Professional Documents
Culture Documents
Terga
Date of Assessment:
17-09-2009
Assessor(s):
Biman Modak
System/Activity:
Probabi
lity &
Frequen
cy
Location:
Definite
High
Moderate
Low
Negligible
5
4
3
2
1
5
4
3
2
1
1
Minor
10
8
6
4
2
2
Serious
15
12
9
6
3
3
Major
Assessment No:
20
16
12
8
4
4
Catastrophic
Severity
Medium Priority (5 days)
Key to Priorities
High Priority (2-3 days)
Immediate
INTRODUCTION
The table below provides a simplified representation of the methodology used and the processes involved in this Hazard Identification & Risk Analysis Procedure (Risk
Management) to be undertaken by OCIA and all Subcontractors in order to initiate, act on, review and effectively manage project-related risks throughout the Construction
Phase.
IMPLEMENTATION &
COMMUNICATION
Hazards Identified (include the exposed groups)
Severity
Risk
1-5
1-4
1 - 20
Unstable load
12
Probability
Severity
Risk
1-5
1-4
1 - 20
Residual
Risk
Date Action
Completed
Grating fixing
Working at heights with man basket
16
16
Rigging , miscommunication between riggers
and crane operators
12
4
3
3
4
3
2
16
9
6
2
2
2
3
3
2
6
6
4
Irritation to eyes
Inadequate lighting
Erection of scaffolding
Welding at height
Inclement weather
Assessor
Print :
BIMAN MODAK
Sign:
Date:
25-07-2009