SUPERVISION DE OBRA
VALORIZACIN DE OBRA
VALORIZACIN N
01
PROPIETARIO
VALOR REFERENCIAL
S/.
CONTRATISTA
MONTO CONTRATADO
S/.
PROVINCIA
OYON
FORMULA
UNICA
700,000.00
DEPARTAMENTO
LIMA
FECHA
700,000.00
OBRA : CONSTRUCCION CENTRO DE SALUD TIPO II DE OYON CON ATENCION MATERNO INFANTIL CON APOYO SOCIEDAD CIVIL
Avance Anterior
tem
Partidas
Und.
Metrado
Costo
Unitario
(S/.)
Costo
Parcial
(S/.)
Metrado
Monto de
Valorizacin
Total
Avance Actual
Metrado
Avance Acumulado
Monto de
Valorizacin Total
Metrado
Saldo a Ejecutar
Monto de
Valorizacin Total
Metrado
Monto de
Valorizacin Total
ESTRUCTURAS
01.00.00 OBRAS PROVISIONALES
01.01.00 ALMACENES OFICINAS TALLERES Y GUARDIANIA
M2
40.00
31.50
1,260.00
0.00
0.00
40.00
1,260.00
40.00
0.00
0.00
UND
1.00
842.52
842.52
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
842.52
GLB
1.00
500.00
500.00
0.00
0.00
1.00
500.00
0.00
1,260.00 100.00%
500.00
0.00%
1.00
0.00
500.00
0.24
120.00
0.00
0.00
500.00
120.00
500.00
120.00 100.00%
0.00
0.00
600.00
1.00
600.00 100.00%
0.00
0.00
M2
GLB
1.00
600.00
600.00
0.00
0.00
1.00
M2
2,000.00
0.32
640.00
0.00
0.00
1,990.00
M3
820.00
1.87
1,533.40
0.00
0.00
800.00
1,496.00
M3
35.00
1.87
65.45
0.00
0.00
0.00
M2
1,400.00
5.97
8,358.00
0.00
0.00
0.00
M3
215.00
7.29
1,567.35
0.00
0.00
0.00
636.80 1,990.00
636.80
99.50%
10.00
3.20
800.00
1,496.00
97.56%
20.00
37.40
0.00
0.00
0.00
0.00%
35.00
65.45
0.00
0.00
0.00
0.00%
1,400.00
8,358.00
0.00
0.00
0.00
0.00%
215.00
1,567.35
364.65
610.00
1.87
1,140.70
0.00
0.00
415.00
776.05
415.00
776.05
68.03%
195.00
M2
710.00
11.16
7,923.60
0.00
0.00
675.00
7,533.00
675.00
7,533.00
95.07%
35.00
M3
375.00
38.90
14,587.50
0.00
0.00
370.00
14,393.00
370.00
14,393.00
98.67%
5.00
194.50
M3
135.00
72.28
9,757.80
0.00
0.00
27.00
1,951.56
27.00
1,951.56
20.00%
108.00
7,806.24
M2
1,410.00
18.25
25,732.50
0.00
0.00
282.00
5,146.50
282.00
5,146.50
20.00%
1,128.00
20,586.00
KG
9,450.00
0.47
4,441.50
0.00
0.00
8,978.00
4,219.66 8,978.00
4,219.66
95.01%
472.00
221.84
M2
2,000.00
9.25
18,500.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
2,000.00
18,500.00
1,965.52
M3
81.00
24.88
2,015.28
0.00
0.00
79.00
KG
1,300.00
0.47
611.00
0.00
0.00
1,235.00
79.00
1,965.52
97.53%
2.00
49.76
580.45 1,235.00
580.45
95.00%
65.00
M3
17.00
44.18
751.06
0.00
0.00
30.55
16.00
706.88
16.00
706.88
94.12%
1.00
44.18
2,593.52
136.00
M2
136.00
19.07
2,593.52
0.00
0.00
136.00
KG
1,850.00
0.47
869.50
0.00
0.00
1,757.00
825.79 1,757.00
2,593.52 100.00%
825.79
94.97%
0.00
0.00
93.00
43.71
05.03.00 COLUMNAS
05.03.01 CONCRETO EN COLUMNAS F"C 210 KG/CM2
M3
55.00
99.10
5,450.50
0.00
0.00
M2
650.00
26.04
16,926.00
0.00
0.00
0.00
M2
7,850.00
0.47
3,689.50
0.00
0.00
7,457.00
0.00
0.00
0.00
0.00%
55.00
5,450.50
0.00
0.00
0.00
0.00%
650.00
16,926.00
3,504.79 7,457.00
3,504.79
M3
8.00
97.21
777.68
0.00
0.00
0.00
M2
111.00
22.49
2,496.39
0.00
0.00
0.00
0.00
0.00
Kg
325.00
0.47
152.75
0.00
0.00
308.00
144.76
308.00
M3
121.00
38.68
4,680.28
0.00
0.00
0.00
0.00
0.00
0.00
94.99%
393.00
184.71
0.00
0.00%
8.00
777.68
0.00
0.00%
111.00
2,496.39
144.76
94.77%
17.00
7.99
0.00
0.00%
121.00
4,680.28
05.04.00 PLACAS
0.00
0.00
05.05.00 VIGAS
05.05.01 VIGAS CONCRETO 210 Kg/Cm2
05.05.02 VIGAS ENCOFRADO Y DESENCOFRADO
M2
665.00
25.63
17,043.95
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
665.00
17,043.95
KG
6,950.00
0.47
3,266.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
6,950.00
3,266.50
M3
150.00
34.30
5,145.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
150.00
5,145.00
M2
1,800.00
23.03
41,454.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1,800.00
41,454.00
KG
10,000.00
0.47
4,700.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
10,000.00
4,700.00
UND
1,700.00
0.25
425.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1,700.00
425.00
VAL. 01 ABRIL
Pgina 1
VALORIZACIN DE OBRA
VALORIZACIN N
01
PROPIETARIO
VALOR REFERENCIAL
S/.
CONTRATISTA
MONTO CONTRATADO
S/.
PROVINCIA
OYON
FORMULA
UNICA
700,000.00
DEPARTAMENTO
LIMA
FECHA
700,000.00
OBRA : CONSTRUCCION CENTRO DE SALUD TIPO II DE OYON CON ATENCION MATERNO INFANTIL CON APOYO SOCIEDAD CIVIL
Avance Anterior
tem
Partidas
Und.
Metrado
Costo
Unitario
(S/.)
Costo
Parcial
(S/.)
Metrado
Monto de
Valorizacin
Total
Avance Actual
Metrado
Avance Acumulado
Monto de
Valorizacin Total
Metrado
Saldo a Ejecutar
Monto de
Valorizacin Total
Metrado
Monto de
Valorizacin Total
05.07.00 CISTERNA
05.07.01 CONCRETO Fc=210 Kg/Cm2-CISTERNA
M3
16.00
76.45
1,223.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
16.00
1,223.20
M2
95.00
20.13
1,912.35
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
95.00
1,912.35
M2
1,200.00
0.47
564.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1,200.00
564.00
M3
6.50
110.29
716.89
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
6.50
716.89
1,243.89
M2
51.00
24.39
1,243.89
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
51.00
KG
500.00
0.47
235.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
500.00
235.00
M2
2,000.00
36.75
73,500.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
2,000.00
73,500.00
ARQUITECTURA
11.00.00
11.01.00
M2
1,243.08
14.71
18,285.71
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1,243.08
18,285.71
11.02.00
M2
1,634.28
11.24
18,369.31
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1,634.28
18,369.31
12.00.00
12.01.00
M2
1,279.90
9.19
11,762.28
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1,279.90
11,762.28
12.02.00
M2
2,983.43
8.74
26,075.18
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
2,983.43
26,075.18
12.03.00
M2
1,603.25
7.79
12,489.32
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1,603.25
12,489.32
12.04.00
TARRAJEO COLUMNAS
M2
6.00
55.08
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
6.00
12.05.00
TARRAJEO DE VIGAS
M2
50.00
11.77
588.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
50.00
588.50
12.06.00
M2
62.35
77.55
4,835.24
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
62.35
4,835.24
12.07.00
TARRAJEO IMPERMEABILIZADO
M2
49.20
7.41
364.57
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
49.20
364.57
12.08.00
423.90
7.00
2,967.30
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
423.90
2,967.30
12.09.00
VESTIDURA DE DERRAMES
515.84
4.41
2,274.85
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
515.84
2,274.85
12.10.00
3,634.26
9.18
55.08
906.30
4.01
3,634.26
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
906.30
12.11.00
BRUAS EN INTERIORES
325.73
3.16
1,029.31
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
325.73
1,029.31
13.00.00
CIELORRASOS
13.01.00
M2
1,370.57
13.21
18,105.23
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1,370.57
18,105.23
14.00.00
PISOS Y PAVIMENTOS
14.01.00
CONTRAPISO E= 40 mm
M2
1,224.99
7.07
8,660.68
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1,224.99
8,660.68
14.06.00
M2
44.76
17.09
764.95
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
44.76
764.95
25.00.00
ESCALERAS
25.01.00
ESCALERA DE GATO
4.35
80.02
348.09
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
4.35
348.09
26.00.00
TAPA METALICA
26.01.00
UND
1.00
182.89
182.89
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
182.89
31.00.00
32.02.00
LIMPIEZA PERMANENTE
GLB
1.00
1,535.73
1,535.73
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
1,535.73
32.03.00
LIMPIEZA FINAL
GLB
1.00
500.00
500.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
500.00
INST. ELECTRICAS
01.00.00
INSTALACIONES ELECTRICAS
01.01.00
CIRCUITOS DERIVADOS
01.02.00
01.02.01
CENTRO DE LUZ
PTO
173.00
24.16
4,179.68
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
173.00
4,179.68
01.02.02
PTO
99.00
16.36
1,619.64
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
99.00
1,619.64
01.02.03
PTO
18.00
35.53
639.54
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
18.00
639.54
01.02.04
PTO
4.00
31.71
126.84
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
4.00
126.84
01.02.05
PTO
7.00
19.58
137.06
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
7.00
137.06
VAL. 01 ABRIL
Pgina 2
VALORIZACIN DE OBRA
VALORIZACIN N
01
PROPIETARIO
VALOR REFERENCIAL
S/.
CONTRATISTA
MONTO CONTRATADO
S/.
PROVINCIA
OYON
FORMULA
UNICA
700,000.00
DEPARTAMENTO
LIMA
FECHA
700,000.00
OBRA : CONSTRUCCION CENTRO DE SALUD TIPO II DE OYON CON ATENCION MATERNO INFANTIL CON APOYO SOCIEDAD CIVIL
Avance Anterior
tem
Partidas
Und.
Metrado
Costo
Unitario
(S/.)
Costo
Parcial
(S/.)
Metrado
Monto de
Valorizacin
Total
Avance Actual
Metrado
Avance Acumulado
Monto de
Valorizacin Total
Metrado
Saldo a Ejecutar
Monto de
Valorizacin Total
Metrado
Monto de
Valorizacin Total
01.02.06
PTO
62.00
28.69
1,778.78
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
62.00
1,778.78
01.02.07
PTO
38.00
29.44
1,118.72
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
38.00
1,118.72
01.02.08
PTO
2.00
33.54
67.08
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
2.00
01.02.09
PTO
18.00
36.77
661.86
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
18.00
661.86
01.02.10
PTO
135.00
35.80
4,833.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
135.00
4,833.00
67.08
01.02.11
PTO
11.00
35.79
393.69
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
11.00
393.69
01.02.12
PTO
9.00
42.74
384.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
9.00
384.66
01.02.13
SALIDA P/TOMACORR./COMPUTADORA
PTO
7.00
18.34
128.38
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
7.00
128.38
01.02.14
PTO
11.00
35.49
390.39
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
11.00
390.39
02.00.00
02.01.00
PTO
4.00
75.48
301.92
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
4.00
301.92
02.02.00
PTO
1.00
55.18
55.18
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
02.03.00
PTO
1.00
611.89
611.89
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
611.89
02.04.00
PTO
8.00
59.94
479.52
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
8.00
479.52
02.05.00
PTO
1.00
63.77
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
02.06.00
PTO
1.00
82.00
82.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
82.00
02.07.00
CALANDRIA
PTO
1.00
244.36
244.36
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
244.36
02.08.00
REFRIGERADORA INDUSTRIAL
PTO
1.00
47.16
47.16
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
02.09.00
SECADORA
PTO
1.00
51.36
51.36
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
51.36
02.10.00
LAVADORA
PTO
2.00
50.43
100.86
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
2.00
100.86
02.11.00
SOLDADORA
PTO
1.00
93.38
93.38
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
93.38
02.12.00
DESTILADOR DE AGUA DE 3 KW
PTO
1.00
63.74
63.74
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
63.74
02.13.00
PTO
1.00
46.15
46.15
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
46.15
02.14.00
CENTRAL DE PARLANTES
PTO
1.00
75.05
75.05
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
02.15.00
PTO
1.00
77.24
77.24
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
77.24
02.16.00
PTO
1.00
100.93
100.93
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
100.93
02.17.00
PTO
1.00
67.12
67.12
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
67.12
02.18.00
ELECTROBONBAS DE AGUA
CJT
1.00
219.22
219.22
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
219.22
02.19.00
CJT
1.00
97.11
97.11
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
97.11
02.20.00
RAYOS X
CJT
1.00
913.50
913.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
913.50
02.21.00
CJT
1.00
29.14
29.14
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
29.14
03.00.00
COMUNICACIONES Y SEALES
03.01.00
SISTEMAS DE TELEFONOS
03.01.01
PTO
1.00
48.30
48.30
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
03.01.02
PTO
3.00
294.21
882.63
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
3.00
882.63
03.01.03
PTO
22.00
71.93
1,582.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
22.00
1,582.46
03.01.04
PTO
7.00
65.87
461.09
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
7.00
461.09
03.01.05
PTO
5.00
52.76
263.80
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
5.00
263.80
03.01.06
PTO
3.00
85.72
257.16
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
3.00
257.16
03.01.07
PTO
1.00
48.10
48.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
48.10
04.00.00
04.01.00
PTO
7.00
85.72
600.04
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
7.00
600.04
04.02.00
PTO
3.00
48.10
144.30
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
04.03.00
PTO
6.00
78.48
470.88
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
6.00
470.88
04.03.04
PTO
73.00
48.77
3,560.21
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
73.00
3,560.21
05.00.00
05.01.00
PTO
1.00
54.23
54.23
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
54.23
05.02.00
PTO
11.00
69.26
761.86
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
11.00
761.86
05.03.00
PTO
10.00
36.46
364.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
10.00
364.60
05.04.00
PTO
5.00
44.07
220.35
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
5.00
220.35
05.05.00
pto
4.00
124.10
496.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
4.00
496.40
05.06.00
PTO
5.00
32.03
160.15
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
5.00
160.15
05.07.00
PTO
1.00
36.47
36.47
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
36.47
05.08.00
PTO
4.00
33.00
132.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
4.00
132.00
06.00.00
SISTEMA DE TELECABLE
06.01.00
PTO
1.00
52.76
52.76
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
52.76
06.02.00
PTO
2.00
47.36
94.72
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
2.00
94.72
07.00.00
TIMBRE
07.01.00
CJT
1.00
39.83
39.83
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
39.83
63.77
VAL. 01 ABRIL
1.00
3.00
55.18
63.77
47.16
75.05
48.30
144.30
Pgina 3
VALORIZACIN DE OBRA
VALORIZACIN N
01
PROPIETARIO
VALOR REFERENCIAL
S/.
CONTRATISTA
MONTO CONTRATADO
S/.
PROVINCIA
OYON
FORMULA
UNICA
700,000.00
DEPARTAMENTO
LIMA
FECHA
700,000.00
OBRA : CONSTRUCCION CENTRO DE SALUD TIPO II DE OYON CON ATENCION MATERNO INFANTIL CON APOYO SOCIEDAD CIVIL
Avance Anterior
tem
Partidas
Und.
Metrado
Costo
Unitario
(S/.)
Costo
Parcial
(S/.)
Metrado
Monto de
Valorizacin
Total
Avance Actual
Metrado
Avance Acumulado
Monto de
Valorizacin Total
Metrado
Saldo a Ejecutar
Monto de
Valorizacin Total
Metrado
Monto de
Valorizacin Total
08.00.00
ALIMENTADORES
08.01.00
2.00
2.64
5.28
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
2.00
5.28
08.02.00
47.00
35.32
1,660.04
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
47.00
1,660.04
08.03.00
28.00
14.07
393.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
28.00
393.96
08.04.00
25.00
12.38
309.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
25.00
309.50
08.05.00
25.00
8.23
205.75
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
25.00
205.75
08.06.00
1.00
9.70
9.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
9.70
08.07.00
31.00
9.70
300.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
31.00
300.70
08.08.00
10.00
9.22
92.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
10.00
92.20
08.09.00
21.00
5.50
115.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
21.00
115.50
08.10.00
31.00
7.68
238.08
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
31.00
238.08
08.11.00
23.00
5.91
135.93
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
23.00
135.93
08.12.00
32.00
74.58
2,386.56
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
32.00
2,386.56
08.13.00
ACOMETIDA TELEFONICA
CJT
4.00
70.31
281.24
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
4.00
281.24
08.14.00
UND
4.00
143.77
575.08
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
4.00
575.08
08.15.00
3.00
7.14
21.42
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
3.00
21.42
09.00.00
ALUMBRADO EXTERIOR
09.01.00
TABLEROS ELECTRICOS
09.01.01
TABLERO GENERAL TG
UND
1.00
46.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
09.01.02
1.00
46.20
46.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
46.20
09.01.03
TABLERO T-CQI
UND
1.00
458.56
458.56
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
458.56
09.01.04
TABLERO T-SG
UND
1.00
458.56
458.56
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
458.56
09.01.05
TABLERO TD-A
UND
1.00
383.20
383.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
383.20
09.01.06
TABLERO TD-R
UND
1.00
338.20
338.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
338.20
09.01.07
TABLERO TD-DP
UND
1.00
383.20
383.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
383.20
09.01.08
TABLERO TD-CE
UND
1.00
416.96
416.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
416.96
09.01.09
TABLERO TD-T
UND
1.00
124.40
124.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
124.40
09.01.10
TABLERO T-CI
UND
1.00
46.20
46.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
46.20
09.01.11
TABLERO TD-3
und
2.00
417.81
835.62
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
2.00
835.62
09.01.12
und
1.00
181.78
181.78
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
181.78
12.00.00
SISTEMA DE PARARRAYOS
12.01.00
UND
1.00
183.36
183.36
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
183.36
12.02.00
CJT
1.00
551.96
551.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
551.96
12.03.00
21.00
10.63
223.23
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
21.00
223.23
12.04.00
PARARRAYOS LONIFLASH
UND
1.00
198.47
198.47
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
198.47
12.05.00
UND
1.00
110.10
110.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
110.10
12.06.00
UND
3.00
143.77
431.31
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
3.00
431.31
12.07.00
UND
1.00
14.24
14.24
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
14.24
12.08.00
12.00
3.56
42.72
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
12.00
42.72
13.00.00
VARIOS
13.01.00
PRUEBAS ELECTRICAS
GLB
1.00
85.10
85.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
85.10
14.00.00
SISTEMA DE COMPUTO
14.01.00
pto
7.00
77.56
542.92
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
7.00
542.92
46.20
VAL. 01 ABRIL
46.20
Pgina 4
VALORIZACIN DE OBRA
VALORIZACIN N
01
PROPIETARIO
VALOR REFERENCIAL
S/.
CONTRATISTA
MONTO CONTRATADO
S/.
PROVINCIA
OYON
FORMULA
UNICA
700,000.00
DEPARTAMENTO
LIMA
FECHA
700,000.00
OBRA : CONSTRUCCION CENTRO DE SALUD TIPO II DE OYON CON ATENCION MATERNO INFANTIL CON APOYO SOCIEDAD CIVIL
Avance Anterior
tem
Partidas
Und.
Metrado
Costo
Unitario
(S/.)
Costo
Parcial
(S/.)
Metrado
Monto de
Valorizacin
Total
Avance Actual
Metrado
Avance Acumulado
Monto de
Valorizacin Total
Metrado
Saldo a Ejecutar
Monto de
Valorizacin Total
Metrado
Monto de
Valorizacin Total
INST. SANITARIAS
01.00.00
DESAGUE Y VENTILACION
01.01.00
PTO
70.00
21.77
1,523.90
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
70.00
1,523.90
01.02.00
PTO
24.00
101.64
2,439.36
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
24.00
2,439.36
01.03.00
PTO
18.00
45.48
818.64
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
18.00
818.64
02.00.00
REDES DE DERIVACION
02.01.00
258.00
8.14
2,100.12
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
258.00
2,100.12
02.02.00
103.00
22.26
2,292.78
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
103.00
2,292.78
03.00.00
03.01.00
54.00
8.14
439.56
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
54.00
439.56
04.00.00
04.01.00
UND
38.00
11.25
427.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
38.00
427.50
04.02.00
UND
10.00
17.26
172.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
10.00
172.60
05.00.00
SOMBREROS DE VENTILACION
05.01.00
PZA
18.00
15.03
270.54
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
18.00
270.54
06.00.00
06.01.00
273.00
0.83
226.59
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
273.00
226.59
06.02.00
273.00
12.47
3,404.31
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
273.00
3,404.31
07.00.00
07.01.00
273.00
35.70
9,746.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
273.00
9,746.10
08.00.00
CAMARAS DE INSPECCION
08.01.00
UND
54.00
71.72
3,872.88
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
54.00
3,872.88
08.02.00
UND
2.00
98.14
196.28
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
2.00
196.28
09.00.00
09.01.00
09.01.01
PTO
97.00
28.52
2,766.44
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
97.00
2,766.44
10.00.00
10.01.00
596.00
0.83
494.68
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
596.00
494.68
11.00.00
11.01.00
355.00
6.54
2,321.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
355.00
2,321.70
11.02.00
37.00
7.03
260.11
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
37.00
260.11
11.03.00
92.00
8.05
740.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
92.00
740.60
11.04.00
12.00
11.05
132.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
12.00
132.60
100.00
14.26
1,426.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
100.00
1,426.00
53.00
6.54
346.62
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
53.00
346.62
2,047.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
60.00
2,047.20
11.05.00
12.00.00
12.01.00
13.00.00
LLAVES Y VALVULAS
13.01.00
PZA
60.00
34.12
13.02.00
PZA
1.00
44.55
44.55
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
44.55
13.03.00
PZA
2.00
71.59
143.18
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
2.00
143.18
13.04.00
PZA
1.00
94.92
94.92
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
94.92
13.05.00
PZA
2.00
88.52
177.04
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
2.00
177.04
14.00.00
14.01.00
14.01.01
PZA
21.00
54.45
1,143.45
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
21.00
1,143.45
15.00.00
15.01.00
15.00
18.44
276.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
15.00
276.60
15.02.00
60.00
23.94
1,436.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
60.00
1,436.40
VAL. 01 ABRIL
Pgina 5
VALORIZACIN DE OBRA
VALORIZACIN N
01
PROPIETARIO
VALOR REFERENCIAL
S/.
CONTRATISTA
MONTO CONTRATADO
S/.
PROVINCIA
OYON
FORMULA
UNICA
700,000.00
DEPARTAMENTO
LIMA
FECHA
700,000.00
OBRA : CONSTRUCCION CENTRO DE SALUD TIPO II DE OYON CON ATENCION MATERNO INFANTIL CON APOYO SOCIEDAD CIVIL
Avance Anterior
tem
Partidas
16.00.00
LLAVES Y VALVULAS
16.02.00
22.00.00
27.00.00
EQUIPOS Y SISTEMAS
27.01.00
29.00.00
INSTALACIONES HIDRAULICAS
29.01.00
29.02.00
29.03.00
30.00.00
30.01.00
31.00.00
31.01.00
32.00.00
ACCESORIOS SANITARIOS/DESAGUE
32.01.00
33.00.00
TRAMPA DE GRASA
33.01.00
34.00.00
34.01.00
Und.
Metrado
Costo
Unitario
(S/.)
Costo
Parcial
(S/.)
Avance Actual
Metrado
Monto de
Valorizacin
Total
Metrado
Avance Acumulado
Monto de
Valorizacin Total
Metrado
Saldo a Ejecutar
Monto de
Valorizacin Total
Metrado
Monto de
Valorizacin Total
PZA
8.00
44.55
356.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
8.00
356.40
UND
1.00
493.54
493.54
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
493.54
UND
1.00
251.56
251.56
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
251.56
UND
1.00
389.00
389.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
389.00
GLB
1.00
85.07
85.07
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
85.07
GLB
1.00
275.69
275.69
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
275.69
GLB
1.00
190.50
190.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
190.50
GLB
1.00
627.90
627.90
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
627.90
UND
1.00
350.06
350.06
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
350.06
UND
1.00
18.25
18.25
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
S/.
511,508.95
0.00%
48,954.28
8%
S/.
UTILIDADES 10.00 %
7%
S/.
35,805.63
3,426.80
3,426.80
32,378.83
S/.
588,235.29
56,297.42
56,297.42
531,937.87
S/.
111,764.71
10,696.51
10,696.51
101,068.20
S/.
700,000.00
I . G . V . 19 %
19%
TOTAL PRESUPUESTO
FACTOR DE RELACION
700,000.00
3,916.34
66,993.93
1.00000
TOTAL VALORIZADO
3,916.34
18.25
462,554.67
GASTOS GENERALES 5 %
SUB - TOTAL
40,920.72
48,954.28
66,993.93
1.00000
0.00%
66,993.93
37,004.37
633,006.07
1.00000
9.57%
66,993.93
1.00000
9.57%
633,006.07
9.57%
VAL. 01 ABRIL
Pgina 6
VALORIZACIN DE OBRA
VALORIZACIN N
02
PROPIETARIO
VALOR REFERENCIAL
S/.
CONTRATISTA
MONTO CONTRATADO
S/.
PROVINCIA
OYON
DEPARTAMENTO
LIMA
700,000.00
700,000.00
FORMULA
UNICA
FECHA
OBRA : CONSTRUCCION CENTRO DE SALUD TIPO II DE OYON CON ATENCION MATERNO INFANTIL CON APOYO SOCIEDAD CIVIL
Avance Anterior
tem
Partidas
Und.
Metrado
Costo
Unitario
(S/.)
Costo
Parcial
(S/.)
Metrado
Monto de
Valorizacin
Total
Avance Actual
Metrado
Avance Acumulado
Monto de
Valorizacin Total
Metrado
Saldo a Ejecutar
Monto de
Valorizacin Total
Metrado
Monto de
Valorizacin Total
ESTRUCTURAS
01.00.00 OBRAS PROVISIONALES
01.01.00 ALMACENES OFICINAS TALLERES Y GUARDIANIA
M2
40.00
31.50
1,260.00
40.00
1,260.00
0.00
0.00
40.00
1,260.00
100.00%
0.00
0.00
UND
1.00
842.52
842.52
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
842.52
GLB
1.00
500.00
500.00
1.00
500.00
0.00
0.00
1.00
500.00
100.00%
0.00
0.00
500.00
0.24
120.00
500.00
120.00
0.00
0.00
500.00
120.00
100.00%
0.00
0.00
1.00
600.00
600.00
1.00
600.00
0.00
0.00
1.00
600.00
100.00%
0.00
0.00
M2
2,000.00
0.32
640.00 1,990.00
636.80
6.00
1.92
1,996.00
638.72
99.80%
4.00
1.28
M3
820.00
1.87
1,533.40
800.00
1,496.00
12.00
22.44
812.00
1,518.44
99.02%
8.00
14.96
M3
35.00
1.87
65.45
0.00
0.00
6.00
11.22
6.00
11.22
17.14%
29.00
54.23
M2
1,400.00
5.97
8,358.00
0.00
0.00
750.00
4,477.50
750.00
4,477.50
53.57%
650.00
3,880.50
M3
215.00
7.29
1,567.35
0.00
610.00
1.87
1,140.70
415.00
M2
GLB
0.00
180.00
1,312.20
180.00
1,312.20
83.72%
35.00
255.15
776.05
50.00
93.50
465.00
869.55
76.23%
145.00
271.15
111.60
M2
710.00
11.16
7,923.60
675.00
7,533.00
25.00
279.00
700.00
7,812.00
98.59%
10.00
M3
375.00
38.90
14,587.50
370.00
14,393.00
3.00
116.70
373.00
14,509.70
99.47%
2.00
77.80
M3
135.00
72.28
9,757.80
27.00
1,951.56
105.00
7,589.40
132.00
9,540.96
97.78%
3.00
216.84
M2
1,410.00
18.25
25,732.50
282.00
5,146.50
1,100.00
20,075.00
1,382.00
25,221.50
98.01%
28.00
511.00
KG
9,450.00
0.47
4,441.50 8,978.00
4,219.66
460.00
216.20
9,438.00
4,435.86
99.87%
12.00
5.64
M2
2,000.00
9.25
18,500.00
0.00
0.00
100.00
925.00
100.00
925.00
5.00%
1,900.00
17,575.00
2,015.28
79.00
1,965.52
2.00
49.76
81.00
2,015.28
100.00%
0.00
0.00
580.45
65.00
30.55
1,300.00
611.00
100.00%
0.00
0.00
M3
81.00
24.88
KG
1,300.00
0.47
611.00 1,235.00
M3
17.00
44.18
751.06
16.00
706.88
1.00
44.18
17.00
751.06
100.00%
0.00
0.00
M2
136.00
19.07
2,593.52
136.00
2,593.52
0.00
0.00
136.00
2,593.52
100.00%
0.00
0.00
KG
1,850.00
0.47
825.79
93.00
43.71
1,850.00
869.50
100.00%
0.00
0.00
869.50 1,757.00
05.03.00 COLUMNAS
05.03.01 CONCRETO EN COLUMNAS F"C 210 KG/CM2
M3
55.00
99.10
5,450.50
0.00
0.00
2.30
227.93
2.30
227.93
4.18%
52.70
5,222.57
M2
650.00
26.04
16,926.00
0.00
0.00
32.63
849.69
32.63
849.69
5.02%
617.37
16,076.31
M2
7,850.00
0.47
3,504.79
320.00
150.40
7,777.00
3,655.19
99.07%
73.00
34.31
M3
8.00
97.21
0.00
0.00
0.00
0.00
0.00%
8.00
777.68
3,689.50 7,457.00
05.04.00 PLACAS
05.04.01 PLACAS DE CONCRETO Fc=210 Kg/Cm2
777.68
0.00
0.00
VALORIZACIN DE OBRA
VALORIZACIN N
02
PROPIETARIO
VALOR REFERENCIAL
S/.
CONTRATISTA
MONTO CONTRATADO
S/.
PROVINCIA
OYON
DEPARTAMENTO
LIMA
700,000.00
700,000.00
FORMULA
UNICA
FECHA
OBRA : CONSTRUCCION CENTRO DE SALUD TIPO II DE OYON CON ATENCION MATERNO INFANTIL CON APOYO SOCIEDAD CIVIL
Avance Anterior
tem
Partidas
Und.
Metrado
Costo
Unitario
(S/.)
Costo
Parcial
(S/.)
Metrado
M2
111.00
22.49
2,496.39
0.00
Kg
325.00
0.47
152.75
308.00
M3
121.00
38.68
4,680.28
M2
665.00
25.63
17,043.95
KG
6,950.00
0.47
Monto de
Valorizacin
Total
Avance Actual
Metrado
Avance Acumulado
Monto de
Valorizacin Total
Metrado
Saldo a Ejecutar
Monto de
Valorizacin Total
Metrado
Monto de
Valorizacin Total
0.00
15.00
337.35
15.00
337.35
13.51%
96.00
2,159.04
144.76
0.00
0.00
308.00
144.76
94.77%
17.00
7.99
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
121.00
4,680.28
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
665.00
17,043.95
3,266.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
6,950.00
3,266.50
05.05.00 VIGAS
M3
150.00
34.30
5,145.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
150.00
5,145.00
M2
1,800.00
23.03
41,454.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1,800.00
41,454.00
KG
10,000.00
0.47
4,700.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
10,000.00
4,700.00
UND
1,700.00
0.25
425.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1,700.00
425.00
M3
16.00
76.45
1,223.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
16.00
1,223.20
M2
95.00
20.13
1,912.35
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
95.00
1,912.35
M2
1,200.00
0.47
564.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1,200.00
564.00
M3
6.50
110.29
716.89
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
6.50
716.89
M2
51.00
24.39
1,243.89
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
51.00
1,243.89
KG
500.00
0.47
235.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
500.00
235.00
M2
2,000.00
36.75
73,500.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
2,000.00
73,500.00
ARQUITECTURA
11.00.00
11.01.00
M2
1,243.08
14.71
18,285.71
0.00
0.00
187.50
2,758.13
187.50
2,758.13
15.08%
1,055.58
15,527.58
11.02.00
M2
1,634.28
11.24
18,369.31
0.00
0.00
97.50
1,095.90
97.50
1,095.90
5.97%
1,536.78
17,273.41
12.00.00
12.01.00
M2
1,279.90
9.19
11,762.28
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1,279.90
11,762.28
12.02.00
M2
2,983.43
8.74
26,075.18
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
2,983.43
26,075.18
12.03.00
M2
1,603.25
7.79
12,489.32
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1,603.25
12,489.32
12.04.00
TARRAJEO COLUMNAS
M2
6.00
9.18
55.08
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
6.00
55.08
12.05.00
TARRAJEO DE VIGAS
M2
50.00
11.77
588.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
50.00
588.50
12.06.00
M2
62.35
77.55
4,835.24
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
62.35
4,835.24
12.07.00
TARRAJEO IMPERMEABILIZADO
M2
49.20
7.41
364.57
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
49.20
364.57
12.08.00
423.90
7.00
2,967.30
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
423.90
2,967.30
12.09.00
VESTIDURA DE DERRAMES
515.84
4.41
2,274.85
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
515.84
2,274.85
12.10.00
906.30
4.01
3,634.26
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
906.30
3,634.26
12.11.00
BRUAS EN INTERIORES
325.73
3.16
1,029.31
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
325.73
1,029.31
VALORIZACIN DE OBRA
VALORIZACIN N
02
PROPIETARIO
VALOR REFERENCIAL
S/.
CONTRATISTA
MONTO CONTRATADO
S/.
PROVINCIA
OYON
DEPARTAMENTO
LIMA
700,000.00
700,000.00
FORMULA
UNICA
FECHA
OBRA : CONSTRUCCION CENTRO DE SALUD TIPO II DE OYON CON ATENCION MATERNO INFANTIL CON APOYO SOCIEDAD CIVIL
Avance Anterior
tem
Partidas
13.00.00
CIELORRASOS
13.01.00
14.00.00
PISOS Y PAVIMENTOS
14.01.00
14.06.00
25.00.00
ESCALERAS
25.01.00
ESCALERA DE GATO
26.00.00
TAPA METALICA
26.01.00
31.00.00
32.02.00
32.03.00
Und.
Metrado
M2
1,370.57
CONTRAPISO E= 40 mm
M2
M2
Costo
Unitario
(S/.)
Costo
Parcial
(S/.)
Metrado
Monto de
Valorizacin
Total
Avance Actual
Metrado
Avance Acumulado
Monto de
Valorizacin Total
Metrado
Saldo a Ejecutar
Monto de
Valorizacin Total
Metrado
Monto de
Valorizacin Total
13.21
18,105.23
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1,370.57
18,105.23
1,224.99
7.07
8,660.68
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1,224.99
8,660.68
44.76
17.09
764.95
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
44.76
764.95
4.35
80.02
348.09
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
4.35
348.09
UND
1.00
182.89
182.89
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
182.89
LIMPIEZA PERMANENTE
GLB
1.00
1,535.73
1,535.73
0.00
0.00
0.20
307.15
0.20
307.15
20.00%
0.80
1,228.58
LIMPIEZA FINAL
GLB
1.00
500.00
500.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
500.00
INST. ELECTRICAS
01.00.00
INSTALACIONES ELECTRICAS
01.01.00
CIRCUITOS DERIVADOS
01.02.00
01.02.01
CENTRO DE LUZ
PTO
173.00
24.16
4,179.68
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
173.00
4,179.68
01.02.02
PTO
99.00
16.36
1,619.64
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
99.00
1,619.64
01.02.03
PTO
18.00
35.53
639.54
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
18.00
639.54
01.02.04
PTO
4.00
31.71
126.84
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
4.00
126.84
01.02.05
PTO
7.00
19.58
137.06
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
7.00
137.06
01.02.06
PTO
62.00
28.69
1,778.78
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
62.00
1,778.78
01.02.07
PTO
38.00
29.44
1,118.72
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
38.00
1,118.72
01.02.08
PTO
2.00
33.54
67.08
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
2.00
67.08
01.02.09
PTO
18.00
36.77
661.86
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
18.00
661.86
01.02.10
PTO
135.00
35.80
4,833.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
135.00
4,833.00
01.02.11
PTO
11.00
35.79
393.69
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
11.00
393.69
01.02.12
PTO
9.00
42.74
384.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
9.00
384.66
01.02.13
SALIDA P/TOMACORR./COMPUTADORA
PTO
7.00
18.34
128.38
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
7.00
128.38
01.02.14
PTO
11.00
35.49
390.39
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
11.00
390.39
02.00.00
02.01.00
PTO
4.00
75.48
301.92
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
4.00
301.92
02.02.00
PTO
1.00
55.18
55.18
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
55.18
02.03.00
PTO
1.00
611.89
611.89
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
611.89
02.04.00
PTO
8.00
59.94
479.52
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
8.00
479.52
VALORIZACIN DE OBRA
VALORIZACIN N
02
PROPIETARIO
VALOR REFERENCIAL
S/.
CONTRATISTA
MONTO CONTRATADO
S/.
PROVINCIA
OYON
DEPARTAMENTO
LIMA
700,000.00
700,000.00
FORMULA
UNICA
FECHA
OBRA : CONSTRUCCION CENTRO DE SALUD TIPO II DE OYON CON ATENCION MATERNO INFANTIL CON APOYO SOCIEDAD CIVIL
Avance Anterior
tem
Partidas
Und.
Metrado
Costo
Unitario
(S/.)
Costo
Parcial
(S/.)
Metrado
Monto de
Valorizacin
Total
Avance Actual
Metrado
Avance Acumulado
Monto de
Valorizacin Total
Metrado
Saldo a Ejecutar
Monto de
Valorizacin Total
Metrado
Monto de
Valorizacin Total
02.05.00
PTO
1.00
63.77
63.77
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
02.06.00
PTO
1.00
82.00
82.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
63.77
82.00
02.07.00
CALANDRIA
PTO
1.00
244.36
244.36
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
244.36
02.08.00
REFRIGERADORA INDUSTRIAL
PTO
1.00
47.16
47.16
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
47.16
02.09.00
SECADORA
PTO
1.00
51.36
51.36
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
51.36
02.10.00
LAVADORA
PTO
2.00
50.43
100.86
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
2.00
100.86
02.11.00
SOLDADORA
PTO
1.00
93.38
93.38
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
93.38
02.12.00
DESTILADOR DE AGUA DE 3 KW
PTO
1.00
63.74
63.74
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
63.74
02.13.00
PTO
1.00
46.15
46.15
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
46.15
02.14.00
CENTRAL DE PARLANTES
PTO
1.00
75.05
75.05
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
75.05
02.15.00
PTO
1.00
77.24
77.24
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
77.24
02.16.00
PTO
1.00
100.93
100.93
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
100.93
02.17.00
PTO
1.00
67.12
67.12
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
67.12
02.18.00
ELECTROBONBAS DE AGUA
CJT
1.00
219.22
219.22
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
219.22
02.19.00
CJT
1.00
97.11
97.11
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
97.11
02.20.00
RAYOS X
CJT
1.00
913.50
913.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
913.50
02.21.00
CJT
1.00
29.14
29.14
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
29.14
03.00.00
COMUNICACIONES Y SEALES
03.01.00
SISTEMAS DE TELEFONOS
03.01.01
PTO
1.00
48.30
48.30
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
48.30
03.01.02
PTO
3.00
294.21
882.63
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
3.00
882.63
03.01.03
PTO
22.00
71.93
1,582.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
22.00
1,582.46
03.01.04
PTO
7.00
65.87
461.09
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
7.00
461.09
03.01.05
PTO
5.00
52.76
263.80
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
5.00
263.80
03.01.06
PTO
3.00
85.72
257.16
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
3.00
257.16
03.01.07
PTO
1.00
48.10
48.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
48.10
04.00.00
04.01.00
PTO
7.00
85.72
600.04
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
7.00
600.04
04.02.00
PTO
3.00
48.10
144.30
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
3.00
144.30
04.03.00
PTO
6.00
78.48
470.88
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
6.00
470.88
04.03.04
PTO
73.00
48.77
3,560.21
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
73.00
3,560.21
05.00.00
05.01.00
PTO
1.00
54.23
54.23
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
54.23
05.02.00
PTO
11.00
69.26
761.86
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
11.00
761.86
05.03.00
PTO
10.00
36.46
364.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
10.00
364.60
05.04.00
PTO
5.00
44.07
220.35
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
5.00
220.35
05.05.00
pto
4.00
124.10
496.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
4.00
496.40
VALORIZACIN DE OBRA
VALORIZACIN N
02
PROPIETARIO
VALOR REFERENCIAL
S/.
CONTRATISTA
MONTO CONTRATADO
S/.
PROVINCIA
OYON
DEPARTAMENTO
LIMA
700,000.00
700,000.00
FORMULA
UNICA
FECHA
OBRA : CONSTRUCCION CENTRO DE SALUD TIPO II DE OYON CON ATENCION MATERNO INFANTIL CON APOYO SOCIEDAD CIVIL
Avance Anterior
tem
Partidas
Und.
Metrado
Costo
Unitario
(S/.)
Costo
Parcial
(S/.)
Metrado
Monto de
Valorizacin
Total
Avance Actual
Metrado
Avance Acumulado
Monto de
Valorizacin Total
Metrado
Saldo a Ejecutar
Monto de
Valorizacin Total
Metrado
Monto de
Valorizacin Total
05.06.00
PTO
5.00
32.03
160.15
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
5.00
05.07.00
PTO
1.00
36.47
36.47
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
160.15
36.47
05.08.00
PTO
4.00
33.00
132.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
4.00
132.00
06.00.00
SISTEMA DE TELECABLE
06.01.00
PTO
1.00
52.76
52.76
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
52.76
06.02.00
PTO
2.00
47.36
94.72
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
2.00
94.72
07.00.00
TIMBRE
07.01.00
CJT
1.00
39.83
39.83
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
39.83
08.00.00
ALIMENTADORES
08.01.00
2.00
2.64
5.28
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
2.00
5.28
08.02.00
47.00
35.32
1,660.04
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
47.00
1,660.04
08.03.00
28.00
14.07
393.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
28.00
393.96
08.04.00
25.00
12.38
309.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
25.00
309.50
08.05.00
25.00
8.23
205.75
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
25.00
205.75
08.06.00
1.00
9.70
9.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
9.70
08.07.00
31.00
9.70
300.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
31.00
300.70
08.08.00
10.00
9.22
92.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
10.00
92.20
08.09.00
21.00
5.50
115.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
21.00
115.50
08.10.00
31.00
7.68
238.08
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
31.00
238.08
08.11.00
23.00
5.91
135.93
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
23.00
135.93
08.12.00
32.00
74.58
2,386.56
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
32.00
2,386.56
08.13.00
ACOMETIDA TELEFONICA
CJT
4.00
70.31
281.24
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
4.00
281.24
08.14.00
UND
4.00
143.77
575.08
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
4.00
575.08
08.15.00
3.00
7.14
21.42
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
3.00
21.42
09.00.00
ALUMBRADO EXTERIOR
09.01.00
TABLEROS ELECTRICOS
09.01.01
TABLERO GENERAL TG
UND
1.00
46.20
46.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
46.20
09.01.02
UND
1.00
46.20
46.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
46.20
09.01.03
TABLERO T-CQI
UND
1.00
458.56
458.56
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
458.56
09.01.04
TABLERO T-SG
UND
1.00
458.56
458.56
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
458.56
09.01.05
TABLERO TD-A
UND
1.00
383.20
383.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
383.20
09.01.06
TABLERO TD-R
UND
1.00
338.20
338.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
338.20
09.01.07
TABLERO TD-DP
UND
1.00
383.20
383.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
383.20
09.01.08
TABLERO TD-CE
UND
1.00
416.96
416.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
416.96
09.01.09
TABLERO TD-T
UND
1.00
124.40
124.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
124.40
09.01.10
TABLERO T-CI
UND
1.00
46.20
46.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
46.20
09.01.11
TABLERO TD-3
und
2.00
417.81
835.62
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
2.00
835.62
VALORIZACIN DE OBRA
VALORIZACIN N
02
PROPIETARIO
VALOR REFERENCIAL
S/.
CONTRATISTA
MONTO CONTRATADO
S/.
PROVINCIA
OYON
DEPARTAMENTO
LIMA
700,000.00
700,000.00
FORMULA
UNICA
FECHA
OBRA : CONSTRUCCION CENTRO DE SALUD TIPO II DE OYON CON ATENCION MATERNO INFANTIL CON APOYO SOCIEDAD CIVIL
Avance Anterior
tem
Partidas
09.01.12
12.00.00
SISTEMA DE PARARRAYOS
12.01.00
12.02.00
12.03.00
12.04.00
Und.
Metrado
Costo
Unitario
(S/.)
Costo
Parcial
(S/.)
Metrado
Monto de
Valorizacin
Total
Avance Actual
Metrado
Avance Acumulado
Monto de
Valorizacin Total
Metrado
Saldo a Ejecutar
Monto de
Valorizacin Total
Metrado
Monto de
Valorizacin Total
und
1.00
181.78
181.78
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
181.78
UND
1.00
183.36
183.36
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
183.36
CJT
1.00
551.96
551.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
551.96
21.00
10.63
223.23
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
21.00
223.23
PARARRAYOS LONIFLASH
UND
1.00
198.47
198.47
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
198.47
12.05.00
UND
1.00
110.10
110.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
110.10
12.06.00
UND
3.00
143.77
431.31
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
3.00
431.31
12.07.00
UND
1.00
14.24
14.24
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
14.24
12.08.00
12.00
3.56
42.72
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
12.00
42.72
13.00.00
VARIOS
13.01.00
PRUEBAS ELECTRICAS
GLB
1.00
85.10
85.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
85.10
14.00.00
SISTEMA DE COMPUTO
14.01.00
pto
7.00
77.56
542.92
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
7.00
542.92
INST. SANITARIAS
01.00.00
DESAGUE Y VENTILACION
01.01.00
PTO
70.00
21.77
1,523.90
0.00
0.00
10.00
217.70
10.00
217.70
14.29%
60.00
1,306.20
01.02.00
PTO
24.00
101.64
2,439.36
0.00
0.00
6.00
609.84
6.00
609.84
25.00%
18.00
1,829.52
01.03.00
PTO
18.00
45.48
818.64
0.00
0.00
6.00
272.88
6.00
272.88
33.33%
12.00
545.76
02.00.00
REDES DE DERIVACION
02.01.00
258.00
8.14
2,100.12
0.00
0.00
25.00
203.50
25.00
203.50
9.69%
233.00
1,896.62
02.02.00
103.00
22.26
2,292.78
0.00
0.00
15.00
333.90
15.00
333.90
14.56%
88.00
1,958.88
03.00.00
03.01.00
54.00
8.14
439.56
0.00
0.00
3.00
24.42
3.00
24.42
5.56%
51.00
415.14
04.00.00
04.01.00
UND
38.00
11.25
427.50
0.00
0.00
2.00
22.50
2.00
22.50
5.26%
36.00
405.00
04.02.00
UND
10.00
17.26
172.60
0.00
0.00
1.00
17.26
1.00
17.26
10.00%
9.00
155.34
05.00.00
SOMBREROS DE VENTILACION
05.01.00
PZA
18.00
15.03
270.54
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
18.00
270.54
06.00.00
06.01.00
273.00
0.83
226.59
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
273.00
226.59
06.02.00
273.00
12.47
3,404.31
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
273.00
3,404.31
07.00.00
07.01.00
273.00
35.70
9,746.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
273.00
9,746.10
08.00.00
CAMARAS DE INSPECCION
VALORIZACIN DE OBRA
VALORIZACIN N
02
PROPIETARIO
VALOR REFERENCIAL
S/.
CONTRATISTA
MONTO CONTRATADO
S/.
PROVINCIA
OYON
DEPARTAMENTO
LIMA
700,000.00
700,000.00
FORMULA
UNICA
FECHA
OBRA : CONSTRUCCION CENTRO DE SALUD TIPO II DE OYON CON ATENCION MATERNO INFANTIL CON APOYO SOCIEDAD CIVIL
Avance Anterior
tem
Partidas
Und.
Metrado
Costo
Unitario
(S/.)
Costo
Parcial
(S/.)
Metrado
Monto de
Valorizacin
Total
Avance Actual
Metrado
Avance Acumulado
Monto de
Valorizacin Total
Metrado
Saldo a Ejecutar
Monto de
Valorizacin Total
Metrado
Monto de
Valorizacin Total
08.01.00
UND
54.00
71.72
3,872.88
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
54.00
3,872.88
08.02.00
UND
2.00
98.14
196.28
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
2.00
196.28
09.00.00
09.01.00
09.01.01
PTO
97.00
28.52
2,766.44
0.00
0.00
12.00
342.24
12.00
342.24
12.37%
85.00
2,424.20
10.00.00
10.01.00
596.00
0.83
494.68
0.00
0.00
50.00
41.50
50.00
41.50
8.39%
546.00
453.18
11.00.00
11.01.00
355.00
6.54
2,321.70
0.00
0.00
35.00
228.90
35.00
228.90
9.86%
320.00
2,092.80
11.02.00
37.00
7.03
260.11
0.00
0.00
12.00
84.36
12.00
84.36
32.43%
25.00
175.75
11.03.00
92.00
8.05
740.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
92.00
740.60
11.04.00
12.00
11.05
132.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
12.00
132.60
11.05.00
100.00
14.26
1,426.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
100.00
1,426.00
12.00.00
12.01.00
53.00
6.54
346.62
0.00
0.00
20.00
130.80
20.00
130.80
37.74%
33.00
215.82
13.00.00
LLAVES Y VALVULAS
13.01.00
PZA
60.00
34.12
2,047.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
60.00
2,047.20
13.02.00
PZA
1.00
44.55
44.55
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
44.55
13.03.00
PZA
2.00
71.59
143.18
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
2.00
143.18
13.04.00
PZA
1.00
94.92
94.92
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
94.92
13.05.00
PZA
2.00
88.52
177.04
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
2.00
177.04
14.00.00
14.01.00
14.01.01
PZA
21.00
54.45
1,143.45
0.00
0.00
5.00
272.25
5.00
272.25
23.81%
16.00
871.20
15.00.00
15.01.00
15.00
18.44
276.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
15.00
276.60
15.02.00
60.00
23.94
1,436.40
0.00
0.00
15.00
359.10
15.00
359.10
25.00%
45.00
1,077.30
16.00.00
LLAVES Y VALVULAS
16.02.00
PZA
8.00
44.55
356.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
8.00
356.40
22.00.00
27.00.00
EQUIPOS Y SISTEMAS
27.01.00
UND
1.00
493.54
493.54
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
493.54
29.00.00
INSTALACIONES HIDRAULICAS
29.01.00
UND
1.00
251.56
251.56
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
251.56
29.02.00
UND
1.00
389.00
389.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
389.00
29.03.00
GLB
1.00
85.07
85.07
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
85.07
30.00.00
VALORIZACIN DE OBRA
VALORIZACIN N
02
PROPIETARIO
VALOR REFERENCIAL
S/.
CONTRATISTA
MONTO CONTRATADO
S/.
PROVINCIA
OYON
DEPARTAMENTO
LIMA
700,000.00
700,000.00
FORMULA
UNICA
FECHA
OBRA : CONSTRUCCION CENTRO DE SALUD TIPO II DE OYON CON ATENCION MATERNO INFANTIL CON APOYO SOCIEDAD CIVIL
Avance Anterior
tem
Partidas
30.01.00
31.00.00
31.01.00
32.00.00
ACCESORIOS SANITARIOS/DESAGUE
32.01.00
33.00.00
TRAMPA DE GRASA
33.01.00
34.00.00
34.01.00
Und.
Metrado
Costo
Unitario
(S/.)
Costo
Parcial
(S/.)
Metrado
Monto de
Valorizacin
Total
Avance Actual
Metrado
Avance Acumulado
Monto de
Valorizacin Total
Metrado
Saldo a Ejecutar
Monto de
Valorizacin Total
Metrado
Monto de
Valorizacin Total
GLB
1.00
275.69
275.69
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
275.69
GLB
1.00
190.50
190.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
190.50
GLB
1.00
627.90
627.90
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
627.90
UND
1.00
350.06
350.06
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
350.06
UND
1.00
18.25
18.25
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
18.25
18.21%
S/.
511,508.95
48,954.28
44,175.97
93,130.25
GASTOS GENERALES 8 %
8%
S/.
40,920.72
3,916.34
3,534.08
7,450.42
UTILIDADES 7.00 %
7%
S/.
35,805.63
3,426.80
3,092.32
6,519.12
29,286.51
S/.
588,235.29
56,297.42
50,802.36
107,099.78
481,135.51
S/.
111,764.71
10,696.51
9,652.45
20,348.96
91,415.75
S/.
700,000.00
66,993.93
60,454.81
127,448.74
572,551.26
SUB - TOTAL
I . G . V . 19 %
19%
TOTAL PRESUPUESTO
FACTOR DE RELACION
TOTAL VALORIZADO
18.21%
1.00000
1.00000
700,000.00
66,993.93
1.00000
9.57%
60,454.81
33,470.30
1.00000
8.64%
127,448.74
418,378.70
1.00000
18.21%
572,551.26
VALORIZACIN DE OBRA
VALORIZACIN N
02
PROPIETARIO
VALOR REFERENCIAL
S/.
CONTRATISTA
MONTO CONTRATADO
S/.
PROVINCIA
OYON
DEPARTAMENTO
LIMA
700,000.00
700,000.00
FORMULA
UNICA
FECHA
OBRA : CONSTRUCCION CENTRO DE SALUD TIPO II DE OYON CON ATENCION MATERNO INFANTIL CON APOYO SOCIEDAD CIVIL
Avance Anterior
tem
Partidas
Und.
Metrado
Costo
Unitario
(S/.)
Costo
Parcial
(S/.)
Metrado
Monto de
Valorizacin
Total
Avance Actual
Metrado
Avance Acumulado
Monto de
Valorizacin Total
Metrado
Saldo a Ejecutar
Monto de
Valorizacin Total
Metrado
Monto de
Valorizacin Total
ESTRUCTURAS
01.00.00 OBRAS PROVISIONALES
01.01.00 ALMACENES OFICINAS TALLERES Y GUARDIANIA
M2
40.00
31.50
1,260.00
40.00
1,260.00
0.00
0.00
40.00
1,260.00
100.00%
0.00
0.00
UND
1.00
842.52
842.52
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
842.52
GLB
1.00
500.00
500.00
1.00
500.00
0.00
0.00
1.00
500.00
100.00%
0.00
0.00
500.00
0.24
120.00
500.00
120.00
0.00
0.00
500.00
120.00
100.00%
0.00
0.00
1.00
600.00
600.00
1.00
600.00
0.00
0.00
1.00
600.00
100.00%
0.00
0.00
M2
2,000.00
0.32
640.00 1,996.00
638.72
0.00
0.00
1,996.00
638.72
99.80%
4.00
1.28
M3
820.00
1.87
1,533.40
812.00
14.96
M3
35.00
1.87
65.45
6.00
M2
1,400.00
5.97
8,358.00
M3
215.00
7.29
610.00
1.87
M2
GLB
0.00
0.00
812.00
1,518.44
99.02%
8.00
11.22
29.00
54.23
35.00
65.45
100.00%
0.00
0.00
750.00
4,477.50
380.00
2,268.60
1,130.00
6,746.10
80.71%
270.00
1,611.90
1,567.35
180.00
1,312.20
14.00
102.06
194.00
1,414.26
90.23%
21.00
153.09
1,140.70
465.00
869.55
80.00
149.60
545.00
1,019.15
89.34%
65.00
121.55
78.12
M2
710.00
11.16
7,923.60
700.00
7,812.00
3.00
33.48
703.00
7,845.48
99.01%
7.00
M3
375.00
38.90
14,587.50
373.00
14,509.70
0.00
0.00
373.00
14,509.70
99.47%
2.00
77.80
M3
135.00
72.28
9,757.80
132.00
9,540.96
0.00
0.00
132.00
9,540.96
97.78%
3.00
216.84
M2
1,410.00
18.25
25,732.50
1,382.00
25,221.50
20.00
365.00
1,402.00
25,586.50
99.43%
8.00
146.00
KG
9,450.00
0.47
4,441.50 9,438.00
4,435.86
12.00
5.64
9,450.00
4,441.50
100.00%
0.00
0.00
M2
2,000.00
9.25
18,500.00
100.00
925.00
115.00
1,063.75
215.00
1,988.75
10.75%
1,785.00
16,511.25
2,015.28
0.00
0.00
81.00
2,015.28
100.00%
0.00
0.00
611.00
0.00
0.00
1,300.00
611.00
100.00%
0.00
0.00
M3
81.00
24.88
2,015.28
81.00
KG
1,300.00
0.47
611.00
1,300.00
M3
17.00
44.18
751.06
17.00
751.06
0.00
0.00
17.00
751.06
100.00%
0.00
0.00
M2
136.00
19.07
2,593.52
136.00
2,593.52
0.00
0.00
136.00
2,593.52
100.00%
0.00
0.00
KG
1,850.00
0.47
869.50
0.00
0.00
1,850.00
869.50
100.00%
0.00
0.00
869.50 1,850.00
05.03.00 COLUMNAS
12.68
M3
55.00
99.10
5,450.50
2.30
227.93
10.32
1,022.71
12.62
1,250.64
22.95%
42.38
4,199.86
M2
650.00
26.04
16,926.00
32.63
849.69
160.30
4,174.21
192.93
5,023.90
29.68%
457.07
11,902.10
M2
7,850.00
0.47
3,655.19
0.00
0.00
7,777.00
3,655.19
99.07%
73.00
34.31
M3
8.00
97.21
0.00
0.00
0.00
0.00
0.00
0.00%
8.00
777.68
3,689.50 7,777.00
05.04.00 PLACAS
05.04.01 PLACAS DE CONCRETO Fc=210 Kg/Cm2
777.68
0.00
VALORIZACIN DE OBRA
VALORIZACIN N
02
PROPIETARIO
VALOR REFERENCIAL
S/.
CONTRATISTA
MONTO CONTRATADO
S/.
PROVINCIA
OYON
DEPARTAMENTO
LIMA
700,000.00
700,000.00
FORMULA
UNICA
FECHA
OBRA : CONSTRUCCION CENTRO DE SALUD TIPO II DE OYON CON ATENCION MATERNO INFANTIL CON APOYO SOCIEDAD CIVIL
Avance Anterior
tem
Partidas
Und.
Metrado
Costo
Unitario
(S/.)
Costo
Parcial
(S/.)
Metrado
Monto de
Valorizacin
Total
Avance Actual
Metrado
Avance Acumulado
Monto de
Valorizacin Total
Metrado
Saldo a Ejecutar
Monto de
Valorizacin Total
Metrado
Monto de
Valorizacin Total
M2
111.00
22.49
2,496.39
15.00
337.35
0.00
0.00
15.00
337.35
13.51%
96.00
2,159.04
Kg
325.00
0.47
152.75
308.00
144.76
0.00
0.00
308.00
144.76
94.77%
17.00
7.99
M3
121.00
38.68
4,680.28
0.00
0.00
20.00
773.60
20.00
773.60
16.53%
101.00
3,906.68
M2
665.00
25.63
17,043.95
0.00
0.00
95.00
2,434.85
95.00
2,434.85
14.29%
570.00
14,609.10
KG
6,950.00
0.47
3,266.50
0.00
0.00
700.00
329.00
700.00
329.00
10.07%
6,250.00
2,937.50
05.05.00 VIGAS
M3
150.00
34.30
5,145.00
0.00
0.00
30.00
1,029.00
30.00
1,029.00
20.00%
120.00
4,116.00
M2
1,800.00
23.03
41,454.00
0.00
0.00
284.00
6,540.52
284.00
6,540.52
15.78%
1,516.00
34,913.48
KG
10,000.00
0.47
4,700.00
0.00
0.00
958.00
450.26
958.00
450.26
9.58%
9,042.00
4,249.74
UND
1,700.00
0.25
425.00
0.00
0.00
1,231.00
307.75
1,231.00
307.75
72.41%
469.00
117.25
M3
16.00
76.45
1,223.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
16.00
1,223.20
M2
95.00
20.13
1,912.35
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
95.00
1,912.35
M2
1,200.00
0.47
564.00
0.00
0.00
400.00
188.00
400.00
188.00
33.33%
800.00
376.00
M3
6.50
110.29
716.89
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
6.50
716.89
M2
51.00
24.39
1,243.89
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
51.00
1,243.89
KG
500.00
0.47
235.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
500.00
235.00
M2
2,000.00
36.75
73,500.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
2,000.00
73,500.00
ARQUITECTURA
11.00.00
11.01.00
M2
1,243.08
14.71
18,285.71
187.50
2,758.13
650.00
9,561.50
837.50
12,319.63
67.37%
405.58
5,966.08
11.02.00
M2
1,634.28
11.24
18,369.31
97.50
1,095.90
700.00
7,868.00
797.50
8,963.90
48.80%
836.78
9,405.41
12.00.00
12.01.00
M2
1,279.90
9.19
11,762.28
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1,279.90
11,762.28
12.02.00
M2
2,983.43
8.74
26,075.18
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
2,983.43
26,075.18
12.03.00
M2
1,603.25
7.79
12,489.32
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1,603.25
12,489.32
12.04.00
TARRAJEO COLUMNAS
M2
6.00
9.18
55.08
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
6.00
55.08
12.05.00
TARRAJEO DE VIGAS
M2
50.00
11.77
588.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
50.00
588.50
12.06.00
M2
62.35
77.55
4,835.24
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
62.35
4,835.24
12.07.00
TARRAJEO IMPERMEABILIZADO
M2
49.20
7.41
364.57
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
49.20
364.57
12.08.00
423.90
7.00
2,967.30
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
423.90
2,967.30
12.09.00
VESTIDURA DE DERRAMES
515.84
4.41
2,274.85
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
515.84
2,274.85
12.10.00
906.30
4.01
3,634.26
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
906.30
3,634.26
12.11.00
BRUAS EN INTERIORES
325.73
3.16
1,029.31
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
325.73
1,029.31
VALORIZACIN DE OBRA
VALORIZACIN N
02
PROPIETARIO
VALOR REFERENCIAL
S/.
CONTRATISTA
MONTO CONTRATADO
S/.
PROVINCIA
OYON
DEPARTAMENTO
LIMA
700,000.00
700,000.00
FORMULA
UNICA
FECHA
OBRA : CONSTRUCCION CENTRO DE SALUD TIPO II DE OYON CON ATENCION MATERNO INFANTIL CON APOYO SOCIEDAD CIVIL
Avance Anterior
tem
Partidas
13.00.00
CIELORRASOS
13.01.00
14.00.00
PISOS Y PAVIMENTOS
14.01.00
14.06.00
25.00.00
ESCALERAS
25.01.00
ESCALERA DE GATO
26.00.00
TAPA METALICA
26.01.00
31.00.00
32.02.00
32.03.00
Und.
Metrado
M2
1,370.57
CONTRAPISO E= 40 mm
M2
M2
Costo
Unitario
(S/.)
Costo
Parcial
(S/.)
Metrado
Monto de
Valorizacin
Total
Avance Actual
Metrado
Avance Acumulado
Monto de
Valorizacin Total
Metrado
Saldo a Ejecutar
Monto de
Valorizacin Total
Metrado
Monto de
Valorizacin Total
13.21
18,105.23
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1,370.57
18,105.23
1,224.99
7.07
8,660.68
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1,224.99
8,660.68
44.76
17.09
764.95
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
44.76
764.95
4.35
80.02
348.09
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
4.35
348.09
UND
1.00
182.89
182.89
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
182.89
LIMPIEZA PERMANENTE
GLB
1.00
1,535.73
1,535.73
0.20
307.15
0.20
307.15
0.40
614.29
40.00%
0.60
921.44
LIMPIEZA FINAL
GLB
1.00
500.00
500.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
500.00
INST. ELECTRICAS
01.00.00
INSTALACIONES ELECTRICAS
01.01.00
CIRCUITOS DERIVADOS
01.02.00
01.02.01
CENTRO DE LUZ
PTO
173.00
24.16
4,179.68
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
173.00
4,179.68
01.02.02
PTO
99.00
16.36
1,619.64
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
99.00
1,619.64
01.02.03
PTO
18.00
35.53
639.54
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
18.00
639.54
01.02.04
PTO
4.00
31.71
126.84
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
4.00
126.84
01.02.05
PTO
7.00
19.58
137.06
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
7.00
137.06
01.02.06
PTO
62.00
28.69
1,778.78
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
62.00
1,778.78
01.02.07
PTO
38.00
29.44
1,118.72
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
38.00
1,118.72
01.02.08
PTO
2.00
33.54
67.08
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
2.00
67.08
01.02.09
PTO
18.00
36.77
661.86
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
18.00
661.86
01.02.10
PTO
135.00
35.80
4,833.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
135.00
4,833.00
01.02.11
PTO
11.00
35.79
393.69
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
11.00
393.69
01.02.12
PTO
9.00
42.74
384.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
9.00
384.66
01.02.13
SALIDA P/TOMACORR./COMPUTADORA
PTO
7.00
18.34
128.38
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
7.00
128.38
01.02.14
PTO
11.00
35.49
390.39
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
11.00
390.39
02.00.00
02.01.00
PTO
4.00
75.48
301.92
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
4.00
301.92
02.02.00
PTO
1.00
55.18
55.18
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
55.18
02.03.00
PTO
1.00
611.89
611.89
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
611.89
02.04.00
PTO
8.00
59.94
479.52
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
8.00
479.52
VALORIZACIN DE OBRA
VALORIZACIN N
02
PROPIETARIO
VALOR REFERENCIAL
S/.
CONTRATISTA
MONTO CONTRATADO
S/.
PROVINCIA
OYON
DEPARTAMENTO
LIMA
700,000.00
700,000.00
FORMULA
UNICA
FECHA
OBRA : CONSTRUCCION CENTRO DE SALUD TIPO II DE OYON CON ATENCION MATERNO INFANTIL CON APOYO SOCIEDAD CIVIL
Avance Anterior
tem
Partidas
Und.
Metrado
Costo
Unitario
(S/.)
Costo
Parcial
(S/.)
Metrado
Monto de
Valorizacin
Total
Avance Actual
Metrado
Avance Acumulado
Monto de
Valorizacin Total
Metrado
Saldo a Ejecutar
Monto de
Valorizacin Total
Metrado
Monto de
Valorizacin Total
02.05.00
PTO
1.00
63.77
63.77
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
02.06.00
PTO
1.00
82.00
82.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
63.77
82.00
02.07.00
CALANDRIA
PTO
1.00
244.36
244.36
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
244.36
02.08.00
REFRIGERADORA INDUSTRIAL
PTO
1.00
47.16
47.16
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
47.16
02.09.00
SECADORA
PTO
1.00
51.36
51.36
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
51.36
02.10.00
LAVADORA
PTO
2.00
50.43
100.86
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
2.00
100.86
02.11.00
SOLDADORA
PTO
1.00
93.38
93.38
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
93.38
02.12.00
DESTILADOR DE AGUA DE 3 KW
PTO
1.00
63.74
63.74
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
63.74
02.13.00
PTO
1.00
46.15
46.15
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
46.15
02.14.00
CENTRAL DE PARLANTES
PTO
1.00
75.05
75.05
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
75.05
02.15.00
PTO
1.00
77.24
77.24
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
77.24
02.16.00
PTO
1.00
100.93
100.93
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
100.93
02.17.00
PTO
1.00
67.12
67.12
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
67.12
02.18.00
ELECTROBONBAS DE AGUA
CJT
1.00
219.22
219.22
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
219.22
02.19.00
CJT
1.00
97.11
97.11
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
97.11
02.20.00
RAYOS X
CJT
1.00
913.50
913.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
913.50
02.21.00
CJT
1.00
29.14
29.14
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
29.14
03.00.00
COMUNICACIONES Y SEALES
03.01.00
SISTEMAS DE TELEFONOS
03.01.01
PTO
1.00
48.30
48.30
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
48.30
03.01.02
PTO
3.00
294.21
882.63
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
3.00
882.63
03.01.03
PTO
22.00
71.93
1,582.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
22.00
1,582.46
03.01.04
PTO
7.00
65.87
461.09
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
7.00
461.09
03.01.05
PTO
5.00
52.76
263.80
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
5.00
263.80
03.01.06
PTO
3.00
85.72
257.16
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
3.00
257.16
03.01.07
PTO
1.00
48.10
48.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
48.10
04.00.00
04.01.00
PTO
7.00
85.72
600.04
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
7.00
600.04
04.02.00
PTO
3.00
48.10
144.30
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
3.00
144.30
04.03.00
PTO
6.00
78.48
470.88
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
6.00
470.88
04.03.04
PTO
73.00
48.77
3,560.21
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
73.00
3,560.21
05.00.00
05.01.00
PTO
1.00
54.23
54.23
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
54.23
05.02.00
PTO
11.00
69.26
761.86
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
11.00
761.86
05.03.00
PTO
10.00
36.46
364.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
10.00
364.60
05.04.00
PTO
5.00
44.07
220.35
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
5.00
220.35
05.05.00
pto
4.00
124.10
496.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
4.00
496.40
VALORIZACIN DE OBRA
VALORIZACIN N
02
PROPIETARIO
VALOR REFERENCIAL
S/.
CONTRATISTA
MONTO CONTRATADO
S/.
PROVINCIA
OYON
DEPARTAMENTO
LIMA
700,000.00
700,000.00
FORMULA
UNICA
FECHA
OBRA : CONSTRUCCION CENTRO DE SALUD TIPO II DE OYON CON ATENCION MATERNO INFANTIL CON APOYO SOCIEDAD CIVIL
Avance Anterior
tem
Partidas
Und.
Metrado
Costo
Unitario
(S/.)
Costo
Parcial
(S/.)
Metrado
Monto de
Valorizacin
Total
Avance Actual
Metrado
Avance Acumulado
Monto de
Valorizacin Total
Metrado
Saldo a Ejecutar
Monto de
Valorizacin Total
Metrado
Monto de
Valorizacin Total
05.06.00
PTO
5.00
32.03
160.15
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
5.00
05.07.00
PTO
1.00
36.47
36.47
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
160.15
36.47
05.08.00
PTO
4.00
33.00
132.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
4.00
132.00
06.00.00
SISTEMA DE TELECABLE
06.01.00
PTO
1.00
52.76
52.76
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
52.76
06.02.00
PTO
2.00
47.36
94.72
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
2.00
94.72
07.00.00
TIMBRE
07.01.00
CJT
1.00
39.83
39.83
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
39.83
08.00.00
ALIMENTADORES
08.01.00
2.00
2.64
5.28
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
2.00
5.28
08.02.00
47.00
35.32
1,660.04
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
47.00
1,660.04
08.03.00
28.00
14.07
393.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
28.00
393.96
08.04.00
25.00
12.38
309.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
25.00
309.50
08.05.00
25.00
8.23
205.75
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
25.00
205.75
08.06.00
1.00
9.70
9.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
9.70
08.07.00
31.00
9.70
300.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
31.00
300.70
08.08.00
10.00
9.22
92.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
10.00
92.20
08.09.00
21.00
5.50
115.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
21.00
115.50
08.10.00
31.00
7.68
238.08
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
31.00
238.08
08.11.00
23.00
5.91
135.93
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
23.00
135.93
08.12.00
32.00
74.58
2,386.56
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
32.00
2,386.56
08.13.00
ACOMETIDA TELEFONICA
CJT
4.00
70.31
281.24
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
4.00
281.24
08.14.00
UND
4.00
143.77
575.08
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
4.00
575.08
08.15.00
3.00
7.14
21.42
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
3.00
21.42
09.00.00
ALUMBRADO EXTERIOR
09.01.00
TABLEROS ELECTRICOS
09.01.01
TABLERO GENERAL TG
UND
1.00
46.20
46.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
46.20
09.01.02
UND
1.00
46.20
46.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
46.20
09.01.03
TABLERO T-CQI
UND
1.00
458.56
458.56
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
458.56
09.01.04
TABLERO T-SG
UND
1.00
458.56
458.56
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
458.56
09.01.05
TABLERO TD-A
UND
1.00
383.20
383.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
383.20
09.01.06
TABLERO TD-R
UND
1.00
338.20
338.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
338.20
09.01.07
TABLERO TD-DP
UND
1.00
383.20
383.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
383.20
09.01.08
TABLERO TD-CE
UND
1.00
416.96
416.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
416.96
09.01.09
TABLERO TD-T
UND
1.00
124.40
124.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
124.40
09.01.10
TABLERO T-CI
UND
1.00
46.20
46.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
46.20
09.01.11
TABLERO TD-3
und
2.00
417.81
835.62
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
2.00
835.62
VALORIZACIN DE OBRA
VALORIZACIN N
02
PROPIETARIO
VALOR REFERENCIAL
S/.
CONTRATISTA
MONTO CONTRATADO
S/.
PROVINCIA
OYON
DEPARTAMENTO
LIMA
700,000.00
700,000.00
FORMULA
UNICA
FECHA
OBRA : CONSTRUCCION CENTRO DE SALUD TIPO II DE OYON CON ATENCION MATERNO INFANTIL CON APOYO SOCIEDAD CIVIL
Avance Anterior
tem
Partidas
09.01.12
12.00.00
SISTEMA DE PARARRAYOS
12.01.00
12.02.00
12.03.00
12.04.00
Und.
Metrado
Costo
Unitario
(S/.)
Costo
Parcial
(S/.)
Metrado
Monto de
Valorizacin
Total
Avance Actual
Metrado
Avance Acumulado
Monto de
Valorizacin Total
Metrado
Saldo a Ejecutar
Monto de
Valorizacin Total
Metrado
Monto de
Valorizacin Total
und
1.00
181.78
181.78
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
181.78
UND
1.00
183.36
183.36
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
183.36
CJT
1.00
551.96
551.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
551.96
21.00
10.63
223.23
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
21.00
223.23
PARARRAYOS LONIFLASH
UND
1.00
198.47
198.47
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
198.47
12.05.00
UND
1.00
110.10
110.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
110.10
12.06.00
UND
3.00
143.77
431.31
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
3.00
431.31
12.07.00
UND
1.00
14.24
14.24
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
14.24
12.08.00
12.00
3.56
42.72
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
12.00
42.72
13.00.00
VARIOS
13.01.00
PRUEBAS ELECTRICAS
GLB
1.00
85.10
85.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
85.10
14.00.00
SISTEMA DE COMPUTO
14.01.00
pto
7.00
77.56
542.92
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
7.00
542.92
INST. SANITARIAS
01.00.00
DESAGUE Y VENTILACION
01.01.00
PTO
70.00
21.77
1,523.90
10.00
217.70
55.00
1,197.35
65.00
1,415.05
92.86%
5.00
108.85
01.02.00
PTO
24.00
101.64
2,439.36
6.00
609.84
15.00
1,524.60
21.00
2,134.44
87.50%
3.00
304.92
01.03.00
PTO
18.00
45.48
818.64
6.00
272.88
11.00
500.28
17.00
773.16
94.44%
1.00
45.48
02.00.00
REDES DE DERIVACION
02.01.00
258.00
8.14
2,100.12
25.00
203.50
205.00
1,668.70
230.00
1,872.20
89.15%
28.00
227.92
02.02.00
103.00
22.26
2,292.78
15.00
333.90
75.00
1,669.50
90.00
2,003.40
87.38%
13.00
289.38
03.00.00
03.01.00
54.00
8.14
439.56
3.00
24.42
45.00
366.30
48.00
390.72
88.89%
6.00
48.84
04.00.00
04.01.00
UND
38.00
11.25
427.50
2.00
22.50
25.00
281.25
27.00
303.75
71.05%
11.00
123.75
04.02.00
UND
10.00
17.26
172.60
1.00
17.26
8.00
138.08
9.00
155.34
90.00%
1.00
17.26
05.00.00
SOMBREROS DE VENTILACION
05.01.00
PZA
18.00
15.03
270.54
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
18.00
270.54
06.00.00
06.01.00
273.00
0.83
226.59
0.00
0.00
245.70
203.93
245.70
203.93
90.00%
27.30
22.66
06.02.00
273.00
12.47
3,404.31
0.00
0.00
245.70
3,063.88
245.70
3,063.88
90.00%
27.30
340.43
07.00.00
07.01.00
273.00
35.70
9,746.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
273.00
9,746.10
08.00.00
CAMARAS DE INSPECCION
VALORIZACIN DE OBRA
VALORIZACIN N
02
PROPIETARIO
VALOR REFERENCIAL
S/.
CONTRATISTA
MONTO CONTRATADO
S/.
PROVINCIA
OYON
DEPARTAMENTO
LIMA
700,000.00
700,000.00
FORMULA
UNICA
FECHA
OBRA : CONSTRUCCION CENTRO DE SALUD TIPO II DE OYON CON ATENCION MATERNO INFANTIL CON APOYO SOCIEDAD CIVIL
Avance Anterior
tem
Partidas
Und.
Metrado
Costo
Unitario
(S/.)
Costo
Parcial
(S/.)
Metrado
Monto de
Valorizacin
Total
Avance Actual
Metrado
Avance Acumulado
Monto de
Valorizacin Total
Metrado
Saldo a Ejecutar
Monto de
Valorizacin Total
Metrado
Monto de
Valorizacin Total
08.01.00
UND
54.00
71.72
3,872.88
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
54.00
3,872.88
08.02.00
UND
2.00
98.14
196.28
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
2.00
196.28
09.00.00
09.01.00
09.01.01
PTO
97.00
28.52
2,766.44
12.00
342.24
70.00
1,996.40
82.00
2,338.64
84.54%
15.00
427.80
10.00.00
10.01.00
596.00
0.83
494.68
50.00
41.50
546.00
453.18
596.00
494.68
100.00%
0.00
0.00
11.00.00
11.01.00
355.00
6.54
2,321.70
35.00
228.90
250.00
1,635.00
285.00
1,863.90
80.28%
70.00
457.80
11.02.00
37.00
7.03
260.11
12.00
84.36
22.00
154.66
34.00
239.02
91.89%
3.00
21.09
11.03.00
92.00
8.05
740.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
92.00
740.60
11.04.00
12.00
11.05
132.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
12.00
132.60
11.05.00
100.00
14.26
1,426.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
100.00
1,426.00
12.00.00
12.01.00
53.00
6.54
346.62
20.00
130.80
30.00
196.20
50.00
327.00
94.34%
3.00
19.62
13.00.00
LLAVES Y VALVULAS
13.01.00
PZA
60.00
34.12
2,047.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
60.00
2,047.20
13.02.00
PZA
1.00
44.55
44.55
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
44.55
13.03.00
PZA
2.00
71.59
143.18
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
2.00
143.18
13.04.00
PZA
1.00
94.92
94.92
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
94.92
13.05.00
PZA
2.00
88.52
177.04
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
2.00
177.04
14.00.00
14.01.00
14.01.01
PZA
21.00
54.45
1,143.45
5.00
272.25
15.00
816.75
20.00
1,089.00
95.24%
1.00
54.45
15.00.00
15.01.00
15.00
18.44
276.60
0.00
0.00
13.00
239.72
13.00
239.72
86.67%
2.00
36.88
15.02.00
60.00
23.94
1,436.40
15.00
359.10
36.00
861.84
51.00
1,220.94
85.00%
9.00
215.46
16.00.00
LLAVES Y VALVULAS
16.02.00
PZA
8.00
44.55
356.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
8.00
356.40
22.00.00
27.00.00
EQUIPOS Y SISTEMAS
27.01.00
UND
1.00
493.54
493.54
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
493.54
29.00.00
INSTALACIONES HIDRAULICAS
29.01.00
UND
1.00
251.56
251.56
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
251.56
29.02.00
UND
1.00
389.00
389.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
389.00
29.03.00
GLB
1.00
85.07
85.07
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
85.07
30.00.00
VALORIZACIN DE OBRA
VALORIZACIN N
02
PROPIETARIO
VALOR REFERENCIAL
S/.
CONTRATISTA
MONTO CONTRATADO
S/.
PROVINCIA
OYON
DEPARTAMENTO
LIMA
700,000.00
700,000.00
FORMULA
UNICA
FECHA
OBRA : CONSTRUCCION CENTRO DE SALUD TIPO II DE OYON CON ATENCION MATERNO INFANTIL CON APOYO SOCIEDAD CIVIL
Avance Anterior
tem
Partidas
30.01.00
31.00.00
31.01.00
32.00.00
ACCESORIOS SANITARIOS/DESAGUE
32.01.00
33.00.00
TRAMPA DE GRASA
33.01.00
34.00.00
34.01.00
Und.
Metrado
Costo
Unitario
(S/.)
Costo
Parcial
(S/.)
Metrado
Monto de
Valorizacin
Total
Avance Actual
Metrado
Avance Acumulado
Monto de
Valorizacin Total
Metrado
Saldo a Ejecutar
Monto de
Valorizacin Total
Metrado
Monto de
Valorizacin Total
GLB
1.00
275.69
275.69
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
275.69
GLB
1.00
190.50
190.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
190.50
GLB
1.00
627.90
627.90
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
627.90
UND
1.00
350.06
350.06
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
350.06
UND
1.00
18.25
18.25
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
18.25
29.15%
S/.
511,508.95
93,130.25
55,996.53
149,126.78
GASTOS GENERALES 8 %
8%
S/.
40,920.72
7,450.42
4,479.72
11,930.14
UTILIDADES 7.00 %
7%
S/.
35,805.63
6,519.12
3,919.76
10,438.87
25,366.75
S/.
588,235.29
107,099.78
64,396.01
171,495.79
416,739.50
SUB - TOTAL
I . G . V . 19 %
19%
TOTAL PRESUPUESTO
FACTOR DE RELACION
TOTAL VALORIZADO
29.15%
362,382.17
28,990.57
S/.
111,764.71
20,348.96
12,235.24
32,584.20
79,180.51
S/.
700,000.00
127,448.74
76,631.25
204,079.99
495,920.01
1.00000
1.00000
700,000.00
127,448.74
1.00000
18.21%
76,631.25
1.00000
10.95%
204,079.99
1.00000
29.15%
495,920.01
337772454.xls
SUPERVISION DE OBRA
VALORIZACIN DE OBRA
VALORIZACIN N
05
PROPIETARIO
VALOR REFERENCIAL
S/.
CONTRATISTA
MONTO CONTRATADO
S/.
PROVINCIA
OYON
DEPARTAMENTO
LIMA
700,000.00
700,000.00
FORMULA
UNICA
FECHA
OBRA : CONSTRUCCION CENTRO DE SALUD TIPO II DE OYON CON ATENCION MATERNO INFANTIL CON APOYO SOCIEDAD CIVIL
Avance Anterior
tem
Partidas
Und.
Metrado
Costo
Unitario
(S/.)
Costo
Parcial
(S/.)
Metrado
Monto de
Valorizacin
Total
Avance Actual
Metrado
Avance Acumulado
Monto de
Valorizacin
Total
Metrado
Monto de
Valorizacin
Total
Saldo a Ejecutar
Metrado
Monto de
Valorizacin Total
ESTRUCTURAS
01.00.00 OBRAS PROVISIONALES
01.01.00 ALMACENES OFICINAS TALLERES Y GUARDIANIA
M2
40.00
31.50
1,260.00
40.00
1,260.00
0.00
0.00
40.00
1,260.00
100.00%
0.00
0.00
UND
1.00
842.52
842.52
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
842.52
GLB
1.00
500.00
500.00
1.00
500.00
0.00
0.00
1.00
500.00
100.00%
0.00
0.00
500.00
0.24
120.00
500.00
120.00
0.00
0.00
500.00
120.00
100.00%
0.00
0.00
1.00
600.00
600.00
1.00
600.00
0.00
0.00
1.00
600.00
100.00%
0.00
0.00
M2
2,000.00
0.32
640.00 1,996.00
638.72
0.00
0.00
1,996.00
638.72
99.80%
4.00
1.28
M3
820.00
1.87
1,533.40
812.00
1,518.44
0.00
0.00
812.00
1,518.44
99.02%
8.00
14.96
M3
35.00
1.87
65.45
35.00
65.45
0.00
0.00
35.00
65.45
100.00%
0.00
0.00
M2
1,400.00
5.97
8,358.00 1,130.00
6,746.10
140.00
835.80
1,270.00
7,581.90
90.71%
130.00
776.10
M3
215.00
7.29
1,567.35
194.00
1,414.26
10.50
76.55
204.50
1,490.81
95.12%
10.50
76.54
610.00
1.87
1,140.70
545.00
1,019.15
30.00
56.10
575.00
1,075.25
94.26%
35.00
65.45
78.12
M2
GLB
M2
710.00
11.16
7,923.60
703.00
7,845.48
0.00
0.00
703.00
7,845.48
99.01%
7.00
M3
375.00
38.90
14,587.50
373.00
14,509.70
0.00
0.00
373.00
14,509.70
99.47%
2.00
77.80
M3
135.00
72.28
9,757.80
132.00
9,540.96
0.00
0.00
132.00
9,540.96
97.78%
3.00
216.84
M2
1,410.00
18.25
25,732.50 1,402.00
25,586.50
0.00
0.00
1,402.00
25,586.50
99.43%
8.00
146.00
KG
9,450.00
0.47
4,441.50 9,450.00
4,441.50
0.00
0.00
9,450.00
4,441.50
100.00%
0.00
0.00
M2
2,000.00
9.25
18,500.00
215.00
1,988.75
1,435.00
13,273.75
1,650.00
15,262.50
82.50%
350.00
3,237.50
2,015.28
81.00
2,015.28
0.00
0.00
81.00
2,015.28
100.00%
0.00
0.00
611.00
0.00
0.00
1,300.00
611.00
100.00%
0.00
0.00
M3
81.00
24.88
KG
1,300.00
0.47
611.00 1,300.00
M3
17.00
44.18
751.06
17.00
751.06
0.00
0.00
17.00
751.06
100.00%
0.00
0.00
M2
136.00
19.07
2,593.52
136.00
2,593.52
0.00
0.00
136.00
2,593.52
100.00%
0.00
0.00
KG
1,850.00
0.47
869.50
0.00
0.00
1,850.00
869.50
100.00%
0.00
0.00
869.50 1,850.00
05.03.00 COLUMNAS
05.03.01 CONCRETO EN COLUMNAS F"C 210 KG/CM2
M3
55.00
99.10
5,450.50
12.62
1,250.64
31.88
3,159.31
44.50
4,409.95
80.91%
10.50
1,040.55
M2
650.00
26.04
16,926.00
192.93
5,023.90
330.00
8,593.20
522.93
13,617.10
80.45%
127.07
3,308.90
VAL.04 JULIO
Pgina 23
337772454.xls
SUPERVISION DE OBRA
VALORIZACIN DE OBRA
VALORIZACIN N
05
PROPIETARIO
VALOR REFERENCIAL
S/.
CONTRATISTA
MONTO CONTRATADO
S/.
PROVINCIA
OYON
DEPARTAMENTO
LIMA
700,000.00
700,000.00
FORMULA
UNICA
FECHA
OBRA : CONSTRUCCION CENTRO DE SALUD TIPO II DE OYON CON ATENCION MATERNO INFANTIL CON APOYO SOCIEDAD CIVIL
Avance Anterior
tem
Partidas
Und.
M2
Metrado
Costo
Unitario
(S/.)
7,850.00
0.47
Costo
Parcial
(S/.)
Metrado
3,689.50 7,777.00
Monto de
Valorizacin
Total
3,655.19
Avance Actual
Metrado
0.00
Avance Acumulado
Monto de
Valorizacin
Total
0.00
Metrado
7,777.00
Monto de
Valorizacin
Total
3,655.19
Saldo a Ejecutar
%
99.07%
Metrado
73.00
Monto de
Valorizacin Total
34.31
05.04.00 PLACAS
05.04.01 PLACAS DE CONCRETO Fc=210 Kg/Cm2
M3
8.00
97.21
777.68
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
8.00
777.68
M2
111.00
22.49
2,496.39
15.00
337.35
41.00
922.09
56.00
1,259.44
50.45%
55.00
1,236.95
Kg
325.00
0.47
152.75
308.00
144.76
17.00
7.99
325.00
152.75
100.00%
0.00
0.00
M3
121.00
38.68
4,680.28
20.00
773.60
M2
665.00
25.63
17,043.95
95.00
2,434.85
KG
6,950.00
0.47
3,266.50
700.00
329.00
05.05.00 VIGAS
0.00
0.00
20.00
773.60
16.53%
101.00
3,906.68
160.00
4,100.80
255.00
6,535.65
38.35%
410.00
10,508.30
1,800.00
846.00
2,500.00
1,175.00
35.97%
4,450.00
2,091.50
M3
150.00
34.30
5,145.00
30.00
1,029.00
0.00
0.00
30.00
1,029.00
20.00%
120.00
4,116.00
M2
1,800.00
23.03
41,454.00
284.00
6,540.52
150.00
3,454.50
434.00
9,995.02
24.11%
1,366.00
31,458.98
KG
10,000.00
0.47
4,700.00
958.00
450.26
1,000.00
470.00
1,958.00
920.26
19.58%
8,042.00
3,779.74
UND
1,700.00
0.25
425.00 1,231.00
307.75
0.00
0.00
1,231.00
307.75
72.41%
469.00
117.25
M3
16.00
76.45
1,223.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
16.00
1,223.20
M2
95.00
20.13
1,912.35
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
95.00
1,912.35
M2
1,200.00
0.47
564.00
400.00
188.00
0.00
0.00
400.00
188.00
33.33%
800.00
376.00
M3
6.50
110.29
716.89
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
6.50
716.89
M2
51.00
24.39
1,243.89
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
51.00
1,243.89
KG
500.00
0.47
235.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
500.00
235.00
M2
2,000.00
36.75
73,500.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
2,000.00
73,500.00
ARQUITECTURA
11.00.00
11.01.00
M2
1,243.08
14.71
18,285.71
837.50
12,319.63
344.41
5,066.27
1,181.91
17,385.90
95.08%
61.17
899.81
11.02.00
M2
1,634.28
11.24
18,369.31
797.50
8,963.90
676.00
7,598.24
1,473.50
16,562.14
90.16%
160.78
1,807.17
12.00.00
12.01.00
M2
1,279.90
9.19
11,762.28
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1,279.90
11,762.28
12.02.00
M2
2,983.43
8.74
26,075.18
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
2,983.43
26,075.18
12.03.00
M2
1,603.25
7.79
12,489.32
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1,603.25
12,489.32
12.04.00
TARRAJEO COLUMNAS
M2
6.00
9.18
55.08
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
6.00
55.08
12.05.00
TARRAJEO DE VIGAS
M2
50.00
11.77
588.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
50.00
588.50
VAL.04 JULIO
Pgina 24
337772454.xls
SUPERVISION DE OBRA
VALORIZACIN DE OBRA
VALORIZACIN N
05
PROPIETARIO
VALOR REFERENCIAL
S/.
CONTRATISTA
MONTO CONTRATADO
S/.
PROVINCIA
OYON
DEPARTAMENTO
LIMA
700,000.00
700,000.00
FORMULA
UNICA
FECHA
OBRA : CONSTRUCCION CENTRO DE SALUD TIPO II DE OYON CON ATENCION MATERNO INFANTIL CON APOYO SOCIEDAD CIVIL
Avance Anterior
tem
Partidas
Und.
Metrado
Costo
Unitario
(S/.)
Costo
Parcial
(S/.)
Metrado
Monto de
Valorizacin
Total
Avance Actual
Metrado
Avance Acumulado
Monto de
Valorizacin
Total
Metrado
Monto de
Valorizacin
Total
Saldo a Ejecutar
Metrado
Monto de
Valorizacin Total
12.06.00
M2
62.35
77.55
4,835.24
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
62.35
12.07.00
TARRAJEO IMPERMEABILIZADO
M2
49.20
7.41
364.57
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
49.20
4,835.24
364.57
12.08.00
423.90
7.00
2,967.30
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
423.90
2,967.30
12.09.00
VESTIDURA DE DERRAMES
515.84
4.41
2,274.85
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
515.84
2,274.85
12.10.00
906.30
4.01
3,634.26
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
906.30
3,634.26
12.11.00
BRUAS EN INTERIORES
325.73
3.16
1,029.31
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
325.73
1,029.31
13.00.00
CIELORRASOS
13.01.00
M2
1,370.57
13.21
18,105.23
0.00
0.00
0.00
0.00
400.00
0.00
29.18%
970.57
18,105.23
14.00.00
PISOS Y PAVIMENTOS
14.01.00
CONTRAPISO E= 40 mm
M2
1,224.99
7.07
8,660.68
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1,224.99
8,660.68
14.06.00
M2
44.76
17.09
764.95
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
44.76
764.95
25.00.00
ESCALERAS
25.01.00
ESCALERA DE GATO
4.35
80.02
348.09
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
4.35
348.09
26.00.00
TAPA METALICA
26.01.00
UND
1.00
182.89
182.89
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
182.89
31.00.00
32.02.00
LIMPIEZA PERMANENTE
GLB
1.00
1,535.73
1,535.73
0.40
614.29
0.20
307.15
0.60
921.44
60.00%
0.40
614.29
32.03.00
LIMPIEZA FINAL
GLB
1.00
500.00
500.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
500.00
INST. ELECTRICAS
01.00.00
INSTALACIONES ELECTRICAS
01.01.00
CIRCUITOS DERIVADOS
01.02.00
01.02.01
CENTRO DE LUZ
PTO
173.00
24.16
4,179.68
0.00
0.00
27.00
652.32
27.00
652.32
15.61%
146.00
3,527.36
01.02.02
PTO
99.00
16.36
1,619.64
0.00
0.00
18.00
294.48
18.00
294.48
18.18%
81.00
1,325.16
01.02.03
PTO
18.00
35.53
639.54
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
18.00
639.54
01.02.04
PTO
4.00
31.71
126.84
0.00
0.00
1.00
31.71
1.00
31.71
25.00%
3.00
95.13
01.02.05
PTO
7.00
19.58
137.06
0.00
0.00
2.00
39.16
2.00
39.16
28.57%
5.00
97.90
01.02.06
PTO
62.00
28.69
1,778.78
0.00
0.00
13.00
372.97
13.00
372.97
20.97%
49.00
1,405.81
01.02.07
PTO
38.00
29.44
1,118.72
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
38.00
1,118.72
01.02.08
PTO
2.00
33.54
67.08
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
2.00
67.08
01.02.09
PTO
18.00
36.77
661.86
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
18.00
661.86
01.02.10
PTO
135.00
35.80
4,833.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
135.00
4,833.00
VAL.04 JULIO
Pgina 25
337772454.xls
SUPERVISION DE OBRA
VALORIZACIN DE OBRA
VALORIZACIN N
05
PROPIETARIO
VALOR REFERENCIAL
S/.
CONTRATISTA
MONTO CONTRATADO
S/.
PROVINCIA
OYON
DEPARTAMENTO
LIMA
700,000.00
700,000.00
FORMULA
UNICA
FECHA
OBRA : CONSTRUCCION CENTRO DE SALUD TIPO II DE OYON CON ATENCION MATERNO INFANTIL CON APOYO SOCIEDAD CIVIL
Avance Anterior
tem
Partidas
Und.
Metrado
Costo
Unitario
(S/.)
Costo
Parcial
(S/.)
Metrado
Monto de
Valorizacin
Total
Avance Actual
Metrado
Avance Acumulado
Monto de
Valorizacin
Total
Metrado
Monto de
Valorizacin
Total
Saldo a Ejecutar
Metrado
Monto de
Valorizacin Total
01.02.11
PTO
11.00
35.79
393.69
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
11.00
393.69
01.02.12
PTO
9.00
42.74
384.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
9.00
384.66
01.02.13
SALIDA P/TOMACORR./COMPUTADORA
PTO
7.00
18.34
128.38
0.00
0.00
3.00
55.02
3.00
55.02
42.86%
4.00
73.36
01.02.14
PTO
11.00
35.49
390.39
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
11.00
390.39
02.00.00
02.01.00
PTO
4.00
75.48
301.92
0.00
0.00
4.00
301.92
4.00
301.92
100.00%
0.00
0.00
02.02.00
PTO
1.00
55.18
55.18
0.00
0.00
1.00
55.18
1.00
55.18
100.00%
0.00
0.00
02.03.00
PTO
1.00
611.89
611.89
0.00
0.00
1.00
611.89
1.00
611.89
100.00%
0.00
0.00
02.04.00
PTO
8.00
59.94
479.52
0.00
0.00
3.00
179.82
3.00
179.82
37.50%
5.00
299.70
02.05.00
PTO
1.00
63.77
63.77
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
63.77
02.06.00
PTO
1.00
82.00
82.00
0.00
0.00
1.00
82.00
1.00
82.00
100.00%
0.00
0.00
02.07.00
CALANDRIA
PTO
1.00
244.36
244.36
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
244.36
02.08.00
REFRIGERADORA INDUSTRIAL
PTO
1.00
47.16
47.16
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
47.16
02.09.00
SECADORA
PTO
1.00
51.36
51.36
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
51.36
02.10.00
LAVADORA
PTO
2.00
50.43
100.86
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
2.00
100.86
02.11.00
SOLDADORA
PTO
1.00
93.38
93.38
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
93.38
02.12.00
DESTILADOR DE AGUA DE 3 KW
PTO
1.00
63.74
63.74
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
63.74
02.13.00
PTO
1.00
46.15
46.15
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
46.15
02.14.00
CENTRAL DE PARLANTES
PTO
1.00
75.05
75.05
0.00
0.00
1.00
75.05
1.00
75.05
100.00%
0.00
0.00
02.15.00
PTO
1.00
77.24
77.24
0.00
0.00
1.00
77.24
1.00
77.24
100.00%
0.00
0.00
02.16.00
PTO
1.00
100.93
100.93
0.00
0.00
1.00
100.93
1.00
100.93
100.00%
0.00
0.00
02.17.00
PTO
1.00
67.12
67.12
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
67.12
02.18.00
ELECTROBOMBAS DE AGUA
CJT
1.00
219.22
219.22
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
219.22
02.19.00
CJT
1.00
97.11
97.11
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
97.11
02.20.00
RAYOS X
CJT
1.00
913.50
913.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
913.50
02.21.00
CJT
1.00
29.14
29.14
0.00
0.00
1.00
29.14
1.00
29.14
100.00%
0.00
0.00
03.00.00
COMUNICACIONES Y SEALES
03.01.00
SISTEMAS DE TELEFONOS
03.01.01
PTO
1.00
48.30
48.30
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
48.30
03.01.02
PTO
3.00
294.21
882.63
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
3.00
882.63
03.01.03
PTO
22.00
71.93
1,582.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
22.00
1,582.46
03.01.04
PTO
7.00
65.87
461.09
0.00
0.00
1.00
65.87
1.00
65.87
14.29%
6.00
395.22
03.01.05
PTO
5.00
52.76
263.80
0.00
0.00
1.00
52.76
1.00
52.76
20.00%
4.00
211.04
03.01.06
PTO
3.00
85.72
257.16
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
3.00
257.16
VAL.04 JULIO
Pgina 26
337772454.xls
SUPERVISION DE OBRA
VALORIZACIN DE OBRA
VALORIZACIN N
05
PROPIETARIO
VALOR REFERENCIAL
S/.
CONTRATISTA
MONTO CONTRATADO
S/.
PROVINCIA
OYON
DEPARTAMENTO
LIMA
700,000.00
700,000.00
FORMULA
UNICA
FECHA
OBRA : CONSTRUCCION CENTRO DE SALUD TIPO II DE OYON CON ATENCION MATERNO INFANTIL CON APOYO SOCIEDAD CIVIL
Avance Anterior
tem
Partidas
03.01.07
04.00.00
04.01.00
04.02.00
Und.
Metrado
Costo
Unitario
(S/.)
Costo
Parcial
(S/.)
Metrado
Monto de
Valorizacin
Total
Avance Actual
Metrado
Avance Acumulado
Monto de
Valorizacin
Total
Metrado
Monto de
Valorizacin
Total
Saldo a Ejecutar
Metrado
Monto de
Valorizacin Total
PTO
1.00
48.10
48.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
48.10
PTO
7.00
85.72
600.04
0.00
0.00
1.00
85.72
1.00
85.72
14.29%
6.00
514.32
PTO
3.00
48.10
144.30
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
3.00
144.30
04.03.00
PTO
6.00
78.48
470.88
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
6.00
470.88
04.03.04
PTO
73.00
48.77
3,560.21
0.00
0.00
11.00
536.47
11.00
536.47
15.07%
62.00
3,023.74
05.00.00
05.01.00
PTO
1.00
54.23
54.23
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
54.23
05.02.00
PTO
11.00
69.26
761.86
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
11.00
761.86
05.03.00
PTO
10.00
36.46
364.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
10.00
364.60
05.04.00
PTO
5.00
44.07
220.35
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
5.00
220.35
05.05.00
pto
4.00
124.10
496.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
4.00
496.40
05.06.00
PTO
5.00
32.03
160.15
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
5.00
160.15
05.07.00
PTO
1.00
36.47
36.47
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
36.47
05.08.00
PTO
4.00
33.00
132.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
4.00
132.00
06.00.00
SISTEMA DE TELECABLE
06.01.00
PTO
1.00
52.76
52.76
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
52.76
06.02.00
PTO
2.00
47.36
94.72
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
2.00
94.72
07.00.00
TIMBRE
07.01.00
CJT
1.00
39.83
39.83
0.00
0.00
1.00
39.83
1.00
39.83
100.00%
0.00
0.00
08.00.00
ALIMENTADORES
08.01.00
2.00
2.64
5.28
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
2.00
5.28
08.02.00
47.00
35.32
1,660.04
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
47.00
1,660.04
08.03.00
28.00
14.07
393.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
28.00
393.96
08.04.00
25.00
12.38
309.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
25.00
309.50
08.05.00
25.00
8.23
205.75
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
25.00
205.75
08.06.00
1.00
9.70
9.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
9.70
08.07.00
31.00
9.70
300.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
31.00
300.70
08.08.00
10.00
9.22
92.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
10.00
92.20
08.09.00
21.00
5.50
115.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
21.00
115.50
08.10.00
31.00
7.68
238.08
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
31.00
238.08
08.11.00
23.00
5.91
135.93
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
23.00
135.93
08.12.00
32.00
74.58
2,386.56
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
32.00
2,386.56
08.13.00
ACOMETIDA TELEFONICA
CJT
4.00
70.31
281.24
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
4.00
281.24
VAL.04 JULIO
Pgina 27
337772454.xls
SUPERVISION DE OBRA
VALORIZACIN DE OBRA
VALORIZACIN N
05
PROPIETARIO
VALOR REFERENCIAL
S/.
CONTRATISTA
MONTO CONTRATADO
S/.
PROVINCIA
OYON
DEPARTAMENTO
LIMA
700,000.00
700,000.00
FORMULA
UNICA
FECHA
OBRA : CONSTRUCCION CENTRO DE SALUD TIPO II DE OYON CON ATENCION MATERNO INFANTIL CON APOYO SOCIEDAD CIVIL
Avance Anterior
tem
Partidas
08.14.00
08.15.00
09.00.00
ALUMBRADO EXTERIOR
09.01.00
TABLEROS ELECTRICOS
09.01.01
09.01.02
Und.
Metrado
Costo
Unitario
(S/.)
Costo
Parcial
(S/.)
Metrado
Monto de
Valorizacin
Total
Avance Actual
Metrado
Avance Acumulado
Monto de
Valorizacin
Total
Metrado
Monto de
Valorizacin
Total
Saldo a Ejecutar
Metrado
Monto de
Valorizacin Total
UND
4.00
143.77
575.08
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
4.00
575.08
3.00
7.14
21.42
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
3.00
21.42
TABLERO GENERAL TG
UND
1.00
46.20
46.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
46.20
UND
1.00
46.20
46.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
46.20
09.01.03
TABLERO T-CQI
UND
1.00
458.56
458.56
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
458.56
09.01.04
TABLERO T-SG
UND
1.00
458.56
458.56
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
458.56
09.01.05
TABLERO TD-A
UND
1.00
383.20
383.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
383.20
09.01.06
TABLERO TD-R
UND
1.00
338.20
338.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
338.20
09.01.07
TABLERO TD-DP
UND
1.00
383.20
383.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
383.20
09.01.08
TABLERO TD-CE
UND
1.00
416.96
416.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
416.96
09.01.09
TABLERO TD-T
UND
1.00
124.40
124.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
124.40
09.01.10
TABLERO T-CI
UND
1.00
46.20
46.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
46.20
09.01.11
TABLERO TD-3
und
2.00
417.81
835.62
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
2.00
835.62
09.01.12
und
1.00
181.78
181.78
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
181.78
12.00.00
SISTEMA DE PARARRAYOS
12.01.00
UND
1.00
183.36
183.36
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
183.36
12.02.00
CJT
1.00
551.96
551.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
551.96
12.03.00
21.00
10.63
223.23
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
21.00
223.23
12.04.00
PARARRAYOS LONIFLASH
UND
1.00
198.47
198.47
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
198.47
12.05.00
UND
1.00
110.10
110.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
110.10
12.06.00
UND
3.00
143.77
431.31
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
3.00
431.31
12.07.00
UND
1.00
14.24
14.24
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
14.24
12.08.00
12.00
3.56
42.72
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
12.00
42.72
13.00.00
VARIOS
13.01.00
PRUEBAS ELECTRICAS
GLB
1.00
85.10
85.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
85.10
14.00.00
SISTEMA DE COMPUTO
14.01.00
pto
7.00
77.56
542.92
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
7.00
542.92
PTO
70.00
21.77
1,523.90
65.00
1,415.05
0.00
0.00
65.00
1,415.05
92.86%
5.00
108.85
INST. SANITARIAS
01.00.00
DESAGUE Y VENTILACION
01.01.00
VAL.04 JULIO
Pgina 28
337772454.xls
SUPERVISION DE OBRA
VALORIZACIN DE OBRA
VALORIZACIN N
05
PROPIETARIO
VALOR REFERENCIAL
S/.
CONTRATISTA
MONTO CONTRATADO
S/.
PROVINCIA
OYON
DEPARTAMENTO
LIMA
700,000.00
700,000.00
FORMULA
UNICA
FECHA
OBRA : CONSTRUCCION CENTRO DE SALUD TIPO II DE OYON CON ATENCION MATERNO INFANTIL CON APOYO SOCIEDAD CIVIL
Avance Anterior
tem
Partidas
Und.
Metrado
Costo
Unitario
(S/.)
Costo
Parcial
(S/.)
Metrado
Monto de
Valorizacin
Total
Avance Actual
Metrado
Avance Acumulado
Monto de
Valorizacin
Total
Metrado
Monto de
Valorizacin
Total
Saldo a Ejecutar
Metrado
Monto de
Valorizacin Total
01.02.00
PTO
24.00
101.64
2,439.36
21.00
2,134.44
0.00
0.00
21.00
2,134.44
87.50%
3.00
304.92
01.03.00
PTO
18.00
45.48
818.64
17.00
773.16
0.00
0.00
17.00
773.16
94.44%
1.00
45.48
02.00.00
REDES DE DERIVACION
02.01.00
258.00
8.14
2,100.12
230.00
1,872.20
10.00
81.40
240.00
1,953.60
93.02%
18.00
146.52
02.02.00
103.00
22.26
2,292.78
90.00
2,003.40
10.00
222.60
100.00
2,226.00
97.09%
3.00
66.78
03.00.00
03.01.00
54.00
8.14
439.56
48.00
390.72
0.00
0.00
48.00
390.72
88.89%
6.00
48.84
04.00.00
04.01.00
UND
38.00
11.25
427.50
27.00
303.75
0.00
0.00
27.00
303.75
71.05%
11.00
123.75
04.02.00
UND
10.00
17.26
172.60
9.00
155.34
0.00
0.00
9.00
155.34
90.00%
1.00
17.26
05.00.00
SOMBREROS DE VENTILACION
05.01.00
PZA
18.00
15.03
270.54
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
18.00
270.54
06.00.00
06.01.00
273.00
0.83
226.59
245.70
203.93
27.30
22.66
273.00
226.59
100.00%
0.00
0.00
06.02.00
273.00
12.47
3,404.31
245.70
3,063.88
27.30
340.43
273.00
3,404.31
100.00%
0.00
0.00
07.00.00
07.01.00
273.00
35.70
9,746.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
273.00
9,746.10
08.00.00
CAMARAS DE INSPECCION
08.01.00
UND
54.00
71.72
3,872.88
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
54.00
3,872.88
08.02.00
UND
2.00
98.14
196.28
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
2.00
196.28
09.00.00
09.01.00
09.01.01
PTO
97.00
28.52
2,766.44
82.00
2,338.64
0.00
0.00
82.00
2,338.64
84.54%
15.00
427.80
10.00.00
10.01.00
596.00
0.83
494.68
596.00
494.68
0.00
0.00
596.00
494.68
100.00%
0.00
0.00
11.00.00
11.01.00
355.00
6.54
2,321.70
285.00
1,863.90
0.00
0.00
285.00
1,863.90
80.28%
70.00
457.80
11.02.00
37.00
7.03
260.11
34.00
239.02
0.00
0.00
34.00
239.02
91.89%
3.00
21.09
11.03.00
92.00
8.05
740.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
92.00
740.60
11.04.00
12.00
11.05
132.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
12.00
132.60
11.05.00
100.00
14.26
1,426.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
100.00
1,426.00
12.00.00
12.01.00
53.00
6.54
346.62
50.00
327.00
0.00
0.00
50.00
327.00
94.34%
3.00
19.62
13.00.00
LLAVES Y VALVULAS
VAL.04 JULIO
Pgina 29
337772454.xls
SUPERVISION DE OBRA
VALORIZACIN DE OBRA
VALORIZACIN N
05
PROPIETARIO
VALOR REFERENCIAL
S/.
CONTRATISTA
MONTO CONTRATADO
S/.
PROVINCIA
OYON
DEPARTAMENTO
LIMA
700,000.00
700,000.00
FORMULA
UNICA
FECHA
OBRA : CONSTRUCCION CENTRO DE SALUD TIPO II DE OYON CON ATENCION MATERNO INFANTIL CON APOYO SOCIEDAD CIVIL
Avance Anterior
tem
Partidas
Und.
Metrado
Costo
Unitario
(S/.)
Costo
Parcial
(S/.)
Metrado
Monto de
Valorizacin
Total
Avance Actual
Metrado
Avance Acumulado
Monto de
Valorizacin
Total
Metrado
Monto de
Valorizacin
Total
Saldo a Ejecutar
Metrado
Monto de
Valorizacin Total
13.01.00
PZA
60.00
34.12
2,047.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
60.00
13.02.00
PZA
1.00
44.55
44.55
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
44.55
13.03.00
PZA
2.00
71.59
143.18
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
2.00
143.18
13.04.00
PZA
1.00
94.92
94.92
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
94.92
13.05.00
PZA
2.00
88.52
177.04
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
2.00
177.04
14.00.00
14.01.00
14.01.01
PZA
21.00
54.45
1,143.45
20.00
1,089.00
0.00
0.00
20.00
1,089.00
95.24%
1.00
54.45
15.00.00
15.01.00
15.00
18.44
276.60
13.00
239.72
0.00
0.00
13.00
239.72
86.67%
2.00
36.88
15.02.00
60.00
23.94
1,436.40
51.00
1,220.94
0.00
0.00
51.00
1,220.94
85.00%
9.00
215.46
16.00.00
LLAVES Y VALVULAS
16.02.00
PZA
8.00
44.55
356.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
8.00
356.40
22.00.00
27.00.00
EQUIPOS Y SISTEMAS
27.01.00
UND
1.00
493.54
493.54
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
493.54
29.00.00
INSTALACIONES HIDRAULICAS
29.01.00
UND
1.00
251.56
251.56
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
251.56
29.02.00
UND
1.00
389.00
389.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
389.00
29.03.00
GLB
1.00
85.07
85.07
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
85.07
30.00.00
30.01.00
GLB
1.00
275.69
275.69
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
275.69
31.00.00
31.01.00
GLB
1.00
190.50
190.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
190.50
32.00.00
ACCESORIOS SANITARIOS/DESAGUE
32.01.00
33.00.00
TRAMPA DE GRASA
33.01.00
34.00.00
34.01.00
0.00
2,047.20
0.00
0.00
GLB
1.00
627.90
627.90
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
627.90
UND
1.00
350.06
350.06
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
350.06
UND
1.00
18.25
18.25
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
18.25
39.55%
S/.
511,508.95
149,126.78
53,174.31
202,301.09
GASTOS GENERALES 8 %
8%
S/.
40,920.72
11,930.14
4,253.94
16,184.09
24,736.63
UTILIDADES 7.00 %
7%
S/.
35,805.63
10,438.87
3,722.20
14,161.08
21,644.55
VAL.04 JULIO
309,207.86
Pgina 30
337772454.xls
SUPERVISION DE OBRA
VALORIZACIN DE OBRA
VALORIZACIN N
05
PROPIETARIO
VALOR REFERENCIAL
S/.
CONTRATISTA
MONTO CONTRATADO
S/.
PROVINCIA
OYON
DEPARTAMENTO
LIMA
700,000.00
700,000.00
FORMULA
UNICA
FECHA
OBRA : CONSTRUCCION CENTRO DE SALUD TIPO II DE OYON CON ATENCION MATERNO INFANTIL CON APOYO SOCIEDAD CIVIL
Avance Anterior
tem
Partidas
Und.
SUB - TOTAL
I . G . V . 19 %
19%
TOTAL PRESUPUESTO
FACTOR DE RELACION
TOTAL VALORIZADO
Metrado
Costo
Unitario
(S/.)
Costo
Parcial
(S/.)
Metrado
Monto de
Valorizacin
Total
Avance Actual
Metrado
Monto de
Valorizacin
Total
Avance Acumulado
Metrado
Monto de
Valorizacin
Total
Saldo a Ejecutar
Metrado
Monto de
Valorizacin Total
S/.
588,235.29
171,495.79
61,150.46
232,646.25
S/.
111,764.71
32,584.20
11,618.59
44,202.79
67,561.92
S/.
700,000.00
204,079.99
72,769.04
276,849.04
423,150.96
1.00000
1.00000
700,000.00
204,079.99
1.00000
29.15%
72,769.04
355,589.04
1.00000
10.40%
276,849.04
1.00000
39.55%
423,150.96
39.55%
VAL.04 JULIO
Pgina 31
337772454.xls
SUPERVISION DE OBRA
VALORIZACIN DE OBRA
VALORIZACIN N
06
PROPIETARIO
CONTRATISTA
PROVINCIA
DEPARTAMENTO
OBRA :
VALOR REFERENCIAL
MONTO CONTRATADO
FORMULA
FECHA
700,000.00
700,000.00
UNICA
CONSTRUCCION CENTRO DE SALUD TIPO II DE OYON CON ATENCION MATERNO INFANTIL CON APOYO SOCIEDAD CIVIL
Avance Anterior
Partidas
ITEM
01.00.00
01.01.00
01.02.00
01.03.00
02.00.00
02.01.00
02.02.00
02.03.00
03.00.00
03.01.00
03.02.00
03.03.00
03.04.00
03.05.00
04.00.00
04.01.00
04.02.00
04.03.01
04.03.02
04.03.03
04.04.00
05.00.00
05.01.00
05.01.01
05.01.02
05.02.00
05.02.01
05.02.02
05.02.03
05.03.00
05.03.01
05.03.02
05.03.03
05.04.00
05.04.01
05.04.02
05.04.03
05.05.00
05.05.01
05.05.02
05.05.03
05.06.00
05.06.01
05.06.02
05.06.03
05.06.04
05.07.00
05.07.01
05.07.02
05.07.03
05.08.00
05.08.01
05.08.02
05.08.03
06.00.00
S/.
S/.
Und.
ESTRUCTURAS
OBRAS PROVISIONALES
ALMACENES OFICINAS TALLERES Y GUARDIANIA
M2
CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M
UND
AGUA Y FUERZA ELECTRICA EN LA CONSTRUCCION
GLB
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
M2
TRANSPORTE DE EQUIPOS Y HERAMIENTAS
GLB
NIVELACION ,TRAZO Y REPLANTEO PRELIMINAR
M2
MOVIMIENTO DE TIERRAS
EXCAVACIN DE ZANJA P/CIMIENTOS Y / O ZAPATAS
M3
EXCAVACION P/CISTERNA
M3
NIVELACION INT.Y APISONADO FINAL DEL TERRENO PREVIO AL PISO
M2
RELLENO CON MATERIAL PROPIO
M3
ELIMINACION MATERIAL EXCEDENTE HASTA 30 MTS( A MANO USANDO CARRE m3
OBRAS DE CONCRETO SIMPLE
SOLADO DE CONCRETO 1:12 C:H
M2
CIMIENTOS 1:10 ( CH ) +30 % P.G
M3
SOBRECIMIENTO CONCRETO CICLOPEO 1:8 C.H+ 25% PM
M3
SOBRECIMIENTO ENCOFRADO UY DESENCOFRADO
M2
ACERO DE REFUERZO Fy=4200Kg/Cm2
KG
FALSO PISO DE 4" DE CONCRETO 1:10
M2
OBRAS DE CONCRETO ARMADO
ZAPATAS
CONCRETO EN ZAPATAS F"C= 210 KG/CM2
M3
ACERO DE REFUERZO Fy=4200Kg/Cm2
KG
VIGAS DE ARRIOSTRE
VIGAS DE ARRIOSTRE Fc=210 Kg/Cm2
M3
ENCOFRADO Y DESENCOFRADO VIGAS DE ARRIOSTRE
M2
ACERO DE REFUERZO EN VIGAS DE ARRIOSTREFy=4200 Kg/CM2
KG
COLUMNAS
CONCRETO EN COLUMNAS F"C 210 KG/CM2
M3
ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS
M2
ACERO DE REFUERZO Fy=4200 Kg/Cm2 COLUMNAS
M2
PLACAS
PLACAS DE CONCRETO Fc=210 Kg/Cm2
M3
ENCOFRADO Y DESNCOFRADO PLACAS
M2
ACERO DE REFUERZO Fy=4200 Kg/Cm2 PLACAS
Kg
VIGAS
VIGAS CONCRETO 210 Kg/Cm2
M3
VIGAS ENCOFRADO Y DESENCOFRADO
M2
ACERO DE REFUERZO Fy=4200Kg/Cm2 VIGAS
KG
LOSAS ALIGERADAS
LOSA ALIGERADA CONCRETO 210 Kg/Cm2
M3
ENCOFRADO Y DESENCOFRADO PARA LOSAS ALIGERADAS
M2
ACERO DE REFUERZO Fy= 4200Kg/Cm2 LOSA ALIGERADA
KG
LOSA ALIGERADA LADRILLO HUECO 15X30X30
UND
CISTERNA
CONCRETO Fc=210 Kg/Cm2-CISTERNA
M3
ENCOFRADO Y DESENCOFRADO-CISTERNA
M2
REFUERZO DE ACERO-CISTERNA
M2
TANQUE ELEVADO
CONCRETO EN TANQUE ELEVADO F'C=210 KG/CM2
M3
ENCOFRADO Y DESENCOFRADO NORMAL EN TANQUE ELEVADO
M2
ACERO GRADO 60 EN TANQUE ELEVADO
KG
ESTRUCTURA DE MADERA
M2
Metrado
Costo
Unitario
(S/.)
Costo
Parcial
(S/.)
1,260.00
842.52
500.00
Metrado
40.00
1.00
1.00
31.50
842.52
500.00
500.00
1.00
2,000.00
0.24
600.00
0.32
120.00
500.00
600.00
1.00
640.00 1,996.00
820.00
35.00
1,400.00
215.00
610.00
1.87
1.87
5.97
7.29
1.87
1,533.40
812.00
65.45
35.00
8,358.00 1,270.00
1,567.35
204.50
1,140.70
575.00
710.00
375.00
135.00
1,410.00
9,450.00
2,000.00
11.16
38.90
72.28
18.25
0.47
9.25
81.00
1,300.00
Avance Actual
Metrado
Avance Acumulado
Monto de
Valorizacin
Total
Metrado
Monto de
Valorizacin
Total
Saldo a Ejecutar
Metrado
Monto de
Valorizacin Total
1,260.00
0.00
500.00
0.00
1.00
0.00
0.00
842.52
0.00
40.00
1.00
1.00
1,260.00
842.52
500.00
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
120.00
600.00
638.72
0.00
0.00
4.00
0.00
0.00
1.28
500.00
1.00
2,000.00
120.00
600.00
640.00
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
1,518.44
65.45
7,581.90
1,490.81
1,075.25
8.00
0.00
130.00
10.50
35.00
14.96
0.00
776.10
76.55
65.45
820.00
35.00
1,400.00
215.00
610.00
1,533.40
65.45
8,358.00
1,567.35
1,140.70
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7,923.60
703.00
14,587.50
373.00
9,757.80
132.00
25,732.50 1,402.00
4,441.50 9,450.00
18,500.00 1,650.00
7,845.48
14,509.70
9,540.96
25,586.50
4,441.50
15,262.50
7.00
2.00
3.00
8.00
0.00
150.00
78.12
77.80
216.84
146.00
0.00
1,387.50
710.00
375.00
135.00
1,410.00
9,450.00
1,800.00
7,923.60
14,587.50
9,757.80
25,732.50
4,441.50
16,650.00
100.00%
100.00%
100.00%
100.00%
100.00%
90.00%
0.00
0.00
0.00
0.00
0.00
200.00
0.00
0.00
0.00
0.00
0.00
1,850.00
24.88
0.47
2,015.28
81.00
611.00 1,300.00
2,015.28
611.00
0.00
0.00
0.00
0.00
81.00
1,300.00
2,015.28
611.00
100.00%
100.00%
0.00
0.00
0.00
0.00
17.00
136.00
1,850.00
44.18
19.07
0.47
751.06
17.00
2,593.52
136.00
869.50 1,850.00
751.06
2,593.52
869.50
0.00
0.00
0.00
0.00
0.00
0.00
17.00
136.00
1,850.00
751.06
2,593.52
869.50
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
55.00
650.00
7,850.00
99.10
26.04
0.47
5,450.50
44.50
16,926.00
522.93
3,689.50 7,777.00
4,409.95
13,617.10
3,655.19
10.50
90.00
73.00
1,040.55
2,343.60
34.31
55.00
612.93
7,850.00
5,450.50
15,960.70
3,689.50
100.00%
94.30%
100.00%
0.00
37.07
0.00
0.00
965.30
0.00
8.00
111.00
325.00
97.21
22.49
0.47
0.00
56.00
325.00
0.00
1,259.44
152.75
2.40
1.00
17.00
233.30
22.49
7.99
2.40
57.00
342.00
233.30
1,281.93
160.74
30.00%
51.35%
105.23%
5.60
54.00
(17.00)
544.38
1,214.46
(7.99)
121.00
665.00
6,950.00
38.68
25.63
0.47
4,680.28
20.00
17,043.95
255.00
3,266.50 2,500.00
773.60
6,535.65
1,175.00
50.00
200.00
4,000.00
1,934.00
5,126.00
1,880.00
70.00
455.00
6,500.00
2,707.60
11,661.65
3,055.00
57.85%
68.42%
93.53%
51.00
210.00
450.00
1,972.68
5,382.30
211.50
150.00
1,800.00
10,000.00
1,700.00
34.30
23.03
0.47
0.25
5,145.00
30.00
41,454.00
434.00
4,700.00 1,958.00
425.00 1,231.00
1,029.00
9,995.02
920.26
307.75
60.00
660.00
6,500.00
129.00
2,058.00
15,199.80
3,055.00
32.25
90.00
1,094.00
8,458.00
1,360.00
3,087.00
25,194.82
3,975.26
340.00
60.00%
60.00
60.78%
706.00
84.58% 1,542.00
80.00%
340.00
2,058.00
16,259.18
724.74
85.00
16.00
95.00
1,200.00
76.45
20.13
0.47
1,223.20
1,912.35
564.00
0.00
0.00
400.00
0.00
0.00
188.00
8.00
75.00
450.00
611.60
1,509.75
211.50
8.00
75.00
850.00
611.60
1,509.75
399.50
6.50
51.00
500.00
2,000.00
110.29
24.39
0.47
36.75
716.89
1,243.89
235.00
73,500.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
100.00
600.00
0.00
0.00
47.00
22,050.00
0.00
0.00
100.00
600.00
0.00
0.00
47.00
22,050.00
777.68
2,496.39
152.75
40.00
0.00
1.00
Monto de
Valorizacin
Total
VAL.05 AGOSTO
50.00%
78.95%
70.83%
8.00
20.00
350.00
611.60
402.60
164.50
0.00%
6.50
0.00%
51.00
20.00%
400.00
30.00% 1,400.00
716.89
1,243.89
188.00
51,450.00
Pgina 32
337772454.xls
SUPERVISION DE OBRA
11.00.00
11.01.00
11.02.00
12.00.00
12.01.00
12.02.00
12.03.00
12.04.00
12.05.00
12.06.00
12.07.00
12.08.00
12.09.00
12.10.00
12.11.00
13.00.00
13.01.00
14.00.00
14.01.00
14.06.00
25.00.00
25.01.00
26.00.00
26.01.00
31.00.00
32.02.00
32.03.00
01.00.00
01.01.00
01.02.00
01.02.01
01.02.02
01.02.03
01.02.04
01.02.05
01.02.06
01.02.07
01.02.08
01.02.09
01.02.10
01.02.11
01.02.12
01.02.13
01.02.14
02.00.00
02.01.00
02.02.00
02.03.00
02.04.00
02.05.00
02.06.00
02.07.00
02.08.00
02.09.00
02.10.00
02.11.00
02.12.00
02.13.00
02.14.00
02.15.00
02.16.00
ARQUITECTURA
MUROS Y TABIQUES DE ALBAILERIA
MURO DE LADRILLO KK 18 H CABEZA
M2
1,243.08
14.71
18,285.71 1,181.91
17,385.90
50.00
735.50
1,231.91
18,121.40
99.10%
11.17
164.31
M2
1,634.28
11.24
18,369.31 1,473.50
16,562.14
150.00
1,686.00
1,623.50
18,248.14
99.34%
10.78
121.17
M2
M2
1,279.90
2,983.43
9.19
8.74
M2
1,603.25
TARRAJEO COLUMNAS
TARRAJEO DE VIGAS
M2
M2
6.00
50.00
M2
M2
M
VESTIDURA DE DERRAMES
UNION DE MUROS Y CIELOS RASOS
0.00
0.00
0.00
0.00
380.00
750.00
3,492.20
6,555.00
380.00
750.00
3,492.20
6,555.00
29.69%
899.90
25.14% 2,233.43
8,270.08
19,520.18
7.79
11,762.28
26,075.18
12,489.32
0.00
0.00
600.00
4,674.00
600.00
4,674.00
37.42% 1,003.25
7,815.32
9.18
11.77
55.08
588.50
0.00
0.00
0.00
0.00
2.50
20.00
22.95
235.40
2.50
20.00
22.95
235.40
41.67%
40.00%
3.50
30.00
32.13
353.10
62.35
49.20
423.90
77.55
7.41
7.00
4,835.24
364.57
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
175.00
0.00
0.00
1,225.00
0.00
0.00
175.00
0.00
0.00
1,225.00
0.00%
0.00%
41.28%
62.35
49.20
248.90
4,835.24
364.57
1,742.30
M
M
515.84
906.30
4.41
4.01
0.00
0.00
0.00
0.00
205.00
300.00
904.05
1,203.00
205.00
300.00
904.05
1,203.00
39.74%
33.10%
310.84
606.30
1,370.80
2,431.26
BRUAS EN INTERIORES
325.73
3.16
3,634.26
1,029.31
0.00
0.00
100.00
316.00
100.00
316.00
30.70%
225.73
713.31
CIELORRASOS
ENLUCIDO DE CIELO RASO
PISOS Y PAVIMENTOS
M2
1,370.57
13.21
18,105.23
0.00
0.00
400.00
5,284.00
400.00
5,284.00
29.18%
970.57
12,821.23
CONTRAPISO E= 40 mm
PISO DE CEMENTO TEXTURIZADO EN RAMPAS
M2
M2
1,224.99
44.76
7.07
17.09
8,660.68
764.95
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00% 1,224.99
0.00%
44.76
8,660.68
764.95
ESCALERAS
ESCALERA DE GATO
2,967.30
2,274.85
4.35
80.02
348.09
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
4.35
348.09
TAPA METALICA
TAPA METALICA P/CISTERNA
UND
1.00
182.89
182.89
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
182.89
GLB
GLB
1.00
1.00
1,535.73
500.00
1,535.73
500.00
0.60
0.00
921.44
0.00
0.20
0.00
307.15
0.00
0.80
0.00
1,228.58
0.00
80.00%
0.00%
0.20
1.00
307.15
500.00
CENTRO DE LUZ
SALIDA PARA ARTEFAC. ALUMBRADO SPOT LIGHT
SALIDA PARA ALUMBRADO EN PARED
PTO
PTO
PTO
173.00
99.00
18.00
24.16
16.36
35.53
4,179.68
1,619.64
27.00
18.00
0.00
652.32
294.48
0.00
80.00
20.00
10.00
1,932.80
327.20
355.30
107.00
38.00
10.00
2,585.12
621.68
355.30
61.85%
38.38%
55.56%
66.00
61.00
8.00
1,594.56
997.96
284.24
PTO
PTO
4.00
7.00
31.71
19.58
PTO
62.00
PTO
PTO
PTO
38.00
2.00
18.00
PTO
PTO
INST. ELECTRICAS
INSTALACIONES ELECTRICAS
CIRCUITOS DERIVADOS
CIRCUITOS DERIVADOS ALUMBRADO Y TOMA CORRIENTES
639.54
126.84
1.00
2.00
31.71
39.16
1.00
2.00
31.71
39.16
2.00
4.00
63.42
78.32
50.00%
57.14%
2.00
3.00
63.42
58.74
28.69
137.06
1,778.78
13.00
372.97
10.00
286.90
23.00
659.87
37.10%
39.00
1,118.91
29.44
33.54
36.77
1,118.72
67.08
661.86
0.00
0.00
0.00
0.00
0.00
0.00
10.00
0.00
0.00
294.40
0.00
0.00
10.00
0.00
0.00
294.40
0.00
0.00
26.32%
0.00%
0.00%
28.00
2.00
18.00
824.32
67.08
661.86
135.00
11.00
35.80
35.79
4,833.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
135.00
11.00
4,833.00
393.69
PTO
9.00
42.74
393.69
384.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
9.00
384.66
PTO
PTO
7.00
11.00
18.34
35.49
128.38
390.39
3.00
0.00
55.02
0.00
3.00
0.00
55.02
0.00
6.00
0.00
110.04
0.00
85.71%
0.00%
1.00
11.00
18.34
390.39
PTO
PTO
4.00
1.00
75.48
55.18
301.92
4.00
1.00
301.92
55.18
4.00
1.00
301.92
55.18
8.00
2.00
603.84
110.36
200.00%
200.00%
(4.00)
(1.00)
(301.92)
(55.18)
PTO
PTO
1.00
8.00
611.89
59.94
1.00
3.00
611.89
179.82
1.00
3.00
611.89
179.82
2.00
6.00
1,223.78
359.64
200.00%
75.00%
(1.00)
2.00
(611.89)
119.88
PTO
PTO
1.00
1.00
63.77
82.00
0.00
1.00
0.00
82.00
0.00
1.00
0.00
82.00
0.00
2.00
0.00
164.00
0.00%
200.00%
1.00
(1.00)
63.77
(82.00)
CALANDRIA
REFRIGERADORA INDUSTRIAL
SECADORA
LAVADORA
SOLDADORA
DESTILADOR DE AGUA DE 3 KW
PTO
PTO
PTO
PTO
PTO
PTO
1.00
1.00
1.00
2.00
1.00
1.00
244.36
47.16
51.36
50.43
93.38
63.74
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
1.00
1.00
1.00
2.00
1.00
1.00
244.36
47.16
51.36
100.86
93.38
63.74
PTO
1.00
46.15
100.86
93.38
63.74
46.15
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
46.15
CENTRAL DE PARLANTES
SALIDA PARA CONCENTRADOR DE REDES
PTO
PTO
1.00
1.00
75.05
77.24
75.05
77.24
1.00
1.00
75.05
77.24
1.00
1.00
75.05
77.24
2.00
2.00
150.10
154.48
200.00%
200.00%
(1.00)
(1.00)
(75.05)
(77.24)
55.18
611.89
479.52
63.77
82.00
244.36
47.16
51.36
VAL.05 AGOSTO
Pgina 33
337772454.xls
SUPERVISION DE OBRA
02.17.00
PTO
1.00
100.93
02.18.00
02.19.00
02.20.00
02.21.00
PTO
CJT
CJT
1.00
1.00
1.00
67.12
219.22
97.11
RAYOS X
SALIDA PARA TIMBRE
COMUNICACIONES Y SEALES
SISTEMAS DE TELEFONOS
CJT
CJT
1.00
1.00
913.50
29.14
PTO
1.00
PTO
PTO
3.00
22.00
PTO
PTO
PTO
7.00
5.00
3.00
65.87
52.76
85.72
PTO
1.00
48.10
263.80
257.16
48.10
PTO
7.00
85.72
PTO
PTO
PTO
3.00
6.00
73.00
48.10
78.48
48.77
PTO
1.00
54.23
PTO
11.00
PTO
PTO
pto
03.00.00
03.01.00
03.01.01
03.01.02
03.01.03
03.01.04
03.01.05
03.01.06
03.01.07
04.00.00
04.01.00
04.02.00
04.03.00
04.03.04
05.00.00
05.01.00
05.02.00
05.03.00
05.04.00
05.05.00
05.06.00
05.07.00
05.08.00
06.00.00
06.01.00
06.02.00
07.00.00
07.01.00
08.00.00
08.01.00
08.02.00
08.03.00
08.04.00
08.05.00
08.06.00
08.07.00
08.08.00
08.09.00
08.10.00
08.11.00
08.12.00
08.13.00
08.14.00
08.15.00
09.00.00
09.01.00
09.01.01
09.01.02
09.01.03
09.01.04
09.01.05
09.01.06
09.01.07
09.01.08
09.01.09
09.01.10
09.01.11
09.01.12
12.00.00
12.01.00
100.93
67.12
219.22
97.11
1.00
100.93
1.00
100.93
2.00
201.86
200.00%
(1.00)
(100.93)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
1.00
1.00
1.00
67.12
219.22
97.11
913.50
29.14
0.00
1.00
0.00
29.14
0.00
1.00
0.00
29.14
0.00
2.00
0.00
58.28
0.00%
200.00%
1.00
(1.00)
913.50
(29.14)
48.30
48.30
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
48.30
294.21
71.93
882.63
1,582.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
3.00
22.00
882.63
1,582.46
461.09
1.00
1.00
0.00
65.87
52.76
0.00
1.00
1.00
0.00
65.87
52.76
0.00
2.00
2.00
0.00
131.74
105.52
0.00
28.57%
40.00%
0.00%
5.00
3.00
3.00
329.35
158.28
257.16
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
48.10
600.04
1.00
85.72
1.00
85.72
2.00
171.44
28.57%
5.00
428.60
144.30
470.88
3,560.21
0.00
0.00
11.00
0.00
0.00
536.47
0.00
0.00
11.00
0.00
0.00
536.47
0.00
0.00
22.00
0.00
0.00
1,072.94
0.00%
0.00%
30.14%
3.00
6.00
51.00
144.30
470.88
2,487.27
54.23
761.86
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
54.23
69.26
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
11.00
761.86
10.00
5.00
4.00
36.46
44.07
124.10
364.60
220.35
496.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
10.00
5.00
4.00
364.60
220.35
496.40
PTO
PTO
5.00
1.00
32.03
36.47
160.15
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
5.00
1.00
160.15
36.47
PTO
4.00
33.00
36.47
132.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
4.00
132.00
PTO
PTO
1.00
2.00
52.76
47.36
52.76
94.72
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
1.00
2.00
52.76
94.72
TIMBRE
SALIDA PARA PULSADOR DE TIMBRE
CJT
1.00
39.83
39.83
1.00
39.83
1.00
39.83
2.00
79.66
200.00%
(1.00)
(39.83)
ALIMENTADORES
ALIMENTADOR DEL TABLERO GNERAL (3-1X185+1X35/T)mm2 NYY
ALIMENTADOR DEL TABLERO TRANSFEREN. MANUAL (3-1X185+1X35/T)mm2
M
M
2.00
47.00
2.64
35.32
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
2.00
47.00
5.28
1,660.04
28.00
14.07
5.28
1,660.04
393.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
28.00
393.96
M
M
25.00
25.00
12.38
8.23
309.50
205.75
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
25.00
25.00
309.50
205.75
M
M
M
1.00
31.00
10.00
9.70
9.70
9.22
9.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
1.00
31.00
10.00
9.70
300.70
92.20
21.00
5.50
300.70
92.20
115.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
21.00
115.50
M
M
31.00
23.00
7.68
5.91
238.08
135.93
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
31.00
23.00
238.08
135.93
M
CJT
UND
32.00
4.00
4.00
74.58
70.31
143.77
2,386.56
281.24
575.08
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
32.00
4.00
4.00
2,386.56
281.24
575.08
3.00
7.14
21.42
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
3.00
21.42
TABLERO GENERAL TG
TABLERO DE TRANSFERENCIA MANUAL TRIFASICO DE 2 ITM 300A REG- Y DE
TABLERO T-CQI
UND
UND
UND
1.00
1.00
1.00
46.20
46.20
458.56
46.20
46.20
458.56
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
1.00
1.00
1.00
46.20
46.20
458.56
TABLERO T-SG
TABLERO TD-A
UND
UND
1.00
1.00
458.56
383.20
458.56
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
1.00
1.00
458.56
383.20
TABLERO TD-R
TABLERO TD-DP
UND
UND
1.00
1.00
338.20
383.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
1.00
1.00
338.20
383.20
TABLERO TD-CE
TABLERO TD-T
TABLERO T-CI
UND
UND
UND
1.00
1.00
1.00
416.96
124.40
46.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
1.00
1.00
1.00
416.96
124.40
46.20
TABLERO TD-3
TABLERO ELECTRONICO TES
SISTEMA DE PARARRAYOS
und
und
2.00
1.00
417.81
181.78
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
2.00
1.00
835.62
181.78
TABLEROS ELECTRICOS
383.20
338.20
383.20
416.96
124.40
46.20
835.62
181.78
VAL.05 AGOSTO
Pgina 34
337772454.xls
SUPERVISION DE OBRA
12.02.00
UND
1.00
183.36
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
183.36
CJT
M
UND
1.00
21.00
1.00
551.96
10.63
198.47
183.36
551.96
223.23
198.47
0.00
12.03.00
12.04.00
12.05.00
12.06.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
1.00
21.00
1.00
551.96
223.23
198.47
UND
UND
UND
M
1.00
3.00
1.00
12.00
110.10
143.77
14.24
3.56
110.10
431.31
14.24
42.72
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
1.00
3.00
1.00
12.00
110.10
431.31
14.24
42.72
GLB
1.00
85.10
85.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
85.10
pto
7.00
77.56
542.92
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
7.00
542.92
INST. SANITARIAS
DESAGUE Y VENTILACION
SALIDA DE DESAGUE PVC-SAL 2"
PTO
70.00
21.77
1,415.05
0.00
0.00
65.00
1,415.05
92.86%
5.00
108.85
PTO
24.00
101.64
1,523.90
2,439.36
65.00
21.00
2,134.44
0.00
0.00
21.00
2,134.44
87.50%
3.00
304.92
PTO
18.00
45.48
818.64
17.00
773.16
0.00
0.00
17.00
773.16
94.44%
1.00
45.48
12.07.00
12.08.00
13.00.00
13.01.00
14.00.00
14.01.00
01.00.00
01.01.00
01.02.00
01.03.00
02.00.00
02.01.00
02.02.00
03.00.00
03.01.00
04.00.00
04.01.00
04.02.00
05.00.00
05.01.00
06.00.00
06.01.00
06.02.00
07.00.00
07.01.00
08.00.00
08.01.00
08.02.00
09.00.00
09.01.00
09.01.01
10.00.00
10.01.00
11.00.00
11.01.00
11.02.00
11.03.00
11.04.00
11.05.00
12.00.00
12.01.00
13.00.00
13.01.00
13.02.00
13.03.00
13.04.00
13.05.00
14.00.00
14.01.00
14.01.01
15.00.00
15.01.00
15.02.00
16.00.00
16.02.00
22.00.00
27.00.00
VARIOS
PRUEBAS ELECTRICAS
SISTEMA DE COMPUTO
SALIDA PARA DATA
258.00
8.14
2,100.12
240.00
1,953.60
10.00
81.40
250.00
2,035.00
96.90%
8.00
65.12
103.00
22.26
2,292.78
100.00
2,226.00
10.00
222.60
110.00
2,448.60
106.80%
(7.00)
(155.82)
54.00
8.14
439.56
48.00
390.72
0.00
0.00
48.00
390.72
88.89%
6.00
48.84
UND
UND
38.00
10.00
11.25
17.26
427.50
172.60
27.00
9.00
303.75
155.34
0.00
0.00
0.00
0.00
27.00
9.00
303.75
155.34
71.05%
90.00%
11.00
1.00
123.75
17.26
SOMBREROS DE VENTILACION
SOMBRERO VENTILACION PVC DE 2"
PZA
18.00
15.03
270.54
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
18.00
270.54
M
M
273.00
273.00
0.83
12.47
226.59
3,404.31
273.00
273.00
226.59
3,404.31
27.30
27.30
22.66
340.43
300.30
300.30
249.25
3,744.74
110.00%
110.00%
(27.30)
(27.30)
(22.66)
(340.43)
273.00
35.70
9,746.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
273.00
9,746.10
UND
UND
54.00
2.00
71.72
98.14
3,872.88
196.28
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
54.00
2.00
3,872.88
196.28
PTO
97.00
28.52
2,766.44
82.00
2,338.64
0.00
0.00
82.00
2,338.64
84.54%
15.00
427.80
596.00
0.83
494.68
596.00
494.68
0.00
0.00
596.00
494.68
100.00%
0.00
0.00
355.00
6.54
1,863.90
0.00
0.00
285.00
1,863.90
80.28%
70.00
457.80
M
M
37.00
92.00
7.03
8.05
2,321.70
260.11
285.00
239.02
0.00
0.00
0.00
0.00
0.00
34.00
0.00
239.02
0.00
91.89%
0.00%
3.00
92.00
21.09
740.60
12.00
11.05
740.60
132.60
34.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
12.00
132.60
100.00
14.26
1,426.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
100.00
1,426.00
53.00
6.54
346.62
50.00
327.00
0.00
0.00
50.00
327.00
94.34%
3.00
19.62
LLAVES Y VALVULAS
VALVULA COMPUERTA BRONCE 1/2"
PZA
60.00
34.12
0.00
0.00
0.00
0.00
0.00
0.00%
60.00
2,047.20
PZA
1.00
44.55
2,047.20
44.55
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
44.55
PZA
PZA
PZA
2.00
1.00
2.00
71.59
94.92
88.52
143.18
94.92
177.04
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
2.00
1.00
2.00
143.18
94.92
177.04
PZA
21.00
54.45
1,143.45
20.00
1,089.00
0.00
0.00
20.00
1,089.00
95.24%
1.00
54.45
15.00
18.44
239.72
0.00
0.00
13.00
239.72
86.67%
2.00
36.88
60.00
23.94
276.60
1,436.40
13.00
51.00
1,220.94
0.00
0.00
51.00
1,220.94
85.00%
9.00
215.46
PZA
8.00
44.55
356.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
8.00
356.40
VAL.05 AGOSTO
Pgina 35
337772454.xls
SUPERVISION DE OBRA
27.01.00
EQUIPOS Y SISTEMAS
29.00.00
29.01.00
29.02.00
29.03.00
UND
1.00
493.54
493.54
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
493.54
UND
1.00
251.56
251.56
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
251.56
UND
GLB
1.00
1.00
389.00
85.07
389.00
85.07
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
1.00
1.00
389.00
85.07
GLB
1.00
275.69
275.69
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
275.69
GLB
1.00
190.50
190.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
190.50
GLB
1.00
627.90
627.90
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
627.90
UND
1.00
350.06
350.06
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
350.06
UND
1.00
18.25
18.25
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
18.25
S/.
S/.
S/.
S/.
S/.
S/.
511,508.95
40,920.72
35,805.63
588,235.29
111,764.71
700,000.00
1.00000
700,000.00
296,304.99
23,704.40
20,741.35
340,750.74
64,742.64
405,493.38
1.00000
405,493.38
57.93%
30.00.00
30.01.00
31.00.00
31.01.00
32.00.00
32.01.00
33.00.00
33.01.00
34.00.00
34.01.00
8%
7%
19%
202,301.09
16,184.09
14,161.08
232,646.25
44,202.79
276,849.04
1.00000
276,849.04
39.55%
94,003.91
7,520.31
6,580.27
108,104.49
20,539.85
128,644.34
1.00000
128,644.34
18.38%
57.93%
215,203.96
17,216.32
15,064.28
247,484.55
47,022.07
294,506.62
1.00000
294,506.62
57.93%
VAL.05 AGOSTO
Pgina 36
337772454.xls
SUPERVISION DE OBRA
VALORIZACIN DE OBRA
VALORIZACIN N
PROPIETARIO
CONTRATISTA
PROVINCIA
DEPARTAMENTO
06
MUNICIPALIDAD PROVINCIAL DE OYON
VALOR REFERENCIAL
MONTO CONTRATADO
FORMULA
FECHA
VAL.05 AGOSTO
S/.
S/.
700,000.00
700,000.00
UNICA
12 DE SEPTIEMBRE DEL 2006
Pgina 37
337772454.xls
SUPERVISION DE OBRA
VAL.05 AGOSTO
Pgina 38
337772454.xls
SUPERVISION DE OBRA
VAL.05 AGOSTO
Pgina 39
337772454.xls
SUPERVISION DE OBRA
VAL.05 AGOSTO
Pgina 40
337772454.xls
SUPERVISION DE OBRA
VAL.05 AGOSTO
Pgina 41
337772454.xls
SUPERVISION DE OBRA
VALORIZACIN DE OBRA
VALORIZACIN N
06
PROPIETARIO
CONTRATISTA
PROVINCIA
DEPARTAMENTO
OBRA :
VALOR REFERENCIAL
MONTO CONTRATADO
FORMULA
FECHA
S/.
S/.
700,000.00
700,000.00
UNICA
CONSTRUCCION CENTRO DE SALUD TIPO II DE OYON CON ATENCION MATERNO INFANTIL CON APOYO SOCIEDAD CIVIL
Partidas
ITEM
01.00.00
01.01.00
01.02.00
01.03.00
02.00.00
02.01.00
02.02.00
02.03.00
03.00.00
03.01.00
03.02.00
03.03.00
03.04.00
03.05.00
04.00.00
04.01.00
04.02.00
04.03.01
04.03.02
04.03.03
04.04.00
05.00.00
05.01.00
05.01.01
05.01.02
05.02.00
05.02.01
05.02.02
05.02.03
05.03.00
05.03.01
05.03.02
05.03.03
05.04.00
05.04.01
05.04.02
05.04.03
05.05.00
05.05.01
05.05.02
05.05.03
05.06.00
05.06.01
05.06.02
05.06.03
05.06.04
05.07.00
05.07.01
05.07.02
05.07.03
05.08.00
05.08.01
05.08.02
ESTRUCTURAS
OBRAS PROVISIONALES
ALMACENES OFICINAS TALLERES Y GUARDIANIA
CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M
AGUA Y FUERZA ELECTRICA EN LA CONSTRUCCION
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRANSPORTE DE EQUIPOS Y HERAMIENTAS
NIVELACION ,TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACIN DE ZANJA P/CIMIENTOS Y / O ZAPATAS
EXCAVACION P/CISTERNA
NIVELACION INT.Y APISONADO FINAL DEL TERRENO PREVIO AL PISO
RELLENO CON MATERIAL PROPIO
ELIMINACION MATERIAL EXCEDENTE HASTA 30 MTS( A MANO USANDO CARRETILLA )
OBRAS DE CONCRETO SIMPLE
SOLADO DE CONCRETO 1:12 C:H
CIMIENTOS 1:10 ( CH ) +30 % P.G
SOBRECIMIENTO CONCRETO CICLOPEO 1:8 C.H+ 25% PM
SOBRECIMIENTO ENCOFRADO UY DESENCOFRADO
ACERO DE REFUERZO Fy=4200Kg/Cm2
FALSO PISO DE 4" DE CONCRETO 1:10
OBRAS DE CONCRETO ARMADO
ZAPATAS
CONCRETO EN ZAPATAS F"C= 210 KG/CM2
ACERO DE REFUERZO Fy=4200Kg/Cm2
VIGAS DE ARRIOSTRE
VIGAS DE ARRIOSTRE Fc=210 Kg/Cm2
ENCOFRADO Y DESENCOFRADO VIGAS DE ARRIOSTRE
ACERO DE REFUERZO EN VIGAS DE ARRIOSTREFy=4200 Kg/CM2
COLUMNAS
CONCRETO EN COLUMNAS F"C 210 KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS
ACERO DE REFUERZO Fy=4200 Kg/Cm2 COLUMNAS
PLACAS
PLACAS DE CONCRETO Fc=210 Kg/Cm2
ENCOFRADO Y DESNCOFRADO PLACAS
ACERO DE REFUERZO Fy=4200 Kg/Cm2 PLACAS
VIGAS
VIGAS CONCRETO 210 Kg/Cm2
VIGAS ENCOFRADO Y DESENCOFRADO
ACERO DE REFUERZO Fy=4200Kg/Cm2 VIGAS
LOSAS ALIGERADAS
LOSA ALIGERADA CONCRETO 210 Kg/Cm2
ENCOFRADO Y DESENCOFRADO PARA LOSAS ALIGERADAS
ACERO DE REFUERZO Fy= 4200Kg/Cm2 LOSA ALIGERADA
LOSA ALIGERADA LADRILLO HUECO 15X30X30
CISTERNA
CONCRETO Fc=210 Kg/Cm2-CISTERNA
ENCOFRADO Y DESENCOFRADO-CISTERNA
REFUERZO DE ACERO-CISTERNA
TANQUE ELEVADO
CONCRETO EN TANQUE ELEVADO F'C=210 KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL EN TANQUE ELEVADO
Und.
Metrado
Costo
Unitario
(S/.)
Costo
Parcial
(S/.)
Avance Anterior
Metrado
M2
UND
GLB
40.00
1.00
1.00
31.50
842.52
500.00
1,260.00
842.52
500.00
40.00
1.00
1.00
M2
GLB
M2
500.00
1.00
2,000.00
0.24
600.00
0.32
120.00
600.00
640.00
M3
M3
M2
M3
m3
820.00
35.00
1,400.00
215.00
610.00
1.87
1.87
5.97
7.29
1.87
M2
M3
M3
M2
KG
M2
710.00
375.00
135.00
1,410.00
9,450.00
2,000.00
M3
KG
Monto de
Valorizacin
Total
Avance Actual
Metrado
Avance Acumulado
Monto de
Valorizacin Total
Metrado
Monto de
Valorizacin
Total
Saldo a Ejecutar
Metrado
Monto de
Valorizacin
Total
0.00
0.00
0.00
0.00
0.00
0.00
40.00
1.00
1.00
1,260.00
842.52
500.00
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
500.00
1.00
2,000.00
1,260.00
842.52
500.00
0.00
120.00
600.00
640.00
0.00
0.00
0.00
0.00
0.00
0.00
500.00
1.00
2,000.00
120.00
600.00
640.00
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
1,533.40
65.45
8,358.00
1,567.35
1,140.70
820.00
35.00
1,400.00
215.00
610.00
1,533.40
65.45
8,358.00
1,567.35
1,140.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
820.00
35.00
1,400.00
215.00
610.00
1,533.40
65.45
8,358.00
1,567.35
1,140.70
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11.16
38.90
72.28
18.25
0.47
9.25
7,923.60
14,587.50
9,757.80
25,732.50
4,441.50
18,500.00
710.00
375.00
135.00
1,410.00
9,450.00
1,800.00
7,923.60
14,587.50
9,757.80
25,732.50
4,441.50
16,650.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
710.00
375.00
135.00
1,410.00
9,450.00
1,800.00
7,923.60
14,587.50
9,757.80
25,732.50
4,441.50
16,650.00
100.00%
100.00%
100.00%
100.00%
100.00%
90.00%
0.00
0.00
0.00
0.00
0.00
200.00
0.00
0.00
0.00
0.00
0.00
1,850.00
81.00
1,300.00
24.88
0.47
2,015.28
611.00
81.00
1,300.00
2,015.28
611.00
0.00
0.00
0.00
0.00
81.00
1,300.00
2,015.28
611.00
100.00%
100.00%
0.00
0.00
0.00
0.00
M3
M2
KG
17.00
136.00
1,850.00
44.18
19.07
0.47
751.06
2,593.52
869.50
17.00
136.00
1,850.00
751.06
2,593.52
869.50
0.00
0.00
0.00
0.00
0.00
0.00
17.00
136.00
1,850.00
751.06
2,593.52
869.50
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
M3
M2
M2
55.00
650.00
7,850.00
99.10
26.04
0.47
5,450.50
16,926.00
3,689.50
55.00
612.93
7,850.00
5,450.50
15,960.70
3,689.50
0.00
0.00
0.00
0.00
0.00
0.00
55.00
612.93
7,850.00
5,450.50
15,960.70
3,689.50
100.00%
94.30%
100.00%
0.00
37.07
0.00
0.00
965.30
0.00
M3
M2
Kg
8.00
111.00
325.00
97.21
22.49
0.47
777.68
2,496.39
152.75
2.40
57.00
342.00
233.30
1,281.93
160.74
0.00
0.00
0.00
0.00
0.00
0.00
2.40
57.00
342.00
233.30
1,281.93
160.74
30.00%
51.35%
105.23%
5.60
54.00
(17.00)
544.38
1,214.46
(7.99)
M3
M2
KG
121.00
665.00
6,950.00
38.68
25.63
0.47
4,680.28
17,043.95
3,266.50
70.00
455.00
6,500.00
2,707.60
11,661.65
3,055.00
18.00
160.00
0.00
696.24
4,100.80
0.00
88.00
615.00
6,500.00
3,403.84
15,762.45
3,055.00
72.73%
92.48%
93.53%
33.00
50.00
450.00
1,276.44
1,281.50
211.50
M3
M2
KG
UND
150.00
1,800.00
10,000.00
1,700.00
34.30
23.03
0.47
0.25
5,145.00
41,454.00
4,700.00
425.00
90.00
1,094.00
8,458.00
1,360.00
3,087.00
25,194.82
3,975.26
340.00
20.00
560.00
510.00
129.00
686.00
12,896.80
239.70
32.25
110.00
1,654.00
8,968.00
1,489.00
3,773.00
38,091.62
4,214.96
372.25
73.33%
91.89%
89.68%
87.59%
40.00
146.00
1,032.00
211.00
1,372.00
3,362.38
485.04
52.75
M3
M2
M2
16.00
95.00
1,200.00
76.45
20.13
0.47
1,223.20
1,912.35
564.00
8.00
75.00
850.00
611.60
1,509.75
399.50
0.00
0.00
0.00
0.00
0.00
0.00
8.00
75.00
850.00
611.60
1,509.75
399.50
50.00%
78.95%
70.83%
8.00
20.00
350.00
611.60
402.60
164.50
M3
M2
6.50
51.00
110.29
24.39
716.89
1,243.89
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
6.50
51.00
716.89
1,243.89
VAL. 06 AGOS-SET.
Pgina 42
337772454.xls
SUPERVISION DE OBRA
KG
M2
500.00
2,000.00
0.47
36.75
235.00
73,500.00
100.00
600.00
47.00
22,050.00
0.00
0.00
0.00
0.00
100.00
600.00
47.00
22,050.00
20.00%
30.00%
11.00.00
11.01.00
ARQUITECTURA
MUROS Y TABIQUES DE ALBAILERIA
MURO DE LADRILLO KK 18 H CABEZA
M2
1,243.08
14.71
18,121.40
0.00
0.00
1,231.91
18,121.40
M2
1,634.28
11.24
18,285.71
18,369.31
1,231.91
11.02.00
12.00.00
1,623.50
18,248.14
0.00
0.00
1,623.50
18,248.14
12.01.00
12.02.00
M2
M2
1,279.90
2,983.43
9.19
8.74
11,762.28
380.00
750.00
3,492.20
6,555.00
42.50
420.00
390.58
3,670.80
422.50
1,170.00
12.03.00
12.04.00
M2
M2
1,603.25
6.00
7.79
9.18
600.00
2.50
4,674.00
22.95
50.00
1.85
389.50
16.98
12.05.00
12.06.00
TARRAJEO DE VIGAS
TARRAJEO CON BARITINA
M2
M2
50.00
62.35
11.77
77.55
20.00
0.00
235.40
0.00
4.00
0.00
12.07.00
12.08.00
TARRAJEO IMPERMEABILIZADO
VESTIDURA DE DERRAMES E=0.25
M2
M
49.20
423.90
7.41
7.00
0.00
175.00
0.00
1,225.00
12.09.00
12.10.00
VESTIDURA DE DERRAMES
UNION DE MUROS Y CIELOS RASOS
M
M
515.84
906.30
4.41
4.01
205.00
300.00
12.11.00
13.00.00
BRUAS EN INTERIORES
CIELORRASOS
325.73
3.16
3,634.26
1,029.31
13.01.00
14.00.00
M2
1,370.57
13.21
14.01.00
14.06.00
CONTRAPISO E= 40 mm
PISO DE CEMENTO TEXTURIZADO EN RAMPAS
M2
M2
1,224.99
44.76
25.00.00
25.01.00
ESCALERAS
ESCALERA DE GATO
4.35
26.00.00
26.01.00
TAPA METALICA
TAPA METALICA P/CISTERNA
UND
1.00
182.89
31.00.00
32.02.00
GLB
1.00
32.03.00
LIMPIEZA FINAL
GLB
1.00
01.00.00
INST. ELECTRICAS
INSTALACIONES ELECTRICAS
01.01.00
01.02.00
CIRCUITOS DERIVADOS
CIRCUITOS DERIVADOS ALUMBRADO Y TOMA CORRIENTES
01.02.01
01.02.02
CENTRO DE LUZ
SALIDA PARA ARTEFAC. ALUMBRADO SPOT LIGHT
PTO
PTO
01.02.03
01.02.04
01.02.05
01.02.06
05.08.03
06.00.00
400.00
1,400.00
188.00
51,450.00
99.10%
11.17
164.31
99.34%
10.78
121.17
3,882.78
10,225.80
33.01%
39.22%
857.40
1,813.43
7,879.51
15,849.38
650.00
4.35
5,063.50
39.93
40.54%
72.50%
953.25
1.65
7,425.82
15.15
47.08
0.00
24.00
0.00
282.48
0.00
48.00%
0.00%
26.00
62.35
306.02
4,835.24
0.00
3.00
0.00
21.00
0.00
178.00
0.00
1,246.00
0.00%
41.99%
49.20
245.90
364.57
1,721.30
904.05
1,203.00
0.00
50.00
0.00
200.50
205.00
350.00
904.05
1,403.50
39.74%
38.62%
310.84
556.30
1,370.80
2,230.76
100.00
316.00
0.00
30.00
94.80
130.00
410.80
39.91%
195.73
618.51
18,105.23
400.00
5,284.00
0.00
250.00
3,302.50
650.00
8,586.50
47.43%
720.57
9,518.73
7.07
17.09
8,660.68
764.95
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
1,224.99
44.76
8,660.68
764.95
80.02
348.09
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
4.35
348.09
182.89
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
182.89
1,535.73
1,535.73
0.80
1,228.58
0.10
153.57
0.90
1,382.16
90.00%
0.10
153.57
500.00
500.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
500.00
173.00
99.00
24.16
16.36
4,179.68
107.00
38.00
2,585.12
621.68
16.00
20.00
386.56
327.20
123.00
58.00
2,971.68
948.88
71.10%
58.59%
50.00
41.00
1,208.00
670.76
PTO
PTO
18.00
4.00
35.53
31.71
10.00
2.00
355.30
63.42
3.00
1.00
106.59
31.71
13.00
3.00
461.89
95.13
72.22%
75.00%
5.00
1.00
177.65
31.71
PTO
PTO
7.00
62.00
19.58
28.69
4.00
23.00
78.32
659.87
2.00
10.00
39.16
286.90
6.00
33.00
117.48
946.77
85.71%
53.23%
1.00
29.00
19.58
832.01
01.02.07
01.02.08
PTO
PTO
38.00
2.00
29.44
33.54
10.00
0.00
294.40
0.00
10.00
0.00
294.40
0.00
20.00
0.00
588.80
0.00
52.63%
0.00%
18.00
2.00
529.92
67.08
01.02.09
01.02.10
PTO
PTO
18.00
135.00
36.77
35.80
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
18.00
135.00
661.86
4,833.00
01.02.11
01.02.12
PTO
PTO
11.00
9.00
35.79
42.74
4,833.00
393.69
384.66
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
11.00
9.00
393.69
384.66
01.02.13
01.02.14
SALIDA P/TOMACORR./COMPUTADORA
SALIDA CAJA PASE ALUMBRADO PARED
PTO
PTO
7.00
11.00
18.34
35.49
128.38
390.39
6.00
0.00
110.04
0.00
0.00
0.00
0.00
0.00
6.00
0.00
110.04
0.00
85.71%
0.00%
1.00
11.00
18.34
390.39
02.00.00
02.01.00
PTO
4.00
75.48
301.92
8.00
603.84
0.00
0.00
8.00
603.84
200.00%
(4.00)
(301.92)
02.02.00
02.03.00
PTO
PTO
1.00
1.00
55.18
611.89
55.18
611.89
2.00
2.00
110.36
1,223.78
0.00
0.00
0.00
0.00
2.00
2.00
110.36
1,223.78
200.00%
200.00%
(1.00)
(1.00)
(55.18)
(611.89)
02.04.00
02.05.00
PTO
PTO
8.00
1.00
59.94
63.77
479.52
63.77
6.00
0.00
359.64
0.00
2.00
0.00
119.88
0.00
8.00
0.00
479.52
0.00
100.00%
0.00%
0.00
1.00
0.00
63.77
02.06.00
02.07.00
PTO
PTO
1.00
1.00
82.00
244.36
82.00
244.36
2.00
0.00
164.00
0.00
0.00
0.00
0.00
0.00
2.00
0.00
164.00
0.00
200.00%
0.00%
(1.00)
1.00
(82.00)
244.36
02.08.00
02.09.00
02.10.00
02.11.00
REFRIGERADORA INDUSTRIAL
SECADORA
LAVADORA
SOLDADORA
PTO
PTO
PTO
PTO
1.00
1.00
2.00
1.00
47.16
51.36
50.43
93.38
47.16
51.36
100.86
93.38
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
1.00
1.00
2.00
1.00
47.16
51.36
100.86
93.38
02.12.00
DESTILADOR DE AGUA DE 3 KW
PTO
1.00
63.74
63.74
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
63.74
26,075.18
12,489.32
55.08
588.50
4,835.24
364.57
2,967.30
2,274.85
1,619.64
639.54
126.84
137.06
1,778.78
1,118.72
67.08
661.86
VAL. 06 AGOS-SET.
Pgina 43
337772454.xls
SUPERVISION DE OBRA
02.13.00
PTO
1.00
46.15
02.14.00
02.15.00
CENTRAL DE PARLANTES
SALIDA PARA CONCENTRADOR DE REDES
PTO
PTO
1.00
1.00
75.05
77.24
02.16.00
02.17.00
PTO
PTO
1.00
1.00
100.93
67.12
02.18.00
02.19.00
ELECTROBONBAS DE AGUA
CONTROL DE NIVEL D CISTER. Y TANQUE ELEVADO
CJT
CJT
1.00
1.00
219.22
97.11
02.20.00
02.21.00
RAYOS X
SALIDA PARA TIMBRE
CJT
CJT
1.00
1.00
913.50
29.14
03.00.00
03.01.00
COMUNICACIONES Y SEALES
SISTEMAS DE TELEFONOS
03.01.01
03.01.02
PTO
PTO
1.00
3.00
48.30
294.21
03.01.03
03.01.04
PTO
PTO
22.00
7.00
71.93
65.87
03.01.05
03.01.06
PTO
PTO
5.00
3.00
52.76
85.72
03.01.07
04.00.00
PTO
1.00
48.10
04.01.00
04.02.00
PTO
PTO
7.00
3.00
85.72
48.10
04.03.00
04.03.04
PTO
PTO
6.00
73.00
78.48
48.77
05.00.00
05.01.00
PTO
1.00
05.02.00
05.03.00
PTO
PTO
11.00
10.00
05.04.00
05.05.00
PTO
pto
05.06.00
05.07.00
05.08.00
06.00.00
46.15
75.05
77.24
100.93
67.12
219.22
97.11
913.50
29.14
48.30
882.63
1,582.46
461.09
263.80
257.16
48.10
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
46.15
2.00
2.00
150.10
154.48
0.00
0.00
0.00
0.00
2.00
2.00
150.10
154.48
200.00%
200.00%
(1.00)
(1.00)
(75.05)
(77.24)
2.00
0.00
201.86
0.00
0.00
0.00
0.00
0.00
2.00
0.00
201.86
0.00
200.00%
0.00%
(1.00)
1.00
(100.93)
67.12
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
1.00
1.00
219.22
97.11
0.00
2.00
0.00
58.28
0.00
0.00
0.00
0.00
0.00
2.00
0.00
58.28
0.00%
200.00%
1.00
(1.00)
913.50
(29.14)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
1.00
3.00
48.30
882.63
0.00
2.00
0.00
131.74
0.00
3.00
0.00
197.61
0.00
5.00
0.00
329.35
0.00%
71.43%
22.00
2.00
1,582.46
131.74
2.00
0.00
105.52
0.00
2.00
0.00
105.52
0.00
4.00
0.00
211.04
0.00
80.00%
0.00%
1.00
3.00
52.76
257.16
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
48.10
144.30
470.88
3,560.21
2.00
0.00
171.44
0.00
0.00
0.00
0.00
0.00
2.00
0.00
171.44
0.00
28.57%
0.00%
5.00
3.00
428.60
144.30
0.00
22.00
0.00
1,072.94
0.00
11.00
0.00
536.47
0.00
33.00
0.00
1,609.41
0.00%
45.21%
6.00
40.00
470.88
1,950.80
54.23
54.23
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
54.23
69.26
36.46
761.86
364.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
11.00
10.00
761.86
364.60
5.00
4.00
44.07
124.10
220.35
496.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
5.00
4.00
220.35
496.40
PTO
PTO
5.00
1.00
32.03
36.47
160.15
36.47
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
5.00
1.00
160.15
36.47
PTO
4.00
33.00
132.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
4.00
132.00
06.01.00
06.02.00
PTO
PTO
1.00
2.00
52.76
47.36
52.76
94.72
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
1.00
2.00
52.76
94.72
07.00.00
07.01.00
TIMBRE
SALIDA PARA PULSADOR DE TIMBRE
CJT
1.00
39.83
39.83
2.00
79.66
0.00
0.00
2.00
79.66
200.00%
(1.00)
(39.83)
08.00.00
08.01.00
ALIMENTADORES
ALIMENTADOR DEL TABLERO GNERAL (3-1X185+1X35/T)mm2 NYY
2.00
2.64
5.28
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
2.00
5.28
08.02.00
08.03.00
08.04.00
M
M
M
47.00
28.00
25.00
35.32
14.07
12.38
1,660.04
393.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
47.00
28.00
25.00
1,660.04
393.96
309.50
08.05.00
08.06.00
M
M
25.00
1.00
8.23
9.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
25.00
1.00
205.75
9.70
08.07.00
08.08.00
M
M
31.00
10.00
9.70
9.22
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
31.00
10.00
300.70
92.20
08.09.00
08.10.00
M
M
21.00
31.00
5.50
7.68
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
21.00
31.00
115.50
238.08
08.11.00
08.12.00
M
M
23.00
32.00
5.91
74.58
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
23.00
32.00
135.93
2,386.56
08.13.00
08.14.00
ACOMETIDA TELEFONICA
POZO DE TIERRA NUEVO
CJT
UND
4.00
4.00
70.31
143.77
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
4.00
4.00
281.24
575.08
08.15.00
09.00.00
3.00
7.14
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
3.00
21.42
09.01.00
09.01.01
TABLEROS ELECTRICOS
TABLERO GENERAL TG
UND
1.00
46.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
46.20
09.01.02
09.01.03
UND
UND
1.00
1.00
46.20
458.56
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
1.00
1.00
46.20
458.56
09.01.04
09.01.05
TABLERO T-SG
TABLERO TD-A
UND
UND
1.00
1.00
458.56
383.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
1.00
1.00
458.56
383.20
09.01.06
09.01.07
TABLERO TD-R
TABLERO TD-DP
UND
UND
1.00
1.00
338.20
383.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
1.00
1.00
338.20
383.20
09.01.08
TABLERO TD-CE
UND
1.00
416.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
416.96
600.04
0.00
309.50
205.75
9.70
300.70
92.20
115.50
238.08
135.93
2,386.56
281.24
575.08
21.42
46.20
46.20
458.56
458.56
383.20
338.20
383.20
416.96
VAL. 06 AGOS-SET.
Pgina 44
337772454.xls
SUPERVISION DE OBRA
09.01.09
TABLERO TD-T
UND
1.00
124.40
09.01.10
09.01.11
TABLERO T-CI
TABLERO TD-3
UND
und
1.00
2.00
46.20
417.81
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
124.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
1.00
2.00
46.20
835.62
09.01.12
12.00.00
und
1.00
181.78
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
181.78
12.01.00
12.02.00
UND
CJT
1.00
1.00
183.36
551.96
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
1.00
1.00
183.36
551.96
12.03.00
12.04.00
M
UND
21.00
1.00
10.63
198.47
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
21.00
1.00
223.23
198.47
12.05.00
12.06.00
UND
UND
1.00
3.00
110.10
143.77
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
1.00
3.00
110.10
431.31
12.07.00
12.08.00
UND
M
1.00
12.00
14.24
3.56
42.72
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
1.00
12.00
14.24
42.72
13.00.00
13.01.00
VARIOS
PRUEBAS ELECTRICAS
GLB
1.00
14.00.00
SISTEMA DE COMPUTO
85.10
85.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
85.10
14.01.00
pto
7.00
77.56
542.92
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
7.00
542.92
01.00.00
INST. SANITARIAS
DESAGUE Y VENTILACION
01.01.00
01.02.00
PTO
PTO
70.00
24.00
21.77
101.64
1,523.90
2,439.36
65.00
21.00
1,415.05
2,134.44
0.00
0.00
0.00
0.00
65.00
21.00
1,415.05
2,134.44
92.86%
87.50%
5.00
3.00
108.85
304.92
01.03.00
02.00.00
02.01.00
PTO
18.00
45.48
818.64
17.00
773.16
0.00
0.00
17.00
773.16
94.44%
1.00
45.48
02.02.00
03.00.00
258.00
8.14
2,035.00
0.00
0.00
250.00
2,035.00
96.90%
8.00
65.12
103.00
22.26
2,100.12
2,292.78
250.00
110.00
2,448.60
0.00
0.00
110.00
2,448.60
106.80%
(7.00)
(155.82)
03.01.00
04.00.00
54.00
8.14
439.56
48.00
390.72
0.00
0.00
48.00
390.72
88.89%
6.00
48.84
04.01.00
04.02.00
UND
UND
38.00
10.00
11.25
17.26
427.50
172.60
27.00
9.00
303.75
155.34
0.00
0.00
0.00
0.00
27.00
9.00
303.75
155.34
71.05%
90.00%
11.00
1.00
123.75
17.26
05.00.00
05.01.00
SOMBREROS DE VENTILACION
SOMBRERO VENTILACION PVC DE 2"
PZA
18.00
15.03
270.54
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
18.00
270.54
06.00.00
06.01.00
273.00
0.83
249.25
0.00
0.00
300.30
249.25
110.00%
(27.30)
(22.66)
273.00
12.47
226.59
3,404.31
300.30
06.02.00
07.00.00
300.30
3,744.74
0.00
0.00
300.30
3,744.74
110.00%
(27.30)
(340.43)
07.01.00
08.00.00
273.00
35.70
9,746.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
273.00
9,746.10
08.01.00
08.02.00
UND
UND
54.00
2.00
71.72
98.14
3,872.88
196.28
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
54.00
2.00
3,872.88
196.28
09.00.00
09.01.00
09.01.01
10.00.00
PTO
97.00
28.52
2,766.44
82.00
2,338.64
0.00
0.00
82.00
2,338.64
84.54%
15.00
427.80
10.01.00
11.00.00
596.00
0.83
494.68
596.00
494.68
0.00
0.00
0.00
596.00
494.68
100.00%
0.00
0.00
11.01.00
11.02.00
M
M
355.00
37.00
6.54
7.03
2,321.70
260.11
285.00
34.00
1,863.90
239.02
0.00
0.00
0.00
0.00
285.00
34.00
1,863.90
239.02
80.28%
91.89%
70.00
3.00
457.80
21.09
11.03.00
11.04.00
M
M
92.00
12.00
8.05
11.05
740.60
132.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
92.00
12.00
740.60
132.60
11.05.00
12.00.00
100.00
14.26
1,426.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
100.00
1,426.00
12.01.00
13.00.00
53.00
6.54
346.62
50.00
327.00
0.00
0.00
50.00
327.00
94.34%
3.00
19.62
13.01.00
13.02.00
PZA
PZA
60.00
1.00
34.12
44.55
2,047.20
44.55
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
60.00
1.00
2,047.20
44.55
13.03.00
13.04.00
PZA
PZA
2.00
1.00
71.59
94.92
143.18
94.92
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
2.00
1.00
143.18
94.92
13.05.00
14.00.00
PZA
2.00
88.52
177.04
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
2.00
177.04
14.01.00
124.40
46.20
835.62
181.78
183.36
551.96
223.23
198.47
110.10
431.31
14.24
VAL. 06 AGOS-SET.
Pgina 45
337772454.xls
SUPERVISION DE OBRA
14.01.01
PZA
21.00
54.45
1,143.45
20.00
15.00.00
15.01.00
15.00
18.44
15.02.00
16.00.00
60.00
23.94
276.60
1,436.40
16.02.00
22.00.00
PZA
8.00
44.55
27.00.00
27.01.00
EQUIPOS Y SISTEMAS
EQUIPO DE BOMBEO, ELECTROBOMBA 2 HP
UND
1.00
29.00.00
29.01.00
INSTALACIONES HIDRAULICAS
MONTAJE DE ACCESORIOS EN CISTERNA
UND
29.02.00
29.03.00
UND
GLB
30.00.00
30.01.00
31.00.00
31.01.00
32.00.00
32.01.00
ACCESORIOS SANITARIOS/DESAGUE
SUMINISTRO E INSTALACION DE ACCES. P/DESAGUE
33.00.00
33.01.00
TRAMPA DE GRASA
TRAMPA DE GRASA DE CONCRETO/ INCLUYE TAPA Y ACCESORIOS
34.00.00
34.01.00
0.00
0.00
20.00
13.00
239.72
0.00
0.00
51.00
1,220.94
0.00
0.00
356.40
0.00
0.00
0.00
493.54
493.54
0.00
0.00
1.00
251.56
389.00
85.07
251.56
389.00
0.00
1.00
1.00
85.07
0.00
0.00
GLB
1.00
275.69
275.69
GLB
1.00
190.50
GLB
1.00
UND
UND
8%
7%
19%
1,089.00
1,089.00
95.24%
1.00
13.00
239.72
86.67%
2.00
36.88
51.00
1,220.94
85.00%
9.00
215.46
0.00
0.00
0.00
0.00%
8.00
356.40
0.00
0.00
0.00
0.00
0.00%
1.00
493.54
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
251.56
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
1.00
1.00
389.00
85.07
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
275.69
190.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
190.50
627.90
627.90
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
627.90
1.00
350.06
350.06
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
350.06
1.00
18.25
18.25
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
S/.
S/.
S/.
S/.
S/.
S/.
511,508.95
40,920.72
35,805.63
588,235.29
111,764.71
700,000.00
1.00000
700,000.00
63.67%
5.74%
325,676.09
26,054.09
22,797.33
374,527.51
71,160.23
445,687.73
1.00000
445,687.73
296,304.99
23,704.40
20,741.35
340,750.74
64,742.64
405,493.38
1.00000
405,493.38
57.93%
29,371.10
2,349.69
2,055.98
33,776.77
6,417.59
40,194.35
1.00000
40,194.35
63.67%
54.45
18.25
185,832.86
14,866.63
13,008.30
213,707.79
40,604.48
254,312.27
1.00000
254,312.27
63.67%
VAL. 06 AGOS-SET.
Pgina 46
337772454.xls
SUPERVISION DE OBRA
VALORIZACIN DE OBRA
VALORIZACIN N
07
PROPIETARIO
CONTRATISTA
PROVINCIA
DEPARTAMENTO
OBRA :
VALOR REFERENCIAL
MONTO CONTRATADO
FORMULA
FECHA
S/.
S/.
700,000.00
700,000.00
UNICA
06 DE OCTUBRE DEL 2006
CONSTRUCCION CENTRO DE SALUD TIPO II DE OYON CON ATENCION MATERNO INFANTIL CON APOYO SOCIEDAD CIVIL
Partidas
ITEM
Und.
01.00.00
01.01.00
01.02.00
01.03.00
02.00.00
02.01.00
02.02.00
02.03.00
03.00.00
03.01.00
03.02.00
03.03.00
03.04.00
03.05.00
04.00.00
04.01.00
04.02.00
04.03.01
04.03.02
04.03.03
04.04.00
05.00.00
05.01.00
05.01.01
05.01.02
05.02.00
05.02.01
05.02.02
05.02.03
05.03.00
05.03.01
05.03.02
05.03.03
05.04.00
05.04.01
05.04.02
05.04.03
05.05.00
05.05.01
05.05.02
05.05.03
05.06.00
05.06.01
05.06.02
05.06.03
05.06.04
05.07.00
05.07.01
05.07.02
05.07.03
05.08.00
05.08.01
05.08.02
05.08.03
06.00.00
ESTRUCTURAS
OBRAS PROVISIONALES
ALMACENES OFICINAS TALLERES Y GUARDIANIA
M2
CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M
UND
AGUA Y FUERZA ELECTRICA EN LA CONSTRUCCION
GLB
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
M2
TRANSPORTE DE EQUIPOS Y HERAMIENTAS
GLB
NIVELACION ,TRAZO Y REPLANTEO PRELIMINAR
M2
MOVIMIENTO DE TIERRAS
EXCAVACIN DE ZANJA P/CIMIENTOS Y / O ZAPATAS
M3
EXCAVACION P/CISTERNA
M3
NIVELACION INT.Y APISONADO FINAL DEL TERRENO PREVIO AL PISO
M2
RELLENO CON MATERIAL PROPIO
M3
ELIMINACION MATERIAL EXCEDENTE HASTA 30 MTS( A MANO USANDO CARRET m3
OBRAS DE CONCRETO SIMPLE
SOLADO DE CONCRETO 1:12 C:H
M2
CIMIENTOS 1:10 ( CH ) +30 % P.G
M3
SOBRECIMIENTO CONCRETO CICLOPEO 1:8 C.H+ 25% PM
M3
SOBRECIMIENTO ENCOFRADO UY DESENCOFRADO
M2
ACERO DE REFUERZO Fy=4200Kg/Cm2
KG
FALSO PISO DE 4" DE CONCRETO 1:10
M2
OBRAS DE CONCRETO ARMADO
ZAPATAS
CONCRETO EN ZAPATAS F"C= 210 KG/CM2
M3
ACERO DE REFUERZO Fy=4200Kg/Cm2
KG
VIGAS DE ARRIOSTRE
VIGAS DE ARRIOSTRE Fc=210 Kg/Cm2
M3
ENCOFRADO Y DESENCOFRADO VIGAS DE ARRIOSTRE
M2
ACERO DE REFUERZO EN VIGAS DE ARRIOSTREFy=4200 Kg/CM2
KG
COLUMNAS
CONCRETO EN COLUMNAS F"C 210 KG/CM2
M3
ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS
M2
ACERO DE REFUERZO Fy=4200 Kg/Cm2 COLUMNAS
M2
PLACAS
PLACAS DE CONCRETO Fc=210 Kg/Cm2
M3
ENCOFRADO Y DESNCOFRADO PLACAS
M2
ACERO DE REFUERZO Fy=4200 Kg/Cm2 PLACAS
Kg
VIGAS
VIGAS CONCRETO 210 Kg/Cm2
M3
VIGAS ENCOFRADO Y DESENCOFRADO
M2
ACERO DE REFUERZO Fy=4200Kg/Cm2 VIGAS
KG
LOSAS ALIGERADAS
LOSA ALIGERADA CONCRETO 210 Kg/Cm2
M3
ENCOFRADO Y DESENCOFRADO PARA LOSAS ALIGERADAS
M2
ACERO DE REFUERZO Fy= 4200Kg/Cm2 LOSA ALIGERADA
KG
LOSA ALIGERADA LADRILLO HUECO 15X30X30
UND
CISTERNA
CONCRETO Fc=210 Kg/Cm2-CISTERNA
M3
ENCOFRADO Y DESENCOFRADO-CISTERNA
M2
REFUERZO DE ACERO-CISTERNA
M2
TANQUE ELEVADO
CONCRETO EN TANQUE ELEVADO F'C=210 KG/CM2
M3
ENCOFRADO Y DESENCOFRADO NORMAL EN TANQUE ELEVADO
M2
ACERO GRADO 60 EN TANQUE ELEVADO
KG
ESTRUCTURA DE MADERA
M2
11.00.00
11.01.00
11.02.00
ARQUITECTURA
MUROS Y TABIQUES DE ALBAILERIA
MURO DE LADRILLO KK 18 H CABEZA
MURO DE LADRILLO KK 18H SOGA
M2
M2
Metrado
Costo
Unitario
(S/.)
Costo
Parcial
(S/.)
Avance Anterior
Monto de
Valorizacin
Total
Metrado
40.00
1.00
1.00
31.50
842.52
500.00
1,260.00
842.52
500.00
40.00
1.00
1.00
500.00
1.00
2,000.00
0.24
600.00
0.32
120.00
600.00
640.00
820.00
35.00
1,400.00
215.00
610.00
1.87
1.87
5.97
7.29
1.87
710.00
375.00
135.00
1,410.00
9,450.00
2,000.00
Avance Actual
Monto de
Valorizacin
Total
Metrado
Avance Acumulado
Metrado
Monto de
Valorizacin Total
Saldo a Ejecutar
Monto de
Valorizacin
Total
Metrado
1,260.00
842.52
500.00
0.00
0.00
0.00
0.00
0.00
0.00
40.00
1.00
1.00
1,260.00
842.52
500.00
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
500.00
1.00
2,000.00
120.00
600.00
640.00
0.00
0.00
0.00
0.00
0.00
0.00
500.00
1.00
2,000.00
120.00
600.00
640.00
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
1,533.40
65.45
8,358.00
1,567.35
1,140.70
820.00
35.00
1,400.00
215.00
610.00
1,533.40
65.45
8,358.00
1,567.35
1,140.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
820.00
35.00
1,400.00
215.00
610.00
1,533.40
65.45
8,358.00
1,567.35
1,140.70
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11.16
38.90
72.28
18.25
0.47
9.25
7,923.60
14,587.50
9,757.80
25,732.50
4,441.50
18,500.00
710.00
375.00
135.00
1,410.00
9,450.00
1,800.00
7,923.60
14,587.50
9,757.80
25,732.50
4,441.50
16,650.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
710.00
375.00
135.00
1,410.00
9,450.00
1,800.00
7,923.60
14,587.50
9,757.80
25,732.50
4,441.50
16,650.00
100.00%
100.00%
100.00%
100.00%
100.00%
90.00%
0.00
0.00
0.00
0.00
0.00
200.00
0.00
0.00
0.00
0.00
0.00
1,850.00
81.00
1,300.00
24.88
0.47
2,015.28
611.00
81.00
1,300.00
2,015.28
611.00
0.00
0.00
0.00
0.00
81.00
1,300.00
2,015.28
611.00
100.00%
100.00%
0.00
0.00
0.00
0.00
17.00
136.00
1,850.00
44.18
19.07
0.47
751.06
2,593.52
869.50
17.00
136.00
1,850.00
751.06
2,593.52
869.50
0.00
0.00
0.00
17.00
136.00
1,850.00
751.06
2,593.52
869.50
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
55.00
650.00
7,850.00
99.10
26.04
0.47
5,450.50
16,926.00
3,689.50
55.00
612.93
7,850.00
5,450.50
15,960.70
3,689.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
55.00
612.93
7,850.00
5,450.50
15,960.70
3,689.50
100.00%
94.30%
100.00%
0.00
37.07
0.00
0.00
965.30
0.00
8.00
111.00
325.00
97.21
22.49
0.47
777.68
2,496.39
152.75
2.40
57.00
342.00
233.30
1,281.93
160.74
3.15
45.00
0.00
306.21
1,012.05
0.00
5.55
102.00
325.00
539.52
2,293.98
160.74
69.38%
91.89%
100.00%
2.45
9.00
0.00
238.16
202.41
(7.99)
121.00
665.00
6,950.00
38.68
25.63
0.47
4,680.28
17,043.95
3,266.50
88.00
615.00
6,500.00
3,403.84
15,762.45
3,055.00
0.00
10.00
0.00
0.00
256.30
0.00
88.00
625.00
6,500.00
3,403.84
16,018.75
3,055.00
72.73%
93.98%
93.53%
33.00
40.00
450.00
1,276.44
1,025.20
211.50
150.00
1,800.00
10,000.00
1,700.00
34.30
23.03
0.47
0.25
5,145.00
41,454.00
4,700.00
425.00
110.00
1,654.00
8,968.00
1,489.00
3,773.00
38,091.62
4,214.96
372.25
8.96
85.00
510.00
85.00
307.33
1,957.55
239.70
21.25
118.96
1,739.00
9,478.00
1,574.00
4,080.33
40,049.17
4,454.66
393.50
79.31%
96.61%
94.78%
92.59%
31.04
61.00
522.00
126.00
1,064.67
1,404.83
245.34
31.50
16.00
95.00
1,200.00
76.45
20.13
0.47
1,223.20
1,912.35
564.00
8.00
75.00
850.00
611.60
1,509.75
399.50
0.00
20.00
0.00
0.00
402.60
0.00
8.00
95.00
850.00
611.60
1,912.35
399.50
50.00%
100.00%
70.83%
8.00
0.00
350.00
611.60
0.00
164.50
6.50
51.00
500.00
2,000.00
110.29
24.39
0.47
36.75
716.89
1,243.89
235.00
73,500.00
0.00
0.00
100.00
600.00
0.00
0.00
47.00
22,050.00
0.00
0.00
0.00
1,150.00
0.00
0.00
0.00
42,262.50
0.00
0.00
100.00
1,750.00
0.00
0.00
47.00
64,312.50
0.00%
0.00%
20.00%
87.50%
6.50
51.00
400.00
250.00
716.89
1,243.89
188.00
9,187.50
1,243.08
1,634.28
14.71
11.24
18,285.71
18,369.31
1,231.91
1,623.50
18,121.40
18,248.14
0.00
0.00
0.00
0.00
1,231.91
1,623.50
18,121.40
18,248.14
99.10%
99.34%
11.17
10.78
164.31
121.17
Pgina 47
337772454.xls
SUPERVISION DE OBRA
12.00.00
12.01.00
12.02.00
12.03.00
12.04.00
12.05.00
12.06.00
12.07.00
12.08.00
12.09.00
12.10.00
12.11.00
13.00.00
13.01.00
14.00.00
14.01.00
14.06.00
25.00.00
25.01.00
26.00.00
26.01.00
31.00.00
32.02.00
32.03.00
01.00.00
01.01.00
01.02.00
01.02.01
01.02.02
01.02.03
01.02.04
01.02.05
01.02.06
01.02.07
01.02.08
01.02.09
01.02.10
01.02.11
01.02.12
01.02.13
01.02.14
02.00.00
02.01.00
02.02.00
02.03.00
02.04.00
02.05.00
02.06.00
02.07.00
02.08.00
02.09.00
02.10.00
02.11.00
02.12.00
02.13.00
02.14.00
02.15.00
02.16.00
02.17.00
02.18.00
02.19.00
02.20.00
02.21.00
03.00.00
03.01.00
03.01.01
03.01.02
03.01.03
03.01.04
03.01.05
03.01.06
03.01.07
04.00.00
04.01.00
04.02.00
04.03.00
INST. ELECTRICAS
INSTALACIONES ELECTRICAS
CIRCUITOS DERIVADOS
CIRCUITOS DERIVADOS ALUMBRADO Y TOMA CORRIENTES
CENTRO DE LUZ
SALIDA PARA ARTEFAC. ALUMBRADO SPOT LIGHT
SALIDA PARA ALUMBRADO EN PARED
SALIDA CAJA PASE ALUMBRADO ( TECHO )
SALIDA PARA INTERRUPTOR C/FUS DE 2X20A PA/ALUMB Y TOMACORRIENTE
PTO. DE BAJADA DE INTERR. DE UN GOLPE
PUNTO DE BAJAD. DE INTERR. DE DOS GOLPES
PUNTO DE BAJADA DE INTERRUP. DE TRES GOLPES
BAJADA DE INTERR. DE CONMUT. DE 3 VIAS
PUNTO T/BIPOL.DOBLE TOMA TIERRA CAJA 10X55X50MM
SALIDA P/TOMACORR. UNIVERSAL DOBLE 10A,220V
SALIDA P/TOMACORR. BIPOLAR ININTERRUNPIDO
SALIDA P/TOMACORR./COMPUTADORA
SALIDA CAJA PASE ALUMBRADO PARED
CIRCUITOS DERIVADOS DE CARGAS ESPECIALES
SALIDA PARA ESTERILIZADORES S-3
SALIDA PARA ESTERILIZADOR S-54
SALIDA PARA EQUIPO DENTAL
SALIDA PARA CALENT./ELECTRI DE AGUA
SALIDA PARA COCINA ELECTRI/ DE 8 KW
SALIDA PARA UPS MONOFASICO DE 6 KVA
CALANDRIA
REFRIGERADORA INDUSTRIAL
SECADORA
LAVADORA
SOLDADORA
DESTILADOR DE AGUA DE 3 KW
SALIDA PARA CACI
CENTRAL DE PARLANTES
SALIDA PARA CONCENTRADOR DE REDES
SALIDA PARA CENTRAL DE TELEFONOS
SALIDA LLAMADA DE ENFERMERAS
ELECTROBONBAS DE AGUA
CONTROL DE NIVEL D CISTER. Y TANQUE ELEVADO
RAYOS X
SALIDA PARA TIMBRE
COMUNICACIONES Y SEALES
SISTEMAS DE TELEFONOS
ACOMETIDA TELEFONICA AEREA
SALIDA PARA CAJA TELEFONICA TIPO "C"
SALIDA PARA TELEFONO EXTERNO INTERNO
SALIDA PARA PARLANTE
SALIDA CAJA DE PASE
SALIDA PARA CAJA DE PASE DE 150X150X100mm
SALIDA PARA CAJA DE PASE DE 200X200X100mm
SISTEMA DE ALARMA CONTRA INCENDIO
SALIDA PARA CAJA DE PASE DE 150X150X100mm
SALIDA PARA CAJA DE PASE CUADRADA DE 200X200X10mm
SALIDA PARA ALARMA MANUAL Y SIRENA
M2
M2
M2
M2
M2
M2
M2
M
M
M
M
1,279.90
2,983.43
1,603.25
6.00
50.00
62.35
49.20
423.90
515.84
906.30
325.73
9.19
8.74
7.79
9.18
11.77
77.55
7.41
7.00
4.41
4.01
3.16
11,762.28
26,075.18
12,489.32
55.08
588.50
4,835.24
364.57
2,967.30
2,274.85
3,634.26
1,029.31
422.50
1,170.00
650.00
4.35
24.00
0.00
0.00
178.00
205.00
350.00
130.00
3,882.78
10,225.80
5,063.50
39.93
282.48
0.00
0.00
1,246.00
904.05
1,403.50
410.80
42.50
435.00
120.00
0.00
4.00
0.00
0.00
22.50
0.00
50.00
30.00
390.58
3,801.90
934.80
0.00
47.08
0.00
0.00
157.50
0.00
200.50
94.80
465.00
1,605.00
770.00
4.35
28.00
0.00
0.00
200.50
205.00
400.00
160.00
4,273.35
14,027.70
5,998.30
39.93
329.56
0.00
0.00
1,403.50
904.05
1,604.00
505.60
36.33%
53.80%
48.03%
72.50%
56.00%
0.00%
0.00%
47.30%
39.74%
44.14%
49.12%
M2
1,370.57
13.21
18,105.23
650.00
8,586.50
154.00
2,034.34
804.00
10,620.84
M2
M2
1,224.99
44.76
7.07
17.09
8,660.68
764.95
0.00
0.00
0.00
0.00
105.00
0.00
742.35
0.00
105.00
0.00
742.35
0.00
814.90
1,378.43
833.25
1.65
22.00
62.35
49.20
223.40
310.84
506.30
165.73
7,488.93
12,047.48
6,491.02
15.15
258.94
4,835.24
364.57
1,563.80
1,370.80
2,030.26
523.71
58.66%
566.57
7,484.39
8.57%
0.00%
1,119.99
44.76
7,918.33
764.95
4.35
80.02
348.09
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
4.35
348.09
UND
1.00
182.89
182.89
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
182.89
GLB
GLB
1.00
1.00
1,535.73
500.00
1,535.73
500.00
0.90
0.00
1,382.16
0.00
0.00
0.00
0.00
0.00
0.90
0.00
1,382.16
0.00
90.00%
0.00%
0.10
1.00
153.57
500.00
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
173.00
99.00
18.00
4.00
7.00
62.00
38.00
2.00
18.00
135.00
11.00
9.00
7.00
11.00
24.16
16.36
35.53
31.71
19.58
28.69
29.44
33.54
36.77
35.80
35.79
42.74
18.34
35.49
4,179.68
1,619.64
639.54
126.84
137.06
1,778.78
1,118.72
67.08
661.86
4,833.00
393.69
384.66
128.38
390.39
123.00
58.00
13.00
3.00
6.00
33.00
20.00
0.00
0.00
0.00
0.00
0.00
6.00
0.00
2,971.68
948.88
461.89
95.13
117.48
946.77
588.80
0.00
0.00
0.00
0.00
0.00
110.04
0.00
36.00
0.00
3.00
1.00
1.00
5.00
5.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
869.76
0.00
106.59
31.71
19.58
143.45
147.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
159.00
58.00
16.00
4.00
7.00
38.00
25.00
0.00
0.00
0.00
0.00
0.00
6.00
0.00
3,841.44
948.88
568.48
126.84
137.06
1,090.22
736.00
0.00
0.00
0.00
0.00
0.00
110.04
0.00
91.91%
58.59%
88.89%
100.00%
100.00%
61.29%
65.79%
0.00%
0.00%
0.00%
0.00%
0.00%
85.71%
0.00%
14.00
41.00
2.00
0.00
0.00
24.00
13.00
2.00
18.00
135.00
11.00
9.00
1.00
11.00
338.24
670.76
71.06
0.00
0.00
688.56
382.72
67.08
661.86
4,833.00
393.69
384.66
18.34
390.39
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
CJT
CJT
CJT
CJT
4.00
1.00
1.00
8.00
1.00
1.00
1.00
1.00
1.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
75.48
55.18
611.89
59.94
63.77
82.00
244.36
47.16
51.36
50.43
93.38
63.74
46.15
75.05
77.24
100.93
67.12
219.22
97.11
913.50
29.14
301.92
55.18
611.89
479.52
63.77
82.00
244.36
47.16
51.36
100.86
93.38
63.74
46.15
75.05
77.24
100.93
67.12
219.22
97.11
913.50
29.14
8.00
2.00
2.00
8.00
0.00
2.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
2.00
2.00
0.00
0.00
0.00
0.00
2.00
603.84
110.36
1,223.78
479.52
0.00
164.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
150.10
154.48
201.86
0.00
0.00
0.00
0.00
58.28
0.00
0.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
59.94
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8.00
2.00
2.00
9.00
0.00
2.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
2.00
2.00
0.00
0.00
0.00
0.00
2.00
603.84
110.36
1,223.78
539.46
0.00
164.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
150.10
154.48
201.86
0.00
0.00
0.00
0.00
58.28
200.00%
200.00%
200.00%
112.50%
0.00%
200.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
200.00%
200.00%
200.00%
0.00%
0.00%
0.00%
0.00%
200.00%
(4.00)
(1.00)
(1.00)
(1.00)
1.00
(1.00)
1.00
1.00
1.00
2.00
1.00
1.00
1.00
(1.00)
(1.00)
(1.00)
1.00
1.00
1.00
1.00
(1.00)
(301.92)
(55.18)
(611.89)
(59.94)
63.77
(82.00)
244.36
47.16
51.36
100.86
93.38
63.74
46.15
(75.05)
(77.24)
(100.93)
67.12
219.22
97.11
913.50
(29.14)
PTO
PTO
PTO
PTO
PTO
PTO
PTO
1.00
3.00
22.00
7.00
5.00
3.00
1.00
48.30
294.21
71.93
65.87
52.76
85.72
48.10
48.30
882.63
1,582.46
461.09
263.80
257.16
48.10
0.00
0.00
0.00
5.00
4.00
0.00
0.00
0.00
0.00
0.00
329.35
211.04
0.00
0.00
0.00
0.00
0.00
2.00
0.00
0.00
0.00
0.00
0.00
0.00
131.74
0.00
0.00
0.00
0.00
0.00
0.00
7.00
4.00
0.00
0.00
0.00
0.00
0.00
461.09
211.04
0.00
0.00
0.00%
0.00%
0.00%
100.00%
80.00%
0.00%
0.00%
1.00
3.00
22.00
0.00
1.00
3.00
1.00
48.30
882.63
1,582.46
0.00
52.76
257.16
48.10
PTO
PTO
PTO
7.00
3.00
6.00
85.72
48.10
78.48
600.04
144.30
470.88
2.00
0.00
0.00
171.44
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
0.00
0.00
171.44
0.00
0.00
28.57%
0.00%
0.00%
5.00
3.00
6.00
428.60
144.30
470.88
Pgina 48
337772454.xls
SUPERVISION DE OBRA
04.03.04
05.00.00
05.01.00
05.02.00
05.03.00
05.04.00
05.05.00
05.06.00
05.07.00
05.08.00
06.00.00
06.01.00
06.02.00
07.00.00
07.01.00
08.00.00
08.01.00
08.02.00
08.03.00
08.04.00
08.05.00
08.06.00
08.07.00
08.08.00
08.09.00
08.10.00
08.11.00
08.12.00
08.13.00
08.14.00
08.15.00
09.00.00
09.01.00
09.01.01
09.01.02
09.01.03
09.01.04
09.01.05
09.01.06
09.01.07
09.01.08
09.01.09
09.01.10
09.01.11
09.01.12
12.00.00
12.01.00
12.02.00
12.03.00
12.04.00
12.05.00
12.06.00
12.07.00
12.08.00
13.00.00
13.01.00
14.00.00
14.01.00
01.00.00
01.01.00
01.02.00
01.03.00
02.00.00
02.01.00
02.02.00
03.00.00
03.01.00
04.00.00
04.01.00
04.02.00
05.00.00
05.01.00
06.00.00
06.01.00
06.02.00
07.00.00
INST. SANITARIAS
DESAGUE Y VENTILACION
SALIDA DE DESAGUE PVC-SAL 2"
SALIDA DE DESAGUE PVC-SAL 4"
SALIDA PARA VENTILACION 2" PVC-SAL
REDES DE DERIVACION
SUMINISTRO E INST. TUBERIA PVC -SAL 2"
SUMINISTRO E INST. TUBERIA PVC-SAL 4"
TUBERIA PVC - SAL EMPOTRADA EN MUROS
SUMINISTRO E INST. TUBERIA PVC -SAL 2"
REGISTRO ROSCADO DE BRONCE
REGISTRO DE BRONCE 2"
SUMIDERO DE BRONCE 2"
SOMBREROS DE VENTILACION
SOMBRERO VENTILACION PVC DE 2"
REDES EXTERIORES DE DESAGUE
TRAZO NIVELES Y REPLANTEO REDES DE AGUA DESAG.
EXCAVACION T/N DESAGUE 4-6" HASTA 1.00
SUMISTRO E INSTALACION TUBERIA PVC - SAL PESADA
PTO
73.00
48.77
3,560.21
33.00
1,609.41
22.00
1,072.94
55.00
2,682.35
75.34%
18.00
877.86
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
1.00
11.00
10.00
5.00
4.00
5.00
1.00
4.00
54.23
761.86
364.60
220.35
496.40
160.15
36.47
132.00
PTO
PTO
PTO
PTO
pto
PTO
PTO
PTO
1.00
11.00
10.00
5.00
4.00
5.00
1.00
4.00
54.23
69.26
36.46
44.07
124.10
32.03
36.47
33.00
54.23
761.86
364.60
220.35
496.40
160.15
36.47
132.00
PTO
PTO
1.00
2.00
52.76
47.36
52.76
94.72
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
1.00
2.00
52.76
94.72
CJT
1.00
39.83
39.83
2.00
79.66
0.00
0.00
2.00
79.66
200.00%
(1.00)
(39.83)
M
M
M
M
M
M
M
M
M
M
M
M
CJT
UND
M
2.00
47.00
28.00
25.00
25.00
1.00
31.00
10.00
21.00
31.00
23.00
32.00
4.00
4.00
3.00
2.64
35.32
14.07
12.38
8.23
9.70
9.70
9.22
5.50
7.68
5.91
74.58
70.31
143.77
7.14
5.28
1,660.04
393.96
309.50
205.75
9.70
300.70
92.20
115.50
238.08
135.93
2,386.56
281.24
575.08
21.42
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
2.00
47.00
28.00
25.00
25.00
1.00
31.00
10.00
21.00
31.00
23.00
32.00
4.00
4.00
3.00
5.28
1,660.04
393.96
309.50
205.75
9.70
300.70
92.20
115.50
238.08
135.93
2,386.56
281.24
575.08
21.42
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
und
und
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
1.00
46.20
46.20
458.56
458.56
383.20
338.20
383.20
416.96
124.40
46.20
417.81
181.78
46.20
46.20
458.56
458.56
383.20
338.20
383.20
416.96
124.40
46.20
835.62
181.78
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
1.00
46.20
46.20
458.56
458.56
383.20
338.20
383.20
416.96
124.40
46.20
835.62
181.78
UND
CJT
M
UND
UND
UND
UND
M
1.00
1.00
21.00
1.00
1.00
3.00
1.00
12.00
183.36
551.96
10.63
198.47
110.10
143.77
14.24
3.56
183.36
551.96
223.23
198.47
110.10
431.31
14.24
42.72
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
1.00
1.00
21.00
1.00
1.00
3.00
1.00
12.00
183.36
551.96
223.23
198.47
110.10
431.31
14.24
42.72
GLB
1.00
85.10
85.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
85.10
pto
7.00
77.56
542.92
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
7.00
542.92
PTO
PTO
PTO
70.00
24.00
18.00
21.77
101.64
45.48
1,523.90
2,439.36
818.64
65.00
21.00
17.00
1,415.05
2,134.44
773.16
0.00
0.00
0.00
0.00
0.00
0.00
65.00
21.00
17.00
1,415.05
2,134.44
773.16
92.86%
87.50%
94.44%
5.00
3.00
1.00
108.85
304.92
45.48
M
M
258.00
103.00
8.14
22.26
2,100.12
2,292.78
250.00
110.00
2,035.00
2,448.60
0.00
0.00
0.00
0.00
250.00
110.00
2,035.00
2,448.60
96.90%
106.80%
8.00
(7.00)
65.12
(155.82)
54.00
8.14
439.56
48.00
390.72
0.00
0.00
48.00
390.72
88.89%
6.00
48.84
UND
UND
38.00
10.00
11.25
17.26
427.50
172.60
27.00
9.00
303.75
155.34
0.00
0.00
0.00
0.00
27.00
9.00
303.75
155.34
71.05%
90.00%
11.00
1.00
123.75
17.26
PZA
18.00
15.03
270.54
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
18.00
270.54
M
M
273.00
273.00
0.83
12.47
226.59
3,404.31
300.30
300.30
249.25
3,744.74
0.00
0.00
0.00
0.00
300.30
300.30
249.25
3,744.74
110.00%
110.00%
(27.30)
(27.30)
(22.66)
(340.43)
Pgina 49
337772454.xls
SUPERVISION DE OBRA
07.01.00
08.00.00
08.01.00
M
UND
273.00
54.00
35.70
9,746.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
273.00
9,746.10
71.72
3,872.88
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
54.00
3,872.88
Pgina 50
337772454.xls
SUPERVISION DE OBRA
08.02.00
09.00.00
09.01.00
09.01.01
10.00.00
10.01.00
11.00.00
11.01.00
11.02.00
11.03.00
11.04.00
11.05.00
12.00.00
12.01.00
13.00.00
13.01.00
13.02.00
13.03.00
13.04.00
13.05.00
14.00.00
14.01.00
14.01.01
15.00.00
15.01.00
15.02.00
16.00.00
16.02.00
22.00.00
27.00.00
27.01.00
29.00.00
29.01.00
29.02.00
29.03.00
30.00.00
30.01.00
31.00.00
31.01.00
32.00.00
32.01.00
33.00.00
33.01.00
34.00.00
34.01.00
UND
2.00
98.14
196.28
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
2.00
196.28
PTO
97.00
28.52
2,766.44
82.00
2,338.64
0.00
0.00
82.00
2,338.64
84.54%
15.00
427.80
596.00
0.83
494.68
596.00
494.68
0.00
0.00
596.00
494.68
100.00%
0.00
0.00
M
M
M
M
M
355.00
37.00
92.00
12.00
100.00
6.54
7.03
8.05
11.05
14.26
2,321.70
260.11
740.60
132.60
1,426.00
285.00
34.00
0.00
0.00
0.00
1,863.90
239.02
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
285.00
34.00
0.00
0.00
0.00
1,863.90
239.02
0.00
0.00
0.00
80.28%
91.89%
0.00%
0.00%
0.00%
70.00
3.00
92.00
12.00
100.00
457.80
21.09
740.60
132.60
1,426.00
53.00
6.54
346.62
50.00
327.00
0.00
0.00
50.00
327.00
94.34%
3.00
19.62
PZA
PZA
PZA
PZA
PZA
60.00
1.00
2.00
1.00
2.00
34.12
44.55
71.59
94.92
88.52
2,047.20
44.55
143.18
94.92
177.04
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
60.00
1.00
2.00
1.00
2.00
2,047.20
44.55
143.18
94.92
177.04
PZA
21.00
54.45
1,143.45
20.00
1,089.00
0.00
0.00
20.00
1,089.00
95.24%
1.00
54.45
M
M
15.00
60.00
18.44
23.94
276.60
1,436.40
13.00
51.00
239.72
1,220.94
0.00
0.00
0.00
0.00
13.00
51.00
239.72
1,220.94
86.67%
85.00%
2.00
9.00
36.88
215.46
PZA
8.00
44.55
356.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
8.00
356.40
UND
1.00
493.54
493.54
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
493.54
UND
UND
GLB
1.00
1.00
1.00
251.56
389.00
85.07
251.56
389.00
85.07
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
1.00
1.00
1.00
251.56
389.00
85.07
GLB
1.00
275.69
275.69
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
275.69
GLB
1.00
190.50
190.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
190.50
GLB
1.00
627.90
627.90
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
627.90
UND
1.00
350.06
350.06
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
350.06
UND
1.00
18.25
18.25
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
S/.
S/.
S/.
S/.
S/.
S/.
511,508.95
40,920.72
35,805.63
588,235.29
111,764.71
700,000.00
1.00000
700,000.00
383,428.34
30,674.27
26,839.98
440,942.59
83,779.09
524,721.68
1.00000
524,721.68
74.96%
8%
7%
19%
325,676.09
26,054.09
22,797.33
374,527.51
71,160.23
445,687.73
1.00000
445,687.73
63.67%
57,752.24
4,620.18
4,042.66
66,415.08
12,618.87
79,033.95
1.00000
79,033.95
11.29%
74.96%
18.25
128,080.61
10,246.45
8,965.64
147,292.71
27,985.61
175,278.32
1.00000
175,278.32
74.96%
Pgina 51
337772454.xls
SUPERVISION DE OBRA
VALORIZACIN DE OBRA
VALORIZACIN N
PROPIETARIO
CONTRATISTA
PROVINCIA
DEPARTAMENTO
08
MUNICIPALIDAD PROVINCIAL DE OYON
OYON
LIMA
OBRA :
01.00.00
01.01.00
01.02.00
01.03.00
02.00.00
02.01.00
02.02.00
02.03.00
03.00.00
03.01.00
03.02.00
03.03.00
03.04.00
03.05.00
04.00.00
04.01.00
04.02.00
04.03.01
04.03.02
04.03.03
04.04.00
05.00.00
05.01.00
05.01.01
05.01.02
05.02.00
05.02.01
05.02.02
05.02.03
05.03.00
05.03.01
05.03.02
05.03.03
05.04.00
05.04.01
05.04.02
05.04.03
05.05.00
05.05.01
05.05.02
05.05.03
05.06.00
05.06.01
05.06.02
05.06.03
05.06.04
05.07.00
05.07.01
05.07.02
05.07.03
05.08.00
05.08.01
ESTRUCTURAS
OBRAS PROVISIONALES
ALMACENES OFICINAS TALLERES Y GUARDIANIA
CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M
AGUA Y FUERZA ELECTRICA EN LA CONSTRUCCION
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRANSPORTE DE EQUIPOS Y HERAMIENTAS
NIVELACION ,TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACIN DE ZANJA P/CIMIENTOS Y / O ZAPATAS
EXCAVACION P/CISTERNA
NIVELACION INT.Y APISONADO FINAL DEL TERRENO PREVIO AL PISO
RELLENO CON MATERIAL PROPIO
ELIMINACION MATERIAL EXCEDENTE HASTA 30 MTS( A MANO USANDO CARRETILLA )
OBRAS DE CONCRETO SIMPLE
SOLADO DE CONCRETO 1:12 C:H
CIMIENTOS 1:10 ( CH ) +30 % P.G
SOBRECIMIENTO CONCRETO CICLOPEO 1:8 C.H+ 25% PM
SOBRECIMIENTO ENCOFRADO UY DESENCOFRADO
ACERO DE REFUERZO Fy=4200Kg/Cm2
FALSO PISO DE 4" DE CONCRETO 1:10
OBRAS DE CONCRETO ARMADO
ZAPATAS
CONCRETO EN ZAPATAS F"C= 210 KG/CM2
ACERO DE REFUERZO Fy=4200Kg/Cm2
VIGAS DE ARRIOSTRE
VIGAS DE ARRIOSTRE Fc=210 Kg/Cm2
ENCOFRADO Y DESENCOFRADO VIGAS DE ARRIOSTRE
ACERO DE REFUERZO EN VIGAS DE ARRIOSTREFy=4200 Kg/CM2
COLUMNAS
CONCRETO EN COLUMNAS F"C 210 KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS
ACERO DE REFUERZO Fy=4200 Kg/Cm2 COLUMNAS
PLACAS
PLACAS DE CONCRETO Fc=210 Kg/Cm2
ENCOFRADO Y DESNCOFRADO PLACAS
ACERO DE REFUERZO Fy=4200 Kg/Cm2 PLACAS
VIGAS
VIGAS CONCRETO 210 Kg/Cm2
VIGAS ENCOFRADO Y DESENCOFRADO
ACERO DE REFUERZO Fy=4200Kg/Cm2 VIGAS
LOSAS ALIGERADAS
LOSA ALIGERADA CONCRETO 210 Kg/Cm2
ENCOFRADO Y DESENCOFRADO PARA LOSAS ALIGERADAS
ACERO DE REFUERZO Fy= 4200Kg/Cm2 LOSA ALIGERADA
LOSA ALIGERADA LADRILLO HUECO 15X30X30
CISTERNA
CONCRETO Fc=210 Kg/Cm2-CISTERNA
ENCOFRADO Y DESENCOFRADO-CISTERNA
REFUERZO DE ACERO-CISTERNA
TANQUE ELEVADO
CONCRETO EN TANQUE ELEVADO F'C=210 KG/CM2
S/.
S/.
700,000.00
700,000.00
UNICA
30 DE OCTUBRE DEL 2006
CONSTRUCCION CENTRO DE SALUD TIPO II DE OYON CON ATENCION MATERNO INFANTIL CON APOYO SOCIEDAD CIVIL
Partidas
ITEM
VALOR REFERENCIAL
MONTO CONTRATADO
FORMULA
FECHA
Und.
Metrado
Costo
Unitario
(S/.)
Costo
Parcial
(S/.)
Avance Anterior
Monto de
Valorizacin
Total
Metrado
Avance Actual
Monto de
Valorizacin
Total
Metrado
Avance Acumulado
Monto de
Valorizacin
Total
Metrado
Saldo a Ejecutar
Monto de
Valorizacin
Total
Metrado
M2
UND
GLB
40.00
1.00
1.00
31.50
842.52
500.00
1,260.00
842.52
500.00
40.00
1.00
1.00
1,260.00
842.52
500.00
0.00
0.00
0.00
0.00
0.00
0.00
40.00
1.00
1.00
1,260.00
842.52
500.00
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
M2
GLB
M2
500.00
1.00
2,000.00
0.24
600.00
0.32
120.00
600.00
640.00
500.00
1.00
2,000.00
120.00
600.00
640.00
0.00
0.00
0.00
0.00
0.00
0.00
500.00
1.00
2,000.00
120.00
600.00
640.00
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
M3
M3
M2
M3
m3
820.00
35.00
1,400.00
215.00
610.00
1.87
1.87
5.97
7.29
1.87
1,533.40
65.45
8,358.00
1,567.35
1,140.70
820.00
35.00
1,400.00
214.50
610.00
1,533.40
65.45
8,358.00
1,563.71
1,140.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
820.00
35.00
1,400.00
214.50
610.00
1,533.40
65.45
8,358.00
1,563.71
1,140.70
100.00%
100.00%
100.00%
99.77%
100.00%
0.00
0.00
0.00
0.50
0.00
0.00
0.00
0.00
3.64
0.00
M2
M3
M3
M2
KG
M2
710.00
375.00
135.00
1,410.00
9,450.00
2,000.00
11.16
38.90
72.28
18.25
0.47
9.25
7,923.60
14,587.50
9,757.80
25,732.50
4,441.50
18,500.00
710.00
375.00
135.00
1,410.00
9,450.00
1,800.00
7,923.60
14,587.50
9,757.80
25,732.50
4,441.50
16,650.00
0.00
0.00
0.00
0.00
0.00
200.00
0.00
0.00
0.00
0.00
0.00
1,850.00
710.00
375.00
135.00
1,410.00
9,450.00
2,000.00
7,923.60
14,587.50
9,757.80
25,732.50
4,441.50
18,500.00
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
M3
KG
81.00
1,300.00
24.88
0.47
2,015.28
611.00
81.00
1,300.00
2,015.28
611.00
0.00
0.00
0.00
0.00
81.00
1,300.00
2,015.28
611.00
100.00%
100.00%
0.00
0.00
0.00
0.00
M3
M2
KG
17.00
136.00
1,850.00
44.18
19.07
0.47
751.06
2,593.52
869.50
17.00
136.00
1,850.00
751.06
2,593.52
869.50
0.00
0.00
0.00
0.00
0.00
0.00
17.00
136.00
1,850.00
751.06
2,593.52
869.50
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
M3
M2
M2
55.00
650.00
7,850.00
99.10
26.04
0.47
5,450.50
16,926.00
3,689.50
55.00
612.93
7,850.00
5,450.50
15,960.70
3,689.50
0.00
37.07
0.00
0.00
965.30
0.00
55.00
650.00
7,850.00
5,450.50
16,926.00
3,689.50
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
M3
M2
Kg
8.00
111.00
325.00
97.21
22.49
0.47
777.68
2,496.39
152.75
5.55
102.00
325.00
539.52
2,293.98
152.75
2.45
9.00
0.00
238.16
202.41
0.00
8.00
111.00
325.00
777.68
2,496.39
152.75
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
M3
M2
KG
121.00
665.00
6,950.00
38.68
25.63
0.47
4,680.28
17,043.95
3,266.50
88.00
625.00
6,500.00
3,403.84
16,018.75
3,055.00
33.00
40.00
450.00
1,276.44
1,025.20
211.50
121.00
665.00
6,950.00
4,680.28
17,043.95
3,266.50
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
M3
M2
KG
UND
150.00
1,800.00
10,000.00
1,700.00
34.30
23.03
0.47
0.25
5,145.00
41,454.00
4,700.00
425.00
118.96
1,739.00
9,478.00
1,574.00
4,080.33
40,049.17
4,454.66
393.50
31.04
61.00
522.00
126.00
1,064.67
1,404.83
245.34
31.50
150.00
1,800.00
10,000.00
1,700.00
5,145.00
41,454.00
4,700.00
425.00
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
M3
M2
M2
16.00
95.00
1,200.00
76.45
20.13
0.47
1,223.20
1,912.35
564.00
8.00
95.00
850.00
611.60
1,912.35
399.50
8.00
0.00
350.00
611.60
0.00
164.50
16.00
95.00
1,200.00
1,223.20
1,912.35
564.00
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
M3
6.50
110.29
716.89
0.00
0.00
3.00
330.87
3.00
330.87
46.15%
3.50
386.02
VAL.08 OCT
Pgina 52
337772454.xls
SUPERVISION DE OBRA
11.00.00
11.01.00
11.02.00
12.00.00
12.01.00
12.02.00
12.03.00
12.04.00
12.05.00
12.06.00
12.07.00
12.08.00
12.09.00
12.10.00
12.11.00
13.00.00
13.01.00
14.00.00
14.01.00
14.06.00
25.00.00
25.01.00
26.00.00
26.01.00
31.00.00
32.02.00
32.03.00
ARQUITECTURA
MUROS Y TABIQUES DE ALBAILERIA
MURO DE LADRILLO KK 18 H CABEZA
MURO DE LADRILLO KK 18H SOGA
REVOQUES ENLUCIDOS Y MOLDURAS
TARRAJEO PRIMARIO RAYADO CON CEMENTO-CAL-ARENA
TARRAJEO MUROS INTERIORES
TARRAJEO MUROS EXTERIORES
TARRAJEO COLUMNAS
TARRAJEO DE VIGAS
TARRAJEO CON BARITINA
TARRAJEO IMPERMEABILIZADO
VESTIDURA DE DERRAMES E=0.25
VESTIDURA DE DERRAMES
UNION DE MUROS Y CIELOS RASOS
BRUAS EN INTERIORES
CIELORRASOS
ENLUCIDO DE CIELO RASO
PISOS Y PAVIMENTOS
CONTRAPISO E= 40 mm
PISO DE CEMENTO TEXTURIZADO EN RAMPAS
ESCALERAS
ESCALERA DE GATO
TAPA METALICA
TAPA METALICA P/CISTERNA
VARIOS LIMPIEZA Y JARDINERIA
LIMPIEZA PERMANENTE
LIMPIEZA FINAL
01.00.00
01.01.00
01.02.00
01.02.01
01.02.02
01.02.03
01.02.04
01.02.05
01.02.06
01.02.07
01.02.08
01.02.09
01.02.10
01.02.11
01.02.12
01.02.13
01.02.14
02.00.00
02.01.00
02.02.00
02.03.00
02.04.00
02.05.00
02.06.00
02.07.00
02.08.00
02.09.00
02.10.00
02.11.00
02.12.00
02.13.00
02.14.00
02.15.00
02.16.00
02.17.00
INST. ELECTRICAS
INSTALACIONES ELECTRICAS
CIRCUITOS DERIVADOS
CIRCUITOS DERIVADOS ALUMBRADO Y TOMA CORRIENTES
CENTRO DE LUZ
SALIDA PARA ARTEFAC. ALUMBRADO SPOT LIGHT
SALIDA PARA ALUMBRADO EN PARED
SALIDA CAJA PASE ALUMBRADO ( TECHO )
SALIDA PARA INTERRUPTOR C/FUS DE 2X20A PA/ALUMB Y TOMACORRIENTE
PTO. DE BAJADA DE INTERR. DE UN GOLPE
PUNTO DE BAJAD. DE INTERR. DE DOS GOLPES
PUNTO DE BAJADA DE INTERRUP. DE TRES GOLPES
BAJADA DE INTERR. DE CONMUT. DE 3 VIAS
PUNTO T/BIPOL.DOBLE TOMA TIERRA CAJA 10X55X50MM
SALIDA P/TOMACORR. UNIVERSAL DOBLE 10A,220V
SALIDA P/TOMACORR. BIPOLAR ININTERRUNPIDO
SALIDA P/TOMACORR./COMPUTADORA
SALIDA CAJA PASE ALUMBRADO PARED
CIRCUITOS DERIVADOS DE CARGAS ESPECIALES
SALIDA PARA ESTERILIZADORES S-3
SALIDA PARA ESTERILIZADOR S-54
SALIDA PARA EQUIPO DENTAL
SALIDA PARA CALENT./ELECTRI DE AGUA
SALIDA PARA COCINA ELECTRI/ DE 8 KW
SALIDA PARA UPS MONOFASICO DE 6 KVA
CALANDRIA
REFRIGERADORA INDUSTRIAL
SECADORA
LAVADORA
SOLDADORA
DESTILADOR DE AGUA DE 3 KW
SALIDA PARA CACI
CENTRAL DE PARLANTES
SALIDA PARA CONCENTRADOR DE REDES
SALIDA PARA CENTRAL DE TELEFONOS
SALIDA LLAMADA DE ENFERMERAS
M2
KG
M2
51.00
500.00
2,000.00
24.39
0.47
36.75
1,243.89
235.00
73,500.00
0.00
0.00
1,750.00
0.00
0.00
64,312.50
30.00
500.00
0.00
731.70
235.00
0.00
30.00
500.00
1,750.00
731.70
235.00
64,312.50
58.82%
100.00%
87.50%
21.00
0.00
250.00
512.19
0.00
9,187.50
M2
M2
1,243.08
1,634.28
14.71
11.24
18,285.71
18,369.31
1,231.91
1,623.50
18,121.40
18,248.14
11.17
10.78
164.31
121.17
1,243.08
1,634.28
18,285.71
18,369.31
100.00%
100.00%
0.00
0.00
0.00
0.00
M2
M2
M2
M2
M2
M2
M2
M
M
M
M
1,279.90
2,983.43
1,603.25
6.00
50.00
62.35
49.20
423.90
515.84
906.30
325.73
9.19
8.74
7.79
9.18
11.77
77.55
7.41
7.00
4.41
4.01
3.16
11,762.28
26,075.18
12,489.32
55.08
588.50
4,835.24
364.57
2,967.30
2,274.85
3,634.26
1,029.31
465.00
1,605.00
770.00
4.35
28.00
0.00
0.00
200.50
205.00
350.00
160.00
4,273.35
14,027.70
5,998.30
39.93
329.56
0.00
0.00
1,403.50
904.05
1,403.50
505.60
600.00
510.00
400.00
1.00
10.50
0.00
0.00
130.00
160.00
50.00
110.00
5,514.00
4,457.40
3,116.00
9.18
123.59
0.00
0.00
910.00
705.60
200.50
347.60
1,065.00
2,115.00
1,170.00
5.35
38.50
0.00
0.00
330.50
365.00
400.00
270.00
9,787.35
18,485.10
9,114.30
49.11
453.15
0.00
0.00
2,313.50
1,609.65
1,604.00
853.20
83.21%
70.89%
72.98%
89.17%
77.00%
0.00%
0.00%
77.97%
70.76%
44.14%
82.89%
214.90
868.43
433.25
0.65
11.50
62.35
49.20
93.40
150.84
506.30
55.73
1,974.93
7,590.08
3,375.02
5.97
135.36
4,835.24
364.57
653.80
665.20
2,030.26
176.11
M2
1,370.57
13.21
18,105.23
804.00
10,620.84
220.00
2,906.20
1,024.00
13,527.04
74.71%
346.57
4,578.19
M2
M2
1,224.99
44.76
7.07
17.09
8,660.68
764.95
203.00
0.00
1,435.21
0.00
200.00
0.00
1,414.00
0.00
403.00
0.00
2,849.21
0.00
32.90%
0.00%
821.99
44.76
5,811.47
764.95
4.35
80.02
348.09
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
4.35
348.09
UND
1.00
182.89
182.89
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
182.89
GLB
GLB
1.00
1.00
1,535.73
500.00
1,535.73
500.00
0.70
0.00
1,075.01
0.00
0.30
0.00
460.72
0.00
1.00
0.00
1,535.73
0.00
100.00%
0.00%
0.00
1.00
0.00
500.00
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
173.00
99.00
18.00
4.00
7.00
62.00
38.00
2.00
18.00
135.00
11.00
9.00
7.00
11.00
24.16
16.36
35.53
31.71
19.58
28.69
29.44
33.54
36.77
35.80
35.79
42.74
18.34
35.49
4,179.68
1,619.64
639.54
126.84
137.06
1,778.78
1,118.72
67.08
661.86
4,833.00
393.69
384.66
128.38
390.39
159.00
58.00
16.00
3.00
5.00
38.00
25.00
0.00
0.00
0.00
0.00
0.00
3.00
0.00
3,841.44
948.88
568.48
95.13
97.90
1,090.22
736.00
0.00
0.00
0.00
0.00
0.00
55.02
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
159.00
58.00
16.00
3.00
5.00
38.00
25.00
0.00
0.00
0.00
0.00
0.00
3.00
0.00
3,841.44
948.88
568.48
95.13
97.90
1,090.22
736.00
0.00
0.00
0.00
0.00
0.00
55.02
0.00
91.91%
58.59%
88.89%
75.00%
71.43%
61.29%
65.79%
0.00%
0.00%
0.00%
0.00%
0.00%
42.86%
0.00%
14.00
41.00
2.00
1.00
2.00
24.00
13.00
2.00
18.00
135.00
11.00
9.00
4.00
11.00
338.24
670.76
71.06
31.71
39.16
688.56
382.72
67.08
661.86
4,833.00
393.69
384.66
73.36
390.39
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
4.00
1.00
1.00
8.00
1.00
1.00
1.00
1.00
1.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
75.48
55.18
611.89
59.94
63.77
82.00
244.36
47.16
51.36
50.43
93.38
63.74
46.15
75.05
77.24
100.93
67.12
301.92
55.18
611.89
479.52
63.77
82.00
244.36
47.16
51.36
100.86
93.38
63.74
46.15
75.05
77.24
100.93
67.12
4.00
1.00
1.00
6.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
1.00
1.00
0.00
301.92
55.18
611.89
359.64
0.00
82.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
75.05
77.24
100.93
0.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
59.94
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.00
1.00
1.00
7.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
1.00
1.00
0.00
301.92
55.18
611.89
419.58
0.00
82.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
75.05
77.24
100.93
0.00
100.00%
100.00%
100.00%
87.50%
0.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
100.00%
100.00%
0.00%
0.00
0.00
0.00
1.00
1.00
0.00
1.00
1.00
1.00
2.00
1.00
1.00
1.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00
59.94
63.77
0.00
244.36
47.16
51.36
100.86
93.38
63.74
46.15
0.00
0.00
0.00
67.12
VAL.08 OCT
Pgina 53
337772454.xls
SUPERVISION DE OBRA
02.18.00
02.19.00
02.20.00
02.21.00
03.00.00
03.01.00
03.01.01
03.01.02
03.01.03
03.01.04
03.01.05
03.01.06
03.01.07
04.00.00
04.01.00
04.02.00
04.03.00
04.03.04
05.00.00
05.01.00
05.02.00
05.03.00
05.04.00
05.05.00
05.06.00
05.07.00
05.08.00
06.00.00
06.01.00
06.02.00
07.00.00
07.01.00
08.00.00
08.01.00
08.02.00
08.03.00
08.04.00
08.05.00
08.06.00
08.07.00
08.08.00
08.09.00
08.10.00
08.11.00
08.12.00
08.13.00
08.14.00
08.15.00
09.00.00
09.01.00
09.01.01
09.01.02
09.01.03
09.01.04
09.01.05
09.01.06
09.01.07
09.01.08
09.01.09
09.01.10
09.01.11
09.01.12
12.00.00
12.01.00
12.02.00
12.03.00
12.04.00
12.05.00
12.06.00
12.07.00
ELECTROBONBAS DE AGUA
CONTROL DE NIVEL D CISTER. Y TANQUE ELEVADO
RAYOS X
SALIDA PARA TIMBRE
COMUNICACIONES Y SEALES
SISTEMAS DE TELEFONOS
ACOMETIDA TELEFONICA AEREA
SALIDA PARA CAJA TELEFONICA TIPO "C"
SALIDA PARA TELEFONO EXTERNO INTERNO
SALIDA PARA PARLANTE
SALIDA CAJA DE PASE
SALIDA PARA CAJA DE PASE DE 150X150X100mm
SALIDA PARA CAJA DE PASE DE 200X200X100mm
SISTEMA DE ALARMA CONTRA INCENDIO
SALIDA PARA CAJA DE PASE DE 150X150X100mm
SALIDA PARA CAJA DE PASE CUADRADA DE 200X200X10mm
SALIDA PARA ALARMA MANUAL Y SIRENA
SALIDA PARA DETECTOR DE HUMO
SISTEMA DE LLAMADAS E ENFERMERAS
CAJA DE PASE DE 250X250X100mm
CAJA DE PASE DE 200X200X100mm
ESTACION DE LLAMADA SIMPLE
ESTACION DE LLAMADA DE UN TIRO
SALIDA PARA CAJA CUADRADA DE 200X200X100mm
LUZ DE CORREDOR DE DOS BOMBILLAS
ESTACION DE LLAMADA DE UNA DIRECCION
SALIDA PARA CANCELACION DE LLAMADA
SISTEMA DE TELECABLE
SALIDA CAJA DE PASE
SALIDA PARA TELECABLE
TIMBRE
SALIDA PARA PULSADOR DE TIMBRE
ALIMENTADORES
ALIMENTADOR DEL TABLERO GNERAL (3-1X185+1X35/T)mm2 NYY
ALIMENTADOR DEL TABLERO TRANSFEREN. MANUAL (3-1X185+1X35/T)mm2 NYY-90mm
ALIMENTADOR DEL TABLERO TD-A 3-1X25 mm2THW+1X10mm2TW-40mm DE DIAM
ALIMENTADOR DEL TABLERO T-SG 3-1X50mm2THW+1X25mm2TW/T-50mm DIAM PVC
ALIMENTADOR DEL TAB. TD-DP 3-1X10MM2THW+1X6MM2TW/T50MMPVC
ALIMENTADOR DEL TABL T-CQI 3-1X25mm2 THW+1X10mm2 TW/T-40mm DIAM.
ALIMENTADOR DEL TABL. TD-CE 3-1X25mm2 THW+1X10mm2 TW/T-40mm DIAM.
ALIMENTADOR DEL TABL. TD-R 3-1X10mm2 THW+1X6mm2 TW/T-25mm DIAM PVC
ALIMENTADOR DEL TABLERO TD-T (2-1X4+1X4/T)mm2 TW-20mm DIAM. PVC
ALIMENTADOR DEL TABLERO T.CI (2-1X4+1X4/T)mm2 TW-20mm DIAM. PVC-P
ALIMENTADOR FUTURO TABLERO TD-E
ACOMETIDA DESDE GRUPO ELECTROGENO FUTURO
ACOMETIDA TELEFONICA
POZO DE TIERRA NUEVO
ACOMETIDA AL POZO DE TIERRA CABLE DESN. 16mm2
ALUMBRADO EXTERIOR
TABLEROS ELECTRICOS
TABLERO GENERAL TG
TABLERO DE TRANSFERENCIA MANUAL TRIFASICO DE 2 ITM 300A REG- Y DE 150A
TABLERO T-CQI
TABLERO T-SG
TABLERO TD-A
TABLERO TD-R
TABLERO TD-DP
TABLERO TD-CE
TABLERO TD-T
TABLERO T-CI
TABLERO TD-3
TABLERO ELECTRONICO TES
SISTEMA DE PARARRAYOS
MASTIL DE FG DE 5.00m DE LONGITUD
ACCESORIOS PARA INSTALACION DE PARARRAYOS
CABLE DE COBRE DESNUDO PARA TIERRA
PARARRAYOS LONIFLASH
TUBO DE PROTECCION DE BAJADA DE CABLE DESNUDO
POZO DE TIERRA NUEVO
EMPALME DERIVACION DE 50mm2-50mm2
CJT
CJT
CJT
CJT
1.00
1.00
1.00
1.00
219.22
97.11
913.50
29.14
219.22
97.11
913.50
29.14
0.00
0.00
0.00
1.00
0.00
0.00
0.00
29.14
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00
29.14
0.00%
0.00%
0.00%
100.00%
1.00
1.00
1.00
0.00
219.22
97.11
913.50
0.00
PTO
PTO
PTO
PTO
PTO
PTO
PTO
1.00
3.00
22.00
7.00
5.00
3.00
1.00
48.30
294.21
71.93
65.87
52.76
85.72
48.10
48.30
882.63
1,582.46
461.09
263.80
257.16
48.10
0.00
0.00
0.00
6.00
3.00
0.00
0.00
0.00
0.00
0.00
395.22
158.28
0.00
0.00
0.00
0.00
0.00
1.00
2.00
0.00
0.00
0.00
0.00
0.00
65.87
105.52
0.00
0.00
0.00
0.00
0.00
7.00
5.00
0.00
0.00
0.00
0.00
0.00
461.09
263.80
0.00
0.00
0.00%
0.00%
0.00%
100.00%
100.00%
0.00%
0.00%
1.00
3.00
22.00
0.00
0.00
3.00
1.00
48.30
882.63
1,582.46
0.00
0.00
257.16
48.10
PTO
PTO
PTO
PTO
7.00
3.00
6.00
73.00
85.72
48.10
78.48
48.77
600.04
144.30
470.88
3,560.21
1.00
0.00
0.00
44.00
85.72
0.00
0.00
2,145.88
4.00
0.00
0.00
20.00
342.88
0.00
0.00
975.40
5.00
0.00
0.00
64.00
428.60
0.00
0.00
3,121.28
71.43%
0.00%
0.00%
87.67%
2.00
3.00
6.00
9.00
171.44
144.30
470.88
438.93
PTO
PTO
PTO
PTO
pto
PTO
PTO
PTO
1.00
11.00
10.00
5.00
4.00
5.00
1.00
4.00
54.23
69.26
36.46
44.07
124.10
32.03
36.47
33.00
54.23
761.86
364.60
220.35
496.40
160.15
36.47
132.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
1.00
11.00
10.00
5.00
4.00
5.00
1.00
4.00
54.23
761.86
364.60
220.35
496.40
160.15
36.47
132.00
PTO
PTO
1.00
2.00
52.76
47.36
52.76
94.72
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
1.00
2.00
52.76
94.72
CJT
1.00
39.83
39.83
1.00
39.83
0.00
0.00
1.00
39.83
100.00%
0.00
0.00
M
M
M
M
M
M
M
M
M
M
M
M
CJT
UND
M
2.00
47.00
28.00
25.00
25.00
1.00
31.00
10.00
21.00
31.00
23.00
32.00
4.00
4.00
3.00
2.64
35.32
14.07
12.38
8.23
9.70
9.70
9.22
5.50
7.68
5.91
74.58
70.31
143.77
7.14
5.28
1,660.04
393.96
309.50
205.75
9.70
300.70
92.20
115.50
238.08
135.93
2,386.56
281.24
575.08
21.42
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
2.00
47.00
28.00
25.00
25.00
1.00
31.00
10.00
21.00
31.00
23.00
32.00
4.00
4.00
3.00
5.28
1,660.04
393.96
309.50
205.75
9.70
300.70
92.20
115.50
238.08
135.93
2,386.56
281.24
575.08
21.42
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
und
und
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
1.00
46.20
46.20
458.56
458.56
383.20
338.20
383.20
416.96
124.40
46.20
417.81
181.78
46.20
46.20
458.56
458.56
383.20
338.20
383.20
416.96
124.40
46.20
835.62
181.78
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
1.00
46.20
46.20
458.56
458.56
383.20
338.20
383.20
416.96
124.40
46.20
835.62
181.78
UND
CJT
M
UND
UND
UND
UND
1.00
1.00
21.00
1.00
1.00
3.00
1.00
183.36
551.96
10.63
198.47
110.10
143.77
14.24
183.36
551.96
223.23
198.47
110.10
431.31
14.24
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
1.00
1.00
21.00
1.00
1.00
3.00
1.00
183.36
551.96
223.23
198.47
110.10
431.31
14.24
VAL.08 OCT
Pgina 54
337772454.xls
SUPERVISION DE OBRA
12.08.00
13.00.00
13.01.00
14.00.00
14.01.00
01.00.00
01.01.00
01.02.00
01.03.00
02.00.00
02.01.00
02.02.00
03.00.00
03.01.00
04.00.00
04.01.00
04.02.00
05.00.00
05.01.00
06.00.00
06.01.00
06.02.00
07.00.00
07.01.00
08.00.00
08.01.00
08.02.00
09.00.00
09.01.00
09.01.01
10.00.00
10.01.00
11.00.00
11.01.00
11.02.00
11.03.00
11.04.00
11.05.00
12.00.00
12.01.00
13.00.00
13.01.00
13.02.00
13.03.00
13.04.00
13.05.00
14.00.00
14.01.00
14.01.01
15.00.00
15.01.00
15.02.00
16.00.00
16.02.00
22.00.00
27.00.00
27.01.00
29.00.00
29.01.00
29.02.00
29.03.00
30.00.00
30.01.00
31.00.00
31.01.00
32.00.00
INST. SANITARIAS
DESAGUE Y VENTILACION
SALIDA DE DESAGUE PVC-SAL 2"
SALIDA DE DESAGUE PVC-SAL 4"
SALIDA PARA VENTILACION 2" PVC-SAL
REDES DE DERIVACION
SUMINISTRO E INST. TUBERIA PVC -SAL 2"
SUMINISTRO E INST. TUBERIA PVC-SAL 4"
TUBERIA PVC - SAL EMPOTRADA EN MUROS
SUMINISTRO E INST. TUBERIA PVC -SAL 2"
REGISTRO ROSCADO DE BRONCE
REGISTRO DE BRONCE 2"
SUMIDERO DE BRONCE 2"
SOMBREROS DE VENTILACION
SOMBRERO VENTILACION PVC DE 2"
REDES EXTERIORES DE DESAGUE
TRAZO NIVELES Y REPLANTEO REDES DE AGUA DESAG.
EXCAVACION T/N DESAGUE 4-6" HASTA 1.00
SUMISTRO E INSTALACION TUBERIA PVC - SAL PESADA
SUMINISTRO E INSTA. TUBERIA PVC-SAL 6"
CAMARAS DE INSPECCION
CAJA DE REGISTRO 12"X24 C/TAPA CONCRETO
CAJA DE REGISTRO 24" X 24" C/TAPA CONCRETO
SISTEMA DE AGUA FRIA
SALIDA DE AGUA FRIA
SALIDA DE AGUA FRIA PVC O 1/2"
REDES INTERIORES DE AGUA
TRAZO NIVELES Y REPLANTEO REDES DE AGUA DESAG.
TUBERIA PVC - SAP ENTERRADA EN PISO
SUMINISTRO E INST. TUBO PVC-SAP-C10 1/2"
SUMINISTRO E INST. TUB. PVC-SAP-C10 3/4"
SUMINISTRO E INSTA. TUB. PVC-SAP-C10 1"
SUMINISTRO E INST. TUB. PVC-SAP-C10 1 1/2"
SUMINISTRO E INST. DE TUB. PVC-SAP-C10 2"
TUBERIA PVC - SAL EMPOTRADA EN MUROS
SUMINISTRO E INST. TUBO PVC-SAP-C10 1/2"
LLAVES Y VALVULAS
VALVULA COMPUERTA BRONCE 1/2"
VALVULA DE COMPUERTA DE BRONCE 3/4"
VALVULA COMPUERTA BRONCE 1"
VALVULA DE COMPUERTA DE BRONCE 2"
VALVULA DE COMPUERTA DE BRONCE 1 1/2"
SISTEMA DE AGUA CALIENTE
SALIDA DE AGUA CALIENTE
SALIDA DE AGUA CALIENTE CPVC 1/2"
TUBERIA CPVC - ENTERRADA EN PISO
TUBERIA AGUA CALIENTE CPVC 1/2"
TUBERIA AGUA CALIENTE CPVC 3/4"
LLAVES Y VALVULAS
VALVULA DE COMPUERTA DE BRONCE 3/4"
APARATOS SANITARIOS Y ACCESORIOS
EQUIPOS Y SISTEMAS
EQUIPO DE BOMBEO, ELECTROBOMBA 2 HP
INSTALACIONES HIDRAULICAS
MONTAJE DE ACCESORIOS EN CISTERNA
MONTAJE DE ACCESORIOS TANQUE ELEVADO
PRUEBA HIDRAULICA DE RESERVORIO
ACCESORIOS SANITARIOS/AGUA FRIA
SUMINISTRO E INSTALACION DE ACCES. P/AGUA FRIA
ACCESORIOS SANITARIOS/AGUA CALIENTE
SUMINISTRO E INSTALACION DE ACCES. P/AGUA CALIENTE
ACCESORIOS SANITARIOS/DESAGUE
12.00
3.56
42.72
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
12.00
42.72
GLB
1.00
85.10
85.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
85.10
pto
7.00
77.56
542.92
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
7.00
542.92
PTO
PTO
PTO
70.00
24.00
18.00
21.77
101.64
45.48
1,523.90
2,439.36
818.64
65.00
21.00
17.00
1,415.05
2,134.44
773.16
0.00
0.00
0.00
0.00
0.00
0.00
65.00
21.00
17.00
1,415.05
2,134.44
773.16
92.86%
87.50%
94.44%
5.00
3.00
1.00
108.85
304.92
45.48
M
M
258.00
103.00
8.14
22.26
2,100.12
2,292.78
240.00
100.00
1,953.60
2,226.00
0.00
0.00
0.00
0.00
240.00
100.00
1,953.60
2,226.00
93.02%
97.09%
18.00
3.00
146.52
66.78
54.00
8.14
439.56
48.00
390.72
0.00
0.00
48.00
390.72
88.89%
6.00
48.84
UND
UND
38.00
10.00
11.25
17.26
427.50
172.60
27.00
9.00
303.75
155.34
0.00
0.00
0.00
0.00
27.00
9.00
303.75
155.34
71.05%
90.00%
11.00
1.00
123.75
17.26
PZA
18.00
15.03
270.54
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
18.00
270.54
M
M
273.00
273.00
0.83
12.47
226.59
3,404.31
273.00
273.00
226.59
3,404.31
0.00
0.00
0.00
0.00
273.00
273.00
226.59
3,404.31
100.00%
100.00%
0.00
0.00
0.00
0.00
273.00
35.70
9,746.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
273.00
9,746.10
UND
UND
54.00
2.00
71.72
98.14
3,872.88
196.28
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
54.00
2.00
3,872.88
196.28
PTO
97.00
28.52
2,766.44
82.00
2,338.64
82.00
2,338.64
84.54%
15.00
427.80
596.00
0.83
494.68
596.00
494.68
0.00
0.00
0.00
0.00
0.00
596.00
494.68
100.00%
0.00
0.00
M
M
M
M
M
355.00
37.00
92.00
12.00
100.00
6.54
7.03
8.05
11.05
14.26
2,321.70
260.11
740.60
132.60
1,426.00
285.00
34.00
0.00
0.00
0.00
1,863.90
239.02
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
285.00
34.00
0.00
0.00
0.00
1,863.90
239.02
0.00
0.00
0.00
80.28%
91.89%
0.00%
0.00%
0.00%
70.00
3.00
92.00
12.00
100.00
457.80
21.09
740.60
132.60
1,426.00
53.00
6.54
346.62
50.00
327.00
0.00
0.00
50.00
327.00
94.34%
3.00
19.62
PZA
PZA
PZA
PZA
PZA
60.00
1.00
2.00
1.00
2.00
34.12
44.55
71.59
94.92
88.52
2,047.20
44.55
143.18
94.92
177.04
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
60.00
1.00
2.00
1.00
2.00
2,047.20
44.55
143.18
94.92
177.04
PZA
21.00
54.45
1,143.45
20.00
1,089.00
0.00
0.00
20.00
1,089.00
95.24%
1.00
54.45
M
M
15.00
60.00
18.44
23.94
276.60
1,436.40
13.00
51.00
239.72
1,220.94
0.00
0.00
0.00
0.00
13.00
51.00
239.72
1,220.94
86.67%
85.00%
2.00
9.00
36.88
215.46
PZA
8.00
44.55
356.40
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
8.00
356.40
UND
1.00
493.54
493.54
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
493.54
UND
UND
GLB
1.00
1.00
1.00
251.56
389.00
85.07
251.56
389.00
85.07
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
1.00
1.00
1.00
251.56
389.00
85.07
GLB
1.00
275.69
275.69
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
275.69
GLB
1.00
190.50
190.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
190.50
VAL.08 OCT
Pgina 55
337772454.xls
SUPERVISION DE OBRA
32.01.00
33.00.00
33.01.00
34.00.00
34.01.00
1.00
627.90
627.90
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
627.90
UND
1.00
350.06
350.06
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
350.06
UND
1.00
18.25
18.25
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
1.00
18.25
S/.
S/.
S/.
S/.
S/.
S/.
511,508.95
40,920.72
35,805.63
588,235.29
111,764.71
700,000.00
1.00000
700,000.00
413,057.02
33,044.56
28,913.99
475,015.57
90,252.96
565,268.53
1.00000
565,268.53
80.75%
8%
7%
19%
GLB
380,468.12
30,437.45
26,632.77
437,538.33
83,132.28
520,670.62
1.00000
520,670.62
74.38%
32,588.90
2,607.11
2,281.22
37,477.24
7,120.67
44,597.91
1.00000
44,597.91
6.37%
6.37%
80.75%
98,451.93
7,876.15
6,891.64
113,219.72
21,511.75
134,731.47
1.00000
134,731.47
80.75%
VAL.08 OCT
Pgina 56
VALORIZACIN DE OBRA
VALORIZACIN N
PROPIETARIO
CONTRATISTA
PROVINCIA
DEPARTAMENTO
09
MUNICIPALIDAD PROVINCIAL DE OYON
OYON
LIMA
OBRA :
01.00.00
01.01.00
01.02.00
01.03.00
02.00.00
02.01.00
02.02.00
02.03.00
03.00.00
03.01.00
03.02.00
03.03.00
03.04.00
03.05.00
04.00.00
04.01.00
04.02.00
04.03.01
04.03.02
04.03.03
04.04.00
05.00.00
05.01.00
05.01.01
05.01.02
05.02.00
05.02.01
05.02.02
05.02.03
05.03.00
05.03.01
05.03.02
05.03.03
05.04.00
05.04.01
05.04.02
05.04.03
05.05.00
05.05.01
05.05.02
05.05.03
05.06.00
05.06.01
05.06.02
05.06.03
05.06.04
05.07.00
05.07.01
05.07.02
05.07.03
05.08.00
05.08.01
05.08.02
05.08.03
ESTRUCTURAS
OBRAS PROVISIONALES
ALMACENES OFICINAS TALLERES Y GUARDIANIA
CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M
AGUA Y FUERZA ELECTRICA EN LA CONSTRUCCION
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRANSPORTE DE EQUIPOS Y HERAMIENTAS
NIVELACION ,TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACIN DE ZANJA P/CIMIENTOS Y / O ZAPATAS
EXCAVACION P/CISTERNA
NIVELACION INT.Y APISONADO FINAL DEL TERRENO PREVIO AL PISO
RELLENO CON MATERIAL PROPIO
ELIMINACION MATERIAL EXCEDENTE HASTA 30 MTS( A MANO USANDO CARRETI
S/.
S/.
700,000.00
700,000.00
UNICA
20 DE DICIEMBRE DEL 2006
CONSTRUCCION CENTRO DE SALUD TIPO II DE OYON CON ATENCION MATERNO INFANTIL CON APOYO SOCIEDAD CIVIL
Partidas
ITEM
VALOR REFERENCIAL
MONTO CONTRATADO
FORMULA
FECHA
Und.
Metrado
Costo
Unitario
(S/.)
Costo
Parcial
(S/.)
Avance Anterior
Monto de
Metrado
Valorizacin
Total
M2
UND
GLB
40.00
1.00
1.00
31.50
842.52
500.00
1,260.00
842.52
500.00
40.00
1.00
1.00
M2
GLB
M2
500.00
1.00
2,000.00
0.24
600.00
0.32
120.00
600.00
640.00
M3
M3
M2
M3
m3
820.00
35.00
1,400.00
215.00
610.00
1.87
1.87
5.97
7.29
1.87
M2
M3
M3
M2
KG
M2
710.00
375.00
135.00
1,410.00
9,450.00
2,000.00
M3
KG
Avance Actual
Monto de
Metrado
Valorizacin
Total
Avance Acumulado
Monto de
Metrado
Valorizacin
Total
Saldo a Ejecutar
Monto de
Metrado
Valorizacin
Total
1,260.00
842.52
500.00
0.00
0.00
0.00
0.00
0.00
0.00
40.00
1.00
1.00
1,260.00
842.52
500.00
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
500.00
1.00
2,000.00
120.00
600.00
640.00
0.00
0.00
0.00
0.00
0.00
0.00
500.00
1.00
2,000.00
120.00
600.00
640.00
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
1,533.40
65.45
8,358.00
1,567.35
1,140.70
820.00
35.00
1,400.00
215.00
610.00
1,533.40
65.45
8,358.00
1,567.35
1,140.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
820.00
35.00
1,400.00
215.00
610.00
1,533.40
65.45
8,358.00
1,567.35
1,140.70
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11.16
38.90
72.28
18.25
0.47
9.25
7,923.60
14,587.50
9,757.80
25,732.50
4,441.50
18,500.00
710.00
375.00
135.00
1,410.00
9,450.00
2,000.00
7,923.60
14,587.50
9,757.80
25,732.50
4,441.50
18,500.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
710.00
375.00
135.00
1,410.00
9,450.00
2,000.00
7,923.60
14,587.50
9,757.80
25,732.50
4,441.50
18,500.00
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
81.00
1,300.00
24.88
0.47
2,015.28
611.00
81.00
1,300.00
2,015.28
611.00
0.00
0.00
0.00
0.00
81.00
1,300.00
2,015.28
611.00
100.00%
100.00%
0.00
0.00
0.00
0.00
M3
M2
KG
17.00
136.00
1,850.00
44.18
19.07
0.47
751.06
2,593.52
869.50
17.00
136.00
1,850.00
751.06
2,593.52
869.50
0.00
0.00
0.00
0.00
0.00
0.00
17.00
136.00
1,850.00
751.06
2,593.52
869.50
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
M3
M2
M2
55.00
650.00
7,850.00
99.10
26.04
0.47
5,450.50
16,926.00
3,689.50
55.00
650.00
7,850.00
5,450.50
16,926.00
3,689.50
0.00
0.00
0.00
0.00
0.00
0.00
55.00
650.00
7,850.00
5,450.50
16,926.00
3,689.50
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
M3
M2
Kg
8.00
111.00
325.00
97.21
22.49
0.47
777.68
2,496.39
152.75
8.00
111.00
325.00
777.68
2,496.39
152.75
0.00
0.00
0.00
0.00
0.00
0.00
8.00
111.00
325.00
777.68
2,496.39
152.75
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
M3
M2
KG
121.00
665.00
6,950.00
38.68
25.63
0.47
4,680.28
17,043.95
3,266.50
121.00
665.00
6,950.00
4,680.28
17,043.95
3,266.50
0.00
0.00
0.00
0.00
0.00
0.00
121.00
665.00
6,950.00
4,680.28
17,043.95
3,266.50
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
M3
M2
KG
UND
150.00
1,800.00
10,000.00
1,700.00
34.30
23.03
0.47
0.25
5,145.00
41,454.00
4,700.00
425.00
150.00
1,800.00
10,000.00
1,700.00
5,145.00
41,454.00
4,700.00
425.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
150.00
1,800.00
10,000.00
1,700.00
5,145.00
41,454.00
4,700.00
425.00
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
M3
M2
M2
16.00
95.00
1,200.00
76.45
20.13
0.47
1,223.20
1,912.35
564.00
16.00
95.00
1,200.00
1,223.20
1,912.35
564.00
0.00
0.00
0.00
0.00
0.00
0.00
16.00
95.00
1,200.00
1,223.20
1,912.35
564.00
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
M3
M2
KG
6.50
51.00
500.00
110.29
24.39
0.47
716.89
1,243.89
235.00
3.00
30.00
500.00
330.87
731.70
235.00
3.50
21.00
0.00
386.02
512.19
0.00
6.50
51.00
500.00
716.89
1,243.89
235.00
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
VAL.09 DIC
Pgina 57
06.00.00
ESTRUCTURA DE MADERA
11.00.00
11.01.00
11.02.00
12.00.00
12.01.00
12.02.00
12.03.00
12.04.00
12.05.00
12.06.00
12.07.00
12.08.00
12.09.00
12.10.00
12.11.00
13.00.00
13.01.00
14.00.00
14.01.00
14.06.00
25.00.00
25.01.00
26.00.00
26.01.00
31.00.00
32.02.00
32.03.00
ARQUITECTURA
MUROS Y TABIQUES DE ALBAILERIA
MURO DE LADRILLO KK 18 H CABEZA
MURO DE LADRILLO KK 18H SOGA
REVOQUES ENLUCIDOS Y MOLDURAS
TARRAJEO PRIMARIO RAYADO CON CEMENTO-CAL-ARENA
TARRAJEO MUROS INTERIORES
TARRAJEO MUROS EXTERIORES
TARRAJEO COLUMNAS
TARRAJEO DE VIGAS
TARRAJEO CON BARITINA
TARRAJEO IMPERMEABILIZADO
VESTIDURA DE DERRAMES E=0.25
VESTIDURA DE DERRAMES
UNION DE MUROS Y CIELOS RASOS
BRUAS EN INTERIORES
CIELORRASOS
ENLUCIDO DE CIELO RASO
PISOS Y PAVIMENTOS
CONTRAPISO E= 40 mm
PISO DE CEMENTO TEXTURIZADO EN RAMPAS
ESCALERAS
ESCALERA DE GATO
TAPA METALICA
TAPA METALICA P/CISTERNA
VARIOS LIMPIEZA Y JARDINERIA
LIMPIEZA PERMANENTE
LIMPIEZA FINAL
01.00.00
01.01.00
01.02.00
01.02.01
01.02.02
01.02.03
01.02.04
01.02.05
01.02.06
01.02.07
01.02.08
01.02.09
01.02.10
01.02.11
01.02.12
01.02.13
01.02.14
02.00.00
02.01.00
02.02.00
02.03.00
02.04.00
02.05.00
02.06.00
02.07.00
02.08.00
02.09.00
02.10.00
02.11.00
02.12.00
02.13.00
02.14.00
02.15.00
02.16.00
02.17.00
02.18.00
02.19.00
02.20.00
02.21.00
INST. ELECTRICAS
INSTALACIONES ELECTRICAS
CIRCUITOS DERIVADOS
CIRCUITOS DERIVADOS ALUMBRADO Y TOMA CORRIENTES
CENTRO DE LUZ
SALIDA PARA ARTEFAC. ALUMBRADO SPOT LIGHT
SALIDA PARA ALUMBRADO EN PARED
SALIDA CAJA PASE ALUMBRADO ( TECHO )
SALIDA PARA INTERRUPTOR C/FUS DE 2X20A PA/ALUMB Y TOMACORRI
PTO. DE BAJADA DE INTERR. DE UN GOLPE
PUNTO DE BAJAD. DE INTERR. DE DOS GOLPES
PUNTO DE BAJADA DE INTERRUP. DE TRES GOLPES
BAJADA DE INTERR. DE CONMUT. DE 3 VIAS
PUNTO T/BIPOL.DOBLE TOMA TIERRA CAJA 10X55X50MM
SALIDA P/TOMACORR. UNIVERSAL DOBLE 10A,220V
SALIDA P/TOMACORR. BIPOLAR ININTERRUNPIDO
SALIDA P/TOMACORR./COMPUTADORA
SALIDA CAJA PASE ALUMBRADO PARED
CIRCUITOS DERIVADOS DE CARGAS ESPECIALES
SALIDA PARA ESTERILIZADORES S-3
SALIDA PARA ESTERILIZADOR S-54
SALIDA PARA EQUIPO DENTAL
SALIDA PARA CALENT./ELECTRI DE AGUA
SALIDA PARA COCINA ELECTRI/ DE 8 KW
SALIDA PARA UPS MONOFASICO DE 6 KVA
CALANDRIA
REFRIGERADORA INDUSTRIAL
SECADORA
LAVADORA
SOLDADORA
DESTILADOR DE AGUA DE 3 KW
SALIDA PARA CACI
CENTRAL DE PARLANTES
SALIDA PARA CONCENTRADOR DE REDES
SALIDA PARA CENTRAL DE TELEFONOS
SALIDA LLAMADA DE ENFERMERAS
ELECTROBONBAS DE AGUA
CONTROL DE NIVEL D CISTER. Y TANQUE ELEVADO
RAYOS X
SALIDA PARA TIMBRE
M2
2,000.00
36.75
73,500.00
1,750.00
64,312.50
250.00
9,187.50
2,000.00
73,500.00
100.00%
0.00
0.00
M2
M2
1,243.08
1,634.28
14.71
11.24
18,285.71
18,369.31
1,243.08
1,634.28
18,285.71
18,369.31
0.00
0.00
0.00
0.00
1,243.08
1,634.28
18,285.71
18,369.31
100.00%
100.00%
0.00
0.00
0.00
0.00
M2
M2
M2
M2
M2
M2
M2
M
M
M
M
1,279.90
2,983.43
1,603.25
6.00
50.00
62.35
49.20
423.90
515.84
906.30
325.73
9.19
8.74
7.79
9.18
11.77
77.55
7.41
7.00
4.41
4.01
3.16
11,762.28
26,075.18
12,489.32
55.08
588.50
4,835.24
364.57
2,967.30
2,274.85
3,634.26
1,029.31
1,065.00
2,455.45
1,170.00
5.35
38.50
0.00
0.00
330.50
365.00
400.00
270.00
9,787.35
21,460.59
9,114.30
49.11
453.15
0.00
0.00
2,313.50
1,609.65
1,604.00
853.20
214.90
527.99
433.25
0.65
11.50
62.35
49.20
93.40
150.84
506.30
55.73
1,974.93
4,614.59
3,375.02
5.97
135.36
4,835.24
364.57
653.80
665.20
2,030.26
176.11
1,279.90
2,983.43
1,603.25
6.00
50.00
62.35
49.20
423.90
515.84
906.30
325.73
11,762.28
26,075.18
12,489.32
55.08
588.50
4,835.24
364.57
2,967.30
2,274.85
3,634.26
1,029.31
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
M2
1,370.57
13.21
18,105.23
1,024.00
13,527.04
346.57
4,578.19
1,370.57
18,105.23
100.00%
0.00
0.00
M2
M2
1,224.99
44.76
7.07
17.09
8,660.68
764.95
403.00
0.00
2,849.21
0.00
821.99
44.76
5,811.47
764.95
1,224.99
44.76
8,660.68
764.95
100.00%
100.00%
0.00
0.00
0.00
0.00
4.35
80.02
348.09
0.00
0.00
4.35
348.09
4.35
348.09
100.00%
0.00
0.00
UND
1.00
182.89
182.89
0.00
0.00
1.00
182.89
1.00
182.89
100.00%
0.00
0.00
GLB
GLB
1.00
1.00
1,535.73
500.00
1,535.73
500.00
1.00
0.00
1,535.73
0.00
0.00
1.00
0.00
500.00
1.00
1.00
1,535.73
500.00
100.00%
100.00%
0.00
0.00
0.00
0.00
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
173.00
99.00
18.00
4.00
7.00
62.00
38.00
2.00
18.00
135.00
11.00
9.00
7.00
11.00
24.16
16.36
35.53
31.71
19.58
28.69
29.44
33.54
36.77
35.80
35.79
42.74
18.34
35.49
4,179.68
1,619.64
639.54
126.84
137.06
1,778.78
1,118.72
67.08
661.86
4,833.00
393.69
384.66
128.38
390.39
159.00
58.00
16.00
3.00
5.00
38.00
25.00
0.00
0.00
0.00
0.00
0.00
3.00
0.00
3,841.44
948.88
568.48
95.13
97.90
1,090.22
736.00
0.00
0.00
0.00
0.00
0.00
55.02
0.00
14.00
41.00
2.00
1.00
2.00
24.00
13.00
2.00
18.00
135.00
11.00
9.00
4.00
11.00
338.24
670.76
71.06
31.71
39.16
688.56
382.72
67.08
661.86
4,833.00
393.69
384.66
73.36
390.39
173.00
99.00
18.00
4.00
7.00
62.00
38.00
2.00
18.00
135.00
11.00
9.00
7.00
11.00
4,179.68
1,619.64
639.54
126.84
137.06
1,778.78
1,118.72
67.08
661.86
4,833.00
393.69
384.66
128.38
390.39
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
CJT
CJT
CJT
CJT
4.00
1.00
1.00
8.00
1.00
1.00
1.00
1.00
1.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
75.48
55.18
611.89
59.94
63.77
82.00
244.36
47.16
51.36
50.43
93.38
63.74
46.15
75.05
77.24
100.93
67.12
219.22
97.11
913.50
29.14
301.92
55.18
611.89
479.52
63.77
82.00
244.36
47.16
51.36
100.86
93.38
63.74
46.15
75.05
77.24
100.93
67.12
219.22
97.11
913.50
29.14
4.00
1.00
1.00
7.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
1.00
1.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00
1.00
1.00
0.00
1.00
1.00
1.00
2.00
1.00
1.00
1.00
0.00
0.00
0.00
1.00
1.00
1.00
1.00
0.00
0.00
0.00
0.00
59.94
63.77
0.00
244.36
47.16
51.36
100.86
93.38
63.74
46.15
0.00
0.00
0.00
67.12
219.22
97.11
913.50
0.00
4.00
1.00
1.00
8.00
1.00
1.00
1.00
1.00
1.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
301.92
55.18
611.89
479.52
63.77
82.00
244.36
47.16
51.36
100.86
93.38
63.74
46.15
75.05
77.24
100.93
67.12
219.22
97.11
913.50
29.14
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
VAL.09 DIC
301.92
55.18
611.89
419.58
0.00
82.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
75.05
77.24
100.93
0.00
0.00
0.00
0.00
29.14
Pgina 58
03.00.00
03.01.00
03.01.01
03.01.02
03.01.03
03.01.04
03.01.05
03.01.06
03.01.07
04.00.00
04.01.00
04.02.00
04.03.00
04.03.04
05.00.00
05.01.00
05.02.00
05.03.00
05.04.00
05.05.00
05.06.00
05.07.00
05.08.00
06.00.00
06.01.00
06.02.00
07.00.00
07.01.00
08.00.00
08.01.00
08.02.00
08.03.00
08.04.00
08.05.00
08.06.00
08.07.00
08.08.00
08.09.00
08.10.00
08.11.00
08.12.00
08.13.00
08.14.00
08.15.00
09.00.00
09.01.00
09.01.01
09.01.02
09.01.03
09.01.04
09.01.05
09.01.06
09.01.07
09.01.08
09.01.09
09.01.10
09.01.11
09.01.12
12.00.00
12.01.00
12.02.00
12.03.00
12.04.00
12.05.00
12.06.00
12.07.00
12.08.00
13.00.00
13.01.00
14.00.00
14.01.00
COMUNICACIONES Y SEALES
SISTEMAS DE TELEFONOS
ACOMETIDA TELEFONICA AEREA
SALIDA PARA CAJA TELEFONICA TIPO "C"
SALIDA PARA TELEFONO EXTERNO INTERNO
SALIDA PARA PARLANTE
SALIDA CAJA DE PASE
SALIDA PARA CAJA DE PASE DE 150X150X100mm
SALIDA PARA CAJA DE PASE DE 200X200X100mm
SISTEMA DE ALARMA CONTRA INCENDIO
SALIDA PARA CAJA DE PASE DE 150X150X100mm
SALIDA PARA CAJA DE PASE CUADRADA DE 200X200X10mm
SALIDA PARA ALARMA MANUAL Y SIRENA
SALIDA PARA DETECTOR DE HUMO
SISTEMA DE LLAMADAS E ENFERMERAS
CAJA DE PASE DE 250X250X100mm
CAJA DE PASE DE 200X200X100mm
ESTACION DE LLAMADA SIMPLE
ESTACION DE LLAMADA DE UN TIRO
SALIDA PARA CAJA CUADRADA DE 200X200X100mm
LUZ DE CORREDOR DE DOS BOMBILLAS
ESTACION DE LLAMADA DE UNA DIRECCION
SALIDA PARA CANCELACION DE LLAMADA
SISTEMA DE TELECABLE
SALIDA CAJA DE PASE
SALIDA PARA TELECABLE
TIMBRE
SALIDA PARA PULSADOR DE TIMBRE
ALIMENTADORES
ALIMENTADOR DEL TABLERO GNERAL (3-1X185+1X35/T)mm2 NYY
ALIMENTADOR DEL TABLERO TRANSFEREN. MANUAL (3-1X185+1X35/T)
ALIMENTADOR DEL TABLERO TD-A 3-1X25 mm2THW+1X10mm2TW-40mm
ALIMENTADOR DEL TABLERO T-SG 3-1X50mm2THW+1X25mm2TW/T-50mm
ALIMENTADOR DEL TAB. TD-DP 3-1X10MM2THW+1X6MM2TW/T50MMPVC
ALIMENTADOR DEL TABL T-CQI 3-1X25mm2 THW+1X10mm2 TW/T-40mm D
ALIMENTADOR DEL TABL. TD-CE 3-1X25mm2 THW+1X10mm2 TW/T-40mm
ALIMENTADOR DEL TABL. TD-R 3-1X10mm2 THW+1X6mm2 TW/T-25mm DI
ALIMENTADOR DEL TABLERO TD-T (2-1X4+1X4/T)mm2 TW-20mm DIAM. P
ALIMENTADOR DEL TABLERO T.CI (2-1X4+1X4/T)mm2 TW-20mm DIAM. PV
ALIMENTADOR FUTURO TABLERO TD-E
ACOMETIDA DESDE GRUPO ELECTROGENO FUTURO
ACOMETIDA TELEFONICA
POZO DE TIERRA NUEVO
ACOMETIDA AL POZO DE TIERRA CABLE DESN. 16mm2
ALUMBRADO EXTERIOR
TABLEROS ELECTRICOS
TABLERO GENERAL TG
TABLERO DE TRANSFERENCIA MANUAL TRIFASICO DE 2 ITM 300A REGTABLERO T-CQI
TABLERO T-SG
TABLERO TD-A
TABLERO TD-R
TABLERO TD-DP
TABLERO TD-CE
TABLERO TD-T
TABLERO T-CI
TABLERO TD-3
TABLERO ELECTRONICO TES
SISTEMA DE PARARRAYOS
MASTIL DE FG DE 5.00m DE LONGITUD
ACCESORIOS PARA INSTALACION DE PARARRAYOS
CABLE DE COBRE DESNUDO PARA TIERRA
PARARRAYOS LONIFLASH
TUBO DE PROTECCION DE BAJADA DE CABLE DESNUDO
POZO DE TIERRA NUEVO
EMPALME DERIVACION DE 50mm2-50mm2
EXCAV, RELLENO Y COMPACT. DE ZAMJA 0.4X0.6m DE PROF.
VARIOS
PRUEBAS ELECTRICAS
SISTEMA DE COMPUTO
SALIDA PARA DATA
PTO
PTO
PTO
PTO
PTO
PTO
PTO
1.00
3.00
22.00
7.00
5.00
3.00
1.00
48.30
294.21
71.93
65.87
52.76
85.72
48.10
48.30
882.63
1,582.46
461.09
263.80
257.16
48.10
0.00
0.00
0.00
7.00
5.00
0.00
0.00
0.00
0.00
0.00
461.09
263.80
0.00
0.00
1.00
3.00
22.00
0.00
0.00
3.00
1.00
48.30
882.63
1,582.46
0.00
0.00
257.16
48.10
1.00
3.00
22.00
7.00
5.00
3.00
1.00
48.30
882.63
1,582.46
461.09
263.80
257.16
48.10
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PTO
PTO
PTO
PTO
7.00
3.00
6.00
73.00
85.72
48.10
78.48
48.77
600.04
144.30
470.88
3,560.21
5.00
0.00
0.00
64.00
428.60
0.00
0.00
3,121.28
2.00
3.00
6.00
9.00
171.44
144.30
470.88
438.93
7.00
3.00
6.00
73.00
600.04
144.30
470.88
3,560.21
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
1.00
11.00
10.00
5.00
4.00
5.00
1.00
4.00
54.23
69.26
36.46
44.07
124.10
32.03
36.47
33.00
54.23
761.86
364.60
220.35
496.40
160.15
36.47
132.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
11.00
10.00
5.00
4.00
5.00
1.00
4.00
54.23
761.86
364.60
220.35
496.40
160.15
36.47
132.00
1.00
11.00
10.00
5.00
4.00
5.00
1.00
4.00
54.23
761.86
364.60
220.35
496.40
160.15
36.47
132.00
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PTO
PTO
1.00
2.00
52.76
47.36
52.76
94.72
0.00
0.00
0.00
0.00
1.00
2.00
52.76
94.72
1.00
2.00
52.76
94.72
100.00%
100.00%
0.00
0.00
0.00
0.00
CJT
1.00
39.83
39.83
1.00
39.83
0.00
0.00
1.00
39.83
100.00%
0.00
0.00
M
M
M
M
M
M
M
M
M
M
M
M
CJT
UND
M
2.00
47.00
28.00
25.00
25.00
1.00
31.00
10.00
21.00
31.00
23.00
32.00
4.00
4.00
3.00
2.64
35.32
14.07
12.38
8.23
9.70
9.70
9.22
5.50
7.68
5.91
74.58
70.31
143.77
7.14
5.28
1,660.04
393.96
309.50
205.75
9.70
300.70
92.20
115.50
238.08
135.93
2,386.56
281.24
575.08
21.42
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
47.00
28.00
25.00
25.00
1.00
31.00
10.00
21.00
31.00
23.00
32.00
4.00
4.00
3.00
5.28
1,660.04
393.96
309.50
205.75
9.70
300.70
92.20
115.50
238.08
135.93
2,386.56
281.24
575.08
21.42
2.00
47.00
28.00
25.00
25.00
1.00
31.00
10.00
21.00
31.00
23.00
32.00
4.00
4.00
3.00
5.28
1,660.04
393.96
309.50
205.75
9.70
300.70
92.20
115.50
238.08
135.93
2,386.56
281.24
575.08
21.42
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
und
und
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
1.00
46.20
46.20
458.56
458.56
383.20
338.20
383.20
416.96
124.40
46.20
417.81
181.78
46.20
46.20
458.56
458.56
383.20
338.20
383.20
416.96
124.40
46.20
835.62
181.78
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
1.00
46.20
46.20
458.56
458.56
383.20
338.20
383.20
416.96
124.40
46.20
835.62
181.78
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
1.00
46.20
46.20
458.56
458.56
383.20
338.20
383.20
416.96
124.40
46.20
835.62
181.78
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
UND
CJT
M
UND
UND
UND
UND
M
1.00
1.00
21.00
1.00
1.00
3.00
1.00
12.00
183.36
551.96
10.63
198.47
110.10
143.77
14.24
3.56
183.36
551.96
223.23
198.47
110.10
431.31
14.24
42.72
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
1.00
21.00
1.00
1.00
3.00
1.00
12.00
183.36
551.96
223.23
198.47
110.10
431.31
14.24
42.72
1.00
1.00
21.00
1.00
1.00
3.00
1.00
12.00
183.36
551.96
223.23
198.47
110.10
431.31
14.24
42.72
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
GLB
1.00
85.10
85.10
0.00
0.00
1.00
85.10
1.00
85.10
100.00%
0.00
0.00
pto
7.00
77.56
542.92
0.00
0.00
7.00
542.92
7.00
542.92
100.00%
0.00
0.00
VAL.09 DIC
Pgina 59
01.00.00
01.01.00
01.02.00
01.03.00
02.00.00
02.01.00
02.02.00
03.00.00
03.01.00
04.00.00
04.01.00
04.02.00
05.00.00
05.01.00
06.00.00
06.01.00
06.02.00
07.00.00
07.01.00
08.00.00
08.01.00
08.02.00
09.00.00
09.01.00
09.01.01
10.00.00
10.01.00
11.00.00
11.01.00
11.02.00
11.03.00
11.04.00
11.05.00
12.00.00
12.01.00
13.00.00
13.01.00
13.02.00
13.03.00
13.04.00
13.05.00
14.00.00
14.01.00
14.01.01
15.00.00
15.01.00
15.02.00
16.00.00
16.02.00
22.00.00
27.00.00
27.01.00
29.00.00
29.01.00
29.02.00
29.03.00
30.00.00
30.01.00
31.00.00
31.01.00
32.00.00
32.01.00
33.00.00
33.01.00
34.00.00
34.01.00
INST. SANITARIAS
DESAGUE Y VENTILACION
SALIDA DE DESAGUE PVC-SAL 2"
SALIDA DE DESAGUE PVC-SAL 4"
SALIDA PARA VENTILACION 2" PVC-SAL
REDES DE DERIVACION
SUMINISTRO E INST. TUBERIA PVC -SAL 2"
SUMINISTRO E INST. TUBERIA PVC-SAL 4"
TUBERIA PVC - SAL EMPOTRADA EN MUROS
SUMINISTRO E INST. TUBERIA PVC -SAL 2"
REGISTRO ROSCADO DE BRONCE
REGISTRO DE BRONCE 2"
SUMIDERO DE BRONCE 2"
SOMBREROS DE VENTILACION
SOMBRERO VENTILACION PVC DE 2"
REDES EXTERIORES DE DESAGUE
TRAZO NIVELES Y REPLANTEO REDES DE AGUA DESAG.
EXCAVACION T/N DESAGUE 4-6" HASTA 1.00
SUMISTRO E INSTALACION TUBERIA PVC - SAL PESADA
SUMINISTRO E INSTA. TUBERIA PVC-SAL 6"
CAMARAS DE INSPECCION
CAJA DE REGISTRO 12"X24 C/TAPA CONCRETO
CAJA DE REGISTRO 24" X 24" C/TAPA CONCRETO
SISTEMA DE AGUA FRIA
SALIDA DE AGUA FRIA
SALIDA DE AGUA FRIA PVC O 1/2"
REDES INTERIORES DE AGUA
TRAZO NIVELES Y REPLANTEO REDES DE AGUA DESAG.
TUBERIA PVC - SAP ENTERRADA EN PISO
SUMINISTRO E INST. TUBO PVC-SAP-C10 1/2"
SUMINISTRO E INST. TUB. PVC-SAP-C10 3/4"
SUMINISTRO E INSTA. TUB. PVC-SAP-C10 1"
SUMINISTRO E INST. TUB. PVC-SAP-C10 1 1/2"
SUMINISTRO E INST. DE TUB. PVC-SAP-C10 2"
TUBERIA PVC - SAL EMPOTRADA EN MUROS
SUMINISTRO E INST. TUBO PVC-SAP-C10 1/2"
LLAVES Y VALVULAS
VALVULA COMPUERTA BRONCE 1/2"
VALVULA DE COMPUERTA DE BRONCE 3/4"
VALVULA COMPUERTA BRONCE 1"
VALVULA DE COMPUERTA DE BRONCE 2"
VALVULA DE COMPUERTA DE BRONCE 1 1/2"
SISTEMA DE AGUA CALIENTE
SALIDA DE AGUA CALIENTE
SALIDA DE AGUA CALIENTE CPVC 1/2"
TUBERIA CPVC - ENTERRADA EN PISO
TUBERIA AGUA CALIENTE CPVC 1/2"
TUBERIA AGUA CALIENTE CPVC 3/4"
LLAVES Y VALVULAS
VALVULA DE COMPUERTA DE BRONCE 3/4"
APARATOS SANITARIOS Y ACCESORIOS
EQUIPOS Y SISTEMAS
EQUIPO DE BOMBEO, ELECTROBOMBA 2 HP
INSTALACIONES HIDRAULICAS
MONTAJE DE ACCESORIOS EN CISTERNA
MONTAJE DE ACCESORIOS TANQUE ELEVADO
PRUEBA HIDRAULICA DE RESERVORIO
ACCESORIOS SANITARIOS/AGUA FRIA
SUMINISTRO E INSTALACION DE ACCES. P/AGUA FRIA
ACCESORIOS SANITARIOS/AGUA CALIENTE
SUMINISTRO E INSTALACION DE ACCES. P/AGUA CALIENTE
ACCESORIOS SANITARIOS/DESAGUE
SUMINISTRO E INSTALACION DE ACCES. P/DESAGUE
TRAMPA DE GRASA
TRAMPA DE GRASA DE CONCRETO/ INCLUYE TAPA Y ACCESORIOS
TRAMPA TIPO "U"
TRAMPA "U" DE P.V.C. SAL PARA DESAGUE DE 2"
TOTAL COSTO DIRECTO
GASTOS GENERALES 8 %
PTO
PTO
PTO
70.00
24.00
18.00
21.77
101.64
45.48
1,523.90
2,439.36
818.64
65.00
21.00
17.00
1,415.05
2,134.44
773.16
5.00
3.00
1.00
108.85
304.92
45.48
70.00
24.00
18.00
1,523.90
2,439.36
818.64
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
M
M
258.00
103.00
8.14
22.26
2,100.12
2,292.78
240.00
100.00
1,953.60
2,226.00
18.00
3.00
146.52
66.78
258.00
103.00
2,100.12
2,292.78
100.00%
100.00%
0.00
0.00
0.00
0.00
54.00
8.14
439.56
48.00
390.72
6.00
48.84
54.00
439.56
100.00%
0.00
0.00
UND
UND
38.00
10.00
11.25
17.26
427.50
172.60
27.00
9.00
303.75
155.34
11.00
1.00
123.75
17.26
38.00
10.00
427.50
172.60
100.00%
100.00%
0.00
0.00
0.00
0.00
PZA
18.00
15.03
270.54
0.00
0.00
18.00
270.54
18.00
270.54
100.00%
0.00
0.00
M
M
273.00
273.00
0.83
12.47
226.59
3,404.31
273.00
273.00
226.59
3,404.31
0.00
0.00
0.00
0.00
273.00
273.00
226.59
3,404.31
100.00%
100.00%
0.00
0.00
0.00
0.00
273.00
35.70
9,746.10
0.00
0.00
273.00
9,746.10
273.00
9,746.10
100.00%
0.00
0.00
UND
UND
54.00
2.00
71.72
98.14
3,872.88
196.28
0.00
0.00
0.00
0.00
54.00
2.00
3,872.88
196.28
54.00
2.00
3,872.88
196.28
100.00%
100.00%
0.00
0.00
0.00
0.00
PTO
97.00
28.52
2,766.44
82.00
2,338.64
15.00
427.80
97.00
2,766.44
100.00%
0.00
0.00
596.00
0.83
494.68
596.00
494.68
0.00
0.00
596.00
494.68
100.00%
0.00
0.00
M
M
M
M
M
355.00
37.00
92.00
12.00
100.00
6.54
7.03
8.05
11.05
14.26
2,321.70
260.11
740.60
132.60
1,426.00
285.00
34.00
0.00
0.00
0.00
1,863.90
239.02
0.00
0.00
0.00
70.00
3.00
92.00
12.00
100.00
457.80
21.09
740.60
132.60
1,426.00
355.00
37.00
92.00
12.00
100.00
2,321.70
260.11
740.60
132.60
1,426.00
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
53.00
6.54
346.62
50.00
327.00
3.00
53.00
346.62
100.00%
0.00
0.00
PZA
PZA
PZA
PZA
PZA
60.00
1.00
2.00
1.00
2.00
34.12
44.55
71.59
94.92
88.52
2,047.20
44.55
143.18
94.92
177.04
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
60.00
1.00
2.00
1.00
2.00
19.62
0.00
2,047.20
44.55
143.18
94.92
177.04
60.00
1.00
2.00
1.00
2.00
2,047.20
44.55
143.18
94.92
177.04
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PZA
21.00
54.45
1,143.45
20.00
1,089.00
1.00
54.45
21.00
1,143.45
100.00%
0.00
0.00
M
M
15.00
60.00
18.44
23.94
276.60
1,436.40
13.00
51.00
239.72
1,220.94
2.00
9.00
36.88
215.46
15.00
60.00
276.60
1,436.40
100.00%
100.00%
0.00
0.00
0.00
0.00
PZA
8.00
44.55
356.40
0.00
0.00
8.00
356.40
8.00
356.40
100.00%
0.00
0.00
UND
1.00
493.54
493.54
0.00
0.00
1.00
493.54
1.00
493.54
100.00%
0.00
0.00
UND
UND
GLB
1.00
1.00
1.00
251.56
389.00
85.07
251.56
389.00
85.07
0.00
0.00
0.00
0.00
0.00
0.00
1.00
1.00
1.00
251.56
389.00
85.07
1.00
1.00
1.00
251.56
389.00
85.07
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
GLB
1.00
275.69
275.69
0.00
0.00
1.00
275.69
1.00
275.69
100.00%
0.00
0.00
GLB
1.00
190.50
190.50
0.00
0.00
1.00
190.50
1.00
190.50
100.00%
0.00
0.00
GLB
1.00
627.90
627.90
0.00
0.00
1.00
627.90
1.00
627.90
100.00%
0.00
0.00
UND
1.00
350.06
350.06
0.00
0.00
1.00
350.06
1.00
350.06
100.00%
0.00
0.00
UND
1.00
18.25
18.25
0.00
0.00
1.00
18.25
1.00
18.25
100.00%
0.00
0.00
S/.
S/.
511,508.95
40,920.72
511,508.95
40,920.72
100.00%
8%
VAL.09 DIC
416,036.15
33,282.89
95,472.80
7,637.82
18.66%
Pgina 60
UTILIDADES 7.00 %
SUB - TOTAL
I . G . V . 19 %
TOTAL PRESUPUESTO
FACTOR DE RELACION
TOTAL VALORIZADO
7%
19%
S/.
35,805.63
S/. 588,235.29
S/. 111,764.71
S/. 700,000.00
1.00000
700,000.00
29,122.53
478,441.57
90,903.90
569,345.47
1.00000
569,345.47
81.34%
6,683.10
109,793.72
20,860.81
130,654.53
1.00000
130,654.53
18.66%
35,805.63
588,235.29
111,764.71
700,000.00
1.00000
700,000.00
100.00%
1.00000
-
100.00%
VAL.09 DIC
Pgina 61
VALORIZACIN DE OBRA
VALORIZACIN N
PROPIETARIO
CONTRATISTA
PROVINCIA
DEPARTAMENTO
09
MUNICIPALIDAD PROVINCIAL DE OYON
OYON
LIMA
OBRA :
01.00.00
01.01.00
01.02.00
01.03.00
02.00.00
02.01.00
02.02.00
02.03.00
03.00.00
03.01.00
03.02.00
03.03.00
03.04.00
03.05.00
04.00.00
04.01.00
04.02.00
04.03.01
04.03.02
04.03.03
04.04.00
05.00.00
05.01.00
05.01.01
05.01.02
05.02.00
05.02.01
05.02.02
05.02.03
05.03.00
05.03.01
05.03.02
05.03.03
05.04.00
05.04.01
05.04.02
05.04.03
05.05.00
05.05.01
05.05.02
05.05.03
05.06.00
05.06.01
05.06.02
05.06.03
05.06.04
05.07.00
05.07.01
05.07.02
05.07.03
05.08.00
05.08.01
05.08.02
05.08.03
ESTRUCTURAS
OBRAS PROVISIONALES
ALMACENES OFICINAS TALLERES Y GUARDIANIA
CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M
AGUA Y FUERZA ELECTRICA EN LA CONSTRUCCION
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRANSPORTE DE EQUIPOS Y HERAMIENTAS
NIVELACION ,TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACIN DE ZANJA P/CIMIENTOS Y / O ZAPATAS
EXCAVACION P/CISTERNA
NIVELACION INT.Y APISONADO FINAL DEL TERRENO PREVIO AL PISO
RELLENO CON MATERIAL PROPIO
ELIMINACION MATERIAL EXCEDENTE HASTA 30 MTS( A MANO USANDO CARRETI
S/.
S/.
700,000.00
700,000.00
UNICA
20 DE DICIEMBRE DEL 2006
CONSTRUCCION CENTRO DE SALUD TIPO II DE OYON CON ATENCION MATERNO INFANTIL CON APOYO SOCIEDAD CIVIL
Partidas
ITEM
VALOR REFERENCIAL
MONTO CONTRATADO
FORMULA
FECHA
Und.
Metrado
Costo
Unitario
(S/.)
Costo
Parcial
(S/.)
Avance Anterior
Monto de
Metrado
Valorizacin
Total
M2
UND
GLB
40.00
1.00
1.00
31.50
842.52
500.00
1,260.00
842.52
500.00
40.00
1.00
1.00
M2
GLB
M2
500.00
1.00
2,000.00
0.24
600.00
0.32
120.00
600.00
640.00
M3
M3
M2
M3
m3
820.00
35.00
1,400.00
215.00
610.00
1.87
1.87
5.97
7.29
1.87
M2
M3
M3
M2
KG
M2
710.00
375.00
135.00
1,410.00
9,450.00
2,000.00
M3
KG
Avance Actual
Monto de
Metrado
Valorizacin
Total
Avance Acumulado
Monto de
Metrado
Valorizacin
Total
Saldo a Ejecutar
Monto de
Metrado
Valorizacin
Total
1,260.00
842.52
500.00
0.00
0.00
0.00
0.00
0.00
0.00
40.00
1.00
1.00
1,260.00
842.52
500.00
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
500.00
1.00
2,000.00
120.00
600.00
640.00
0.00
0.00
0.00
0.00
0.00
0.00
500.00
1.00
2,000.00
120.00
600.00
640.00
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
1,533.40
65.45
8,358.00
1,567.35
1,140.70
820.00
35.00
1,400.00
215.00
610.00
1,533.40
65.45
8,358.00
1,567.35
1,140.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
820.00
35.00
1,400.00
215.00
610.00
1,533.40
65.45
8,358.00
1,567.35
1,140.70
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
11.16
38.90
72.28
18.25
0.47
9.25
7,923.60
14,587.50
9,757.80
25,732.50
4,441.50
18,500.00
710.00
375.00
135.00
1,410.00
9,450.00
2,000.00
7,923.60
14,587.50
9,757.80
25,732.50
4,441.50
18,500.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
710.00
375.00
135.00
1,410.00
9,450.00
2,000.00
7,923.60
14,587.50
9,757.80
25,732.50
4,441.50
18,500.00
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
81.00
1,300.00
24.88
0.47
2,015.28
611.00
81.00
1,300.00
2,015.28
611.00
0.00
0.00
0.00
0.00
81.00
1,300.00
2,015.28
611.00
100.00%
100.00%
0.00
0.00
0.00
0.00
M3
M2
KG
17.00
136.00
1,850.00
44.18
19.07
0.47
751.06
2,593.52
869.50
17.00
136.00
1,850.00
751.06
2,593.52
869.50
0.00
0.00
0.00
0.00
0.00
0.00
17.00
136.00
1,850.00
751.06
2,593.52
869.50
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
M3
M2
M2
55.00
650.00
7,850.00
99.10
26.04
0.47
5,450.50
16,926.00
3,689.50
55.00
650.00
7,850.00
5,450.50
16,926.00
3,689.50
0.00
0.00
0.00
0.00
0.00
0.00
55.00
650.00
7,850.00
5,450.50
16,926.00
3,689.50
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
M3
M2
Kg
8.00
111.00
325.00
97.21
22.49
0.47
777.68
2,496.39
152.75
8.00
111.00
325.00
777.68
2,496.39
152.75
0.00
0.00
0.00
0.00
0.00
0.00
8.00
111.00
325.00
777.68
2,496.39
152.75
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
M3
M2
KG
121.00
665.00
6,950.00
38.68
25.63
0.47
4,680.28
17,043.95
3,266.50
121.00
665.00
6,950.00
4,680.28
17,043.95
3,266.50
0.00
0.00
0.00
0.00
0.00
0.00
121.00
665.00
6,950.00
4,680.28
17,043.95
3,266.50
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
M3
M2
KG
UND
150.00
1,800.00
10,000.00
1,700.00
34.30
23.03
0.47
0.25
5,145.00
41,454.00
4,700.00
425.00
150.00
1,800.00
10,000.00
1,700.00
5,145.00
41,454.00
4,700.00
425.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
150.00
1,800.00
10,000.00
1,700.00
5,145.00
41,454.00
4,700.00
425.00
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
M3
M2
M2
16.00
95.00
1,200.00
76.45
20.13
0.47
1,223.20
1,912.35
564.00
16.00
95.00
1,200.00
1,223.20
1,912.35
564.00
0.00
0.00
0.00
0.00
0.00
0.00
16.00
95.00
1,200.00
1,223.20
1,912.35
564.00
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
M3
M2
KG
6.50
51.00
500.00
110.29
24.39
0.47
716.89
1,243.89
235.00
3.00
30.00
500.00
330.87
731.70
235.00
3.50
21.00
0.00
386.02
512.19
0.00
6.50
51.00
500.00
716.89
1,243.89
235.00
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
deductivo
Pgina 62
06.00.00
ESTRUCTURA DE MADERA
11.00.00
11.01.00
11.02.00
12.00.00
12.01.00
12.02.00
12.03.00
12.04.00
12.05.00
12.06.00
12.07.00
12.08.00
12.09.00
12.10.00
12.11.00
13.00.00
13.01.00
14.00.00
14.01.00
14.06.00
25.00.00
25.01.00
26.00.00
26.01.00
31.00.00
32.02.00
32.03.00
ARQUITECTURA
MUROS Y TABIQUES DE ALBAILERIA
MURO DE LADRILLO KK 18 H CABEZA
MURO DE LADRILLO KK 18H SOGA
REVOQUES ENLUCIDOS Y MOLDURAS
TARRAJEO PRIMARIO RAYADO CON CEMENTO-CAL-ARENA
TARRAJEO MUROS INTERIORES
TARRAJEO MUROS EXTERIORES
TARRAJEO COLUMNAS
TARRAJEO DE VIGAS
TARRAJEO CON BARITINA
TARRAJEO IMPERMEABILIZADO
VESTIDURA DE DERRAMES E=0.25
VESTIDURA DE DERRAMES
UNION DE MUROS Y CIELOS RASOS
BRUAS EN INTERIORES
CIELORRASOS
ENLUCIDO DE CIELO RASO
PISOS Y PAVIMENTOS
CONTRAPISO E= 40 mm
PISO DE CEMENTO TEXTURIZADO EN RAMPAS
ESCALERAS
ESCALERA DE GATO
TAPA METALICA
TAPA METALICA P/CISTERNA
VARIOS LIMPIEZA Y JARDINERIA
LIMPIEZA PERMANENTE
LIMPIEZA FINAL
01.00.00
01.01.00
01.02.00
01.02.01
01.02.02
01.02.03
01.02.04
01.02.05
01.02.06
01.02.07
01.02.08
01.02.09
01.02.10
01.02.11
01.02.12
01.02.13
01.02.14
02.00.00
02.01.00
02.02.00
02.03.00
02.04.00
02.05.00
02.06.00
02.07.00
02.08.00
02.09.00
02.10.00
02.11.00
02.12.00
02.13.00
02.14.00
02.15.00
02.16.00
02.17.00
02.18.00
02.19.00
02.20.00
02.21.00
INST. ELECTRICAS
INSTALACIONES ELECTRICAS
CIRCUITOS DERIVADOS
CIRCUITOS DERIVADOS ALUMBRADO Y TOMA CORRIENTES
CENTRO DE LUZ
SALIDA PARA ARTEFAC. ALUMBRADO SPOT LIGHT
SALIDA PARA ALUMBRADO EN PARED
SALIDA CAJA PASE ALUMBRADO ( TECHO )
SALIDA PARA INTERRUPTOR C/FUS DE 2X20A PA/ALUMB Y TOMACORRI
PTO. DE BAJADA DE INTERR. DE UN GOLPE
PUNTO DE BAJAD. DE INTERR. DE DOS GOLPES
PUNTO DE BAJADA DE INTERRUP. DE TRES GOLPES
BAJADA DE INTERR. DE CONMUT. DE 3 VIAS
PUNTO T/BIPOL.DOBLE TOMA TIERRA CAJA 10X55X50MM
SALIDA P/TOMACORR. UNIVERSAL DOBLE 10A,220V
SALIDA P/TOMACORR. BIPOLAR ININTERRUNPIDO
SALIDA P/TOMACORR./COMPUTADORA
SALIDA CAJA PASE ALUMBRADO PARED
CIRCUITOS DERIVADOS DE CARGAS ESPECIALES
SALIDA PARA ESTERILIZADORES S-3
SALIDA PARA ESTERILIZADOR S-54
SALIDA PARA EQUIPO DENTAL
SALIDA PARA CALENT./ELECTRI DE AGUA
SALIDA PARA COCINA ELECTRI/ DE 8 KW
SALIDA PARA UPS MONOFASICO DE 6 KVA
CALANDRIA
REFRIGERADORA INDUSTRIAL
SECADORA
LAVADORA
SOLDADORA
DESTILADOR DE AGUA DE 3 KW
SALIDA PARA CACI
CENTRAL DE PARLANTES
SALIDA PARA CONCENTRADOR DE REDES
SALIDA PARA CENTRAL DE TELEFONOS
SALIDA LLAMADA DE ENFERMERAS
ELECTROBONBAS DE AGUA
CONTROL DE NIVEL D CISTER. Y TANQUE ELEVADO
RAYOS X
SALIDA PARA TIMBRE
M2
2,000.00
36.75
73,500.00
1,750.00
64,312.50
250.00
9,187.50
2,000.00
73,500.00
100.00%
0.00
0.00
M2
M2
1,243.08
1,634.28
14.71
11.24
18,285.71
18,369.31
1,243.08
1,634.28
18,285.71
18,369.31
0.00
0.00
0.00
0.00
1,243.08
1,634.28
18,285.71
18,369.31
100.00%
100.00%
0.00
0.00
0.00
0.00
M2
M2
M2
M2
M2
M2
M2
M
M
M
M
1,279.90
2,983.43
1,603.25
6.00
50.00
62.35
49.20
423.90
515.84
906.30
325.73
9.19
8.74
7.79
9.18
11.77
77.55
7.41
7.00
4.41
4.01
3.16
11,762.28
26,075.18
12,489.32
55.08
588.50
4,835.24
364.57
2,967.30
2,274.85
3,634.26
1,029.31
1,065.00
2,115.00
1,170.00
5.35
38.50
0.00
0.00
330.50
365.00
400.00
270.00
9,787.35
18,485.10
9,114.30
49.11
453.15
0.00
0.00
2,313.50
1,609.65
1,604.00
853.20
214.90
868.43
433.25
0.65
11.50
62.35
49.20
93.40
150.84
506.30
55.73
1,974.93
7,590.08
3,375.02
5.97
135.36
4,835.24
364.57
653.80
665.20
2,030.26
176.11
1,279.90
2,983.43
1,603.25
6.00
50.00
62.35
49.20
423.90
515.84
906.30
325.73
11,762.28
26,075.18
12,489.32
55.08
588.50
4,835.24
364.57
2,967.30
2,274.85
3,634.26
1,029.31
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
M2
1,370.57
13.21
18,105.23
1,024.00
13,527.04
346.57
4,578.19
1,370.57
18,105.23
100.00%
0.00
0.00
M2
M2
1,224.99
44.76
7.07
17.09
8,660.68
764.95
403.00
0.00
2,849.21
0.00
821.99
44.76
5,811.47
764.95
1,224.99
44.76
8,660.68
764.95
100.00%
100.00%
0.00
0.00
0.00
0.00
4.35
80.02
348.09
0.00
0.00
4.35
348.09
4.35
348.09
100.00%
0.00
0.00
UND
1.00
182.89
182.89
0.00
0.00
1.00
182.89
1.00
182.89
100.00%
0.00
0.00
GLB
GLB
1.00
1.00
1,535.73
500.00
1,535.73
500.00
1.00
0.00
1,535.73
0.00
0.00
1.00
0.00
500.00
1.00
1.00
1,535.73
500.00
100.00%
100.00%
0.00
0.00
0.00
0.00
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
173.00
99.00
18.00
4.00
7.00
62.00
38.00
2.00
18.00
135.00
11.00
9.00
7.00
11.00
24.16
16.36
35.53
31.71
19.58
28.69
29.44
33.54
36.77
35.80
35.79
42.74
18.34
35.49
4,179.68
1,619.64
639.54
126.84
137.06
1,778.78
1,118.72
67.08
661.86
4,833.00
393.69
384.66
128.38
390.39
159.00
58.00
16.00
3.00
5.00
38.00
25.00
0.00
0.00
0.00
0.00
0.00
3.00
0.00
3,841.44
948.88
568.48
95.13
97.90
1,090.22
736.00
0.00
0.00
0.00
0.00
0.00
55.02
0.00
14.00
41.00
2.00
1.00
2.00
24.00
13.00
2.00
18.00
135.00
11.00
9.00
4.00
11.00
338.24
670.76
71.06
31.71
39.16
688.56
382.72
67.08
661.86
4,833.00
393.69
384.66
73.36
390.39
173.00
99.00
18.00
4.00
7.00
62.00
38.00
2.00
18.00
135.00
11.00
9.00
7.00
11.00
4,179.68
1,619.64
639.54
126.84
137.06
1,778.78
1,118.72
67.08
661.86
4,833.00
393.69
384.66
128.38
390.39
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
CJT
CJT
CJT
CJT
4.00
1.00
1.00
8.00
1.00
1.00
1.00
1.00
1.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
75.48
55.18
611.89
59.94
63.77
82.00
244.36
47.16
51.36
50.43
93.38
63.74
46.15
75.05
77.24
100.93
67.12
219.22
97.11
913.50
29.14
301.92
55.18
611.89
479.52
63.77
82.00
244.36
47.16
51.36
100.86
93.38
63.74
46.15
75.05
77.24
100.93
67.12
219.22
97.11
913.50
29.14
4.00
1.00
1.00
7.00
0.00
1.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
1.00
1.00
0.00
0.00
0.00
0.00
1.00
0.00
0.00
0.00
1.00
1.00
0.00
1.00
1.00
1.00
2.00
1.00
1.00
1.00
0.00
0.00
0.00
1.00
1.00
1.00
1.00
0.00
0.00
0.00
0.00
59.94
63.77
0.00
244.36
47.16
51.36
100.86
93.38
63.74
46.15
0.00
0.00
0.00
67.12
219.22
97.11
913.50
0.00
4.00
1.00
1.00
8.00
1.00
1.00
1.00
1.00
1.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
301.92
55.18
611.89
479.52
63.77
82.00
244.36
47.16
51.36
100.86
93.38
63.74
46.15
75.05
77.24
100.93
67.12
219.22
97.11
913.50
29.14
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
deductivo
301.92
55.18
611.89
419.58
0.00
82.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
75.05
77.24
100.93
0.00
0.00
0.00
0.00
29.14
Pgina 63
03.00.00
03.01.00
03.01.01
03.01.02
03.01.03
03.01.04
03.01.05
03.01.06
03.01.07
04.00.00
04.01.00
04.02.00
04.03.00
04.03.04
05.00.00
05.01.00
05.02.00
05.03.00
05.04.00
05.05.00
05.06.00
05.07.00
05.08.00
06.00.00
06.01.00
06.02.00
07.00.00
07.01.00
08.00.00
08.01.00
08.02.00
08.03.00
08.04.00
08.05.00
08.06.00
08.07.00
08.08.00
08.09.00
08.10.00
08.11.00
08.12.00
08.13.00
08.14.00
08.15.00
09.00.00
09.01.00
09.01.01
09.01.02
09.01.03
09.01.04
09.01.05
09.01.06
09.01.07
09.01.08
09.01.09
09.01.10
09.01.11
09.01.12
12.00.00
12.01.00
12.02.00
12.03.00
12.04.00
12.05.00
12.06.00
12.07.00
12.08.00
13.00.00
13.01.00
14.00.00
14.01.00
COMUNICACIONES Y SEALES
SISTEMAS DE TELEFONOS
ACOMETIDA TELEFONICA AEREA
SALIDA PARA CAJA TELEFONICA TIPO "C"
SALIDA PARA TELEFONO EXTERNO INTERNO
SALIDA PARA PARLANTE
SALIDA CAJA DE PASE
SALIDA PARA CAJA DE PASE DE 150X150X100mm
SALIDA PARA CAJA DE PASE DE 200X200X100mm
SISTEMA DE ALARMA CONTRA INCENDIO
SALIDA PARA CAJA DE PASE DE 150X150X100mm
SALIDA PARA CAJA DE PASE CUADRADA DE 200X200X10mm
SALIDA PARA ALARMA MANUAL Y SIRENA
SALIDA PARA DETECTOR DE HUMO
SISTEMA DE LLAMADAS E ENFERMERAS
CAJA DE PASE DE 250X250X100mm
CAJA DE PASE DE 200X200X100mm
ESTACION DE LLAMADA SIMPLE
ESTACION DE LLAMADA DE UN TIRO
SALIDA PARA CAJA CUADRADA DE 200X200X100mm
LUZ DE CORREDOR DE DOS BOMBILLAS
ESTACION DE LLAMADA DE UNA DIRECCION
SALIDA PARA CANCELACION DE LLAMADA
SISTEMA DE TELECABLE
SALIDA CAJA DE PASE
SALIDA PARA TELECABLE
TIMBRE
SALIDA PARA PULSADOR DE TIMBRE
ALIMENTADORES
ALIMENTADOR DEL TABLERO GNERAL (3-1X185+1X35/T)mm2 NYY
ALIMENTADOR DEL TABLERO TRANSFEREN. MANUAL (3-1X185+1X35/T)
ALIMENTADOR DEL TABLERO TD-A 3-1X25 mm2THW+1X10mm2TW-40mm
ALIMENTADOR DEL TABLERO T-SG 3-1X50mm2THW+1X25mm2TW/T-50mm
ALIMENTADOR DEL TAB. TD-DP 3-1X10MM2THW+1X6MM2TW/T50MMPVC
ALIMENTADOR DEL TABL T-CQI 3-1X25mm2 THW+1X10mm2 TW/T-40mm D
ALIMENTADOR DEL TABL. TD-CE 3-1X25mm2 THW+1X10mm2 TW/T-40mm
ALIMENTADOR DEL TABL. TD-R 3-1X10mm2 THW+1X6mm2 TW/T-25mm DI
ALIMENTADOR DEL TABLERO TD-T (2-1X4+1X4/T)mm2 TW-20mm DIAM. P
ALIMENTADOR DEL TABLERO T.CI (2-1X4+1X4/T)mm2 TW-20mm DIAM. PV
ALIMENTADOR FUTURO TABLERO TD-E
ACOMETIDA DESDE GRUPO ELECTROGENO FUTURO
ACOMETIDA TELEFONICA
POZO DE TIERRA NUEVO
ACOMETIDA AL POZO DE TIERRA CABLE DESN. 16mm2
ALUMBRADO EXTERIOR
TABLEROS ELECTRICOS
TABLERO GENERAL TG
TABLERO DE TRANSFERENCIA MANUAL TRIFASICO DE 2 ITM 300A REGTABLERO T-CQI
TABLERO T-SG
TABLERO TD-A
TABLERO TD-R
TABLERO TD-DP
TABLERO TD-CE
TABLERO TD-T
TABLERO T-CI
TABLERO TD-3
TABLERO ELECTRONICO TES
SISTEMA DE PARARRAYOS
MASTIL DE FG DE 5.00m DE LONGITUD
ACCESORIOS PARA INSTALACION DE PARARRAYOS
CABLE DE COBRE DESNUDO PARA TIERRA
PARARRAYOS LONIFLASH
TUBO DE PROTECCION DE BAJADA DE CABLE DESNUDO
POZO DE TIERRA NUEVO
EMPALME DERIVACION DE 50mm2-50mm2
EXCAV, RELLENO Y COMPACT. DE ZAMJA 0.4X0.6m DE PROF.
VARIOS
PRUEBAS ELECTRICAS
SISTEMA DE COMPUTO
SALIDA PARA DATA
PTO
PTO
PTO
PTO
PTO
PTO
PTO
1.00
3.00
22.00
7.00
5.00
3.00
1.00
48.30
294.21
71.93
65.87
52.76
85.72
48.10
48.30
882.63
1,582.46
461.09
263.80
257.16
48.10
0.00
0.00
0.00
7.00
5.00
0.00
0.00
0.00
0.00
0.00
461.09
263.80
0.00
0.00
1.00
3.00
22.00
0.00
0.00
3.00
1.00
48.30
882.63
1,582.46
0.00
0.00
257.16
48.10
1.00
3.00
22.00
7.00
5.00
3.00
1.00
48.30
882.63
1,582.46
461.09
263.80
257.16
48.10
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PTO
PTO
PTO
PTO
7.00
3.00
6.00
73.00
85.72
48.10
78.48
48.77
600.04
144.30
470.88
3,560.21
5.00
0.00
0.00
64.00
428.60
0.00
0.00
3,121.28
2.00
3.00
6.00
9.00
171.44
144.30
470.88
438.93
7.00
3.00
6.00
73.00
600.04
144.30
470.88
3,560.21
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PTO
PTO
PTO
PTO
PTO
PTO
PTO
PTO
1.00
11.00
10.00
5.00
4.00
5.00
1.00
4.00
54.23
69.26
36.46
44.07
124.10
32.03
36.47
33.00
54.23
761.86
364.60
220.35
496.40
160.15
36.47
132.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
11.00
10.00
5.00
4.00
5.00
1.00
4.00
54.23
761.86
364.60
220.35
496.40
160.15
36.47
132.00
1.00
11.00
10.00
5.00
4.00
5.00
1.00
4.00
54.23
761.86
364.60
220.35
496.40
160.15
36.47
132.00
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PTO
PTO
1.00
2.00
52.76
47.36
52.76
94.72
0.00
0.00
0.00
0.00
1.00
2.00
52.76
94.72
1.00
2.00
52.76
94.72
100.00%
100.00%
0.00
0.00
0.00
0.00
CJT
1.00
39.83
39.83
1.00
39.83
0.00
0.00
1.00
39.83
100.00%
0.00
0.00
M
M
M
M
M
M
M
M
M
M
M
M
CJT
UND
M
2.00
47.00
28.00
25.00
25.00
1.00
31.00
10.00
21.00
31.00
23.00
32.00
4.00
4.00
3.00
2.64
35.32
14.07
12.38
8.23
9.70
9.70
9.22
5.50
7.68
5.91
74.58
70.31
143.77
7.14
5.28
1,660.04
393.96
309.50
205.75
9.70
300.70
92.20
115.50
238.08
135.93
2,386.56
281.24
575.08
21.42
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
47.00
28.00
25.00
25.00
1.00
31.00
10.00
21.00
31.00
23.00
32.00
4.00
4.00
3.00
5.28
1,660.04
393.96
309.50
205.75
9.70
300.70
92.20
115.50
238.08
135.93
2,386.56
281.24
575.08
21.42
2.00
47.00
28.00
25.00
25.00
1.00
31.00
10.00
21.00
31.00
23.00
32.00
4.00
4.00
3.00
5.28
1,660.04
393.96
309.50
205.75
9.70
300.70
92.20
115.50
238.08
135.93
2,386.56
281.24
575.08
21.42
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
und
und
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
1.00
46.20
46.20
458.56
458.56
383.20
338.20
383.20
416.96
124.40
46.20
417.81
181.78
46.20
46.20
458.56
458.56
383.20
338.20
383.20
416.96
124.40
46.20
835.62
181.78
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
1.00
46.20
46.20
458.56
458.56
383.20
338.20
383.20
416.96
124.40
46.20
835.62
181.78
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
1.00
46.20
46.20
458.56
458.56
383.20
338.20
383.20
416.96
124.40
46.20
835.62
181.78
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
UND
CJT
M
UND
UND
UND
UND
M
1.00
1.00
21.00
1.00
1.00
3.00
1.00
12.00
183.36
551.96
10.63
198.47
110.10
143.77
14.24
3.56
183.36
551.96
223.23
198.47
110.10
431.31
14.24
42.72
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
1.00
21.00
1.00
1.00
3.00
1.00
12.00
183.36
551.96
223.23
198.47
110.10
431.31
14.24
42.72
1.00
1.00
21.00
1.00
1.00
3.00
1.00
12.00
183.36
551.96
223.23
198.47
110.10
431.31
14.24
42.72
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
GLB
1.00
85.10
85.10
0.00
0.00
1.00
85.10
1.00
85.10
100.00%
0.00
0.00
pto
7.00
77.56
542.92
0.00
0.00
7.00
542.92
7.00
542.92
100.00%
0.00
0.00
deductivo
Pgina 64
01.00.00
01.01.00
01.02.00
01.03.00
02.00.00
02.01.00
02.02.00
03.00.00
03.01.00
04.00.00
04.01.00
04.02.00
05.00.00
05.01.00
06.00.00
06.01.00
06.02.00
07.00.00
07.01.00
08.00.00
08.01.00
08.02.00
09.00.00
09.01.00
09.01.01
10.00.00
10.01.00
11.00.00
11.01.00
11.02.00
11.03.00
11.04.00
11.05.00
12.00.00
12.01.00
13.00.00
13.01.00
13.02.00
13.03.00
13.04.00
13.05.00
14.00.00
14.01.00
14.01.01
15.00.00
15.01.00
15.02.00
16.00.00
16.02.00
22.00.00
27.00.00
27.01.00
29.00.00
29.01.00
29.02.00
29.03.00
30.00.00
30.01.00
31.00.00
31.01.00
32.00.00
32.01.00
33.00.00
33.01.00
34.00.00
34.01.00
INST. SANITARIAS
DESAGUE Y VENTILACION
SALIDA DE DESAGUE PVC-SAL 2"
SALIDA DE DESAGUE PVC-SAL 4"
SALIDA PARA VENTILACION 2" PVC-SAL
REDES DE DERIVACION
SUMINISTRO E INST. TUBERIA PVC -SAL 2"
SUMINISTRO E INST. TUBERIA PVC-SAL 4"
TUBERIA PVC - SAL EMPOTRADA EN MUROS
SUMINISTRO E INST. TUBERIA PVC -SAL 2"
REGISTRO ROSCADO DE BRONCE
REGISTRO DE BRONCE 2"
SUMIDERO DE BRONCE 2"
SOMBREROS DE VENTILACION
SOMBRERO VENTILACION PVC DE 2"
REDES EXTERIORES DE DESAGUE
TRAZO NIVELES Y REPLANTEO REDES DE AGUA DESAG.
EXCAVACION T/N DESAGUE 4-6" HASTA 1.00
SUMISTRO E INSTALACION TUBERIA PVC - SAL PESADA
SUMINISTRO E INSTA. TUBERIA PVC-SAL 6"
CAMARAS DE INSPECCION
CAJA DE REGISTRO 12"X24 C/TAPA CONCRETO
CAJA DE REGISTRO 24" X 24" C/TAPA CONCRETO
SISTEMA DE AGUA FRIA
SALIDA DE AGUA FRIA
SALIDA DE AGUA FRIA PVC O 1/2"
REDES INTERIORES DE AGUA
TRAZO NIVELES Y REPLANTEO REDES DE AGUA DESAG.
TUBERIA PVC - SAP ENTERRADA EN PISO
SUMINISTRO E INST. TUBO PVC-SAP-C10 1/2"
SUMINISTRO E INST. TUB. PVC-SAP-C10 3/4"
SUMINISTRO E INSTA. TUB. PVC-SAP-C10 1"
SUMINISTRO E INST. TUB. PVC-SAP-C10 1 1/2"
SUMINISTRO E INST. DE TUB. PVC-SAP-C10 2"
TUBERIA PVC - SAL EMPOTRADA EN MUROS
SUMINISTRO E INST. TUBO PVC-SAP-C10 1/2"
LLAVES Y VALVULAS
VALVULA COMPUERTA BRONCE 1/2"
VALVULA DE COMPUERTA DE BRONCE 3/4"
VALVULA COMPUERTA BRONCE 1"
VALVULA DE COMPUERTA DE BRONCE 2"
VALVULA DE COMPUERTA DE BRONCE 1 1/2"
SISTEMA DE AGUA CALIENTE
SALIDA DE AGUA CALIENTE
SALIDA DE AGUA CALIENTE CPVC 1/2"
TUBERIA CPVC - ENTERRADA EN PISO
TUBERIA AGUA CALIENTE CPVC 1/2"
TUBERIA AGUA CALIENTE CPVC 3/4"
LLAVES Y VALVULAS
VALVULA DE COMPUERTA DE BRONCE 3/4"
APARATOS SANITARIOS Y ACCESORIOS
EQUIPOS Y SISTEMAS
EQUIPO DE BOMBEO, ELECTROBOMBA 2 HP
INSTALACIONES HIDRAULICAS
MONTAJE DE ACCESORIOS EN CISTERNA
MONTAJE DE ACCESORIOS TANQUE ELEVADO
PRUEBA HIDRAULICA DE RESERVORIO
ACCESORIOS SANITARIOS/AGUA FRIA
SUMINISTRO E INSTALACION DE ACCES. P/AGUA FRIA
ACCESORIOS SANITARIOS/AGUA CALIENTE
SUMINISTRO E INSTALACION DE ACCES. P/AGUA CALIENTE
ACCESORIOS SANITARIOS/DESAGUE
SUMINISTRO E INSTALACION DE ACCES. P/DESAGUE
TRAMPA DE GRASA
TRAMPA DE GRASA DE CONCRETO/ INCLUYE TAPA Y ACCESORIOS
TRAMPA TIPO "U"
TRAMPA "U" DE P.V.C. SAL PARA DESAGUE DE 2"
TOTAL COSTO DIRECTO
GASTOS GENERALES 8 %
PTO
PTO
PTO
70.00
24.00
18.00
21.77
101.64
45.48
1,523.90
2,439.36
818.64
65.00
21.00
17.00
1,415.05
2,134.44
773.16
5.00
3.00
1.00
108.85
304.92
45.48
70.00
24.00
18.00
1,523.90
2,439.36
818.64
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
M
M
258.00
103.00
8.14
22.26
2,100.12
2,292.78
240.00
100.00
1,953.60
2,226.00
18.00
3.00
146.52
66.78
258.00
103.00
2,100.12
2,292.78
100.00%
100.00%
0.00
0.00
0.00
0.00
54.00
8.14
439.56
48.00
390.72
6.00
48.84
54.00
439.56
100.00%
0.00
0.00
UND
UND
38.00
10.00
11.25
17.26
427.50
172.60
27.00
9.00
303.75
155.34
11.00
1.00
123.75
17.26
38.00
10.00
427.50
172.60
100.00%
100.00%
0.00
0.00
0.00
0.00
PZA
18.00
15.03
270.54
0.00
0.00
18.00
270.54
18.00
270.54
100.00%
0.00
0.00
M
M
273.00
273.00
0.83
12.47
226.59
3,404.31
273.00
273.00
226.59
3,404.31
0.00
0.00
0.00
0.00
273.00
273.00
226.59
3,404.31
100.00%
100.00%
0.00
0.00
0.00
0.00
273.00
35.70
9,746.10
0.00
0.00
273.00
9,746.10
273.00
9,746.10
100.00%
0.00
0.00
UND
UND
54.00
2.00
71.72
98.14
3,872.88
196.28
0.00
0.00
0.00
0.00
54.00
2.00
3,872.88
196.28
54.00
2.00
3,872.88
196.28
100.00%
100.00%
0.00
0.00
0.00
0.00
PTO
97.00
28.52
2,766.44
82.00
2,338.64
15.00
427.80
97.00
2,766.44
100.00%
0.00
0.00
596.00
0.83
494.68
596.00
494.68
0.00
0.00
596.00
494.68
100.00%
0.00
0.00
M
M
M
M
M
355.00
37.00
92.00
12.00
100.00
6.54
7.03
8.05
11.05
14.26
2,321.70
260.11
740.60
132.60
1,426.00
285.00
34.00
0.00
0.00
0.00
1,863.90
239.02
0.00
0.00
0.00
70.00
3.00
92.00
12.00
100.00
457.80
21.09
740.60
132.60
1,426.00
355.00
37.00
92.00
12.00
100.00
2,321.70
260.11
740.60
132.60
1,426.00
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
53.00
6.54
346.62
50.00
327.00
3.00
53.00
346.62
100.00%
0.00
0.00
PZA
PZA
PZA
PZA
PZA
60.00
1.00
2.00
1.00
2.00
34.12
44.55
71.59
94.92
88.52
2,047.20
44.55
143.18
94.92
177.04
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
60.00
1.00
2.00
1.00
2.00
19.62
0.00
2,047.20
44.55
143.18
94.92
177.04
60.00
1.00
2.00
1.00
2.00
2,047.20
44.55
143.18
94.92
177.04
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PZA
21.00
54.45
1,143.45
20.00
1,089.00
1.00
54.45
21.00
1,143.45
100.00%
0.00
0.00
M
M
15.00
60.00
18.44
23.94
276.60
1,436.40
13.00
51.00
239.72
1,220.94
2.00
9.00
36.88
215.46
15.00
60.00
276.60
1,436.40
100.00%
100.00%
0.00
0.00
0.00
0.00
PZA
8.00
44.55
356.40
0.00
0.00
8.00
356.40
8.00
356.40
100.00%
0.00
0.00
UND
1.00
493.54
493.54
0.00
0.00
1.00
493.54
1.00
493.54
100.00%
0.00
0.00
UND
UND
GLB
1.00
1.00
1.00
251.56
389.00
85.07
251.56
389.00
85.07
0.00
0.00
0.00
0.00
0.00
0.00
1.00
1.00
1.00
251.56
389.00
85.07
1.00
1.00
1.00
251.56
389.00
85.07
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
GLB
1.00
275.69
275.69
0.00
0.00
1.00
275.69
1.00
275.69
100.00%
0.00
0.00
GLB
1.00
190.50
190.50
0.00
0.00
1.00
190.50
1.00
190.50
100.00%
0.00
0.00
GLB
1.00
627.90
627.90
0.00
0.00
1.00
627.90
1.00
627.90
100.00%
0.00
0.00
UND
1.00
350.06
350.06
0.00
0.00
1.00
350.06
1.00
350.06
100.00%
0.00
0.00
UND
1.00
18.25
18.25
0.00
0.00
1.00
18.25
1.00
18.25
100.00%
0.00
0.00
S/.
S/.
511,508.95
40,920.72
511,508.95
40,920.72
100.00%
8%
deductivo
413,060.66
33,044.85
98,448.29
7,875.86
19.25%
Pgina 65
UTILIDADES 7.00 %
SUB - TOTAL
I . G . V . 19 %
TOTAL PRESUPUESTO
FACTOR DE RELACION
TOTAL VALORIZADO
7%
19%
S/.
35,805.63
S/. 588,235.29
S/. 111,764.71
S/. 700,000.00
1.00000
700,000.00
28,914.25
475,019.76
90,253.75
565,273.52
1.00000
565,273.52
80.75%
6,891.38
113,215.53
21,510.95
134,726.48
1.00000
134,726.48
19.25%
35,805.63
588,235.29
111,764.71
700,000.00
1.00000
700,000.00
100.00%
1.00000
-
100.00%
deductivo
Pgina 66