You are on page 1of 13

202

REFERENCES

1.

Abdelmaguid, TF, Ashraf, ON, Badawia, AK & Mohamed, FH 2004,


A hybrid GA / Heuristic approach to the simultaneous scheduling of
machines and automated guided vehicles, International Journal of
Production Research, vol.42, no, 2, pp.267-281.

2.

Agnetis, A, Alfieri, A, Brandimarte, P & Prinsecchi, P 1997, Joint job/


tool scheduling in a flexible manufacturing cell with no on-board tool
magazine, Computer Integrated Manufacturing system, vol.10, no, 1,
pp.61-68.

3.

Amirthagadeswaran, KS & Arunachalam, VP 2007, Enhancement of


performance of Genetic algorithm for job-shop scheduling problems
through inversion operator, International Journal of Advanced
Manufacturing Technology, vol.32, no, 7-8, pp.780-786.

4.

Asha, A, Kannan, SM & Jayabalan, V 2008, Optimization for


clearance variation in selective assembly for components with multiple
characteristics, International Journal of Advanced Manufacturing
Technology, vol.38, no, 9-10, pp.1126-1044.

5.

Asokan, P, Jerald, J, Arunachalam, S & Page, T 2008, Application of


Adaptive genetic Algorithm and Particle Swarm Optimization in
scheduling of jobs and AS/RS in FMS, International Journal of
Manufacturing Research, vol. 3, no, 4, pp. 393-405.

6.

Azadivar,F 1989, Optimum allocation of resources between the


random access and rack storage spaces in an automated warehousing
system, International Journal of Production Research, vol. 27, no, 1,
pp.119-131.

7.

Baker, KR 1974, Introduction to Sequencing and Scheduling, Wiley,


New York.

8.

Bhattacharya, R & Bandyopadhyay, S 2010, Solving conflicting


bi-objective facility location problem by NSGA-II evolutionary
algorithm, International Journal of Advanced Manufacturing
Technology,vol.51, no, 1-4, pp.397-414.

203

9.

Beasley, JE 1990, OR-Library: Distributing test problems by


electronic mail, Journal of Operational Research Society, vol. 41,
no.11, pp.1069-1072.

10.

Berg, JPV & Gademann, AJRM 2000, Simulation study of an


automated storage/retrieval system, International Journal of
Production research, vol.38, pp. 1339-1356.

11.

Bilge, U & Ulusoy, G 1995, A time window approach to simultaneous


scheduling of machines and material handling system in an FMS, Operations
Research, vol.43, no, 6, pp.1058-1070.

12.

Blazewicz, J, Eiselt, HA, Laporte, G & Weglarz, J 1991, Scheduling of tasks


and vehicles in a flexible manufacturing system, International Journal of
Flexible Manufacturing System, vol.4, no, 1, pp.5-16.
13.

Caumond, A, Lacomme, P, Moukrim, A& Tchernev, N 2009, An


MILP for scheduling problems in an FMS with one vehicle, European
Journal of Operational Research, vol.199, no, 3, pp.706-722.

14.

Chan, FTS & Chan, HK 2001, Dynamic scheduling for a flexible


manufacturing system- The pre-emptive approach, International
Journal of Advanced Manufacturing Technology, vol. 17, no, 10,
pp. 760-768.

15.

Chan, FTS 2003, Effects of dispatching and Routeing decisions on the


performance of a flexible manufacturing system, International Journal
of Advanced Manufacturing Technology, vol. 21, no, 5, pp. 328-338.

16.

Chan, FTS, Chung, SH, Chan, LY, Finke, G & Tiwari, MK 2006,
Solving distributed scheduling problems subject to maintenance:
Genetic algorithms approach, Robotics and Computer Integrated
Manufacturing, vol. 22, no, 5-6, pp. 493-504.

17.

Chang, YL &Sullivan, RS 1990, Schedule generation in job shop,


International Journal of Production Research,vol.28, no, 1, pp.65-74.

18.

Chaudhry, IA, Mahmood, S & Shami, M 2011, ' Simultaneous


scheduling of machines and automated guided vehicles in flexible
manufacturing systems using genetic algorithms', Journal of Central
South University of Technology, vol. 18, no, 5, pp. 1473-1486.

204

19.

Chetty, OVK & Reddy, MS 2003, Genetic algorithms for studies on


AS/RS integrated with machines, International Journal of Advance
Manufacturing Technology, vol. 22, no, 11-12, pp.932-940.

20.

Chryssolouris, G, Pierce, JE & Dicke, K 1992, ADecision-Making


Approach to the Operation of Flexible Manufacturing Systems,
International Journal of Flexible Manufacturing Systems, vol.4,
no.3/4,pp.309-330.

21.

Chryssolouris, G, Dicke, K & Lee, M 1992,On the Resources


Allocation Problem, International Journal of Production Research,
vol.30,no.12, pp.2773-2795.

22.

Cochran, JK, Horng, SM &Fowler, JW 2003, A multi-population


genetic algorithm to solve multi-objective scheduling problems for
parallel machines, Computers & Operations Research, vol.30, no, 7,
pp. 1087-1102.

23.

Croce, FD, Tadei, R & Volta, G 1995,A genetic algorithm for the job
shop problem, International Journal of Computers& Operations
Research, vol. 22, no. 1,pp.15-24.

24.

Das, K, Baki, MF & Li, X 2009, Optimization of operation and


changeover time for production planning and scheduling in flexible
manufacturing Technology, Computers and Industrial Engineering,
vol.56, no, 1, pp.283-293.

25.

Deb, K, Pratap, A, Agarwal, S & Meyarivan, T 2002,A fast and elitist


multiobjective genetic algorithm: NSGA-II, IEEE Transactions on
Evolutionary Computing, vol.6, no.2, pp.182-197.

26.

Dias, AHF & Vascancelos, JA 2002, Multiobjective Genetic


algorithms applied to solve optimization problems, IEEE transactions
on Magnetics, vol.38, no.2, pp.1133-1136.

27.

Dioubate & Mamady 2008,An artificial immune system based multi


agent model and its application to robot cooperation problem, In
Proceedings of the 7 th World Congress on Intelligent Control and
Automation, Changqing, China, IEEE, pp.3033-3039.

28.

Eben-chaime, M 1992,Operations sequencing in automated


warehousing systems, International Journal of Production Research,
vol.30, no.10, pp. 2401-2409.

205

29.

Eberhart, RC & Shi, YH 1998, Comparison between genetic algorithm


and particle swarm optimization, Annual Conference on Evolutionary
Programming, San Diego.

30.

EIMekkawy, TY & EIMaraghy, HA 2003,Real-time scheduling with


deadlock avoidance in flexible manufacturing systems, International
Journal of Advanced Manufacturing Technology, vol. 22, no.3-4,
pp. 259-270.

31.

French, S 1982,Sequencing and scheduling, Ellis Horwood Limited,


England.

32.

Gamila, MA & Motavalli, S 2003,A modeling technique for loading


and scheduling problems in FMS, Robotics and Computer Integrated
Manufacturing, vol.19, no.1-2, pp.45-54.

33.

Giffler, B & Thompson, GL 1960,Algorithms for solving production


scheduling problems, International Journal of Operations Research,
vol. 8, pp. 487-503.

34.

Goldberg, DE 1989,Genetic algorithms in search optimization and


machine learning, Addison Wesley, Boston.

35.

Groover, MP 2009,Automation Production Systems, and Computer


Integrated Manufacturing, Third Edition, Prentice Hall of India, India.

36.

Hamid, AMB & Rahman, ATK 2010,Short term load forecasting using
an artificial neural network trained by artificial immune system
learning algorithm, In proceedings of 12th International Conference on
Computer Modeling and Simulation, Cambridge, UK, IEEE,
pp.408-413.

37.

Henry, YKL &Steven, YPL 2008,A lagrangian based immune inspired


optimization framework for distributed systems, In proceedings of
IEEE International Conference on Systems, Man and Cybernetics,1215 Oct 2008, Singapor, IEEE, pp.1326-1331.

38.

Honghong,Y & Zhiming, Z 2003,The application of Adaptive Genetic


Algorithms in FMS dynamic rescheduling, International Journal of
Computer Integrated Manufacturing, vol.16, no.6, pp.382-397.

39.

Hsieh, S & Tsai, KC 2001, A BOM oriented Class Based Storage


Assignment in an Automated Storage/ Retrieval system, International
journal of Advanced Manufacturing Technology, vol. 17, no.17,
pp.683-691

206

40.

Hsu, T, Korbaa, O, Dupas, R & Goncalves, G 2001, Cyclic


scheduling for FMS: Modelling and evolutionary solving approach,
European Journal of Operational Research, vol. 13, no.2, pp.71-88.

41.

Hu, Y, Huang, SY, Chen, C, Hsu, W, Toh, AC, Loh, CK & Song, T
2005,Travel time analysis of a new automated storage and retrieval
system, Computers & Operations Research, vol.32, no.6,
pp.1515-1544.

42.

Hwang, CL & Yoon, K 1981,Multiple attribute decision making


methods and applications, Springer, Berlin.
43. James T. Lin, Chuh-Chih Chiu, Yu-Hsiang Chang & Hung-Ming Chen
2015, A hybrid genetic algorithm for simultaneous scheduling of
machines and AGVs in FMS, Industrial Engineering and Management
Science Application, vol.349, pp.277-286.

44.

Jawahar, N, Aravindan, P, Ponnambalam, SG & Suresh RK


1998,AGV schedule integrated with production in flexible
manufacturing systems, International journal of Advanced
Manufacturing Technology, vol.14, no.6, pp.428-440.

45.

Jawahar, N, Aravindan, P & Ponnambalam, SG 1998,A Genetic


algorithm for Scheduling Flexible Manufacturing Systems,
International Journal of Advanced Manufacturing Technology, vol. 14,
no.8, pp.588-607.

46.

Jawahar, N, Aravindan, P &Ponnambalam, SG 1998, Optimal


Random Storage allocation for an AS/RS in an FMS, International
Journal of Advanced Manufacturing Technology, vol. 14, no.2,
pp.116-132.

47.

Jerald, J, Arunachalam, S & Page, T 2008,Application of Adaptive


genetic Algorithm and Particle Swarm Optimization in scheduling of
jobs and AS/RS in FMS, International Journal of Manufacturing
Research, vol.3, no.4, pp.393-405.

48.

Jerald, J, Asokan, P, Prabaharan, G & Saravanan, R 2006,


Simultaneous scheduling of parts and automated guided vehicles in an
FMS environment using adaptive genetic algorithm, International
Journal of Advanced Manufacturing Technology, vol. 29, no.5-6,
pp.584-589.

207

49.

Jerinleno, I, Saravanasankar, S, Victorraj, M & Ponnambalam, SG


2013,An elitism strategy genetic algorithm for integrated layout
design, International Journal of Advanced Manufacturing Technology,
vol.66, no.9-12, pp.1573-1589.

50.

Jun, H, Kim, Y & Sub, H 1999,Heuristics for a tool provisioning


problem in a flexible manufacturing system with an automatic tool
transporter, IEEE Transactions on Robotics and Automation, vol.15,
no.3, pp.488-497.

51.

Kannan, SM, Sivasubramanian, R & Jayabalan, V 2008,Particle


swarm optimization for minimizing assembly variation in selective
assembly, International Journal of Advanced Manufacturing
Technology, vol.42, no.7-8, pp.793-803.

52.

Kennedy, J & Eberhart, RC 1995,Particle swarm optimization,


Proceedings of the IEEE International Conference on Neural
Networks, Perth, Australia, no.4, pp.1942-1948.

53.

Kim, Y, Lee, G, Choi, S & Lim, S 2001,Tool requirements planning


in a flexible manufacturing system with automatic tool transporter,
IEEE transactions on Robotics and Automation, vol.17, no.6,
pp.795-804.

54.

Kirkpatrick, S, Gelatt, CD & Vecchi, MP 1983,Optimization by


Simulated Annealing, Science, vol.220, no.4598, pp.671-680.

55.

Knapp, GM & Wang, H 1991,Modeling of Automated Storage/


Retrieval Systems Using Petri Nets, Journal of Manufacturing
systems, vol.11, no.1, pp.20-29.

56.

Lacomme, P, Moukrim, A & Tchernev, N 2005,Simultaneous job input


sequencing and vehicle dispatching in a single vehicle automated
guided vehicle system: a heuristic branch and bound approach coupled
with a discrete event simulation model, International Journal of
Production Research, vol. 43, no.9, pp.1911-1942.

57.

Linn, RJ & Wysk, RA 1990,An expert system framework for


automated storage and retrieval system control, Computers and
Industrial Engineering, vol.18, no.1, pp.37-48.

58.

Liu, B, Wang, L & Jin, Y 2007,An effective hybrid particle swarm


optimization for no-wait flow shop scheduling, International Journal
of Advanced Manufacturing Technology, vol.31, no.9-10,
pp.1001-1011.

208

59.

Low, C, Yip, Y & Wu, T 2006,Modelling and heuristics of FMS


scheduling with multiple objectives, Computers & Operations
Research, vol.33, no.3, pp.674-694.

60.

Mishra, S & Patra, SK 2008,Short term load forecasting using a neural


network by a hybrid artificial immune system. In proceedings of IEEE
Conference on Industrial and Information Systems,8-10 Dec 2008,
Kharagpur, India, IEEE, pp.611-616.

61.

Muth, JF & Thompson, GL 1963,Industrial Scheduling, Prentice


Hall, Englewood Cliffs, N.J.

62.

Nagi, ZG & Mark, AL 2001,Deadlock detection, prevention and


avoidance for automated tool sharing systems, IEEE transactions on
Robotics and Automation, vol.17, no.3, pp.342-356.

63.

Natarajan, U, Periasamy, VM & Saravanan,R 2007,Application of


particle swarm optimization in artificial neural network for the
prediction of tool life, International Journal of Advanced
Manufacturing Technology, vol.31, no.9-10, pp. 871-876.

64.

Newman, ST, Newnes, LB & Bell, R 1998,A Multi-Level Modelling


System for the Design of Flexible Machining Installations, International
Journal of Production Research, vol. 36, no. 9, pp.2355-2376.

65.

Noorul Haq, A & Karthikeyan, T 2003, Scheduling decisions in FMS


using a heuristic approach, International Journal of Advanced
Manufacturing Technology, vol.22, no.5-6, pp.374-379.

66.

Petalas, YG, Parsopoulous, KE & Vrahatis, MN 2007,Memetic


Particle Swarm Optimization, Annals of Operational Resarch, vol.156,
no.1, pp.99-127.

67.

Prabaharan, T, Nakkeeran, PR & Jawahar, N 2006, Sequencing and


scheduling of job and tool in flexible manufacturing cell, International
Journal of Advanced Manufacturing Technology, vol.29, no.3,
pp.729-745.

68.

Prabaharan, T, Jawahar, N & Balan Sundarakani 2011, Sequencing


and scheduling of machine and tool in automated manufacturing
system using genetic algorithm, International value chain
management, vol.5, no.3/4, pp.175-211.

209

69.

Rahimifard, S & Newman, ST 1997,Simultaneous Scheduling of


Workpieces, Fixtures and Cutting Tools within Flexible Machining
Cells, International Journal of Production Research, vol. 35,
no.9,pp.2379-2397.

70.

Rahimifard, S & Newman, ST 2000,A Reactive Multi-Flow Approach


to the Planning & Control of Flexible Machining Facilities,
International Journal of Computer Integrated Manufacturing, vol.13,
no.4,pp.311-324.

71.

Rajendran, C 1995,Heuristics for scheduling in flow shop with


multiple objectives, European Journal of Operational Research,
vol.82, no.3, pp.540-555.

72.

Raman, N, Talbot, FB & Rachamadugu, RV 1989,Due date based


scheduling in a general flexible manufacturing system, Journal of
Operations Management, vol.8, no.2, pp.115-132.

73.

Ravindran, D, Noorul Haq, A, Selvakumar & Sivaraman, SJ


2005,Flow shop scheduling with multiple objective of minimizing
makespan and total flow time, International Journal of Advanced
Manufacturing Technology, vol.25, no.9-10, pp.1007-1012.

74.

Reddy, BSP & Rao, CSP 2006, A hybrid multi-objective GA for


simultaneous scheduling of machines and AGVs in FMS,
International Journal of Advanced Manufacturing Technology, vol.31,
no.5-6, pp.602-613.

75.

Sabuncuoglu, I & Hommertzheim, DT 1993Experimental


investigation of an FMS due date scheduling problem: Evaluation
of machine and AGV scheduling rules, The International journal of
Flexible Manufacturing System, vol.5, no.4, pp.301 323.

76.

Sabuncuoglu, I & Kizilisik, OB 2003, Reactive scheduling in a


dynamic and stochastic FMS environment, International Journal of
Production Research, vol.41, no.17, pp.4211-4231.

77.

Saravanan, M & Haq, AN 2008, Evaluation of scatter search approach


for scheduling optimization of flexible manufacturing systems,
International Journal of Advanced Manufacturing Technology, vol.38,
no.9-10, pp.978-986.

210

78.

Saravanasankar, S, Ponnanbalam, SG & Rajendran, C 2003, A multi


objective genetic algorithm for scheduling a flexible manufacturing
system, International Journal of Advanced Manufacturing Technology,
vol.22, no.7-8, pp.229-236.

79.

Sarker, BR & Babu, PS 1995, Travel time models in automated


storage/retrieval systems: A critical review,International Journal of
Production Economics, vol. 40, no.2-3, pp.173-184.

80.

Sathish Kumar, MV, Ranga Janardhana, & Rao, CSP


2011,Simultaneous scheduling of machines and vehicles in an FMS
environment with alternative routing, International Journal of
Advanced Manufacturing Technology, vol. 53, no.1-4, pp.339 -351.

81.

Satheeshkumar, RM, Asokan, P & Kumanan, S 2009, Artificial


immune system based algorithm for the unidirectional loop layout
problem in a flexible manufacturing system. International Journal of
Advanced Manufacturing Technology, vol.40, no.5-6, pp.553-565.

82.

Shi-jin, W, Li-feng, X & Bing-hai, Z 2007, Filtered beam search based


algorithm for dynamic rescheduling in FMS, Robotics & Computer
Integrated Manufacturing, vol.23, no.4, pp.457-468.

83.

Sinriech, D, Rubinovitz, J, Milo, D & Nakyly, G 2001,Sequencing,


scheduling and tooling single stage multimachines in a small batch
environment, IIE transactions,vol.33,pp.897-911.

84.

Srinivas, N & Deb, K 1994,Multi-objective optimization using


nondominated sorting in genetic algorithms, IEEE Transactions
Evolutionary Computing, vol. 2, no. 3, pp.221-248.

85.

Srinivasan, MM, Bozer, YA & Cho, M 1994,Trip-based material


handling systems: throughput capacity analysis, IIE Transactions,
vol.26, no.1, pp.70-89.

86.

Sterna, M 2007,Late work minimization in a small flexible


manufacturing system, Computers & Industrial Engineering, vol.52,
no.2, pp.210-228.

87.

Sureshkumar, N & Sridharan, R 2007, Simulation modeling and


analysis of tool flow control decisions in single stage multimachine
flexible manufacturing system, Robotics and Computer Integrated
Manufacturing, vol.23, no.4, pp.361-370.

211

88.

Sureshkumar, N& Sridharan, R 2009,Simulation modeling and


analysis of tool flow control decisions in a flexible manufacturing
system, Robotics and Computer Integrated Manufacturing, vol.25,
no.4-5, pp.829-838.

89.

Tsukada, TK & Shin, KG 1998Distributed tool sharing in flexible


manufacturing systems, IEEE transactions on Robotics and
Automation, vol.14, no.3, pp.379-389.

90.

Udhayakumar, P & Kumanan, S 2010, Sequencing and scheduling of


job and tool in flexible manufacturing system using ant colony
optimization algorithm, International Journal of Advanced
Manufacturing Technology, vol.50, no.9, pp.1075-1084.

91.

Ulusoy, G, Sivrikaya, F &Bilge, U 1997,A Genetic algorithm


approach to the simultaneous scheduling of machines and guided
vehicles, Computers & Operations Research, vol. 24, no.4,
pp.335-351.

92.

Umar, UA, Ariffin, MKA, Ismail, N & Tang, SH 2015, 'Hybrid multi
objective genetic algorithm for integrated dynamic scheduling and
routing of jobs and automated guided vehicle (AGV) in flexible
manufacturing system (FMS) environment , International Journal of
Advanced Manufacturing Technology.

93.

Victor Raj, M, Saravana Sankar, S & Ponnambalam, SG


2011,Minimizing clearance variations and surplus parts in multiple
characteristic radial assemblies through batch selective assembly,
International Journal of Advanced Manufacturing Technology, vol. 57,
no.9-12, pp.1199-1222.

94.

Watanabe, T & Sakamoto, M 1985, On-line scheduling for adaptive


control machine tools in FMS, Robotics and Computer Integrated
Manufacturing, vol.2, no.1, pp.65-73.

95.

Wang, L & Zheng, DZ 2003,An effective hybrid heuristic for


flowshop scheduling, International Journal of Advanced
Manufacturing Technology, vol. 21, no.1, pp.38-44.

96.

Widmer, M 1991, Job shop scheduling with tooling constraints: a


Tabu search approach, Journal of Operational Research Society,
vol.42, no.1, pp.75-82.

212

97.

Yang, JB 2001,GA-based discrete dynamic programming approach for


scheduling in FMS environments, IEEE transactions on systems, man
and cybernetics- Part B: Cybernetics, vol.31, no.5, pp.824-835.

98.

Yu, J, Yin, Y & Chen, Z 2006,Scheduling of an assembly line with a


multi-objective genetic algorithm, International Journal of Advanced
Manufacturing Technology, vol. 28, no.5-6, pp.551-555.

99.

Zhao, C & Wu, Z 2001,A genetic algorithm approach to the


scheduling of FMSs with multiple routes, The International Journal of
Flexible manufacturing Systems, vol. 13, no.1, pp. 71-88.

213

LIST OF PUBLICATIONS

International Journals
1.

Aldrin Raj, J, Ravindran, D, Saravanan, M & Prabaharan, T


2014,Simultaneous scheduling of machines and tools in multimachine flexible manufacturing systems using Artificial Immune
System algorithm, International Journal of Computer Integrated
Manufacturing,vol.27, no.5, pp.401-414 (Impact Factor 1.019,
Annexure I).

2.

Aldrin Raj, J, Ravindran, D, Sivananithaperumal, S & Victor


Raj,M,Multi-objective optimization for simultaneous scheduling of
machines and tools in multi-machine flexible manufacturing systems,
Arabian Journal for Science and Engineering ( Under review).

3.

Aldrin Raj, J, Ravindran, D, Sivananithaperumal, S & Victor Raj,


M,Simultaneous scheduling of machines, automated guided vehicles
and tools in flexible manufacturing systems using Elitism Strategy
Genetic Algorithm, International Journal of Manufacturing
Technology(Under review).

4.

Aldrin Raj, J, Ravindran, D, Sivananithaperumal, S & Saravanan, M


Multi-objective optimization for simultaneous scheduling of
machines, automated guided vehicles and tools in multi-machine
flexible manufacturing systems, Arabian Journal for Science
&Engineering(Under review).

5.

Aldrin Raj, J, Ravindran, D, Sivananithaperumal, S &Sutha, S


Scheduling of machines and automated storage/retrieval systems in
flexible manufacturing systems, Computers& Industrial Engineering
(Under review).

214

International Conferences
1.

Aldrin Raj, J, Ravindran, D, Saravanan, M & Kesavaraja.D 2010,


Production scheduling of Flexible Manufacturing Systems using
Giffler-Thompson algorithm with Priority dispatching rules 43 rd
Annual Convention of Operational Research Society of India &
International Conference on Operational Research for Urban and Rural
Development, Thiagarajar College of Engineering, Madurai, India,
15- 17th December.

National Conferences
1.

Aldrin Raj, J, Ravindran, D&KesavarajaD 2009, Scheduling of


Flexible Manufacturing system using priority dispatching rules
National conference on Recent trends in Manufacturing Technology,
Anna University, Chennai, India 6-7th March.

You might also like