18 Initial Checks Of Electrical Installations Every Electricain MUST Perform
Testingofelectricalinstallations//
Before any testing of low voltage electrical installations (and equipment) is carried out, a detailed physical
inspection must be made to ensure that everything is:
1. To a relevant National or Harmonized European Standard
2. Erected/installed in compliance with the IEE Regulations
3. Not damaged in such a way that it could cause danger.
In order to comply with these requirements, the Regulations give a checklist of items that, where relevant, should
be inspected. However, before such an inspection, and test for that matter, is carried out, certain information
mustbe available to the verifier.
This information is the result of the Assessment of General Characteristics required by IEE Regulations (Part 3,
sections 311, 312 and 313), together with drawings, charts and similar information relating to the
installation. For domestic electrical installations, these diagrams and charts are usually in the form of a simple
schedule.
Interestingly, one of the items on the checklist isthe presence of diagrams, instructions and similar information. If
these are missing, there is a deviation from the Regulations.
http://electricalengineeringportal.com/18initialchecksofelectricalinstallations
1/8
3/7/2016
18InitialChecksOfElectricalInstallations|EEP
Another item on the list is the verification of conductors for current carrying capacity and voltage drop in accordance
with the design. How could this be verified without all the information?
A 32A type B circuit breaker protecting a length of 4.0 mm2 conductor may look reasonable, but is it correct
and, unless you are sure, are you prepared to sign to say that it is?
Generaltestingchecklist//
Let us look then at the general content of the checklist:
Check #1 Connection of conductors
Are terminations electrically and mechanically sound? Is insulation and sheathing removed only to a minimum to
allow satisfactory termination?
2/8
3/7/2016
18InitialChecksOfElectricalInstallations|EEP
barnsleyelectrical.co.uk)
Check #3 Routing of cables
Are cables installed such that account is taken of external influences, such as mechanical damage, corrosion and
heat?
3/8
3/7/2016
18InitialChecksOfElectricalInstallations|EEP
http://electricalengineeringportal.com/18initialchecksofelectricalinstallations
4/8
3/7/2016
18InitialChecksOfElectricalInstallations|EEP
5/8
3/7/2016
18InitialChecksOfElectricalInstallations|EEP
Are protective and monitoring devices correctly chosen and set to ensure automatic disconnection and/or
overcurrent?
6/8
3/7/2016
18InitialChecksOfElectricalInstallations|EEP
Are diagrams,
instructions and similar
information relating to
the installation
available?
Check #18
Erection methods
Have all wiring
systems, accessories
and equipment been
selected and installed
in accordance with the
requirements of the
Regulations? Are
fixings for equipment
adequate for the
environment?
Once all the relevant items have been inspected, providing there are no defects that may lead to a dangerous situation when
testing, the actual testing procedure can start.
RecommendedEEstuff//
Sharewithengineers//
AboutAuthor//
Edvard Csanyi
Edvard - Electrical engineer, programmer and founder of EEP. Highly specialized for
design of LV high power busbar trunking (<6300A) in power substations, buildings and
industry fascilities. Designing of LV/MV switchgears. Professional in AutoCAD
programming and web-design. Present on Google+
2015 EEP - Electrical Engineering Portal. All Rights Reserved | Privacy Policy |
Terms of Service | 32 queries in 0.177 seconds.
Powered by CsanyiGroup
SHARE
http://electricalengineeringportal.com/18initialchecksofelectricalinstallations
7/8
3/7/2016
18InitialChecksOfElectricalInstallations|EEP
TOP
Get PDF
http://electricalengineeringportal.com/18initialchecksofelectricalinstallations
8/8