No Industry Is Safe
Hot workany operation that
produces flames, sparks or heat
is an established cause of fire and
explosions throughout the world.
FM Global loss history shows there
is no industry or type of facility
immune to his hazard. Cutting, welding, brazing, grinding, sawing, sweat
soldering, applying roof covering,
sealing plastic shrink-wrap by torch,
and using a plumbers torch are all
examples of hot work.
According to FM Global records, during the past five years, hot work was
the second most costly cause of ignition of fire or explosion. In fact,
a summary of FM Global hot work
fires from 2003 to 2012 (a ten-year
period), shows there have been 282
losses with an indexed gross of
US$946.8 million in property loss and
interrupted operationsan average
of US$3.4 million per fire. Of those
losses, all could have been prevented
with proper hot work management.
Small and large companies that utilize
the FM Global Hot Work Permits say
that their success in preventing fires
caused by hot work is not possible
without top managements support of
a strong hot work program.
to see that its operation is on automatic. Fire hose and extinguishers need to
be available, be in service and operate
properly. Hot work equipment should
be in good condition.
4. Train the fire watch:
n
Make sure the fire watch checks
adjoining areas, including above
and below the work area, and
watches for fire during the hot
work operation. This is especially
critical where openings exist.
n
Train the fire watch in using fire
protection (extinguishers and
charged hose lines) and sounding
the fire alarm.
How Effective Is Your Hot Work
Management Program?
n
Do you have a written management policy covering plant or
corporate intention to control hot
work? Is it clearly communicated
to all employees and contractors?
24%
19%
11%
10 %
36 %
24%
19%
36%
11%
10%
Fully trained in hot work
property loss prevention
supervision?
Available (or on call)
24 hours a day?
Contacted for all hot work
(inside and outside of
facility buildings)?
Authorized to stop all
hot work?
Required to visit all sites
before approving hot work?
Required to personally complete the Hot Work Permit?
(This tag is conspicuously
posted at the job site by the
fire-safety supervisor.)
n
Above:
It is critical that any area within
35 ft. (11m) of the hot work is kept
clear of combustible material.
ORK IN
HOT W
PROGRE
st
Checkli
autions
ions
atic.
d Prec
to autom
started
Require
.
Part 2
switched
k
ate time
m are open
tion and
hot wor
k: Indic
kler syste
Y NA
is in opera
.
hot wor location. After posted
for sprin
fire pump
orming
e/operable
r supply
e permit
on perf it at hot work
n n the
s to wate
are in servic
1. Pers
ol valve
and leav
uishers
perm
ition.
n n Contr
and exting
ing cond
and post d, indicate time
streams
good work
for one final
ment in
n n hose
is complete h.
work and
rm
work equip
watc
of hot work
for fire
ved.
n n hot
ft. (11 m)
during hot ing area, perfo afety
35
remo
n
area
sits
depo
nts withi
watch on. Prior to leav and notify fires
and oily
Requireme
Watch:
ed
pleti
, dust, lint
2. Fire
eliminated.
after com
ble liquid
permit post
in area
(1) hour n, sign, leave
n Ignita
sphere
s. Perform n
sive atmo
damp sand
inspectio r.
e (3) hourrvisor.
n n Explo
ed with
clean.
tional thre
s swept
down, cover
superviso
for addi to firesafety supe
n n Floor
floors wet
itor area
rn
ustible
Thiswhere possible. Avets
itor: Mon n, sign and retu
n n Comb esistive sheets.
oid
3. Mon
e material Hot Wng pads, blank
ectio
or fire-r
hot
weldi ork
combustibl
final insp
wor
Pe s.
Approved
ve other
This l shield
k or
with FM
ct
or meta
includ rmit is
n n Remo
seek
wise, prote
tarpaulins
es, bu reunde
quire
r
k by
esistive
n n other
led
an al
ed.
ins, fire-r
d for
t is
instal
hot woR
ings cover
and curta
not
curtains
tern
oyee
open
Empl
floor
ets and
limite any tem
ativ
Er
wall and 1. Firng pads, blank
r
po
s d to:
Job Numb
e/sa
n n All
weldi esafe
Contracto
carry spark
braz rary op
ty
might
Approved
fer m
In
FM
that
er
ing,
supe yors
struc
A.. Ve
nn
d work
cuttin ation inv
etho
rviso
tions
rify and conve
and aroun
DATE
r:
g, gr
d, if
olv
down ducts
prec
or shut with mate
inding ing op
rial.
ct
poss
au
ethe
fLoor
n n Prote t comb
, solde en fla
ible
work tions lis
B. Coustibl
uiLDiNg AND
covering
mes
ted
to distan
.
).
ring,
ustible
mp,let
LocATioN/b
gs or roofs
at
Pa
comb
ut
ceilin
torch or prod
right
rt 1
and witho
onaswalls
sura e anstible
ucing
ioN
-app
(or do moved away.
Hot work
ncombu d re
cific LocAT
lied
is
C. Iss
Y NA
on is nonc e docu tain Pa
or roofs not pr
obJEcT/spE
roofi heat an
tructi
gs
ify
ue
rt 1., ceilin
iDENT
menta
ocee
d/o
ng an
walls
n n Cons
nn
Requ
(P
tion. Part
side oftio
ho
d
d we r sparks
ortinsula
n, if art 1A
ired
woR e material2ontoother
n n the fire
pe
lding
.
is
ne
Pr
rso
pum
ustibl
k
cess rial.for qu
Job
ecau
.
n pe
ment
Emplo by
hoT work
n n Control val p is in
NATurE of
n n Comb
ary.)
ality
tions
rformustible mate
ope
yeeon enclosed equip all comb
N pErformiNg
ves
hose
ration
ing
Co
Chec
ed of
of pErso
n
to
ntrwork
str
Hot
TurE
clean
wa
ho
n
e,
and
actor
eam
klist
ment
t wofrom servic
/vapor.
hot
DATE
) AND sigNA
switch
s and ter sup
ns
sed equip
ble liquid
work
ply
removed rk.
NAmE (priNT
ed
ext
n Enclo
precautio
d of ignita
Instruct
HOT
WOR
K PE
STO
RMI
P!
T
for spr
ment
equ
n
the
to aut
ipment inguisher
and equip
iners purge
inkler
om
examined,
been taken
n n Requirem
ls, piping
n Conta
s are
in goo
system atic.
has been Checklist have
LocATi n
ents
.
in
urized vesse
d wo
e location
are
wi
n n Ignitable
oN/
autions
this work
n Press
rking service/o
n bui
the abov
ope
vented.
liquid, thin 35
ired Prec authorized for
LDiNg
work,
n.
con
I verify
ed and
ft. (11
Job
isolat
toring
visor
n n Explosive
dition. perable.
n is
AND
dust,
hour after
on the Requ
moni
Num
m) of
one (1)
fLoor
permissio
ATioNs supEr
atm
checked
iDENTi
work area
and for
ospher lint and
gbEr
hot
n n Floors sw
visor/opEr
nt fire, and
fy obJ
watch/hot
work
oily
ded durin
fETy supEr
ept
to preve
e in
Comb
dep
e practical,
EcT/sp Fire
area
will be provi
osits
ustible clean.
TurE of firEsA
and wher
ty.
Ecific watch
elim
uishers,
) AND sigNA
inated remove
floors
n n Fire
LocATi any break activi
NATurE
n n or fire-re
le exting
NAmE (priNT
d.
ing
suitab
.
wet
sistive
with
includ oN
ofp.m.
Remo
.
dow
Job
supplied
ing alarmn n
she
ve
n, cov
a.m.
ED:
watch is
otherw other com ets.
.
and in sound
ered
hose.
a.m. n n Fire
TimE fiNish
below
ment
small
NAm
and
equip
with
ed
ise,
, above
E (pr p.m.
and
a charg
TimE
in use of
protec bustible
dam
p.m.
iNT) AND
ing areas
cur
trained
p san
afternthe
mater
n
in adjoin
a.m.
ED:
watch is
(3) hours
d
All wa tains, fire t with FM
ial wh
sigNAT
required
DATE
three
n Fire
TimE sTArT
be
n
nurE
ional
-resis
ll and
Appro
n
ere
h may
pos
FM
of pEr watc
for an addit
ved
I ve s to which
Appro floor ope tive tar
n n Fire
weldin sible.
soNtor hot work area
Expires
pau
arearify
ved
the g the
nings
pErfor
lins
centch
Permit
h.
n n and around weldin
ecd durinab
or me g pads,
n n Moni hour
covere
miN
ove
fireg watc
and all adja
d
blanke
ecteke
g pad
tal shi
Protec
hoT wo
work.
one (1)
work area ad were inspto prevent on the Re location
s, bla d.
ts
elds.
t
rk:
has
spre
nkets
qu
to dis or shut
h signoff:
fire,
utions taken
dow
and
tant
and ired Pre beOther
en ex preca
Fire watc heat might have d firesafe.
NAm
n
curtain
com
perm
E (pr
ncan
bustibl ducts and
iNT) AND
ission utions amined,
s ins
sparks and d and were foun
n n Hot work
e ma
talled
con
sigNAT
veyors
ing is autho Checklist the preca
on
terial.
Const
und
watch perio
urE of
er
uti
rized
ruction walls, cei
ha
that
hours follow
firEsA
might
or ins
for thi ve been ons
three (3)
lings
is
for
afe.
d
n
ed:
non
Tim
fET
ulation
carry
Sign
n
taken
or
s wo
y sup
com
monitore E sTA and found fires
Comb
sparks
.
rk.
bustibl roofs
Erviso
D:
k area was fire watch rTE
ustible
r/opEr
e and
kup: wor
hour
ma
chec
(1)
l
withou
ATioNs
terial
one
Fina
a.m.
n n Hot work
on oth
t com
supErv
on of the
Perm
on enc
er sid
bustibl
completi
isor
it Ex
n n Enclosed
p.m.
losed
e of
e cov
pires
equ
TimE
walls,
equ
ering
ipm
n n Containe
fiNish
ipm
ceiling
Signed:
Note:
DATE
ent
rs pur ent cle
ED:
Pre
s
ane
Use Emerge
as
nc
appr
a.m.
y
To ord
opria notifica
TimE
te for tion
online er additio
your on ba
24 hou nal hot
facilit ck of
rs a
day, work per
form.
y.
seven
mit
days s or oth
a we er FM
ek, at
Glo
www.f bal res
mglob ources
alcata , order
F2630
log.co
201
m.
All
rights
2
reservFM Globa
l. (Re
ed.
v. 6/2
012)
ssurize
ged
d of
of ign
all com
d ves
isolate
itab
sels,
d and
piping le liquid/v bustibl
ven
or roo
fs is
e ma
apo
ted.
and
p.m.
terial.
n n Fire watch
r.
equ
ipment
Fire
/hot
a.m.
watch
work
rem
oved
are
p.m.
n n including will be pro a mo
from
nit
ser
any
moved
away.
vice,
break vided dur oring
watch
ing and
act
n n a charge is supplie ivity.
for one
d
d
(1) hou
n n Fire watch small hos with sui
table
e.
r aft
exting
er wo
n n Fire watch is traine
d in
rk,
uisher
Monito
ma
use
s, and
of equ
r hot y be req
one
where
ipm
(1) hou work are uired in
practic
nn
adjoin ent and
a for
r fire
in
al,
ing
an
Other
sou
watch
areas,
add
nding
precau
itional
.
tions
three above and alarm.
taken:
(3) hou
below
rs aft
.
er the
Fire
Contact Us:
Report A Loss:
P9802 2013 FM Global
(Rev. 03/2013) All rights reserved.
www.fmglobal.com
In the United Kingdom:
FM Insurance Company Limited
1 Windsor Dials, Windsor, Berkshire, SL4 1RS
Regulated by the Financial Services Authority.