Total storage capacity in one dyke area in M3
No of tanks
Cooing water required for tank falling within R+30 from the centre of the tank und
Total storage capacity in one dyke area in M3
508
No of tanks
3.1428
ANK PROTECTION
17
17
1442.5452
LPM
86552.712
1442.5452
5000
LPM
Rate of cooling water=3lpm/M3
of tank area
86552.712
66076.5843
2.2
Data
Total storage capacity in one dyke area in M3
No of tanks
Cooing water required for tank falling within R+30 from the centre of the tank und
Total storage capacity in one dyke area in M3
508
No of tanks
3.1428
ANK PROTECTION
30
30
2828.52
LPM
169711.2
2828.52
5000
LPM
Rate of cooling water=3lpm/M3
of tank area
169711.2
14142.6
3429.5805
3535.65 LPM/M3
205774.83
10
10
2.2
Data
Total storage capacity in one dyke area in M3
508
No of tanks
Cooing water required for tank falling within R+30 from the centre of the tank u
Total storage capacity in one dyke area in M3
508
No of tanks
3.1428
216.636
5000
18
10
1527.4008
LPM
91644.048
848.556
5000
LPM
Rate of cooling water=3lpm/M3
of tank area
50913.36
id surface area
5091.336 1272.834 LPM/M3
1234.64898
M3/ hr.
74078.9388
18
15
5
1
2.3 FIRE WATER FLOW RATE FOR COOLING POL TANK WAGON LOADING GANTR
a)
Data
Total No. of loading
points
Width
of tank wagon gantry (Cooling two spur)
b)
Cooling water flow rate
Divide total area of gantry into equal segments such that each segment measuring
15 m X 12 m and consider 3 segments operating at a time.
Water rate required
=
=
5508 LPM
330480
Conventional or BTPN.
12
3 x 15 m x 12 m x 10.2 lpm/m2.
5508
3
330 mlpm
/hr
2.5
TOTAL DESIGN FIRE WATER FLOW RATE FOR SINGLE FIRE CONTEGENCY
The total fire water flow requirement will be highest of one of the fire water requirement calculated in 2.1 (3
i.e. 659m3/hr plus supplementary water (36 x 4 = 144 m/hr) = 803 m/hr.
re water requirement calculated in 2.1 (376 m/hr) & 2.2 (458 m/hr), 2.3 (330 m/hr) and 2.4 (659 m/hr) above
2408
M3/hr
1806
M3
458
144
602
50000
4
12500
37.5
12
18.75
Cooling water rate for the tank falling with in ( R+30) from the center of the
5524.453125 LPM
5358.71953125 LPM
321523.171875
321.523171875 M3/ hr.
Tank cooling
Foam solution application
1018.2672
321.523171875
NK PROTECTION
3.1428
4242.78
254566.8
254.5668
M3/ hr.
ce
12728.34
763700.4
763.7004
M3/ hr.
3.3 FIRE WATER FLOW RATE FOR COOLING POL TANK WAGON LOADING GANTRY
Length
15
Width
12
sigment
Conventional or BTPN.
12 m.
5508
LPM
330480
330.48
M3/hr
TOTAL DESIGN FIRE WATER FLOW RATE FOR TWO SIMULTANEOUS FIRE SCENARIO
The total fire water flow requirement will be sum of the two largest fire water requirement calculated in 3.1 (504 m/hr) & 3.2 (13
m/hr), 3.3 (330 m/hr) above i.e. (1341+504) =1845 m3/hr plus supplementary water (36 x 4 = 144 m/hr) = 1989 m/hr.
OR water requirement alone as calculated in 3.4 i.e. 1028 m 3/hr plus supplementary water (36 x 4 = 144 m 3/hr) = 1172 m
Hence water requirement for double contingency locations shall be 1989 m 3/hr
9000 M3
FIRE WATER FLOW RATE FOR COOLING POL TANK WAGON LOADING GANTRY
a)
Data
=
Total No. of loading points
Width of tank wagon gantry
=
(Cooling
two
spur)
b)
Cooling water flow rate
Divide total area of gantry into equal segments such that each segment measuring 15 m
X 12 m and consider 3 segments operating at a time
Water rate required
=
3 x 15 m x 12 m x 10.2 lpm/m 2.
Conventional or BTPN.
12 m.
a)
Total
----- ) 0 x 0 ( -----
474m/hr.
=
=
4 x 36 = 144 m 3/hr.
144 m3 / hr.
330 m/hr.
144m3/ hr
5508 lpm
330 m3/hr
Conventional or BTPN.
12 m.
5508
=
5508 330.48
lpm
330 m3/hr
330480
M3/hr
1.2
Foam compound calculation for single largest cone roof tank in a dyke.
Tank Data
Total storage capacity in one dyke area =
10,000 m 3. No. of tanks
=
2
3
Capacity of each tank
=
5,000 m .
Diameter of each tank
=
24 m.
Height of each tank
=
12 m.
Foam compound requirement for tank
Foam solution application rate
= 5 lpm/m 2 of liquid surface area of tank. Foam solution required
2
= ( x (12) x 5) lpm = 2262.9 lpm Foam compound required (3%)
= 0.03 x
2262.9 lpm = 67.9 lpm.
Foam compound required for 65 minutes =
2.2
Foam compound calculation for single largest cone roof tank in a dyke.
Tank Data
Total storage capacity in one dyke area =
50,000 m 3. No. of tanks
=
4.
3
Capacity of each tank
=
12,500 m .
Diameter of each tank
=
37.5 m.
Height of each tank
=
12 m.
Foam compound requirement for tank
Foam solution application rate
= 5 lpm/m 2 of liquid surface area of tank. Foam solution required
2
= ( x (18.75) x 5) lpm = 5524.6
Foam compound required (3%)
= 0.03 x 5524.6 lpm = 165.7 lpm.
Foam compound required for 65 minutes = 65 minutes x165.7 lpm = 10,771 litres.
2.3
In case of double fire, foam will be required to pour in both tanks simultaneously.
Foam compound requirement for 65 minutes = (2308 + 10,771) litres = 13,079 litres.