Professional Documents
Culture Documents
ProjectCodes
Date (MM/DD/YY)
Category
RR-160530
RR-160530
RR-160530
RR-160530
RR-160530
11/07/16
11/08/16
11/09/16
11/10/16
11/11/16
FAT
FAT
FAT
FAT
FAT
Page 1 of 10
Page 2 of 10
Activity Detail
FAT Test
FAT Test
FAT Test
FAT Test
FAT Test
Work(hours)
8.1
7.9
7.6
7.5
8.1
Page 3 of 10
Page 4 of 10
Created By
Roberto Carrasco
Roberto Carrasco
Roberto Carrasco
Roberto Carrasco
Roberto Carrasco
Page 5 of 10
Page 6 of 10
Category Details
Category
Design - Hardware
Documentation
Engineering
FAT
G&A
Idle Time
Leave / Holidays
Management
Meeting
Non-Project Support
Panel Shop
Project Support
Punch List
Site Visit
Testing
Training
tails
Category Details
System Architecture Design, Panel Layout, Panel Wiring, BOM, Electical & Heat Load Calculations, R&D
HMI Screen Design, HMI Object Design, Control Banner Design, Diagnostic, R&D
Design Documents (FDS, Panel Drawings etc), Test Procedures (FAT, SAT, Installation Procedures etc), Manuals, Drawings
Documentation Update, Documentation Review/Study, M-Files, R&D, PDS, Documentation Preparation (Printing, Scann
Writing etc)
Extended IO List, BDB, R&D
Documentation for Visas, Visits for Visas Submission / Interviews, Completing G&A Forms
No work assign (Self Study/ Self Training or RnD), Waiting for Co-worker / Task / FTP Downloads or Uploads, Due to Supp
Hrs against these). Gaming / Recreation, Prayer Break, Lunch Break, Tea Break, Late Coming (Please DON'T Enter any H
HMI Application, Alarms and Events Configuration, Static's Development, HMI Object Insanitation, Application Reviews, R&D
Proposal, Costing and Architecture Review, PO, Technical & Application Specs Review, Existing Applications Review, Comp
Specifcation Review
IPCS (PIR, COR, SC Feedback), IPPS, IEMS, Procurement / Vendor Correspondence, Vendor Visits, Entering Time Shee
in MSP
Sick (Full / Half & Short Leave), Compensatory (Full / Half & Short Leave), Casual (Full / Half & Short Leave), Annual (Full /
(Please Enter Actual Hrs against these). No need to enter Gazetted Holidays, if entered only enter "0" Hrs
PnL / Resource Management, Project Management (Including Client Correspondence), PCR, Project Audits, Project Revie
Sheets, RCA, Lessons Learnt, PnL Sheet Review, Invoices, Resource Quarterly Evaluations
Meeting Preparation, Internal Meeting i.e. Sales Handover Meeting, Project Handover Meeting, External Meeting i.e. K
Review Meeting with Customers etc. Non-Project Meetings, With Other Departments i.e. Monthly QA Project Review M
Arranging & Organizing INTECH Events, Participation in Events, Meetings & Activities, Official Lunch/Dinner & Annual Tr
Other PnL / Departments, Self Evaluation (Performance Evaluation), CV & Skill Matrix Updation
Material Receiving, Material Packing & Shipping, Material Handling and Organization (physical Work), Working on Panel
Modifications
SIT Support, Commissioning Support, Customer Support after Project Closure & Support to Other PnL / Departments
Internal Punch List, External FAT Punch List, External SAT Punch List
Site Survey, SAT / Commissioning, Support & Trouble Shooting, Procurement, Site Preparation (Laptop preparation etc.)
Internal Objects Testing, Internal C& E Testing, Internal Custom Logic Testing, Testing with PM
Internal Training, External Training, Training Need Identification & HR Coordination, Training Preparation / Presentation