BENEFITS OF YOUR FUTURE RIDE

How long will my trip from Lynnwood take?

One train
every
MINUTES

MINUTES

28

MINUTES

DOWNTOWN
BELLEVUE

OVERLAKE
TRANSIT CENTER

UNIVERSITY OF
WASHINGTON

DOWNTOWN
SEATTLE

33

60

20

65

HOURS
per year

of CO 2
reduced
annually

ONE YEARS
ENERGY USE

6,960

MINUTES

STADIUMS

SEA-TAC
AIRPORT

Multiple suitcases

In that time you


could watch

32
movies

ONE
YEAR OF
EMISSIONS

from

76,285
METRIC TONS

MINUTES

200 riders

Thats

14-16 minutes
on peak morning
commute

4 wheelchairs

4 bicycles

Thats

Ride Link
and save

SOUTH

MINUTES

EACH LINK CAR


CAN HOLD...

from

60

MINUTES

LYNNWOOD

Thats

50

EAST

during peak weekday commutes

16,060
PASSENGER
VEHICLES

HOMES

11.16

PROJECT SCHEDULE

2010-2012
EVALUATED
POTENTIAL
ROUTES AND MODE
ALTERNATIVES

2013-2015
ENVIRONMENTAL
REVIEW

Conducted
environmental review
of alternatives
The Sound Transit
Board selected final
route and station

2016-2018
FINAL DESIGN
AND PERMITTING
Develop and then finalize
project design through 30%,
60% and 90% milestones
Obtain permits

WE ARE HERE

Federal Transit
Administration issued
Record of Decision

Pre-construction activities

2018-2023
CONSTRUCTION

LATE 2023
SAFETY AND
SYSTEMS TESTING
OPEN FOR
SERVICE

Subject to change
11.16

UNDERSTANDING NOISE WALLS AND NOISE MITIGATION

Below are types of noise mitigation that Sound Transit can


use to help reduce noise along Link light rail alignments.

Elevated sound walls


Installed close to the track
Made of stainless steel or aluminum
Inside surface absorbs sound
Wall heights range from four feet to 10 feet over the
elevated deck
Provide noise reduction up to 15 decibels

Elevated sound barriers


Thick plastic/rubber sheets used on elevated guideway
Used when less than 10 decibels noise reduction is
needed

At-grade sound walls


Typical sound walls seen along the freeways
Made of concrete or engineered composites
Wall heights can range from eight feet to 26 feet
Provide noise reduction up to 15 decibels

11.16

RIDGECREST PARK

The Lynnwood Link Extension alignment runs along the western edge
of Ridgecrest Park in Shoreline. This means:
The alignment affects a berm and row of mature cottonwoods
that currently screens Interstate 5 from the park
A noise wall and landscaping will separate the light rail
guideway from the park
Replacement park space and parking will be provided as
mitigation for lost park space and existing parking

Coordination with the City of Shoreline


Sound Transit and the City of Shoreline are working together to
ensure the park remains an enjoyable gathering place for the
community after construction.

NE 163RD S T

Path: P:\3164_SoundTransit\LynnwoodLink\FEIS\PH_Parks\Fig4.17-2_LL_FEIS_Park_Detail_Ridgecrest.mxd

3RD AVE NE

Ridgecrest
Park

NE 161ST ST

k
Feet

100

Light rail alignment

Source: Esri, DigitalGlobe, GeoEye, i-cubed, Earthstar Geographics,


CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP,
swisstopo, and the GIS User Community

Area of affected park and recreation facility


Figure 4.17-2

Data Sources: (King County, Snohomish County, WSDOT, Sound Transit, Bing Aerial)

All Light Rail Alternatives

Area
of
impact
Area of Impact

Area of Affected Park and Recreation Facility

Ridgecrest Park Impacts

5HORFDWHGVW$YHQXH1( and Replacement Park Land

Relocated 1ST AVE NE and replacement Lynnwood


park land
Link Extension

11.16

START ART PROGRAM


CREATING A SENSE OF PLACE

Tad Savinar, 2009, A Molecule of the Region, Tukwila/


International Blvd Station, Tukwila

Sheila Klein, 2009, Sky Within (detail),


Mount Baker Station, Seattle

Art at transit stations


creates welcoming and
engaging environments
for our riders, our
neighbors and visitors
to our region.
Laura Haddad, 2016, Cloud (detail),
Angle Lake Station, SeaTac

Ellen Forney, 2015, Crossed Pinkies, Capitol Hill Station, Seattle

Claudia Fitch, 2003, Shift (detail),


Lynnwood Transit Center

DATE

BUSTER SIMPSON
PAST WORK EXAMPLES | 145TH STATION SHORELINE

MARY LUCKING

Buster Simpson, 2011, Bio Boulevard & Water


Molecule, Brightwater Treatment Facility, Woodinville

Buster Simpson, 2001, Water Table/Water Glass, Intercorp Ellington


Condominiums, Seattle
Buster Simpson, 2008, Parable, Rainier Beach Station plaza,
Sound Transit, Seattle

Shift (detail), 2003,Claudia Fitch


Subterranium, 2015, Leo Saul Berk, University of Washington Station, Seattle

Buster Simpson, 2013, Venacular (exterior),


Cloud
Bank,
2009, Bellevue
Leo Saul Regional
Berk Shoreline
Parking
garage,
LibraryCity Hall, Shoreline

Lynnwood Trancit Center


Buster Simpson, 2011, Bio Boulevard & Water
Molecule, Brightwater Treatment Facility, Woodinville

Buster Simpson, 2013, Venacular (interior), Parking


garage, Bellevue Regional Library

NOV DATE
2016

MARY LUCKING
PAST WORK EXAMPLES | 185TH STATION SHORELINE

MARY LUCKING
Threshold (detail), 2009, Leo Saul Berk, Private Development, SLU Seattle

Mary Lucking, 2011, Contours and Crossings, Crosscut Canal, Tempe AZ

Mary Lucking, 2015, Desert Rose, Desert Sky Transit Center, Phoenix AZ

Mary Lucking, 2015, Desert Rose, Desert Sky Transit Center, Phoenix AZ

Mary Lucking, 2015, Sixteen Stories of One Home Town,


Shift (detail), 2003,Claudia Fitch
Mesa Drive Station, Mesa AZ

Subterranium, 2015, Leo Saul Berk, University of Washington Station, Seattle

Mary
Lucking,
Contours
and Crossings,
Crosscut
Canal, Tempe AZ
Cloud
Bank,
2009,2011,
Leo Saul
Berk Shoreline
City Hall,
Shoreline

Lynnwood Trancit Center

NOV DATE
2016