You are on page 1of 1

REPORT No.

LEAK TESTING REPORT FOR ABOVE


GROUND STORAGE TANK; (PMS)

LOGO

Project: INTEGRITY ASSESSMENT OF PMS TANK

Quality Control Form:

Client:
AREAS OF INSPECTION: TANK BOTTOM AND ANNULAR WELD JOINTS

Report
Date:

CODE FOR INSPECTION: API653 AND API650

MATERIAL: CARBON STEEL

PROCEDURE:
1. PROPERLY CLEAN AND PREPARE ALL WELDMENTS.
2. APPLY LEAN QUANTITY OF FOAMY LIQUID & SET VACUUM BOX
DIRECTLY ON WELDMENT TO BE TESTED, AND THEN APPLY
COMPRESSED AIR.
3. THE PRESSURE BUILD UP, WILL SEAL THE WELDMENT SURFACE AND
ALLOW VACUUM OF MAXIMUM OF 300 BAR TO EXIST WITHIN THE
BOX FOR 10 MINS.
4. FINALLY, CAREFULLY AND PATIENTLY OBSERVE INSIDE THE VACUUM
BOX THROUGH THE GLASS FOR ANY CONTINOUS BUBBLE. WHICH
CAN BE INDICATIVE OF A LEAK ALONG ANY WELDMENT UNDER TEST
Area: TANK BOTTOM & ANNULAR
PLATE
Material: A283 GRADE C;

Category: NA
Welding process: NOT REQUIRED

Prepared edge

State of Examination
X
Surface Preparation

Size: NOT REQUIRED

As weld

Brushing

After PWHT
Repair
As weld

ACCEPTANCE
CRITERIA

FOAMY LIQUID

Thickness (Average): 9.5mm & 5.5mm

Other
X

CONSUMABLES

GAMMATEC

Base Metal

Grinding

EQUIPMENT

TEST PRESSURE; 300BAR (4.4Psi)


VACUUM BOX DIMENSIONS: 70cm
x25cmX8cm

Other

LIGHTING IN TANK

API653

100LUX

Temperature

AMBIENT

TEST RESULT
CML

JUDGMENT

BOTTOM
PLATE

ANNULAR PLATE

TOP SIDE

TOP SIDE

INTERNAL

INTERNAL &
EXTERNAL

DEFECTS

Accept

Reject

NIL

OK

NIL

OK

Date of
Inspection

Remarks

OK AS OF DATE
OF INSPECTION
OK AS OF DATE
OF INSPECTION

REPORT SUMMARY FOR PMS TANK 31;


NO BUBBLE WAS OBSERVED DURING THE VACUUM BOX TEST. THE TANK BOTTOM STEEL PLATE AND
ANNULAR PLATE WELDMENTS MEET THE ACCEPTABLE CRITERIA OF API653 & API650 AS AT THIS DAY OF
PROJECT
SUPERVISORS

REVIEWED BY

1.
2.

API INSPECTOR &


ENGINEER

APPROVED BY

CLIENT

You might also like