You are on page 1of 16

REKAPITULASI BIAYA

PROJECT : PEMBANGUNAN MESS NON STAFF


No

JENIS PEKERJAAN

A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
N.

PEKERJAAN PERSIAPAN
PEKERJAAN TANAH
PEKERJAAN PONDASI
PEKERJAAN DINDING
PEKERJAAN PLESTERAN
PEKERJAAN KAYU
PEKERJAAN BETON
PEKERJAAN PENUTUP ATAP
PEKERJAAN LANGIT-LANGIT
PEKERJAAN SANITASI
PEKERJAAN BESI DAN ALUMUNIUM
PEKERJAAN KUNCI DAN KACA
PEKERJAAN PENUTUP LANTAI DAN DINDING
PEKERJAAN PENGECATAN

JUMLAH HARGA
6,590,475.00
10,901,437.50
9,926,793.00
83,337,423.50
50,942,850.00
132,412,470.45
86,158,134.10
20,132,739.20
15,008,649.22
48,316,419.36
9,602,335.00
8,940,215.00
9,839,625.00
14,019,640.60
506,129,206.93

DAFTAR KUANTITAS DAN HARGA


PROJECT : PEMBANGUNAN MESS NON STAFF
NO.

NOMOR
ANALISA

JENIS PEKERJAAN

A.
4
8
10

PEKERJAAN PERSIAPAN
A.004
Mengerjakan 1 m pengukuran dan pemasangan bouwplank
A.008
Membersihkan 1 m lapangan dan perataan
A.010
Membuat 1 m bak adukan ukuran (40 x 50 x 50) cm

B. PEKERJAAN TANAH
29
B.001
Menggali 1 m tanah biasa sedalam 1 meter
38
B.010
Mengurug kembali 1 m galian
39
B.011
Memadatkan 1 m tanah (per 20 cm)
40
B.012
Mengurug 1 m pasir urug
C. PEKERJAAN PONDASI
53
C.007
Memasang 1 m pondasi batu belah; campuran 1 PC : 6 PP
59
C.013
Memasang 1 m pondasi siklop; 60% beton campuran 1 PC : 2 PB : 3 KR dan
40 % batu belah
D. PEKERJAAN DINDING
73
D.012
Memasang 1 m dinding bata merah (5x11x22) cm; tebal bata; campuran 1
PC : 5 PP
82
D.021
Memasang 1 m dinding bata berongga ekspose uk. (5x11x24) cm; campuran
spesi 1 PC : 3 PP

HARGA SATUAN
( Rp )

JUMLAH HARGA
( Rp )

31.00
310.00
1.00

m
m
m

58,590.00
15,000.00
124,185.00

12.90
6.45
12.90
31.00

m
m
m
m

78,750.00
26,250.00
57,500.00
289,500.00

9.72
-

m
m

1,021,275.00
2,688,825.00

6,590,475.00
1,816,290.00
4,650,000.00
124,185.00
10,901,437.50
1,015,875.00
169,312.50
741,750.00
8,974,500.00
9,926,793.00
9,926,793.00
-

580.00

107,875.00

83,337,423.50
62,567,500.00

1.20

168,325.00

201,990.00

580.00
580.00

m
m

54,320.00
33,512.50

1.06

4,781,375.00

50,942,850.00
31,505,600.00
19,437,250.00
132,412,470.45
5,088,148.02

m
m
m

401,750.00
280,800.00
477,085.00

8,243,910.00
4,003,084.80
-

28.80
2.73
1.86
379.44
217.00
76.00
177.00
180.00

m
m
m
m
m
m
m
m

309,675.00
4,319,200.00
3,460,500.00
56,955.00
95,465.00
59,265.00
206,785.00
24,970.00

G. PEKERJAAN BETON
167
G.004
Membuat 1 m lantai kerja beton tumbuk 1 PC : 3 PB : 5 KR; tebal 5 cm
168
G.005
Membuat 1 m beton bertulang 1 PC : 2 PB : 3 KR
196
G.033
Memasang 1 m pondasi beton bertulang (150 kg besi + bekisting)
197
G.034
Memasang 1 m sloof beton bertulang (200 kg besi + bekisting)
199
G.036
Memasang 1 m balok beton bertulang (200 kg besi + bekisting)
200
G.037
Memasang 1 m kolom beton bertulang (150 kg besi + bekisting)
203
G.040
Memasang 1 m' kolom praktis beton bertulang (11 x 11 cm)
204
G.041
Memasang 1 m' ring balok beton bertulang (10 x 15 cm)
G.050
Pembesian 1 kg dengan besi beton U-24
213

310.00
2.88
2.88
1.62
1.00
2.88
-

m
m
m
m
m
m
m
m
m

155,800.00
955,125.00
3,876,950.00
4,690,325.00
5,617,025.00
4,810,075.00
81,195.00
104,670.00
20,130.00

H. PEKERJAAN PENUTUP ATAP


213
H.009
Memasang 1 m atap seng gelombang
214
H.010
Memasang 1 m atap nok seng

399.28
12.40

m
m

49,240.00
38,080.00

310.00

47,253.75

6.00
4.00
10.00
16.00
59.00
12.00
16.00
1.00
32.00
12.00
2.00

bh
bh
bh
bh
bh
m'
m'
m'
m'
m'
m'

2,008,125.00
631,000.00
816,300.00
947,280.00
852,556.00
165,525.00
323,625.00
19,301.25
25,386.38
114,657.42
139,097.66
387,225.00
50,650.00
40,000.00
8,661,008.03

8,918,640.00
11,795,562.43
6,436,530.00
21,611,005.20
20,715,905.00
4,504,140.00
36,600,945.00
4,494,600.00
86,158,134.10
48,298,000.00
13,508,136.00
16,177,032.00
7,792,321.50
81,195.00
301,449.60
20,132,739.20
19,660,547.20
472,192.00
15,008,649.22
14,648,662.50
48,316,419.36
12,048,750.00
2,524,000.00
8,525,560.00
308,820.00
1,497,796.69
1,375,889.03
2,225,562.58
387,225.00
1,620,800.00
480,000.00
17,322,016.05

E. PEKERJAAN PLESTERAN
87
E.006
Memasang 1 m plesteran 1 PC : 6 PP; tebal 15 mm
116
E.033
Memasang 1 m acian
F. PEKERJAAN KAYU
120
F.004
Membuat dan memasang 1 m kusen pintu dan kusen jendela; Kayu Meranti
Batu
125
F.009
Membuat dan memasang 1 m daun pintu panel; Kayu Meranti Batu
128
132

F.012
F.016

134
138
142
144
153
154
158
161

F.018
F.022
F.026
F.028
F.037
F.038
F.042
F.045

Membuat dan memasang 1 m pintu dan jendela kaca; Kayu Meranti Batu
Membuat dan memasang 1 m daun pintu kayu lapis (plywood); rangka
tertutup Kayu Kruing
Membuat dan memasang 1 m jalusi kusen; Kayu Meranti Batu
Membuat dan memasang 1 m konstruksi kuda kuda konvensional; Kayu
Meranti
Batu
Membuat
dan memasang 1 m konstruksi gording; Kayu Meranti Batu
Membuat dan memasang 1 m rangka atap ; Kayu Meranti Batu
Memasang 1 m rangka langit-langit (60 x 60) cm; Kayu Meranti Batu
Memasang 1 m' lisplank uk. (3 x 20) cm; Kayu Meranti Batu
Memasang 1 m dinding pemisah plywood rangkap; GRC
Memasang 1 m' list plafond kayu profil

I. PEKERJAAN LANGIT-LANGIT
222
I.002
Memasang 1 m langit-langit tripleks ukuran (120 x 240 ) cm; tbl. 3 mm, 4 mm
dan 6 mm
J. PEKERJAAN SANITASI
235
J.001
Memasang 1 buah kloset duduk/monoblok
236
J.002
Memasang 1 buah kloset jongkok porselen
238
J.004
Memasang 1 buah urinoir
239
J.005
Memasang 1 buah wastafel
240
J.006
Memasang 1 buah bak mandi fibreglass volume 0,30 m
250
J.016
Memasang 1 m' pipa galvanis "
251
J.017
Memasang 1 m' pipa galvanis "
256
J.022
Memasang 1 m' pipa PVC tipe AW "
257
J.023
Memasang 1 m' pipa PVC tipe AW "
262
J.028
Memasang 1 m' pipa PVC tipe AW 3"
263
J.029
Memasang 1 m' pipa PVC tipe AW 4"
264
J.030
Memasang 1 buah bak cuci piring satinless steel
265
J.031
Memasang 1 buah kran " atau "
266
J.032
Memasang 1 buah floordrain
J.034
Membuat 1 unit septic tank ukuran 2 x 2 x 1,5 m + rembesan (kantor tipe kecil)
267

20.52
14.26
-

m
m
m
unit

K. PEKERJAAN BESI DAN ALUMUNIUM


261
K.008
Memasang 1 m pintu alumunium/ PVC
264
K.017
Memasang 1 m' talang datar seng BJLS 28
264
K.019
Memasang 1 m' talang lingkaran 10 cm, seng BJLS 28
265
K.020
Memasang 1 m' talang lingkaran 15 cm, seng BJLS 24

10.00
62.00
-

444,905.00
83,117.50
74,962.50
117,457.50

L. PEKERJAAN KUNCI DAN KACA


267
L.002
Memasang 1 buah kunci tanam biasa
268
L.003
Memasang 1 buah kunci tanam kamar mandi
269
L.004
Memasang 1 buah engsel pintu
270
L.005
Memasang 1 buah engsel jendela kupu-kupu
271
L.006
Memasang 1 buah kait angin
272
L.007
Memasang 1 buah kunci selot
273
L.008
Memasang 1 buah pegangan pintu / door holder
276
L.011
Memasang 1 m kaca; tebal 5 mm

12.00
10.00
12.00
48.00
24.00
24.00
10.80

bh
bh
bh
bh
bh
bh
bh

158,000.00
156,500.00
52,987.50
26,325.00
37,487.50
37,650.00
95,625.00
164,487.50

M. PEKERJAAN PENUTUP LANTAI DAN DINDING


277
M.001
Memasang 1 m lantai ubin PC abu-abu ukuran 30 x 30 cm
283
M.007
Memasang 1 m lantai keramik ukuran 30 x 30 cm
284
M.008
Memasang 1 m' plint keramik ukuran 10 x 20 cm
M.015
Memasang 1 m lantai keramik ukuran 40 x 40 cm
291

30.00
55.00
-

m
m
m'
m

104,997.50
189,250.00
75,675.00
141,375.00

20.52
20.52
20.52
580.00

m
m
m
m

12,805.00
36,775.00
29,825.00
21,362.50

N. PEKERJAAN PENGECATAN
298
N.001
Mendempul dan Menggosok 1 m kayu
300
N.003
Mengecat 1 m bidang kayu baru (1 lps plamir, 1 lps cat dsr, 2 lps cat penutup)
302
N.005
Melabur 1 m bidang kayu dengan politur
305
N.008
Mengecat 1 m bidang tembok baru (1 lps plamir, 1 lps cat dsr, 2 lps cat
penutup)

Harga Satuan Pekerjaan

SAT

VOLUME

m'
m'
m'

9,602,335.00
4,449,050.00
5,153,285.00
8,940,215.00
1,896,000.00
1,565,000.00
635,850.00
1,263,600.00
899,700.00
903,600.00
1,776,465.00
9,839,625.00
5,677,500.00
4,162,125.00
14,019,640.60
262,758.60
754,623.00
612,009.00
12,390,250.00

2 dari 16

ANALISA HARGA SATUAN PEKERJAAN


TAHUN ANGGARAN 2016
NO
1
A.
A.004

A.008

A.010

B.
B.001

B.010

B.011

B.012

KOEF

JUMLAH
Rp.
6=(3x5)

m
kg
m

1,800,000.00
19,500.00
1,800,000.00
Jumlah (1)

21,600.00
390.00
12,600.00
34,590.00

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.1000
0.1000
0.0100
0.0050

OH
OH
OH
OH

Jumlah (1) + (2)


Membersihkan 1 m lapangan dan perataan
Pekerja
Mandor

100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)

10,000.00
12,000.00
1,250.00
750.00
24,000.00
58,590.00

0.0750
0.0500

OH
OH

100,000.00
150,000.00
Jumlah (2)

7,500.00
7,500.00
15,000.00

Membuat 1 m bak adukan ukuran (40 x 50 x 50) cm


Bahan
Kayu Terentang
Paku
Kayu Meranti Batu 5/7 (ikat)

0.0360
0.0800
0.0140

m
kg
m

1,700,000.00
19,500.00
1,800,000.00
Jumlah (1)

61,200.00
1,560.00
25,200.00
87,960.00

Tenaga
Tukang Kayu
Mandor

0.3000
0.0015

OH
OH

120,000.00
150,000.00
Jumlah (2)

36,000.00
225.00
36,225.00
124,185.00

0.7500
0.0250

OH
OH

100,000.00
150,000.00

75,000.00
3,750.00
78,750.00

0.2500
0.0083

OH
OH

100,000.00
150,000.00

25,000.00
1,250.00
26,250.00

0.5000
0.0500

OH
OH

100,000.00
150,000.00

50,000.00
7,500.00
57,500.00

1.2000

215,000.00
Jumlah (1)

258,000.00
258,000.00

0.3000
0.0100

OH
OH

Jumlah (1) + (2)


PEKERJAAN PONDASI
Memasang 1 m pondasi batu belah; campuran 1 PC : 6 PP
Bahan
Batu Belah 15/20
1.2000
Portland Cement (PC)
117.0000
Pasir Pasang (PP)
0.5610

100,000.00
150,000.00
Jumlah (2)

30,000.00
1,500.00
31,500.00
289,500.00

m
kg
m

400,000.00
1,250.00
275,000.00
Jumlah (1)

480,000.00
146,250.00
154,275.00
780,525.00

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

OH
OH
OH
OH

100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)

150,000.00
72,000.00
7,500.00
11,250.00
240,750.00
1,021,275.00

Jumlah (1) + (2)


PEKERJAAN TANAH
Menggali 1 m tanah biasa sedalam 1 meter
Tenaga
Pekerja
Mandor
Jumlah
Mengurug kembali 1 m galian
Tenaga
Pekerja
Mandor
Jumlah
Memadatkan 1 m tanah (per 20 cm)
Tenaga
Pekerja
Mandor
Jumlah
Mengurug 1 m pasir urug
Bahan
Pasir Urug

Jumlah (1) + (2)

Analisa Pekerjaan

1.5000
0.6000
0.0600
0.0750

HARGA SAT
Rp.
5

2
3
PEKERJAAN PERSIAPAN
Mengerjakan 1 m pengukuran dan pemasangan bouwplank
Bahan
Kayu Meranti Batu 5/7 (ikat)
0.0120
Paku Biasa 2" - 5"
0.0200
Kayu Papan Meranti Batu (2 x 20 x 400)
0.0070

Tenaga
Pekerja
Mandor
C.
C.007

SAT

3 dari 16

NO
1
C.013

D.
D.013

D.020

E.
E.006

E.033

F.
F.004

HARGA SAT
Rp.
2
3
4
5
Memasang 1 m pondasi siklop; 60% beton campuran 1 PC : 2 PB : 3 KR dan 40 % batu belah
Bahan
Batu Belah 15/20
0.4800
m
400,000.00
Portland Cement (PC)
194.0000
kg
1,250.00
Pasir Beton (PB)
0.3120
m
275,000.00
Koral (Batu pecah ukuran 5 mm - 40 mm)
0.4680
m
400,000.00
Besi Beton
126.0000
m
12,000.00
Kawat Beton
1.8000
m
19,000.00
Jumlah (1)
Tenaga
Pekerja
3.0000
OH
100,000.00
Tukang Batu
0.8500
OH
120,000.00
Kepala Tukang
0.0850
OH
125,000.00
Mandor
0.1500
OH
150,000.00
Jumlah (2)
Jumlah (1) + (2)
PEKERJAAN DINDING
Memasang 1 m dinding bata merah (5x11x22) cm; tebal bata; campuran 1 PC : 6 PP
Bahan
Bata Merah
70.0000
buah
550.00
Portland Cement (PC)
8.3200
kg
1,250.00
Pasir Pasang (PP)
0.0490
m
275,000.00
Jumlah (1)
Tenaga
Pekerja
0.3000
OH
100,000.00
Tukang Batu
0.1000
OH
120,000.00
Kepala Tukang
0.0100
OH
125,000.00
Mandor
0.0150
OH
150,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m dinding terawang (roster) uk. (12x11x24) cm; campuran spesi 1 PC : 4 PP
Bahan
Bata Terawang / Roster
30.0000
buah
3,315.00
Portland Cement (PC)
11.0000
kg
1,250.00
Pasir Pasang (PP)
0.0350
m
275,000.00
Jumlah (1)
Tenaga
Pekerja
0.3000
OH
100,000.00
Tukang Batu
0.1000
OH
120,000.00
Kepala Tukang
0.0100
OH
125,000.00
Mandor
0.0150
OH
150,000.00
Jumlah (2)
Jumlah (1) + (2)
PEKERJAAN PLESTERAN
Memasang 1 m plesteran 1 PC : 6 PP; tebal 15 mm
Bahan
Portland Cement (PC)
4.4160
kg
1,250.00
Pasir Pasang (PP)
0.0270
m
275,000.00
Jumlah (1)
Tenaga
Pekerja
0.2000
OH
100,000.00
Tukang Batu
0.1500
OH
120,000.00
Kepala Tukang
0.0150
OH
125,000.00
Mandor
0.0100
OH
150,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m acian
Bahan
Portland Cement (PC)
3.2500
kg
1,250.00
Jumlah (1)
Tenaga
Pekerja
0.1500
OH
100,000.00
Tukang Batu
0.1000
OH
120,000.00
Kepala Tukang
0.0100
OH
125,000.00
Mandor
0.0080
OH
150,000.00
Jumlah (2)
Jumlah (1) + (2)
PEKERJAAN KAYU
Membuat dan memasang 1 m kusen pintu dan kusen jendela; Kayu Meranti Batu
Bahan
Balok Kayu Meranti Batu
1.2000
m
1,800,000.00
Paku 10 cm
1.2500
kg
19,500.00
Lem Kayu
1.0000
kg
22,000.00
Jumlah (1)
Tenaga
Pekerja
6.0000
OH
100,000.00
Tukang Kayu
14.0000
OH
120,000.00
Kepala Tukang
2.0000
OH
125,000.00
Mandor
0.3000
OH
150,000.00
Jumlah (2)
Jumlah (1) + (2)

Analisa Pekerjaan

KOEF

SAT

JUMLAH
Rp.
6=(3x5)
192,000.00
242,500.00
85,800.00
187,200.00
1,512,000.00
34,200.00
2,253,700.00
300,000.00
102,000.00
10,625.00
22,500.00
435,125.00
2,688,825.00

38,500.00
10,400.00
13,475.00
62,375.00
30,000.00
12,000.00
1,250.00
2,250.00
45,500.00
107,875.00
99,450.00
13,750.00
9,625.00
122,825.00
30,000.00
12,000.00
1,250.00
2,250.00
45,500.00
168,325.00

5,520.00
7,425.00
12,945.00
20,000.00
18,000.00
1,875.00
1,500.00
41,375.00
54,320.00
4,062.50
4,062.50
15,000.00
12,000.00
1,250.00
1,200.00
29,450.00
33,512.50
SNI 03-3434-2002
2,160,000.00
24,375.00
22,000.00
2,206,375.00
600,000.00
1,680,000.00
250,000.00
45,000.00
2,575,000.00
4,781,375.00

4 dari 16

NO
1
F.009

F.012

KOEF

F.018

F.022

F.026

JUMLAH
Rp.
6=(3x5)

m
kg

1,800,000.00
22,000.00
Jumlah (1)

72,000.00
11,000.00
83,000.00

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

OH
OH
OH
OH

100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)

100,000.00
180,000.00
31,250.00
7,500.00
318,750.00
401,750.00

1,800,000.00
22,000.00
Jumlah (1)

43,200.00
6,600.00
49,800.00

100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)

80,000.00
120,000.00
25,000.00
6,000.00
231,000.00
280,800.00

1.0000
1.5000
0.2500
0.0500

HARGA SAT
Rp.
5

2
3
Membuat dan memasang 1 m daun pintu panel; Kayu Meranti Batu
Bahan
Papan Kayu Meranti Batu
0.0400
Lem Kayu
0.5000

Jumlah (1) + (2)


Membuat dan memasang 1 m pintu dan jendela kaca; Kayu Meranti Batu
Bahan
Papan Kayu Meranti Batu
0.0240
m
Lem Kayu
0.3000
kg
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

F.016

SAT

0.8000
1.0000
0.2000
0.0400

OH
OH
OH
OH

Jumlah (1) + (2)


Membuat dan memasang 1 m daun pintu kayu lapis (plywood); rangka tertutup Meranti Batu
Bahan
Papan Kayu Meranti Batu
0.0250
m
1,800,000.00
Paku 1 cm - 2,5 cm
0.0300
kg
19,500.00
Lem Kayu
0.5000
kg
22,000.00
Plywood tbl. 4 mm; uk. (90 x 220) cm
1.0000 lembar
91,000.00
Jumlah (1)
Tenaga
Pekerja
0.6000
OH
100,000.00
Tukang Kayu
2.0000
OH
120,000.00
Kepala Tukang
0.2000
OH
125,000.00
Mandor
0.0300
OH
150,000.00
Jumlah (2)
Jumlah (1) + (2)
Membuat dan memasang 1 m jalusi kusen; Kayu Meranti Batu
Bahan
Papan Kayu Meranti Batu
0.0600
m
1,800,000.00
Paku 1 cm - 2,5 cm
0.1500
kg
19,500.00
Jumlah (1)
Tenaga
Pekerja
0.5000
OH
100,000.00
Tukang Kayu
1.0000
OH
120,000.00
Kepala Tukang
0.2000
OH
125,000.00
Mandor
0.0250
OH
150,000.00
Jumlah (2)
Jumlah (1) + (2)
Membuat dan memasang 1 m konstruksi kuda kuda konvensional; Kayu Meranti Batu
Bahan
Balok Kayu Meranti Batu
1.1000
m
1,800,000.00
Besi Strip 5 mm
15.0000
kg
14,000.00
Paku 12 cm
5.6000
kg
19,500.00
Jumlah (1)
Tenaga
Pekerja
4.0000
OH
100,000.00
Tukang Kayu
12.0000
OH
120,000.00
Kepala Tukang
1.2000
OH
125,000.00
Mandor
0.2000
OH
150,000.00
Jumlah (2)
Jumlah (1) + (2)
Membuat dan memasang 1 m konstruksi gording; Kayu Meranti Batu
Bahan
Balok Kayu Meranti Batu
1.1000
m
1,800,000.00
Besi Strip 5 mm
15.0000
kg
14,000.00
Paku 12 cm
3.0000
kg
19,500.00
Jumlah (1)
Tenaga
Pekerja
2.4000
OH
100,000.00
Tukang Kayu
7.2000
OH
120,000.00
Kepala Tukang
0.7200
OH
125,000.00
Mandor
0.1200
OH
150,000.00
Jumlah (2)
Jumlah (1) + (2)

Analisa Pekerjaan

45,000.00
585.00
11,000.00
91,000.00
147,585.00
60,000.00
240,000.00
25,000.00
4,500.00
329,500.00
477,085.00
108,000.00
2,925.00
110,925.00
50,000.00
120,000.00
25,000.00
3,750.00
198,750.00
309,675.00
1,980,000.00
210,000.00
109,200.00
2,299,200.00
400,000.00
1,440,000.00
150,000.00
30,000.00
2,020,000.00
4,319,200.00
1,980,000.00
210,000.00
58,500.00
2,248,500.00
240,000.00
864,000.00
90,000.00
18,000.00
1,212,000.00
3,460,500.00

5 dari 16

NO
1
F.028

F.037

F.038

F.042

F.045

G.
G.004

KOEF

SAT

HARGA SAT
Rp.
5

2
3
4
Membuat dan memasang 1 m rangka atap genteng kodok; Kayu Meranti Batu
Bahan
Kaso-kaso (5 x 7) cm
0.0120
m
1,800,000.00
Reng (2 x 3) cm
0.0036
m
1,800,000.00
Paku 5 cm & 10 cm
0.2500
kg
19,500.00
Jumlah (1)
Tenaga
Pekerja
0.1000
OH
100,000.00
Tukang Kayu
0.1000
OH
120,000.00
Kepala Tukang
0.0100
OH
125,000.00
Mandor
0.0050
OH
150,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m rangka langit-langit (60 x 60) cm; Kayu Meranti Batu
Bahan
Kaso-kaso (5 x 7) cm
0.0163
m
1,800,000.00
Paku 7 cm - 10 cm
0.2500
kg
19,500.00
Jumlah (1)
Tenaga
Pekerja
0.2000
OH
100,000.00
Tukang Kayu
0.3000
OH
120,000.00
Kepala Tukang
0.0300
OH
125,000.00
Mandor
0.0100
OH
150,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m' lisplank uk. (3 x 20) cm; Kayu Meranti Batu
Bahan
Papan Kayu Kruing
0.0108
m
1,800,000.00
Paku 5 cm - 7 cm
0.1000
kg
19,500.00
Jumlah (1)
Tenaga
Pekerja
0.1000
OH
100,000.00
Tukang Kayu
0.2000
OH
120,000.00
Kepala Tukang
0.0250
OH
125,000.00
Mandor
0.0050
OH
150,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m dinding pemisah plywood rangkap; GRC
Bahan
Balok Kayu Kruing
0.0280
m
1,800,000.00
Paku 5 cm - 10 cm
0.1500
kg
19,500.00
GRC tbl. 4 mm; uk. (120 x 240) cm
0.8600 lembar
61,000.00
Lem Kayu
0.5600
kg
Jumlah (1)
Tenaga
Pekerja
0.2000
OH
100,000.00
Tukang Kayu
0.6000
OH
120,000.00
Kepala Tukang
0.0600
OH
125,000.00
Mandor
0.0100
OH
150,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m' list plafond kayu profil
Bahan
List Kayu Profil
1.0500
m'
19,000.00
Jumlah (1)
Tenaga
Pekerja
0.0210
OH
100,000.00
Tukang Kayu
0.0210
OH
120,000.00
Kepala Tukang
0.0020
OH
125,000.00
Mandor
0.0010
OH
150,000.00
Jumlah (2)
Jumlah (1) + (2)
PEKERJAAN BETON
Membuat 1 m lantai kerja beton tumbuk 1 PC : 3 PB : 5 KR; tebal 5 cm
Bahan
Portland Cement (PC)
10.0000
kg
1,250.00
Pasir Beton (PB)
0.0260
m
275,000.00
Koral Beton (maksimum 30 mm)
0.0440
m
400,000.00
Jumlah (1)
Tenaga
Pekerja
1.1500
OH
100,000.00
Tukang Batu
0.0200
OH
120,000.00
Kepala Tukang
0.0020
OH
125,000.00
Mandor
0.0060
OH
150,000.00
Jumlah (2)
Jumlah (1) + (2)

Analisa Pekerjaan

JUMLAH
Rp.
6=(3x5)
21,600.00
6,480.00
4,875.00
32,955.00
10,000.00
12,000.00
1,250.00
750.00
24,000.00
56,955.00
29,340.00
4,875.00
34,215.00
20,000.00
36,000.00
3,750.00
1,500.00
61,250.00
95,465.00
19,440.00
1,950.00
21,390.00
10,000.00
24,000.00
3,125.00
750.00
37,875.00
59,265.00
50,400.00
2,925.00
52,460.00
105,785.00
20,000.00
72,000.00
7,500.00
1,500.00
101,000.00
206,785.00
19,950.00
19,950.00
2,100.00
2,520.00
250.00
150.00
5,020.00
24,970.00

12,500.00
7,150.00
17,600.00
37,250.00
115,000.00
2,400.00
250.00
900.00
118,550.00
155,800.00

6 dari 16

NO
1
G.005

G.034

G.036

JUMLAH
Rp.
6=(3x5)

SAT

232.0000
0.5200
0.7800

kg
m
m

1,250.00
275,000.00
400,000.00
Jumlah (1)

290,000.00
143,000.00
312,000.00
745,000.00

1.6500
0.2500
0.0250
0.0800

OH
OH
OH
OH

Jumlah (1) + (2)


Memasang 1 m pondasi beton bertulang (150 kg besi + bekisting)
Bahan
Kayu Pinus/Kayu Rawa
0.2000
Paku 5 cm - 12 cm
1.5000
Minyak Bekisting
0.4000
Besi Beton (polos/ulir)
157.5000
Kawat Beton
2.2500
Portland Cement (PC)
336.0000
Pasir Beton (PB)
0.5400
Koral Beton (maksimum 30 mm)
0.8100

100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)

165,000.00
30,000.00
3,125.00
12,000.00
210,125.00
955,125.00

m
kg
liter
kg
kg
kg
m
m

1,700,000.00
19,500.00
3,000.00
10,500.00
19,000.00
1,250.00
275,000.00
400,000.00
Jumlah (1)

340,000.00
29,250.00
1,200.00
1,653,750.00
42,750.00
420,000.00
148,500.00
324,000.00
2,959,450.00

Tenaga
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

5.3000
0.2750
1.3000
1.0500
0.2620
0.2650

OH
OH
OH
OH
OH
OH

Jumlah (1) + (2)


Memasang 1 m sloof beton bertulang (200 kg besi + bekisting)
Bahan
Kayu Pinus/Kayu Rawa
0.2700
Paku 5 cm - 12 cm
2.0000
Minyak Bekisting
0.6000
Besi Beton (polos/ulir)
210.0000
Kawat Beton
3.0000
Portland Cement (PC)
336.0000
Pasir Beton (PB)
0.5400
Koral Beton (maksimum 30 mm)
0.8100

100,000.00
120,000.00
120,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)

530,000.00
33,000.00
156,000.00
126,000.00
32,750.00
39,750.00
917,500.00
3,876,950.00

m
kg
liter
kg
kg
kg
m
m

1,700,000.00
19,500.00
3,000.00
10,500.00
19,000.00
1,250.00
275,000.00
400,000.00
Jumlah (1)

459,000.00
39,000.00
1,800.00
2,205,000.00
57,000.00
420,000.00
148,500.00
324,000.00
3,654,300.00

Tenaga
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

OH
OH
OH
OH
OH
OH

100,000.00
120,000.00
120,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)

565,000.00
33,000.00
187,200.00
168,000.00
40,375.00
42,450.00
1,036,025.00
4,690,325.00

m
kg
liter
kg
kg
kg
m
m
m
lembar
m'

1,700,000.00
19,500.00
3,000.00
10,500.00
19,000.00
1,250.00
275,000.00
400,000.00
1,800,000.00
170,000.00
34,000.00
Jumlah (1)

544,000.00
62,400.00
4,800.00
2,205,000.00
57,000.00
420,000.00
148,500.00
324,000.00
252,000.00
476,000.00
4,493,700.00

OH
OH
OH
OH
OH
OH

100,000.00
120,000.00
120,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)

635,000.00
33,000.00
198,000.00
168,000.00
41,625.00
47,700.00
1,123,325.00
5,617,025.00

2
Membuat 1 m beton bertulang 1 PC : 2 PB : 3 KR
Bahan
Portland Cement (PC)
Pasir Beton (PB)
Koral Beton (maksimum 30 mm)
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

G.033

HARGA SAT
Rp.
5

KOEF

5.6500
0.2750
1.5600
1.4000
0.3230
0.2830

Jumlah (1) + (2)


Memasang 1 m balok beton bertulang (200 kg besi + bekisting)
Bahan
Kayu Pinus/Kayu Rawa
0.3200
Paku 5 cm - 12 cm
3.2000
Minyak Bekisting
1.6000
Besi Beton (polos/ulir)
210.0000
Kawat Beton
3.0000
Portland Cement (PC)
336.0000
Pasir Beton (PB)
0.5400
Koral Beton (maksimum 30 mm)
0.8100
Balok Kayu Meranti Batu 5/7
0.1400
Plywood tebal 9 mm
2.8000
Dolken (8-10) cm
0.0000
Tenaga
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Jumlah (1) + (2)

Analisa Pekerjaan

6.3500
0.2750
1.6500
1.4000
0.3330
0.3180

7 dari 16

NO
1
G.037

G.040

G.041

G.050

KOEF
2
3
Memasang 1 m kolom beton bertulang (150 kg besi + bekisting)
Bahan
Kayu Pinus/Kayu Rawa
0.3200
Paku 5 cm - 12 cm
3.2000
Minyak Bekisting
1.6000
Besi Beton (polos/ulir)
157.5000
Kawat Beton
2.2500
Portland Cement (PC)
336.0000
Pasir Beton (PB)
0.5400
Koral Beton (maksimum 30 mm)
0.8100
Balok Kayu Meranti Batu 5/7
0.1200
Plywood tebal 9 mm
2.8000
Dolken (8-10) cm
0.0000

SAT
4

HARGA SAT
Rp.
5

JUMLAH
Rp.
6=(3x5)

m
kg
liter
kg
kg
kg
m
m
m
lembar
m'

1,700,000.00
19,500.00
3,000.00
10,500.00
19,000.00
1,250.00
275,000.00
400,000.00
1,800,000.00
170,000.00
34,000.00
Jumlah (1)

544,000.00
62,400.00
4,800.00
1,653,750.00
42,750.00
420,000.00
148,500.00
324,000.00
216,000.00
476,000.00
3,892,200.00

Tenaga
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

5.3000
0.2750
1.3000
1.0500
0.2650
0.2650

OH
OH
OH
OH
OH
OH

Jumlah (1) + (2)


Memasang 1 m' kolom praktis beton bertulang (11 x 11 cm)
Bahan
Kayu Pinus/Kayu Rawa
Paku 5 cm - 12 cm
Minyak Bekisting
Besi Beton (polos/ulir)
Kawat Beton
Portland Cement (PC)
Pasir Beton (PB)
Koral Beton (maksimum 30 mm)

100,000.00
120,000.00
120,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)

530,000.00
33,000.00
156,000.00
126,000.00
33,125.00
39,750.00
917,875.00
4,810,075.00

0.0020
0.0100
0.0000
3.0000
0.4500
4.0000
0.0060
0.0090

m
kg
liter
kg
kg
kg
m
m

1,700,000.00
19,500.00
3,000.00
10,500.00
19,000.00
1,250.00
275,000.00
400,000.00
Jumlah (1)

3,400.00
195.00
31,500.00
8,550.00
5,000.00
1,650.00
3,600.00
53,895.00

Tenaga
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

0.1800
0.0200
0.0200
0.0200
0.0060
0.0090

OH
OH
OH
OH
OH
OH

Jumlah (1) + (2)


Memasang 1 m' ring balok beton bertulang (10 x 15 cm)
Bahan
Kayu Pinus/Kayu Rawa
Paku 5 cm - 12 cm
Minyak Bekisting
Besi Beton (polos/ulir)
Kawat Beton
Portland Cement (PC)
Pasir Beton (PB)
Koral Beton (maksimum 30 mm)

100,000.00
120,000.00
120,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)

18,000.00
2,400.00
2,400.00
2,400.00
750.00
1,350.00
27,300.00
81,195.00

0.0030
0.0200
0.0000
3.6000
0.0500
5.5000
0.0090
0.0150

m
kg
liter
kg
kg
kg
m
m

1,700,000.00
19,500.00
3,000.00
10,500.00
19,000.00
1,250.00
275,000.00
400,000.00
Jumlah (1)

5,100.00
390.00
37,800.00
950.00
6,875.00
2,475.00
6,000.00
59,590.00

Tenaga
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

0.2970
0.0330
0.0330
0.0330
0.0100
0.0150

OH
OH
OH
OH
OH
OH

Jumlah (1) + (2)


Pembesian 1 kg dengan besi beton U-24
Bahan
Besi Beton U-24
Kawat Beton

100,000.00
120,000.00
120,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)

29,700.00
3,960.00
3,960.00
3,960.00
1,250.00
2,250.00
45,080.00
104,670.00

1.0500
0.0150

kg
kg

10,500.00
19,000.00
Jumlah (1)

11,025.00
285.00
11,310.00

Tenaga
Pekerja
Tukang Besi
Kepala Tukang
Mandor
Peralatan, Spancer

0.0400
0.0150
0.0150
0.0075
0.0200

OH
OH
OH
OH
lot

100,000.00
120,000.00
125,000.00
150,000.00
1,000.00
Jumlah (2)

4,000.00
1,800.00
1,875.00
1,125.00
20.00
8,820.00
20,130.00

Jumlah (1) + (2)

Analisa Pekerjaan

8 dari 16

NO
1
H.
H.009

H.010

I.
I.002

I.014

J.
J.001

J.002

KOEF

SAT

HARGA SAT
Rp.
5

JUMLAH
Rp.
6=(3x5)

2
PEKERJAAN PENUTUP ATAP
Memasang 1 m atap seng gelombang
Bahan
Seng Gelombang 3' - 6' BJLS 28
Paku " - 1"

0.7000
0.0200

lbr
kg

40,000.00
19,500.00
Jumlah (1)

28,000.00
390.00
28,390.00

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.1200
0.0600
0.0060
0.0060

OH
OH
OH
OH

Jumlah (1) + (2)


Memasang 1 m atap nok seng
Bahan
Seng Plat 3' - 6' BJLS 28
Paku " - 1"

100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)

12,000.00
7,200.00
750.00
900.00
20,850.00
49,240.00

0.3000
0.0400

lbr
kg

40,000.00
19,500.00
Jumlah (1)

12,000.00
780.00
12,780.00

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.1500
0.0700
0.0080
0.0060

OH
OH
OH
OH

100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)

15,000.00
8,400.00
1,000.00
900.00
25,300.00
38,080.00

Jumlah (1) + (2)


PEKERJAAN LANGIT-LANGIT
Memasang 1 m langit-langit tripleks ukuran (120 x 240 ) cm; tbl. 3 mm, 4 mm dan 6 mm
Bahan
Tripleks
0.3750 lembar
68,850.00
Paku Triplek
0.0300
kg
19,500.00
Jumlah (1)
Tenaga
Pekerja
0.0700
OH
100,000.00
Tukang Kayu
0.1000
OH
120,000.00
Kepala Tukang
0.0100
OH
125,000.00
Mandor
0.0040
OH
150,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m' list kayu profil
Bahan
List Kayu Profil
1.0500
m'
19,000.00
Paku Triplek
0.0100
kg
19,500.00
Jumlah (1)
Tenaga
Pekerja
0.0500
OH
100,000.00
Tukang Kayu
0.0500
OH
120,000.00
Kepala Tukang
0.0050
OH
125,000.00
Mandor
0.0030
OH
150,000.00
Jumlah (2)
Jumlah (1) + (2)
PEKERJAAN SANITASI
Memasang 1 buah kloset duduk/monoblok
Bahan
Kolset Duduk/Monblok
1.0000
bh
1,600,000.00
6% harga kloset
Perlengkapan
18,360.00
Jumlah (1)
Tenaga
Pekerja
3.3000
OH
100,000.00
Tukang Batu
0.5500
OH
120,000.00
Kepala Tukang
0.0010
OH
125,000.00
Mandor
0.0800
OH
150,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 buah kloset jongkok porselen
Bahan
Kloset Jongkok Porselen
1.0000
bh
325,000.00
Portland Cement (PC)
6.0000
kg
1,250.00
Pasir Pasang
0.0100
m
275,000.00
Jumlah (1)
Tenaga
Pekerja
1.0000
OH
100,000.00
Tukang Batu
0.7500
OH
120,000.00
Kepala Tukang
0.7500
OH
125,000.00
Mandor
0.0800
OH
150,000.00
Jumlah (2)
Jumlah (1) + (2)

Analisa Pekerjaan

25,818.75
585.00
26,403.75
7,000.00
12,000.00
1,250.00
600.00
20,850.00
47,253.75
19,950.00
195.00
20,145.00
5,000.00
6,000.00
625.00
450.00
12,075.00
32,220.00
SNI
1,600,000.00
18,360.00
1,600,000.00
330,000.00
66,000.00
125.00
12,000.00
408,125.00
2,008,125.00
325,000.00
7,500.00
2,750.00
335,250.00
100,000.00
90,000.00
93,750.00
12,000.00
295,750.00
631,000.00

9 dari 16

NO
1
J.004

2
Memasang 1 buah urinoir
Bahan
Urinoir
Perlengkapan
Portland Cement (PC)
Pasir Pasang
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

J.005

Jumlah (1) + (2)


Memasang 1 buah wastafel
Bahan
Wastafel
Perlengkapan
Portland Cement (PC)
Pasir Pasang
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

J.006

Jumlah (1) + (2)


Memasang 1 buah bak mandi fibreglass volume 0,30 m
Bahan
Bak Fibreglass
Perlengkapan
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

J.007

Jumlah (1) + (2)


Memasang 1 buah bak mandi batu bata volume 0,30 m
Bahan
Bata Merah 5 x 12 x 22 cm
Portland Cement (PC)
Pasir Pasang
Keramik Dinding 10x20 cm
Semen Nat
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

J.016

Jumlah (1) + (2)


Memasang 1 m' pipa galvanis "
Bahan
Pipa Galvanis
Perlengkapan
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

J.017

Jumlah (1) + (2)


Memasang 1 m' pipa galvanis "
Bahan
Pipa Galvanis
Perlengkapan
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Jumlah (1) + (2)

Analisa Pekerjaan

KOEF

SAT

1.0000
bh
30% harga urinoir
6.0000
kg
0.0100
m

HARGA SAT
Rp.
5

JUMLAH
Rp.
6=(3x5)

433,500.00
125,050.00
1,250.00
275,000.00
Jumlah (1)

433,500.00
125,050.00
7,500.00
2,750.00
568,800.00

100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)

100,000.00
120,000.00
12,500.00
15,000.00
247,500.00
816,300.00

544,000.00
65,280.00
1,250.00
275,000.00
Jumlah (1)

544,000.00
65,280.00
7,500.00
2,750.00
619,530.00

OH
OH
OH
OH

100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)

120,000.00
174,000.00
18,750.00
15,000.00
327,750.00
947,280.00

1.0000
bh
18% harga bak

520,000.00
38,556.00
Jumlah (1)

520,000.00
38,556.00
558,556.00

1.0000
1.0000
0.1000
0.1000

OH
OH
OH
OH

1.0000
bh
12% harga wastafel
6.0000
kg
0.0100
m
1.2000
1.4500
0.1500
0.1000

0.9000
1.3500
0.2700
0.0550

OH
OH
OH
OH

100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)

90,000.00
162,000.00
33,750.00
8,250.00
294,000.00
852,556.00

303.0303
120.0000
0.3000
4.3560
6.0000

bh
kg
m
m
kg

7,500.00
1,250.00
275,000.00
57,000.00
3,000.00
Jumlah (1)

2,272,727.27
150,000.00
82,500.00
248,292.00
18,000.00
2,771,519.27

6.0000
3.0000
0.3000
0.3000

OH
OH
OH
OH

100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)

600,000.00
360,000.00
37,500.00
45,000.00
1,042,500.00
3,814,019.27

1.2000
m'
35% harga pipa

93,000.00
32,550.00
Jumlah (1)

111,600.00
32,550.00
144,150.00

OH
OH
OH
OH

100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)

5,400.00
10,800.00
1,125.00
4,050.00
21,375.00
165,525.00

1.2000
m'
35% harga pipa

195,000.00
68,250.00
Jumlah (1)

234,000.00
68,250.00
302,250.00

100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)

5,400.00
10,800.00
1,125.00
4,050.00
21,375.00
323,625.00

0.0540
0.0900
0.0090
0.0270

0.0540
0.0900
0.0090
0.0270

OH
OH
OH
OH

10 dari 16

NO
1
J.022

2
Memasang 1 m' pipa PVC tipe AW "
Bahan
Pipa PVC
Perlengkapan
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

J.023

Jumlah (1) + (2)


Memasang 1 m' pipa PVC tipe AW "
Bahan
Pipa PVC
Perlengkapan
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

J.028

Jumlah (1) + (2)


Memasang 1 m' pipa PVC tipe AW 3"
Bahan
Pipa PVC
Perlengkapan
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

J.029

J.030

J.031

J.032

J.034

Jumlah (1) + (2)


Memasang 1 m' pipa PVC tipe AW 4"
Bahan
Pipa PVC
Perlengkapan

KOEF

SAT

HARGA SAT
Rp.
5

1.2000
m'
35% harga pipa

JUMLAH
Rp.
6=(3x5)

5,250.00
1,181.25
Jumlah (1)

6,300.00
1,181.25
7,481.25

OH
OH
OH
OH

100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)

3,600.00
7,200.00
750.00
270.00
11,820.00
19,301.25

1.2000
m'
35% harga pipa

10,000.00
1,566.38
Jumlah (1)

12,000.00
1,566.38
13,566.38

OH
OH
OH
OH

100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)

3,600.00
7,200.00
750.00
270.00
11,820.00
25,386.38

1.2000
m'
35% harga pipa

62,500.00
13,054.92
Jumlah (1)

75,000.00
13,054.92
88,054.92

OH
OH
OH
OH

100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)

8,100.00
16,200.00
1,687.50
615.00
26,602.50
114,657.42

1.2000
m'
35% harga pipa

77,500.00
19,495.16
Jumlah (1)

93,000.00
19,495.16
112,495.16

0.0360
0.0600
0.0060
0.0018

0.0360
0.0600
0.0060
0.0018

0.0810
0.1350
0.0135
0.0041

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

0.0810
0.1350
0.0135
0.0041

OH
OH
OH
OH

Jumlah (1) + (2)


Memasang 1 buah bak cuci piring satinless steel
Bahan
Bak Cuci Satinless Steel
Water Drain + Aksesoris

100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)

8,100.00
16,200.00
1,687.50
615.00
26,602.50
139,097.66

1.0000
1.0000

bh
set

255,000.00
89,250.00
Jumlah (1)

255,000.00
89,250.00
344,250.00

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

0.0300
0.3000
0.0300
0.0015

OH
OH
OH
OH

Jumlah (1) + (2)


Memasang 1 buah kran " atau "
Bahan
Kran Air
Seal Tape

100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)

3,000.00
36,000.00
3,750.00
225.00
42,975.00
387,225.00

1.0000
0.0250

bh
bh

33,000.00
2,650.00
Jumlah (1)

33,000.00
2,650.00
35,650.00

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

0.0100
0.1000
0.0100
0.0050

OH
OH
OH
OH

Jumlah (1) + (2)


Memasang 1 buah floordrain
Bahan
Floordrain

100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)

1,000.00
12,000.00
1,250.00
750.00
15,000.00
50,650.00

1.0000

bh

25,000.00
Jumlah (1)

25,000.00
25,000.00

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

0.0100
0.1000
0.0100
0.0050

OH
OH
OH
OH

100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)

1,000.00
12,000.00
1,250.00
750.00
15,000.00
40,000.00

78,750.00

354,375.00

Jumlah (1) + (2)


Membuat 1 unit septic tank ukuran2 x 1,5 x 1,5 m + rembesan (kantor tipe kecil)
Galian Tanah
4.5000
m

Analisa Pekerjaan

11 dari 16

NO
1

K.
K.008

K.017

K.018

K.019

K.020

KOEF
2
Urugan Pasir urug
Lantai kerja beton
Pas. Batu bata 1 PC : 2 PS + Plesteran
Plat beton penutup & balok
Pipa PVC 4" jenis AW + sambungan
Pipa GIP 1 1/2"
Galian tanah untuk rembesan
Pasang Ijuk
Urugan kerikil 3-5 cm.
Pipa PVC 4" berlobang jenis AW
Urugan kembali perataan tanah
Tambahan upah
Jumlah
PEKERJAAN BESI DAN ALUMUNIUM
Memasang 1 m pintu alumunium/ PVC
Bahan
Pintu Alumunium/ PVC

SAT

HARGA SAT
Rp.
5
289,500.00
155,800.00
195,707.50
3,876,950.00
114,558.00
714,660.00
86,250.00
108,750.00
400,000.00
77,500.00
26,250.00
500,000.00

JUMLAH
Rp.
6=(3x5)
62,010.90
350,550.00
2,935,612.50
1,308,470.63
1,031,022.00
857,592.00
291,093.75
587,250.00
420,000.00
387,500.00
29,531.25
46,000.00
8,661,008.03

3
0.2142
2.2500
15.0000
0.3375
9.0000
1.2000
3.3750
5.4000
1.0500
5.0000
1.1250
0.0920

4
m
m
m
m
m
m'
m
kg
m
m'
m
ls

1.0000

200,000.00
Jumlah (1)

200,000.00
200,000.00

Tenaga
Pekerja
Tukang Besi
Kepala Tukang
Mandor

1.0500
1.0500
0.1050
0.0052

OH
OH
OH
OH

Jumlah (1) + (2)


Memasang 1 m' talang datar seng BJLS 28
Bahan
Seng Plat 3' x 6 ' BJLS 28
Paku Biasa " - 1" atau sekrup
Kayu Kalimantan Papan

100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)

105,000.00
126,000.00
13,125.00
780.00
244,905.00
444,905.00

0.5000
0.0150
0.0190

lbr
kg
m

20,000.00
19,500.00
1,800,000.00
Jumlah (1)

10,000.00
292.50
34,200.00
44,492.50

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.1000
0.2000
0.0250
0.0100

OH
OH
OH
OH

Jumlah (1) + (2)


Memasang 1 m' talang miring seng BJLS 28
Bahan
Seng Plat 3' x 6 ' BJLS 28
Paku Biasa " - 1" atau sekrup
Kayu Kalimantan Papan
Flincote/Meni Besi

100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)

10,000.00
24,000.00
3,125.00
1,500.00
38,625.00
83,117.50

0.5000
0.0150
0.0190
0.3000

lbr
kg
m
kg

20,000.00
19,500.00
1,800,000.00
23,000.00
Jumlah (1)

10,000.00
292.50
34,200.00
6,900.00
51,392.50

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.1500
0.4000
0.0250
0.0013

OH
OH
OH
OH

Jumlah (1) + (2)


Memasang 1 m' talang lingkaran 10 cm, seng BJLS 28
Bahan
Seng Plat 3' x 6 ' BJLS 28
0.3000
Paku Biasa " - 1" atau sekrup
0.1000
Besi Strip
0.5000

100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)

15,000.00
48,000.00
3,125.00
187.50
66,312.50
117,705.00

lbr
kg
kg

59,000.00
19,500.00
14,000.00
Jumlah (1)

17,700.00
1,950.00
7,000.00
26,650.00

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.1500
0.2500
0.0250
0.0013

OH
OH
OH
OH

Jumlah (1) + (2)


Memasang 1 m' talang lingkaran 15 cm, seng BJLS 24
Bahan
Seng Plat 3' x 6 ' BJLS 28
1.0500
Paku Biasa " - 1" atau sekrup
0.0100
Besi Strip
0.5000

100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)

15,000.00
30,000.00
3,125.00
187.50
48,312.50
74,962.50

lbr
kg
kg

59,000.00
19,500.00
14,000.00
Jumlah (1)

61,950.00
195.00
7,000.00
69,145.00

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

OH
OH
OH
OH

100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)

15,000.00
30,000.00
3,125.00
187.50
48,312.50
117,457.50

Jumlah (1) + (2)

Analisa Pekerjaan

0.1500
0.2500
0.0250
0.0013

12 dari 16

NO
1
L.
L.002

L.003

L.004

L.005

L.006

L.007

L.008

KOEF

SAT

HARGA SAT
Rp.
5

JUMLAH
Rp.
6=(3x5)

2
PEKERJAAN KUNCI DAN KACA
Memasang 1 buah kunci tanam biasa
Bahan
Kunci Tanam Biasa

1.0000

bh

125,000.00
Jumlah (1)

125,000.00
125,000.00

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0100
0.2500
0.0100
0.0050

OH
OH
OH
OH

Jumlah (1) + (2)


Memasang 1 buah kunci tanam kamar mandi
Bahan
Kunci Tanam Kamar Mandi

100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)

1,000.00
30,000.00
1,250.00
750.00
33,000.00
158,000.00

1.0000

bh

125,000.00
Jumlah (1)

125,000.00
125,000.00

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0050
0.2500
0.0050
0.0025

OH
OH
OH
OH

Jumlah (1) + (2)


Memasang 1 buah engsel pintu
Bahan
Engsel Pintu

100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)

500.00
30,000.00
625.00
375.00
31,500.00
156,500.00

1.0000

bh

31,500.00
Jumlah (1)

31,500.00
31,500.00

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0150
0.1500
0.0150
0.0008

OH
OH
OH
OH

Jumlah (1) + (2)


Memasang 1 buah engsel jendela kupu-kupu
Bahan
Engsel Jendela Kupu-Kupu

100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)

1,500.00
18,000.00
1,875.00
112.50
21,487.50
52,987.50

1.0000

bh

12,000.00
Jumlah (1)

12,000.00
12,000.00

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0100
0.1000
0.0100
0.0005

OH
OH
OH
OH

Jumlah (1) + (2)


Memasang 1 buah kait angin
Bahan
Kait Angin

100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)

1,000.00
12,000.00
1,250.00
75.00
14,325.00
26,325.00

1.0000

bh

16,000.00
Jumlah (1)

16,000.00
16,000.00

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0150
0.1500
0.0150
0.0008

OH
OH
OH
OH

Jumlah (1) + (2)


Memasang 1 buah kunci selot
Bahan
Kunci Selot / Gerendel

100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)

1,500.00
18,000.00
1,875.00
112.50
21,487.50
37,487.50

1.0000

bh

9,000.00
Jumlah (1)

9,000.00
9,000.00

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0200
0.2000
0.0200
0.0010

OH
OH
OH
OH

Jumlah (1) + (2)


Memasang 1 buah pegangan pintu / door holder
Bahan
Pegangan Pintu

100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)

2,000.00
24,000.00
2,500.00
150.00
28,650.00
37,650.00

1.0000

bh

24,000.00
Jumlah (1)

24,000.00
24,000.00

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0500
0.5000
0.0500
0.0025

OH
OH
OH
OH

100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)

5,000.00
60,000.00
6,250.00
375.00
71,625.00
95,625.00

Jumlah (1) + (2)

Analisa Pekerjaan

13 dari 16

NO
1
L.011

M.
M.001

M.007

M.015

N.
N.001

KOEF

SAT

HARGA SAT
Rp.
5

JUMLAH
Rp.
6=(3x5)

2
Memasang 1 m kaca; tebal 5 mm
Bahan
Kaca

1.1000

130,000.00
Jumlah (1)

143,000.00
143,000.00

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0150
0.1500
0.0150
0.0008

OH
OH
OH
OH

Jumlah (1) + (2)


PEKERJAAN PENUTUP LANTAI DAN DINDING
Memasang 1 m lantai ubin PC abu-abu ukuran 30 x 30 cm
Bahan
Ubin PC Abu-Abu 30 x 30 cm
11.8700
Portland Cement (PC)
10.0000
Pasir Pasang
0.0450

100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)

1,500.00
18,000.00
1,875.00
112.50
21,487.50
164,487.50
SNI-Pt-T2000-C

bh
kg
m

3,000.00
1,250.00
275,000.00
Jumlah (1)

35,610.00
12,500.00
12,375.00
60,485.00

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

0.2600
0.1250
0.0125
0.0130

OH
OH
OH
OH

100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)

26,000.00
15,000.00
1,562.50
1,950.00
44,512.50
104,997.50

1.0000
10.0000
0.0450
1.5000

m
kg
m
kg

47,000.00
1,250.00
275,000.00
3,000.00
Jumlah (1)

47,000.00
12,500.00
12,375.00
4,500.00
76,375.00

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

0.6200
0.3500
0.0350
0.0300

OH
OH
OH
OH

Jumlah (1) + (2)


Memasang 1 m lantai keramik ukuran 40 x 40 cm
Bahan
Ubin Keramik Motif 40 x 40 cm
Portland Cement (PC)
Pasir Pasang
Semen Warna

100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)

62,000.00
42,000.00
4,375.00
4,500.00
112,875.00
189,250.00

1.0000
9.8000
0.0450
1.3000

m
kg
m
kg

70,000.00
1,250.00
275,000.00
3,000.00
Jumlah (1)

70,000.00
12,250.00
12,375.00
3,900.00
98,525.00

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

0.2500
0.1200
0.0120
0.0130

OH
OH
OH
OH

Jumlah (1) + (2)


PEKERJAAN PENGECATAN
Mendempul dan Menggosok 1 m kayu
Bahan
Dempul Jadi
Minyak Cat
Batu Apung

100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)

25,000.00
14,400.00
1,500.00
1,950.00
42,850.00
141,375.00
SNI

0.0800
0.0200
0.0100

kg
kg
kg

34,000.00
12,500.00
16,000.00
Jumlah (1)

2,720.00
250.00
160.00
3,130.00

Tenaga
Pekerja
Tukang Cat
Kepala Tukang
Mandor

0.0400
0.0400
0.0040
0.0025

OH
OH
OH
OH

100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)

4,000.00
4,800.00
500.00
375.00
9,675.00
12,805.00

Jumlah (1) + (2)


Memasang 1 m lantai keramik ukuran 30 x 30 cm
Bahan
Ubin Keramik 30 x 30 cm
Portland Cement (PC)
Pasir Pasang
Semen Warna

Jumlah (1) + (2)

Analisa Pekerjaan

14 dari 16

NO
1
N.003

N.005

N.008

KOEF

SAT

2
3
4
Mengecat 1 m bidang kayu baru (1 lps plamir, 1 lps cat dsr, 2 lps cat penutup)
Bahan
Cat Meni
0.2000
kg
Plamir
0.1500
kg
Cat Dasar
0.1700
kg
Cat Penutup
0.2600
kg

HARGA SAT
Rp.
5

JUMLAH
Rp.
6=(3x5)

34,000.00
15,000.00
34,000.00
49,000.00
Jumlah (1)

6,800.00
2,250.00
5,780.00
12,740.00
27,570.00

Tenaga
Pekerja
Tukang Cat
Kepala Tukang
Mandor

0.0700
0.0090
0.0060
0.0025

OH
OH
OH
OH

Jumlah (1) + (2)


Melabur 1 m bidang kayu dengan politur
Bahan
Politur
Politur Jadi
Ampelas

100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)

7,000.00
1,080.00
750.00
375.00
9,205.00
36,775.00

0.2000
0.1500
2.0000

kg
kg
lbr

35,000.00
35,000.00
4,000.00
Jumlah (1)

7,000.00
5,250.00
8,000.00
20,250.00

Tenaga
Tukang Cat
Kepala Tukang
Mandor

0.0600
0.0160
0.0025

OH
OH
OH

120,000.00
125,000.00
150,000.00
Jumlah (2)

7,200.00
2,000.00
375.00
9,575.00
29,825.00

Jumlah (1) + (2)


Mengecat 1 m bidang tembok baru (1 lps plamir, 1 lps cat dsr, 2 lps cat penutup)
Bahan
Plamir
0.1000
kg
16,000.00
Cat Dasar
0.1000
kg
15,000.00
Cat Penutup
0.2600
kg
29,000.00
Jumlah (1)
Tenaga
Pekerja
0.0200
OH
100,000.00
Tukang Cat
0.0630
OH
120,000.00
Kepala Tukang
0.0063
OH
125,000.00
Mandor
0.0025
OH
150,000.00
Jumlah (2)
Jumlah (1) + (2)

Analisa Pekerjaan

1,600.00
1,500.00
7,540.00
10,640.00
2,000.00
7,560.00
787.50
375.00
10,722.50
21,362.50

15 dari 16

pondasi
atap
dinding

dinding KM

lantai

KUSEN PINTU
KUSEN JENDELA
daun jendela
kuda2 6/12
atap

86
399.28 m2
186 m2
177 m2
m2
84 m2
20 m2
310 m2

0.02892
0.02988
0.594
379.3
379.44

350,000.00
1,000,000.00
600,000.00
600,000.00

139,748,000.00
186,000,000.00
106,200,000.00
-

200,000.00

62,000,000.00
493,948,000.00