DRAWING NO
PART CONSIDERED
Cargo Tank 1
DESIGN INTENT
MATERIAL : LPG
DESIGN PRESS
DESIGN TEMP
OPERATING PRESS
DESTINATION : MANIFOLD 1
OPERATING TEMP
No
GUIDE
WORD
DEVIATION
NODE : 1
POSSIBLE CAUSES
CONSEQUENCES
SAFEGUARDS
1. No Supply LPG
NO
No Flow
Arar
DRAWING NO
PART CONSIDERED
Cargo Tank 1
DESIGN INTENT
MATERIAL : LPG
DESIGN PRESS
DESIGN TEMP
OPERATING PRESS
DESTINATION : MANIFOLD 1
OPERATING TEMP
No
GUIDE
WORD
DEVIATION
NODE : 1
POSSIBLE CAUSES
CONSEQUENCES
SAFEGUARDS
More
More Pressure
Pipe/equipment leak
because overpressure
and lead to:
PRD (Pressure
Release Device)
DRAWING NO
PART CONSIDERED
Cargo Tank 1
DESIGN INTENT
MATERIAL : LPG
DESIGN PRESS
DESIGN TEMP
OPERATING PRESS
DESTINATION : MANIFOLD 1
OPERATING TEMP
1256404
No
GUIDE
WORD
DEVIATION
More
More Pressure
NODE : 1
POSSIBLE CAUSES
CONSEQUENCES
SAFEGUARDS
More
More Temperature
3. Explosion (delayed
ignition and
confinement)
4. Gas Dispersion (no
ignition)
Temperature
Indicator
DRAWING NO
PART CONSIDERED
Cargo Tank 1
DESIGN INTENT
MATERIAL : LPG
DESIGN PRESS
DESIGN TEMP
OPERATING PRESS
DESTINATION : MANIFOLD 1
OPERATING TEMP
1256404
No
GUIDE
WORD
DEVIATION
Reverse
Reserve Flow
NODE : 1
POSSIBLE CAUSES
Butterfly valve with double
action hydraulic 32HV6000
or 32HV7022 blocked
CONSEQUENCES
Potential Reserve flow
leading to equipment
damage
SAFEGUARDS
None Shown
NO
No Pressure
No Supply LPG
Pressure Indicator
Less
Less Flow
ignition and no
confinement)
3. Explosion (delayed
ignition and
confinement)
Flow Meter
3. Explosion (delayed
ignition and
confinement)
4. Gas Dispersion (no
ignition)
STUDY TITLE
DRAWING NO
PART CONSIDERED
Cargo Tank 1
DESIGN INTENT
MATERIAL : LPG
DESIGN PRESS
DESIGN TEMP
OPERATING PRESS
DESTINATION : MANIFOLD 1
OPERATING TEMP
No
GUIDE
WORD
DEVIATION
NODE : 1
POSSIBLE CAUSES
CONSEQUENCES
SAFEGUARDS
Safety Valve
Other Than
Other Than
Destination
Pressure Indicator
2. Flashfire (delayed
line rupture, and LPG leakage
ignition and no
before reach the cargo heater
confinement)
3. Explosion (delayed
ignition and
confinement)
Integrity of Piping
Other Than
Other Than
Maintenance
Other Than
Other Than
Operation
10
11
Other Than
Other Than
External Factor
Other Than
Other Than
Instrumentation
STUDY TITLE
DRAWING NO
PART CONSIDERED
Cargo Tank 1
DESIGN INTENT
MATERIAL : LPG
DESIGN PRESS
DESIGN TEMP
OPERATING PRESS
DESTINATION : MANIFOLD 1
OPERATING TEMP
1256404
No
GUIDE
WORD
DEVIATION
12
Other Than
Other Than
Occupational
Safety
NODE : 1
POSSIBLE CAUSES
CONSEQUENCES
SAFEGUARDS
STUDY TITLE
DRAWING NO
PART CONSIDERED
Cargo Tank 2
DESIGN INTENT
MATERIAL : LPG
DESIGN PRESS
DESIGN TEMP
OPERATING PRESS
DESTINATION : MANIFOLD 1
OPERATING TEMP
No
GUIDE
WORD
DEVIATION
NODE : 1
POSSIBLE CAUSES
CONSEQUENCES
SAFEGUARDS
1. No Supply LPG
Flow Meter
NO
No Flow
STUDY TITLE
DRAWING NO
PART CONSIDERED
Cargo Tank 2
DESIGN INTENT
MATERIAL : LPG
DESIGN PRESS
DESIGN TEMP
OPERATING PRESS
DESTINATION : MANIFOLD 1
OPERATING TEMP
No
GUIDE
WORD
DEVIATION
NODE : 1
POSSIBLE CAUSES
CONSEQUENCES
SAFEGUARDS
More
More Pressure
Pipe/equipment leak
because overpressure
and lead to:
PRD (Pressure
Release Device)
More
More Pressure
Pressure Indicator
8. Butterfly valve 32V6005
blocked
9. Butterfly valve 22V6002
blocked
10. Butterfly valve 32V7026
blocked
11. Swing Check Valve
32C6005 Failure
STUDY TITLE
DRAWING NO
PART CONSIDERED
Cargo Tank 2
DESIGN INTENT
MATERIAL : LPG
DESIGN PRESS
DESIGN TEMP
OPERATING PRESS
DESTINATION : MANIFOLD 1
OPERATING TEMP
1256404
No
GUIDE
WORD
DEVIATION
More
More Pressure
NODE : 1
POSSIBLE CAUSES
CONSEQUENCES
SAFEGUARDS
More
More Temperature
3. Explosion (delayed
ignition and
confinement)
4. Gas Dispersion (no
ignition)
Temperature
Indicator
More
Temperature
Indicator
More Temperature
DRAWING NO
PART CONSIDERED
Cargo Tank 2
DESIGN INTENT
MATERIAL : LPG
DESIGN PRESS
DESIGN TEMP
OPERATING PRESS
DESTINATION : MANIFOLD 1
OPERATING TEMP
1256404
No
GUIDE
WORD
DEVIATION
Reverse
Reserve Flow
NODE : 1
POSSIBLE CAUSES
Butterfly valve with double
action hydraulic 32HV6000
or 32HV7022 blocked
CONSEQUENCES
Potential Reserve flow
leading to equipment
damage
SAFEGUARDS
None Shown
NO
No Pressure
No Supply LPG
Pressure Indicator
Less
Less Flow
Flow Meter
Less
Less Flow
1. Jetfire (immidiate
ignition)
Flow Meter
2. Flashfire (delayed
ignition and no
confinement)
3. Explosion (delayed
ignition and
confinement)
4. Gas Dispersion (no
ignition)
STUDY TITLE
DRAWING NO
PART CONSIDERED
Cargo Tank 2
DESIGN INTENT
MATERIAL : LPG
DESIGN PRESS
DESIGN TEMP
OPERATING PRESS
DESTINATION : MANIFOLD 1
OPERATING TEMP
No
GUIDE
WORD
DEVIATION
NODE : 1
POSSIBLE CAUSES
CONSEQUENCES
SAFEGUARDS
Safety Valve
Other Than
Other Than
Destination
Pressure Indicator
2. Flashfire (delayed
line rupture, and LPG leakage
ignition and no
before reach the cargo heater
confinement)
3. Explosion (delayed
ignition and
confinement)
Integrity of Piping
Integrity of Piping
4. Gas Dispersion (no
ignition)
8
Other Than
Other Than
Maintenance
Other Than
Other Than
Operation
10
Other Than
Other Than
External Factor
Other Than
Other Than
Instrumentation
11
STUDY TITLE
DRAWING NO
PART CONSIDERED
Cargo Tank 3
DESIGN INTENT
MATERIAL : LPG
DESIGN PRESS
DESIGN TEMP
OPERATING PRESS
DESTINATION : MANIFOLD 1
OPERATING TEMP
No
GUIDE
WORD
DEVIATION
NODE : 1
POSSIBLE CAUSES
CONSEQUENCES
SAFEGUARDS
1. No Supply LPG
Flow Meter
NO
No Flow
NO
No Flow
1. No Supply LPG
Flow Meter
STUDY TITLE
DRAWING NO
PART CONSIDERED
Cargo Tank 3
DESIGN INTENT
MATERIAL : LPG
DESIGN PRESS
DESIGN TEMP
OPERATING PRESS
DESTINATION : MANIFOLD 1
OPERATING TEMP
No
GUIDE
WORD
DEVIATION
NODE : 1
POSSIBLE CAUSES
CONSEQUENCES
SAFEGUARDS
More
More Pressure
Pipe/equipment leak
because overpressure
and lead to:
PRD (Pressure
Release Device)
Pressure Indicator
More
More Pressure
3. Explosion (delayed
ignition and
confinement)
DRAWING NO
PART CONSIDERED
Cargo Tank 3
DESIGN INTENT
MATERIAL : LPG
DESIGN PRESS
DESIGN TEMP
OPERATING PRESS
DESTINATION : MANIFOLD 1
OPERATING TEMP
1256404
No
GUIDE
WORD
DEVIATION
More
More Pressure
NODE : 1
POSSIBLE CAUSES
CONSEQUENCES
SAFEGUARDS
More
More Temperature
3. Explosion (delayed
ignition and
confinement)
Temperature
Indicator
More
More Temperature
3. Explosion (delayed
ignition and
confinement)
Temperature
Indicator
DRAWING NO
PART CONSIDERED
Cargo Tank 3
DESIGN INTENT
MATERIAL : LPG
DESIGN PRESS
DESIGN TEMP
OPERATING PRESS
DESTINATION : MANIFOLD 1
OPERATING TEMP
1256404
No
GUIDE
WORD
DEVIATION
Reverse
Reserve Flow
NODE : 1
POSSIBLE CAUSES
Butterfly valve with double
action hydraulic 32HV6000
or 32HV7022 blocked
CONSEQUENCES
Potential Reserve flow
leading to equipment
damage
SAFEGUARDS
None Shown
NO
No Pressure
No Supply LPG
Booster pump failure
Due to the reduced flow
rate because most the
2. Butterfly valve with double gas release to the
environment
action hydraulic 32HV6000
not fully open
1. Leaks in pipe joint
Pressure Indicator
Less
Less Flow
ignition and no
confinement)
3. Explosion (delayed
ignition and
confinement)
Flow Meter
STUDY TITLE
DRAWING NO
PART CONSIDERED
Cargo Tank 3
DESIGN INTENT
MATERIAL : LPG
DESIGN PRESS
DESIGN TEMP
OPERATING PRESS
DESTINATION : MANIFOLD 1
OPERATING TEMP
No
GUIDE
WORD
DEVIATION
NODE : 1
POSSIBLE CAUSES
CONSEQUENCES
SAFEGUARDS
Safety Valve
Other Than
Other Than
Destination
2. Flashfire (delayed
line rupture, and LPG leakage
ignition and no
before reach the cargo heater
confinement)
Pressure Indicator
Pressure Indicator
Other Than
Other Than
Destination
2. Flashfire (delayed
line rupture, and LPG leakage
ignition and no
before reach the cargo heater
confinement)
3. Explosion (delayed
ignition and
confinement)
Integrity of Piping
Other Than
Other Than
Maintenance
Other Than
Other Than
Operation
10
Other Than
Other Than
External Factor
11
Other Than
Other Than
Instrumentation
STUDY TITLE
DRAWING NO
PART CONSIDERED
Cargo Tank 4
DESIGN INTENT
MATERIAL : LPG
DESIGN PRESS
DESIGN TEMP
OPERATING PRESS
DESTINATION : MANIFOLD 1
OPERATING TEMP
No
GUIDE
WORD
DEVIATION
NODE : 1
POSSIBLE CAUSES
CONSEQUENCES
SAFEGUARDS
1. No Supply LPG
Flow Meter
NO
No Flow
NO
No Flow
1. No Supply LPG
Flow Meter
STUDY TITLE
DRAWING NO
PART CONSIDERED
Cargo Tank 4
DESIGN INTENT
MATERIAL : LPG
DESIGN PRESS
DESIGN TEMP
OPERATING PRESS
DESTINATION : MANIFOLD 1
OPERATING TEMP
No
GUIDE
WORD
DEVIATION
NODE : 1
POSSIBLE CAUSES
CONSEQUENCES
SAFEGUARDS
Pipe/equipment leak
because overpressure
and lead to:
PRD (Pressure
Release Device)
PRD (Pressure
Release Device)
More
More Pressure
2. Flashfire (delayed
4. Butterfly valve with double ignition and no
action hydraulic 32HV7022
confinement)
blocked
3. Explosion (delayed
5. Butterfly valve 32V4000
ignition and
blocked
confinement)
6. Butterfly valve 32V4031
blocked
DRAWING NO
PART CONSIDERED
Cargo Tank 4
DESIGN INTENT
MATERIAL : LPG
DESIGN PRESS
DESIGN TEMP
OPERATING PRESS
DESTINATION : MANIFOLD 1
OPERATING TEMP
1256404
No
GUIDE
WORD
DEVIATION
More
More Pressure
NODE : 1
POSSIBLE CAUSES
CONSEQUENCES
SAFEGUARDS
More
More Temperature
3. Explosion (delayed
ignition and
confinement)
Temperature
Indicator
DRAWING NO
PART CONSIDERED
Cargo Tank 4
DESIGN INTENT
MATERIAL : LPG
DESIGN PRESS
DESIGN TEMP
OPERATING PRESS
DESTINATION : MANIFOLD 1
OPERATING TEMP
1256404
No
GUIDE
WORD
DEVIATION
Reverse
Reserve Flow
NO
No Pressure
NODE : 1
POSSIBLE CAUSES
Butterfly valve with double
action hydraulic 32HV6000
or 32HV7022 blocked
CONSEQUENCES
Potential Reserve flow
leading to equipment
damage
SAFEGUARDS
None Shown
Pressure Indicator
NO
No Pressure
No Supply LPG
Pressure Indicator
Less
Less Flow
ignition and no
confinement)
3. Explosion (delayed
ignition and
confinement)
Flow Meter
STUDY TITLE
DRAWING NO
PART CONSIDERED
Cargo Tank 4
DESIGN INTENT
MATERIAL : LPG
DESIGN PRESS
DESIGN TEMP
OPERATING PRESS
DESTINATION : MANIFOLD 1
OPERATING TEMP
No
GUIDE
WORD
DEVIATION
NODE : 1
POSSIBLE CAUSES
CONSEQUENCES
SAFEGUARDS
Safety Valve
Pressure Indicator
Environmental
contamination and lead
to:
Pressure Indicator
1. Jetfire (immidiate
ignition)
7
Other Than
Other Than
Destination
2. Flashfire (delayed
line rupture, and LPG leakage
ignition and no
before reach the cargo heater
confinement)
3. Explosion (delayed
ignition and
confinement)
8
9
10
11
Integrity of Piping
Other Than
Other Than
Maintenance
Other Than
Other Than
Operation
Other Than
Other Than
External Factor
Other Than
Other Than
Instrumentation
STUDY TITLE
DRAWING NO
1256404
PART CONSIDERED
Fleksible Hose
DESIGN INTENT
MATERIAL : LPG
DESIGN PRESS
DESIGN TEMP
SOURCE : MANIFOLD 1
OPERATING PRESS
DESTINATION : MANIFOLD 2
OPERATING TEMP
No
GUIDE
WORD
DEVIATION
NODE : 2
POSSIBLE CAUSES
CONSEQUENCES
SAFEGUARDS
1. No Supply LPG
2.Pipe/equipment leak
and lead to:
Flow Meter
1
Less
Less Flow
Leakage of pipeline on
connection manifold and
2.Pipe/equipment leak
and lead to:
Less
Less Flow
Leakage of pipeline on
connection manifold and
fleksible hose
Flow Meter
Jetfire (immidiate
ignition)
Flashfire (delayed
ignition and no
confinement)
Explosion (delayed
ignition and
confinement)
Safety Valve
No
No Pressure
Leakage of pipeline on
connection manifold and
fleksible hose
2.Pipe/equipment leak
and lead to:
Pressure Indicator
Jetfire (immidiate
ignition)
Flashfire (delayed
ignition and no
confinement)
STUDY TITLE
DRAWING NO
1256404
PART CONSIDERED
Fleksible Hose
DESIGN INTENT
MATERIAL : LPG
DESIGN PRESS
DESIGN TEMP
SOURCE : MANIFOLD 1
OPERATING PRESS
DESTINATION : MANIFOLD 2
OPERATING TEMP
No
GUIDE
WORD
DEVIATION
NODE : 2
POSSIBLE CAUSES
CONSEQUENCES
Explosion (delayed
ignition and
confinement)
SAFEGUARDS
Safety Valve
Explosion (delayed
ignition and
confinement)
Safety Valve
No
No Flow
Connections between
Manifold and Flexible Hose
disconnected
No Supply LPG
None Shown
1. Unloading Time is
Longer
3
Less
More
Other Than
STUDY TITLE
DRAWING NO
PART CONSIDERED
DESIGN INTENT
No
Less Pressure
2. Release LPG to
Environment starts of
fire
More Pressure
Other Than
Environmental
=
=
=
=
GUIDE WORD
Pressure Indicator
Connections between
Manifold and Flexible Hose
disconnected
Pressure Indicator
POSSIBLE CAUSES
1. Environmental
Pollution
None Shown
NODE : 3
DESIGN PRESS
DESIGN TEMP
OPERATING PRESS
OPERATING TEMP
CONSEQUENCES
SAFEGUARDS
No
No Flow
No
No Flow
4. Ball valve V0019 blocked
6. LPG Heater Failure
7. Connections between
Manifold and Flexible Hose
disconnected
1. Leakage of pipeline on
connection Fleksible Hose
and Manifold 2
2. Ball valve V0001 not fully
open
3. Ball valve V0002 not fully
open
4. Ball valve V0019 not fully
open
Less
STUDY TITLE
DRAWING NO
PART CONSIDERED
DESIGN INTENT
No
Less Flow
=
=
=
=
GUIDE WORD
None Shown
1. Unloading Time is
Longer
2.Pipe/equipment leak
and lead to:
Jetfire (immidiate
ignition)
Flashfire (delayed
ignition and no
5. Leaks in pipe joint
confinement)
6. Pump in not good condition Explosion (delayed
ignition and
confinement)
Gas Dispersion (no
ignition)
POSSIBLE CAUSES
None Shown
NODE : 3
DESIGN PRESS
DESIGN TEMP
OPERATING PRESS
OPERATING TEMP
CONSEQUENCES
SAFEGUARDS
No
No Pressure
1. No Supply LPG
Pressure Indicator
No
No Pressure
More
More Pressure
1. No Supply LPG
2. Connection between
Fleksible Hose and Manifold 2
Disconnected
1. LPG flow in the pipeline
Pipe/equipment leak
partially obstructed
because overpressure
2. LPG Heater Failure
and lead to:
3. Ball valve V0001 blocked
1. Jetfire (immidiate
ignition)
4. Ball valve V0002 blocked
2. Flashfire (delayed
ignition and no
5. Ball valve V0019 blocked
confinement)
3. Explosion (delayed
ignition and
confinement)
4. Gas Dispersion (no
ignition)
1. Leak on pipeline
Less
Less Pressure
STUDY TITLE
DRAWING NO
PART CONSIDERED
DESIGN INTENT
No
GUIDE WORD
=
=
=
=
POSSIBLE CAUSES
Pressure Indicator
None Shown
Pipe/equipment leak
because overpressure
and lead to:
1. Jetfire (immidiate
ignition)
2. Flashfire (delayed
ignition and no
confinement)
3. Explosion (delayed
ignition and
confinement)
None Shown
NODE : 3
DESIGN PRESS
DESIGN TEMP
OPERATING PRESS
OPERATING TEMP
CONSEQUENCES
SAFEGUARDS
No
DEVIATION
GUIDE WORD
POSSIBLE CAUSES
CONSEQUENCES
SAFEGUARDS
Pipe/equipment leak
because more
temperature and lead to:
1. Jetfire (immidiate
ignition)
4. Ball valve V0019 blocked
2. Flashfire (delayed
More
More Temperature
ignition and no
5. Overpressure on pipeline confinement)
3. Explosion (delayed
ignition and
confinement)
4. Gas Dispersion (no
ignition)
Environmental
contamination and lead
to:
1. Jetfire (immidiate
ignition)
2. Flashfire (delayed
Other Than
line rupture, and LPG leakage
Other Than
ignition and no
Destination
before reach the cargo tank
confinement)
3. Explosion (delayed
ignition and
confinement)
4. Gas Dispersion (no
ignition)
STUDY TITLE
DRAWING NO
PART CONSIDERED
DESIGN INTENT
=
=
=
=
Sensor Temperature
ESD valve
Pressure Indicator
Integrity of Piping
NODE : 3
DESIGN PRESS
DESIGN TEMP
OPERATING PRESS
OPERATING TEMP
No
DEVIATION
POSSIBLE CAUSES
Other Than
Corrosion
GUIDE WORD
Other Than
Other Than
10
Other Than
11
Other Than
STUDY TITLE
DRAWING NO
PART CONSIDERED
DESIGN INTENT
Other Than
Maintenance
Other Than
Operation
Other Than
Instrumentation
=
=
=
=
CONSEQUENCES
SAFEGUARDS
Corrosion leading to
leakage of gas and
potential fire:
1. Jetfire (immidiate
ignition)
2. Flashfire (delayed
ignition and no
confinement)
None Shown
3. Explosion (delayed
ignition and
confinement)
4. Gas Dispersion (no
ignition)
No additional significant is issues of cause identified
No additional significant is issues of cause identified
No additional significant is issues of cause identified
NODE : 3
DESIGN PRESS
DESIGN TEMP
SOURCE : MANIFOLD 2
DESTINATION : Cargo Tank 2 Gas Arar
No
DEVIATION
GUIDE WORD
POSSIBLE CAUSES
OPERATING PRESS
OPERATING TEMP
CONSEQUENCES
SAFEGUARDS
No
No Flow
4. Ball valve V0010 blocked
6. LPG Heater Failure
7. Connections between
Manifold and Flexible Hose
disconnected
1. Leakage of pipeline on
connection Fleksible Hose
and Manifold 2
2. Ball valve V0001 not fully
open
3. Ball valve V0002 not fully
open
4. Ball valve V0010 not fully
open
Less
STUDY TITLE
DRAWING NO
PART CONSIDERED
Less Flow
=
=
=
None Shown
1. Unloading Time is
Longer
2.Pipe/equipment leak
and lead to:
Jetfire (immidiate
ignition)
Flashfire (delayed
ignition and no
5. Leaks in pipe joint
confinement)
6. Pump in not good condition Explosion (delayed
ignition and
confinement)
Gas Dispersion (no
ignition)
None Shown
NODE : 3
DESIGN INTENT
No
MATERIAL : LPG
ACTIVITY : TRANSFER LPG
SOURCE : MANIFOLD 2
DESTINATION : Cargo Tank 2 Gas Arar
DEVIATION
GUIDE WORD
POSSIBLE CAUSES
DESIGN PRESS
DESIGN TEMP
OPERATING PRESS
OPERATING TEMP
CONSEQUENCES
SAFEGUARDS
No
No Pressure
More
More Pressure
1. No Supply LPG
2. Connection between
Fleksible Hose and Manifold 2
Disconnected
1. LPG flow in the pipeline
Pipe/equipment leak
partially obstructed
because overpressure
2. LPG Heater Failure
and lead to:
3. Ball valve V0001 blocked
1. Jetfire (immidiate
ignition)
4. Ball valve V0002 blocked
2. Flashfire (delayed
ignition and no
5. Ball valve V0010 blocked
confinement)
3. Explosion (delayed
ignition and
confinement)
4. Gas Dispersion (no
ignition)
1. Leak on pipeline
Less
Less Pressure
STUDY TITLE
Pressure Indicator
None Shown
Pipe/equipment leak
because overpressure
and lead to:
1. Jetfire (immidiate
ignition)
2. Flashfire (delayed
ignition and no
confinement)
3. Explosion (delayed
ignition and
confinement)
None Shown
DRAWING NO
PART CONSIDERED
DESIGN INTENT
No
GUIDE WORD
=
=
=
1256404
Cargo Tank 2 Kapal Gas Arar
MATERIAL : LPG
ACTIVITY : TRANSFER LPG
SOURCE : MANIFOLD 2
DESTINATION : Cargo Tank 2 Gas Arar
DEVIATION
POSSIBLE CAUSES
NODE : 3
DESIGN PRESS
DESIGN TEMP
OPERATING PRESS
OPERATING TEMP
CONSEQUENCES
SAFEGUARDS
Pipe/equipment leak
because more
temperature and lead to:
1. Jetfire (immidiate
ignition)
4. Ball valve V0010 blocked
2. Flashfire (delayed
More
More Temperature
ignition and no
5. Overpressure on pipeline confinement)
3. Explosion (delayed
ignition and
confinement)
4. Gas Dispersion (no
ignition)
Environmental
contamination and lead
to:
1. Jetfire (immidiate
ignition)
2. Flashfire (delayed
Other Than
line rupture, and LPG leakage
Other Than
ignition and no
Destination
before reach the cargo tank
confinement)
3. Explosion (delayed
ignition and
confinement)
4. Gas Dispersion (no
ignition)
Sensor Temperature
ESD valve
Pressure Indicator
Integrity of Piping
STUDY TITLE
DRAWING NO
PART CONSIDERED
DESIGN INTENT
No
GUIDE WORD
Other Than
Other Than
10
Other Than
11
Other Than
=
=
=
=
POSSIBLE CAUSES
Other Than
Corrosion
Other Than
Maintenance
Other Than
Operation
Other Than
Instrumentation
NODE : 3
DESIGN PRESS
DESIGN TEMP
OPERATING PRESS
OPERATING TEMP
CONSEQUENCES
Corrosion leading to
leakage of gas and
potential fire:
1. Jetfire (immidiate
ignition)
2. Flashfire (delayed
ignition and no
confinement)
SAFEGUARDS
None Shown
3. Explosion (delayed
ignition and
confinement)
4. Gas Dispersion (no
ignition)
No additional significant is issues of cause identified
No additional significant is issues of cause identified
No additional significant is issues of cause identified
SHEET =
1 of 1
P&ID
ACTIVITY
Transfer LPG from Ship to Ship
COMMENT
ACTION REQUIRED
SHEET =
1 of 2
P&ID
ACTIVITY
Transfer LPG from Ship to Ship
COMMENT
ACTION REQUIRED
Routine Check
Situation not
acceptable
Emergency Shutdown
and Emergency Alarm
Device to prevent
potential damage
Device to prevent
potential damage
SHEET =
1 of 3
P&ID
ACTIVITY
Transfer LPG from Ship to Ship
COMMENT
ACTION REQUIRED
SHEET =
1 of 4
P&ID
ACTIVITY
Transfer LPG from Ship to Ship
COMMENT
ACTION REQUIRED
Situation not
Acceptable
Situation
Acceptable
SHEET =
1 of 5
P&ID
ACTIVITY
Transfer LPG from Ship to Ship
COMMENT
ACTION REQUIRED
Situation
Acceptable
Situation not
Acceptable
SHEET =
1 of 6
P&ID
ACTIVITY
Transfer LPG from Ship to Ship
COMMENT
ACTION REQUIRED
SHEET =
1 of 7
P&ID
ACTIVITY
Transfer LPG from Ship to Ship
COMMENT
ACTION REQUIRED
SHEET =
1 of 8
P&ID
ACTIVITY
Transfer LPG from Ship to Ship
COMMENT
ACTION REQUIRED
Routine Check
Situation not
acceptable
Emergency Shutdown
and Emergency Alarm
acceptable
Device to prevent
potential damage
SHEET =
1 of 9
P&ID
ACTIVITY
Transfer LPG from Ship to Ship
COMMENT
ACTION REQUIRED
SHEET =
1 of 10
P&ID
ACTIVITY
Transfer LPG from Ship to Ship
COMMENT
ACTION REQUIRED
Situation not
Acceptable
Situation
Acceptable
Situation
Acceptable
SHEET =
1 of 11
P&ID
ACTIVITY
Transfer LPG from Ship to Ship
COMMENT
ACTION REQUIRED
Situation
Acceptable
Situation not
Acceptable
response to prevent an
explosion
SHEET =
1 of 12
P&ID
ACTIVITY
Transfer LPG from Ship to Ship
COMMENT
ACTION REQUIRED
SHEET =
1 of 13
P&ID
ACTIVITY
Transfer LPG from Ship to Ship
COMMENT
ACTION REQUIRED
Routine Check
Situation not
acceptable
Emergency Shutdown
and Emergency Alarm
Situation not
acceptable
Emergency Shutdown
and Emergency Alarm
Device to prevent
potential damage
SHEET =
1 of 14
P&ID
ACTIVITY
Transfer LPG from Ship to Ship
COMMENT
ACTION REQUIRED
SHEET =
1 of 15
P&ID
ACTIVITY
Transfer LPG from Ship to Ship
COMMENT
ACTION REQUIRED
Situation not
Acceptable
Situation
Acceptable
SHEET =
1 of 16
P&ID
ACTIVITY
Transfer LPG from Ship to Ship
COMMENT
ACTION REQUIRED
Situation
Acceptable
Situation not
Acceptable
Situation not
Acceptable
SHEET =
1 of 17
P&ID
ACTIVITY
Transfer LPG from Ship to Ship
COMMENT
ACTION REQUIRED
SHEET =
1 of 18
P&ID
ACTIVITY
Transfer LPG from Ship to Ship
COMMENT
ACTION REQUIRED
Routine Check
Routine Check
Situation not
acceptable
Emergency Shutdown
and Emergency Alarm
Device to prevent
potential damage
SHEET =
1 of 19
P&ID
ACTIVITY
Transfer LPG from Ship to Ship
COMMENT
ACTION REQUIRED
SHEET =
1 of 20
P&ID
ACTIVITY
Transfer LPG from Ship to Ship
COMMENT
ACTION REQUIRED
Situation not
Acceptable
Situation
Acceptable
SHEET =
1 of 21
P&ID
ACTIVITY
Transfer LPG from Ship to Ship
COMMENT
ACTION REQUIRED
Situation
Acceptable
Situation not
Acceptable
SHEET =
1 of 1
P&ID
ACTIVITY
Transfer LPG from Ship to Ship
COMMENT
ACTION REQUIRED
Situation
acceptable
Situation
acceptable
Situation not
acceptable
SHEET =
1 of 2
P&ID
ACTIVITY
Transfer LPG from Ship to Ship
COMMENT
ACTION REQUIRED
Situation Not
Acceptable
Considered to add
Emergency Shutdown
and Emergency Alarm
before Fleksible Hose
Situation not
acceptable
Situation Not
Acceptable
None
SHEET =
1 of 1
P&ID
ACTIVITY
Transfer LPG from Ship to Ship
COMMENT
ACTION REQUIRED
Situation not
Acceptable
Considered to add
Emergency Shutdown
and Emergency Alarm
after Fleksible Hose
Situation not
Acceptable
Considered to add
Emergency Shutdown
and Emergency Alarm
after Fleksible Hose
Situation
Acceptable
SHEET =
1 of 2
P&ID
ACTIVITY
Transfer LPG from Ship to Ship
COMMENT
ACTION REQUIRED
Situation not
Acceptable
Situation not
Acceptable
Situation not
Acceptable
Situation
Acceptable
SHEET =
1 of 3
P&ID
ACTIVITY
Transfer LPG from Ship to Ship
COMMENT
ACTION REQUIRED
COMMENT
ACTION REQUIRED
Situation not
Acceptable
Situation not
Acceptable
SHEET =
1 of 4
P&ID
ACTIVITY
Transfer LPG from Ship to Ship
COMMENT
ACTION REQUIRED
Situation not
Acceptable
SHEET =
1 of 5
P&ID
ACTIVITY
Transfer LPG from Ship to Ship
COMMENT
ACTION REQUIRED
Situation not
Acceptable
Considered to add
Emergency Shutdown
and Emergency Alarm
after Fleksible Hose
Situation
Acceptable
SHEET =
P&ID
1 of 5
ACTIVITY
Transfer LPG from Ship to Ship
COMMENT
ACTION REQUIRED
Situation not
Acceptable
Situation not
Acceptable
Situation
Acceptable
SHEET =
1 of 5
P&ID
ACTIVITY
Transfer LPG from Ship to Ship
COMMENT
ACTION REQUIRED
Situation not
Acceptable
Situation not
Acceptable
SHEET =
1 of 5
P&ID
ACTIVITY
Transfer LPG from Ship to Ship
COMMENT
ACTION REQUIRED
Situation not
Acceptable
Node :
NO
1
SOURCE
EQUIPMENT
SIZE
POSSIBLE CAUSES
CONSEQUENCES
System 1
0.000978
BV-1
BV-2
BV-3
BV-4
Butterfly
Valve
BV-6
10 inch
BV-7
14 inch
SV-5
RBV-1
RBV-5
RBV-6
BP-1
BP-2
CH-1
10 inch
BV-5
SV-1
FREQUENCY
< 50 mm
Swing Check
Valve
Remotely
Butterfly
Valve
8 inch
8 inch
10 inch
Booster
Pump
8 inch
Cargo
Heater
10 inch
Node :
NO
1
SOURCE
EQUIPMENT
SIZE
POSSIBLE CAUSES
CONSEQUENCES
BV-8
BV-9
Butterfly
Valve
BV-6
10 inch
BV-7
14 inch
SV-5
RBV-2
RBV-5
RBV-6
BP-1
BP-2
CH-1
10 inch
BV-5
SV-2
< 50 mm
0.000955
System 2
BV-4
FREQUENCY
Swing Check
Valve
Remotely
Butterfly
Valve
8 inch
8 inch
10 inch
Booster
Pump
8 inch
Cargo
Heater
10 inch
Node :
NO
1
SOURCE
EQUIPMENT
SIZE
POSSIBLE CAUSES
CONSEQUENCES
BV-10
BV-11
BV-4
Butterfly
Valve
BV-6
10 inch
BV-7
14 inch
SV-5
RBV-3
RBV-5
RBV-6
BP-1
BP-2
CH-1
10 inch
BV-5
SV-3
< 50 mm
0.000978
System 3
BV-3
FREQUENCY
Swing Check
Valve
Remotely
Butterfly
Valve
8 inch
8 inch
10 inch
Booster
Pump
8 inch
Cargo
Heater
10 inch
Node :
NO
1
SOURCE
EQUIPMENT
SIZE
POSSIBLE CAUSES
CONSEQUENCES
BV-12
BV-13
BV-4
Butterfly
Valve
BV-6
10 inch
BV-7
14 inch
SV-5
RBV-4
RBV-5
RBV-6
BP-1
BP-2
CH-1
10 inch
BV-5
SV-4
< 50 mm
0.000978
System 4
BV-3
FREQUENCY
Swing Check
Valve
Remotely
Butterfly
Valve
8 inch
8 inch
10 inch
Booster
Pump
8 inch
Cargo
Heater
10 inch
FREQUENCY
50 - 150 mm 150 mm
0.00023
0.00026
NO
1
SOURCE
EQUIPMENT
SIZE
BV-1
10 inch
BV-2
BV-4
BV-5
Butterfly
Valve
8 inch
BV-6
10 inch
BV-7
14 inch
SV-1
SV-5
RBV-1
RBV-5
RBV-6
BP-1
BP-2
CH-1
3-10 mm
< 50 mm
0.000978
System 1
BV-3
FREQUENCY
1-3 mm
Swing Check
Valve
Remotely
Butterfly
Valve
Booster
Pump
Cargo
Heater
8 inch
8 inch
10 inch
8 inch
10 inch
FREQUENCY
50 - 150 mm 150 mm
0.000227
0.000256
NO
1
SOURCE
EQUIPMENT
SIZE
1-3 mm
BV-8
10 inch
BV-9
BV-5
Butterfly
Valve
8 inch
BV-6
10 inch
BV-7
14 inch
SV-2
SV-5
RBV-2
RBV-5
RBV-6
BP-1
BP-2
CH-1
3-10 mm
< 50 mm
0.000955
System 2
BV-4
FREQUENCY
Swing Check
Valve
Remotely
Butterfly
Valve
Booster
Pump
Cargo
Heater
8 inch
8 inch
10 inch
8 inch
10 inch
FREQUENCY
50 - 150 mm 150 mm
0.000232
0.00026
NO
1
SOURCE
EQUIPMENT
SIZE
BV-10
BV-11
BV-4
10 inch
Butterfly
Valve
BV-5
8 inch
BV-6
10 inch
BV-7
14 inch
SV-3
SV-5
RBV-3
RBV-5
RBV-6
BP-1
BP-2
CH-1
1-3 mm
3-10 mm
< 50 mm
0.000978
System 3
BV-3
FREQUENCY
Swing Check
Valve
Remotely
Butterfly
Valve
8 inch
8 inch
10 inch
Booster
Pump
8 inch
Cargo
Heater
10 inch
FREQUENCY
50 - 150 mm 150 mm
0.000232
0.00026
NO
1
SOURCE
EQUIPMENT
SIZE
BV-12
BV-13
BV-4
10 inch
Butterfly
Valve
BV-5
8 inch
BV-6
10 inch
BV-7
14 inch
SV-4
SV-5
RBV-4
RBV-5
RBV-6
BP-1
BP-2
CH-1
1-3 mm
3-10 mm
< 50 mm
0.000978
System 4
BV-3
FREQUENCY
Swing Check
Valve
Remotely
Butterfly
Valve
8 inch
8 inch
10 inch
Booster
Pump
8 inch
Cargo
Heater
10 inch
Node :
REQUENCY
50 - 150 mm 150 mm
0.00023
0.00026
Node :
REQUENCY
50 - 150 mm 150 mm
0.000227
0.000256
Node :
REQUENCY
50 - 150 mm 150 mm
0.000232
0.00026
Node :
REQUENCY
50 - 150 mm 150 mm
0.000232
0.00026
NO
EQUIPMENT
SIZE
POSSIBLE CAUSES
CONSEQUENCES
1
BV-1
BV-2
10 inch
BV-3
BV-4
8 inch
BV-5
BV-6
BV-7
Butterfly
Valve
10 inch
14 inch
BV-8
BV-9
BV-10
10 inch
BV-11
BV-12
BV-13
SV-1
SV-2
SV-3
SV-4
Swing Check
Valve
8 inch
SV-5
RBV-1
RBV-2
RBV-3
RBV-4
Remotely
Butterfly
Valve
RBV-5
BP-2
CH-1
RBV-6
BP-1
8 inch
Booster
Pump
8 inch
Cargo
Heater
10 inch
CONSEQUENCES
FREQUENCY
< 50 mm 50 - 150 mm 150 mm
0.003889
0.000921
0.001036
NO
1
SOURCE
EQUIPMENT
SIZE
BV-2
10 inch
BV-3
BV-4
8 inch
BV-5
BV-7
Butterfly
Valve
10 inch
14 inch
BV-8
BV-9
BV-10
10 inch
BV-11
BV-12
BV-13
SV-1
SV-2
SV-3
SV-4
Swing Check
Valve
8 inch
SV-5
RBV-1
RBV-2
RBV-3
RBV-4
Remotely
Butterfly
Valve
RBV-5
BP-2
CH-1
8 inch
10 inch
RBV-6
BP-1
1-3 mm
3-10 mm
BV-1
BV-6
FREQUENCY
Booster
Pump
8 inch
Cargo
Heater
10 inch
0.000921
0.001036
DIAMETER
PERSENTASE
<50
50 - 150
150
57%
18%
25%
PERSENTASE OF LEAK
External Impact
48.40%
0.17
16.70%
0.059
16.10%
0.057
Natural Hazard
7.40%
0.026
4.80%
0.017
Other
6.60%
0.034
Total
100.00%
0.363
LEAK CAUSE
MODIFICATION
FACTOR
1
per km-year
9.69E-05
1.2
3.36E-05
2
1
3.25E-05
1.48E-05
1
1
-
9.69E-06
1.94E-05
2.07E-04
modified leak frequencies for onshore pipeline leak size 50 - 150 mm (medium)
LEAK CAUSE
External Impact
Material Failure / Construction Defect
Corrossion (internal & external)
Natural Hazard
Hot tap Made by Error
Other
Total
MODIFICATION
FACTOR
1
per km-year
3.06E-05
1.2
1.06E-05
2
1
1
1
-
1.03E-05
4.68E-06
3.06E-06
6.12E-06
6.53E-05
modified leak frequencies for onshore pipeline leak size 150 mm (full bore)
LEAK CAUSE
External Impact
Material Failure / Construction Defect
Corrossion (internal & external)
Natural Hazard
Hot tap Made by Error
Other
Total
MODIFICATION
FACTOR
1
per km-year
4.25E-05
1.2
1.48E-05
2
1
1
1
-
1.43E-05
6.50E-06
4.25E-06
8.50E-06
9.08E-05
0.2
SMALL
TOTAL
9.69E-05
3.06E-05
4.25E-05
1.70E-04
3.36E-05
1.06E-05
1.48E-05
5.90E-05
3.25E-05
1.03E-05
1.43E-05
5.70E-05
1.48E-05
4.68E-06
6.50E-06
2.60E-05
9.69E-06
3.06E-06
4.25E-06
1.70E-05
1.94E-05
6.12E-06
8.50E-06
3.40E-05
2.07E-04
6.53E-05
9.08E-05
3.63E-04
MODIFIED LEAK
FREQUENCY
per km-year
9.69E-05
4.04E-05
6.50E-05
1.48E-05
9.69E-06
1.94E-05
6.53E-05
MODIFIED LEAK
FREQUENCY
per km-year
3.06E-05
1.27E-05
2.05E-05
4.68E-06
3.06E-06
6.12E-06
7.77E-05
MODIFIED LEAK
FREQUENCY
per km-year
4.25E-05
1.77E-05
2.85E-05
6.50E-06
4.25E-06
8.50E-06
1.08E-04
FULL (>150mm)
2.16E-05
NO
1
SOURCE
GV1
EQUIPMENT
Globe Valve
FH1
Flexible
Hose
F/S1
Filter/Straine
r
MF 1
MF2
Manifold
EI
External
Impact
MF
Material
Failure/Cons
truction
Defect
SIZE
1 inch
12 inch
14 inch
12 inch
8 inch
POSSIBLE CAUSES
CONSEQUENCES
FREQUENCY
< 50 mm
0.000787
FREQUENCY
50 - 150 mm 150 mm
0.00013772
0.000147
NO
1
SOURCE
EQUIPMENT
GV1
Globe Valve
FH1
Flexible
Hose
F/S1
Filter/Straine
r
MF 1
MF2
Manifold
EI
External
Impact
MF
Material
Failure/Cons
truction
Defect
SIZE
1 inch
12 inch
14 inch
12 inch
8 inch
FREQUENCY
1-3 mm
3-10 mm
< 50 mm
0.000787
REQUENCY
50 - 150 mm 150 mm
0.00013772
0.000147
NO
SOURCE
BV1
EQUIPMENT
SIZE
POSSIBLE CAUSES
BV2
BV3
BV4
Ball Valve
4 inch
BV5
F/S2
CP 1
CP 2
BV6
F/S1
CONSEQUENCES
Filter/Straine
r
1 inch
Cargo Pump
8 inch
2 inch
Heater Failed
CH
LPG Heater
MF
Material
Failure/Cons
truction
Defect
Filter/Stainer Blocked
2. Flash Fire (if any source of fire and delayed
ignition)
3. Gas Dispersion (if no source of fire)
FREQUENCY
< 50 mm
System 1
NO
SOURCE
BV1
BV2
BV3
EQUIPMENT
SIZE
POSSIBLE CAUSES
CONSEQUENCES
FREQUENCY
< 50 mm
0.000355
Ball Valve
4 inch
BV4
F/S1
Filter/Straine
r
1 inch
Filter/Stainer Blocked
CP 1
Cargo Pump
8 inch
CH
LPG Heater
MF
Material
Failure/Cons
truction
Defect
2 inch
Heater Failed
System 2
NO
SOURCE
BV1
BV2
BV5
EQUIPMENT
SIZE
POSSIBLE CAUSES
Ball Valve
4 inch
Filter/Straine
r
1 inch
Filter/Stainer Blocked
CP 2
Cargo Pump
8 inch
CH
LPG Heater
2 inch
Heater Failed
MF
Material
Failure/Cons
truction
Defect
F/S2
FREQUENCY
< 50 mm
0.001937
BV6
F/S1
CONSEQUENCES
FREQUENCY
50 - 150 mm 150 mm
System 1
FREQUENCY
50 - 150 mm 150 mm
0.000189
6.10E-05
NO
SOURCE
BV1
BV2
EQUIPMENT
SIZE
1-3 mm
3-10 mm
< 50 mm
0.000355
Ball Valve
4 inch
F/S1
Filter/Straine
r
1 inch
CP 1
Cargo Pump
8 inch
CH
LPG Heater
MF
Material
Failure/Cons
truction
Defect
BV3
FREQUENCY
BV4
2 inch
System 2
FREQUENCY
50 - 150 mm 150 mm
0.000288
0.000104
NO
SOURCE
BV1
BV2
EQUIPMENT
SIZE
4 inch
Filter/Straine
r
1 inch
CP 2
Cargo Pump
8 inch
CH
LPG Heater
MF
Material
Failure/Cons
truction
Defect
BV6
F/S1
F/S2
1-3 mm
3-10 mm
< 50 mm
0.001937
Ball Valve
BV5
FREQUENCY
2 inch
REQUENCY
50 - 150 mm 150 mm
0.000189
6.10E-05
REQUENCY
50 - 150 mm 150 mm
0.000288
0.000104
NO
SOURCE
BV1
EQUIPMENT
SIZE
POSSIBLE CAUSES
BV4
Ball Valve
4 inch
BV5
F/S2
CP 1
CP 2
BV6
F/S1
FREQUENCY
< 50 mm
0.002292
BV2
BV3
CONSEQUENCES
Filter/Straine
r
1 inch
Cargo Pump
8 inch
2 inch
Heater Failed
CH
LPG Heater
MF
Material
Failure/Cons
truction
Defect
Filter/Stainer Blocked
2. Flash Fire (if any source of fire and delayed
ignition)
3. Gas Dispersion (if no source of fire)
FREQUENCY
50 - 150 mm 150 mm
0.000477
0.000165
NO
SOURCE
BV1
EQUIPMENT
SIZE
BV4
Ball Valve
4 inch
Filter/Straine
r
1 inch
Cargo Pump
8 inch
BV5
BV6
F/S1
F/S2
CP 1
CP 2
3-10 mm
< 50 mm
0.002292
BV2
BV3
FREQUENCY
1-3 mm
CH
LPG Heater
MF
Material
Failure/Cons
truction
Defect
2 inch
REQUENCY
50 - 150 mm 150 mm
0.000477
0.000165
NO
SOURCE
EQUIPMENT
SIZE
1.
QO
Quick Connect
1-3 mm
3-10 mm
6 inch
6.876.E-05
3.196.E-05
Manual Valve
4 inch
5.760.E-05
Actuated Valve
4 inch
FREQUENCY
10-50 mm
50 - 150 mm
150 mm
1.527.E-05
3.658.E-06
4.859.E-06
2.677.E-05
1.279.E-05
7.459.E-06
0.000.E+00
5.656.E-04
1.788.E-04
5.447.E-05
2.140.E-05
0.000.E+00
JO-1
2.
JO-2
JI-1
3.
JI-2
4.
CO-1
Actuated Valve
6 inch
5.711.E-04
1.805.E-04
5.500.E-05
8.033.E-06
1.347.E-05
5.
JO-3
Manual Valve
6 inch
6.876.E-05
3.196.E-05
1.527.E-05
3.658.E-06
4.859.E-06
6.
SF-J1
SF-J2
SF-J3
SF-J4
SF-J5
SF-J6
Actuated Valve
2 inch
5.611.E-04
1.774.E-04
5.404.E-05
2.131.E-05
0.000.E+00
NO
SOURCE
EQUIPMENT
SIZE
1-3 mm
3-10 mm
FRUQUENCY
10-50 mm
50 - 150 mm
150 mm
4.
NO
1.
2.
SOURCE
C-101
C-102
C-103
C-104
C-105
C-106
C-107
C-108
C-109
C-110
C-111
C-112
C-113
C-114
C-115
C-116
CV-1
CV-2
CV-3
CV-4
CV-5
CV-6
CV-7
EQUIPMENT
SIZE
Reciprocating
Compressor
Manual Valve
1-3 mm
3-10 mm
2 inch
3.641.E-02
1.581.E-02
2 inch
5.262.E-05
2.446.E-05
FREQUENCY
10-50 mm
50 - 150 mm
150 mm
6.973.E-03
2.599.E-03
0.000.E+00
1.169.E-05
6.986.E-06
0.000.E+00
2.
3.
CV-8
CV-9
CV-10
CV-11
CV-12
CV-13
CV-14
CV-15
CV-16
SF-C1
SF-C2
SF-C3
SF-C4
SF-C5
SF-C6
SF-C7
SF-C8
SF-C9
SF-C10
SF-C11
SF-C12
SF-C13
SF-C14
SF-C15
SF-C16
Manual Valve
2 inch
5.262.E-05
2.446.E-05
1.169.E-05
6.986.E-06
0.000.E+00
Actuated Valve
0,5 inch
5.166.E-05
2.401.E-05
7.507.E-05
0.000.E+00
0.000.E+00
NO
1.
SOURCE
E-101
E-102
E-103
E-104
E-105
E-106
E-107
E-108
E-109
E-110
E-111
E-112
E-113
E-114
E-115
E-116
E-117
E-118
EQUIPMENT
SIZE
Tube Heat
Exchanger
2 inch
1-3 mm
3-10 mm
1.721.E-03
7.729.E-04
FREQUENCY
< 50 mm
3.548.E-04
50 - 150 mm
150 mm
1.914.E-04
0.000.E+00
2.
TV-1
TV-2
TV-3
TV-4
TV-5
TV-6
TV-7
TV-8
TV-9
TV-10
TV-11
TV-12
TV-13
TV-14
TV-15
TV-16
TV-17
TV-18
Actuated Valve
2 inch
5.611.E-04
1.774.E-04
5.404.E-05
2.131.E-05
0.000.E+00
NO
SOURCE
EQUIPMENT
SIZE
1.
SV-1
Manual Valve
HV-1
2.
3.
HV-101
HV-102
HV-103
HV-104
HV-105
HV-106
HV-107
HV-108
HV-109
V-101
V-102
V-103
V-104
V-105
V-106
1-3 mm
3-10 mm
6 inch
6.876.E-05
3.196.E-05
1 inch
5.180.E-05
0,5 inch
0,5 inch
FREQUENCY
< 50 mm
50 - 150 mm
150 mm
1.527.E-05
3.658.E-06
4.859.E-06
2.407.E-05
1.841.E-05
0.000.E+00
0.000.E+00
5.166.E-05
2.401.E-05
1.837.E-05
0.000.E+00
0.000.E+00
2.300.E-05
1.200.E-05
7.100.E-06
4.300.E-06
4.700.E-07
Manual Valve
Pressurized Storage
Vessel
3.
Pressurized Storage
Vessel
0,5 inch
2.300.E-05
1.200.E-05
7.100.E-06
4.300.E-06
4.700.E-07
Actuated Valve
0,5 inch
5.587.E-04
1.767.E-04
7.507.E-05
0.000.E+00
0.000.E+00
V-107
V-108
V-109
4.
SF-C1
SF-C2
SF-C3
SF-C4
SF-C5
SF-C6
SF-C7
SF-C8
SF-C9
SF-C10
SF-C11
SF-C12
SF-C13
SF-C14
SF-C15
SF-C16
Node :
node 1,2
Node
Scenario
Gas Release
Gas Release
Gas Release
Location
Node :
Node :
Node :
Node :
Leak Frequence
Small
Medium
Full
(10-50mm) (50-150mm) (>150mm)
3.89E-03
9.21E-04
1.04E-03
7.87E-04
1.38E-04
1.47E-04
2.29E-03
4.77E-04
1.65E-04
Rumus 1 (UK-HSE)
Rumus 2 (DNV)
Node 1 (medium)
0.000490625
#VALUE!
Node 2 (medium)
0.000490625
0.4406
Node 3 (medium)
0.000490625
0.6055
0.490625
Node 1 (small)
0.000490625
0.0339
Node 2 (small)
0.000490625
0.4842
Node 3 (small)
0.000490625
0.8716
Node 1 (large)
Node 1 (full)
0.00785
#VALUE!
Node 2 (large)
0.0176625
#VALUE!
Node 2 (full)
0.00785
7.0493
Node 3 (large)
0.0176625
15.8610
Node 3 (full)
0.00785
9.6884
0.0176625
21.7988
4.415625
12.265625
Node 1 (medium)
0.004415625
0.3050
Node 1 (full)
0.012265625
0.8474
Node 2 (medium)
0.004415625
4.3578
Node 2 (full)
0.012265625
12.1050
Node 3 (medium)
0.004415625
7.8441
Node 3 (full)
0.012265625
21.7891
hole area
head statis
tekanan ambient
tekanan operasi
keterangan
diambil 50 mm
diambil 150 mm
diambil 250 mm atau sama dengan diameter
< 50 mm
50-150 mm
> 150 mm
20 m
100000 N/m2
70000 N/m2
1000000 N/m2
1800000 N/m2
0.4347826087
keterangan
hole area
10-50 mm
50-150 mm
> 150 mm
diambil 50 mm
diambil 150 mm
diambil 200 mm
0.01
0.001
node 1
node 2
node 3
eterangan
0.0787402 inch
pada konsekuensi diambil 3 mm
pada konsekuensi diambil 10 mm
1.9685039 inch
5.9055118 inch
9.8425197 inch
1 bar =
node 1
node 2
node 3
100000 N/m2
0.7 bar
10 bar
18 bar
0.05
0.15
0.25
0.025
0.075
0.125
ensi diambil 3 mm
Node 1 (small)
flow release
Ignition prob.
type plant
0.034 kg/s
OGP
Large
Immediate Ignition
0.89
Jet Fire
3.46E-06
Ignition
0.001
Delayed Ignition
0.11
Gas Release
3.89E-03
No Ignition
0.999
Flash fire
4.28E-07
Gas Dispersion
3.89E-03
Node 1 (medium)
flow release
Ignition prob.
type plant
0.305 kg/s
OGP
Large
Immediate Ignition
0.89
Jet Fire
1.15E-06
Delayed Ignition
0.11
Flash fire
1.42E-07
Ignition
0.0014
Gas Release
9.21E-04
No Ignition
0.9986
Gas Dispersion
9.20E-04
Node 1 (Full)
flow release
Ignition prob.
type plant
0.847 kg/s
OGP
Large
Immediate Ignition
0.89
Jet Fire
2.77E-06
Ignition
0.003
Delayed Ignition
0.11
Gas Release
1.04E-03
No Ignition
0.997
Flash fire
3.42E-07
Gas Dispersion
1.03E-03
Immediate Ignition
0.89
Jet Fire
0.00E+00
Delayed Ignition
Flash fire
Ignition
0.125
Gas Release
0.00E+00
No Ignition
Gas Dispersion
Node 2 (small)
flow release
Ignition prob.
type plant
0.484 kg/s
OGP
Large
Immediate Ignition
0.89
Ignition
0.0022
Delayed Ignition
0.11
Gas Release
7.87E-04
No Ignition
0.9978
Node 2 (medium)
flow release
Ignition prob.
type plant
4.358 kg/s
OGP
Large
Immediate Ignition
0.89
Ignition
0.0066
Delayed Ignition
0.11
Gas Release
1.38E-04
No Ignition
0.9934
Node 2 (full)
flow release
Ignition prob.
type plant
12.105 kg/s
OGP
Large
Immediate Ignition
0.89
Ignition
0.0092
Delayed Ignition
0.11
Gas Release
1.47E-04
No Ignition
0.9908
Node 3 (small)
flow release
Ignition prob.
type plant
0.872 kg/s
OGP
Large
Jet Fire
1.54E-06
Immediate Ignition
0.89
Ignition
0.003
Flash fire
1.90E-07
Gas Dispersion
7.85E-04
Delayed Ignition
0.11
Gas Release
9.28E-04
No Ignition
0.997
Node 3 (medium)
flow release
Ignition prob.
type plant
7.844 kg/s
OGP
Large
Jet Fire
8.09E-07
Immediate Ignition
0.89
Ignition
0.0092
Flash fire
1.00E-07
Gas Dispersion
1.37E-04
Delayed Ignition
0.11
Gas Release
4.77E-04
No Ignition
0.9908
Node 3 (full)
flow release
Ignition prob.
type plant
21.789 kg/s
OGP
Large
Jet Fire
1.20E-06
Immediate Ignition
0.07
Ignition
0.0129
Flash fire
1.49E-07
Gas Dispersion
1.46E-04
Delayed Ignition
0.11
Gas Release
1.65E-04
No Ignition
0.9871
Immediate Ignition
Jet Fire
2.48E-06
yed Ignition
Flash fire
3.06E-07
Gas Dispersion
9.25E-04
Immediate Ignition
Jet Fire
3.91E-06
Delayed Ignition
Flash fire
4.83E-07
Gas Dispersion
4.73E-04
Immediate Ignition
Jet Fire
1.49E-07
yed Ignition
Flash fire
2.34E-07
Gas Dispersion
1.63E-04
0.103
OGP
Large
Ignition
0.001
Gas Release
1.04E-02
No Ignition
0.999
Node 5 (small)
flow release
Ignition prob.
type plant
0.646
OGP
Large
Ignition
0.0019
Gas Release
4.84E-03
No Ignition
0.9981
Ignition
0
Gas Release
0.00E+00
No Ignition
0
kg/s
Immediate Ignition
0.89
Delayed Ignition
0.11
Jet Fire
9.27E-06
Flash fire
1.15E-06
Gas Dispersion
1.04E-02
kg/s
Immediate Ignition
0.89
Jet Fire
8.18E-06
Delayed Ignition
0.11
Flash fire
1.01E-06
Gas Dispersion
4.83E-03
Immediate Ignition
0.07
Jet Fire
0.00E+00
Open Atmosphere
0.07
Flash Fire
0.00E+00
Congested Atmosphere
0.01
BLEVE
0.00E+00
Delayed
0.93
Gas Dispersion
0.00E+00
Node 1
Potential Hazard
Jet Fire
Flash Fire
Gas Dispersion
Node 2
Potential Hazard
Jet Fire
Flash Fire
Gas Dispersion
Node 3
Potential Hazard
Jet Fire
Flash Fire
Gas Dispersion
Small (10-50mm)
3.46E-06
4.28E-07
3.89E-03
Frequency
Medium (50-150mm) Full (>150mm)
1.15E-06
2.77E-06
1.42E-07
3.42E-07
9.20E-04
1.03E-03
Small (10-50mm)
1.54E-06
1.90E-07
7.85E-04
Frequency
Medium (50-150mm) Full (>150mm)
8.09E-07
1.20E-06
1.00E-07
1.49E-07
1.37E-04
1.46E-04
Small (10-50mm)
2.48E-06
3.06E-07
9.25E-04
Frequency
Medium (50-150mm) Full (>150mm)
3.91E-06
1.49E-07
4.83E-07
2.34E-07
4.73E-04
1.63E-04
Node 1
Node 2
Node 3&4
Node 5
Potential Hazard
Jet fire
6.12E-08
Flash fire
7.56E-09
Gas dispersion
6.87E-05
Potential Hazard
Jet fire
5.09E-07
Flash fire
6.29E-08
Gas dispersion
5.71E-04
Potential Hazard
Jet fire
8.26E-07
Flash fire
1.02E-07
Gas dispersion
9.27E-04
Potential Hazard
Jet fire
Flash fire
Gas dispersion
Node
1
2
3&4
5
Frequency
Small (10-50mm)
6.80E-08
2.45E-07
7.02E-07
1.49E-02
Frequency
Small (3-10mm)
Medium (10-50mm)
Large (50-150mm)
Full (>150mm)
2.84E-08
6.80E-08
1.63E-06
5.41E-07
3.52E-09
8.40E-09
2.01E-07
6.68E-08
3.19E-05
1.52E-05
3.48E-05
4.25E-06
Frequency
Small (3-10mm)
Medium (10-50mm)
Large (50-150mm)
Full (>150mm)
1.61E-07
2.45E-07
3.57E-07
1.50E-06
1.99E-08
3.03E-08
4.42E-08
1.85E-07
1.80E-04
5.47E-05
7.63E-06
1.18E-05
Frequency
Small (3-10mm)
Medium (10-50mm)
Large (50-150mm)
Full (>150mm)
2.84E-07
7.02E-07
1.58E-07
0.00E+00
3.51E-08
8.68E-08
1.96E-08
0.00E+00
1.68E-04
5.52E-06
1.78E-07
0.00E+00
Small (3-10mm)
8.18E-06
1.01E-06
4.83E-03
Frequencies
Medium (10-50mm)
1.49E-02
1.84E-03
1.17E-01
Large (50-150mm)
2.75E-06
3.40E-07
3.09E-06
Full (>150mm)
3.95E-06
4.89E-07
2.39E-06
Frequency
Medium (50-150mm)
1.63E-06
3.57E-07
1.58E-07
2.75E-06
Full (>150mm)
5.41E-07
1.50E-06
0.00E+00
3.95E-06
rumusan masalah
bobot
30%
25%
25%
10%
10%
100%
BAB I
Latar Belakang
Perumusan Masalah
Batasan Masalah
Tujuan
Manfaat
100%
Progress
Progress
BAB III
Progress
100%
60%
BAB V
Metodologi Penelitian
Progress
0%
Progress