
13851 , Clauses 1.5.B.1 &
2 and 1.5.C, Page No. 3
of 25

Procurement Engineer
I Project Engineer I EL V
QC Engineer.

Project Specification
(Division 13 Section
13851, Para 2.3 to 2.18 ,
Page Nos. 10 to 21 of 25.

MATERIAL SUBMITIALS

a.

Shall submit product data related to Fire Alarm


System Equipments, Devices, cables & Wires &
Conduits for Engineer's approval.

Shop Drawings & Co Ordination Drawings.

R/ V

Material Submittal I
Method Statement
submittals.

R /V

Pa_g_e 1 of 6
INSPECTION TYPE :

H = HOLD POINT (IR - D~~)

SR = SURVEILLANCE

R = REVIEW

W=WITNESS

V= VERIFICATION

A = APPROVAL

DOC/CON/008-ISSUE 0

rvesma

l_n llA j

& P.1rtners

,am Lf-~'--

INSPECTION AND TEST PLAN


INSTALLATION OF FIRE ALARM SYSTEM (FAS) I Rev No: 0
& CONTAINMENT WORKS

MATERIAL CONTROL:

Site Engineer I Project


Engineer I ELV QC
Engineer.

a.

WIRES & CABLES

b.

RSC Conduits & Fittings

Site Engineer I Project


Engineer I ELV QC
Engineer.

C.

Flexible Steel Conduits & Fittings

Site Engineer I Project


Engineer I ELV QC
Engineer

d.

Steel Conduit Accessories

Site Engineer I Project


Engineer I ELV QC
Engineer.

e.

Outlet Boxes - General, Metallic & Moulded


Plastic

Site Engineer I Project


Engineer I ELV QC
Eng ineer.

f.

Manual Stations

Site Engineer I Proj ect


Engineer I ELV QC
Engineer.

g.

Smoke Detectors - General, Photo Electric,


Multi Criteria, Laser based photo electric, Harsh
environments photo electric, Beam Type,
Asoiratinq detectors & Duct

Site Engineer I Project


Engineer I ELV QC
Engineer

Heat Detectors - Combination Type & Fixed


Temperature Type

Site Engineer I Project


Engineer I EL V QC
Engineer

h.

I.T.P. Ref. No: NESMA/ITP/ELV /001

For

Project Specification
( Division 13 Section 13851 ,
Paras 2.18. A,B & C Page
No. 21 of 25).
Project Specification
(Division 16, Section 16130,
Para 2.3, Clauses A to E,
Page No. 3 of 15).
Project Specification
(Division 16, Section 161 30,
Para 2.4, Clauses A to E,
Paqe No. 3 of 15
Project Specification
(Division 16, Section 16130,
Para 2.7, Clauses A to E,
Page Nos. 4 & 5 of 15)
Project Specification
(Division 16, Section 16130,
Para 2.13, 2,14 & 2.15 Page
No.8of15
Project Specification
(Division 13, Section 13851,
Paras 2.3. A.1 to 5, Page No.
10 of 25
Project Specification
(Division 13, Section 13851,
Paras 2.4. A - H , Page
Nos. 11 & 12 of 25.
Project Specification
(Division 13, Section 13851 ,
Paras 2.5. A & B , Page
Nos.12 & 13 of 25

Date: 30/May/20 15

Cable I wires Test


Certificates from the
manufacturer

Approved Material
Submittal

Approved Material
Submittal

Approved Material
Submittal

Approved Material
Submittal

Approved Material
Submittal

Approved Materia l
Submittal & Test
Certificates from the
manufacturer
Approved Material
Submittal & Test
Certificates from the
manufacturer

Pa_ge 2 of 6
INSPECTION TYPE :

H = HO LD POINT _{!__~_DAR)

SR= SURVEILLANCE

R = REVIEW

W=WITNESS

V= VERIFICATION

A=APPROVAL

DOC/CON/008-ISSUE 0

Nesma

lo ,J.J....J
p.Lbl...:

INSPECTION AND TEST PLAN


INSTALLATION OF F IRE ALARM SYSTEM (FAS) I Rev No: 0
& CONTAINM ENT WORKS

Date: 30/May/2015

Project Specification
(Division 13, Section 13851,
Para 2. 5. C, 1 to 5 Page No.
13 of 25
Proj ect Specification
(Division 13, Section 13851,
Paras 2.6. A & C Page No.
13 of 25
Project Specification
(Division 13, Sect ion 1385 1,
Para 2.6.B.1 to 4 Page No.
13 of 25
Project Specification
(Division 13, Section 13851,
Paras 2.6. 0 & E Page No.
14 of 25.
Project Specification
(Division 13, Section 13851,
Paras 2.7.A, B & C Page
No. 14 of 25
Project Specification
(Division 13, Section 1385 1,
Paras 2.8.A & B Page No.
14 of 25

Approved Materia l
Submittal & Test
Certificates from the
manufacturer
Approved Material
Submittal & Test
Certificates from the
manufacturer
Approved Material
Submittal & Test
Certificates from the
manufacturer
Approved Material
Subm ittal & Test
Certificates from the
manufacturer
Approved Material
Submittal & Test
Certificates from the
manufacture
Approved Material
Submitta l & T est
Certificates from the
manufacturer

Site Engineer I Project


Engineer I EL V QC
Engineer

Project Specification
(Division 13, Section 13851,
Paras 2.9.A to K Page
Nos. 15 & 16 of 25.

Site Engineer I Project


Engineer I ELV QC
Engineer

Project Specification
(Division 13, Section 13851,
Paras 2.1 O.A to D Page
Nos, 16 & 17 of 25.

i.

Flame Detectors

Site Engineer I Project


Engineer I ELV QC
Engineer

j.

Horns - General Types H1 , H2 & H3, W ith


Strobe Light.

Site Engineer I Project


Engineer I EL V QC
Engineer

k.

Xenon Strobe Lights

Site Engineer I Project


Engineer I ELV QC
Engineer

I.

Voice Evacuation Speakers - Gen eral & with


Integrated Strobe Light

Site Engineer I Project


Engineer I ELV QC
Engineer

m. Fire Fighters Telephones

Site Engineer I Project


Engineer I ELV Q C
Engineer

n.

Magnetic Door Holders

Site Engineer I Project


Engineer I ELV QC
Engineer

0.

MFACP I FACP - Cabinet , Alarm & Supervisory


Systems, Control Modules, Indicators, System
Controls, Resetting Controls, Alphanumeric
Displays & controls, Voice A larm System &
Components, Fire Fighter's Telephone Control
Modu le, Instruction Card , BMS Interface
Data Networking components comprising of the
network media (wire or fiber optic medium) & a
fire alarm work station with the w ire or fiber
optic compatible network card s to fo rm a

p.

I.T.P. Ref. No: NESMA/ITP/ELV /00 1

For

Approved Material
Submittal & Test
Certificates from the
manufacturer

Approved Material
Submittal & Test
Certificates from the
manufacturer

Pa_g_e 3 of 6
INSPECTION TYPE :

H = HOLD POINTJ.IR - DAR)

SR = SURVEILLANCE

R = REVIEW

W = WITNESS

V= VERIFl CATION

A=APPROVAL

DOC/CON/008-ISSUE 0

Nesma

la111i

INSPECTION AND TEST PLAN

& PHrtners

fl(bt. ,

I.T.P. Ref. No: NESMA/ITP/ELV /001

For

INSTALLATION OF FIRE ALARM SYSTEM (FAS) I Rev No: 0


& CONTAINMENT WORKS

Date: 30/May/20 15

physical loop data network with the MFACP &


FACPs.

System Printer - Strip Printer to be mounted


directly on the main MFACP enclosure.

Site Engineer I Project


Engineer I ELV QC
Engineer

Project Specification
(Division 13, Section 13851,
Para 2.16, Page No,2 1 of 25

Physical Protect welded wire mesh guards for


the manual station, smoke detectors & gong

Site Engineer I Project


Engineer I ELV QC
Engineer

Project Specification
(Division 13, Section 13851 ,
Para 2.17, Page No,21 of 25
-- - -

App roved Material


Submittal & Test
Certificates from the
manufacturer
Approved Material
Submittal & Test
Certificates from the
manufacture
Approved Materia l
Submittal & Test
Certificates from the
manufacturer
Approved Material
Submittal & Test
Certificates from the
manufacturer
Approved Material
Submittal & Test
Certificates from the
manufacturer
Approved Material
Submittal & Test
Certificate s from the
manufacturer

Project Specification
( Division 16, Section 16130,
Sub section 3.2 , Clauses A
to N, Page Nos. 9 & 10 of
15).

App roved Shop


Drawings & QC
Inspection Checklist CL
- ELV- 001 Rev

q.

Fire Alarm Network Reporting Terminal

r.

Emergency Power Supply - With Batter~


Charger, Lead Acid Batteries & automatic
transfer switches.

s.

t.

u.

V.

Addressable Interface Device Monitoring


Module, Control Module, Isolator Module &
Relay Module
Auto Dialler

Site Engineer I Project


Engineer I EL V QC
Engineer

Project Specification
(Division 13, Section 13851,
Para 2.11 , Page No, 17 of 25

Site Engineer I Project


Engineer I ELV QC
Engineer

Project Specification
(Division 13, Section 13851,
Para 2.13, Page No,20 of
25.
Project Specification
(Division 13, Section 13851 ,
Para 2.14, Page No,20 of
25.
Project Specification
(Division 13, Section 13851,
Para 2.15, Page Nos,20 & 21
of25

Site Engineer I Project


Engineer I ELV QC
Engineer
Site Engineer I Project
Engineer I ELV QC
Engineer

INSTALLATION:

a)

Conduits, Wire Ways & Boxes - General Installation


guide lines

Site Engineer I Project


Engineer I EL V QC
Engineer

Pa_ge 4 of 6
INSPECTION TYPE :

H = HOLD POINT _(IR - DAR)

SR = SURVEILLANCE

R = REVIEW

W=WJTNESS

V= VERJFICA TION

A = APPROVAL

DOC/CON/008-ISSUE 0

Nesma
~

Partners

l.a ,Lil
,l!LDL"

j
~

INSPECTION AND TEST PLAN


INSTALLATION OF FIRE ALARM SYSTEM (FAS) I Rev No: 0
& CONTAINMENT WORKS

b)

Conduits and Wireways - Applications & Installation

Site Engineer I Project


Engineer I ELV QC
Engineer.

c)

Embedded Conduits - Installation

Site Engineer I Project


Engineer I EL V QC
Engineer

d)

Exposed Conduits - Installation

Site Engineer I Project


Engineer I ELV QC
Engineer

e)

Outlet Boxes - General

Site Engineer I Project


Engineer I EL V QC
Engineer

f)

Metallic Outlet Boxes

Site Engineer I Project


Engineer I ELV QC
Engineer

g)

Moulded Plastic Outlet Boxes

Site Engineer I Project


Engineer I ELV QC
Engineer.

h)

Wiring Installation - Wiring Methods, Wiring Within


enclosures, cable taps, color - coding, Installation
of cable Risers & Wiring to remote alarm
transmitting device.

Site Engineer I Project


Engineer I EL V QC
Engineer

Wiring, Cabling & terminals Identification

Site Engineer I Project


Engineer I ELV QC
Enoineer.

i)

I.T.P. Ref. No: NESMA/ITP/ELV /00 1

For

Date: 30/May/2015

Project Specification
(Division 16, Section 16130,
Sub section 3.3, Clauses A
to II , Page Nos. 10, 11 & 12
of 15).
Project Specification
(Division 16, Section 16130,
Sub section 3.6, Clauses A
to E, Page Nos. 13 & 14 of
15).
Project Specification
(Division 16, Section 16130,
Sub section
3.7, C1auses A to G, Page
No, 14of15).
Project Specification
( Division 16, Section 16130,
Sub section 2.13, Clauses A
to C, Paqe No. 8 of 15)
Project Specification
(Division 16, Section 16130,
Sub section 2.14, Clauses A
to F, Page No. 8 of 15)
Project Specification
(Division 16, Section 16130,
Sub section 2.14, Clauses A
to F, PaQe No. 8 of 15)
Project Specification
(Division 13, Section 13851,
Sub section 3.2, Clauses A
to F, Page No. 23 of 25).

Approved Shop
Drawings & QC
Inspection Checklist CL
- EL V - 001 Rev 0
Approved Shop
Drawings & QC
Inspection Checklist CL
-ELV-00 1 RevO
Approved Shop
Drawings & QC
Inspection Checklist CL
- ELV - 001 Rev 0
Approved Shop
Drawings & QC
Inspection Checklist CL
-ELV-001 RevO
Approved Shop
Drawings & QC
Inspection Checklist CL
- EL V - 00 1 Rev 0

Project Specification
(Division 13, Section 13851 ,

Approved Shop
Drawings & QC

Approved Shop
Drawings & QC
Inspection Checklist CL
- EL V - 001 Rev 0

Approved Shop
Drawings & QC
Inspection Checklist CL
-ELV-001 Rev O

Page 5 of 6
INSPECTION TYPE :

H = HOLD POINT (IR - ]>AR}

SR= SURVEILLANCE

R = REVIEW

W=WITNESS

V= VERIFICATION

A=APPROVAL

DOC/CON/008-ISSUE 0

Nesmao ) Lcu.u.i
F,. P 8 rtn e rs

plb L _...__, t,.uc

INSPECTION AND TEST PLAN


I.T.P. Ref. No: NESMAIITP/ELV /001

For
INSTALLATION OF FIRE ALARM SYSTEM (FAS)
& CONTAINMENT WORKS

Rev No: 0

Sub section 3.3, Clause A,


Pa_g_e No. 24 of 25)
Project Specification
(Division 13, Section 13851 ,
Para 3.4, Clauses A to C,
Page No. 24 of 25).

Inspection Checklist CL
-ELV-001 RevO
Approved Shop
Drawings & QC
Inspection Checklist CL
- ELV-001 RevO

Approved Shop
Drawings & QC
Inspection Checklist CL
-ELV - 001 RevO

Grounding - Cable Shields, Equipment, Signal


Ground Terminal, Grounding Electrodes Installation

Site Engineer I Project


Engineer I ELV QC
Engineer

Equipment Installation - MFACP, FACPs, Smoke


Detectors, Heat Detectors, Manual pull stations,
Water Flow detectors & Valve Supervisory Switches
for the select sprinkler valve station, Audible Alarm
Indicating Devices, Visible Alarm Indicating
Devices, Device Location Indicating Lights,
Annunciator & Antenna for the Radio Alarm
Transmitter
FIELD QUALITY CONTROL

Site Engineer I Project


Engineer I ELV QC
Engineer

Project Specification
(Division 13,
Section 13851 , Para 3.1 ,
Clauses A to P, Page Nos.22
& 23 of 25).

Commissioning
Engineer. I QAQC
Engineer

Project Specification
( Division 16 Section 16120)
and Approved shop drawings

j)

k)

a.
b.
C.

d.

e.

Fire A larm System Cable Continuity and


Insulation Testing after Installation.
Fire Alarm System Cable Termination . .
Grounding Installation Visual Inspection
Cable and Conduit Hazardous Location
Sealing.
Fire Alarm System Cable I Circuit Final Visual
lnspection(Before Energization)

Date: 30/May/20 15

Approved Shop
Drawings & QC
Inspection Checklist CL
-ELV -001 RevO
and Cable Insulation
Test (Meggering Test)
report

Page 6 of 6
lN~PECTION TYPE :

H = HOLD POINTQg --_I>AR)

SR= SURVEILLANCE

R = REVIEW

W=WITNESS

V= VERIFICATION

A=APPROVAL

DOC/CON/008-IS SUE 0

Nesma,( ) l a.uU

IR REF. NO.

QUALITY RECORD No. Nesma/CL/ELV/001 /RO

Fire Alarm Systems ( FAS) Containment &


Svstem Installation
Project: NATIONAL GUARD HEALTH AFFAIRS
Contract No.: SHR2 - 323022, SHR3-323032, SHR4-323042
SPECIALIZED
HOSPITAL, JEDDAH (CH & NH),
SHR5- 323052 & SHR6 - 323062
T AIF & QASSIM

& Partners

~ b pig

Location:

System: Fire Alarm System

Area Location:

Description:

Equipment No.

To:

Specification : Section 13851 - Fire Alann System

From:

Item
No.

Description

Nesma

A) VISUAL INSPECTION CHECKLIS1' (PRE - INSTALLATION CHECKS)


LOCATION
1.1 Locations of the FAS Cables, Conduits, boxes & devices are marked at the
site as per the latest approved layout shop drawings.

1.2 Proper alignment, Support and level of the cable routes, pull boxes, room
penetration EMT Conduit sleeves , Junction Boxes, drop down EMT conduits for
the FAS Device Cables, Manual Stations, Smoke Detectors, Heat Detectors,
flame detectors, Homs, Xenon Strobe Lights, Voice Evacuation Speakers, Fire
Fighters' Telephones, Magnetic Door Holders, Main Fire Alann Control Panel
(MFACP), Other FACPs, Fire Alarm Work Station, Network Reporting Terminal,
Emergency Power Supply, Addressable Interface Device, Auto Dialer, System
Printer, Welded Wire Mesh guards for the (manual station, smoke detectors &
gong) are in their respective locations and as per the final approved shop
drawings.

1.0

1.3 Ensure that the locations on the false ceiling are co ordinated as per the latest
reflected ceiling layout.
2.0

OTHER GENERAL CHECKS & REQUIREMENTS


Containment Works

a)

1) Correct material types & Sizes for the FAS cables, Junction Boxes, EMT
Conduits & pull boxes are available as per the approved material submittals.
2) Cables are new undamaged & without ioints.
3) Cable Containment shall be free of burrs, sharp edges or the projections that
can damage the cable insulation.
4) Make sure that the pull ropes have been provided inside the concrete encased
PVC Conduits, Device Drop down EMT Conduits & Room Penetration EMT
Sleeves which in tum must be dry & clean without any block during the cable
pulling.
5) Make sure that the cable containment installation works are completed in all
the aspects .

b)

Other General Checks


!)Availability of updated approved shop drawings for the installation works.
2) All the civil works related to the installation area are completed.
3) Make Sure that the installation work area is clean and safe.

DAR

Nesma::~~~ la.ULi

IR REF.NO.

QUALITY RECORD No. Nesma/CL/ELV/001 /RO

Fire Alarm Systems ( FAS) Containment &


Svstem Installation
Project: NATIONAL GUARD HEALTH AFFAIRS
Contract No.: SHR2 - 323022, SHR3-323032, SHR4-323042
SPECIALIZED HOSPITAL, JEDDAH (CH & NH),
SHR5- 323052 & SHR6 - 323062
T AIF & QASSIM

& Partners }

-1 pml=::i_ri'.iig .

Location:

System: Fire Alarm System

Area Location:

Description :

Equipment No.

To:

Specification : Section 13851 - Fire Alann System

From:

Item
No.

Description

4) Ensure that there are no Hazards from moving parts, hot surfaces etc
throughout the installation path & nearby areas.

1
2

B) DURING INSTALLATION CHECKS


The containment installation works for the FAS are approved prior to the
commencement of the installation & pulling of the FAS Device Cables.
No interference with the cables of the LV Electrical equipment I unit is
encountered while routing the FAS Cables.

FAS Cables are cut to the required lengths as decided by the route run.

The splicing of the cables, if applicable, must be done only with the prior
approval of the owner's representative and is done only at the building block units
and not at the other places.

The Cable shields are physically and electrically continuous by proper jointing at
the splice locations, if the splices are pennitted by the owner . representative.

Under no circumstances, the joints between the two field devices are allowed.

UTP CAT 6A Copper Data Cables for the back bone transmission over the
Ethernet VLAN are routed as per the latest approved shop drawings ( as part of the
SCS Cabling).

All the cable fittings and the connectors are of correct types and proper fit for the
purpose.

10
11

The recommended bending radius and the cable pulling tension are maintained as
per the manufacturer recommendations for the different types of cables.
The supports of the cables including cable clips & ties are adequate & at the
required spacing as per the specifications.
FAS Cables are properly identified at the F ACPs & MFACPs prior to their
tenninations ..

12

The cable tenninations are executed as per the manufacturer recommendations.

13

Earthing cables are tenninated with proper sleeves for all the field devices in the
appropriate tenninals to avoid the undesirable earth fault in the loops.

14

EMT Conduits & sleeves are installed directly on the ceiling surfaces for the
room penetrations & the device drop down cable locations.

15

Wherever gypsum boards are installed for the wall panels, EMT Conduits are
used in those areas to route the FAS Cables.

16
17

In the concrete block walls, encased PVC Conduits are used to route the FAS
Device Cables.
For the expansion joints crossings, flexible EMT Conduits are installed.

Nesma

DAR

Nesma,( ) la.wJ

IR REF.NO.

QUALlTY RECORD No. Nesma/CL/ELV/001 /RO

Fire Alarm Systems (FAS) Containment &


Svstem Installation
Project: NATIONAL GUARD HEALTH AFFAIRS
Contract No.: SHR2 - 323022, SHR3-323032 , SHR4-323042
SPECIALIZED
HOSPITAL, JEDDAH (CH & NH),
SHR5- 323052 & SHR6 - 323062
T AIF & QASSIM

& Partners

pmb}'llg

Location:

System: Fire Alarm System

Area Location:

Description:

Equipment No.

To:

Specification : Section 13851 - Fire A lann System

From:

Item
No.

Description

19

Rigid Steel Conduits (RSC) are installed inside the Mechanical and Electrical
rooms to route the FAS Device Cables through them.
Cables, Conduit and stability of their supports are good.

20

The raceways foe the FAS are not shared by power or any other electrical wiring.

18

21
22
23
24
25
26
27
28

29
30
31
32
33
34
35
36

Install at least two vertical cable risers for the FAS in close proximity to each
other with a minimum of one hour fire rated wall separating them so that the loss
of one riser does not prevent the receipt or the transmission of the signal from the
other floors or zones.
The junction boxes are installed as per the latest approved shop drawings
The junction boxes are equipped with the oil resistant and adhesive gasket.
Proper Fixing bolts and nuts are installed for the Junction Boxes
Backboxes are installed as per the latest approved shop drawings.
Ensure that a 11 the FAS Enclosures, boxes & their accessories are water tight.
Emergency Power Supply and the Batteries are installed as per the latest approved
shop drawings and manufacturer reco1mnendations.
Manual Stations are installed indoors and outdoors as required with the
corresponding protective guard shields & the integral addressable Modules as per
the latest approved shop drawings and the manufacturer recommendations.
Smoke detectors are installed with the corresponding protective guard shield as
per the latest approved shop drawings and the manufacturer recommendations to
prevent the accumulation of dust inside the detector.
Heat detectors are installed as per the latest approved shop drawings and the
manufacturer recommendations.
Flame detectors are installed as per the latest approved shop drawings and the
manufacturer recommendations.
Homs are installed as per the latest approved shop drawings and the manufacturer
recommendations.
Xenon Strobe Lights are installed as per the latest approved shop drawings and
the manufacturer recommendations.
Voice Evacuation Speakers are installed as per the latest approved shop drawings
and the manufacturer recolllinendations.
Fire Fighters' telephones are installed as per the latest approved shop drawings
and the manufacturer recommendations.
Magnetic Door Holders are installed as per the latest approved shop drawings and
the manufacturer recommendations.

Nesma

DAR

Nesma,( ) l a.w..i

IR REF.NO.

QUALITY RECORD No. Nesma/CL/ELV/001 /RO

Fire Alarm Systems ( FAS) Containment &


Svstem Installation
Project: NATIONAL GUARD HEALTH AFFAIRS
Contract No.: SHR2 - 323022, SHR3-323032 , SHR4-323042
SPECIALIZED HOSPITAL, JEDDAH (CH & NH),
SHR5- 323052 & SHR6 - 323062
TAIF & QASSIM

& Partners

pmb_pllg

Location:

System: Fire Alarm System

Area Location:

Description:

Equipment No.

To:

Specification : Section 13851 - Fire Alarm System

From:

Item
No.

37
38
39
40

41
42
43

Description

Nesma

DAR

MFACP I FACPs are installed as per the latest approved shop drawings and the
manufacturer recommendations.
Fire Alann Work Station is installed as per the latest approved shop drawings and
the manufacturer recommendations.
The network reporting tenninal is installed as per the latest approved shop
drawings and the manufacturer recommendations.
Addressable Interface Devices for the corresponding functional modules of the
FAS System are installed as per the latest approved shop drawings and the
manufacturer recommendations.
Fully Programmable Multi - input, multi number auto dialer and digital
announcer units are installed as per the latest approved shop drawings and the
manufacturer recommendations.
System Printer is installed on the assigned enclosure inside the MFACP as per
the latest approved shop drawings and the manufacturer recommendations.
All the required Accessories & enclosures are installed

44

All the installation materials such as crimps, lugs, tenninals & ferrules comply
with the approved shop drawings & area classification requirements.

45

Overall installation is completed as per the approved shop drawings, Fire Life
Safety Drawings, NFPA Requirements & Local authority requirements.
C) POST INSTALLATION CHECKS AND ACTIVITIES (PRIOR TO THE ENERGIZATION OF FAS)

Adequate slack of the cables is available at all terminations

The dressing of the cables is done properly after the tenninations.

The whole cable & conduit installations are accessible for easy maintenance.

4
5

FAS Equipments & Devices, Cables, Conduits, junction boxes & panels are
labeled as per the approved labeling scheme.
Touch up the marred finishes and scratches (if any found during the installation)
to match the original finish.
Accepted by:

N esma & Partners


Dar al-handasah

Name

Signature

Date