You are on page 1of 12

MWC Paramount Tower

CIP Shell Scope

SUBCONTRACTOR NAME:
CONTACT NAME:
TELEPHONE:
EMAIL:
Item
No.
1

OVERALL ADJUSTED SUBCONTRACTOR BID:

Locational Breakdown per Bid Form to follow:

a. Tower footprint per Key Plans


b. Parking Podium per Key Plans (includes Garage Roof Slab/Amenity Deck)
c. Retail footprint per Key Plans
Note: Onscreen pdf files are posted to confirm/clarify the above Key plans &
locational bid breakdowns

5
6

Comments

BASE BID:

2
4

Yes / No /
Qty

Please acknowledge and provide completed bid form

Please acknowledge onscreen pdf files which define locational breakdown per
the bid form provided.

9
10
11
12
13
14
15
16
17
18
19
20
21
22
23

In accordance with the Developer's agreement with the CRA:


LOCAL WORKFORCE PARTICIPATION
List the % of your workforce that reside in the County
List the % of your workforce that reside the area as shown on Exhibit E-1
List the % of your workforce that reside the area as shown on Exhibit E-2
List the % of your workforce that reside in zip codes 33137, 33128, 33130,
List the % of your workforce that reside in zip codes 33010, 33030, 33034,
LIVING WAGE REQUIREMENT
Confirm that you are paying a minimum wage of $12.83/hour inclusive of
RESPONSIBLE WAGES REQUIREMENT (Electrical trade only)
Confirm that you are paying a wage of $30.11/hour + $5.60/hour benefits
Electrical apprentice wages and ratios per Section 2-11.16 of the County
Subcontractor includes, if required, certified payroll verification.
An abstract & the full CRA agreement are posted for your review

24
25
26
27
28
29
30

PRICE INCLUDES:
STATE, COUNTY, LOCAL SALES & USE TAX
SUBCONTRACTOR'S GENERAL CONDITIONS/REQUIREMENTS
MOBILIZATION AND DE-MOBILIZATION (Multiple if required)
ALL LABOR & MATERIAL
ALL DOCUMENTS (PER COASTAL'S SMART-BID SITE), INCLUDING:

31
32
33
34
35

36

Structural GMP II Set Drawings: (per Exhibit B Doc log)


Architectural Progress dwgs; Coastal received 2/18/16, 2/26/2016 & 3/23/16; by
ODP Architecture & Design
Civil Progress dwgs; Coastal received 3/2/2016; by Kimley Horn
Structural GMP II Set dwgs; Coastal received 4/2/2016; by DeSimone
Structural Foundation Progress dwgs For Info; Coastal received 3/24/2016; by
DeSimone

37
38
39
40
41
42

Specifications: (Note - generally all spec info on dwgs)


Geotechnical Reports dated 10-13-14
LEED Info including LEED Plan & Scorecard dated 6/8/15 & 10/9/15
Acknowledge review of Wind Tunnel Testing dated 3/13/15 & 2/17/15
Survey Info dated May, 2015 by Perimeter incl Supplemental Survey Info posted
10/28/15

43

Page 1 of 12

Provided for Info and


Coordination w/Reinforcing
Fabricators direct proposal
for Mat Cap Foundation
Reinforcing

MWC Paramount Tower

CIP Shell Scope

SUBCONTRACTOR NAME:
CONTACT NAME:
TELEPHONE:
EMAIL:
Item
No.
44
45
46

OVERALL ADJUSTED SUBCONTRACTOR BID:


Coastal Tishman Project Information:
Acknowledge Draft Construction Schedule dated 4/1/16
Acknowledge Site Logistics & Safety Logistics documents dated 4/1/16

47
48

Acknowledge Addenda's - as necessary

49
50

Acknowledge RFI Responses - as necessary

51
52

53

54

55

56

57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72

GENERAL PROVISIONS:
This Scope of Work checklist is intended to define, but not limit, the scope of work to
be performed. The scope shall include all labor and material, equipment, layout,
supervision, shop drawings, permits, insurance, and all other services required for the
complete performance of the related trade work for this project.
Acknowledge Coastal Subcontract Terms & Conditions / Insurance & Bond
Requirements / Safety Program - Draft Subcontract Agreement including Exhibits A,
B, D, F1, G, H, J, K1 & L - Verify that you have read and comply with Coastal's
subcontract - provide any material exceptions with bid.

The subcontractor acknowledges that verification of this scope of work will supersede
omissions and clarifications in his/her proposal.
It is assumed that additional costs are included for escalation and that potential cost
increases have been considered in this proposal. Trade agrees to no price escalation
on materials oe labor for the duration of the project.
Has completely filled out and submitted Coastal's sub - prequalification form. (This is
mandatory for all subs prior to submitting a bid)
Indicate whether you have done or are presently doing work with Coastal or Tishman
Includes warranty & insurance requirements
Comply With All OSHA & Coastal Safety Requirements, including:
All field employees to have OSHA 10-hr certification
All supervisors and foremen to have OSHA 30-hr/CPR/First Aid certification.
One (1) full-time on-site safety representative when your workforce exceeds 50.
Two (2) representatives if workforce exceeds 100.
Comply with Coastal's insurance requirements per the provided sample certificate
which includes:
$1M per occurrence and $2M aggregate
No residential exclusion
No leased employees without Minimum Premium Policy
No Workers Compensation exemptions allowed.
What are your bonding limits?: Per project / Aggregate
Provide all scaffolding and hoisting required to perform this scope of work. All
equipment must have evidence of recent mechanical certification and be OSHA
approved.
Provide for a 2-way radio system tuned to a Coastal designated frequency.
Full time English speaking superintendent or foreman with authority to accept
direction per shift

73

Page 2 of 12

Yes / No /
Qty

Comments

MWC Paramount Tower

CIP Shell Scope

SUBCONTRACTOR NAME:
CONTACT NAME:
TELEPHONE:
EMAIL:
Item
No.
74
75
76
77
78
79

80

81
82
83
84
85
86
87
88
89
90
91
92
93
94
95

OVERALL ADJUSTED SUBCONTRACTOR BID:

Yes / No /
Qty

Comments

PROJECT SPECIFIC PROVISIONS:


Subcontractor acknowledges that they have reviewed the site conditions and
understands the logistics with reference to adjacent structures, receipt of materials,
lay down areas, MOT, working hours, etc.
Subcontractor acknowledges Coastal's Site Logistics Plan
Includes cost for off-site parking for subcontractor's employees.
Subcontractor acknowledges that they have reviewed and can comply with Coastal's
schedule for this project.
Saturday included as a makeup day. Subcontractor has included overtime and after
working hours as necessary to maintain the project schedule
Subcontractor acknowledges that Subcontractors Monthly AIA Payment Application
shall be processed using Textura Contract Payment Management Web Based
Software as outlined in Exhibit K. The fee for this service is included in this
agreement.
Secure and pay for all necessary licenses, permits, fees, inspections and tests
required by code or specifications for this portion of the work.
Provide for all necessary coordination as required with the CM and related trades
Layout required for this portion of the work.
All work/material shall be protected during construction as necessary until final
acceptance
Temporary storage of material (off-site) if required, is included.
Daily clean up of work areas broom swept - Trash Removal to a designated area on
each level
Shop Dwgs, Cut Sheets, Samples, Coordination Dwgs (as required)
Punch-out: Subcontractor shall create his own punch list prior to punch-out stage and
shall complete this to minimize items on future punch lists from Owner/CM/Architect
As-Built Dwgs, Close Out Documents & Maintenance manuals (as required)
Scope includes all lifting, hoisting , stocking and storage as required to complete
scope of work.
Acknowledge Pre-Bid Meeting (if applicable)
Composite cleanup crews
Each Trade is responsible for all applicable LEED requirements
Include provision for electronic badging for your personnel per Exhibit D to include
$35 per employee for this provision.
Perform 3D coordination for this work and participate in MEP and Structural
Coordination Meetings.

96

Page 3 of 12

Please provide breakout $

MWC Paramount Tower

CIP Shell Scope

SUBCONTRACTOR NAME:
CONTACT NAME:
TELEPHONE:
EMAIL:
Item
No.
97

OVERALL ADJUSTED SUBCONTRACTOR BID:

PROJECT SPECIFIC SCOPE:

98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117

Please acknowledge structural dwgs as follows:


Plan notes as indicated on various dwgs
General Notes per S002
Load Maps per S030 thru S035 (6 sheets)
Cladding Pressure Diagrams per S050 thru S070 (21 sheets)
Structural Foundation Plans S075 thru S101B (8 sheets) & S115 thru S118
sheets) & S141 (1 sheet)
Foundation Details/Schedules & Sections S110, S111, S130, S131, S132, S133,
S150, S151, S152 & S153 (10 sheets)
Plans & Enlarged Plans S202A.1 thru S259B (83 sheets)
Column Details & Schedules S300.1 thru S328 (7 sheets)
PT & RC Beam Schedules S340.1 thru S341 (2 sheets)
Link Beam Schedules & Details S345 (2 sheets)
Shear Wall Plans S440.01 thru S444.04 (22 sheets)
SW Elevations S480.01 thru S493.01 (15 sheets)
Bridge Section S506 & S507
Ramp Sections & Details S530
Sections & Details S580 thru S605 (8 sheets)
PT Details S700 thru S702 (3 sheets)
Masonry Details S800 (for coordination)
Structural Steel Details (for coordination except for work to be installed by the CIP
Shell Sub) S900 thru S951 (8 sheets)

118
119
120
121
122
123
124
125
126
127
128

Acknowledge Draft Construction Schedule dated 4/1/16


Schedule: 82 Weeks (following excavation & dewatering for dry hole)
Please indicate if your plan can improve this draft schedule.
Please provide your draft schedule with proposal.
Tower Mat:
Frame, Rebar, Pour Mat Foundations: 44 Days
Tower Concrete Superstructure
Slab on Grade Through Level 7 Amenity Deck: 7 Months
Levels 8 - 11 : 8 Days per Floor
Levels 12 - Roof: 5 Days per Floor

129

Page 4 of 12

(4

Yes / No /
Qty

Comments

MWC Paramount Tower

CIP Shell Scope

SUBCONTRACTOR NAME:
CONTACT NAME:
TELEPHONE:
EMAIL:
Item
No.
130
131
132
133
134
135

136

137

138
139

140

141
142
143
144
145

OVERALL ADJUSTED SUBCONTRACTOR BID:

Structural Excavation
Backfill & Grading
Cleaning of Sheet Piling as required for base bid
The site will be delivered to the shell subcontractor at the bottom of mat cap
elevation.
The Shell Contractor will excavate the large shear wall caps to the bottom of the cap
and provide and install ballast rock.
The shell contractor will excavate as necessary for each of the smaller individual
caps, grade beams, thickened edges, CIP wall footings and drop offs to the bottom
elevation of the cap as indicated in the design documents and provide and install
ballast rock at his discretion.
Mass dewatering will be provided by others if required, however, the shell
subcontractor will need to perform minor dewatering in individual pile caps via a trash
pump etc.
Once the soils are excavated around the piling, the shell contractor will mark the
cutoff elevation for each pile for cut off and removal by others.
At the completion of the pile cap construction and stripping of forms the Shell
Contractor will perform all back fill to the bottom of the slab on grade.
Buildup, backfill and compaction of the site on grade and other exterior slabs the on
grade will be provided by others. All final hand grading and minor machine grading at
the bottom of the slabs on grade will be performed by the shell subcontractor.
Includes all soil treatment (i.e. termite, pest control) as required and all preparation of
slabs on grade including fine grading, etc.
Provide and install the slab on grade as indicated. General fine grading and minor
grading around backfilled MEP trench work is to be included.
Temporary Truck Wash-Install/Remove
Truck Wash Operator
Street Sweeping for duration on site

148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164

Formwork Labor & Materials incl Foundation & Vertical Placing:


Include all design, engineering, materials and labor to supply, install, erect, and
remove all formwork required to complete:
Foundation Formwork - Mat Cap, Pile caps, foundations, footings, grade beams,
thickened edges, etc.
Foundation Walls incl Elevator Pits - Elevator, and equipment pits
Slab On Grade Edge Form
PT & RC Slabs incl Helix Ramp
PT & RC Slab Edge Form
Belt Truss @ Level #6
Shoring & Re-shoring as necessary for the elevated helix ramp & belt trusses
Beams Three Sides all sizes incl Beams, headers and tie beams
Patching PT Pockets
Styrofoam Fill
Stairs
Column incl Columns and tie columns
Shear walls incl Link Beams
Other Walls incl Parapet walls and beams, Planter walls
Garage Ramp Walls incl Crash Walls
Lintels and parapet caps
Page 5 of 12

Comments
As indicated below

Structural Excavation, Backfill & Grading as necessary (Generally by Others):

146
147

Yes / No /
Qty

NA

By Others

NA

By Others

NA

By Others

NA

By Others

NA

By Others

NA

By Others

MWC Paramount Tower

CIP Shell Scope

SUBCONTRACTOR NAME:
CONTACT NAME:
TELEPHONE:
EMAIL:
Item
No.
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184

OVERALL ADJUSTED SUBCONTRACTOR BID:

Yes / No /
Qty

Comments

Equipment and housekeeping pads - Allowance for 100 ea. pads of various sizes
Electrical Rise Encasement
Ramps, stairs and landings
Loading docks
Trench drains
Pool and spa structures in elevated decks.
Masonry, slab and terrace depression(s)
Provide and install all Styrofoam fill under step or elevated slab construction as
required.
Equipment, railing, roof and door curbs
Coordinate with the railing manufacturer the location of all slab / terrace block outs
and install sleeves, provided by others, for the railing system posts as per the railing
subcontractors shop drawings.
Provide and install all expansion joint material as indicated and / or required.
Subcontractor to aid glazing contractor to set anchor bolts and imbed plates as
required for attachment of the store front glazing as required (Material provided by
others).
Install only imbeds for rough carpentry integral with the structural shell.
Bulkhead/construction joint formwork
All cast in place/jobsite precast stairs.
Planter walls - Cast in place including those reflected on the landscape/hard cape
drawings
Water stop
Chamfer of exposed concrete column corners
Forming of all openings for trades in concrete floors and walls.
Concrete Curbs at Shaft Penetrations & Equipment Rooms

185
186
187
188
189
190
191
192
193
194
195
196
197
199
200
201

Ready Mix Material incl waste:


Puddling as indicated and/or required. Note RFI #79 confirmed 72% of vertical mix
design strength for slabs in lieu of puddling
Topping Slabs
DCI Admixture Balcony Slabs & Terraces (See detail S702)
Super P Provision as indicated and/or required
Environmental Load Charges
Fuel Surcharge
Plant Opening & Saturday Delivery Charges as necessary
Pump Grout Prime
Pump Blowback Grout Mix
Concrete strength and WC ratio per plans
Concrete mixes to support schedule
No Mass Concrete Requirements pertain at this time, including previously considered
DCI & Shrinkage reducing admixtures in either foundation or vertical elements
Escalation
Breakout Price - Total value of ready mix
concrete materials included, with tax.

202

Page 6 of 12

Please provide breakout $

NIC

NA

MWC Paramount Tower

CIP Shell Scope

SUBCONTRACTOR NAME:
CONTACT NAME:
TELEPHONE:
EMAIL:
Item
No.
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229

230
231

OVERALL ADJUSTED SUBCONTRACTOR BID:


Concrete Placing & Finishing:
Mat Cap, Pile caps, foundations, footings, grade beams, thickened edges, etc.
Foundation Walls incl Elevator Pits - Elevator, and equipment pits
Slab On Grade
PT & RC Slabs incl Helix Ramp
Belt Truss @ Level #6
Beams all sizes incl Beams, headers and tie beams
Stairs
Column incl Columns and tie columns
Shear walls incl Link Beams
Other Walls incl Parapet walls and beams, Planter walls
Garage Ramp Walls incl Crash Walls
Lintels and parapet caps
Equipment and housekeeping pads - Allowance for 100 ea. pads of various sizes
Electrical Rise Encasement
Ramps, stairs and landings
Loading docks
Pool and spa structures in elevated decks.
Ramps, stairs and landings
Loading docks
Topping slabs and secondary pours
Provide and install slopes and drainage as required. Coordinate and assist roof drain
block outs with the plumbing contractor.
Provide and install sealer to the garage floor slabs and ramps as indicated.
Furnish all concrete finishing for all slabs in strike-in broom or float as directed by
Coastal Tishman.
Provide and install curing & sealing compound where indicated.
Saw cut control joints as required.
Provide and install the FPL conduits concrete encasement detail as indicated or
required. Coordinate with the electrician for block outs and stub-up dimensions
Provide and install the exterior site stairs to include coordination with the paver
subcontractor regarding paver system sizes as well as installing imbeds provided by
the railing subcontractor.
Apply curing compound and sealer as required.

267

Page 7 of 12

Yes / No /
Qty

Comments

MWC Paramount Tower

CIP Shell Scope

SUBCONTRACTOR NAME:
CONTACT NAME:
TELEPHONE:
EMAIL:
Item
No.
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299

OVERALL ADJUSTED SUBCONTRACTOR BID:

Yes / No /
Qty

Comments

Reinforcing:
Include all design, engineering, materials and labor to design, supply and install:
All steel reinforcing as required by the plans and specifications
Provide and install galvanized reinforcing and galvanized accessories on all terraces
and / or balconies. Provide plastic bar supports for these areas. See detail S702
All reinforcing support items including bolsters, chairs, brick, etc.
All couplers and connectors
Welded wire mesh
Include 225 tons of additional reinforcing steel for engineer of record's use on the
Tower & Retail/Parking Podium Areas
Provide and install all stud rails and/or shear heads as per the requirements indicated
on the plans.
Provide reinforcing steel as required and maintain steel condition free from scaling
until utilized.
Provide reinforcing steel as required for post tension tendon support.
Provide and install all link beam construction as indicated.
Provide reinforcing steel material for all masonry. (supply only)
Standard rebar tonnage included:
Galvanized rebar tonnage included:
Provide all Grade 75 and Grade 100 Reinforcing as indicated
Tonnage of post tension back up bars included:
Tonnage masonry reinforcement included:
Link Beam Steel
Engineer Allowance
Rebar Accessories & Safety Caps
Premium for Grade 75
Premium for Grade 100
Premium for Galvanized
WWM
WWM Garage/Retail
Sales Tax
Escalation
Misc. Items:
SF of welded wire fabric
Number of Couplers
Breakout Price - Total value of reinforcing
materials included, with tax.

300

Page 8 of 12

Please provide breakout $

MWC Paramount Tower

CIP Shell Scope

SUBCONTRACTOR NAME:
CONTACT NAME:
TELEPHONE:
EMAIL:
Item
No.
301
302
303
304
305
306
307
308
309
310
311
312
313

OVERALL ADJUSTED SUBCONTRACTOR BID:

Yes / No /
Qty

Comments

PT Material:
Design, provide and install the post tension system as required.
Furnish all post tension engineering drawings (signed & sealed).
Includes stressing all post tension cables as required by the contract documents.
Includes removal of all excess cables after the stressing is complete, installation of
grease caps and patching of PT pockets.
Post tension cables:
Total # included (bare)
Total # included (encased weight)
Total SQFT of post tensioned elevated slab included
Shear Rails
Accessories & Stressing Machine Rental
Sales Tax
Breakout Price - Total value included for post tension
materials including tax:

314
315
316
317
318

Structural Steel Material:


Shear Plates at Belt Trusses
Link Beam Steel Plates
Breakout Price - Total value included for structural
steel belt truss and link beam materials including tax:

319
320
321
322
323
324
325

Rebar & PT Installation:


Rod Busting (Rebar)
Rod Busting (PT Installation)
Rod Busting (Accessories & Stud rails)
Rod Busting (Link Beam & Belt Truss Steel) Tower
Breakout Price - Total value included for Rebar & PT
Installation including tax:

343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359

Equipment:
Tower Crane(s):
Number of Tower Cranes included: (2)
Furnish and Install (2) Tower Crane Foundations
Includes all delivery, erection, dismantling and removal.
Includes all anchors and tie backs and all associated structure for same.
Includes all jumps.
Includes all Operators, both straight time and overtime based on 260 hours per
month.
Layout and placement of all anchors required to be placed in footings/pile caps.
Crane rental cost per month for use by other trades once building shell is topped out
and the concrete shell is complete: $ _______/month.
Subcontractor to provide for outriggers and slings if needed.
Includes all buckets, tremies, etc.
All permits and licenses
All specialty engineering required for crane installation and usage.
Engineering of Crane Foundations
Provide tower cranes and pedestal support (piles by others) as necessary, for
support.
Page 9 of 12

Please advise rate $/mo.

MWC Paramount Tower

CIP Shell Scope

SUBCONTRACTOR NAME:
CONTACT NAME:
TELEPHONE:
EMAIL:
Item
No.
360
361
362
363
364

365

OVERALL ADJUSTED SUBCONTRACTOR BID:


Install and removal of (2) Tower Crane Foundations
Including third party inspections on ( 2) Cranes.
Subcontractor to provide for flagmen and spotters as needed.
Includes all signal men and riggers.
Subcontractor to provide for hoisting of Coastal material during normal business
hours if needed. After normal hours the subcontractor may charge to the contractor
for additional hoisting time at the rate of $_______ / hour.
Include Cost for (6) Months additional rent on (1) Tower Cranes with Operators i.e. 6
months total - Please provide breakout price

Yes / No /
Qty

Comments

Please advise rate $/hr. OT


Please provide breakout $

366
367
368

Man & Material Buck Hoist: Foundation & Platforms Only:


Install and Remove (2) Man & Material Hoist Foundations & Loading Platforms

369
370
371
372
373

Mobile cranes:
Includes all mobile cranes required for completion of the scope of work herein
included.
Includes all hoisting/mobile cranes required for completion of the garage scope of
work herein included.
Provide all forklifts as necessary to move supplies and material related to the shell
construction.

374
375
376
377
378

Concrete Pumps:
Pumps including all piping, thrust blocks, anchors, floor penetrations, etc.
Placing booms
Contractors include pour backs for placing boom penetrations

379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399

Misc. Concrete:
Misc. Concrete
Termite & pest control
Embed Install/Fill
Logistics Permitting/BIM
Waste Removal/Recycling
Support Crews
Composite Clean-Up
Temp Generators; Up to 3 months
FPL Encasement & Bus Duct Curb
Housekeeping Pads
Named Storms Prep/Restorations
Dumpster Pulls Include 10 pulls per month for duration on site
Bulk Trash Hauling Include $1000 per month for duration on site
Provide 4 Carpenters & 4 Laborers for duration on site
Provide 2 Gate Guards/Flagmen for the duration on site
Temporary Truck Wash-Install/Remove
Truck Wash Operator
Street Sweeping for duration on site
Please provide for a Penetron admixture and necessary bentonite water stops for the
anticipated cold joint at the elevator pits in the Mat Cap for the pours below the 9'
deep mat

400

Page 10 of 12

Please provide breakout $


Please provide breakout $
Please provide breakout $
Please provide breakout $
Please provide breakout $
Please provide breakout $
Please provide breakout $

MWC Paramount Tower

CIP Shell Scope

SUBCONTRACTOR NAME:
CONTACT NAME:
TELEPHONE:
EMAIL:
Item
No.
443
444
445
446
447
448

449

450
451
461
462

OVERALL ADJUSTED SUBCONTRACTOR BID:

Yes / No /
Qty

Comments

NA

By Others

Miscellaneous:
Saturday included as a makeup day
Concrete under pavers
Include below slab floor vapor barrier as required and detailed.
Provide for continuous cleanup of all materials including bag goods / sand, materials,
shipping wrappers, crates, etc. to a Coastal dumpster
Furnish & install construction trailer stair and landings for the contractors compound
as directed by Coastal.
Provide grinding of all exposed concrete immediately after stripping where plumbness
exceeds tolerances and or between form boards. Includes grinding and filling of all
exposed concrete ceilings as required to correct imperfections in excess of 1/8".
Final walk through inspection to take place with Coastal and quality to be approved
prior to Stucco and drywall applicator starting.
Subcontractor to provide for additional expenditure for blue print cost for plan
replication if needed.
No level 13 exists in the current plans
Install all required dove tail slots (supplied by others)

463
464
465
466
467
468
469
470
471
472
473
474
475
476

Safety Provisions:
Safety straps: provided by subcontractor / installed by sub in location directed by
Coastal Tishman
Safety/Debris nets/Cocoon Jump Form & Access equipment
Maintain safety for duration of the project
Safety on floors below formed deck thru Re-shored decks
Place & Maintain safety rebar caps on exposed reinforcing
Strip and cover all slab openings
Furnish and install OSHA compliant handrails
Provide Labor & Material for all Safety Railings & Protection of Interior Openings
including Elevator Shafts, Stairs, etc.
Safety Nets & Safety Provisions
Maintenance of 7 levels of perimeter safety rails below working deck
Elevator Railing Protection at Elevator Fronts & Maintenance of same for 7 levels
Elevator Overhead Protection (3 platforms incl 1 sloping per shaft)

477
478
479
480
481
482
483
484
485
486
487

Quantity Verification:
Structural Excavation, Backfill & Grading (cy)
Contact Area Formwork - Foundation (sf)
Contact Area Formwork - Elevated Slabs incl beams (sf)
Contact Area Formwork - Walls & Columns incl Link beams (sf)
Styrofoam Fill (cf)
Ready Mix Material incl waste (cy)
Reinforcing Steel (tons)
Post Tensioning Material (lbs)
Structural Steel Link Beams & Belt Trusses (tons)

488
489

Provide Unit Price Info: (TBD)

490

Page 11 of 12

SF
SF
SF
CF
CY
TONS
LBS
TONS

MWC Paramount Tower

CIP Shell Scope

SUBCONTRACTOR NAME:
CONTACT NAME:
TELEPHONE:
EMAIL:
Item
No.
491
492

OVERALL ADJUSTED SUBCONTRACTOR BID:

Yes / No /
Qty

Comments

NIC

By Others

Provide Alternate Prices:


Alternate #1 - Please provide a separate price for the Mat Cap Foundation

493

494

495

Provide Cost breakdown as follows: (for accounting and


evaluation purposes only) NOTE THIS IS SEPARATE AND
DISTINCT FROM THE BID FORM BREAKDOWN REQUIRED

509

Mobilization
Structural Excavation, Backfill & Grading
Formwork Labor & Materials incl Foundation & Vertical Placing:
Ready Mix Material incl waste
Concrete Placing & Finishing
Concrete Pumping
Reinforcing Steel
Post Tensioning Material
Structural Steel Link Beam & Belt Truss Material
Rebar & PT Installation
Tower Cranes
Other Equipment incl Mobile Cranes & Forklifts, etc.
Misc. Concrete Items
Safety Provisions
Subcontractor General Conditions/Requirements incl Insurance

510

De-Mobilization

496
497
498
499
500
501
502
503
504
505
506
507
508

511
512

513

Subcontractor Default Insurance:


Subcontractor acknowledges that Coastal has a "Subcontractor Default Insurance"
program and in the event that Coastal chooses not to provide a "Subcontractor
Default Insurance" program for this package this Subcontractor will be required to
provide a Payment and Performance Bond at an additional cost as below.

514
515
516

Provide Schedule Duration (weeks)


Bid Validity (90 days minimum)

517
518
519
520
521

SUBTOTAL:
BONDING COMPANY:
ADD FOR PAYMENT & PERFORMANCE BOND:
OVERALL ADJUSTED SUBCONTRACTOR BID:

Page 12 of 12

You might also like