You are on page 1of 28

Risk Assessment Register

Doc Number Revision Date


TEC-RAS-001
TEC-RAS-002
TEC-RAS-003
TEC-RAS-004
TEC-RAS-005
TEC-RAS-006
TEC-RAS-007
TEC-RAS-008
TEC-RAS-009
TEC-RAS-010
TEC-RAS-011
TEC-RAS-012
TEC-RAS-013
TEC-RAS-014
TEC-RAS-015
TEC-RAS-016
TEC-RAS-017
TEC-RAS-018
TEC-RAS-019
TEC-RAS-020
TEC-RAS-021
TEC-RAS-022
TEC-RAS-023
TEC-RAS-024
TEC-RAS-025
TEC-RAS-026
TEC-RAS-027
TEC-RAS-028
TEC-RAS-029

Rev_01
Rev_01
Rev_01
Rev_01
Rev_01
Rev_01
Rev_01
Rev_01
Rev_01
Rev_01
Rev_01
Rev_01
Rev_01
Rev_01
Rev_01
Rev_01
Rev_01
Rev_01
Rev_01
Rev_01
Rev_01
Rev_01
Rev_01
Rev_01
Rev_01
Rev_01
Rev_01
Rev_01
Rev_01

Task Description
Assembly and Disassembly of Mobile Crane
Abrassive Blasting
Carpentry Works
Cofferdam Installation and De-installation
Use of Power Tools
CONFINED SPACE WORK
Crane Lifting Operation
DIVING
Earth Work- Digging,Trenching and Excavation
Electrical Works
FORKLIFT TRUCK Operation
GANTRY CRANE
Hotworks- Welding,Grinding,Gas Cutting,Gouging
Operating HYDRAULIC EQUIPTMENTS
Hydrotesting
Insulation
Man basket
Mechanical maintenance work
Pipe Threading Machine
Painting
Pneumatic Testing
POSITIONING AND MANUEVERING OF THE BARGE
Radiographic Testing
Roof Work
Scaffolding Erection and Dismantling
Unloading of Main crane parts using SPMT
Weld Heat Treatment
Working at Heights
WORKING IN HEAT

TEC-RAS-030
TEC-RAS-031
TEC-RAS-032
TEC-RAS-033
TEC-RAS-034
TEC-RAS-035
TEC-RAS-036
TEC-RAS-037
TEC-RAS-038
TEC-RAS-039
TEC-RAS-040
TEC-RAS-041
TEC-RAS-042
TEC-RAS-043
TEC-RAS-044
TEC-RAS-045
TEC-RAS-046
TEC-RAS-047
TEC-RAS-048
TEC-RAS-049
TEC-RAS-050
TEC-RAS-051
TEC-RAS-052
TEC-RAS-053
TEC-RAS-054
TEC-RAS-055

Rev_01
Rev_01
Rev_01
Rev_01
Rev_01
Rev_01
Rev_01
Rev_01
Rev_01
Rev_01
Rev_01
Rev_01
Rev_01
Rev_01
Rev_01
Rev_01
Rev_01
Rev_01
Rev_01
Rev_01
Rev_01
Rev_01
Rev_01
Rev_01
Rev_01
Rev_01

Working inside the cofferdam


Working Overboard
Yard Diesel Bunkering operation
Barge Diesel Bunkering operation
Barge Water Bunkering Operation
Jacking System Lifting and Installation
Off loading Leg/Lifting in Tandem
Hellideck Installation
Engine Lifting and Installation
Thruster Installation
Main Crane Lifting and Installation
Auxillary Crane Lifting and Installation
Leg Lifting and Installation
Life Boat Lifting and Installation
Davit Lifting and Installation
Sea Water Riser Pipe Lifting and Installation
Jacking Trial
Engine Start up
Auxillary Crane Commisioning
Barge inclination tests from GMS quayside
Load Testing of the Main Generator Sets and Emergency Generator
Main Crane Commisioning
Power-up and Testing of motors, fans and all electrical equiptments on-board
Setting and Lowering the Leg using Hydraulic Jacks into the Spudcan
Operating CNC machine
Manual handling

Category
Non-Routine
Routine
Routine
Non-Routine
Routine
Non-Routine
Routine
Non-Routine
Non-Routine
Routine
Routine
Routine
Routine
Routine
Pre-Commisioning
Non-Routine
Non-Routine
Routine
Routine
Routine
Pre-Commisioning
Non-Routine
Non-Routine
Non-Routine
Routine
Non-Routine
Non-Routine
Routine
Routine

Initial Risk Residual Risk


Rating
Rating

Non-Routine
Non-Routine
Routine
Non-Routine
Non-Routine
Non-Routine - Lifting
Non-Routine - Lifting
Non-Routine - Lifting
Non-Routine - Lifting
Non-Routine - Lifting
Non-Routine - Lifting
Non-Routine - Lifting
Non-Routine - Lifting
Non-Routine - Lifting
Non-Routine - Lifting
Non-Routine - Lifting
Commissioning
Commissioning
Commissioning
Commissioning
Commissioning
Commissioning
Commissioning
Non-Routine
Routine
Routine

Risk Assessment Register


Doc Number Revision

Date

Location

TEC-RAS-063
TEC-RAS-064
TEC-RAS-065
TEC-RAS-066
TEC-RAS-067
TEC-RAS-068
TEC-RAS-069
TEC-RAS-070
TEC-RAS-071
TEC-RAS-072
TEC-RAS-073
TEC-RAS-074
TEC-RAS-075
TEC-RAS-076
TEC-RAS-077
TEC-RAS-078
TEC-RAS-079
TEC-RAS-080
TEC-RAS-081
TEC-RAS-082
TEC-RAS-083
TEC-RAS-084
TEC-RAS-085

TEC-RAS-086
TEC-RAS-087
TEC-RAS-088
TEC-RAS-089
TEC-RAS-090
TEC-RAS-091
TEC-RAS-092
TEC-RAS-093
TEC-RAS-094
TEC-RAS-095
TEC-RAS-096
TEC-RAS-097
TEC-RAS-098
TEC-RAS-099
TEC-RAS-100
TEC-RAS-101
TEC-RAS-102
TEC-RAS-103
TEC-RAS-104
TEC-RAS-105
TEC-RAS-106
TEC-RAS-107
TEC-RAS-108
TEC-RAS-109
TEC-RAS-110
TEC-RAS-111
TEC-RAS-112
TEC-RAS-113
TEC-RAS-114
TEC-RAS-115
TEC-RAS-116
TEC-RAS-117
TEC-RAS-118
TEC-RAS-119
TEC-RAS-120
TEC-RAS-121
TEC-RAS-122
TEC-RAS-123
TEC-RAS-124
TEC-RAS-125
TEC-RAS-126
TEC-RAS-127
TEC-RAS-128

TEC-RAS-129
TEC-RAS-130
TEC-RAS-131
TEC-RAS-132
TEC-RAS-133
TEC-RAS-134
TEC-RAS-135
TEC-RAS-136
TEC-RAS-137
TEC-RAS-138
TEC-RAS-139
TEC-RAS-140
TEC-RAS-141
TEC-RAS-142
TEC-RAS-143
TEC-RAS-144
TEC-RAS-145
TEC-RAS-146
TEC-RAS-147
TEC-RAS-148
TEC-RAS-149
TEC-RAS-150
TEC-RAS-151
TEC-RAS-152
TEC-RAS-153
TEC-RAS-154
TEC-RAS-155
TEC-RAS-156
TEC-RAS-157
TEC-RAS-158
TEC-RAS-159
TEC-RAS-160
TEC-RAS-161
TEC-RAS-162
TEC-RAS-163
TEC-RAS-164
TEC-RAS-165
TEC-RAS-166
TEC-RAS-167
TEC-RAS-168
TEC-RAS-169
TEC-RAS-170
TEC-RAS-171

TEC-RAS-172
TEC-RAS-173
TEC-RAS-174
TEC-RAS-175
TEC-RAS-176
TEC-RAS-177
TEC-RAS-178
TEC-RAS-179
TEC-RAS-180
TEC-RAS-181
TEC-RAS-182
TEC-RAS-183
TEC-RAS-184
TEC-RAS-185
TEC-RAS-186
TEC-RAS-187
TEC-RAS-188
TEC-RAS-189
TEC-RAS-190
TEC-RAS-191
TEC-RAS-192
TEC-RAS-193
TEC-RAS-194
TEC-RAS-195
TEC-RAS-196
TEC-RAS-197
TEC-RAS-198
TEC-RAS-199
TEC-RAS-200
TEC-RAS-201
TEC-RAS-202
TEC-RAS-203
TEC-RAS-204
TEC-RAS-205
TEC-RAS-206
TEC-RAS-207
TEC-RAS-208
TEC-RAS-209
TEC-RAS-210
TEC-RAS-211
TEC-RAS-212
TEC-RAS-213
TEC-RAS-214

TEC-RAS-215
TEC-RAS-216
TEC-RAS-217
TEC-RAS-218
TEC-RAS-219
TEC-RAS-220
TEC-RAS-221
TEC-RAS-222
TEC-RAS-223
TEC-RAS-224
TEC-RAS-225
TEC-RAS-226
TEC-RAS-227
TEC-RAS-228
TEC-RAS-229
TEC-RAS-230
TEC-RAS-231
TEC-RAS-232
TEC-RAS-233
TEC-RAS-234
TEC-RAS-235
TEC-RAS-236
TEC-RAS-237
TEC-RAS-238
TEC-RAS-239
TEC-RAS-240
TEC-RAS-241
TEC-RAS-242
TEC-RAS-243
TEC-RAS-244
TEC-RAS-245
TEC-RAS-246
TEC-RAS-247
TEC-RAS-248
TEC-RAS-249
TEC-RAS-250
TEC-RAS-251
TEC-RAS-252
TEC-RAS-253
TEC-RAS-254
TEC-RAS-255
TEC-RAS-256
TEC-RAS-257

TEC-RAS-258
TEC-RAS-259
TEC-RAS-260
TEC-RAS-261
TEC-RAS-262
TEC-RAS-263
TEC-RAS-264
TEC-RAS-265
TEC-RAS-266
TEC-RAS-267
TEC-RAS-268
TEC-RAS-269
TEC-RAS-270
TEC-RAS-271
TEC-RAS-272
TEC-RAS-273
TEC-RAS-274
TEC-RAS-275
TEC-RAS-276
TEC-RAS-277
TEC-RAS-278
TEC-RAS-279
TEC-RAS-280
TEC-RAS-281
TEC-RAS-282
TEC-RAS-283
TEC-RAS-284
TEC-RAS-285
TEC-RAS-286
TEC-RAS-287
TEC-RAS-288
TEC-RAS-289
TEC-RAS-290
TEC-RAS-291
TEC-RAS-292
TEC-RAS-293
TEC-RAS-294
TEC-RAS-295
TEC-RAS-296
TEC-RAS-297
TEC-RAS-298
TEC-RAS-299
TEC-RAS-300

TEC-RAS-301
TEC-RAS-302
TEC-RAS-303
TEC-RAS-304
TEC-RAS-305
TEC-RAS-306
TEC-RAS-307
TEC-RAS-308

Risk Assessment Register


Task Description

Off loading Leg/Lifting in Tandem


Hellideck Installation
Engine Lifting and Installation
Thruster Installation
Main Crane Lifting and Installation
Auxillary Crane Lifting and Installation
Leg Lifting and Installation
Life Boat Lifting and Installation
Davit Lifting and Installation
Sea Water Riser Pipe Lifting and Installation
Jacking Trial
Engine Start up

Auxillary Crane Commisioning


Barge inclination tests from GMS quayside
Load Testing of the Main Generator Sets and Emergency Generator
Main Crane Commisioning
Testing of motors, fans

Initial Risk Residual Risk


Rating
Rating

You might also like