0 Risk Management
A risk is the possibility of an issue that has not occurred yet, and if it occurs it would have a
negative impact on a project. Risks can become issues if they are not addressed properly. The
process of risk management includes identifying, analyzing and addressing risks in order to
mitigate their negative effects on a project.
1.1 Impact Scale
Project
Objective
Cost
Schedule
Scope
Quality
Very Low
1
Insignifican
t cost
impact
Insignifican
t schedule
impact
Barely
noticeable
Low
2
< 10%
cost
impact
< 5%
schedule
impact
Minor
areas
impacted
Moderate
3
10-20%
cost
impact
5-10%
schedule
impact
Major
areas
impacted
Barely
noticeable
Only very
demanding
application
s impacted
Sponsor
must
approve
quality
reduction
High
4
20-40%
cost
impact
10-20%
schedule
impact
Changes
unaccepta
ble to
sponsor
Quality
reduction
unaccepta
ble to
sponsor
Very High
5
> 40%
cost
impact
> 20%
schedule
impact
Product
becomes
effectively
useless
Product
becomes
effectively
useless
Probabilit
5
4
3
Moderate
Major
Minor
y
2
1
1
Impact
Table: Risk severity matrix
Co
st
5
Sco
pe
5
Impa
ct
5
Probabi
lity
5
Ind
ex
25
15
Major
Avera
ge
5
4.8333
33
3.6666
67
Attrition
4.5
Absenteeism
20
3.5
Design defect
Test case defect
Defect found in
UAT level
Deployment
approval delay
3
4
2
2
3
3
3
3
2
1
6
3
Server failure
15
Power failure
technology
change
Update issues
with uncertainty
Lack of top
management
commitment to
the project
Failure to gain
user
commitment
Users with
negative
attitudes toward
the project
12
Minor
3.5
2.6666
67
3
3.6666
67
1.6666
67
2.6666
67
3.6666
67
2.6666
67
3.6666
67
Major
Modera
te
Modera
te
Modera
te
Minor
Modera
te
SRS defect
Change Request
16
Major
2.6666
67
Modera
te
2.6666
67
Modera
te
3.6666
67
20
Risk
System error
Status
Major
Minor
Modera
te
Modera
te
Major
Risk
Mitigation plan
Responsi
ble
Contingency plan
System error
Test prototype
SSE
Attrition
Allocate bench
resources
PM
Absenteeism
SRS defect
SRS rework
SSE,
SQAE, PM
Snr.BA
Change Request
design defect
Design rework
Change management
Deployment approval
delay
Server failure
Power failure
technology change
TL
Tech
Lead
QA lead
PM,
Review
board
PM
Network
Admin
Admin
Tech
Lead
Re-installation
Network
Admin
Lack of top
management
commitment to the
project
PM
Increase the
communication via
meetings
Increase effective
communication
BA
BA