Rates do not include cost of collection of boulders, metal, moorum and
bitumen unless otherwise specified.
2.
Rates however include lead Up to 100 m and all lifts for all materials
including cost of water unless otherwise specified.
3.
Open season means the period between 1st November to 15th June. No
payment for lead of water shall be made for consolidation done in wet
season, i.e. from 16th June to 31st October.
4.
5.
6.
7.
IRC No.
Title
14-2004
17-1977
Title
73-1992
215-1995
Specifications
for
Road
(Reaffirmed2000)(third revision)
217-1988
454-1994
3117-2004
Item No.
2001
2002
tar
(Revised)
bitumen-Digboi
Item
Unit
Rate
cum
52.80
cum
16.40
type
Remark
Item No.
2003
2004
2005
2006
2007
2008
Item
(a) Consolidation of boulder soling
by SRR/ DRR
including
spreading of moorum and lead of
water up to 100 m:(i)including hire and running
expenses of roller.
(ii)excluding hire and running
expenses of roller.
(b)Consolidation of oversize metal
by SRR/ DRR including spreading
of moorum and lead of water up to
100 m:(i)including hire and running
expenses of roller.
(ii)excluding hire and running
expenses of roller.
(c)Consolidation of moorum by
SRR/ DRR including spreading
moorum, excluding watering(i)but including hire and running
expenses of roller
(ii)and hire and running expenses
of roller.
(a)Watering
for
moorum
consolidation with lead of water up
to 100 m.
(b)Labour for watering only in Item
2004(a).
Picking
old
surface
for
consolidation.
Labour only for metal patch repair
of WBM surface including picking
of old surface.
(a)40 mm size and below metal
spreading for consolidation.
(b)Spreading
including
hand
packing and dressing of oversize
metal for consolidation.
80 mm thick water bound
macadam coat in wet season by
SRR / DRR including spreading of
metal and moorum, watering,
korebandi (40 mm metal)-
Unit
Rate
cum
41.00
cum
24.00
cum
98.00
cum
37.40
cum
26.00
cum
16.40
cum
17.60
cum
3.50
sqm
2.20
cum
134.00
cum
25.00
cum
30.00
Remark
Item No.
2009
2010
2011
2012
2013
Item
Unit
Rate
cum
167.00
cum
77.00
cum
265.00
cum
129.00
cum
24.00
cum
5.80
cum
5.80
sqm
0.10
sqm
1.30
sqm
0.70
Remark
Item No.
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
Item
Unit
Rate
sqm
0.20
tonne
446.00
tonne
272.00
tonne
592.00
tonne
458.00
tonne
592.00
tonne
592.00
cum
99.00
sqm
11.90
sqm
6.20
sqm
6.00
sqm
0.70
sqm
3.60
sqm
0.60
Remark
Item No.
2024
2025
Item
Labour for mixing and spreading
and rolling for premix carpet 25
mm thick excluding tack coat and
heating of binder(a) but including hire and running
expenses of roller.
(b) and also hire and running
expenses of roller
Add for miscellaneous materials
required for cleaning
(a) For item 2012
(b) For item 2013
(c) For item 2014
Unit
Rate
sqm
14.10
sqm
7.20
sqm
sqm
sqm
0.30
0.20
0.10