TENDER 27/2012, KHASAB G/S COMMISSIONING PLANNIN

Project - EPC for Double Circuit 132kV OHL Transmission Line with Associated 132kV/33kV/ 11kV Grid Substations in MU
SL NO

NAME OF THE TESTING

11KV AIS
1 RELAY TESTING
Trip Test
2 BB STABILITY TEST
Scheme Checks / Interlocks (Level 0 &1)
CT AND VT Secondary Injection
Primary Injection
CT Phase/Core and Polarity Identification
33KV GIS SECTION A & B.
1 BB STABILITY TEST
Scheme Checks / Interlocks (Level 0 &1)
CT AND VT Secondary Injection
Primary Injection
CT Phase/Core and Polarity Identification
2 RELAY TESTING
Trip Test
132 KV GIS
1 RELAY TESTING
Trip Test
2 BB STABILITY TEST
Scheme Checks / Interlocks (Level 0 &1)
CT AND VT Secondary Injection
Primary Injection
CT Phase/Core and Polarity Identification
3 BB HV Test
4 VT Test
125MVA Power Transformer
1 Oil BDV and DGA Test

SNCC CREW

Team - 3

NO OF DAYS RQD

WITNESS DATES
Start

10

30-Oct-16

Team - 1 & 2

10.0

27-Oct-16

Team - 1 & 2

11.0

08-Nov-16

Team - 4

30

01-Nov-16

Team - 4

30

01-Nov-16

2 Power Factor (TanDelta) Test


3 RTCC
Tapcon Relay Test
Parallel Operation
Indication & Trip Test
4 TXR STABILITY TEST
20MVA Power Transformer
1 Oil BDV and DGA Test
2 Power Factor (TanDelta) Test
3 RTCC
Tapcon Relay Test
Parallel Operation
Indication & Trip Test
4 TXR STABILITY TEST
SCS
1 SCS SIGNAL TEST
1.5MVA SAT
1 TXR Testing
2 Scheme Check
LVAC
1 Compound Test (CT,VT,CB..etc)
2 Relay Testing
3 Scheme / Interlock Check
33KV CAPACITOR BANK
1 Control and Relay Panel Testing
2 Scheme / Interlock Check
110V DISTRUBUTION CHARGER
1
Function Check
2
Battery Charging Test
3
Battery Discharging Test
POWER CABLE HV TEST
1 125MVA TXR To 132KV GIS
2 125MVA TXR To 33KV GIS
3 20MVA TXR To 11KV AIS

Team - 4

30

01-Nov-16

Team - 4

30

01-Nov-16

Team - 4

30

01-Nov-16

Team - 4

30

01-Nov-16

HBL

BPC

4 20MVA TXR To 33KV GIS


5 132KV GIS To O/G Feeders
6 33KV GIS To O/G Feeders
7 11KV AIS To O/G Feeders
OVER ALL REQUIREMENTS
1
2
3
4
5
6
7
8

Final Relay settings (132/33/11KV,Tapcon,Auto Recloser)


FO Cable Installation and Testing
BCU configuration and Testing
Earthing Work
Telecom Panel configuration and Testing
EDG Installation and Testing
Fire fighting system Installation and Testing
SCS / LDC configuration and Testing

SIONING PLANNING

Substations in MUSANDAM Governorate


WITNESS DATES
End
10-Nov-16

07-Nov-16

19-Nov-16

30-Nov-16

30-Nov-16

SNCC RESPONSE

REMARKS

30-Nov-16

30-Nov-16

30-Nov-16

30-Nov-16

SL.NO
A.
1
1.1
1.1.1
1.1.2
2
2.1
2.2
2.3
2.4
2.5
2.6
3
3.1
3.1.1
3.1.2
3.1.3
3.2
3.2.1
3.2.2
3.2.3
3.2.4
3.2.5
3.3
4
4.1
4.2
5
5.1
5.2
5.3
6

DESCRIPTION
Team No: -1- Mr. ARUN- 132KV
OETC - Level II
OHL Feeders
Relay Testing
Main 1 & Main 2 Protection Test
50BF 1 & 50BF-2/79/25 Test
Functional Check and Trip test
Differential Trip
Distance Zone-1 Trip
Distance Zone-2,3&4 Trip
50BF Initation and Trip
AR Initation and Block
SYNCH Operation
TRANSFORMER FEEDERS
Relay Testing
Main - 1
Main - 2 Siprotec
50BF 1 & 50BF-2/79/25 Test
Scheme Check and Trip test
Differential Trip
50BF Initation and Trip
AR Initation and Block
SYNCH Operation
125MVA Transformer Stability
Bus section and Bus coupler
Relay testing
Scheme check and Trip test
Bus Stability
CT Secondary Injection
VT Secondary Injection
Primary Injection
132KV GIS HV Test

Team No: 2- SUDARSON


DCRP - Level III
1
33KV Relay Test
1.1 Transformer Feeder
1.2 OHL / Spare Feeder
1.3 Capacitor Feeder
1.4 DG Incomer Feeder
2
Scheme check and Trip test

No Of Days

1
1
5

B.

?
10

2.1
2.2
3
3.1
3.2
3.3
4
4.1
4.2
4.3
4.4
C.
1
2
3
3.1
3.2
4
5
6
D.
1
E
1
2

3
4
5
6

20MVA Transformer Stability


Interlock Verification
11KV relay Test
Out Going Feeder
Incomer Feeder
Synch Protection
11KV scheme Check and Trip test
Bus Stability
CT Secondary Injection
VT Secondary Injection
Primary Injection
Team No: 3 VENKATASAN- Transformer &
LVAC
OETC Level I
20 MVA- Transformer- RTCC
Testing of SAT
Testing of LVAC Panels
Relay Testing
Scheme check and Trip test
Tan Delta Test
Capacitor Bank Test by Vendor
110 V DC distribution Battery test
Team No: 4- MV cable HV test
Ray International
MV cable HV test
Reaming Activities
FO Cable Installation and Testing
BCU configuration and Testing
BCU - Site Acceptance Test
BCU I/O Matrix Verification.
Earthing Installation and Testing
Telecom Panel configuration and Testing
END To END Test
EDG Installation and Testing
SCS / LDC configuration and Testing

2
2
3

2
5
5

No Of Panels

From

To

13-Nov-16

17-Nov-16

19-Nov-16

21-Nov-16

22-Nov-16

23-Nov-16

24-Nov-16

28-Nov-16

29-Nov-16
30-Nov-16
01-Dec-16

29-Nov-16
30-Nov-16
05-Dec-16

13-Nov-16

13-Nov-16

08-Nov-16

14-Nov-16

?
21-Nov-16

?
30-Nov-16

14-Nov-16

20-Nov-16

01-Dec-16

05-Dec-16

09-Nov-16
12-Nov-16
19-Nov-16

10-Nov-16
13-Nov-16
21-Nov-16

22-Nov-16
26-Nov-16
26-Nov-16

23-Nov-06
30-Nov-16
30-Nov-16

13-Nov-16

16-Nov-16

20-Nov-16

05-Dec-16
-

20-Nov-16
-

05-Dec-16

05-Dec-16
14-Jan-17

Remarks

Completed

Completed

Completed

Completed
Completed
Completed
Completed
Setting File Required.

In Progress
Completed
Completed
Not Yet Started

Completed
In Progress
Not Yet Started

Oil DGA Test?

In Progress

SL.N
DESCRIPTION
O
A. Team No: -1- Mr. ARUN- 132KV
OETC - Level II
1 Internal Testing
2 OHL Feeders
2.1 Relay Testing
Main 1 & Main 2 Protection
50BF 1 & 50BF-2
2.2 Scheme Check and Trip test
3 TRANSFORMER FEEDERS
3.1 Relay Testing
3.2 Scheme Check and Trip test
3.3 125MVA Transformer Stability
4 Bus section and Bus coupler
4.1 Relay testing
4.2 Scheme check and Trip test
5 Bus Stability
5.1 CT Secondary Injection
5.2 VT Secondary Injection
5.3 Primary Injection
6 132KV GIS HV Test
B. Team No: 2- SUDARSON
DCRP - Level III
1 33KV Relay Test
1.1 Transformer Feeder
1.2 OHL / Spare Feeder
1.3 Capacitor Feeder
1.4 DG Incomer Feeder
2 Scheme check and Trip test
2.1 20MVA Transformer Stability
2.2 Interlock Verification
3 11KV relay Test
3.1 Out Going Feeder
3.2 Incomer Feeder
3.3 Synch Protection
4 11KV scheme Check and Trip test
4.1 Bus Stability
4.2 CT Secondary Injection
4.3 VT Secondary Injection

No: of Days

5
5

3
2
5

1
1
5

?
10

4.4 Primary Injection


Team No: 3 VENKATASAN- Transformer &
C.
LVAC
OETC Level I
1 20 MVA- Transformer- RTCC
2 Testing of SAT
3 Testing of LVAC Panels
3.1 Relay Testing
3.2 Scheme check and Trip test
4 Tan Delta Test
5 Capacitor Bank Test by Vendor
6 110 V DC distribution Battery test
D. Team No: 4- MV cable HV test
Ray International
1 MV cable HV test
E Reaming Activities
1 FO Cable Installation and Testing
2 BCU configuration and Testing
3 Earthing Installation and Testing
4 Telecom Panel configuration and Testing
5 EDG Installation and Testing
6 SCS / LDC configuration and Testing

2
2
3

2
5
5

From

To

Remarks

08-Nov-16

12-Nov-16

13-Nov-16

17-Nov-16

Completed

19-Nov-16

21-Nov-16

Not Yet Started

22-Nov-16
24-Nov-16

23-Nov-16
28-Nov-16

29-Nov-16
30-Nov-16
01-Dec-16

29-Nov-16
30-Nov-16
05-Dec-16

13-Nov-16

13-Nov-16

Completed

08-Nov-16

14-Nov-16

?
21-Nov-16

?
30-Nov-16

Completed
Completed
Completed
Completed
Setting File Required.

14-Nov-16

20-Nov-16

01-Dec-16

05-Dec-16

In Progress
Completed
Completed
Not Yet Started

09-Nov-16
12-Nov-16
19-Nov-16

10-Nov-16
13-Nov-16
21-Nov-16

Completed
In Progress
Not Yet Started

22-Nov-16
26-Nov-16
26-Nov-16

23-Nov-06
30-Nov-16
30-Nov-16

Oil DGA Test?

13-Nov-16

16-Nov-16

In Progress

20-Nov-16
20-Nov-16
05-Dec-16
14-Jan-17

05-Dec-16
05-Dec-16
-