1.
2.
3.
4.
5.

Site clearance
Set -up of lab, office and labor hut
Temporary water supply connection
Temporary electric supply connection
Demarkation of site
Excavation of isolated footing of block 1
Block 1
6. Site layout
7. Excavation of earth for columns
8. Excavation of earth for strip wall
9. Dressing of foundation
10. Ramming of foundation and curing for PCC
11. Laying of PCC with (1:4:8)
12. Reinforcement for column footing
13. Form work of column footing
14. Concreting of column
15. Removing of form work and curing
16. Dressing of strip foundation with ramming
17. Laying of PCC for strip brick wall
18. Brick work of strip foundation with (1:8)cement sand mortar
19. curing of brick work
20. Back filling of earth
21. Form work of plinth beam
22. Reinforcement of plinth beam
23. Cement concreting of plinth beam(1:1.5:3)
Ground floor
24. Reinforcement of ground floor columns
25. Form work of columns
26. Cement concreting of columns
27. Removing of form work and curing of columns
28. Shuttering of stair case for first floor
29. Shuttering of beam and slab
30. Reinforcement of beam, columns and stair case
31. Laying of electrical conduit
32. Cement concreting of beam and slab(1:1.5:3) and stair case
First floor
33. Reinforcement of first floor columns
34. Form work of columns
35. cement concreting of columns
36. Removing of form work and curing
37. Shuttering of beam, slab and stair case
38. Reinforcement of beam, slab for first floor
39. Reinforcement for stair case for second floor
40. Laying of electrical conduit

41. Cement concreting of beam, slab(1:1.5:3) and stairs


42. Removal of form work of ground floor slab, beam
Second floor
43. Reinforcement of second floor columns
44. Form work of columns
45. cement concreting of columns
46. Shuttering of beam, slab
47. Shuttering of staircase
48. Reinforcement of beam ,slab and staircase
49. Laying of electrical conduit
50. Cement concreting of beam, columns(1:1.5:3) staircase
51. Removing of shuttering of first floor
Mumty
52. Mumty reinforcement of columns
53. Shuttering of mumty columns
54. concreting of mumty columns
55. Removing of shuttering
56. Shuttering of slab, beam and staircase
57. Cement concreting of slab, beam and staircase
58. Removing of shuttering and curing
Brick work and joinery
59. Brick work and joinery of door and windows on ground floor
60. Brick work and joinery of door and windows on first floor
61. Brick work and joinery of door and windows on second floor
62. Brick work on mumty and parapet
Electrical services
63. Electrical services on ground floor
64. Electrical services on first floor
65. Electrical services on second floor
Plumbing services
66. Plumbing services on ground floor
67. Plumbing services on first floor
68. Plumbing services on second floor
Plastering
69. Plastering of slab (1:4)
70. Plastering on ground floor wall
71. Plastering under side of ceiling
72. Plastering on first floor wall
73. Plastering of slab
74. Plastering on second floor wall
Flooring
75. Flooring on ground floor
76. Flooring on first floor
77. Flooring on second floor

78. Flooring of mumty


79. Flooring of stairs
Roofing
80. Roofing on terrace with brick tile
Doors and windows fixing
81. Doors and windows fixing on ground floor
82. Doors and windows fixing on first floor
83. Doors and windows fixing on second floor
Painting
84. Painting on ground floor
85. Painting on first floor
86. Painting on second floor
87. Painting on external walls
Other services
88. Laying of water tank
89. Water supply connection
90. Rain water pipe
91. Electric supply connection
92. Sewage connection
93. Street light pole
External services
94. Boundary wall
95. Columns of gate
96. Gate
97. Road development
BLOCK 2
98. Excavation of earth for columns
99. Excavation of earth for strip wall
100.
Dressing of foundation
101.
Ramming of foundation and curing for PCC
102.
Laying of PCC with (1:4:8)
103.
Reinforcement for column footing
104.
Form work of column footing
105.
Concreting of column
106.
Removing of form work and curing
107.
Dressing of strip foundation with ramming
108.
Laying of PCC for strip brick wall
109.
Brick work of strip foundation with (1:8)cement sand mortar
110.
curing of brick work
111.
Back filling of earth
112.
Form work of plinth beam
113.
Reinforcement of plinth beam
114.
Cement concreting of plinth beam(1:1.5:3)
Ground floor
115.
Reinforcement of ground floor columns
116.
Form work of columns

117.
Cement concreting of columns
118.
Removing of form work and curing of columns
119.
Shuttering of stair case for first floor
120.
Shuttering of beam and slab
121.
Reinforcement of beam, columns and stair case
122.
Laying of electrical conduit
123.
Cement concreting of beam and slab(1:1.5:3) and stair case
First floor
124.
Reinforcement of first floor columns
125.
Form work of columns
126.
cement concreting of columns
127.
Removing of form work and curing
128.
Shuttering of beam, slab and stair case
129.
Reinforcement of beam, slab for first floor
130.
Reinforcement for stair case for second floor
131.
Laying of electrical conduit
132.
Cement concreting of beam, slab(1:1.5:3) and stairs
133.
Removal of form work of ground floor slab, beam
Second floor
134.
Reinforcement of second floor columns
135.
Form work of columns
136.
cement concreting of columns
137.
Shuttering of beam, slab
138.
Shuttering of staircase
139.
Reinforcement of beam ,slab and staircase
140.
Laying of electrical conduit
141.
Cement concreting of beam, columns(1:1.5:3) staircase
142.
Removing of shuttering of first floor
Mumty
143.
Mumty reinforcement of columns
144.
Shuttering of mumty columns
145.
concreting of mumty columns
146.
Removing of shuttering
147.
Shuttering of slab, beam and staircase
148.
Cement concreting of slab, beam and staircase
149.
Removing of shuttering and curing
Brick work and joinery
150.
Brick work and joinery of door and windows on ground floor
151.
Brick work and joinery of door and windows on first floor
152.
Brick work and joinery of door and windows on second floor
153.
Brick work on mumty and parapet
Electrical services
154.
Electrical services on ground floor
155.
Electrical services on first floor
156.
Electrical services on second floor
Plumbing services

157.
Plumbing services on ground floor
158.
Plumbing services on first floor
159.
Plumbing services on second floor
Plastering
160.
Plastering of slab (1:4)
161.
Plastering on ground floor wall
162.
Plastering under side of ceiling
163.
Plastering on first floor wall
164.
Plastering of slab
165.
Plastering on second floor wall
Flooring
166.
Flooring on ground floor
167.
Flooring on first floor
168.
Flooring on second floor
169.
Flooring of mumty
170.
Flooring of stairs
Roofing
171.
Roofing on terrace with brick tile
Doors and windows fixing
172.
Doors and windows fixing on ground floor
173.
Doors and windows fixing on first floor
174.
Doors and windows fixing on second floor
Painting
175.
Painting on ground floor
176.
Painting on first floor
177.
Painting on second floor
178.
Painting on external walls
Other services
179.
Laying of water tank
180.
Water supply connection
181.
Rain water pipe
182.
Electric supply connection
183.
Sewage connection
184.
Street light pole
External services
185.
Boundary wall
186.
Columns of gate
187.
Gate
188.
Road development
BLOCK3
189.
Excavation of earth for columns
190.
Excavation of earth for strip wall
191.
Dressing of foundation

192.
Ramming of foundation and curing for PCC
193.
Laying of PCC with (1:4:8)
194.
Reinforcement for column footing
195.
Form work of column footing
196.
Concreting of column
197.
Removing of form work and curing
198.
Dressing of strip foundation with ramming
199.
Laying of PCC for strip brick wall
200.
Brick work of strip foundation with (1:8)cement sand mortar
201.
curing of brick work
202.
Back filling of earth
203.
Form work of plinth beam
204.
Reinforcement of plinth beam
205.
Cement concreting of plinth beam(1:1.5:3)
Ground floor
206.
Reinforcement of ground floor columns
207.
Form work of columns
208.
Cement concreting of columns
209.
Removing of form work and curing of columns
210.
Shuttering of stair case for first floor
211.
Shuttering of beam and slab
212.
Reinforcement of beam, columns and stair case
213.
Laying of electrical conduit
214.
Cement concreting of beam and slab(1:1.5:3) and stair case
First floor
215.
Reinforcement of first floor columns
216.
Form work of columns
217.
cement concreting of columns
218.
Removing of form work and curing
219.
Shuttering of beam, slab and stair case
220.
Reinforcement of beam, slab for first floor
221.
Reinforcement for stair case for second floor
222.
Laying of electrical conduit
223.
Cement concreting of beam, slab(1:1.5:3) and stairs
224.
Removal of form work of ground floor slab, beam
Second floor
225.
Reinforcement of second floor columns
226.
Form work of columns
227.
cement concreting of columns
228.
Shuttering of beam, slab
229.
Shuttering of staircase
230.
Reinforcement of beam ,slab and staircase
231.
Laying of electrical conduit
232.
Cement concreting of beam, columns(1:1.5:3) staircase
233.
Removing of shuttering of first floor
Mumty

234.
Mumty reinforcement of columns
235.
Shuttering of mumty columns
236.
concreting of mumty columns
237.
Removing of shuttering
238.
Shuttering of slab, beam and staircase
239.
Cement concreting of slab, beam and staircase
240.
Removing of shuttering and curing
Brick work and joinery
241.
Brick work and joinery of door and windows on ground floor
242.
Brick work and joinery of door and windows on first floor
243.
Brick work and joinery of door and windows on second floor
244.
Brick work on mumty and parapet
Electrical services
245.
Electrical services on ground floor
246.
Electrical services on first floor
247.
Electrical services on second floor
Plumbing services
248.
Plumbing services on ground floor
249.
Plumbing services on first floor
250.
Plumbing services on second floor
Plastering
251.
Plastering of slab (1:4)
252.
Plastering on ground floor wall
253.
Plastering under side of ceiling
254.
Plastering on first floor wall
255.
Plastering of slab
256.
Plastering on second floor wall
Flooring
257.
Flooring on ground floor
258.
Flooring on first floor
259.
Flooring on second floor
260.
Flooring of mumty
261.
Flooring of stairs
Roofing
262.
Roofing on terrace with brick tile
Doors and windows fixing
263.
Doors and windows fixing on ground floor
264.
Doors and windows fixing on first floor
265.
Doors and windows fixing on second floor
Painting
266.
Painting on ground floor
267.
Painting on first floor
268.
Painting on second floor
269.
Painting on external walls
Other services

270.
Laying of water tank
271.
Water supply connection
272.
Rain water pipe
273.
Electric supply connection
274.
Sewage connection
275.
Street light pole
External services
276.
Boundary wall
277.
Columns of gate
278.
Gate
279.
Road development
BLOCK4
280.
Excavation of earth for columns
281.
Excavation of earth for strip wall
282.
Dressing of foundation
283.
Ramming of foundation and curing for PCC
284.
Laying of PCC with (1:4:8)
285.
Reinforcement for column footing
286.
Form work of column footing
287.
Concreting of column
288.
Removing of form work and curing
289.
Dressing of strip foundation with ramming
290.
Laying of PCC for strip brick wall
291.
Brick work of strip foundation with (1:8)cement sand mortar
292.
curing of brick work
293.
Back filling of earth
294.
Form work of plinth beam
295.
Reinforcement of plinth beam
296.
Cement concreting of plinth beam(1:1.5:3)
297.
Ground floor
298.
Reinforcement of ground floor columns
299.
Form work of columns
300.
Cement concreting of columns
301.
Removing of form work and curing of columns
302.
Shuttering of stair case for first floor
303.
Shuttering of beam and slab
304.
Reinforcement of beam, columns and stair case
305.
Laying of electrical conduit
306.
Cement concreting of beam and slab(1:1.5:3) and stair case
First floor
307.
Reinforcement of first floor columns
308.
Form work of columns
309.
cement concreting of columns
310.
Removing of form work and curing
311.
Shuttering of beam, slab and stair case
312.
Reinforcement of beam, slab for first floor

313.
Reinforcement for stair case for second floor
314.
Laying of electrical conduit
315.
Cement concreting of beam, slab(1:1.5:3) and stairs
316.
Removal of form work of ground floor slab, beam
Second floor
317.
Reinforcement of second floor columns
318.
Form work of columns
319.
cement concreting of columns
320.
Shuttering of beam, slab
321.
Shuttering of staircase
322.
Reinforcement of beam ,slab and staircase
323.
Laying of electrical conduit
324.
Cement concreting of beam, columns(1:1.5:3) staircase
325.
Removing of shuttering of first floor
Mumty
326.
Mumty reinforcement of columns
327.
Shuttering of mumty columns
328.
concreting of mumty columns
329.
Removing of shuttering
330.
Shuttering of slab, beam and staircase
331.
Cement concreting of slab, beam and staircase
332.
Removing of shuttering and curing
Brick work and joinery
333.
Brick work and joinery of door and windows on ground floor
334.
Brick work and joinery of door and windows on first floor
335.
Brick work and joinery of door and windows on second floor
336.
Brick work on mumty and parapet
Electrical services
337.
Electrical services on ground floor
338.
Electrical services on first floor
339.
Electrical services on second floor
Plumbing services
340.
Plumbing services on ground floor
341.
Plumbing services on first floor
342.
Plumbing services on second floor
Plastering
343.
Plastering of slab (1:4)
344.
Plastering on ground floor wall
345.
Plastering under side of ceiling
346.
Plastering on first floor wall
347.
Plastering of slab
348.
Plastering on second floor wall
Flooring
349.
Flooring on ground floor

350.
Flooring on first floor
351.
Flooring on second floor
352.
Flooring of mumty
353.
Flooring of stairs
Roofing
354.
Roofing on terrace with brick tile
Doors and windows fixing
355.
Doors and windows fixing on ground floor
356.
Doors and windows fixing on first floor
357.
Doors and windows fixing on second floor
Painting
358.
Painting on ground floor
359.
Painting on first floor
360.
Painting on second floor
361.
Painting on external walls
Other services
362.
Laying of water tank
363.
Water supply connection
364.
Rain water pipe
365.
Electric supply connection
366.
Sewage connection
367.
Street light pole
External services
368.
Boundary wall
369.
Columns of gate
370.
Gate
371.
Road development
BLOCK5
372.
Excavation of earth for columns
373.
Excavation of earth for strip wall
374.
Dressing of foundation
375.
Ramming of foundation and curing for PCC
376.
Laying of PCC with (1:4:8)
377.
Reinforcement for column footing
378.
Form work of column footing
379.
Concreting of column
380.
Removing of form work and curing
381.
Dressing of strip foundation with ramming
382.
Laying of PCC for strip brick wall
383.
Brick work of strip foundation with (1:8)cement sand mortar
384.
curing of brick work
385.
Back filling of earth
386.
Form work of plinth beam
387.
Reinforcement of plinth beam

388.
Cement concreting of plinth beam(1:1.5:3)
Ground floor
389.
Reinforcement of ground floor columns
390.
Form work of columns
391.
Cement concreting of columns
392.
Removing of form work and curing of columns
393.
Shuttering of stair case for first floor
394.
Shuttering of beam and slab
395.
Reinforcement of beam, columns and stair case
396.
Laying of electrical conduit
397.
Cement concreting of beam and slab(1:1.5:3) and stair case
First floor
398.
Reinforcement of first floor columns
399.
Form work of columns
400.
cement concreting of columns
401.
Removing of form work and curing
402.
Shuttering of beam, slab and stair case
403.
Reinforcement of beam, slab for first floor
404.
Reinforcement for stair case for second floor
405.
Laying of electrical conduit
406.
Cement concreting of beam, slab(1:1.5:3) and stairs
407.
Removal of form work of ground floor slab, beam
Second floor
408.
Reinforcement of second floor columns
409.
Form work of columns
410.
cement concreting of columns
411.
Shuttering of beam, slab
412.
Shuttering of staircase
413.
Reinforcement of beam ,slab and staircase
414.
Laying of electrical conduit
415.
Cement concreting of beam, columns(1:1.5:3) staircase
416.
Removing of shuttering of first floor
Mumty
417.
Mumty reinforcement of columns
418.
Shuttering of mumty columns
419.
concreting of mumty columns
420.
Removing of shuttering
421.
Shuttering of slab, beam and staircase
422.
Cement concreting of slab, beam and staircase
423.
Removing of shuttering and curing
Brick work and joinery
424.
Brick work and joinery of door and windows on ground floor
425.
Brick work and joinery of door and windows on first floor
426.
Brick work and joinery of door and windows on second floor
427.
Brick work on mumty and parapet
Electrical services

428.
Electrical services on ground floor
429.
Electrical services on first floor
430.
Electrical services on second floor
Plumbing services
431.
Plumbing services on ground floor
432.
Plumbing services on first floor
433.
Plumbing services on second floor
Plastering
434.
Plastering of slab (1:4)
435.
Plastering on ground floor wall
436.
Plastering under side of ceiling
437.
Plastering on first floor wall
438.
Plastering of slab
439.
Plastering on second floor wall
Flooring
440.
Flooring on ground floor
441.
Flooring on first floor
442.
Flooring on second floor
443.
Flooring of mumty
444.
Flooring of stairs
Roofing
445.
Roofing on terrace with brick tile
Doors and windows fixing
446.
Doors and windows fixing on ground floor
447.
Doors and windows fixing on first floor
448.
Doors and windows fixing on second floor
Painting
449.
Painting on ground floor
450.
Painting on first floor
451.
Painting on second floor
452.
Painting on external walls
Other services
453.
Laying of water tank
454.
Water supply connection
455.
Rain water pipe
456.
Electric supply connection
457.
Sewage connection
458.
Street light pole
External services
459.
Boundary wall
460.
Columns of gate
461.
Gate

462.
Road development
BLOCK6
463.
Excavation of earth for columns
464.
Excavation of earth for strip wall
465.
Dressing of foundation
466.
Ramming of foundation and curing for PCC
467.
Laying of PCC with (1:4:8)
468.
Reinforcement for column footing
469.
Form work of column footing
470.
Concreting of column
471.
Removing of form work and curing
472.
Dressing of strip foundation with ramming
473.
Laying of PCC for strip brick wall
474.
Brick work of strip foundation with (1:8)cement sand mortar
475.
curing of brick work
476.
Back filling of earth
477.
Form work of plinth beam
478.
Reinforcement of plinth beam
479.
Cement concreting of plinth beam(1:1.5:3)
Ground floor
480.
Reinforcement of ground floor columns
481.
Form work of columns
482.
Cement concreting of columns
483.
Removing of form work and curing of columns
484.
Shuttering of stair case for first floor
485.
Shuttering of beam and slab
486.
Reinforcement of beam, columns and stair case
487.
Laying of electrical conduit
488.
Cement concreting of beam and slab(1:1.5:3) and stair case
First floor
489.
Reinforcement of first floor columns
490.
Form work of columns
491.
cement concreting of columns
492.
Removing of form work and curing
493.
Shuttering of beam, slab and stair case
494.
Reinforcement of beam, slab for first floor
495.
Reinforcement for stair case for second floor
496.
Laying of electrical conduit
497.
Cement concreting of beam, slab(1:1.5:3) and stairs
498.
Removal of form work of ground floor slab, beam
Second floor
499.
Reinforcement of second floor columns
500.
Form work of columns
501.
cement concreting of columns
502.
Shuttering of beam, slab
503.
Shuttering of staircase

504.
Reinforcement of beam ,slab and staircase
505.
Laying of electrical conduit
506.
Cement concreting of beam, columns(1:1.5:3) staircase
507.
Removing of shuttering of first floor
Mumty
508.
Mumty reinforcement of columns
509.
Shuttering of mumty columns
510.
concreting of mumty columns
511.
Removing of shuttering
512.
Shuttering of slab, beam and staircase
513.
Cement concreting of slab, beam and staircase
514.
Removing of shuttering and curing
Brick work and joinery
515.
Brick work and joinery of door and windows on ground floor
516.
Brick work and joinery of door and windows on first floor
517.
Brick work and joinery of door and windows on second floor
518.
Brick work on mumty and parapet
Electrical services
519.
Electrical services on ground floor
520.
Electrical services on first floor
521.
Electrical services on second floor
Plumbing services
522.
Plumbing services on ground floor
523.
Plumbing services on first floor
524.
Plumbing services on second floor
Plastering
525.
Plastering of slab (1:4)
526.
Plastering on ground floor wall
527.
Plastering under side of ceiling
528.
Plastering on first floor wall
529.
Plastering of slab
530.
Plastering on second floor wall
Flooring
531.
Flooring on ground floor
532.
Flooring on first floor
533.
Flooring on second floor
534.
Flooring of mumty
535.
Flooring of stairs
Roofing
536.
Roofing on terrace with brick tile
Doors and windows fixing
537.
Doors and windows fixing on ground floor
538.
Doors and windows fixing on first floor

539.
Doors and windows fixing on second floor
Painting
540.
Painting on ground floor
541.
Painting on first floor
542.
Painting on second floor
543.
Painting on external walls
Other servces
544.
Laying of water tank
545.
Water supply connection
546.
Rain water pipe
547.
Electric supply connection
548.
Sewage connection
549.
Street light pole
External services
550.
Boundary wall
551.
Columns of gate
552.
Gate
553.
Road development