JENIS PEKERJAAN
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
N.
PEKERJAAN PERSIAPAN
PEKERJAAN TANAH
PEKERJAAN PONDASI
PEKERJAAN DINDING
PEKERJAAN PLESTERAN
PEKERJAAN KAYU
PEKERJAAN BETON
PEKERJAAN PENUTUP ATAP
PEKERJAAN LANGIT-LANGIT
PEKERJAAN SANITASI
PEKERJAAN BESI DAN ALUMUNIUM
PEKERJAAN KUNCI DAN KACA
PEKERJAAN PENUTUP LANTAI DAN DINDING
PEKERJAAN PENGECATAN
JUMLAH HARGA
6,590,475.00
10,901,437.50
9,926,793.00
83,337,423.50
50,942,850.00
132,412,470.45
86,158,134.10
20,132,739.20
15,008,649.22
48,316,419.36
9,602,335.00
8,940,215.00
9,839,625.00
14,019,640.60
506,129,206.93
NOMOR
ANALISA
JENIS PEKERJAAN
A.
4
8
10
PEKERJAAN PERSIAPAN
A.004
Mengerjakan 1 m pengukuran dan pemasangan bouwplank
A.008
Membersihkan 1 m lapangan dan perataan
A.010
Membuat 1 m bak adukan ukuran (40 x 50 x 50) cm
B. PEKERJAAN TANAH
29
B.001
Menggali 1 m tanah biasa sedalam 1 meter
38
B.010
Mengurug kembali 1 m galian
39
B.011
Memadatkan 1 m tanah (per 20 cm)
40
B.012
Mengurug 1 m pasir urug
C. PEKERJAAN PONDASI
53
C.007
Memasang 1 m pondasi batu belah; campuran 1 PC : 6 PP
59
C.013
Memasang 1 m pondasi siklop; 60% beton campuran 1 PC : 2 PB : 3 KR dan
40 % batu belah
D. PEKERJAAN DINDING
73
D.012
Memasang 1 m dinding bata merah (5x11x22) cm; tebal bata; campuran 1
PC : 5 PP
82
D.021
Memasang 1 m dinding bata berongga ekspose uk. (5x11x24) cm; campuran
spesi 1 PC : 3 PP
HARGA SATUAN
( Rp )
JUMLAH HARGA
( Rp )
31.00
310.00
1.00
m
m
m
58,590.00
15,000.00
124,185.00
12.90
6.45
12.90
31.00
m
m
m
m
78,750.00
26,250.00
57,500.00
289,500.00
9.72
-
m
m
1,021,275.00
2,688,825.00
6,590,475.00
1,816,290.00
4,650,000.00
124,185.00
10,901,437.50
1,015,875.00
169,312.50
741,750.00
8,974,500.00
9,926,793.00
9,926,793.00
-
580.00
107,875.00
83,337,423.50
62,567,500.00
1.20
168,325.00
201,990.00
580.00
580.00
m
m
54,320.00
33,512.50
1.06
4,781,375.00
50,942,850.00
31,505,600.00
19,437,250.00
132,412,470.45
5,088,148.02
m
m
m
401,750.00
280,800.00
477,085.00
8,243,910.00
4,003,084.80
-
28.80
2.73
1.86
379.44
217.00
76.00
177.00
180.00
m
m
m
m
m
m
m
m
309,675.00
4,319,200.00
3,460,500.00
56,955.00
95,465.00
59,265.00
206,785.00
24,970.00
G. PEKERJAAN BETON
167
G.004
Membuat 1 m lantai kerja beton tumbuk 1 PC : 3 PB : 5 KR; tebal 5 cm
168
G.005
Membuat 1 m beton bertulang 1 PC : 2 PB : 3 KR
196
G.033
Memasang 1 m pondasi beton bertulang (150 kg besi + bekisting)
197
G.034
Memasang 1 m sloof beton bertulang (200 kg besi + bekisting)
199
G.036
Memasang 1 m balok beton bertulang (200 kg besi + bekisting)
200
G.037
Memasang 1 m kolom beton bertulang (150 kg besi + bekisting)
203
G.040
Memasang 1 m' kolom praktis beton bertulang (11 x 11 cm)
204
G.041
Memasang 1 m' ring balok beton bertulang (10 x 15 cm)
G.050
Pembesian 1 kg dengan besi beton U-24
213
310.00
2.88
2.88
1.62
1.00
2.88
-
m
m
m
m
m
m
m
m
m
155,800.00
955,125.00
3,876,950.00
4,690,325.00
5,617,025.00
4,810,075.00
81,195.00
104,670.00
20,130.00
399.28
12.40
m
m
49,240.00
38,080.00
310.00
47,253.75
6.00
4.00
10.00
16.00
59.00
12.00
16.00
1.00
32.00
12.00
2.00
bh
bh
bh
bh
bh
m'
m'
m'
m'
m'
m'
2,008,125.00
631,000.00
816,300.00
947,280.00
852,556.00
165,525.00
323,625.00
19,301.25
25,386.38
114,657.42
139,097.66
387,225.00
50,650.00
40,000.00
8,661,008.03
8,918,640.00
11,795,562.43
6,436,530.00
21,611,005.20
20,715,905.00
4,504,140.00
36,600,945.00
4,494,600.00
86,158,134.10
48,298,000.00
13,508,136.00
16,177,032.00
7,792,321.50
81,195.00
301,449.60
20,132,739.20
19,660,547.20
472,192.00
15,008,649.22
14,648,662.50
48,316,419.36
12,048,750.00
2,524,000.00
8,525,560.00
308,820.00
1,497,796.69
1,375,889.03
2,225,562.58
387,225.00
1,620,800.00
480,000.00
17,322,016.05
E. PEKERJAAN PLESTERAN
87
E.006
Memasang 1 m plesteran 1 PC : 6 PP; tebal 15 mm
116
E.033
Memasang 1 m acian
F. PEKERJAAN KAYU
120
F.004
Membuat dan memasang 1 m kusen pintu dan kusen jendela; Kayu Meranti
Batu
125
F.009
Membuat dan memasang 1 m daun pintu panel; Kayu Meranti Batu
128
132
F.012
F.016
134
138
142
144
153
154
158
161
F.018
F.022
F.026
F.028
F.037
F.038
F.042
F.045
Membuat dan memasang 1 m pintu dan jendela kaca; Kayu Meranti Batu
Membuat dan memasang 1 m daun pintu kayu lapis (plywood); rangka
tertutup Kayu Kruing
Membuat dan memasang 1 m jalusi kusen; Kayu Meranti Batu
Membuat dan memasang 1 m konstruksi kuda kuda konvensional; Kayu
Meranti
Batu
Membuat
dan memasang 1 m konstruksi gording; Kayu Meranti Batu
Membuat dan memasang 1 m rangka atap ; Kayu Meranti Batu
Memasang 1 m rangka langit-langit (60 x 60) cm; Kayu Meranti Batu
Memasang 1 m' lisplank uk. (3 x 20) cm; Kayu Meranti Batu
Memasang 1 m dinding pemisah plywood rangkap; GRC
Memasang 1 m' list plafond kayu profil
I. PEKERJAAN LANGIT-LANGIT
222
I.002
Memasang 1 m langit-langit tripleks ukuran (120 x 240 ) cm; tbl. 3 mm, 4 mm
dan 6 mm
J. PEKERJAAN SANITASI
235
J.001
Memasang 1 buah kloset duduk/monoblok
236
J.002
Memasang 1 buah kloset jongkok porselen
238
J.004
Memasang 1 buah urinoir
239
J.005
Memasang 1 buah wastafel
240
J.006
Memasang 1 buah bak mandi fibreglass volume 0,30 m
250
J.016
Memasang 1 m' pipa galvanis "
251
J.017
Memasang 1 m' pipa galvanis "
256
J.022
Memasang 1 m' pipa PVC tipe AW "
257
J.023
Memasang 1 m' pipa PVC tipe AW "
262
J.028
Memasang 1 m' pipa PVC tipe AW 3"
263
J.029
Memasang 1 m' pipa PVC tipe AW 4"
264
J.030
Memasang 1 buah bak cuci piring satinless steel
265
J.031
Memasang 1 buah kran " atau "
266
J.032
Memasang 1 buah floordrain
J.034
Membuat 1 unit septic tank ukuran 2 x 2 x 1,5 m + rembesan (kantor tipe kecil)
267
20.52
14.26
-
m
m
m
unit
10.00
62.00
-
444,905.00
83,117.50
74,962.50
117,457.50
12.00
10.00
12.00
48.00
24.00
24.00
10.80
bh
bh
bh
bh
bh
bh
bh
158,000.00
156,500.00
52,987.50
26,325.00
37,487.50
37,650.00
95,625.00
164,487.50
30.00
55.00
-
m
m
m'
m
104,997.50
189,250.00
75,675.00
141,375.00
20.52
20.52
20.52
580.00
m
m
m
m
12,805.00
36,775.00
29,825.00
21,362.50
N. PEKERJAAN PENGECATAN
298
N.001
Mendempul dan Menggosok 1 m kayu
300
N.003
Mengecat 1 m bidang kayu baru (1 lps plamir, 1 lps cat dsr, 2 lps cat penutup)
302
N.005
Melabur 1 m bidang kayu dengan politur
305
N.008
Mengecat 1 m bidang tembok baru (1 lps plamir, 1 lps cat dsr, 2 lps cat
penutup)
SAT
VOLUME
m'
m'
m'
9,602,335.00
4,449,050.00
5,153,285.00
8,940,215.00
1,896,000.00
1,565,000.00
635,850.00
1,263,600.00
899,700.00
903,600.00
1,776,465.00
9,839,625.00
5,677,500.00
4,162,125.00
14,019,640.60
262,758.60
754,623.00
612,009.00
12,390,250.00
2 dari 16
A.008
A.010
B.
B.001
B.010
B.011
B.012
KOEF
JUMLAH
Rp.
6=(3x5)
m
kg
m
1,800,000.00
19,500.00
1,800,000.00
Jumlah (1)
21,600.00
390.00
12,600.00
34,590.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.1000
0.1000
0.0100
0.0050
OH
OH
OH
OH
100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)
10,000.00
12,000.00
1,250.00
750.00
24,000.00
58,590.00
0.0750
0.0500
OH
OH
100,000.00
150,000.00
Jumlah (2)
7,500.00
7,500.00
15,000.00
0.0360
0.0800
0.0140
m
kg
m
1,700,000.00
19,500.00
1,800,000.00
Jumlah (1)
61,200.00
1,560.00
25,200.00
87,960.00
Tenaga
Tukang Kayu
Mandor
0.3000
0.0015
OH
OH
120,000.00
150,000.00
Jumlah (2)
36,000.00
225.00
36,225.00
124,185.00
0.7500
0.0250
OH
OH
100,000.00
150,000.00
75,000.00
3,750.00
78,750.00
0.2500
0.0083
OH
OH
100,000.00
150,000.00
25,000.00
1,250.00
26,250.00
0.5000
0.0500
OH
OH
100,000.00
150,000.00
50,000.00
7,500.00
57,500.00
1.2000
215,000.00
Jumlah (1)
258,000.00
258,000.00
0.3000
0.0100
OH
OH
100,000.00
150,000.00
Jumlah (2)
30,000.00
1,500.00
31,500.00
289,500.00
m
kg
m
400,000.00
1,250.00
275,000.00
Jumlah (1)
480,000.00
146,250.00
154,275.00
780,525.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
OH
OH
OH
OH
100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)
150,000.00
72,000.00
7,500.00
11,250.00
240,750.00
1,021,275.00
Analisa Pekerjaan
1.5000
0.6000
0.0600
0.0750
HARGA SAT
Rp.
5
2
3
PEKERJAAN PERSIAPAN
Mengerjakan 1 m pengukuran dan pemasangan bouwplank
Bahan
Kayu Meranti Batu 5/7 (ikat)
0.0120
Paku Biasa 2" - 5"
0.0200
Kayu Papan Meranti Batu (2 x 20 x 400)
0.0070
Tenaga
Pekerja
Mandor
C.
C.007
SAT
3 dari 16
NO
1
C.013
D.
D.013
D.020
E.
E.006
E.033
F.
F.004
HARGA SAT
Rp.
2
3
4
5
Memasang 1 m pondasi siklop; 60% beton campuran 1 PC : 2 PB : 3 KR dan 40 % batu belah
Bahan
Batu Belah 15/20
0.4800
m
400,000.00
Portland Cement (PC)
194.0000
kg
1,250.00
Pasir Beton (PB)
0.3120
m
275,000.00
Koral (Batu pecah ukuran 5 mm - 40 mm)
0.4680
m
400,000.00
Besi Beton
126.0000
m
12,000.00
Kawat Beton
1.8000
m
19,000.00
Jumlah (1)
Tenaga
Pekerja
3.0000
OH
100,000.00
Tukang Batu
0.8500
OH
120,000.00
Kepala Tukang
0.0850
OH
125,000.00
Mandor
0.1500
OH
150,000.00
Jumlah (2)
Jumlah (1) + (2)
PEKERJAAN DINDING
Memasang 1 m dinding bata merah (5x11x22) cm; tebal bata; campuran 1 PC : 6 PP
Bahan
Bata Merah
70.0000
buah
550.00
Portland Cement (PC)
8.3200
kg
1,250.00
Pasir Pasang (PP)
0.0490
m
275,000.00
Jumlah (1)
Tenaga
Pekerja
0.3000
OH
100,000.00
Tukang Batu
0.1000
OH
120,000.00
Kepala Tukang
0.0100
OH
125,000.00
Mandor
0.0150
OH
150,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m dinding terawang (roster) uk. (12x11x24) cm; campuran spesi 1 PC : 4 PP
Bahan
Bata Terawang / Roster
30.0000
buah
3,315.00
Portland Cement (PC)
11.0000
kg
1,250.00
Pasir Pasang (PP)
0.0350
m
275,000.00
Jumlah (1)
Tenaga
Pekerja
0.3000
OH
100,000.00
Tukang Batu
0.1000
OH
120,000.00
Kepala Tukang
0.0100
OH
125,000.00
Mandor
0.0150
OH
150,000.00
Jumlah (2)
Jumlah (1) + (2)
PEKERJAAN PLESTERAN
Memasang 1 m plesteran 1 PC : 6 PP; tebal 15 mm
Bahan
Portland Cement (PC)
4.4160
kg
1,250.00
Pasir Pasang (PP)
0.0270
m
275,000.00
Jumlah (1)
Tenaga
Pekerja
0.2000
OH
100,000.00
Tukang Batu
0.1500
OH
120,000.00
Kepala Tukang
0.0150
OH
125,000.00
Mandor
0.0100
OH
150,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m acian
Bahan
Portland Cement (PC)
3.2500
kg
1,250.00
Jumlah (1)
Tenaga
Pekerja
0.1500
OH
100,000.00
Tukang Batu
0.1000
OH
120,000.00
Kepala Tukang
0.0100
OH
125,000.00
Mandor
0.0080
OH
150,000.00
Jumlah (2)
Jumlah (1) + (2)
PEKERJAAN KAYU
Membuat dan memasang 1 m kusen pintu dan kusen jendela; Kayu Meranti Batu
Bahan
Balok Kayu Meranti Batu
1.2000
m
1,800,000.00
Paku 10 cm
1.2500
kg
19,500.00
Lem Kayu
1.0000
kg
22,000.00
Jumlah (1)
Tenaga
Pekerja
6.0000
OH
100,000.00
Tukang Kayu
14.0000
OH
120,000.00
Kepala Tukang
2.0000
OH
125,000.00
Mandor
0.3000
OH
150,000.00
Jumlah (2)
Jumlah (1) + (2)
Analisa Pekerjaan
KOEF
SAT
JUMLAH
Rp.
6=(3x5)
192,000.00
242,500.00
85,800.00
187,200.00
1,512,000.00
34,200.00
2,253,700.00
300,000.00
102,000.00
10,625.00
22,500.00
435,125.00
2,688,825.00
38,500.00
10,400.00
13,475.00
62,375.00
30,000.00
12,000.00
1,250.00
2,250.00
45,500.00
107,875.00
99,450.00
13,750.00
9,625.00
122,825.00
30,000.00
12,000.00
1,250.00
2,250.00
45,500.00
168,325.00
5,520.00
7,425.00
12,945.00
20,000.00
18,000.00
1,875.00
1,500.00
41,375.00
54,320.00
4,062.50
4,062.50
15,000.00
12,000.00
1,250.00
1,200.00
29,450.00
33,512.50
SNI 03-3434-2002
2,160,000.00
24,375.00
22,000.00
2,206,375.00
600,000.00
1,680,000.00
250,000.00
45,000.00
2,575,000.00
4,781,375.00
4 dari 16
NO
1
F.009
F.012
KOEF
F.018
F.022
F.026
JUMLAH
Rp.
6=(3x5)
m
kg
1,800,000.00
22,000.00
Jumlah (1)
72,000.00
11,000.00
83,000.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)
100,000.00
180,000.00
31,250.00
7,500.00
318,750.00
401,750.00
1,800,000.00
22,000.00
Jumlah (1)
43,200.00
6,600.00
49,800.00
100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)
80,000.00
120,000.00
25,000.00
6,000.00
231,000.00
280,800.00
1.0000
1.5000
0.2500
0.0500
HARGA SAT
Rp.
5
2
3
Membuat dan memasang 1 m daun pintu panel; Kayu Meranti Batu
Bahan
Papan Kayu Meranti Batu
0.0400
Lem Kayu
0.5000
F.016
SAT
0.8000
1.0000
0.2000
0.0400
OH
OH
OH
OH
Analisa Pekerjaan
45,000.00
585.00
11,000.00
91,000.00
147,585.00
60,000.00
240,000.00
25,000.00
4,500.00
329,500.00
477,085.00
108,000.00
2,925.00
110,925.00
50,000.00
120,000.00
25,000.00
3,750.00
198,750.00
309,675.00
1,980,000.00
210,000.00
109,200.00
2,299,200.00
400,000.00
1,440,000.00
150,000.00
30,000.00
2,020,000.00
4,319,200.00
1,980,000.00
210,000.00
58,500.00
2,248,500.00
240,000.00
864,000.00
90,000.00
18,000.00
1,212,000.00
3,460,500.00
5 dari 16
NO
1
F.028
F.037
F.038
F.042
F.045
G.
G.004
KOEF
SAT
HARGA SAT
Rp.
5
2
3
4
Membuat dan memasang 1 m rangka atap genteng kodok; Kayu Meranti Batu
Bahan
Kaso-kaso (5 x 7) cm
0.0120
m
1,800,000.00
Reng (2 x 3) cm
0.0036
m
1,800,000.00
Paku 5 cm & 10 cm
0.2500
kg
19,500.00
Jumlah (1)
Tenaga
Pekerja
0.1000
OH
100,000.00
Tukang Kayu
0.1000
OH
120,000.00
Kepala Tukang
0.0100
OH
125,000.00
Mandor
0.0050
OH
150,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m rangka langit-langit (60 x 60) cm; Kayu Meranti Batu
Bahan
Kaso-kaso (5 x 7) cm
0.0163
m
1,800,000.00
Paku 7 cm - 10 cm
0.2500
kg
19,500.00
Jumlah (1)
Tenaga
Pekerja
0.2000
OH
100,000.00
Tukang Kayu
0.3000
OH
120,000.00
Kepala Tukang
0.0300
OH
125,000.00
Mandor
0.0100
OH
150,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m' lisplank uk. (3 x 20) cm; Kayu Meranti Batu
Bahan
Papan Kayu Kruing
0.0108
m
1,800,000.00
Paku 5 cm - 7 cm
0.1000
kg
19,500.00
Jumlah (1)
Tenaga
Pekerja
0.1000
OH
100,000.00
Tukang Kayu
0.2000
OH
120,000.00
Kepala Tukang
0.0250
OH
125,000.00
Mandor
0.0050
OH
150,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m dinding pemisah plywood rangkap; GRC
Bahan
Balok Kayu Kruing
0.0280
m
1,800,000.00
Paku 5 cm - 10 cm
0.1500
kg
19,500.00
GRC tbl. 4 mm; uk. (120 x 240) cm
0.8600 lembar
61,000.00
Lem Kayu
0.5600
kg
Jumlah (1)
Tenaga
Pekerja
0.2000
OH
100,000.00
Tukang Kayu
0.6000
OH
120,000.00
Kepala Tukang
0.0600
OH
125,000.00
Mandor
0.0100
OH
150,000.00
Jumlah (2)
Jumlah (1) + (2)
Memasang 1 m' list plafond kayu profil
Bahan
List Kayu Profil
1.0500
m'
19,000.00
Jumlah (1)
Tenaga
Pekerja
0.0210
OH
100,000.00
Tukang Kayu
0.0210
OH
120,000.00
Kepala Tukang
0.0020
OH
125,000.00
Mandor
0.0010
OH
150,000.00
Jumlah (2)
Jumlah (1) + (2)
PEKERJAAN BETON
Membuat 1 m lantai kerja beton tumbuk 1 PC : 3 PB : 5 KR; tebal 5 cm
Bahan
Portland Cement (PC)
10.0000
kg
1,250.00
Pasir Beton (PB)
0.0260
m
275,000.00
Koral Beton (maksimum 30 mm)
0.0440
m
400,000.00
Jumlah (1)
Tenaga
Pekerja
1.1500
OH
100,000.00
Tukang Batu
0.0200
OH
120,000.00
Kepala Tukang
0.0020
OH
125,000.00
Mandor
0.0060
OH
150,000.00
Jumlah (2)
Jumlah (1) + (2)
Analisa Pekerjaan
JUMLAH
Rp.
6=(3x5)
21,600.00
6,480.00
4,875.00
32,955.00
10,000.00
12,000.00
1,250.00
750.00
24,000.00
56,955.00
29,340.00
4,875.00
34,215.00
20,000.00
36,000.00
3,750.00
1,500.00
61,250.00
95,465.00
19,440.00
1,950.00
21,390.00
10,000.00
24,000.00
3,125.00
750.00
37,875.00
59,265.00
50,400.00
2,925.00
52,460.00
105,785.00
20,000.00
72,000.00
7,500.00
1,500.00
101,000.00
206,785.00
19,950.00
19,950.00
2,100.00
2,520.00
250.00
150.00
5,020.00
24,970.00
12,500.00
7,150.00
17,600.00
37,250.00
115,000.00
2,400.00
250.00
900.00
118,550.00
155,800.00
6 dari 16
NO
1
G.005
G.034
G.036
JUMLAH
Rp.
6=(3x5)
SAT
232.0000
0.5200
0.7800
kg
m
m
1,250.00
275,000.00
400,000.00
Jumlah (1)
290,000.00
143,000.00
312,000.00
745,000.00
1.6500
0.2500
0.0250
0.0800
OH
OH
OH
OH
100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)
165,000.00
30,000.00
3,125.00
12,000.00
210,125.00
955,125.00
m
kg
liter
kg
kg
kg
m
m
1,700,000.00
19,500.00
3,000.00
10,500.00
19,000.00
1,250.00
275,000.00
400,000.00
Jumlah (1)
340,000.00
29,250.00
1,200.00
1,653,750.00
42,750.00
420,000.00
148,500.00
324,000.00
2,959,450.00
Tenaga
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
5.3000
0.2750
1.3000
1.0500
0.2620
0.2650
OH
OH
OH
OH
OH
OH
100,000.00
120,000.00
120,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)
530,000.00
33,000.00
156,000.00
126,000.00
32,750.00
39,750.00
917,500.00
3,876,950.00
m
kg
liter
kg
kg
kg
m
m
1,700,000.00
19,500.00
3,000.00
10,500.00
19,000.00
1,250.00
275,000.00
400,000.00
Jumlah (1)
459,000.00
39,000.00
1,800.00
2,205,000.00
57,000.00
420,000.00
148,500.00
324,000.00
3,654,300.00
Tenaga
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
OH
OH
OH
OH
OH
OH
100,000.00
120,000.00
120,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)
565,000.00
33,000.00
187,200.00
168,000.00
40,375.00
42,450.00
1,036,025.00
4,690,325.00
m
kg
liter
kg
kg
kg
m
m
m
lembar
m'
1,700,000.00
19,500.00
3,000.00
10,500.00
19,000.00
1,250.00
275,000.00
400,000.00
1,800,000.00
170,000.00
34,000.00
Jumlah (1)
544,000.00
62,400.00
4,800.00
2,205,000.00
57,000.00
420,000.00
148,500.00
324,000.00
252,000.00
476,000.00
4,493,700.00
OH
OH
OH
OH
OH
OH
100,000.00
120,000.00
120,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)
635,000.00
33,000.00
198,000.00
168,000.00
41,625.00
47,700.00
1,123,325.00
5,617,025.00
2
Membuat 1 m beton bertulang 1 PC : 2 PB : 3 KR
Bahan
Portland Cement (PC)
Pasir Beton (PB)
Koral Beton (maksimum 30 mm)
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
G.033
HARGA SAT
Rp.
5
KOEF
5.6500
0.2750
1.5600
1.4000
0.3230
0.2830
Analisa Pekerjaan
6.3500
0.2750
1.6500
1.4000
0.3330
0.3180
7 dari 16
NO
1
G.037
G.040
G.041
G.050
KOEF
2
3
Memasang 1 m kolom beton bertulang (150 kg besi + bekisting)
Bahan
Kayu Pinus/Kayu Rawa
0.3200
Paku 5 cm - 12 cm
3.2000
Minyak Bekisting
1.6000
Besi Beton (polos/ulir)
157.5000
Kawat Beton
2.2500
Portland Cement (PC)
336.0000
Pasir Beton (PB)
0.5400
Koral Beton (maksimum 30 mm)
0.8100
Balok Kayu Meranti Batu 5/7
0.1200
Plywood tebal 9 mm
2.8000
Dolken (8-10) cm
0.0000
SAT
4
HARGA SAT
Rp.
5
JUMLAH
Rp.
6=(3x5)
m
kg
liter
kg
kg
kg
m
m
m
lembar
m'
1,700,000.00
19,500.00
3,000.00
10,500.00
19,000.00
1,250.00
275,000.00
400,000.00
1,800,000.00
170,000.00
34,000.00
Jumlah (1)
544,000.00
62,400.00
4,800.00
1,653,750.00
42,750.00
420,000.00
148,500.00
324,000.00
216,000.00
476,000.00
3,892,200.00
Tenaga
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
5.3000
0.2750
1.3000
1.0500
0.2650
0.2650
OH
OH
OH
OH
OH
OH
100,000.00
120,000.00
120,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)
530,000.00
33,000.00
156,000.00
126,000.00
33,125.00
39,750.00
917,875.00
4,810,075.00
0.0020
0.0100
0.0000
3.0000
0.4500
4.0000
0.0060
0.0090
m
kg
liter
kg
kg
kg
m
m
1,700,000.00
19,500.00
3,000.00
10,500.00
19,000.00
1,250.00
275,000.00
400,000.00
Jumlah (1)
3,400.00
195.00
31,500.00
8,550.00
5,000.00
1,650.00
3,600.00
53,895.00
Tenaga
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
0.1800
0.0200
0.0200
0.0200
0.0060
0.0090
OH
OH
OH
OH
OH
OH
100,000.00
120,000.00
120,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)
18,000.00
2,400.00
2,400.00
2,400.00
750.00
1,350.00
27,300.00
81,195.00
0.0030
0.0200
0.0000
3.6000
0.0500
5.5000
0.0090
0.0150
m
kg
liter
kg
kg
kg
m
m
1,700,000.00
19,500.00
3,000.00
10,500.00
19,000.00
1,250.00
275,000.00
400,000.00
Jumlah (1)
5,100.00
390.00
37,800.00
950.00
6,875.00
2,475.00
6,000.00
59,590.00
Tenaga
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
0.2970
0.0330
0.0330
0.0330
0.0100
0.0150
OH
OH
OH
OH
OH
OH
100,000.00
120,000.00
120,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)
29,700.00
3,960.00
3,960.00
3,960.00
1,250.00
2,250.00
45,080.00
104,670.00
1.0500
0.0150
kg
kg
10,500.00
19,000.00
Jumlah (1)
11,025.00
285.00
11,310.00
Tenaga
Pekerja
Tukang Besi
Kepala Tukang
Mandor
Peralatan, Spancer
0.0400
0.0150
0.0150
0.0075
0.0200
OH
OH
OH
OH
lot
100,000.00
120,000.00
125,000.00
150,000.00
1,000.00
Jumlah (2)
4,000.00
1,800.00
1,875.00
1,125.00
20.00
8,820.00
20,130.00
Analisa Pekerjaan
8 dari 16
NO
1
H.
H.009
H.010
I.
I.002
I.014
J.
J.001
J.002
KOEF
SAT
HARGA SAT
Rp.
5
JUMLAH
Rp.
6=(3x5)
2
PEKERJAAN PENUTUP ATAP
Memasang 1 m atap seng gelombang
Bahan
Seng Gelombang 3' - 6' BJLS 28
Paku " - 1"
0.7000
0.0200
lbr
kg
40,000.00
19,500.00
Jumlah (1)
28,000.00
390.00
28,390.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.1200
0.0600
0.0060
0.0060
OH
OH
OH
OH
100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)
12,000.00
7,200.00
750.00
900.00
20,850.00
49,240.00
0.3000
0.0400
lbr
kg
40,000.00
19,500.00
Jumlah (1)
12,000.00
780.00
12,780.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.1500
0.0700
0.0080
0.0060
OH
OH
OH
OH
100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)
15,000.00
8,400.00
1,000.00
900.00
25,300.00
38,080.00
Analisa Pekerjaan
25,818.75
585.00
26,403.75
7,000.00
12,000.00
1,250.00
600.00
20,850.00
47,253.75
19,950.00
195.00
20,145.00
5,000.00
6,000.00
625.00
450.00
12,075.00
32,220.00
SNI
1,600,000.00
18,360.00
1,600,000.00
330,000.00
66,000.00
125.00
12,000.00
408,125.00
2,008,125.00
325,000.00
7,500.00
2,750.00
335,250.00
100,000.00
90,000.00
93,750.00
12,000.00
295,750.00
631,000.00
9 dari 16
NO
1
J.004
2
Memasang 1 buah urinoir
Bahan
Urinoir
Perlengkapan
Portland Cement (PC)
Pasir Pasang
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
J.005
J.006
J.007
J.016
J.017
Analisa Pekerjaan
KOEF
SAT
1.0000
bh
30% harga urinoir
6.0000
kg
0.0100
m
HARGA SAT
Rp.
5
JUMLAH
Rp.
6=(3x5)
433,500.00
125,050.00
1,250.00
275,000.00
Jumlah (1)
433,500.00
125,050.00
7,500.00
2,750.00
568,800.00
100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)
100,000.00
120,000.00
12,500.00
15,000.00
247,500.00
816,300.00
544,000.00
65,280.00
1,250.00
275,000.00
Jumlah (1)
544,000.00
65,280.00
7,500.00
2,750.00
619,530.00
OH
OH
OH
OH
100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)
120,000.00
174,000.00
18,750.00
15,000.00
327,750.00
947,280.00
1.0000
bh
18% harga bak
520,000.00
38,556.00
Jumlah (1)
520,000.00
38,556.00
558,556.00
1.0000
1.0000
0.1000
0.1000
OH
OH
OH
OH
1.0000
bh
12% harga wastafel
6.0000
kg
0.0100
m
1.2000
1.4500
0.1500
0.1000
0.9000
1.3500
0.2700
0.0550
OH
OH
OH
OH
100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)
90,000.00
162,000.00
33,750.00
8,250.00
294,000.00
852,556.00
303.0303
120.0000
0.3000
4.3560
6.0000
bh
kg
m
m
kg
7,500.00
1,250.00
275,000.00
57,000.00
3,000.00
Jumlah (1)
2,272,727.27
150,000.00
82,500.00
248,292.00
18,000.00
2,771,519.27
6.0000
3.0000
0.3000
0.3000
OH
OH
OH
OH
100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)
600,000.00
360,000.00
37,500.00
45,000.00
1,042,500.00
3,814,019.27
1.2000
m'
35% harga pipa
93,000.00
32,550.00
Jumlah (1)
111,600.00
32,550.00
144,150.00
OH
OH
OH
OH
100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)
5,400.00
10,800.00
1,125.00
4,050.00
21,375.00
165,525.00
1.2000
m'
35% harga pipa
195,000.00
68,250.00
Jumlah (1)
234,000.00
68,250.00
302,250.00
100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)
5,400.00
10,800.00
1,125.00
4,050.00
21,375.00
323,625.00
0.0540
0.0900
0.0090
0.0270
0.0540
0.0900
0.0090
0.0270
OH
OH
OH
OH
10 dari 16
NO
1
J.022
2
Memasang 1 m' pipa PVC tipe AW "
Bahan
Pipa PVC
Perlengkapan
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
J.023
J.028
J.029
J.030
J.031
J.032
J.034
KOEF
SAT
HARGA SAT
Rp.
5
1.2000
m'
35% harga pipa
JUMLAH
Rp.
6=(3x5)
5,250.00
1,181.25
Jumlah (1)
6,300.00
1,181.25
7,481.25
OH
OH
OH
OH
100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)
3,600.00
7,200.00
750.00
270.00
11,820.00
19,301.25
1.2000
m'
35% harga pipa
10,000.00
1,566.38
Jumlah (1)
12,000.00
1,566.38
13,566.38
OH
OH
OH
OH
100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)
3,600.00
7,200.00
750.00
270.00
11,820.00
25,386.38
1.2000
m'
35% harga pipa
62,500.00
13,054.92
Jumlah (1)
75,000.00
13,054.92
88,054.92
OH
OH
OH
OH
100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)
8,100.00
16,200.00
1,687.50
615.00
26,602.50
114,657.42
1.2000
m'
35% harga pipa
77,500.00
19,495.16
Jumlah (1)
93,000.00
19,495.16
112,495.16
0.0360
0.0600
0.0060
0.0018
0.0360
0.0600
0.0060
0.0018
0.0810
0.1350
0.0135
0.0041
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.0810
0.1350
0.0135
0.0041
OH
OH
OH
OH
100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)
8,100.00
16,200.00
1,687.50
615.00
26,602.50
139,097.66
1.0000
1.0000
bh
set
255,000.00
89,250.00
Jumlah (1)
255,000.00
89,250.00
344,250.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.0300
0.3000
0.0300
0.0015
OH
OH
OH
OH
100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)
3,000.00
36,000.00
3,750.00
225.00
42,975.00
387,225.00
1.0000
0.0250
bh
bh
33,000.00
2,650.00
Jumlah (1)
33,000.00
2,650.00
35,650.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.0100
0.1000
0.0100
0.0050
OH
OH
OH
OH
100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)
1,000.00
12,000.00
1,250.00
750.00
15,000.00
50,650.00
1.0000
bh
25,000.00
Jumlah (1)
25,000.00
25,000.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.0100
0.1000
0.0100
0.0050
OH
OH
OH
OH
100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)
1,000.00
12,000.00
1,250.00
750.00
15,000.00
40,000.00
78,750.00
354,375.00
Analisa Pekerjaan
11 dari 16
NO
1
K.
K.008
K.017
K.018
K.019
K.020
KOEF
2
Urugan Pasir urug
Lantai kerja beton
Pas. Batu bata 1 PC : 2 PS + Plesteran
Plat beton penutup & balok
Pipa PVC 4" jenis AW + sambungan
Pipa GIP 1 1/2"
Galian tanah untuk rembesan
Pasang Ijuk
Urugan kerikil 3-5 cm.
Pipa PVC 4" berlobang jenis AW
Urugan kembali perataan tanah
Tambahan upah
Jumlah
PEKERJAAN BESI DAN ALUMUNIUM
Memasang 1 m pintu alumunium/ PVC
Bahan
Pintu Alumunium/ PVC
SAT
HARGA SAT
Rp.
5
289,500.00
155,800.00
195,707.50
3,876,950.00
114,558.00
714,660.00
86,250.00
108,750.00
400,000.00
77,500.00
26,250.00
500,000.00
JUMLAH
Rp.
6=(3x5)
62,010.90
350,550.00
2,935,612.50
1,308,470.63
1,031,022.00
857,592.00
291,093.75
587,250.00
420,000.00
387,500.00
29,531.25
46,000.00
8,661,008.03
3
0.2142
2.2500
15.0000
0.3375
9.0000
1.2000
3.3750
5.4000
1.0500
5.0000
1.1250
0.0920
4
m
m
m
m
m
m'
m
kg
m
m'
m
ls
1.0000
200,000.00
Jumlah (1)
200,000.00
200,000.00
Tenaga
Pekerja
Tukang Besi
Kepala Tukang
Mandor
1.0500
1.0500
0.1050
0.0052
OH
OH
OH
OH
100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)
105,000.00
126,000.00
13,125.00
780.00
244,905.00
444,905.00
0.5000
0.0150
0.0190
lbr
kg
m
20,000.00
19,500.00
1,800,000.00
Jumlah (1)
10,000.00
292.50
34,200.00
44,492.50
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.1000
0.2000
0.0250
0.0100
OH
OH
OH
OH
100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)
10,000.00
24,000.00
3,125.00
1,500.00
38,625.00
83,117.50
0.5000
0.0150
0.0190
0.3000
lbr
kg
m
kg
20,000.00
19,500.00
1,800,000.00
23,000.00
Jumlah (1)
10,000.00
292.50
34,200.00
6,900.00
51,392.50
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.1500
0.4000
0.0250
0.0013
OH
OH
OH
OH
100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)
15,000.00
48,000.00
3,125.00
187.50
66,312.50
117,705.00
lbr
kg
kg
59,000.00
19,500.00
14,000.00
Jumlah (1)
17,700.00
1,950.00
7,000.00
26,650.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.1500
0.2500
0.0250
0.0013
OH
OH
OH
OH
100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)
15,000.00
30,000.00
3,125.00
187.50
48,312.50
74,962.50
lbr
kg
kg
59,000.00
19,500.00
14,000.00
Jumlah (1)
61,950.00
195.00
7,000.00
69,145.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
OH
OH
OH
OH
100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)
15,000.00
30,000.00
3,125.00
187.50
48,312.50
117,457.50
Analisa Pekerjaan
0.1500
0.2500
0.0250
0.0013
12 dari 16
NO
1
L.
L.002
L.003
L.004
L.005
L.006
L.007
L.008
KOEF
SAT
HARGA SAT
Rp.
5
JUMLAH
Rp.
6=(3x5)
2
PEKERJAAN KUNCI DAN KACA
Memasang 1 buah kunci tanam biasa
Bahan
Kunci Tanam Biasa
1.0000
bh
125,000.00
Jumlah (1)
125,000.00
125,000.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.0100
0.2500
0.0100
0.0050
OH
OH
OH
OH
100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)
1,000.00
30,000.00
1,250.00
750.00
33,000.00
158,000.00
1.0000
bh
125,000.00
Jumlah (1)
125,000.00
125,000.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.0050
0.2500
0.0050
0.0025
OH
OH
OH
OH
100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)
500.00
30,000.00
625.00
375.00
31,500.00
156,500.00
1.0000
bh
31,500.00
Jumlah (1)
31,500.00
31,500.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.0150
0.1500
0.0150
0.0008
OH
OH
OH
OH
100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)
1,500.00
18,000.00
1,875.00
112.50
21,487.50
52,987.50
1.0000
bh
12,000.00
Jumlah (1)
12,000.00
12,000.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.0100
0.1000
0.0100
0.0005
OH
OH
OH
OH
100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)
1,000.00
12,000.00
1,250.00
75.00
14,325.00
26,325.00
1.0000
bh
16,000.00
Jumlah (1)
16,000.00
16,000.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.0150
0.1500
0.0150
0.0008
OH
OH
OH
OH
100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)
1,500.00
18,000.00
1,875.00
112.50
21,487.50
37,487.50
1.0000
bh
9,000.00
Jumlah (1)
9,000.00
9,000.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.0200
0.2000
0.0200
0.0010
OH
OH
OH
OH
100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)
2,000.00
24,000.00
2,500.00
150.00
28,650.00
37,650.00
1.0000
bh
24,000.00
Jumlah (1)
24,000.00
24,000.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.0500
0.5000
0.0500
0.0025
OH
OH
OH
OH
100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)
5,000.00
60,000.00
6,250.00
375.00
71,625.00
95,625.00
Analisa Pekerjaan
13 dari 16
NO
1
L.011
M.
M.001
M.007
M.015
N.
N.001
KOEF
SAT
HARGA SAT
Rp.
5
JUMLAH
Rp.
6=(3x5)
2
Memasang 1 m kaca; tebal 5 mm
Bahan
Kaca
1.1000
130,000.00
Jumlah (1)
143,000.00
143,000.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.0150
0.1500
0.0150
0.0008
OH
OH
OH
OH
100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)
1,500.00
18,000.00
1,875.00
112.50
21,487.50
164,487.50
SNI-Pt-T2000-C
bh
kg
m
3,000.00
1,250.00
275,000.00
Jumlah (1)
35,610.00
12,500.00
12,375.00
60,485.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.2600
0.1250
0.0125
0.0130
OH
OH
OH
OH
100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)
26,000.00
15,000.00
1,562.50
1,950.00
44,512.50
104,997.50
1.0000
10.0000
0.0450
1.5000
m
kg
m
kg
47,000.00
1,250.00
275,000.00
3,000.00
Jumlah (1)
47,000.00
12,500.00
12,375.00
4,500.00
76,375.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.6200
0.3500
0.0350
0.0300
OH
OH
OH
OH
100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)
62,000.00
42,000.00
4,375.00
4,500.00
112,875.00
189,250.00
1.0000
9.8000
0.0450
1.3000
m
kg
m
kg
70,000.00
1,250.00
275,000.00
3,000.00
Jumlah (1)
70,000.00
12,250.00
12,375.00
3,900.00
98,525.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
0.2500
0.1200
0.0120
0.0130
OH
OH
OH
OH
100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)
25,000.00
14,400.00
1,500.00
1,950.00
42,850.00
141,375.00
SNI
0.0800
0.0200
0.0100
kg
kg
kg
34,000.00
12,500.00
16,000.00
Jumlah (1)
2,720.00
250.00
160.00
3,130.00
Tenaga
Pekerja
Tukang Cat
Kepala Tukang
Mandor
0.0400
0.0400
0.0040
0.0025
OH
OH
OH
OH
100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)
4,000.00
4,800.00
500.00
375.00
9,675.00
12,805.00
Analisa Pekerjaan
14 dari 16
NO
1
N.003
N.005
N.008
KOEF
SAT
2
3
4
Mengecat 1 m bidang kayu baru (1 lps plamir, 1 lps cat dsr, 2 lps cat penutup)
Bahan
Cat Meni
0.2000
kg
Plamir
0.1500
kg
Cat Dasar
0.1700
kg
Cat Penutup
0.2600
kg
HARGA SAT
Rp.
5
JUMLAH
Rp.
6=(3x5)
34,000.00
15,000.00
34,000.00
49,000.00
Jumlah (1)
6,800.00
2,250.00
5,780.00
12,740.00
27,570.00
Tenaga
Pekerja
Tukang Cat
Kepala Tukang
Mandor
0.0700
0.0090
0.0060
0.0025
OH
OH
OH
OH
100,000.00
120,000.00
125,000.00
150,000.00
Jumlah (2)
7,000.00
1,080.00
750.00
375.00
9,205.00
36,775.00
0.2000
0.1500
2.0000
kg
kg
lbr
35,000.00
35,000.00
4,000.00
Jumlah (1)
7,000.00
5,250.00
8,000.00
20,250.00
Tenaga
Tukang Cat
Kepala Tukang
Mandor
0.0600
0.0160
0.0025
OH
OH
OH
120,000.00
125,000.00
150,000.00
Jumlah (2)
7,200.00
2,000.00
375.00
9,575.00
29,825.00
Analisa Pekerjaan
1,600.00
1,500.00
7,540.00
10,640.00
2,000.00
7,560.00
787.50
375.00
10,722.50
21,362.50
15 dari 16
pondasi
atap
dinding
dinding KM
lantai
KUSEN PINTU
KUSEN JENDELA
daun jendela
kuda2 6/12
atap
86
399.28 m2
186 m2
177 m2
m2
84 m2
20 m2
310 m2
0.02892
0.02988
0.594
379.3
379.44
350,000.00
1,000,000.00
600,000.00
600,000.00
139,748,000.00
186,000,000.00
106,200,000.00
-
200,000.00
62,000,000.00
493,948,000.00
1,593,380.65