5.00.00
5.01.00
5.02.00
5.03.00
5.04.00
5.05.00
5.06.00

SCOPE ............................................................................................................ 2
SUPPLY OF PIPES......................................................................................... 2
ALIGNMENT, LEVELS AND GRADE.............................................................. 2
LAYING OF PIPES.......................................................................................... 2
BEDDING AND SUPPORTS........................................................................... 3
JOINT OF PIPES ............................................................................................ 3
MANHOLES .................................................................................................... 4

J P MUKHERJI & ASSOCIATES PVT LTD


TSFP

TECHNICAL SPECIFICATIONS
RCC PIPES

Section-IX
Sub-Section-IX.2.05
Page - 2 / 4

BID DOCUMENT FOR


CIVIL WORKS FOR FOUNDATIONS OF EQUIPMENT
AND PLANT BUILDINGS
5.00.00

SCOPE
This specification covers the supply and laying of R.C.C. Hume Pipes as may
be required. The entire work shall be carried out as per latest editions of
British Standards.

5.01.00

SUPPLY OF PIPES
The Contractor shall supply the R.C.C. Hume Pipes of various diameters
along with complete fittings required for carrying out the work. R.C.C. Hume
Pipes should conform to British Standards, as may be required and should be
in a good condition. The Contractor must furnish, on being demanded by the
Engineer, manufacturers certificates and/or test certificates from recognised
authorities. PCC encasement shall also be provided whenever required as
per design requirement.

5.02.00

ALIGNMENT, LEVELS AND GRADE


The work shall be carried out in conformance to the alignments, levels and
grades specified in the drawings. The layout and levels shall be made by the
Contractor at his own cost from one reference grid and bench mark given by
the Engineer. He shall give all help in instruments materials and men to the
Engineer for checking the detailed layout and levels as and when required.
Making of reference layout and level pillars along the pipeline route and
maintaining them upto completion of the work shall be the responsibility of the
Contractor.

5.03.00

LAYING OF PIPES

5.03.01

General
The laying of R.C.C. Pipes shall conform to British Standards.

5.03.02

Conditions for Laying.


The conditions for laying of pipes to suit the conditions at site and/or as per
drawings and instructions

5.03.03

Culvert Condition
In this condition the pipe is laid under embankment and may project wholly or
partly above the original ground surface.

J P MUKHERJI & ASSOCIATES PVT LTD


TSFP

TECHNICAL SPECIFICATIONS
RCC PIPES

Section-IX
Sub-Section-IX.2.05
Page - 3 / 4

BID DOCUMENT FOR


CIVIL WORKS FOR FOUNDATIONS OF EQUIPMENT
AND PLANT BUILDINGS
5.03.04

Trench Condition
In this condition the pipe is laid in a trench excavated for the purpose. The
trench shall be refilled with thoroughly tamped earth after laying and jointing
of pipes in approved manner.

5.04.05

Open Condition
In this condition the pipe is laid such that it projects wholly or partly above
original ground surface, there being no super imposed over burden on the
pipe.

5.04.00

BEDDING AND SUPPORTS

5.04.01

Culvert Condition
In this condition the pipes shall be laid generally on Bedding as per relevant
British Standards, unless directed otherwise.

5.04.02

Trench Condition
In this condition the pipes shall be laid generally on Bedding as per relevant
British Standards, unless directed otherwise.

5.04.03

Concrete Cradle Bedding


If shown on the drawing or so instructed by the Engineer, the pipes shall be
laid on concrete cradles, conforming to British Standards in case of trench
condition and culvert condition. Minimum crushing strength shall be 140
kg/sq.cm.

5.04.04

Open Condition
In open condition the pipeline shall be supported over rigid pedestals
constructed at intervals not greater than the length of one individual piece of
pipe, as per drawings and instructions of the Engineer. In no case shall the
joint concrete with a properly shaped out top to receive the pipe.

5.05.00

JOINT OF PIPES
The provision of British Standards shall be followed for jointing of pipes and
every possible care shall be taken by the Contractor to ensure that the joints
made are leak proof. Curing of joints shall be done for a period of 10 days.

J P MUKHERJI & ASSOCIATES PVT LTD


TSFP

TECHNICAL SPECIFICATIONS
RCC PIPES

Section-IX
Sub-Section-IX.2.05
Page - 4 / 4

BID DOCUMENT FOR


CIVIL WORKS FOR FOUNDATIONS OF EQUIPMENT
AND PLANT BUILDINGS
5.06.00

MANHOLES
Manholes shall be provided for pipe drains at the change of diameter of pipe,
alignment and direction at a max. spacing of 30 m c/c upto 900 mm diameter
and 45 m c/c for higher diameters of the pipe. Details of manhole shall be as
specified in British Standards.
Each manhole shall be provided with a heavy duty C.I cover as per British
Standards.