You are on page 1of 21

REPUBLIC OF THE PHILIPPINES

TABLE
OF
CONTENTS

OFFICE OF THE CITY/MUNICIPAL


ENGINEER/BUILDING OFFICIAL

DISTRICT/CITY/MUNICIPALITY

PERSPECTIVE VIEW & TABLE OF CONTENTS

A-2

GROUND, TYP. 2nd & 3rd FLOOR PLAN, FINISHES

A-3

FRONT, REAR ELEVATIONS

A-4

RIGHT, LEFT ELEV., LONGITUDINAL & CROSS SECTION

A-5

THIRD FLOOR REFLECTED CEILING & ROOF PLAN

A-6

TOILETS, STAIRS & RAMP DETAIL

A-7

TOILET SECTION DETAILS, FACADE PEDIMENTS

A-8

STAIR, HANDRAIL & MISC. DETAILS

A-9

DOOR & WINDOW SCHEDULE, DETAIL OF STEEL

75mPVCDS

A-1

CASEMENT

S-1

FOUNDATION PLAN, DET. OF FOOTING, TIE


BEAM, STAIR ON GRADE & RAMP, ELEV. OF
COL. SCH. FOOTING & COLUMN

S-2

2nd & 3RD FLOOR FRAMING PLAN, TYP. DET.


OF BEAM & SLAB, SCH. OF BEAMS & SLABS

S-3
S-4

STAIR PLAN & SECTION DETAIL, MISC. DETAILS

ROOF FRAMING PLAN, TRUSS DIAGRAM DETAILS


OF STEEL CONNECTION

E-1

GENERAL NOTES, SINGLE LINE DIAGRAM,


LOAD SCHEDULE, LEGEND & RISER
DIAGRAM

E-2

1
A-1

LAYOUT

SCALE :

GROUND & TYP. 2nd & 3rd FLOOR POWER

E-3

GROUND & TYP. 2nd & 3rd FLOOR LIGHTING


LAYOUT

N T S

P-1

DRAINAGE AND SANITARY SYSTEM LAYOUT

P-2

DARINAGE AND SANITARY SYSTEM

ISOMETRIC VIEW

REPUBLIC OF THE PHILIPPINES

AND

SCHOO
L

De p ED

N
S IO

L FAC I L I T I E
I CA

EERING D
I VI
NGIN
SE

DEPARTMENT

OF EDUCATION

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


MERALCO AVENUE, PASIG CITY

DESIGNER:

CHECKED BY

MAXIMO M. CALBANG
PDO III, PFSED-DepED

NATHANIEL Q. MENDOZA
ARCHITECT III, PFSED-DepED

RECOMMENDING APPROVAL

RECOMMENDING APPROVAL

APPROVED BY :

PROJECT TITLE :

OLIVER R. HERNANDEZ

RAMON C. BACANI

HEAD, PLANNING AND DESIGN UNIT

CHIEF, PFSED-OPS

UNDERSECRETARY

PFSED-DepED

DepED

DepED

LUIS G. PURISIMA

LOCATION :

P-3

WATER SYSTEM LAYOUT

P-4

WATER SYSTEM ISOMETRIC DIAGRAM

P-5

SEPTIC TANK, CATCH BASIN & COVER


DETAILS, NOTES, LEGEND, DESIGN CRITERIA

PROJECT NO:

OWNER :

DESIGNED BY:

NQM

ENCODED BY:

MMC

CHECKED BY:

LGP

SHEET NO:

DEPARTMENT OF EDUCATION

DepED
SHEET CONTENTS :

ISOMETRIC VIEW

PERSPECTIVE VIEW, TABLE OF CONTENTS

DATE :

NOTE:

THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF PHYSICAL FACILITIES AND SCHOOLS ENGINEERING
DIVISION AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545

PHY
S

54000
4500

4500

4500

4500

4500

4500

4500

4500

4500

4500

4500

4500

200x200mm
VITRIFIED FLOOR

TILES (UNGLAZED)

10
425 955

960

960

A-8

1200

PIPE CHASE

W
1

W
1

WF1

W
1

W
1

WF1

W
1

WF1

WC

URINAL

HE
D-2

W
2

DN

W
2

W
2

W
2

W
2

7000

FL1
WF1

W
2

LANDING

W
2

W
2

25mm

25mm

25mm

25mm

25mm

25mm

25mm

25mm

25mm

25mm

DEP

DEP

DEP

DEP

DEP

DEP

DEP

DEP

DEP

C
FL1

FL1

FL1

WF2

FL1

DN
1500

FL1

WF2

1200

WF2

9500

FL1
WF1

W
2

SINK COUNTER

10

DEP

2500

1500

FL1

D-4

CLASSROOM

WF1

D-4

PIPE CHASE

2500

FL1
WF1

W
2

WC

BLACKBOARD BASE

FL1
WF1

CLASSROOM

BLACKBOARD BASE

7
BLACKBOARD BASE

9500

CLASSROOM

BLACKBOARD BASE

CLASSROOM

163

CLASSROOM
LANDING

1400

W
1

WF1

D-2

SINK COUNTER

VITRIFIED UNGLAZED
FLOOR TILES

600

W
1

D-2

SHE

7000

W
1

WF1

D-4

200x200mm

2000

D-4

W
1

BLACKBOARD BASE

600 1090

D-4

A-4

W
1

STO

A-7

1000 425

W
3

W
4

1400

1000

CONCRETE SUNBREAKER

W
3

2075

A-4

A-6

A-6
LINE OF ROOF FOR
THIRD FLOOR

2
A-2

3150

850

1400

4500

4500

4500

WF3

HCR

W
1

4500

4500

4500

4500

4500

4500

PIPE CHASE

4500

773

W
1

W
1

WF1

W
1

W
1

WF1

W
1

W
1

WF1

W
1

W
1

WF1

W
1

WF1

WC

LAV

850 425

SCHEDULE OF FINISHES

W
3

FLOORS :

URINAL WC

NCR
HE

D-3

SHE

- PLAIN CEMENT FLOOR FINISH

FL2

- PLAIN CEMENT FLOOR ROUGH

D-2
SINK COUNTER

SINK COUNTER

W
2

W
2

W
2

W
2

FL1
WF1

W
2

FL1
WF1

W
2

W
2

LANDING

W
2

FL1
WF1

D
1

W
2

FL3

D-3a

25mm

25mm

25mm

25mm

25mm

25mm

25mm

25mm

25mm

DEP

DEP

DEP

DEP

DEP

DEP

DEP

DEP

DEP

DEP

FL1

FL1

FL1

UP

REPUBLIC OF THE PHILIPPINES

3
3600

EERING D
I VI
NGIN
SE

DEPARTMENT

OF EDUCATION

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


MERALCO AVENUE, PASIG CITY

DESIGNER:

CHECKED BY

RECOMMENDING APPROVAL

- 100 MM THK. CHB W/ PLAIN


CEMENT PLASTER FIN (PAINT)

(GLAZED)

3600

A-2

WF2

WF3 - 200X200 VITRIFIED WALL TILES

RAMP
UP

9000

- 150 MM THK. CHB W/ PLAIN


CEMENT PLASTER FIN (PAINT)

50mm G.I. PIPE FOR HANDRAIL

1200

1200

WF2

UP

WF1
UP

FL1

1525

WF2

WF2

1500

2500

25mm

2500

1500

FL1

1700

( UNGLAZED )
WALLS :

D-3a

UP

- 200X200 VITRIFIED FLR TILES

STO

W
2

WITH GROOVES

3850

WF1

CLASSROOM

BLACKBOARD BASE

FL1

CLASSROOM

BLACKBOARD BASE

3850

WF1

BLACKBOARD BASE

2
BLACKBOARD BASE

CLASSROOM
3

CLASSROOM

BLACKBOARD BASE

CLASSROOM

7000

SD

FL1

A-6

FL1

D-3

3625

650

1750

D-4

RAMP
UP

N
S IO

L FAC I L I T I E
I CA

54000

D-4

De p ED

W
4

SS

SCHOO
L

W
4

STO

AND

1700

LANDING

LINE OF SUNBREAKER

1750

W
3

D-4

A-4

9500

METERS

3150

650 850

PIPE CHASE

1 : 100

2000

425

2000

(UNGLAZED)

A-7

4500

4500

FLOOR TILES

A-4

200x200mm VITRIFIED

SCALE :

A-6

1700

SCALE :

1 : 100

RECOMMENDING APPROVAL

METERS

APPROVED BY :

PROJECT TITLE :

MAXIMO M. CALBANG

NATHANIEL Q. MENDOZA

LUIS G. PURISIMA

OLIVER R. HERNANDEZ

RAMON C. BACANI

PDO III, PFSED-DepED

ARCHITECT III, PFSED-DepED

HEAD, PLANNING AND DESIGN UNIT

CHIEF, PFSED-OPS

UNDERSECRETARY

PFSED-DepED

DepED

DepED

PROJECT NO:

OWNER :

DESIGNED BY:

NQM

ENCODED BY:

MMC

CHECKED BY:

LGP

SHEET NO:

DEPARTMENT OF EDUCATION

DepED
SHEET CONTENTS :

ISOMETRIC VIEW

GROUND, 2nd & 3rd TYPICAL FLOOR PLAN, FINISHES


LOCATION :

DATE :

NOTE:

THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF PHYSICAL FACILITIES AND SCHOOLS ENGINEERING
DIVISION AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545

PHY
S

APEX LINE OF TRUSS

2985

2500

GA#26 CORR. G.I. ROOFING


SHEET (PAINT FIN.)
GA#26 PL. G.I. GUTTER ON
12x300mm FIBER CEMENT

FASCIA BD. (PAINT FINISH)

TOP OF ROOF BEAM

W
3

PLAIN CEMENT PLASTER


PAINT FINISH

W
4
W
1

W
1

W
1

W
1

W
1

W
1

W
1

W
1

W
1

3200

W
3

W
1

THIRD FLOOR LEVEL

CONCRETE SUN BREAKER

(SEE DETAIL)
F

W
3

W
4
W
1

W
1

W
1

W
1

W
1

W
1

W
1

W
1

W
1

W
1

SECOND FLOOR LEVEL

W
4

W
3

W
3

W
4
W
1

W
1

W
1

W
1

W
1

W
1

W
1

W
1

W
1

W
3

W
1

GROUND FLOOR LEVEL


NAT. GRD. LN.

2
A-3

SCALE :

1 : 100

METERS

APEX LINE OF TRUSS

GA. #26 CORR. G.I.


ROOFING SHEET (PAINT
FINISH)

CA

G MA

ES

TOP OF ROOF BEAM

2500

815

9925

3200

3200

325

GA. #26 PLAIN G.I.


GUTTER ON

12x300mm FIBER
CEMENT FASCIA BD.

3200

(PAINT FINISH)
D-2

D-1

D-1
W-2

D-1

W-2

D-1
W-2

D-1

D-1

W-2

W-2

D-1

D-1
W-2

W-2

D-1

W-2

D-1
W-2

D-2

W-2

100 MM THK. CHB

THIRD FLOOR LEVEL

RAILING W/50mm

3200

9925

G.I. PIPE RAILING

D-2

D-1

D-1
W-2

W-2

W-2

W-2

D-1

D-1
W-2

W-2

W-2

W-2

D-1

D-1
W-2

W-2

W-2

W-2

D-1

D-1
W-2

W-2

W-2

W-2

D-1
W-2

W-2

W-2

W-2

D-1

D-2

D-1

D-2

SECOND FLOOR LEVEL

3200

B W/ PLAIN
FIN (PAINT)

E FOR HANDRAIL

D-3A

D-2

D-1

D-1

D-1

D-1

D-1

D-1

D-1

D-1

D-1

D-3A

32mm G.I. PIPE


HANDRAIL WITH 32mm

ED WALL TILES

VERT. SUPPORT @ 600mm

325

O.C. (PAINT FINISH)


GROUND FLOOR LEVEL
NAT. GRD. LN.

1
A-3

REPUBLIC OF THE PHILIPPINES

AND

De p ED

N
S IO

L FAC I L I T I E
I CA

EERING D
I VI
NGIN
SE

SCHOO
L

DEPARTMENT

OF EDUCATION

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


MERALCO AVENUE, PASIG CITY

DESIGNER:

CHECKED BY

RECOMMENDING APPROVAL

RECOMMENDING APPROVAL

SCALE :

1 : 100

METERS

APPROVED BY :

PROJECT TITLE :

MAXIMO M. CALBANG

NATHANIEL Q. MENDOZA

LUIS G. PURISIMA

OLIVER R. HERNANDEZ

RAMON C. BACANI

PDO III, PFSED-DepED

ARCHITECT III, PFSED-DepED

HEAD, PLANNING AND DESIGN UNIT

CHIEF, PFSED-OPS

UNDERSECRETARY

PFSED-DepED

DepED

DepED

LOCATION :

PROJECT NO:

OWNER :

DESIGNED BY:

NQM

ENCODED BY:

MMC

CHECKED BY:

LGP

SHEET NO:

DEPARTMENT OF EDUCATION

DepED
SHEET CONTENTS :

FRONT, REAR ELEVATIONS

DATE :

NOTE:

THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF PHYSICAL FACILITIES AND SCHOOLS ENGINEERING
DIVISION AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545

PHY
S

600

600

2500

APEX OF TRUSS

SEE STRUCTURAL DETAIL

TOP OF ROOF BEAM

TOP OF ROOF BEAM

W
4

W
3

3200

3225

W
3

200x200mm
FEMALE

VITRIFIED WALL

TOILET

THIRD FLOOR LEVEL

W
1

12425

STORAGE

W
1

CLASSROOM 11

W
1

W
1

CLASSROOM 12

W
1

W
1

CLASSROOM 13

W
1

W
1

CLASSROOM 14

W
1

W
1

CLASSROOM 15

TILES (GLAZED)

MALE

3rd FLOOR TOILET LEVEL

TOILET

W
3
W
3

W
4

3200

VITRIFIED WALL

TILES (GLAZED)

FEMALE

MALE

TOILET

SECOND FLOOR LEVEL

W
1

STORAGE

W
1

CLASSROOM 6

W
1

CLASSROOM

W
1

W
1

CLASSROOM

W
1

W
1

CLASSROOM

W
1

W
1

TOILET

W
1

CLASSROOM 10

2nd FLOOR TOILET LEVEL

6mm THK. MARINE PLYWOOD

3mm THK. FASCIAL

CEILING FOR ALL TOILET ON


ON

W
3

CENTER

W
4

MIRROR ON AL.

W
4

HANGER

@1200mm

FRAME

W
3

BOTHWAYS w/10mm BAR

MALE

OC.

TOILET

FEMALE

BOTHWAYS EMBEDDED ON

LAV

TOILET

W
1

CONC. SLAB
325

3200

@600mm

GROUND FLOOR LEVEL

CLASSROOM

W
1

W
1

CLASSROOM

W
1

W
1

CLASSROOM

W
1

W
1

W
1

CLASSROOM 4

W
1

CLASSROOM

W
1

CS

WC

WC
300

3200

50x50mm CEILING JOIST

NAT. GRD. LN.

EXPOSED CEILING

UNDER

SLAB PAINT FIN.

A-4

SCALE :

METERS

1 : 100

9500

200

7000

2500

1100

200

TOP OF TRUSS

GA#26 CORR. G.I.

TOP OF ROOF BEAM

(PAINT FIN.)

ROOFING SHEET

(PAINT FIN.)

2500

2500

1000

GA#26 CORR. G.I.

1000

ROOFING SHEET

ON

ON 12x300mm FIBER

(PAINT FIN.)

SEE TRUSS DETAIL


TOP OF ROOF BEAM

12x300mm

FASCIA BOARD

(PAINT FIN.)

(PAINT FIN.)

3200

3200

ROOFING SHEET

FIBER CEMENT

CEMENT FASCIA BOARD

PLAIN CEMENT PLASTER


WALL PAINT

GA#26 CORR. G.I.

GA#26 G.I. GUTTER

TOP OF ROOF BEAM

GA#26 PLAIN G.I. GUTTER

TOP OF TRUSS

2500

APEX LINE OF TRUSS

840

1100

PLAIN CEMENT PLASTER


WALL PAINT

FIN.

THIRD FLR. LVL.

3200

815

1000
1100
200

GROUND FLOOR TOILET


LEVEL

W-1

D-1

FIN.

THIRD FLOOR LEVEL

CLASSROOM

THIRD FLOOR LEVEL

CORRIDOR

10

900

3200

200x200mm

A-8

3200

10

CONCRETE
SUNBREAKER

W-1

D-1

(SEE DETAIL)

SECOND FLOOR LEVEL

CLASSROOM

SECOND FLOOR LEVEL

CORRIDOR

900

SUNBREAKER (SEE
DETAIL)

CORRIDOR

900

SECOND FLR. LVL.

RAILING PAINT FIN.

CONCRETE

9925

9925

50mm G.I. PIPE

3200

SUNBREAKER (SEE
DETAIL)

3200

9925

CONCRETE

38mm G.I. PIPE


HANDRAIL

32mm GI PIPE HANDRAIL

1
A-4

GROUND FLOOR LEVEL


NAT. GRD. LN.

SCALE :

1 : 100

@600mm

O.C. (PAINT FIN.)

325

NAT. GRD. LN.

SUPPORT

3200

w/32mm VERT.

3200

GROUND FLR. LVL.

325

325

3200

w/32mm VERT. SUPPORT


@600mm O.C. (PAINT FIN.)

2
A-4

METERS

W-1

D-1

CLASSROOM

GROUND FLOOR LEVEL

SCALE :

1 : 100

EXPOSED CEILING

UNDER

A-4

SLAB PAINT FIN.

REPUBLIC OF THE PHILIPPINES

AND

SCHOO
L

De p ED

N
S IO

L FAC I L I T I E
I CA

EERING D
I VI
NGIN
SE

DEPARTMENT

OF EDUCATION

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


MERALCO AVENUE, PASIG CITY

DESIGNER:

CHECKED BY

RECOMMENDING APPROVAL

RECOMMENDING APPROVAL

APPROVED BY :

PROJECT TITLE :

MAXIMO M. CALBANG

NATHANIEL Q. MENDOZA

LUIS G. PURISIMA

OLIVER R. HERNANDEZ

RAMON C. BACANI

PDO III, PFSED-DepED

ARCHITECT III, PFSED-DepED

HEAD, PLANNING AND DESIGN UNIT

CHIEF, PFSED-OPS

UNDERSECRETARY

PFSED-DepED

DepED

DepED

METERS

NAT. GRD. LN.

PROJECT NO:

SCALE :

1 : 100

METERS

OWNER :

DESIGNED BY:

NQM

ENCODED BY:

MMC

CHECKED BY:

LGP

SHEET NO:

DEPARTMENT OF EDUCATION

DepED
SHEET CONTENTS :

RIGHT & LEFT SIDE ELEV., LONGITUDINAL & CROSS


LOCATION :

SECTION

DATE :

NOTE:

THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF PHYSICAL FACILITIES AND SCHOOLS ENGINEERING
DIVISION AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545

PHY
S


600

4500

9000

9000

4500

4500

4500

9000
4500

9000

4500

4500

4500

9000
4500

4500

4500

4500

GA#26 CORR. G.I. SHEET


ROOFING (PAINT FIN.)

GA#26 G.I. GUTTER ON

12x300mm FIBER CEMENT

FASCIA BOARD (PAINT FIN.)

7000

RD

RD

RD

RD

RD

RD

RD

RD

RD

RD

RD

RD

RD

RD

RD

1000

RD

600

SLOPE

SLOPE

SLOPE

SLOPE

LN. OF STRUCTURE

200

1000

2500

RD

RD

RD

RD

RD

RD

RD

RD

GA#26 PLAIN G.I. RIDGE


ROLL (PAINT FIN.)

CONCRETE PARAPET

2
A-5

SCALE :

1 : 100

RD

GA#26 G.I. GUTTER ON

GA#26 PLAIN G.I. FLASHING


(PAINT FIN.)

12x300mm FIBER CEMENT

FASCIA BOARD (PAINT FIN.)

METERS

6mm THK. ORD. PLYWOOD CEILING ON


50x50mm CEILING JOIST @600mm OC

BOTH WAYS (PAINT FIN.)

9000
600

4500

4500

4500

4500

4500

9000

9000

4500

9000
4500

4500

LIGHTING FIXTURES

9000
4500

4500

4500

4500

600

1000

A-7

MANHOLE
7000

MANHOLE

1000

2500

CONCRETE PARAPET

A-8

A-5

REPUBLIC OF THE PHILIPPINES

AND

SCHOO
L

De p ED

N
S IO

L FAC I L I T I E
I CA

EERING D
I VI
NGIN
SE

DEPARTMENT

OF EDUCATION

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


MERALCO AVENUE, PASIG CITY

DESIGNER:

CHECKED BY

RECOMMENDING APPROVAL

SCALE :

1 : 100

RECOMMENDING APPROVAL

GA#26 PLAIN GI GUTTER ON

CEILING VENTILATION (SEE


DETAIL)

CEILING ON 50x50mm CEILING


JOIST @600mm OC BOTH WAYS

6mm THK. MARINE PLYWOOD

(PAINT FIN.)

12x300mm FIBER CEMENT FASCIA

BOARD (PAINT FIN.)

METERS

APPROVED BY :

PROJECT TITLE :

MAXIMO M. CALBANG

NATHANIEL Q. MENDOZA

LUIS G. PURISIMA

OLIVER R. HERNANDEZ

RAMON C. BACANI

PDO III, PFSED-DepED

ARCHITECT III, PFSED-DepED

HEAD, PLANNING AND DESIGN UNIT

CHIEF, PFSED-OPS

UNDERSECRETARY

PFSED-DepED

DepED

DepED

PROJECT NO:

OWNER :

DESIGNED BY:

NQM

ENCODED BY:

MMC

CHECKED BY:

LGP

SHEET NO:

DEPARTMENT OF EDUCATION

DepED
SHEET CONTENTS :

THIRD REFLECTED CEILING, ROOF PLAN


LOCATION :

DATE :

NOTE:

THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF PHYSICAL FACILITIES AND SCHOOLS ENGINEERING
DIVISION AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545

PHY
S

32mm G.I. PIPE

HANDRAIL

WITH 32mm VERT. SUPPORT @

O.C. (PAINT FINISH)

100

32mm G.I. PIPE

SPOT DETAIL

GROOVE LINES

5b1
5b

SCALE

D-4

D-4

D-3

200x200mm

W
3

W
4

FLOOR TILES

LAV

URINAL

NCR

D-2

HE

SINK COUNTER

7000

WC

D-4

D-4

HE
SINK COUNTER

D-2

SINK COUNTER

9
A-8

7000

1337

1337

WC

URINAL

D-3
D-2

A-8

VITRIFIED UNGLAZED
FLOOR TILES

WC

D-2

600

600

SINK COUNTER
SD

200x200mm

W
3

VITRIFIED UNGLAZED

D-4
D-2

1300

WC

D-4

SHE

1000

7000

1750

STO

D-4

SHE

WC

2100

888

1400

3150

D-4

WC

1025

1700
CLEAR

WC

1400

1400

WF3

38mm STAINLESS

1500

4500

4500
STEEL GRAB BAR

WC

LAV

W
4

W
3

1200

1:5 M

1:10 M

2000

WC

960

2000

W
4

WC

960

1090

955

TILES (UNGLAZED)

STEEL GRAB BAR

W
3

425

VITRIFIED FLOOR

38mm STAINLESS

425

SCALE

DETAIL SECTION

A-6

200x200mm

2000

(UNGLAZED)

1725

SPOT DETAIL

A-6

CENTER

12mm

STEEL DOWELS (PAINT


FIN.)

1:50 M

ON

PROVIDE

600

SCALE

4500

850

VERTICAL SUPPORT @
600mm

FLOOR FINISH W/

200x200mm VITRIFIED
850

32 mm G.I PIPE

3150

A-6

1:50 M

1075

CENTER

12mm

STEEL DOWELS (PAINT


FIN.)
100

5a

4500
FLOOR TILES

ON

PROVIDE

100

VERTICAL SUPPORT
@600mm

NONSKID PLAIN CEMENT

SCALE

SKIRTING

32 mm G.I PIPE

1700

DET. ELEVATION OF RAMP

A-6

FLOOR

FINISH
CEMEMNT

700

300

MENT
PLAIN CE
NON-SKID

A-6
900

1200

700

200
700

900

6mm

6mm

100X100 CONCRETE

O.C. (PAINT FINISH)

A-8

5b1

6mm

3600

TYPICAL

VERT. SUPPORT @600mm

12

150

A-6

A-6

100

100

HANDRAIL WITH 32mm

200

5b

5a

FINISH W/ GROOVE LINES

900

NONSKID PLAIN CEMENT FLOOR

200

600mm

10

13

13

14

14

15

15

16

8-STEPS@300mm

9-STEPS@300mm

16

17

STO.

18

D-3a

STO.
19

10

10

11

12

13

14

15

15

16

16

17

18

19

11

12

13

14

9500

12

3850

5000

12

11

2400

11

9500

2700

3850

9500

10

DN

UP

A-8

A-8

1700

1
A-6

N
S IO

L FAC I L I T I E
I CA

EERING D
I VI
NGIN
SE

DEPARTMENT

SCALE :

RAMP
UP

4
3600

1:50 M

SCALE :

OF EDUCATION

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


MERALCO AVENUE, PASIG CITY

3
A-6

1:50 M

REPUBLIC OF THE PHILIPPINES

De p ED

1574

1500

1200

1200

3600

A-6

SCHOO
L

DN
3000

RAMP
UP

AND

UP

1500

1500

2500

1359

1500

2500

1360

2500

2500

D-3a

DESIGNER:

CHECKED BY

MAXIMO M. CALBANG
PDO III, PFSED-DepED

NATHANIEL Q. MENDOZA
ARCHITECT III, PFSED-DepED

RECOMMENDING APPROVAL

RECOMMENDING APPROVAL

A-6

1700

SCALE :

1:50 M

SCALE :

APPROVED BY :

1:50 M

PROJECT TITLE :

LUIS G. PURISIMA

OLIVER R. HERNANDEZ

RAMON C. BACANI

HEAD, PLANNING AND DESIGN UNIT

CHIEF, PFSED-OPS

UNDERSECRETARY

PFSED-DepED

DepED

DepED

PROJECT NO:

OWNER :

DESIGNED BY:

NQM

ENCODED BY:

MMC

CHECKED BY:

LGP

SHEET NO:

DEPARTMENT OF EDUCATION

DepED
SHEET CONTENTS :

TOILETS, STAIR & RAMP PLAN AND


LOCATION :

RAMP DETAIL

DATE :

NOTE:

THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF PHYSICAL FACILITIES AND SCHOOLS ENGINEERING
DIVISION AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545

PHY
S

PLAIN CEM. PLASTERED


PAINT FIN.

3mm THK. FASCIAL

MIRROR ON AL. FRAMING

1900
450

PLAIN CEM. PLASTER

PAINT FIN.

500

500

4549

450

200

1000

200x200mm GLAZED

200

PLAIN CEMENT PLASTER


PAINT FINISH

WALL TILES

200x200mm VITRIFIED

200x200mm VITRIFIED

GLAZED TILES

2ND FLR. LVL.

WALL TILES (GLAZED)


600

PIPE CHASE

4500

A-7

SCALE

WC

6a

MALE

WC

TOILET

STORAGE

A-7

3RD FLR. LVL.

3rd FLOOR
TOILET LVL.

SCALE

3250
150

7a
150mm

A-7

CHB

1:20 M

1000

7b
A-7

CHB
150mM THK. CHB

PLYWOOD CEILING ON
50x50mm CEILING JOIST
BW.

@600mm

38 STAINLESS STEEL
GRAB BAR

325

300

TOILET LVL.

SCALE

CORRIDOR

50

50

300

300

CLASSROOM LVL.

DET. SECTION

A-7

900

WC

TOILET LVL.
FIN. GRD. LN.

7b

1:20 M

A-7

1:50 M

A-7

DET. SECTION
SCALE

650

DET. SECTION OF MALE TOILETS


SCALE

1:50 M

FFL

1525

9000

REPUBLIC OF THE PHILIPPINES

AND

SCHOO
L

De p ED

N
S IO

L FAC I L I T I E
I CA

EERING D
I VI
NGIN
SE

DEPARTMENT

OF EDUCATION

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


MERALCO AVENUE, PASIG CITY

DESIGNER:

CHECKED BY

RECOMMENDING APPROVAL

RECOMMENDING APPROVAL

APPROVED BY :

PROJECT TITLE :

MAXIMO M. CALBANG

NATHANIEL Q. MENDOZA

LUIS G. PURISIMA

OLIVER R. HERNANDEZ

RAMON C. BACANI

PDO III, PFSED-DepED

ARCHITECT III, PFSED-DepED

HEAD, PLANNING AND DESIGN UNIT

CHIEF, PFSED-OPS

UNDERSECRETARY

PFSED-DepED

DepED

DepED

1:50 M

300

SCALE

7a

300

A-7

DET. SECTION OF FEMALE TOILETS

1:50 M

40

A-8

SCALE

LVL.

TOILET LVL.
FIN. GRD. LN.

A-7

DET. OF FACADE PEDIMENT

1000

1625

FEMALE

3200

650

1000

W
3

1000

MALE
TOILET

GLAZED WALL TILES

GROUND FLOOR

BW.

1000

200x200mm VITRIFIED

TOILET

OC.

40

3200

(PROVIDE MANHOLE)

LAV

&

1000

W
3

BW.

1000

OC.

OC

PLASTERED PAINT FIN.

EMBEDDED ON SLAB
@1200mm

@1040mm

1000

W
4

GROOVE

10mm REINF. BAR

1000

W
3

OC

w/10mm BAR HANGER

3200

3200

1525

@600mm

PLASTER FIN. w/40mm

1000

6mm THK. MARINE

1000

THK.

PLASTERED PAINT FIN.

9425

150mm

2ND FLR. LVL.

100

1000

WC

STORAGE
TOILET LVL.

PIPE CHASE

TOILET

1525

WC

WC

MALE

1600

1625

TOILET

1000

FEMALE

3200

CONCRETE COLUMN

1000

1000

3200

3200

PIPE CHASE

150

W
3

13195

350

W
4

1000

650

W
3

2nd FLOOR

25

300

654

654
802

DET. SECTION

TOP OF ROOF BEAM

1000

1600

1600

WC

1000

FEMALE
TOILET

1600

3200

MA

392
150

3225

1452

300

3200

200 50

CEM. PLASTERED FIN.

80

E S

W
3

W
4

6" THK CHB PEDIMENT

650

80

LVL.

URINAL
W
3

65

650

TOP OF BEAM

C A

4500

TOP OF ROOF BEAM

2695

1:20 M

3200

4175

DETAIL SECTION

200

A-7

1:20 M

1:50 M

6a

3315

SCALE

1800

783

A-7

SCALE

TOILET LVL.
FIN. GRADE LN.

MOUNTING FIXTURES OF MALE TOILET

A-7

DETAIL SECTION

CORRIDOR LVL.

3919

1:20 M

WC

WALL

TILES ( GLAZED )

500 268

SCALE

183 100
TOILET LVL.

100

50

600

CLASSROOM LVL.

FFL

DETAIL OF COUNTER SINK

A-7

WC

15

FFL

100

284

1500

1500

100

COUNTER SINK DET. PLAN

URINAL

800

800

70

300

CONC. COUNTER

60 200

200

100

200x200mm
VITRIFIED

200

1600

600

SD

150

1650

W
3

780

600

PROJECT NO:

OWNER :

DESIGNED BY:

NQM

ENCODED BY:

MMC

CHECKED BY:

LGP

SHEET NO:

DEPARTMENT OF EDUCATION

DepED
SHEET CONTENTS :

TOILET SECTION DETAILS


LOCATION :

DATE :

NOTE:

THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF PHYSICAL FACILITIES AND SCHOOLS ENGINEERING
DIVISION AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545

PHY
S

CONCRETE SLAB
GA 26 CORR. G.I.
POLYETHYLENE SHEET
DAMP PROOFING

PLYWOOD CEILING ON

TOP CHORD SEE

50x50mm CEILING

STRUCTURAL DETAIL
10mm

@250mm

38mm

ILES ( GLAZED )

12x12mm

STRUCTURAL DETAIL

PLYWOOD CEILING ON

GROOVE

6mm THK. ORD.

W/ 25mm SQ. BAR

STEEL BRACKET @
EVERY

6mm

JOIST

1200mm

200

CHB

BEAM

CONC.

700

OC

BW

ANGULAR

GA 26 GI GUTTER

FRAME COATED WITH

QUARTER ROUND

PAINT FIN.

PRIMER

MOULDING

BASKET STRAINER
6mm THK. MARINE PLYWD.

BASKET STRAINER
75mm

CEILING (PAINT) ON 50x50mm

PVC

CLG. JST. @600mm OC BW

DOWNSPOUT PAINT
50

PLASTER PAINT FIN.

SPOT DET.

SCALE

AS

10

1:20 M

A-4

FINISH

75mm

CEILING VENT (SEE


DETAIL)

DOWNSPOUT PAINT

PVC

SCALE

SCALE :

12

FINISH

A-8

SCALE

1 : 10 M

1150

1 : 20 M
575

A-8

TYPICAL DETAIL OF
BALCONY RAILING
SCALE

20x20X2mm

CONC. BEAM

CLG. JST. @600mm

PAINT FIN.

BW

RAILING W/ PLAIN CEM.

1:50 M

A-8

@600mm

BW

BAR FOR FASCIA BOARD

675

SECTION

A-4

(PAINT) ON 50x50mm

GA 26 GI GUTTER

ROOF

(PAINT FIN.)

THIRD FLOOR LEVEL

SCALE

5A

ON

50x50mm CEILING

PAINT FINISH
100mm

GROOVE

PLYWD. CEILING

FINISH

GA 26 GI STRAP

PLYWOOD CEILING W/

SCHED. 40 RAILING

6mm THK. ORD.

SCREW ON STL. FRAME PAINT

575

1:20 M
25x25

50

mm

325

50

WOOD VENT
PROVIDE INSECT

SHOWN

7000

SCREEN

275

WALL

6mm THK. MARINE

@600mm

BW

FASCIA BOARD FIX W/METAL

BEAM REBARS SEE

JOIST

TEKSCREW

12x300mm FIBER CEMENT

50x50mm CEILING

50mm B.I. PIPE

00x200mm

SCALE

@600mm

GA 26 GI STRAP

STRUCTURAL DETAIL

100100

A-8

TO

JOIST
38mm

COPPER RIVET

SAG ROD SEE

NOT

TEKSCREW

C-PURLIN (SEE STRUC'L


DETAIL)

ON CENTER

SEE TRUSS DET.

6mm THK. MARINE

1000

GRAVEL BEDDING

PIPE CHASE

FR. 25x75mm

275

WD.FRAME S4S KD

2500

TANG.
6mm THK. MARINE PLYWOOD

TOP OF ROOF BEAM

13
A-8

SCHEDULE 40
W-4

(PAINT FINISH)

50mm G.G. PIPE SCH.

THIRD FLOOR

(PAINT FIN.)
CORRIDOR

19

TOILET FIN. LINE

900

WC

SCALE :

1 : 10 M

175

18

19mm SQUARE

50

BAR

WELDED TO G.I. PIPE

50mm G.I. PIPE

HANDRAIL @150mm O.C.

SCHEDULE 40
PAINT FINISH

=1512mm

17
100

16
50

15
14
5

W-4

LANDING

A-8

12

50mm G.I. PIPE


SCHEDULE 40 PAIN. FIN.

=1680mm

7
6
4

SCALE

SECOND FLOOR

A-8

SCHEDULE 40

(PAINT FINISH)

18

175

14

CEILING ON 50x50mm CEILING


JOIST @600mm 0N CENTER

LANDING

BOTHWAYS W/ 10mm BAR

12

19mm SQUARE

11

A-8

TOILET FIN. LINE

168

STORAGE

FEMALE

19 mm SQUARE BAR

ANCHORED TO THE

WALL (PAINT FIN.)

LANDING F.F.L.

CORRIDOR

19mm SQUARE

50 300
ANGULAR BAR
1200

3800

HANDRAIL @150mm O.C.

168

ANCHORED @ R.C. STAIR

25x25x2mm THK.

FINISHED GRADE LINE

BAR

WELDED TO G.I. PIPE

168

WC

950

CS

(PAINT FINISH)
50

1125

SCHEDULE 40

900

200x200mm VITRIFIED

50mm G.I. PIPE

HANDRAIL (PAINT FIN.)

50mm G.I. PIPE


SCHEDULE 40 PAIN. FIN.

SCHEDULE 40

(PAINT FINISH)

BAR @150mm

O.C. WELDED TO G.I. PIPE


9

GLAZED WALL TILES

50mm G.I. PIPE

50

13

10

HANGER @1200mm OC. BW.

1:5 M

15

6mm THK. MARINE PLYWOOD

900

SCALE

A-8

16

1625

(CRASH RAILING)

17

2000

SPOT DETAIL

1:20 M

50mm G.I. PIPE

CORRIDOR

19

TOILET FIN. LINE

GROUND FLOOR

SCALE

WC

LAV

SPOT DETAIL

A-8

1:20 M

CS

W-4

CRASH RAILING

A-8

STL. GRAB BAR

ANCHORED TO THE

WALL (PAINT FIN.)

150

ANCHORED @ R.C. STAIR

10

GLAZED WALL TILES

38mm STAINLESS

19 mm SQUARE BAR

13

11

200x200mm VITRIFIED

=1512mm

9-RISERS@168mm

TO G.I. PIPE HANDRAIL

900

CS

10-RISERS@168mm

BAR

150 150 150

19mm SQUARE

@150mm O.C. WELDED


W A L L

3200

A-8

SCHEDULE 40 PAIN. FIN.

3200

1 : 10 M

(PAINT FINISH)

3200

SCALE :

50mm G.I. PIPE

50mm G.I. PIPE

RAILING @150mm O.C.


WELDED TO G.I. PIPE

325

JOISTS @600mm O.C. B/W


(PAINT FIN.)

SCHEDULE 40

19mm SQUARE BAR

GLAZED WALL TILES

VENT

14

50

40 (PAINT FIN.)
200x200mm VITRIFIED

WOOD

PROVIDE INSECT SCREEN

200

50mm G.I. PIPE

CEILING ON 50x50mm CEILING.

25x25mm

14
A-8

9-RISERS@168mm

ITRIFIED

ROOFING SHT. PAINT FIN.

NOSING

7000
50

SECTION OF STAIR

A-8
REPUBLIC OF THE PHILIPPINES

AND

SCHOO
L

De p ED

N
S IO

L FAC I L I T I E
I CA

EERING D
I VI
NGIN
SE

DEPARTMENT

OF EDUCATION

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


MERALCO AVENUE, PASIG CITY

SCALE

DESIGNER:

A-8

1:50 M

CHECKED BY

RECOMMENDING APPROVAL

RECOMMENDING APPROVAL

300

DETAIL SECTION
SCALE

1:20 M

APPROVED BY :

25x25x2mm THK.
ANGULAR BAR
NOSING

3
A-8

SCALE

PROJECT TITLE :

MAXIMO M. CALBANG

NATHANIEL Q. MENDOZA

LUIS G. PURISIMA

OLIVER R. HERNANDEZ

RAMON C. BACANI

PDO III, PFSED-DepED

ARCHITECT III, PFSED-DepED

HEAD, PLANNING AND DESIGN UNIT

CHIEF, PFSED-OPS

UNDERSECRETARY

PFSED-DepED

DepED

DepED

HANDRAIL DETAIL

A-8

1:5 M

PROJECT NO:

SPOT DETAIL
SCALE

OWNER :

DESIGNED BY:

NQM

ENCODED BY:

MMC

CHECKED BY:

LGP

SHEET NO:

DEPARTMENT OF EDUCATION

DepED
SHEET CONTENTS :

STAIR, HANDRAIL & MISC. DETAILS


LOCATION :

1:5 M

DATE :

NOTE:

THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF PHYSICAL FACILITIES AND SCHOOLS ENGINEERING
DIVISION AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545

PHY
S

900
800

900

20

300

800

600

PVC PIPE

D-3

TOILET (DISABLED)

D-3a

TANGUILE PANEL DOOR ON 50X150 HOLLOW CORE FLUSH TYPE SWING

HOLLOW CORE FLUSH TYPE SWING

mm YACAL/GUIJO JAMB W/ FIXED

DOOR ON 50x50mm YACAL GUIJO

WITH HARDWARE AND ACCESSORIES

JAMB W/ MARINE PLYWOOD FACING

INSIDE AND ORDINARY OUTSIDE

DOOR ON 50x150mm GUIJO/YACAL


JAMB w/MARINE PLYWOOD FACING

COMPLETE W/ HARDWARE AND

COMPLETE W/ HARDWARE AND

ACCESSORIES

YACAL/GUIJO DOOR JAMB

300

60

YACAL/GUIJO DOOR JAMB

COMPLETE WITH HARDWARE

ACCESSORIES

ACCESSORIES

BEAM

3 EQUAL PARTS = 2000


950

2000

600

900

SEALANT

3x25mm

2400

1800

2400

1100

2000

300 400

2400

1200

SEALANT

MANUAL LOCK

2400

BAR

SWING DOOR ON 50X100

2 EQUAL PARTS =

10mm

TOILET (CUBICLE)

COMPLETE WITH HARDWARE

4000

ACCESSORIES PROVIDE KICK PLATE

600

300

D-4

LOUVER DOOR ON 50X100

INSIDE AND ORDINARY OUTSIDE

4EQ. PARTS
1000

20

TRANSOM COMPLETE

1000

600

CLEAR GLASS

1000

20

TOILET

D-2

1500

D-1 CLASSROOM

1000

1199

FFL

1000

4000

300

300

KICKING PLATE

1200

STAINLESS STL.

800

1500

2100

2100

2100

2100

2400

4EQ. PARTS=

A-9

SCALE :

1 : 20

Z-BAR

FRAME

PUTTY

METERS

CLEAR GLASS
W-1 CLASSROOM

W-2 CLASSROOM

RQD: 30 SETS

JALOUSIE WINDOWS WITH CLEAR GLASS

LOC: REAR ELEVATION

BLADES ON STANDARD ALUMINUM CASING

W-3 TOILET

W-4 TOILET

STEEL AWNING WINDOW

STEEL AWNING WINDOW

ON 50X150mm YACAL/GUIJO JAMB

STEEL CASEMENT WINDOW

COMPLETE WITH HARDWARE AND

WITH FIX GLASS

1.6x35mm CONT.

ACCESSORIES & STEEL GRILLS ON 300mm


60

FROM FLOOR FIN.

1
A-9

SCALE :

1 : 50

20

WEATHERING

25

ANGLE PIN

METERS

HINGES
Z-BAR FRAME

Z-BAR

TRANSOM

SEALANT

BAR

I-BAR MULLION

3x25mm

Z-BAR

GLAZING PIN
25

GROUT

CHB

WINDOW JAMB

PUTTY

CLEAR GLASS

SPOT WELD

25

FULL WELD

PVC PIPE

CLEAR GLASS

PUTTY
20

10mm

20

BAR

WINDOW JAMB

NG)

60

20

16

3x35mm

25

Z-BAR

PUTTY
SPOT WELD

FRAME

CLEAR GLASS

MEETING RAIL

MULLION

VENT

25

20

SCALE :

N
S IO

L FAC I L I T I E
I CA

EERING D
I VI
NGIN
SE

De p ED

DEPARTMENT

OF EDUCATION

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


MERALCO AVENUE, PASIG CITY

20
CHB

1 : 10 METERS

WINDOW JAMB

A-9

SCHOO
L

BAR

32

REPUBLIC OF THE PHILIPPINES

SILL

SEALANT

3
A-9

AND

10mm

35

GROUT

WINDOW

ANGLE PIN

FULL WELD

1.

WELD

PVC PIPE

HINGE
25

FRAME

35

10

HINGE

DESIGNER:

CHECKED BY

RECOMMENDING APPROVAL

RECOMMENDING APPROVAL

SCALE :

APPROVED BY :

1 : 10 METERS

PROJECT TITLE :

MAXIMO M. CALBANG

NATHANIEL Q. MENDOZA

LUIS G. PURISIMA

OLIVER R. HERNANDEZ

RAMON C. BACANI

PDO III, PFSED-DepED

ARCHITECT III, PFSED-DepED

HEAD, PLANNING AND DESIGN UNIT

CHIEF, PFSED-OPS

UNDERSECRETARY

PFSED-DepED

DepED

DepED

PROJECT NO:

OWNER :

DESIGNED BY:

NQM

ENCODED BY:

MMC

CHECKED BY:

LGP

SHEET NO:

DEPARTMENT OF EDUCATION

DepED
SHEET CONTENTS :

DOOR & WINDOW SCHEDULE, DETAIL


LOCATION :

OF STEEL CASEMENT

DATE :

NOTE:

THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF PHYSICAL FACILITIES AND SCHOOLS ENGINEERING
DIVISION AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545

PHY
S

2950

2950
4500

4500

F-3
C-3

F-3
C-3

F-3
C-3

TG-3

4500

F-3
C-3

TG-3

4500

F-3
C-3

TG-3

4500

F-3
C-3

TG-3

4500

F-3
C-3

TG-3

4500

F-3
C-3

TG-3

4500

F-3
C-3

TG-3

4500

F-3
C-3

TG-3

4500

F-3
C-3

TG-3

F-3
C-3

TG-3

F-3
C-3

TG-3
WF

TG-3

TG-3

TG-3

SCALE :

1:100 M.

LEVEL

3800

WF

TG-1

TG-3
RAMP

C-1

C-2

C-3

100

L
100 mm THICK

SECTION

SCALE

fy = 275.8 Mpa (40,000 psi), minimum yield strength of reinforcing bars


unless otherwise specified.
SBP = 95.706 Kpa (2000psf) was used in the design for all footings.
No footing shall rest on fill.

10mm STIRRUPS

1@50, 6@100, REST@200

FOOTING DIMENSIONS

FOOTING

LENGTH

C-4
F-1

S-1

SCALE :

REPUBLIC OF THE PHILIPPINES

EERING D
I VI
NGIN
SE

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION

F-2

WIDTH

(L)

(W)

1700

1700

2800

2800

DEPTH

(D)
1500

1500

(mm)

REINFORCEMENT

Thickness

BAR X

(t)
300

350

12

16mm

20mm

REMARKS

BAR Y

12

SQUARE FOOTING

16mm

SQUARE FOOTING

20mm

1 : 25 M
F-3

DESIGNER:

CHECKED BY

350

350

TIES : 10 mm

TIES : 10 mm

1@50, 8@75, REST @


TO

12-20mm
TIES : 10 mm

1@50, 8@75, REST @

CENTER

150mm

TO

1@50, 8@75, REST @

CENTER

150mm

350

TO

CENTER

350

MARK

C-3

12-20mm

8-16mm

150mm

MAIN BAR:

2500

RECOMMENDING APPROVAL

2500

1500

300

11

RECOMMENDING APPROVAL

20mm

11

SQUARE FOOTING

20mm

APPROVED BY :

400

SEE SCHEDULE FOR


REINFORCEMENT OF
MEMBERS.

CENTER

TO

150mm

350

MAIN BAR:

350

BOTTOM BARS

NOTE:

1@50, 8@75, REST @

CENTER

TO

350

350

2ND FLOOR LEVEL

G-5/G-7

LENGTH

300

LENGTH
SEE DEV'T

SEE DEV'T G-5/G-7

150mm

MAIN BAR:

NSCP 2001, ACI 318-89, AISC ((th Edition)

REFERENCES

TIES : 10 mm

1@50, 8@75, REST @

CENTER

350

B. REBAR

3RD FLOOR LEVEL

f'c = 20.685 Mpa (3000psi), minimum compresive strength of concrete a 28 days


unless otherwise specified.

2ND FLOOR LEVEL TO

A. CONCRETE

C. FOUNDATION

2ND FLOOR LEVEL

1@50, 8@75, REST @


TO

8-20mm

TIES : 10 mm

350

TOP BARS

2ND FLOOR LEVEL

TIES : 10 mm
150mm

MAIN BAR:

8-20mm

NTS

MAIN BAR:

8-16mm

350

S-1

350

350

MAIN BAR:

FOUNDATION LEVEL TO

1:25

ROOF DECKLEVEL

X-BARS

3RD FLOOR LEVEL TO

350

1500
250

SCALE

350

MAIN BAR:

MAIN BAR:

8-16mm

BERNADETTE N. AQUINO

LUIS G. PURISIMA

OLIVER R. HERNANDEZ

RAMON C. BACANI

PDO III, PFSED-DepED

STRUCTURAL CONSULTANT, PFSED-DepED

HEAD, PLANNING AND DESIGN UNIT

CHIEF, PFSED-OPS

UNDERSECRETARY

PFSED-DepED

DepED

DepED

LOCATION :

TIES : 10 mm

1@50, 10@75, REST @

CENTER

PROJECT TITLE :

MAXIMO M. CALBANG

12-20mm

TIES : 10 mm

1@50, 8@75, REST @


TO

MAIN BAR:

14-20mm

TIES : 10 mm
150mm

400

100

500

1150

Y-BARS
X-BARS

S-1

N
S IO

L FAC I L I T I E
I CA

F-1
C-1

NGL

GRAVEL BEDDING

MERALCO AVENUE, PASIG CITY

TG-3

350

PLAN

De p ED

F-1
C-1

Y-BARS

OF EDUCATION

F-1
C-1

TG-3

300

DEPARTMENT

TG-3
TG-1

F-1
C-1

F-2
C-2

5301

TIE BEAM

SCHOO
L

TG-3
TG-1

F-1
C-1

F-2
C-2

NGL

(SEE SCHEDULE)

AND

F-2
C-2

TG-3
TG-1

F-1
C-1

TG-3

F-2
C-2

TG-3
TG-1

F-1
C-1

TG-3

F-2
C-2

TG-3
TG-1

TG-3

F-1
C-1

TG-3

S-1

TG-3

WF
TG-3

F-1
C-1

G-4/G-6

TG-2

TG-2

TG-2

TG-2

TG-2

TG-2

TG-2

TG-2
F-1
C-1

TG-3

F-2
C-2

5301

PC-1

1525

RAMP

WF

PC-1

1300

TG-3

1300

1525

TG-3

F-1
C-1

TG-3

F-2
C-2

WF

F-1
C-1

TG-3

F-2
C-2

WF

TG-3

F-2
C-2

TG-1

F-1
C-1

F-2
C-2

TG-1

TG-3
TG-1

TG-1

2500

TG-3

F-2
C-2

TG-1

F-2
C-2

TG-1

F-2
C-2

TG-2

100mm THICK
SLAB ON FILL
WITH 10mm
SPACED AT 400
BOTHWAYS

TG-1

PC-1

TG-2

TG-3

WF

WF

TG-2

PC-1

9500

7000

TG-2

WF

TG-2

WF

4500

WF

TG-3

WF

1400

4500

150mm
PROJECT NO:

TO

1@50, 10@75, REST @

CENTER

150mm

TO

CENTER

OWNER :

DESIGNED BY:

SHEET NO:

DEPARTMENT OF EDUCATION

ENCODED BY:

MMC

CHECKED BY:

LGP

DepED
SHEET CONTENTS :

FOUNDATION PLAN, DET. OF FOOTING, TIE BEAM,


ELEV. OF COL. SCH. FOOTING & COLUMN

DATE :

NOTE:

THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF PHYSICAL FACILITIES AND SCHOOLS ENGINEERING
DIVISION AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545

PHY
S

4525

4500

4500

4500

4500

4500

4500

4500

4500

4500

4500

4500

2950

2950

SCALE :

L2/3
LAP SPLICES ARE

2D2

2D2

ALLOWED ONLY IN

2D2

L3/5

500

440

L2/5

2-12mm STIFFENER

L3/5

6-20mm

6-20mm

2-12mm

2-12mm

4-20mm

4-20mm

END

MID

S-2

L1

L2

L1/3

TOP BAR

L2/3

L1/6

MARK

NESS
in

mm

REBAR

LEFT SUPPORT

SIZE

AND

De p ED

N
S IO

L FAC I L I T I E
I CA

EERING D
I VI
NGIN
SE

SCHOO
L

DEPARTMENT

OF EDUCATION

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


MERALCO AVENUE, PASIG CITY

LEVEL

SECOND

TOP

BOTT.

MIDSPAN

BOTT.

TOP

RIGHT SUPPORT

TOP

BOTT.

in

REBAR
SIZE

LEFT SUPPORT

TOP

BOTT.

mm

MIDSPAN

TOP

BOTT.

RIGHT SUPPORT

TOP

REMARKS

BOTT.

TIE

LEVEL

THICK-

REBAR SPACING ALONG LONG DIRECTION

S-1

100

10

200

300

300

200

300

10

250

300

300

250

300

TWO-WAY

S-2

100

10

300

300

300

300

300

10

300

300

300

300

300

TWO-WAY

S-3

100

10

200

200

200

200

200

10

300

300

300

300

300

ONE-WAY

CHECKED BY

RECOMMENDING APPROVAL

RECOMMENDING APPROVAL

APPROVED BY :

BEAM

SLAB

mm

BEAM

in

STAIR

REBAR SPACING ALONG SHORT DIRECTION

ROOF

LEVEL

S-2

FLOOR

3800

B-3

G-5

7
G

G-4

G-6

S T E E L

R E I N F O R C E M E N T S

DIMENSIONS

( in / mm )
b

G-1

200

400

G-2

200

G-3

LEFT

REBAR

(mm )

MID SPAN
TOP

S T I R R U P S

RIGHT

BOTTOM

TOP

10mm

BOTTOM

(UNLESS NOTED OTHERWISE)

TOP

BOTTOM

20mm

1@50, 6@100, REST@200

400

20mm

1@50, 6@100, REST@200

200

400

20mm

1@50, 6@100, REST@200

G-4

200

400

20mm

1@50, 6@100, REST@200

G-5

250

500

20mm

1@50, 8@100, REST@200

G-6

200

400

20mm

1@50, 6@100, REST@200

G-7

250

500

20mm

1@50, 8@100, REST@200

B-1

200

400

16mm

1@50, 6@100, REST@200

B-2

200

400

16mm

1@50, 6@100, REST@200

B-3

200

400

16mm

1@50, 6@100, REST@200

G-1

200

400

20mm

1@50, 6@100, REST@200

G-2

200

400

20mm

1@50, 6@100, REST@200

G-3

200

400

20mm

1@50, 6@100, REST@200

G-4

200

400

20mm

1@50, 6@100, REST@200

G-5

250

500

20mm

1@50, 8@100, REST@200

G-6

200

400

20mm

1@50, 6@100, REST@200

G-7

250

500

20mm

1@50, 8@100, REST@200

B-1

200

400

16mm

1@50, 6@100, REST@200

B-2

200

400

16mm

1@50, 6@100, REST@200

B-3

200

400

16mm

1@50, 6@100, REST@200

RG-1

200

400

16mm

1@50, 6@100, REST@200

RG-2

200

500

16mm

3
2

1@50, 8@100, REST@200

RCG-1

200

500

16mm

1@50, 8@100, REST@200

RB-1

200

400

16mm

1@50, 8@100, REST@200

TG-1

300

500

20mm

1@50, 8@100, REST@200

TG-2

300

500

20mm

1@50, 8@100, REST@200

TG-3

300

500

20mm

1@50, 6@100, REST@200

LB-1

200

400

16mm

1@50, 6@100, REST@200

TOP BAR

3RD FLOOR LEVEL

L1/3

G-6

G-6
MARK

DESIGNER:

7
G

G
G-6

LEVEL

MID

REPUBLIC OF THE PHILIPPINES

G-1

THIS PORTION

300

300

7
G
G-6

2D2

ALLOWED ONLY IN

6-20mm

L2/5

BEAM

L3/3
LAP SPLICES ARE

D1

2-12mm

4-20mm

END

L3/3

THIS PORTION

2-20mm

STAIR WELL

S-2

G-1

BEAM
FLOOR

L3

L2/3

2D1

PC-1

G-2

S-2

3500

L2

2D1

G-2

G-1

2ND FLOOR LEVEL

L1

G-1

B-2

PC-1

S-3

S-1

S-2

1:100 M.

3500

L1/3

B-1

G-2

S-2

G-1

2500

2-12mm

G-1

B-1

S-1

CG-1

925

S-2

6-20mm

G
G-1

S-1

S-1

G-2

S-2

G-6

G-6
G-1

S-1

G-3

S-2

G-3

S-1

B-1

G-2

CG-1

G-1

G-3

S-1

S-1

G-2

S-2

G-6

G-1

7
G

G
G-6

G-6

G-6

G-1

B-1

S-1

G-2

S-2

G-3

S-1

B-1

S-1

G-2

S-2

G-3

S-1

B-1

S-1

G-2

S-2

G-3

S-1

B-1

S-1

G-2

S-2

G-1

S-1

B-1

S-1

G-2

G-3

S-1

S-2
G-4

B-1

S-3

G-3

S-1

B-1

G-2

2500

G-3

S-1

G
B-3

3800

STAIR WELL

PC-1

B-2

G-5

7000

PC-1

S-1

S-1

G-3

G-3

G-3

PROJECT TITLE :

MAXIMO M. CALBANG

BERNADETTE N. AQUINO

LUIS G. PURISIMA

OLIVER R. HERNANDEZ

RAMON C. BACANI

PDO III, PFSED-DepED

STRUCTURAL CONSULTANT, PFSED-DepED

HEAD, PLANNING AND DESIGN UNIT

CHIEF, PFSED-OPS

UNDERSECRETARY

PFSED-DepED

DepED

DepED

LOCATION :

PROJECT NO:

OWNER :

DESIGNED BY:

SHEET NO:

DEPARTMENT OF EDUCATION

ENCODED BY:

MMC

CHECKED BY:

LGP

DepED
SHEET CONTENTS :

2nd & 3RD FLOOR FRAMING PLAN, TYP. DET.


OF BEAM & SLAB, SCH. OF BEAMS & SLABS

DATE :

NOTE:

THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF PHYSICAL FACILITIES AND SCHOOLS ENGINEERING
DIVISION AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545

PHY
S

10 @250
CUT BARS

10 SPACED
PVC PIPE

MAIN BARS

200

350

10 @250

1-10
NOSING BAR

MAIN BAR:

100

4-16mm
TIES : 10 mm
150mm
SEALANT

TO

400

CENTER

PC-1

500

300

BARS BOTHWAYS

SEALANT

1@50, 8@75, REST @

10mm

4-10 CONT. BARS

(FROM TIE BEAM UP TO LANDING LEVEL/


FROM 2ND FLR BEAM UP TO LANDING LEVEL)

10 @250
CUT BARS

S-3

1 : 25 M

SCALE

FRAME

S-3

S-3

7000

TEMP

125

12

BAR

1600

300mm

10

125

125

200

10mm

125125

3543

4500
1550

2500

2950

G-3

1-10

THIRD FLOOR LINE

S-1

3200

16 @ 150

NOSING BAR

B-2

3RD FLOOR LEVEL

10 @300

LANDING

3200

G-5

G-7

B-2

16 @ 150
MAIN BAR

LB-1

PC-1

PC-1

7000

SEE SCHEDULE OF S-1 (2ND/3RD


LVL) FOR DETAIL OF REIN.

16 @ 150

S-3

10 @300

SECOND FLOOR LINE

2ND FLOOR LEVEL

16 @ 150

3200

LANDING
10 @300
1-10

LB-1

NOSING BAR
16 @ 150

10 @300

G-2

150mm
16 @ 150
MAIN BAR

325

GROUND FLOOR LINE

A
S-3

GROUND FLOOR LEVEL

NATURAL GRADE LINE

10 @300

SCALE

TG-3

1:50 M
7000

SECTION OF STAIR

S-3

REPUBLIC OF THE PHILIPPINES

De p ED

N
S IO

L FAC I L I T I E
I CA

EERING D
I VI
NGIN
SE

SCHOO
L

DEPARTMENT

10 @250

AND

G-1

G-2

B-2

B-3

3800

S-3

G-1

G-2

10 @300

OF EDUCATION

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


MERALCO AVENUE, PASIG CITY

DESIGNER:

CHECKED BY

RECOMMENDING APPROVAL

RECOMMENDING APPROVAL

SCALE

APPROVED BY :

1:50 M

PROJECT TITLE :

MAXIMO M. CALBANG

BERNADETTE N. AQUINO

LUIS G. PURISIMA

OLIVER R. HERNANDEZ

RAMON C. BACANI

PDO III, PFSED-DepED

STRUCTURAL CONSULTANT, PFSED-DepED

HEAD, PLANNING AND DESIGN UNIT

CHIEF, PFSED-OPS

UNDERSECRETARY

PFSED-DepED

DepED

DepED

LOCATION :

PROJECT NO:

OWNER :

DESIGNED BY:

SHEET NO:

DEPARTMENT OF EDUCATION

ENCODED BY:

MMC

CHECKED BY:

LGP

DepED
SHEET CONTENTS :

STAIR PLAN & SECTION DETAIL, DETAIL OF


RAMP & STAIR ON GRADE, MISC. DETAILS

DATE :

NOTE:

THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF PHYSICAL FACILITIES AND SCHOOLS ENGINEERING
DIVISION AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545

PHY
S

1200

12mm

RB-1

LC-150x50x15x2.0 PURLINS

CROSS

SPACED

BRACINGS

750

mm

QTY

SIZE

W-1

TOP & BOT. CHORDS

2L

2"x2"x1/4"

W-2

WEB

2L

2"x2"x3/16"

MEMBERS

RG-1

RG-1

RG-1

RG-1
RG-1

DESCRIPTION

T-1

RG-2

T-1

RG-2

T-1

RG-2

T-1

RG-2

RG-1

RG-1

RG-1
RG-1

MARK

4500

RG-1

RG-1

RG-1

RG-1

4862

RG-1

RG-1

RB-1

4862

T-1
T-1

RG-2

T-1

RG-2

T-1
HT-1 RG-1

4500

RG-1

RG-1

RG-1

RCG-1

RG-1 HT-1

4500

RG-1

RG-1

RG-1

RG-1

4500

RG-1

RG-1

RCG-1

RG-1

RCG-1

RG-1

RG-2

RG-2

RG-1

4500

RG-1

RG-1

RG-1

4500

RG-1

RG-1

RG-1

RG-1

4500

RG-1

RG-2

RG-2

RG-2

T-1

RG-2

RG-1

4500

RG-1

RG-1

RG-1
RG-1

RG-1

RG-1

RG-1

2500

RG-1

4500

RG-1

4500

RG-1

T-1

RG-2

RG-1

7000

4500

T-1

1200

4500

T-1

T-1

T-1

4862

O.C

200

WITH 10 SAGRODS @ MIDSPAN

50

50

50

50

A
S-4

SCALE :

6mm GUSSET PLATE


BOTTOM CHORD

1:100 M.

4-12x300mm

LONG

ANCHOR STUDS
C
50

S-4

CH

OR

OR

TO

6mm GUSSET PLATE


200

W-2

2L-2x2x1/4 STRUT

S-4

KING POST

W-2

W-1

2 SPANS @ 1125
= 2250

PLAN

S-4

FULL WELD

W-2

2 SPANS @ 1250
= 2500

GUSSET

PLATE (TYP.)

W-2

W-2

W-2

W-2

W-2

W-2

1000

W-

6mm

FULL WELD

W-2

2500

CH

200

OP

100

OR

CH

200x200x10mm
EMBEDED PLATE

50

D
S-4

6mm GUSSET PLATE (TYP.)

TO

W-2

4 SPANS @ 1187.5 = 4750

1000

S-4

1 : 50 M

SCALE

50

SCALE

S-4

50

50

50

BOTTOM CHORD (FULLY


WELDED TO BASE PLATED)
4-12x250mm

1 : 50 M

LONG

ANCHOR STUDS

9500
200x200x10mm BASE
PLATE

B
S-4

SEE TRUSS ANCHORAGE DETAIL

1 : 25 M

SCALE

COLUMN

OR

BEAM

150x50x15x2.0mm
STEEL C-PURLINS
750mm O.C.
10mm SAG ROD WITH

LC-150x50x15x2.0
PURLINS

6-10x200mm

A-307

MACHINEBOLT

LONG

150

1-10mm

WASHERS @ EACH END


50

W-2

150

STANDARD NUTS &

L-2.5x2.5x1/4
FULL WELD

W-2

6mm GUSSET PLATE (TYP.)

SECTION

BOTTOM CHORD

E
S-4

1 : 50 M

SCALE

REPUBLIC OF THE PHILIPPINES

AND

SCHOO
L

De p ED

N
S IO

L FAC I L I T I E
I CA

EERING D
I VI
NGIN
SE

DEPARTMENT

OF EDUCATION

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


MERALCO AVENUE, PASIG CITY

DESIGNER:

SCALE

S-4

CHECKED BY

1 : 50 M

S-4

RECOMMENDING APPROVAL

SCALE

RECOMMENDING APPROVAL

1 : 10 M

S-4

APPROVED BY :

PROJECT TITLE :

MAXIMO M. CALBANG

BERNADETTE N. AQUINO

LUIS G. PURISIMA

OLIVER R. HERNANDEZ

RAMON C. BACANI

PDO III, PFSED-DepED

STRUCTURAL CONSULTANT, PFSED-DepED

HEAD, PLANNING AND DESIGN UNIT

CHIEF, PFSED-OPS

UNDERSECRETARY

PFSED-DepED

DepED

DepED

1 : 10 M

SCALE

S-4

PROJECT NO:

LOCATION :

SCALE

1:5 M

OWNER :

DESIGNED BY:

SHEET NO:

DEPARTMENT OF EDUCATION

ENCODED BY:

MMC

CHECKED BY:

LGP

DepED
SHEET CONTENTS :

TRUSS DIAGRAM DETAILS OF STEEL


DATE :

100mm THK. + FIN. SLAB W/

CONNECTION
NOTE:

THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF PHYSICAL FACILITIES AND SCHOOLS ENGINEERING
DIVISION AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

10mm REBARS AT 200mm O.C.

CB

BENT UP 2 OUT OF 3 AT L/4

FROM FACE SUPPORT. BOTH WAYS

150X300mm RC BEAM W/2-16mm

100mm THK CHB W/


10mm VERT/HOR BAR
@600mm

O.C.

EW

CDP

100mm THK. + FIN. SLAB W/


10mm BENT UP 2 OUT OF 3 AT L/4 FROM

CO

CATCH BASIN
CONCRETE DRAIN PIPE
CLEAN OUT

REP. ACT 545

PHY
S

GENERAL NOTES

LOAD SCHEDULE

LEGEND

1. ALL ELECTRICAL WORKS SHALL COMPLY IN ACCORDANCE WITH THESE PLANS AND SPECIFICATIONS. THE APPLICABLE

DESCRIPTION

PANELBOARD:

PROVISIONS OF THE LATEST EDITION OF THE PHILIPPINE ELECTRICAL CODE (PEC). THE RULES AND REGULATION OF
THE LOCAL ENFORCING AUTHORITY AND THE REQUIREMENTS OF THE LOCAL POWER COMPANY. THE ELECTRICAL

WORKS SHALL BE DONE UNDER THE IMMEDIATE SUPERVISION OF A DULY REGISTERED ELECTRICAL ENGINEER.

2. THE ELECTRICAL SERVICE POWER IS 1-PHASE, 2-WIRE, 230 V AC, 60 Hz.

3. WIRING METHOD SHALL BE AS FOLLOWS :


a. FEEDERS AND RISERS - INTERMEDIATE METALLIC CONDUIT

CKT.
NO.

20

50

3.35mm THW IN 15mm C

CONVENIENCE OUTLET - 9x180w

1860

230

20

50

3.35mm THW IN 15mm C

CONVENIENCE OUTLET - 9x180w

1860

230

20

50

3.35mm THW IN 15mm C

SWITCH

LIGHTING OUTLET

1460

230

20

50

3.35mm THW IN 15mm C

SWITCH

LIGHTING OUTLET

1500

230

20

50

3.35mm THW IN 15mm C

LIGHTING OUTLET

1200

230

20

50

3.35mm THW IN 15mm C

LIGHTING OUTLET

1000

230

20

50

3.35mm THW IN 15mm C

LIGHTING OUTLET

1200

230

20

50

3.35mm THW IN 15mm C

LIGHTING OUTLET

1000

230

20

50

3.35mm THW IN 15mm C

10

SPARE

1500

230

20

50

11

SPARE

1500

230

20

50

TWO

GANG

DEVICE

SWITCH

S cde

THREE

GANG

S 3W

THREE

WAY

Sf

FAN

S EF

EXHAUST

FAN

RACEWAY

CONDUIT

RACEWAY

DEVICE

DEVICE

SWITCH

SWITCH

CONCEALED

IN

CEILING

BRANCH CKT., & AUXILIARY

5. ALL OUTLET BOXES SHALL BE GALVANIZED GAGE NO. 16 DEEP TYPE WITH FACTORY KNOCKOUTS.
EF

LP

PURPOSE OF USAGE.

CKT. BREAKER, RATING AS INDICATED

DUPLEX

CONVENIENCE

AMPS,

250

VOLT

OUTLET,
WITH

GROUNDING

MODERN

PLATE

TYPE
COVER

EXHAUST FAN OUTLET, SINGLE, GROUNDING TYPE


AMPS,

HOMERUN

250

VOLT

DIRECT

TO

WITH

MODERN

PLATE

COVER

PANELBOARD

- 1.20 M ABOVE FINISH FLOOR

- 0.30 M ABOVE FINISH FLOOR.

- 1.50 M ABOVE FINISH FLOOR

TOTAL

- FIRE ALARM CONTROL PANEL

FA

8. MOUNTING HEIGHT OF WIRING DEVICES SHALL BE AS FOLLOWS :

FIRE

ALARM

VIBRATING

STATION

BELL

- FIRE ALARM BELL

- SERVICE METER

OUTLET

15220

OVERHEAD SERVICE ENTRANCE


CONNECTED TO 220V AC, 1, 2
WIRE, 60 Hz FITTED WITH
32mm TYPE "F" CONDULET

BUILDING WALL

TO SIMILAR OUTLET
@ SECOND FLOOR
& THIRD FLOOR

2ND FLOOR LINE

f. FIRE ALARM & VIBRATING BELL - 0.30 M BELOW CEILING LINE

PANEL LP
150AT, 225AF, 2P, 230V AC
1

TO LINE SIDE OF LP

2
20

20

20

20

20

20

20

20

20

20

20

20

METERING CONDUIT
3-3.5mm THW
IN 15mm RSC

KWHR METER

FA

10

13

15

20

20

20

20

12

14

16

GROUND TERMINAL

ELECTRICAL

GROUND FLOOR LINE

#8mm BARE COOPER WIRE

AND

SCHOO
L

De p ED

N
S IO

L FAC I L I T I E
I CA

EERING D
I VI
NGIN
SE

DEPARTMENT

OF EDUCATION

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


MERALCO AVENUE, PASIG CITY

CHECKED BY

VIBRATING BELL

16MMO x 240MM LENGTH


GROUNDING ROD COPPERWELD

RISER DIAGRAM
NOT

FIRE ALARM

SCALE

RECOMMENDING APPROVAL

TO NEAREST C.O.

1-8.0mm BARE COPPER WIRE


IN 15mmO C

SINGLE LINE DIAGRAM


TO

2-3.5mm THW
IN 15mm RSC

FIN. GRADE LINE

16mmx2400mm
COPPERWELD
GROUND ROD

NOT

2-3.5mm THW
IN 15mm RSC

1500 mm

11

ENCLOSED ACB
RATING: 20AT, 50AF,
230V, 2P

1800 mm

2-32mmTHW
IN 32mm RSC

DESIGNER:

PROTECTION: 150 AT, 225 AF, 2P, 230 V

230 V

- 1.20 M ABOVE FINISH FLOOR

REPUBLIC OF THE PHILIPPINES

2-30mm THW IN 32mm C

FEEDER:

IL @ 80% D.F. = 15220 x 80% x 1.25 = 63.8 A

OUTLET

- SERVICE ENTRANCE

d. FIRE ALARM STATION OUTLET - 1.50 M. ABOVE FINISH FLOOR


e. PUSH BUTTON OUTLET

FLOOR

- ENCLOSED AIR CIRCUIT BREAKER

CODE REQUIREMENT.

c. PANELBOARD

UNDER

- PUSH BUTTON

7. GROUNDING SYSTEM SHALL BE PROVIDED TO ALL LIGHTING AND POWER CIRCUIT AS PER PHILIPPINE ELECTRICAL

b. CONVENIENCE OUTLET

CONCEALED

10

6. ALL MATERIALS TO BE USED SHALL BE BRAND NEW AND APPROVED TYPE FOR THE PARTICULAR LOCATION AND

CONDUIT

PANELBOARD

10

230

S ab

CONVENIENCE OUTLET - 9x180w

WIRE & CONDUIT SIZE

1860

S/Sa

SWITCH

FOR 600 VOLTS. SMALLEST RACEWAY SHALL BE 15mm TRADE/NOMINAL SIZE. I

CIRCUIT BREAKER
AF

DEVICE

PLAN. THE MINIMUM SIZE OF WIRE FOR POWER AND LIGHTING CIRCUIT HOMERUN SHALL BE 3.5mm AND INSULATED

VA
LOAD

AT

GANG

4. ALL WIRES SHALL BE COPPER AND THERMOPLASTIC INSULATED TYPE "THW" UNLESS OTHERWISE INDICATED IN THE

DESCRIPTION

100AT, 100AF, 2P, 230V

POLE

ONE

CONTROL

MAIN :

VOLT

b. LIGHTING, POWER RECEPTACLE - POLYVINYL CHLORIDE CONDUIT SCH. 40

a. LIGHT SWITCH

LP

RECOMMENDING APPROVAL

TO

SCALE

APPROVED BY :

PROJECT TITLE :

MAXIMO M. CALBANG

VENERANDO D. SAHAGUN

LUIS G. PURISIMA

OLIVER R. HERNANDEZ

RAMON C. BACANI

PDO III, PFSED-DepED

ENGINEER III, PFSED-DepED

HEAD, PLANNING AND DESIGN UNIT

CHIEF, PFSED-OPS

UNDERSECRETARY

PFSED-DepED

DepED

DepED

LOCATION :

PROJECT NO:

OWNER :

DESIGNED BY:

VDS

ENCODED BY:

MMC

CHECKED BY:

LGP

SHEET NO:

DEPARTMENT OF EDUCATION

DepED
SHEET CONTENTS :

GENERAL NOTES

LOAD SCHEDULE
LEGEND

SINGLE LINE DIAGRAM RISER DIAGRAM

DATE :

NOTE:

THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF PHYSICAL FACILITIES AND SCHOOLS ENGINEERING
DIVISION AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545

PHY
S

S
DN

DN

S ab
S ghi

S cd

Sf

LP
7

LP
6

Sf

S ef

Sf

UP

UP

S jk
g

h
2

i
2

LP
8

LP
9

SCALE :

1 : 100

S ef

UD

S lm
l

S ef

ef

SINK COUNTER

S ab
UP

S cd

Sf

S ef

Sf

STO.

LP
5

Sf

S jk
h

i
2

no

S ghi
g

SD

URINAL

ef

SINK COUNTER

METERS

UP
k
2

LP
4

RAMP
UP

RAMP
UP

SCALE :

REPUBLIC OF THE PHILIPPINES

AND

SCHOO
L

De p ED

N
S IO

L FAC I L I T I E
I CA

EERING D
I VI
NGIN
SE

DEPARTMENT

OF EDUCATION

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


MERALCO AVENUE, PASIG CITY

DESIGNER:

1 : 100

CHECKED BY

METERS

RECOMMENDING APPROVAL

RECOMMENDING APPROVAL

APPROVED BY :

PROJECT TITLE :

MAXIMO M. CALBANG

VENERANDO D. SAHAGUN

LUIS G. PURISIMA

OLIVER R. HERNANDEZ

RAMON C. BACANI

PDO III, PFSED-DepED

ENGINEER III, PFSED-DepED

HEAD, PLANNING AND DESIGN UNIT

CHIEF, PFSED-OPS

UNDERSECRETARY

PFSED-DepED

DepED

DepED

LOCATION :

PROJECT NO:

OWNER :

DESIGNED BY:

VDS

ENCODED BY:

MMC

CHECKED BY:

LGP

SHEET NO:

DEPARTMENT OF EDUCATION

DepED
SHEET CONTENTS :

LIGHTING LAYOUT

DATE :

NOTE:

THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF PHYSICAL FACILITIES AND SCHOOLS ENGINEERING
DIVISION AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545

PHY
S

DN

DN

UP

UP

LP LP
2
3

SCALE :

1 : 100

METERS

URINAL

UD

SINK COUNTER

SINK COUNTER

SD

STO.

UP

TO C.O.

UP

TO F.A.

LP
1

ENCLOSED AIR CIRCUIT BREAKER


RATING
230V 2P 100AT 100AF TO
RAMP
LINE SIDE OF PANEL
UP

RAMP
UP

OVERHEAD SERVICE ENTRANCE


REFER TO RISER DIAGRAM

SCALE :

REPUBLIC OF THE PHILIPPINES

AND

SCHOO
L

De p ED

N
S IO

L FAC I L I T I E
I CA

EERING D
I VI
NGIN
SE

DEPARTMENT

OF EDUCATION

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


MERALCO AVENUE, PASIG CITY

1 : 100

DESIGNER:

CHECKED BY

METERS

RECOMMENDING APPROVAL

RECOMMENDING APPROVAL

APPROVED BY :

PROJECT TITLE :

MAXIMO M. CALBANG

VENERANDO D. SAHAGUN

LUIS G. PURISIMA

OLIVER R. HERNANDEZ

RAMON C. BACANI

PDO III, PFSED-DepED

ENGINEER III, PFSED-DepED

HEAD, PLANNING AND DESIGN UNIT

CHIEF, PFSED-OPS

UNDERSECRETARY

PFSED-DepED

DepED

DepED

LOCATION :

PROJECT NO:

OWNER :

DESIGNED BY:

VDS

ENCODED BY:

MMC

CHECKED BY:

LGP

SHEET NO:

DEPARTMENT OF EDUCATION

DepED
SHEET CONTENTS :

POWER LAYOUT

DATE :

NOTE:

THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF PHYSICAL FACILITIES AND SCHOOLS ENGINEERING
DIVISION AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545

PHY
S

WC

WC

FD

WC

100mm PVCSP
75mm PVCWP

75mm PVC MAIN VENT PIPE

UR

FD
CO

WC

CO

75mm PVCWP

SHE

FD
75mm PVCWP

CSF CSF
CO

FD
75mm PVCWP

CO
CSF CSF CSF

CO
CSF

100mm PVC MAIN


SOIL STACK

FD

100mm PVCSP

CO

CO

75mm PVCWP

FD WC

75mm PVC MAIN


VENT STACK

75mm PVCWP

FD

100mm PVC MAIN


WASTE STACK

CO

2150

NGL

25mm

25mm

25mm

25mm

25mm

25mm

25mm

25mm

25mm

25mm

DEP

DEP

DEP

DEP

DEP

DEP

DEP

DEP

DEP

DEP

2
P-1

100mm
CO

100mm PVCWP

150 mm CDP sloped @ 2%

150 mm CDP sloped @ 2%

CB

CB

150 mm CDP sloped @ 2%

CB

100mm PVCSP

100mm PVCSP

SS

WC

FD

WC

FD

LAV

100mm PVCSP

100mm PVCSP
CO

CO

150 mm CDP sloped @ 2%

CB

CO

CO

CO

100mm
CO

CB

100mm PVCWP

CO

CO

OC
WC FD

FD WC

UR

LAV
FD

NCR

HE

FD
CO

FD
WC

75mm PVCWP CO
CSF

CSF

CO

CSF

CO

CSF
CO

SD

100mm PVC MAIN SOIL STACK PIPE


75mm PVC MAIN VENT STACK
100mm PVC MAIN WASTE STACK
PIPE

150

150 mm CDP sloped @ 2%


CB

METERS

100mm PVCWP

150 mm CDP sloped @ 2%

100mm PVCWP

1 : 100

100mm
CO
SEPTIC TANK

8850

CB

SCALE :

100mm PVCSP

TO SEWER
LINE

DN

150 mm CDP sloped @ 2%

DN

OUTLET

25mm

25mm

25mm

25mm

25mm

25mm

25mm

25mm

DEP

DEP

DEP

DEP

DEP

DEP

DEP

DEP

RAMP
UP

150 mm CDP sloped @ 2%

150 mm CDP sloped @ 2%

CB

UP

150 mm CDP sloped @ 2%

CB

1
P-1

150 mm CDP sloped @ 2%

CB

CB

CB

SCALE :

1 : 100

FAC

150 mm CDP sloped @ 2%

CB

METERS

TO MAIN DRAIN
SYSTEM

TO MAIN DRAIN
SYSTEM

REPUBLIC OF THE PHILIPPINES

AND

SCHOO
L

De p ED

N
S IO

L FAC I L I T I E
I CA

EERING D
I VI
NGIN
SE

DEPARTMENT

OF EDUCATION

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


MERALCO AVENUE, PASIG CITY

DESIGNER:

CHECKED BY

RECOMMENDING APPROVAL

RECOMMENDING APPROVAL

2500

RAMP
UP

150 mm CDP sloped @ 2%

CB

200 mm CDP sloped @ 2%

CB

UP

UP

150

25mm
DEP

150 mm CDP sloped @ 2%

25mm
DEP

200 mm CDP sloped @ 2%

150 mm CDP sloped @ 2%

UP

2800

CB

CB

APPROVED BY :

PROJECT TITLE :

MAXIMO M. CALBANG

ELIAS M. EMEL B. CUBA II

LUIS G. PURISIMA

OLIVER R. HERNANDEZ

RAMON C. BACANI

PDO III, PFSED-DepED

ENGINEER III, PFSED-DepED

HEAD, PLANNING AND DESIGN UNIT

CHIEF, PFSED-OPS

UNDERSECRETARY

PFSED-DepED

DepED

DepED

PROJECT NO:

OWNER :

DESIGNED BY:

EMEBC

ENCODED BY:

MMC

CHECKED BY:

LGP

SHEET NO:

DEPARTMENT OF EDUCATION

DepED
SHEET CONTENTS :

DRAINAGE AND SANITARY SYSTEM LAYOUT


LOCATION :

DATE :

NOTE:

THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF PHYSICAL FACILITIES AND SCHOOLS ENGINEERING
DIVISION AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545

PHY
S

15

ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545

D
P

sl

ed

THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF PHYSICAL FACILITIES AND SCHOOLS ENGINEERING
DIVISION AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,

2
D 5
E m
P m

2
D 5
E m
P m

ed

P
V

2%

sl

D
P

2%

D 5
E m
P m

S
P

DRANAIGE & SANITARY SYSTEM

2%

R
A
U MP
P

PHY
S
N
S IO

ISOMETRIC LAYOUT
ISOMETRIC VIEW

SHEET CONTENTS :

2
D 5
E m
P m

2
D 5
E m
P m

P-2

5
CO
ed

DepED

DEPARTMENT OF EDUCATION

sl

SHEET NO:

FD

m
m

D
P

S
P C

15

FD

FD
W

S
S

C
B

p
ed

sl
@
2%

m
m

m
m

15
0

m
C
P

D
o

sl
ed

p
@

C
S

2%

0
m

P
5

V
C
B

C
FD O

C
B

FD

2
D 5
E m
P m

D 5
E m
P m

V
C

P[

PI

H
AC
SO
E

m
5

2%

FD

15

D 5
E m
P m

2
D 5
E m
P m

FD

ed

sl
@

2
D 5
E m
P m

2%

D 5
E m
P m

15

P[

PI

C
B

D 5
E m
P m

2
D 5
E m
P m

S
LI EW
N E
E R

TO

PVCVTR

C
B

75mm PVCDS

C
B

2
D 5
E m
P m

P
C

SS
H

D 5
E m
P m

FD C

UW

CO

75mm PVCDS

FD

FL

5
75mm PVCMVS
0

100mm PVCVSTR VSTR


PVCMVS

C
O
FD

m
5
775
m

ER

IS

ER 75mm

ed

sl

IS

P
W
C

FD

V
PVCSS

2
D 5
E m
P m

V
P
5

15

W
0

FD C m
S
P
LA
V
NP V
C CB
T
S V
E
R
C
SS
C
O
H

FD

PE

P
100mm PVCWS
V
C

100mm

FL

75mm PVCDS

UW

CO

m
5
775
m

ER

IS

S AIN
Y
S D
TE R
M AI

TO

FD

W
C
100mm
PVCWS
P
O
F
R 100mm PVCSS
D
IS
C

ER

0
m

75mm PVCDS

C
S
P

P
V

W
C
V
m

R
A
U MP
P

C
O

C
S

D 5
E m
P m

FD
W

75mm PVCDS

W
0

C
B

W
C
100mm
PVCSS
P
O
100mm PVCWS
F

P
V

R
2
IS
D 5
ER
E m
P m

LA

2%

ed

sl

PI

15

D 5
E m
P m

D 5
E m
P m

ed

sl

2%

2%

D 5
E m
P m

ed

D 5
E m
P m

ed

sl

sl

2%

15

0m

10

75mm PVCDS

C
B

D 5
E m
P m

D 5
E m
P m

C CB
B

C m
O

0m

10

0m
C m
O

10

K
A

N
R

TA

15

2
D 5
E m
P m

D 5
E m
P m

15

0m U M
C m P P
O

10

TI

ed

2%

15

D 5
E m
P m

2%

D 5
E m
P m

sl

ed

sl

75mm PVCDS

15

M
S AIN
Y
S D
TE R
M AI

TO

P
V
C

C
D

p
ed

sl
o

D 5
E m
P m

2%

2%

C
B

2
D 5
E m
P m

p
ed

sl
o

D 5
E m
P m

@50 mm
2% C

75mm PVCDS

p
ed

sl

R
A
U MP
P

2
D 5
E m
P m

D 5
E m
P m

2
D 5
E m
P m

FD
W

CCD
B

FD O

C
B

FD

FL
R

FD

C
O

H
E

P C

C
S

15
0

P
V

W
C

75mm PVCDS

2
D 5
E m
P m

2
D 5
E m
P m

FD

P
V

FD

C
O

15
0

W
C

C
S
C
S

D 5
E m
P m

FD

C
O

W
C

FD

U
R

ed

C
O

C
S

V
P

I
S

FD

B
V

75mm PVCDS

C
O

B
V

U
R
C
O

W
C

2
D 5
E m
P m

PI
P[
E

C
H

AC
SO
E

P
V

B
V

FD
O

2
D 5
E m
P m

15
0

B
V

PI
P[
E

C
H

A
S
E

VSTR

75mm PVCDS

W
C

2
D 5
E m
P m

P
V
C
S

SS

C
B

C
S

FD

R 100mm PVCVSTR
IS
ER 75mm PVCMVS

P
W
C

V
P

2%

2
D 5
E m
P m

o
p
ed

PVCVTR

2
D 5
E m
P m

sl

C
B

P
V

75mm PVCDS

W
C

FD

C
W
P

m
P
V

P
V

W
C

5
m
m

C
B

C
S

0
m

1
0
0
m

2
D 5
E m
P m

FL
R

5
75mm PVCMVS
0

R
D

FD C m
S
CO
UW
NP
T
C

P
K
V

W
C
100mm
PVCWS
P
O
FD
R 100mm PVCSS
IS
C

2% ER
P
W
C
5
m
m

C
S

W
C
S

@
C

W
C

Bo7p5m

s
Cl

C
O

5
775

V
P

R
IS
ER

H
A
S
E

P
W
C

75mm PVCDS

2
D 5
E m
P m

CCO
D

C
O
FD

W
C
100mm
PVCSS
P
O
100mm PVCWS
F

C VC
W BV
P

R
IS
ER

C
S

C
W
P

m
P
V

LA mm
V
P

U
R

V
100mm PVCSS

2%

ed

C
S

sl
o

PI
PE

P
100mm PVCWS
V
C

N
D

FD C m
S
P
CC L
OW A
V
U
C
NP V
C
T
B
S
E
V
R
C
SS
C
O
H

D
H
C

R
IS
ER

H
A
S
E

P
K
V

V
P

I
S

W
C

5
775

P
V

75mm PVCDS

D 5
E m
P m

D 5
E m
P m

C CB
B

FD
W

PI
PE

U
P

C
B

2
D 5
E m
P m

2
D 5
E m
P m

S
LI EW
N E
E R

TO

CO

15

15

75mm PVCDS

S AIN
Y
S D
TE R
M AI
N

C
V

75mm PVCDS

TO

B
C
V

15

ER
S

C
B

C
B

C
O

C
O

IS

PE

PI

2%

ed
p

o
sl

NOTE:

DATE :

LGP

CHECKED BY:

MMC

ENCODED BY:

EMEBC

DESIGNED BY:

m
0

OWNER :

CO

CO

PROJECT NO:

D
C

NOT TO SCALE

D LAYOUT
1 ISOMETRIC PLUMBING
P-2

DS

3
P-2
S

ER
S

IS

20

CO
2%

CO
@

ed
p

o
sl

LOCATION :

DepED

DepED

PFSED-DepED

0
15

CHIEF, PFSED-OPS

V
B

HEAD, PLANNING AND DESIGN UNIT


UNDERSECRETARY

2%

RAMON C. BACANI

OLIVER R. HERNANDEZ

ed

p
o

EMMANUEL P. CUNTAPAY

V
B

sl

SGD.

V
B

D
C

PROJECT TITLE :

APPROVED BY :

20

2%

CHIEF, ARCHITECTURAL
DIVISION
LUIS
G. PURISIMA
BUREAU OF DESIGN, DPWH
RECOMMENDING APPROVAL

ed

p
o

sl

ELIAS M. EMEL B. CUBA II


RECOMMENDING APPROVAL

2%

FD

CO

P
D

ENGINEER III, PFSED-DepED

DS
CO

ed

sl

CO

DS
FD

CO

20

FD
FD

2%

15

CHECKED BY

CO
DS

2%

PDO III, PFSED-DepED

CO
CO

ed

sl

MAXIMO M. CALBANG
DS

ed

DESIGNER:

DS
m

FD

CO
m

DS

DS
0

15

o
sl

S
W

C
C

0
15

MERALCO AVENUE, PASIG CITY

CO
5

2%

OF EDUCATION
DS

FD
m

ISOMETRIC PLUMBING LAYOUT


- FEMALE TOILET

DS
m

ed

REPUBLIC OF THE PHILIPPINES


CO

DS

DS

CO
FD

FD

De p ED

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


DEPARTMENT

sl

SCHOO
L

AND

EERING D
I VI
NGIN
SE

2
P-2
m
0
0
1

15

L FAC I L I T I E
I CA

DS

DS

FD

CO

ISOMETRIC PLUMBING LAYOUT


- MALE TOILET

DS

FD

FD

P-3

SCALE :

1 :

4
SCHEDULE
SCHEDULE OF
OF FINISHES
FINISHES

19mm GICWL
LAV

WC

WC

WC

LAV

WC

UR

NCR

RISER

RISER

HE

UP

GV

GV
CV

CV

UP

GV
SINK COUNTER

GROUND

19mm GICWL

SD

FLOOR

11

FEMALE

22

TOILET

GROUND

FLOOR

MALE

TOILET

WC

WC

P-3
P-3

UR

WC

19mm GICWL
WC

STO

WC

RISER

SHE
F

RISER

F
F
19mm GICWL

19mm GICWL
19mm GICWL

WC
WC

19mm
19mm GICWL
GICWL RISER
RISER

22

19mm
19mm GATE
GATE VALVE
VALVE

33

19mm
19mm GICWL
GICWL

44

25mm
25mm GICWL
GICWL

55

STAINLESS
STAINLESS WATER
WATER TANK
TANK (125
(125 GAL
GAL CAPACITY)
CAPACITY)

66

64
64 GAL
GAL CAP.
CAP. STAINLESS
STAINLESS PRESSURE
PRESSURE TANK
TANK

77

1.5
1.5 HP
HP BOOSTER
BOOSTER PUMP
PUMP

88

IMAGINARY
IMAGINARY LINE
LINE OF
OF PUMP
PUMP HOUSING
HOUSING

CS
19mm GICWL

SCALE
SCALE ::

11 :: 20
20

SEC.

&

3RD

FEMALE

TOILET

SEC.

&

3RD

MALE

TOILET

METERS
METERS

33

19mm
19mm GICWL
GICWL
WC
WC

11

SINK COUNTER

3
3

33

22

UR
UR 19mm
19mm GICWL
GICWL
WC
WC

WC
WC

WC
WC

STO
STO

RISER
RISER

RISER
RISER

SHE
SHE
SINK COUNTER
SINK COUNTER

FF

CS
CS

FF
FF
19mm
19mm GICWL
GICWL

DN

25mm

25mm

UP

DEP

25mm
25mm
DEP
DEP

DEP

DN
DN

UP

25mm

25mm
25mm
DEP
DEP

25mm
25mm
DEP
DEP

1 : 100
22

33

25mm

DEP

DEP

25mm

25mm
25mm
DEP
DEP

DEP

25mm

25mm
25mm
DEP
DEP

DEP

25mm
25mm
DEP
DEP

25mm
25mm
DEP
DEP

25mm
25mm
DEP
DEP

25mm
25mm
DEP
DEP

P-3
P-3

SCALE
SCALE ::

11 :: 100
100

25mm GICWL
25mm GICWL

19mm GICWL
19mm GICWL

19mm
19mm GICWL
GICWL
SS
SS

WC
WC

WC
WC

LAV
LAV

P-3

25mm

25mm
DEP

25mm
25mm
DEP
DEP

25mm
25mm
DEP
DEP

DN
DN

44

SCALE :

33

11

22

77

25mm
25mm GICWL
GICWL
19mm
19mm GICWL
GICWL

LAV
LAV

WC
WC

UR
UR

NCR
NCR

RISER
RISER

HE
HE

6
CS
CS

25mm GICWL

25mm
25mm
DEP
DEP

25mm
25mm
DEP
DEP

25mm
25mm
DEP
DEP

WATER SYSTEM LAYOUT

25mm
25mm
DEP
DEP

25mm
25mm
DEP
DEP

CC

OO

SS

WC

RISER

RR

UP
UP

1
1
P-3
P-3
REPUBLIC OF THE PHILIPPINES

AND

De p ED

N
S IO

L FAC I L I T I E
I CA

EERING D
I VI
NGIN
SE

SCHOO
L

DEPARTMENT

OF EDUCATION

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


MERALCO AVENUE, PASIG CITY

DESIGNER:

CHECKED BY

RECOMMENDING APPROVAL

19mm GICWL

WC
LAV

WC

UR

NCR

25mm
25mm
DEP
DEP

RR

LAV
WC

25mm
25mm
DEP
DEP

II

F
RAMP
RAMP
UP
UP

WC

DD

OO

25mm
25mm
DEP
DEP

RISER

HE

19mm GICWL

25mm
25mm
DEP
DEP

19mm GICWL

UP
UP

25mm GICWL

19mm GICWL
GV

55

UP

GV

GV
GV
CV
CV
UP
UP

8 GVGV

UP
UP

UP

CS
SINK COUNTER

SD

1 : 100

METERS

GV

RAMP
RAMP
UP
UP

RECOMMENDING APPROVAL

UP
UP GV
GV

CV
CV

CV

CV
GV

19mm GICWL

11 :: 100
100

88

19mm
19mm GICWL
GICWL

25mm
25mm
DEP
DEP

RR

UP
UP

SCALE
SCALE ::

66

SINK COUNTER
SINK COUNTER

25mm GICWL

SD
SD

FROM WATER SOURCE

FF

25mm GICWL

FF

UP

WC
WC

DEP

DEP

WC
WC

RISER
RISER

DEP

44

25mm

25mm

UP

METERS
METERS

44

METERS

25mm

DEP

2
2

25mm
25mm GICWL
GICWL

DEP
DN

25mm

DEP

19mm
19mm GICWL
GICWL

25mm

25mm

DEP

11

25mm

DEP

RAMP
RAMP
UP UP

GV
GV

11

FROM WATER SOURCE


FROM WATER SOURCE

19mm GICWL

CS

m
m

PHY
S

25mm GICWL
25mm GICWL

WC

19mm GICWL
19mm GICWL

19mm GICWL

25mm GICWL

19mm GICWL
SS

25mm GICWL

25mm GICWL

GV

19mm GICWL
19mm GICWL

4
METERS

19mm GICWL

1 : 20

19mm GICWL

FROM WATER SOURCE

25mm GICWL

19mm GICWL

METERS
METERS

APPROVED BY :

PROJECT TITLE :

MAXIMO M. CALBANG

ELIAS M. EMEL B. CUBA II

LUIS G. PURISIMA, Jr.

OLIVER R. HERNANDEZ

RAMON C. BACANI

PDO III, PFSED-DepED

ENGINEER III, PFSED-DepED

HEAD, PLANNING AND DESIGN UNIT

CHIEF, PFSED-OPS

UNDERSECRETARY

PFSED-DepED

DepED

DepED

PROJECT NO:

LOCATION :

OWNER :

DESIGNED BY:

EMEBC

ENCODED BY:

MMC

CHECKED BY:

LGP

SHEET NO:

DEPARTMENT OF EDUCATION

DepED
SHEET CONTENTS :

WATER
WATER SYSTEM
SYSTEM LAYOUT
LAYOUT

DATE :

NOTE:

THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF PHYSICAL FACILITIES AND SCHOOLS ENGINEERING
DIVISION AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545

25mm

25mm

25mm

25mm

UP

25mm
25mm

DEP

UP

25mm

25mm

DEP

DEP

2
E

m
m
9
1

P
U

L
W
C
I
G

2
5
m

2
D

m
m
5
2

C
O

L
W
C
I
G

U
m

2
E

19mm GICWL

N
T
E

G
I
C
W
L

m
m
9
1
L
W
C R
I
G U

C
W

R
2

L
W
C
I
G

19mm GICWL

L
W
C
I
G

1
9
m
m

L
W
C
I
G

m
m
9
1

SE

F
F

RI

2
D

L
W
C
I
G

SE

m
m
9
1

RI

F
T
E

L
W
C
I

V
m
m

C
W

I
5

9
1
L

R
C
N

L
W
C
I
G
C
W

m
m
9
1

I
G

2
5

m
m
9
1

R
Em
Sm
I
R5 P

1
9
m
m

G
I
C
W
L

G
I
C

H
E
W
C
L
W
I

m
5

2
P

DIAG.

C
R

P
M
A
R UP

A
W

WATERLINE

V
V

ISOMETRIC

TOILET

SCALE

TO

NOT

G
C

FEMALE

2
P-4

P
M
A
R UP

C
U

RI

SE

L
W
C
I
G

m
m
9

DIAG.

19mm GICWL

2
E

C
m

C
I
G

19mm GICWL

m
G
I
C
W

W
C
G
9

C
W
L
W

5
2

R
E

T
N

C
W

U
O

P
U
V

R
U

W
C

S
E

9
1

K
N

I
S

m
m
5
2 P
E
D

M
O

G
I

1
9

L
W
L

G
I

SCALE

TO

NOT

9
1
L

DIAGRAM

P-4

WATERLINE

ISOMETRIC

1
I

I
C
W

L
W

R
C
N

I
G
C

S
S

C
W

m
m
5

R
Em
Sm
I
R5
2 P
E
D

C
W

A
L

F
F

H
S

U
C
I
G

9
1
L

m
m

L
W
C

2
E

1
C

WATERLINE

H
W

ISOMETRIC

TOILET

SCALE

2
5

TO

SE

NOT

P-4

RI

MALE

2
D

P
U

C
E
U
R
S
O
M

W
A

T
E

P
M
A
R UP

N
A

V
A

R
O

D
S

CHECKED BY

RECOMMENDING APPROVAL

RECOMMENDING APPROVAL

APPROVED BY :

PROJECT TITLE :

MERALCO AVENUE, PASIG CITY

ELIAS M. EMEL B. CUBA II

LUIS G. PURISIMA, Jr.

OLIVER R. HERNANDEZ

RAMON C. BACANI

PDO III, PFSED-DepED

ENGINEER III, PFSED-DepED

HEAD, PLANNING AND DESIGN UNIT

CHIEF, PFSED-OPS

UNDERSECRETARY

PFSED-DepED

DepED

DepED

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION

MAXIMO M. CALBANG

OF EDUCATION

N
S IO

L FAC I L I T I E
I CA

DEPARTMENT

De p ED

SCHOO
L

AND

EERING D
I VI
NGIN
SE

DESIGNER:

REPUBLIC OF THE PHILIPPINES

PROJECT NO:

OWNER :

DESIGNED BY:

EMEBC

ENCODED BY:

MMC

CHECKED BY:

LGP

SHEET NO:

DEPARTMENT OF EDUCATION

DepED
SHEET CONTENTS :

WATER SYSTEM ISOMETRIC DIAGRAM


LOCATION :

DATE :

PHY
S

P
M
A
R UP

NOTE:

ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF PHYSICAL FACILITIES AND SCHOOLS ENGINEERING
DIVISION AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
REP. ACT 545

100mm THK. + FIN. SLAB W/

10mm REBARS AT 200mm O.C.

CB

BENT UP 2 OUT OF 3 AT L/4

100mm THK CHB W/


10mm VERT/HOR BAR

FROM FACE SUPPORT. BOTH WAYS

150X300mm RC BEAM W/2-16mm

600

@600mm

TOP AND BOT. REBARS & 10mm STIRRUPS

O.C.

CDP

100mm THK. + FIN. SLAB W/


10mm BENT UP 2 OUT OF 3 AT L/4 FROM

EW

1000

AIR SPACE

INLET

150

700

150

WATER LEVEL

PLASTERED W/WATERPROOFING COMPOUND OR

PLASTERED W/ WATERPROOFING

BW

DIGESTIVE CHAMBER

10mm REINF. VERT & HOR.


@200mm

O.C

HOSE BIBB

FD

FLOOR DRAIN

UP

UNION PATENTE

GICWL

GALVANIZED IRON COLD WATER LINE (SCH. 40)

GICWR

GALVANIZED IRON COLD WATER RISER (SCH. 40)


GATE VALVE

PVCDS POLYVINYL CHLORIDE DOWNSPOUT


150

150

150

MANHOLE

PVCDP POLYVINYL CHLORIDE DRAIN PIPE

BWAYS

1% SLOPE

1000

HB

PVCDS POLYVINYL CHLORIDE DOWNSPOUT

GRAVEL BED

150

CHECK VALVE

MH

1900

1600

2150

10mm VERT. & HOR. BAR


OC

CV

FACE BITUMEN TAR

WALLS REINFORCEMENT
@200mm

CLEAN OUT

GV

APPLY ONE FACE BITUMEN TAR

COMPOUND OR APPLY ONE

LEACHING
CHAMBER

CO

MH

300

50

LEVEL

INLET

100

100
300

NGL
WATER

AIR SPACE

VAR.

MH
AIR SPACE

NGL

CONCRETE DRAIN PIPE

FACE SUPPORT BW

1@50,3@100, REST @300mm O.C.

MH

CATCH BASIN

5000

PVCSP POLYVINYL CHLORIDE SOIL PIPE


150

150

2500

150
PVCVAC POLYVINYL CHLORIDE VENT. ACROSS CEILING

2800

6450

PVCVP POLYVINYL CHLORIDE VENT. PIPE

150mm THK. SLAB W/


10mm

REBARS

300mm

BOTH

150mm THK. + FIM. SLAB W/

10mm

P-2

@300mm

O.C.

BW

PVCVS POLYVINYL CHLORIDE VENT STACK

1 : 40

SCALE :

REBARS

WAYS

P-3

1 : 40

SCALE :

PVCVTR/W POLYVINYL CHLORIDE VENT TROUGH ROOF/WALL


PVCWP POLYVINYL CHLORIDE WASTE PIPE

METERS

PVCWS POLYVINYL CHLORIDE WASTE STACK

METERS
700

PVCSPR POLYVINYL CHLORIDE SOIL PIPE RISER

400

150

150

RD

ROOF DRAIN

UD

URINAL DRAIN

150

WC

BARS

S-1a 100mm THK. + FIN. SLAB W/

10mm

SIDE

REBARS

300mm

O.C.

400

EXTRA

TOP/BOT. ON TWO PARALLEL

700

2-10mm

DRAINAGE PIPE

CS

1.

150

150

2.
200

600

GRADES OF HORIZONTAL PIPINGS

RUN ALL HORIZONTAL PIPINGS IN PERPECT ALIGNMENT AND AT A FORM GRADE NOT LESS THAN TWO PERCENT (2%)

5000

150

COUNTER SINK

150

6450
1000

LAVATORY

OUTLET

INLET

BENT UP 2 OUT OF 3 AT L/4


FROM FACE OF SUPPORT B.W.

LAV

WATER CLOSET

200

2000

150

700

150

2000

CHANGE IN DIRECTION

ALL CHANGE IN DIRECTION SHALL BE MADE BY APPROPRIATE USE OF FORTY-FIVE DEGREES (45) WYES, LONG SWEEP

QUARTER BEND, SIXTH-EIIGHT OR SIXTEENTH BEND. WHEN THE CHANGE OF FLOW IS FROM HORIZONTAL TO VERTICAL A

SINGLE 1/8 BEND COMBINATION MAYBE USED ON VERTICAL STACKS AND SHORT QUARTER BENDS MAYBE USED ON WASTE

150

LINE, TEE AND CROSSES MAYBE USED IN BENT PIPES.


3.
900

700
400

150

VERT. @600mm O.C.

150

INLET

1.
4.

a)
b)
c)
d)

75mm

S-1a

P-3
BAR

HANDLE

3-10mm (E.W.)

2% SLOPE
CDP

INLET
2% SLOPE

50

100

OUTLET

100

150

600
250

250

S2 100mm THK. + FIN. SLAB W/


REBARS

300mm

O.C.

BARS

@300mm

E.W.

100

FACE SUPPORT AND SHORT SPAN AND


TEMP

5.

THE DIGESTION CHAMBER OF SEPTIC VAULT MUST BE WATERPROOFED.

6.

NOT LESS THAN 0.30 METER OF AIR SPACE MUST BE LEFT BETWEEN THE TOP OF THE SEWAGE AND THE UNDER PART OF
VAULT ROOF SLAB.

7.
8.

NO SEPTIC VAULT SHALL BE CONSTRUCTED UNDER THE BUILDING.


ALL PLUMBING WORKS SHALL BE UNDER THE SUPRVISION OF A LICENSED MASTER PLUMBER AND A LICENCED PLUMBING
CONTRACTOR.

INLET

BENT UP 2/3 OUT AT L/4

10mm

600 min.

900

50

10mm

10mm

EVERY CHANGE OF HORIZONTAL DIRECTION EXCEEDING TWENTY TWOAND ONE-HALF DEGREES (22 1/2).
ONE AND ONE-HALF METERS (1.50m.) INSIDE THE PROPERTY LINES BEFORE THE HOUSE DRAINAGE CONNECTION.
EVERY FIFTEEN METERS (15.00m) IN HORIZONTAL RUN OF PIPES.
AT THE END OF ANY HORIZONTAL PIPE LINES.

CDP

(VARIABLE)

MH

100

S-1a

100

600

PVCDS
MH

PIPE CLEAN-OUTS

CLEAN-OUTS ARE REQUIRED UNDER THE F0LLOWING CONDITIONS:


75

50

2500

2800

NO DOUBLE HUB OR TEE BRANCH SHALL BE USED ON HORIZONTAL SOIL AND WASTE LINES, THE DRILLINGS AND TAPPING
OF HOUSE DRAIN, WASTE OR VENT PIPES AND USED OF SADDLE HUB AND BEND ARE PROHIBITED.

150MM THK. CHB W/ 10mm

REBARS HOR. EVERY 2-LAYERS

50 (TYP.)

50

OUTLET

PROHIBITED FITTINGS

P-3

50

50

50

P-2

50

SCALE :

1 : 20

METERS

i. LIVE LOAD_________________ 1000Pa


ii ALLOWABLE STRESSES
1. CONCRETE

1
P-2

1 : 40

SCALE :

4
P-2

METERS

a. FOR FOOTING, BEAMS AND SLABS


fc'' = 20 MPa

SCALE :

1 : 10

2. CONCRETE MASONRY UNITS (LOAD BEARING CHB)


fm' =6.90 MPa, fm = 2.41 MPa

METERS

3. REINFORCING STEEL BARS


FOR BARS SMALLER THAN 16mm

fy = 230 MPa
4. ASSUMED ALLOWABLE BEARING CAPACITY Y = 100KPa

WATER TABLE IS 1500 BELOW GROUND LEVEL.

REPUBLIC OF THE PHILIPPINES

AND

SCHOO
L

De p ED

N
S IO

L FAC I L I T I E
I CA

EERING D
I VI
NGIN
SE

DEPARTMENT

OF EDUCATION

PHYSICAL FACILITIES AND SCHOOLS ENGINEERING DIVISION


MERALCO AVENUE, PASIG CITY

DESIGNER:

CHECKED BY

RECOMMENDING APPROVAL

RECOMMENDING APPROVAL

APPROVED BY :

PROJECT TITLE :

MAXIMO M. CALBANG

ELIAS M. EMEL B. CUBA II

LUIS G. PURISIMA

OLIVER R. HERNANDEZ

RAMON C. BACANI

PDO III, PFSED-DepED

ENGINEER III, PFSED-DepED

HEAD, PLANNING AND DESIGN UNIT

CHIEF, PFSED-OPS

UNDERSECRETARY

PFSED-DepED

DepED

DepED

PROJECT NO:

OWNER :

DESIGNED BY:

EMEBC

ENCODED BY:

MMC

CHECKED BY:

LGP

SHEET NO:

DEPARTMENT OF EDUCATION

DepED
SHEET CONTENTS :

SEPTIC TANK, CATCH BASIN & COVER DETAIL, LEGEND,


LOCATION :

NOTES & DESIGN CRITERIA

DATE :

NOTE:

THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF PHYSICAL FACILITIES AND SCHOOLS ENGINEERING
DIVISION AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545

PHY
S

You might also like