You are on page 1of 10

Time Sheets Template

ProjectCodes

Date (MM/DD/YY)

Category

RR-160530
RR-160530
RR-160530
RR-160530
RR-160530

11/07/16
11/08/16
11/09/16
11/10/16
11/11/16

FAT
FAT
FAT
FAT
FAT

FRM # : OPS-WI-02-RM (01)


Issue # : 00
Date: 30-Apr-2015

Page 1 of 10

FRM # : OPS-WI-02-RM (01)


Issue # : 00
Date: 30-Apr-2015

Page 2 of 10

Activity Detail
FAT Test
FAT Test
FAT Test
FAT Test
FAT Test

FRM # : OPS-WI-02-RM (01)


Issue # : 00
Date: 30-Apr-2015

Work(hours)
8.1
7.9
7.6
7.5
8.1

Page 3 of 10

FRM # : OPS-WI-02-RM (01)


Issue # : 00
Date: 30-Apr-2015

Page 4 of 10

Created By
Roberto Carrasco
Roberto Carrasco
Roberto Carrasco
Roberto Carrasco
Roberto Carrasco

FRM # : OPS-WI-02-RM (01)


Issue # : 00
Date: 30-Apr-2015

Page 5 of 10

FRM # : OPS-WI-02-RM (01)


Issue # : 00
Date: 30-Apr-2015

Page 6 of 10

Category Details
Category
Design - Hardware

Design - HMI Software

Design - PLC Software

Documentation

Engineering

FAT

G&A

Idle Time

Implementation - HMI Software


Implementation - PLC
Software
Initial Specification Review /
System Preparation
INTECH Systems

Leave / Holidays

Management

Meeting

Non-Project Support

Panel Shop

Project Support

Punch List

Site Visit

Testing

Training

Time Sheets Rules

Please refer to details at INTECH Portal:


http://portal.intechww.com/OPS/Documents/OPS-WI-02-RM%20%20-%20%20Reso

tails
Category Details
System Architecture Design, Panel Layout, Panel Wiring, BOM, Electical & Heat Load Calculations, R&D

HMI Screen Design, HMI Object Design, Control Banner Design, Diagnostic, R&D

PLC Object Design, System Diagnostics, Cause and Effect, R&D

Design Documents (FDS, Panel Drawings etc), Test Procedures (FAT, SAT, Installation Procedures etc), Manuals, Drawings
Documentation Update, Documentation Review/Study, M-Files, R&D, PDS, Documentation Preparation (Printing, Scann
Writing etc)
Extended IO List, BDB, R&D

Staging, Internal FAT, External FAT

Documentation for Visas, Visits for Visas Submission / Interviews, Completing G&A Forms

No work assign (Self Study/ Self Training or RnD), Waiting for Co-worker / Task / FTP Downloads or Uploads, Due to Supp
Hrs against these). Gaming / Recreation, Prayer Break, Lunch Break, Tea Break, Late Coming (Please DON'T Enter any H

HMI Application, Alarms and Events Configuration, Static's Development, HMI Object Insanitation, Application Reviews, R&D

Objects Instantiation, Custom Logic Development, Application Reviews, R&D

Proposal, Costing and Architecture Review, PO, Technical & Application Specs Review, Existing Applications Review, Comp
Specifcation Review

IPCS (PIR, COR, SC Feedback), IPPS, IEMS, Procurement / Vendor Correspondence, Vendor Visits, Entering Time Shee
in MSP
Sick (Full / Half & Short Leave), Compensatory (Full / Half & Short Leave), Casual (Full / Half & Short Leave), Annual (Full /
(Please Enter Actual Hrs against these). No need to enter Gazetted Holidays, if entered only enter "0" Hrs
PnL / Resource Management, Project Management (Including Client Correspondence), PCR, Project Audits, Project Revie
Sheets, RCA, Lessons Learnt, PnL Sheet Review, Invoices, Resource Quarterly Evaluations

Meeting Preparation, Internal Meeting i.e. Sales Handover Meeting, Project Handover Meeting, External Meeting i.e. K
Review Meeting with Customers etc. Non-Project Meetings, With Other Departments i.e. Monthly QA Project Review M

Arranging & Organizing INTECH Events, Participation in Events, Meetings & Activities, Official Lunch/Dinner & Annual Tr
Other PnL / Departments, Self Evaluation (Performance Evaluation), CV & Skill Matrix Updation

Material Receiving, Material Packing & Shipping, Material Handling and Organization (physical Work), Working on Panel
Modifications
SIT Support, Commissioning Support, Customer Support after Project Closure & Support to Other PnL / Departments

Internal Punch List, External FAT Punch List, External SAT Punch List

Site Survey, SAT / Commissioning, Support & Trouble Shooting, Procurement, Site Preparation (Laptop preparation etc.)

Internal Objects Testing, Internal C& E Testing, Internal Custom Logic Testing, Testing with PM

Internal Training, External Training, Training Need Identification & HR Coordination, Training Preparation / Presentation

Time Sheets Rules


Please refer to details at INTECH Portal:
http://portal.intechww.com/OPS/Documents/OPS-WI-02-RM%20%20-%20%20Resource%20Management.pdf

You might also like