Load Calculation




( 2.5 mm2 )

4
1.
2.
3.
4. ()



5, 10, 15 20 A.
15 20 A.
()

50 A.

(VA)

(V)


5 A.

10 A.

15 A.

20 A.

220

880

1760

2640

3520

230

920

1840

2760

3680

** CB 80 % **


180 VA. 1
5, 10, 15 20 A.
10
15 A.
THW 2.5 mm2 (18 A)




- (name plate)
-

1.
2. ( name plate )
3. ()
4.

5.
6.



1.

2. Demand Factor ... 3-1, 3-2, 3-3


3.
1
40
4. Demand Factor

(Load Schedule)
Load

3 (Load Balancing)
Load Center
Consumer Unit


1. ,
, ,

2.
1(A), 3(B), 5(C)
2(A), 4(B), 6(C) 7(A), 9(B), 11(C)

3.

4.

5.


6.

7.

(Space Branch Circuit)
(Spare Branch Circuit)

8.
( 20 %)
()

9.
(Total Connected Load)
10.

1

.
- 3x36 W
- 1x18 W
-
- 3,500 W

15
20
30
2

- 12000 BTU (1,500 VA)

** Ballast Loss less (5 W/)

1.
1.1 3x36 W 15
= 153(36 + 5)
0.8

= 2,306.25

VA.

1.2 1x18 W 20
= 201(18 + 5)
0.8

= 575

**

VA.

= 2,306.25+575
= 2,881.25 VA

(V)


5 A.

10 A.

15 A.

20 A.

220

880

1760

2640

3520

230

920

1840

2760

3680

20 A.
VAF 2.5 mm2 (20 A)

2. 30
3

10

18010

= 1,800 VA.
15 A ( )
VAF 2.5 mm2 (20 A)

3. 3500 W 2
2 1 1
= 3,500 VA.

3,500
1.25
220

= 19.89 A.
20 A.
VAF 2.5 mm2 (20 A)

4. 12,000 BTU (1,500 VA) 3


3 1 1
= 1,500 VA.

1,500
1.25
220

= 8.52 A.
15 A.
VAF 2.5 mm2 (20 A)

(VA)

1
2

2881.25
1800

3
4
5
6
7
8
9
10

1800
1800
3500
3500
1500
1500
1500

AT
AF
1
20
50
1
15
50
1
1
1
1
1
1
1

15
15
20
20
15
15
15

50
50
50
50
50
50
50

(..)

2.5
VAF
2.5
VAF
2.5
2.5
2.5
2.5
2.5
2.5
2.5

VAF
VAF
VAF
VAF
VAF
VAF
VAF



Demand Factor
Demand Factor

3-1

2,881.25

VA.

2,000 VA 100 %
=

2,000

VA.

2,000 VA 35 %
=

0.35 x (2881.25 2000)

308.4375

VA.

**

= 2000 + 308.4375 = 2,308.4375 VA.

= + +
+
= 2,308.4375 + (3x1,800) + (2x3,500) +
(3x1,500)
=

19,208.4375 VA

1 2 220 V.

19,208.4375
220

87.31 A

.. 9-1

50(150)A. 1 P

( 80 %)
= 1.25
= 1.25 x 87.31
= 109.1375 A.
* 125 A. *
THW
35 .. ( 137 A.)

2
Load Center 1 .

.
. .11-2531 4
EMT
.
. .11-2531 4 IMC
.


1.
- 1 5

2,760 VA.
=

2, 760
220

= 12.55 A.

= 1.25
= 1.25 x 12.55
= 15.69
A.

CB 20 AT
THW 4 mm2 (24 A)

2.
6 12 1,800 VA

1,800
220

= 8.18 A.

= 1.25
= 1.25 x 8.18
= 10.23
A.

CB 15 AT
THW 2.5 mm2 (18 A)

3. (3 )

3x3,500 VA.

= 33,500
3 380

= 15.96

A.

= 1.25
= 1.25 x 15.96
= 19.95
A.

CB 20 AT
THW 4 mm2 (24 A)


Demand Factor
Demand Factor 3.2

1 Demand Factor
A
B
C

= 2 x 1800
= 2 x 1800
= 3 x 1800

= 3600 VA
= 3600 VA
= 5400 VA

Demand Factor

2 Demand Factor
A = 2 x 1800
B = 2 x 1800
C = 3 x 1800

= 3600 VA
= 3600 VA
= 5400 VA

= 12,600 VA

10 kVA Demand Factor


= 12600 (10000 + 0.5x(12600 10000))


= 1,300 VA


1
A

17,320
220

= 78.73 A.

17,320
220

= 78.73 A.

16,360
220

= 74.36 A.

** **

78.73 A.

= 1.25
= 1.25 x 78.73
= 98.41
A.

CB 100 AT
THW 50 mm2 (119 A)
200 A. =

4x50 mm2
(
)
-
- (IMC)
40%

THW 50 mm2

= 143.20 mm2
4

= 4 x 143.20 mm2
= 572.8 mm2

1.5


2
Load Center 1

54,000

VA.

Demand Factor ( 1300 VA)


( Demand) =
=

VA.

52,700

VA.

52,700
3 380

= 80.07

54,000 1,300

A.

= 1.25
= 1.25 x 80.07
= 100.08 A.

CB 100 AT
THW 50 mm2 (119 A)
200 A. =
4x50 mm2 IMC 1.5

3
3 .
3 1

;
1.
2. THW

=
=

8,000 + 5,200 + 6,000


19,200
VA.

Demand Factor 100 % ( 3-1)


= 3,600 + 3,600 + 3,600
= 10,800
VA.
Demand Factor 3-2

10,000 VA 100 %

= 10,000

50 %

= 0.5 x (10,800 10,000)


= 400 VA
= 10,400

( Demand Factor)

=
=

VA

VA.

4,000 + 4,000 + 4,000


12,000
VA

Demand Factor 100 % 3-3


= 19,200 + 10,400 + 12,000
=

41,600

VA

=
=

6,000 + 5,400 + 6,400


17,800
VA.

Demand Factor 100 % ( 3-1)


=
=

3,600 + 5,400 + 5,400


14,400
VA.

Demand Factor 3-2

10,000 VA 100 %

= 10,000

50 %

= 0.5 x (14,400 10,000)


= 2,200
VA

( Demand Factor)

= 12,200

VA

VA.

=
=

4,000 + 4,000 + 4,000


12,000
VA

Demand Factor 100 % 3-3


= 17,800 + 12,200 + 12,000
=

42,000

VA

=
=

6,800 + 5,800 + 6,200


18,800
VA.

Demand Factor 100 % ( 3-1)


=
=

3,600 + 5,400 + 3,600


12,600
VA.

Demand Factor 3-2

10,000 VA 100 %

= 10,000

50 %

= 0.5 x (12,600 10,000)


= 1,300
VA

( Demand Factor)

= 11,300

=
=

VA

VA.

4,000 + 4,000 + 4,000


12,000
VA

Demand Factor 100 % 3-3


= 18,800 + 11,300 + 12,000
=

42,100

VA

C [ 42,100 kVA ]
C =

42,100
220

= 191.36

A.

= 1.25
= 1.25 x 191.36
= 239.20 A.

239.20 A.

250 A.
THW 150 mm2 (251 A)

9-1

191.36 A

200 A 3P ( 200 A)

= 8,000 + 6,000 + 6,800 + 5,200 + 5,400 +


5,800 + 6,000 + 6,400 + 6,200
=

55,800

VA.

3-1 Demand Factor 100 %

3,600 + 3,600 + 3,600 + 3,600 +


5,400 + 5,400 + 3,600 + 5,400 +
3,600
37,800

VA.

Demand Factor 3-2

10,000 VA 100 %
50 %

( Demand Factor)

= 10,000 VA
= 0.5 x (37,800 10,000)
= 13,900 VA
= 23,900

VA.

4,000 + 4,000 + 4,000 + 4,000 +


4,000 + 4,000 + 4,000 + 4,000 +
4,000

36,000

VA

Demand Factor 100 % 3-3


= 55,800 + 23,900 + 36,000
=

115,700

VA

115,700
3 380

= 175.79

A.

200 A. 3 P

= 1.25
= 1.25 x 175.79
= 239.20 A.

250 A.
THW 150 mm2 (251 A)

55,800
3 380

= 87.78

A.

22,900
3 380

= 36.31

A.

200 A

= 87.78 + 36.31

= 124.09 A.
THW 70 mm2 (148 A.)

4
5

- 2x36 W
25
-

30

- 3 36000 BTU (3x1,500 VA) 2


** Ballast 10 W/ (PF. 0.9)
3 .


10 ( 180 VA) 5 50
10

5
1800 VA
(CB) 15 A

3 3x1500 VA

3 1500 VA
3 380 V

6.8370 A

CB

1.25 6.8370

8.546 A

10 15 A (15 A)
10 (2 x 5)


5 x 25 =

2 36 10
0.9

125

125 102.22

102.22 VA

12777.5 VA

12777.5 VA

(V)

5 A.

10 A.

15 A.

20 A.

220

880

1760

2640

3520

230

920

1840

2760

3680

3
4
5
6

4259.17 VA
3194.375 VA
2555.5 VA
2129.58 VA

( 20 A)
( 15 A)
( 15 A)

3194.375 VA

( 20 A)

102.22 VA

3194.375
102.22
31.25

31 3 ( 3168.82 VA)
32 1 ( 3271.04 VA)

2555.5 VA

( 15 A)

102.22 VA

2555.5
102.22
25

25 5 ( 2555.5 VA)

2129.58 VA

( 15 A)

102.22 VA

2129.58
102.22
20.83

21 5 ( 2146.62 VA)
20 1 ( 2044.4 VA)