Advanced building measurement 2014

ACKNOWLEDGEMENT

First of all I wish to pay praise with all my heart to Almighty God for guiding me, blessing
me in all my activities. I also wish to express my gratitude to my parents, who have given
their kind and support.
I wish to thank our respective lecturer Mr. NTK. Lokuliyana for his guidance and plentiful
support given throughout the preparation of the assignment. I also wish to thanks the authors
of the books that referred which helped me a lot in preparing this assignment.
Also my thanks go to the all staff of BCAS for furnishing me with all necessary assistance
required for the preparation of this Assignment.

Advanced building measurement 2014

Table of Contents
Acknowledgement ................................................................... Error! Bookmark not defined.
Introduction ................................................................................................................................ 3
Task 01 ................................................................................................................................... 4-8
Specifications for Concreting .................................................................................................... 9
Specifications for Formwork ..................................................................................................... 9
Query Sheet .............................................................................................................................. 10
Task 02 ............................................................................................................................... 11-13
Specifications for Steel Work .................................................................................................. 14
Query Sheet .............................................................................. Error! Bookmark not defined.
Task 03 ................................................................................ Error! Bookmark not defined.-21
Specifications for disposal system ........................................................................................... 22
Query Sheet .............................................................................. Error! Bookmark not defined.
Task 04 ..................................................................................... Error! Bookmark not defined.
Conclusion ............................................................................................................................... 27
References ................................................................................................................................ 28

Advanced building measurement 2014

Introduction

As a Quantity Surveyor Should know about the advanced building measurement because of it
is funder mental element for the Quantity surveying cause of education. That is why here in
this assignment is going to be explained about what is understand and what is inside this
successful assignment. First of all
Advance building Measurement is a module in BTEC HND in Quantity Surveying which
gives the preliminary idea on measurement of Drainage, manhole, and plumbing. Other
critical calculations are using in the measurement of works. Suitable drawings are used in a
particular work.
I really appreciate the educational system of Edexcel Dimension sheet is main sheet in bill
preparation. It has time sing, dimension, squaring and description. All the measurement
calculations are done here.
Bill page is described quantity and rate. It will take final cost as works. Waste calculations
are done in description in dimension sheet. Drawings and other details are given in annexes.
Building services measured accordance with SMM7. Select design and apply appropriate
methods and techniques for solutions.
Plumbing and manhole activities carried from given drawings and have taken measurements
through scales.
I have done my final report for the Advance building Measurement by completing the tasks
to achieve my target successfully.

Advanced building measurement 2014


Item
No

Description

Quantity

Bill No 01
A-Preliminaries
A-1

The contractor shall provide and


pay the transportation of ready
mix plant to the side in order to
provide a good quality of
concrete to the columns slabs
and beams

Total carried to general


summary

item

Unit

Rate

Amount
Rs
Cts

Advanced building measurement 2014

Item
No

Description

Quantity

Unit

Bill No 02
E Is situ concrete
Preambles for concrete
1. Machineries shall use for the
mixing appropriate.
2. The concrete rate will
include mixing,
transporting, placing,
compacting and curing.

E- 10 Mixing / casting/ curing


in situ concrete
1:3:6,(19) mm aggregates with
reinforced cement concrete.
E- 01

For foundation

E- 02

For ground beams.

01

m3

01

m3

01

m3

01

m3

1:2:4, (13) mm aggregates with


reinforced cement concrete.
in slabs thick ness 150mm

E- 03

E- 04

For beams, attached deep.

Total work carried forward to


next page

Rate

Amount
Rs
Cts

Advanced building measurement 2014


Item
No

Description

Quantity

Unit

Total brought forwarded from


previous page
1:2:4, (13) mm aggregates with
reinforced cement concrete.
E- 05

For columns.

01

m3

E- 06

for staircase

04

m3

for edges of suspended slabs,


plain vertical, height < 250mm

02

E- 08

For soffits of slabs thickness


<200mm height to soffit < 3.0
m, horizontal.

06

m2

E- 09

For beams attached to slabs


regular shaped height to 225
375mm.

07

m2

E 20 Form work for in situ


concrete
Preambles for the form work
1. Steel shoring system shall
use for the support of the
form work.
2. Keep minimum 28 days for
the frame work.

25mm thickness ply wood form


work
E- 07

Total carried to next page

Rate

Amount
Rs
Cts

Advanced building measurement 2014


Item
No

Description

Quantity

Unit

Total brought forwarded from


previous page.
25mm thickness ply wood form
work
E- 10

for columns attached to walls,


height to soffit < 3.0m

E- 11

08

for stair flights width of the stair


03
flights is 1.5m rise 250mm and
thickness of the waist 75mm

Total carried to general


summary

Rate

Amount
Rs
Cts

Advanced building measurement 2014


Item
No

Description

Quantity

Unit

02

nr

Bill No 03
L Windows / doors / stairs
Preambles for the stairs.
1. Wrought iron balustrade
should be welded and
painted with the 2 coat of oil
paint.
2. Form work for steps can be
included in provisional sum.
L- 30 Stairs / walkways /
balustrades

Composite item 38 X 12mm


wrought iron balustrades
painted two coats oil paint and
standard 1175mm hand rail

L-01

Total carried to general


summary

Rate

Amount
Rs
Cts

Advanced building measurement 2014

Specification for the works

Concrete work
1.The ingredients shall be properly gauged and the sand, cement, aggregate shall than be
thoroughly incorporated by turning them over at least.
2.Sufficient water shall be added to give stiff consistency and the mixture shall be turned
over twice.

Form work
1.only treated ply wood timber used for the form work
2.we should use the timber for the form work without any cracks and moisture.

Advanced building measurement 2014


Query Sheet
Project
: Stairs.
Drawing Number : 01
T.O.
: M.N.M.Nathees
No

Date

Query

Date

Answer

01

14/06/07

What is the type of form work


required, material for form work?

14/06/07

25mm thick plywood


forms work.

Quantity Surveyor

10

Architect / Engineer

Advanced building measurement 2014


Item
No

Description

Quantity

Bill No 01
B preliminaries
B-1

Maintenance of office
equipment

item

B-2

Site transport for the duration of


the construction.

item

B-3

Provide prime cost sum for


nominated suppliers ABC to
supply good & quality steel
structures and fittings

item

Total carried to general


summary

11

Unit

Rate

Amount
Rs
Cts

Advanced building measurement 2014


Item
No

Description

Quantity

Unit

Bill no 02
G Structural / car casing
metal / timber
Preambles or steel structure
1. Fittings are sundry steel
work which is necessary to
form connections to other
materials and steel work.
These include fixing plate ,
baseplates and reinforcing
flat pieces
2. Holding down bolts
assembly consisting 04 nr
bolt cast into concrete in
sleeves
G- 10 Structural steel framing

G-01

Framing fabrication
universal columns 305X 305 X
158 weight > 100kgm-1

G-02

G-03

7.44

universal beams weight 40- 100


kgm-1

7.85

fittings includes base plates and


angle bracket

1.66

Total work carried forward to


next page

12

Rate

Amount
Rs
Cts

Advanced building measurement 2014


Item
No

Description

Quantity

Unit

Total work brought from the


previous page

G-04

200 long 30 diameter holding


down bolts with 100X100X
12mm plate washers

24

nr

Framing erection
G-05

permanent erection on site

16.95

G-06

Surface preparation blast


cleaning

317

m2

G-07

Surface treatments galvanizing

317

m2

Total carried to general


summary

13

Rate

Amount
Rs
Cts

Advanced building measurement 2014


Specification for the structural steel framing
1. Bolts and nuts used for the work shall be given otherwise specified black bolts and
nuts to BS73.
2. Beam dimensions are given according to the drawing otherwise stated.

14

Advanced building measurement 2014


Query Sheet
Project
: Steal structure
Drawing Number : 02
T.O.
: M.N.M.Nathees
No

Date

Query

01

08/06/14

Surface preparation details not


given.

Blast cleaning.

02

08/06/14

Surface treatment details not


given

Galvanizing.

Quantity Surveyor

15

Date

Answer

Architect / Engineer

Advanced building measurement 2014

Item
No

Description

Quantity

Unit

Rate

Amount
Rs
Cts

Bill no 1
C- preliminaries
C-01

Connecting to main sewer.

Total carried to general


summary

16

27000 27000

00

Advanced building measurement 2014

Item
No

Description

Quantity

Unit

Bill no 2
D ground work
Preambles for disposal system
01

The diameter of the all pipes is


the internal bores.

02

All pipes should be clean before


installation.

D 20- excavating & filling.


Excavating.
D-1

For pits (3), maximum depth


1.00m

02

m3

D-2

pits (3), maximum depth


2.00m

01

m3

Earth Work Support


D-3

maximum depth 1.00m,


distance between opposing
faces 2.00m

07

m2

D-4

maximum depth 2.00m,


distance between opposing
faces 2.00m

05

m2

m3

Disposal
D-5

excavated material on site

03

D-6

surface water

Item

Total carried forward to


summary page

17

Rate

Amount
Rs
Cts

Advanced building measurement 2014

Item
No

Description

Quantity

Unit

Bill No-03
E10 In Situ Concrete
E-01

Bed, thickness 150mm with


1:3:6 mix 19mm aggregate
concrete 100mm thick with
100mm spread.
.

Total carried to general


summary

18

01

m3

Rate

Amount
Rs
Cts

Advanced building measurement 2014


Item
No

Description

Quantity

Unit

Bill No-04
F Masonry
Brick
F-01

Brick walls, thickness 215mm,


class B engineering bricks in
1:3 cement: sand mortar, flush
pointed internally, vertical

Total carried to general


summary

19

06

m2

Rate

Amount
Rs
Cts

Advanced building measurement 2014


Item
No

Description

Quantity

Unit

Bill No-05
R Disposal Systems
R-12 Drainage Below Ground
Excavating trenches,
pipes 200mm.
R-01

Nominal size & there after


250mm stages.

51

Items Extra Over


R-02

Breaking out existing materials,


concrete

02

m2

R-03

Breaking out existing hard


pavings, thickness 150mm,
coated macadam asphalt

01

m2

R-04

Lifting turf for preservation,


grass verge

01

m2

R-05

Disposal of surface water

Item

R-06

Width 500mm, thickness of bed


150mm, surround thickness
150mm, 100 pipes with 1:3:9
(19) mix

51

R-07

Pipes In trenches, 100 pipes to


be glazed stone ware BS65 and
joined in tarred yarn gaskin

53

Total work carried forward to


next page.

20

Rate

Amount
Rs
Cts

Advanced building measurement 2014

Item
No

Description

Quantity

Unit

Total work brought from


previous page

R-08

Pipes Accessories Gullies to be


BS539 with 225 225mm
plastic grating

04

nr

Man Holes
Channels, 100 pipes salt
glazed stoneware 3/4 section
branches,
R-09

length 600mm

02

nr

R-10

length 750mm

01

nr

R-11

Benching, 1:2:4 mix 12mm


aggregate concrete average
thickness 225mm

03

nr

R-12

Manhole step iron fixed to wall

02

nr

R-13

Man hole cover 150mm


thickness, 650 450mm single
seal medium weight to BS497

03

nr

R-14

Connecting to local authority


sever.

01

nr

R-15

Testing and commission


insurance company test.

Item

R-16

Preparing drawings 2 copies,


print.

item

Total carried forward to general


summary

21

Rate

Amount
Rs
Cts

Advanced building measurement 2014

Specification for the disposal system


1. All the diameter of the pipes should be measured for the external diameter.
2. All pipes used to installation should be in according to BS 497

22

Advanced building measurement 2014


Query Sheet
Project
: manholes
Drawing Number : 03
T.O.
: M.N.M.Nathees.
No

Date

Query

01

14/06/14

What is the thickness of the iron


cover hooks

75mm

02

14/06/14

What is the surrounding bed


width?

500mm

03

14/06/14

What is the clearance of


benching thickness?

50mm

04

14/06/14

What is the gully invert height?

150mm

Quantity Surveyor

23

Date

Answer

Architect / Engineer

Advanced building measurement 2014

Task 04
4.1 Write typical item description for five selected items for time related charges and
five selected items for method related charges of preliminaries for one of the above
tasks.

Time related charges


Security
The Contractor, its workers and sub-contractors shall abide by any direction given to it in
relation to the employers security requirement for the site. The Contractor shall from the
commencement of and throughout the period of execution of the project works up to Practical
Completion take all proper and adequate precautions to prevent access by unauthorized
persons to the Site to prevent all thefts and vandalism. The Contractor shall replace and make
good any loss and/or damage from theft, trespass and/or vandalism occurring to the project
works prior to Practical Completion. The Contractor shall provide suitable security to the site
to ensure safety of all Third parties, including the general public, and to ensure the safety of
all materials equipment and plant including the generator until complete.

Lighting and power


The contractor provide all necessary lighting and power to the works including all temporary
wiring and meters; and alter, adapt and maintaining as necessary and pay all the charges in
connection with same. On completion, disconnect and remove. Usage charge of electricity
bill also included. The Contractor shall replace and make it good Need to continue the work.
Water
The contractor shall provide clean, fresh water for use on he works. Pay all necessary
charges, provide all temporary storage, plumbing services and connections and shall clear
away and make it good on completion. Need to continue the work.

24

Advanced building measurement 2014

Telecommunication
The contractor provides all necessary communication facilities throughout the construction to
communicate with the workers, suppliers, supervisors, engineer quantity surveyor etc...
A temporary line is bought and the bills are paid at the end of every month and finally it will
be disconnected on completion of the construction

Technical and surveying equipment


The contractor provides all necessary technical and surveying equipment to start the work.
These equipment are rented from specialized suppliers and the payment will be settled at the
end of the week, month etc... On completion of the construction all the rented equipment will
be returned.

Method Related Charges


Temporary work
The contractor shall provide and maintain all necessary roads, crossings and the like and shall
clear away and make it good on completion. It is built to move the equipment easily from one
place to another.

Fire protection
The Contractor shall be responsible for fire protection on the Site during construction through
the provision of chemical hand-held fire extinguishers and the like. The Contractor shall
ensure that its sub-contractors provide any additional fire extinguishers or similar protection
as made necessary by extreme hazards caused by welding or any other high risk hazards
relating to project works. The Contractor shall replace and make it good.

25

Advanced building measurement 2014


Safety equipment
During the occurrence of the contract, the contractor shall provide and maintain all safety
precautions and such visitors who may be on site from the time to time, all in accordance
with statutory regulations. Safety equipment such as helmet, safety net and first aid box. The
Contractor shall replace and make it good. These equipment are bought by settling the
payments.

Name board

Prior to the starting of the construction, the constructor will provide the name board because
it provide an outline such as the name of the constructor, name of the project and the name of
the construction company, so that it could be easily identifiable by the others. There was a
cost involved for the creation of the name board.

Site accommodation

The contractor shall provide a site accommodation for the workers. The reason behind this is,
there are workers from different places and far places so for the workers to travel daily may
be difficult and if the constructor fails to do so may lead to delay in construction. The
constructor may provide the workers with small huts with necessary facilities on the first day
and it will be removed at the end of the construction.

26

Advanced building measurement 2014

Conclusion
Quantity Surveyors always have a major part in construction industry. Because they are
responsible for the measurements and bill of quantities. As a quantity surveyor I have to
familiar with the taking off, preparing BOQ. The owner of a building project is called as
client. To select a contractor, for a building project, clients will call for tenders. And these
tender documents are form of prized BOQ.
So according to this assignment I am able to understand the taking off for reinforced concrete
elements, steel sections and drainage. In this report I have prepared the bill of quantities,
preambles and specifications. These are given according to the SMM7 rules.
Finally I have given the time related charges and method related charges for one of the above
task. Time related charges are always related with time. They are calculated according to the
time period and method related charges are priced according to the method of using that item.
So finally I can gain the knowledge in taking off quantities for structural concrete items in
super structure and sub structure, taking off quantities for steel structures, taking off
quantities for disposal system.

27

Advanced building measurement 2014


References

Estimating and costing for civil engineering ( D.N Dutta)


Advanced measurement of building works ( Ivor .H. seely)
http://isb.idaho.gov/pdf/general/the_model_standards_of_conduct_for_mediators.pdf
Class room exercise books and lectures advanced building measurement hand outs
and explanation module tutorial and Lokuliyana(sir), N.T.K. Advance building
measurement Dehiwala Bcas campus handouts

Standard Method of Measurement of Building Works, 7th ed. Revised 1998 (London:
RICS Books, 1998).
Seely I, H. (1989) Advanced Building Measurement. Macmillan.

28