You are on page 1of 8

3/7/2016

18InitialChecksOfElectricalInstallations|EEP

Home Technical Articles Article Categories El. Enginering Guides


EE General guides
Power Substations
Schneider Electric CTs
Siemens Basics of EE
ABB Drives Guides
Industry Automation
Relay control/protection
Alternative Energy
Electrical Software MS Excel Spreadsheets Electrical Design Docs Engineering Resources
Electrical Engineering (VIDEO)
PLC Programming Training (VIDEO)
Electric Testing and Maintenance (VIDEO)
Network Theorems
Contact us Subscribe to articles Subscribe to downloads

18InitialChecksOfElectricalInstallations
EveryElectricianMUSTPerform
18 Initial Checks Of Electrical Installations Every Electricain MUST Perform

Testingofelectricalinstallations//
Before any testing of low voltage electrical installations (and equipment) is carried out, a detailed physical
inspection must be made to ensure that everything is:
1. To a relevant National or Harmonized European Standard
2. Erected/installed in compliance with the IEE Regulations
3. Not damaged in such a way that it could cause danger.
In order to comply with these requirements, the Regulations give a checklist of items that, where relevant, should
be inspected. However, before such an inspection, and test for that matter, is carried out, certain information
mustbe available to the verifier.
This information is the result of the Assessment of General Characteristics required by IEE Regulations (Part 3,
sections 311, 312 and 313), together with drawings, charts and similar information relating to the
installation. For domestic electrical installations, these diagrams and charts are usually in the form of a simple
schedule.
Interestingly, one of the items on the checklist isthe presence of diagrams, instructions and similar information. If
these are missing, there is a deviation from the Regulations.
http://electricalengineeringportal.com/18initialchecksofelectricalinstallations

1/8

3/7/2016

18InitialChecksOfElectricalInstallations|EEP

Another item on the list is the verification of conductors for current carrying capacity and voltage drop in accordance
with the design. How could this be verified without all the information?

A 32A type B circuit breaker protecting a length of 4.0 mm2 conductor may look reasonable, but is it correct
and, unless you are sure, are you prepared to sign to say that it is?

Generaltestingchecklist//
Let us look then at the general content of the checklist:
Check #1 Connection of conductors
Are terminations electrically and mechanically sound? Is insulation and sheathing removed only to a minimum to
allow satisfactory termination?

Check #2 Identification of conductors


Are conductors correctly identified in accordance with the regulations?
Labeling of terminals and conductors (photo credit:
http://electricalengineeringportal.com/18initialchecksofelectricalinstallations

2/8

3/7/2016

18InitialChecksOfElectricalInstallations|EEP

barnsleyelectrical.co.uk)
Check #3 Routing of cables
Are cables installed such that account is taken of external influences, such as mechanical damage, corrosion and
heat?

Check #4 Conductor selection


Are conductors selected for current carrying capacity and voltage drop in accordance with the design?

Check #5 Connection of single pole devices


Are single pole protective and switching devices connected in the line conductor only?
http://electricalengineeringportal.com/18initialchecksofelectricalinstallations

3/8

3/7/2016

18InitialChecksOfElectricalInstallations|EEP

Electrical panel (photo credit: electricianstruro.com)


Check #6 Accessories and equipment
Are all accessories and items of equipment correctly connected?

Check #7 Thermal effects


Are fire barriers present where required and protection against thermal effects provided?

Check #8 Protection against shock


What methods have been used to provide protection against electric shock?

http://electricalengineeringportal.com/18initialchecksofelectricalinstallations

4/8

3/7/2016

18InitialChecksOfElectricalInstallations|EEP

Electrical Fundamentals - Protection against electric shock (1hr:13min:19sec)

Check #9 Mutual detrimental influence


Are wiring systems installed so that they can have no harmful effect on non-electrical systems or so that systems
of different currents or voltages are segregated where necessary?

Check #10 Isolation and switching


Are the appropriate devices for isolation and switching correctly located and installed?

Check #11 Undervoltage


Where undervoltage may give rise for concern, are there protective devices present?

Check #12 Protective devices


http://electricalengineeringportal.com/18initialchecksofelectricalinstallations

5/8

3/7/2016

18InitialChecksOfElectricalInstallations|EEP

Are protective and monitoring devices correctly chosen and set to ensure automatic disconnection and/or
overcurrent?

Protective devices Miniature circuit breakers (photo credit: electricalsafetycertificate.co.uk)


Check #13 Labelling
Are all protective devices, switches (where necessary) and terminals correctly labelled?

Check #14 External influences


Have all items of equipment and protective measures been selected in accordance with the appropriate external
influences?

Check #15 Access


Are all means of access to switchgear and equipment adequate?

Check #16 Notices and signs


Are danger notices and warning signs present?
Circuit breaker lockout tag (photo credit: lockoutstore.com)
Check #17 Single line diagrams / Wiring schemes
http://electricalengineeringportal.com/18initialchecksofelectricalinstallations

6/8

3/7/2016

18InitialChecksOfElectricalInstallations|EEP

Are diagrams,
instructions and similar
information relating to
the installation
available?

Check #18
Erection methods
Have all wiring
systems, accessories
and equipment been
selected and installed
in accordance with the
requirements of the
Regulations? Are
fixings for equipment
adequate for the
environment?

Once all the relevant items have been inspected, providing there are no defects that may lead to a dangerous situation when
testing, the actual testing procedure can start.

Reference // Electric Wiring: Domestic Brian Scaddan IEng, MIET

RecommendedEEstuff//
Sharewithengineers//
AboutAuthor//
Edvard Csanyi
Edvard - Electrical engineer, programmer and founder of EEP. Highly specialized for
design of LV high power busbar trunking (<6300A) in power substations, buildings and
industry fascilities. Designing of LV/MV switchgears. Professional in AutoCAD
programming and web-design. Present on Google+
2015 EEP - Electrical Engineering Portal. All Rights Reserved | Privacy Policy |
Terms of Service | 32 queries in 0.177 seconds.
Powered by CsanyiGroup
SHARE
http://electricalengineeringportal.com/18initialchecksofelectricalinstallations

7/8

3/7/2016

18InitialChecksOfElectricalInstallations|EEP