You are on page 1of 37

GAMMON INDIA LIMITED

GAMMON HOUSE, VEER SAWARKAR MARG,PRABHADEVI, MUMBAI-400 025


Phone: 91-22-61153000
E-Mail: gammon@gammonindia.com
Internet: http://www.gammonindia.com

OFFICE OF ORIGIN:
ENGINEERING DESIGN MANAGEMENT SECTION (HEAD OFFICE)

PROJECT:

FOUR LANING OF THE STRETCH OF THE NH-17B FROM VARUNPURI TO SADA JUNCTIO
EPC MODE
CLIENT:
PUBLIC WORK DEPARTMENT, GOA
TITLE:
DESIGN OF CASTING BED FOR PRETENSIONED I- GIRDER
( TROUGH TYPE)

9401/TS/DN-01

DESIGN CALCULATION NO.:

PAGES:

ANNEXURES, if any:
Date of
Issue

Revision

TO

27
NA

Revision to incorporate observations of client

Prepared By

vide their letter reference/minutes of meeting


as the case may be, and as refered below:

22/12/2015

R0

First submission
Name
AUD

APPROVED BY:

This design is the property of GAMMON INDIA LIMITED. It should not be used, copied
or reproduced without their written permission.

Page 1

BAI-400 025

CE)

UNPURI TO SADA JUNCTION ON

ENSIONED I- GIRDER

DATE: 22/12/2015

Checked By

Name
AUD

Sign

Name
RKM

Page 2

PROJECT: FOUR LANING OF THE STRETCH OF NH-17B FROM VARUNPU


JUNCTION ON EPC MODE
TITLE: DESIGN OF CASTING BED FOR PRE-TENSIONED BEAM
REV:
R0
DOC. NO: 9401/TS/DN-01
DSN:

AUD

CHK:

RKM

DATE:

1.0 Preamble:
The following sheets present design of the casting bed to accommodate
4
nos.25
m long girder only.
It is proposed that there shall be one Casting bed for 4 Pre-tensioned girders.

2.0 Methodology:
There shall be two anchor girders, one at stressing end block and one at dead end block.
The girder at stressing end block shall be movable upto the extent of elongation in the
strands.The strands shall be threaded through the anchor girders and shall be anchored
by means of barrels. The movable anchor girder at stressing end block shall move ahead
head with the help of 2 no. hydraulic jacks. The movable anchor girder at Dead end block
shall be kept on rollers. The casting bed is design to take the reactions of the prestrssing
force
3.0 References:
Reference Codes:
IS 800:1984

Code of practice for general construction of


steel
Plain and Reinforced Concrete - Code of
Practice
Standard specification and Code of practice
for road bridges.
Uncoated stress relieved low relaxation seven
ply strand for prestressed concrete- Specific
ation

IS 456:2000
IRC 21-2000
IS 14268-1995

Reference Drg:
9401/TS/ 111/A9401/TS/112/A 9401/TS/113/A 9211/TS/114/A -

G.A. of Casting Bed


RCC details of casting bed- Trough, diaphragm & pedestals
RCC details of casting bed- Stressing/Dead end block
RCC details of Retaining wall at stressing/Dead end

4.0 Design Data:


For Beam at Midspan
No. of strands =
UTS of strand =
Assume
Pretensioning force (total) =
23

23
26.592 t
80 % of the UTL is applied for pretensioning.
x
=
say

For Beam at Support

Page 3

26.59
489.29 t
600
t

0.80

No. of strands =
UTS of strand =
Assume
Pretensioning force (total) =
23

23
26.592 t
80 % of the UTL is applied for pretensioning.
x
=
say

Page 4

26.59
489.29 t
600
t

0.80

NH-17B FROM VARUNPURI TO SADA

TENSIONED BEAM
22/12/2015

d end block.

e anchored
move ahead
ad end block
prestrssing

for general construction of

rced Concrete - Code of

cation and Code of practice

relieved low relaxation seven


stressed concrete- Specific

h, diaphragm & pedestals


sing/Dead end block
tressing/Dead end

Page 5

Page 6

PROJECT: FOUR LANING OF THE STRETCH OF NH-17B FROM VARUNPURI TO SADA


JUNCTION ON EPC MODE
TITLE: DESIGN OF CASTING BED FOR PRE-TENSIONED BEAM
REV:
R0
DOC. NO: 9401/TS/DN-01
DSN:

AUD

CHK:

RKM

DATE:

22/12/2015

To locate C.G of strand : (from bottom of beam )


For Beam at Mid Span

2
7
7
7

55
55
55
75
No of Strands =

Total no of strands =
Dia of strands =
U.T.S. of strands =

23
15.2
26.592

We will design the casting bed for


ie

0.80

23

nos
mm
ton
0.80

of U.T.S.

26.592

21.2736
=
say

Therefore, total force =

21.2736

23

Elongation in strands =

P
A

x
x

L
E

Span of girder (max)


No. of girders in single bed
Hence,

102.4
21.27

A=

140

Elongation in strands

m
ton

E=

mm2
778

489.29
600

25 m
4 nos

L=
P=

ton

2.00E+05

Mpa
IS 14268

mm

Page 7

ton
ton

per strand

PROJECT: FOUR LANING OF THE STRETCH OF NH-17B FROM VARUNPURI TO SADA


JUNCTION ON EPC MODE
TITLE: DESIGN OF CASTING BED FOR PRE-TENSIONED BEAM
REV:
R0
DOC. NO: 9401/TS/DN-01
DSN:

C.G. of strands =

AUD

CHK:

RKM

7 X 75 +7 X 130 +7 X 185 +2 X 240


23
=
139.57

DATE:

22/12/2015

mm

(from soffit of beam)

To locate C.G of strand : (from bottom of beam )


For Beam at Mid Span

2
7
7
7

55
55
55
75
No of Strands =

Total no of strands =
Dia of strands =
U.T.S. of strands =

23
15.2
26.592

We will design the casting bed for


ie

0.80

23

nos
mm
ton
0.80

of U.T.S.

26.592

21.2736
=
say

Therefore, total force =

21.2736

23

Elongation in strands =

P
A

x
x

L
E

Span of girder (max)


No. of girders in single bed

=
=

25 m
4 nos

Page 8

ton
489.29
600

ton
ton

per strand

PROJECT: FOUR LANING OF THE STRETCH OF NH-17B FROM VARUNPURI TO SADA


JUNCTION ON EPC MODE
TITLE: DESIGN OF CASTING BED FOR PRE-TENSIONED BEAM
REV:
R0
DOC. NO: 9401/TS/DN-01
DSN:

Hence,

L=
P=

102.4
21.27

A=

140

Elongation in strands

AUD

m
ton

RKM

DATE:

22/12/2015

E=

2.00E+05

mm2

C.G. of strands =

CHK:

Mpa
IS 14268

778

mm

7 X 75 +7 X 130 +7 X 185 +2 X 240


23
=

139.57

mm

(from soffit of beam)


325

250

325

1900

1.276
A

200

0.624

C
4500

To Locate C.G. of trough :


Area Mkd

(from bottom )

Area

A
B
C

m2

y
m
1.050
1.050
0.100

0.5525
0.5525
0.9
A =
y
A

Y=

0.580
0.580
0.09
Ay=

2.005
=

Ay
m3

1.250
2.005

0.624

1.250

m3

Geometric properties of trough :


Length of trough (L) =

102.4

Area =
Ixx =

2.01
1 X 1.93 X 0.325

m2
+

1.9 X 0.325 X 0.32642

X2

12
( 0.23 X 3.85 )
12

+ ( 3.85 X 0.2 X 0.5242 )

Page 9

PROJECT: FOUR LANING OF THE STRETCH OF NH-17B FROM VARUNPURI TO SADA


JUNCTION ON EPC MODE
TITLE: DESIGN OF CASTING BED FOR PRE-TENSIONED BEAM
REV:
R0
DOC. NO: 9401/TS/DN-01
DSN:

AUD

0.503

0.717

m4

1 X 0.3253 x 1.7
12

Iyy =

CHK:

RKM

DATE:

22/12/2015

0.214

0.33 X 1.70 X 2.08752

X2

mm

623.566

( 4.53 X 0.2 )
12
=

0.010

6.344

rmin =

1.519

0.562

m3

0.717
0.624

1.149

m3

6.344

2.819

m3

4.8152102

m4

0.717
2.01

0.60

0.717

Minimum section modulus :


Ixx

ZTxx =

yTmax

1.276

Ixx
yBmax

ZBxx =
Zyy =

Iyy

xmax

2.25

Force to be taken by strut action by trough =


=

Prestressing force
600
ton

To calculate the eccentricity of prestressing force :


Ht of pedestal
Ht of shuttering
Bottom slab thk.
C.G. of strands from soffit of beam =
unsupportted length to be considered

=
=
=

150 mm
139 mm
200 mm
139.57 mm
=
25

Therefore, eccentricity of prestressing force (ex)

=
=

628.57
4.999

Minimum eccentricity : ( as per IS:456 -2000,clause 25.4 )


About x - axis :
ex

unsupported length
500

lateral dimension
30
( subjected to minimum of

Page 10

20

mm)

PROJECT: FOUR LANING OF THE STRETCH OF NH-17B FROM VARUNPURI TO SADA


JUNCTION ON EPC MODE
TITLE: DESIGN OF CASTING BED FOR PRE-TENSIONED BEAM
REV:
R0
DOC. NO: 9401/TS/DN-01
DSN:

= 102400
500
= 204.8
=
268.1

AUD

CHK:

RKM

DATE:

22/12/2015

1900
30
63.333
mm

About y - axis :
ey

unsupported length
500
= 102400
500
= 204.8
=
355

+
+

lateral dimension
30
( subjected to minimum of

20

4500
30
150
mm

We will design the trough as a compression member subjected to biaxial bending with,
ex =

268.1

mm

ey =

354.8

mm

Therefore, Axial force


Mx =
My =

=
213
161

600 ton
t-m
t-m

Material used :
M 35
Permissible stresses: (As per IS:456-2000)
cbc =
st =

11.5
275

N/mm2
N/mm2

m=

280
3cbc

&

Fe 500

cc =
sc=
280
34.5

9
190

8.115942

Using uncracked section theory


Direct stresses cc(cal) =

P
Ac

1.5m Asc

=
=

600
8.12

where,
P = Axial force
m = modular ratio
Asc = area of steel

Page 11

ton

N/mm2
N/mm2

mm)

PROJECT: FOUR LANING OF THE STRETCH OF NH-17B FROM VARUNPURI TO SADA


JUNCTION ON EPC MODE
TITLE: DESIGN OF CASTING BED FOR PRE-TENSIONED BEAM
REV:
R0
DOC. NO: 9401/TS/DN-01
DSN:

AUD

CHK:

RKM

DATE:

22/12/2015

We will provide minimum steel (ie 0.8 % of c/s area of concrete)


Therefore, Asc =

Ac

0.8

= net area of concrete


=
2.01
=

1.99

Therefore, cc)cal

2.01
100

0.016 m2

0.016

m2
=
1988960
=

2.75

6000000
1.5

8.12

16040

N/mm2

Bending stresses ( about X-X axis)


Mxx
=
Zxx
3.79 N/mm2

cbcx =
=

2128800000
561540889.257921

Bending stresses ( about Y-Y axis)


Myy

cbcy =

1608800000

Zyy
=

2819416203.7037

0.571 N/mm2

Total bending stresses :


cbcx

=
=
=

+
+
N/mm2

3.79
4.36

cbcy
0.571

CHECK :
1)

Maximum stresses

(cc)cal

=
=
=
<

2)

Minimum stresses

ie

3.79

cbcy

+
+

0.571

N/mm2
N/mm2

Hence O.K.

cbcy
(cc)cal
+
3.79
+
0.571
1.61
N/mm2
0.75
x 7 days modulus of rupture of concrete
0.75

3.313004679

2.75

N/mm2
Hence O.K.

2.48

Resultant tension in concrete is not to be greater than 35% of resultant compression.


ie

4)

cbcx

+
+

cbcx

=
=
=
<

3)

2.75
7.109
11.5

(cc)cal
(cc)perm
2.75
9.00

35
100

+
+

cbcx

7.11

+
(cbc)perm

cbcy

2.49 N/mm2

>

1.61 N/mm2
<=
=
<

4.36
11.50

Page 12

Hence O.K.

1
0.68
1

Hence O.K.

PROJECT: FOUR LANING OF THE STRETCH OF NH-17B FROM VARUNPURI TO SADA


JUNCTION ON EPC MODE
TITLE: DESIGN OF CASTING BED FOR PRE-TENSIONED BEAM
REV:
R0
DOC. NO: 9401/TS/DN-01
DSN:

AUD

CHK:

RKM

DATE:

22/12/2015

Design of Trough wall Reinforcement :Consider, Force in each strut =


Let the dimension be

300 t

1700
(d)
Stresses in axial compression =
=

300
(b)

3000000
1700 x
300 x
5.882 N/mm2

=
Area of the struts

Moment of Inertia Ixx

0.1228 m

Moment of Inertia Iyy

0.004 m

Radius of gyration

0.087 m

1 nos.

0.510 m2
4

Reinforcement in trough wall:


Minimum reinforcement =
0.8 % of the cross sectional area
=
4080 mm2
Provide,
20
bars of
16
dia.
+
Total area (Asc) =

4423.36 mm2

Ag =
=
=
Material used :

net area of concrete


510000
505577 mm2
M 35

4080 mm2
Hence ok

>

&

bars of

4423.36

Fe 500

Permissible stresses: (As per IS:456-2000)

Hence,

cc

8.1

N/mm2

sc

171

N/mm2
ccxAg + sc xAsc

Load capacity =
=

###

Page 13

>

300 t

Hence ok

16 dia.

PROJECT: FOUR LANING OF THE STRETCH OF NH-17B FROM VARUNPURI TO SADA


JUNCTION ON EPC MODE
TITLE: DESIGN OF CASTING BED FOR PRE-TENSIONED BEAM
REV:
R0
DOC. NO: 9401/TS/DN-01
DSN:

AUD

CHK:

RKM

DATE:

22/12/2015

Reinforcement for Lateral Ties:Diametre - Minimum of


a) 5 mm
b) 4 mm
Spacing shall not exceed the least of following :
a)
300
mm
b)
256
mm
c)
240
mm
Provided
8 mm
@
125

mm c/c

Design of Trough Slab Reinforcement :For self wt + girder Load :Loading:


Depth of slab
Density of concrete
Dead load of slab
Dead load

=
=
=
=

200
2.6
0.52
0.1

mm
t/m3
t/m2
t/m2

Live load
Total Load

=
=

0.36
0.98

t/m2
t/m2

Weight of girder =

42 t

Length of the strip =

25 m

Provide
Area provided

3.85

25.0 m
96.25 m2

Load =
0.44 t/m2
Safe bearing capacity of soil =
Net upward pressure

20 t/m2
1.42 t/m2

(Assumed)
<
OK

20 t/m2

Calculation of depth of slab:


Grade of concrete =
Grade of steel =
cbc =

M 35
Fe 500
11.5 N/mm2

st =

275 N/mm2

Page 14

IS 456-2000

PROJECT: FOUR LANING OF THE STRETCH OF NH-17B FROM VARUNPURI TO SADA


JUNCTION ON EPC MODE
TITLE: DESIGN OF CASTING BED FOR PRE-TENSIONED BEAM
REV:
R0
DOC. NO: 9401/TS/DN-01
DSN:

AUD

Coefficient values,
m = 280/3cbc
k = 1/(1+(3st/280))
j = 1-k/3
Q = cbc.j.k/2
b

CHK:

8.1
0.25
0.92
1.33
1000

=
=
=
=
=

DATE:

22/12/2015

1.925

mm

Maximum bending moment

1.42

Maximum bending moment

2.62 t-m

Effective depth of the section required =


Use
12
Provide clear cover

RKM

d = (M/Q.b)

mm dia H.Y.S.D bars


=

30

mm

Over all depth

176.26

mm

We provide overall depth, D


Thus effective depth

=
=

200
164

mm
mm

Ast, required = M / st.j.d

635.56

mm2

Area of one bar


No. of bars required
ie.,

=
=

113.1
5.62
6.00

mm2
nos.
nos.

Total area of steel provided

678.6

mm2

Minimum reinforcement steel required:


Ast =
0.85

1000
500

=
Provide

Spacing of main bars

278.8 mm2

nos. of

12

1.925
2

140.26 mm

164

<
OK

678.6 mm2

mm dia. Bars.
200 mm

Say =

200 mm c/c

Distribution steel:
0.15
100
947.1 mm2

Minimum area of distribution steel


required =
=
Diameter of distribution bars provided

16

Page 15

3850

mm

164

PROJECT: FOUR LANING OF THE STRETCH OF NH-17B FROM VARUNPURI TO SADA


JUNCTION ON EPC MODE
TITLE: DESIGN OF CASTING BED FOR PRE-TENSIONED BEAM
REV:
R0
DOC. NO: 9401/TS/DN-01
DSN:

Area of one bar

Provide

16

AUD

16

RKM

DATE:

22/12/2015

201.1 mm2
nos. of bars as distribution bars.

Total area of bars provided


Provide

CHK:

3216.99

=
nos. of

16

Spacing of distribution bars =

947.1 mm2

>

Ok

mm dia. Bars as a distribution bars.

256.67 mm

Say =

235 mm

Check for shear stress:


1925
200
1761

Effective depth, d

164

164
3850
mm

Critical section will be at a distance of 'd' from loading point.


ie.,
1761
mm from the edge of the footing.
Shear force at critical section, V

2.49

Nominal shear stress at critical section,tv =

Cross section of the footing

Percentage steel provided

V
bxd
mm

164000
100 x

Permissible shear stress in concrete

Here,

t
=

15.21

t/m2

0.152

N/mm2

678.6
164000

=
0.281 N/mm2

tv

tv =

0.152 N/mm2

tc =

0.281 N/mm2
tc

0.41 %
IS 456-2000, table 23

<
No shear reinforcement required

Page 16

PROJECT: FOUR LANING OF THE STRETCH OF NH-17B FROM VARUNPURI TO SADA


JUNCTION ON EPC MODE
TITLE: DESIGN OF CASTING BED FOR PRE-TENSIONED BEAM
REV:
R0
DOC. NO: 9401/TS/DN-01
DSN:

AUD

CHK:

RKM

DATE:

22/12/2015

Design of Diaphragm Reinforcement (Part-I) :-

Force in Axial = 2.5% of total load


Let the dimension be
250
(d)
Stresses in axial compression

15
x

250
(b)

1 nos.

150000
250 x
250 x

2.400 N/mm2

Permissible stresses in the struts:


Area of the struts
Moment of Inertia Ixx

0.063 m2

0.00032552 m4

Moment of Inertia Iyy

=
=
=

0.00032552 m4
0.072 m
4500 mm

Radius of gyration
Length
Reinforcement in diphragm:
Minimum reinforcement =
Provide

12

Area of one bar

Total area (Asc)


Ag =
=

0.8
=
mm dia
113.14 mm2

678.86 mm2

net area of concrete


62500
-

% of the cross sectional area


500 mm2
6 nos

>

500 mm2

&

Fe 500

Hence ok

678.86

61821.14 mm2

Material used :

M 35

Permissible stresses: (As per IS:456-2000)


cc

N/mm2

sc

190

N/mm2
ccxAg + sc xAsc

Hence, Load capacity =


=

68.54 t

>

Page 17

15 t

Hence ok

PROJECT: FOUR LANING OF THE STRETCH OF NH-17B FROM VARUNPURI TO SADA


JUNCTION ON EPC MODE
TITLE: DESIGN OF CASTING BED FOR PRE-TENSIONED BEAM
REV:
R0
DOC. NO: 9401/TS/DN-01
DSN:

AUD

CHK:

RKM

DATE:

22/12/2015

Reinforcement for Lateral Ties:Diametre - Minimum


a) 5 mm
b) 3 mm
Spacing shall not exceed the least of following :
a)
250
mm
b)
192
mm
c)
240
mm
Provided
12 mm
@
250

mm c/c

Design of Diaphragm Reinforcement (Part-II) :-

Force in Axial = 2.5% of total load =


Let the dimension be
600
(d)
Stresses in axial compression

15 t
x

250
(b)

=
600 x
=

1 nos.
150000
250 x

1.000 N/mm2

Permissible stresses in the struts:


Area of the struts
Moment of Inertia Ixx

0.150 m2

0.0045 m4

Moment of Inertia Iyy

=
=
=

Radius of gyration
Length

0.00078125 m4
0.072 m
4500 mm

Reinforcement in diphragm:
Minimum reinforcement

0.8
=

Provide,

Total area (Asc) =


Ag

=
=

bars of
1306.90 mm2

net area of concrete


150000
-

=
Material used :

% of the cross sectional area

1200 mm2
12
dia.

>

1200 mm

&

Fe 500

1306.90

148693 mm2
M 35

Page 18

bars of
Hence ok

16

dia.

PROJECT: FOUR LANING OF THE STRETCH OF NH-17B FROM VARUNPURI TO SADA


JUNCTION ON EPC MODE
TITLE: DESIGN OF CASTING BED FOR PRE-TENSIONED BEAM
REV:
R0
DOC. NO: 9401/TS/DN-01
DSN:

AUD

CHK:

RKM

DATE:

22/12/2015

Permissible stresses: (As per IS:456-2000)


cc =
9
N/mm2
sc=
Hence,

190

N/mm2
ccxAg + sc xAsc

Load capacity =
=

158.65 t

>

Reinforcement for Lateral Ties:Diametre - Minimum


a) 5 mm
b) 4 mm
Spacing shall not exceed the least of following :
a)
250
mm
b)
256
mm
c)
240
mm
Provided
12 mm
@
250

mm c/c

Page 19

15 t

Hence ok

PROJECT: FOUR LANING OF THE STRETCH OF NH-17B FROM VARUNPURI TO SADA


JUNCTION ON EPC MODE
TITLE: DESIGN OF CASTING BED FOR PRE-TENSIONED BEAM
REV:
R0
DOC. NO: 9401/TS/DN-01
DSN:

AUD

CHK:

RKM

DATE:

22/12/2015

Design of Stressing End Block :Loading on Beam-I :


300 t

150

1.35 m

Maximum B.M.
Maximum shear

=
=

101
150

150 t

t-m
t

Please input the following data :


Design bending moment M =
Assume width of beam ' b '
=
Material used :
Concrete M
Steel
Fe
Steel
Fe

=
=
=

101 t-m
1500 mm
cbc
st
sc

35
500
500

Perm. Stresses in bending


=
11.5 N/mm2
=
275 N/mm2 tension
2
=
N/mm
190
compression

Design constants :
1

27

280
3 cbc

=
=

8.115942

k
k

0.253394

j
j

=
=

1 - (k / 3)
0.915535

Q
Q

=
=

1/2 * cbc * k * j

Q b d2

dc

1
1 + ( 3 st / 280 )

b=

D=

750

dt

1.333948

d req. =
711.34864 mm
using
25
dia. Bars.
Taking clear cover
=
Overall depth ' D '
=
Provide overall depth ' D '

1500

40
mm
763.84864 mm
=

750 mm

Page 20

PROJECT: FOUR LANING OF THE STRETCH OF NH-17B FROM VARUNPURI TO SADA


JUNCTION ON EPC MODE
TITLE: DESIGN OF CASTING BED FOR PRE-TENSIONED BEAM
REV:
R0
DOC. NO: 9401/TS/DN-01
DSN:

AUD

CHK:

RKM

DATE:

22/12/2015

Therefore effective depth ' d '


=
697.5 mm
2
Mbal =
Qxbxd
Hence,
97.34607 t-m
=
Doubly Reinforced section is reqd.
Effective
Effective
cover cover
'
dc ' =

' dt ' =

40 mm
40 mm

=
=

(To tension reinforcement)


(To compression reinforcement)

Moment to be resisted by compression steel :


M1 =
4 t-m
Calculation of tension steel :
Ast1
=

Mbal

M1

st jd

Provide,
Ast provd

st(d - dc)

5759.185 mm2

6
=

bars of
25
5890.486 mm2

dia.
Hence ok

bars of

25

Calculation of compression steel :


Taking moment of equivalent area of tension & comp steel about N.A.
Asc
M1
=
(1.5 m -1) *cbc*(1- dc / (k*d))*(d-dc)
Asc
Provide,
Asc provd =

=
5

597.2283 mm2
bars of
16
1005.31 mm2

Check for shear :


Design shear ' V '
=
Percentage of steel ' Pt ' =

Therefore ' Pt ' =


Permissible shear stresses c perm.
Actual shear stresses c act.

dia.
Hence ok
t

150
100 Ast
bd

0.563009 %
=

0.3251223 N/mm2
=
=

V
bd
1.433692 N/mm2

Page 21

Shear reinforcement reqd.

dia.

PROJECT: FOUR LANING OF THE STRETCH OF NH-17B FROM VARUNPURI TO SADA


JUNCTION ON EPC MODE
TITLE: DESIGN OF CASTING BED FOR PRE-TENSIONED BEAM
REV:
R0
DOC. NO: 9401/TS/DN-01
DSN:

AUD

Design shear ' Vs '


Using

12

Asv

sv

CHK:

RKM

DATE:

22/12/2015

115.9841 t

mm dia

legged stirrups

678.584 mm2

275 N/mm2

Spacing of stirrups 's'

=
s =

sv * Asv * d
Vs
112.2231 mm

Spacing of stirrups shall be lesser of following :


i)
ii)
iii)
iiii)

112.2231 mm
491.9734 mm
450 mm
523.125 mm

Therefore the spacing of stirrups ' s ' =


Provide
12 mm dia
6

112.2231 mm
legged stirrups

125

mm c/c

Loading on Beam-II :
150.0 t

150 t
3m

150 t

4.5 m

Maximum B.M.
Maximum shear

=
=

113
150

150 t

t-m
t

Please input the following data :


Design bending moment M
Assume width of beam ' b '

113 t-m
750 mm

Material used :
Concrete
Steel

M
Fe

35

Perm. Stresses
in bending
cbc
=

11.5 N/mm2

500

st

275 N/mm2

Page 22

PROJECT: FOUR LANING OF THE STRETCH OF NH-17B FROM VARUNPURI TO SADA


JUNCTION ON EPC MODE
TITLE: DESIGN OF CASTING BED FOR PRE-TENSIONED BEAM
REV:
R0
DOC. NO: 9401/TS/DN-01
DSN:

AUD

Design constants :
m
=

CHK:

RKM

DATE:

22/12/2015

dc

280
3 cbc

0.25

j
j

=
=

1 - (k / 3)
0.92

1/2 * cbc * k * j

b=

750

8.115942
1
1 + ( 3 st / 280 )

D=

1250

dt

1.3339476
Q b d2

d req.
=
1060.4159 mm
using
25
dia. Bars.
Taking clear cover
=
40
mm
Overall depth ' D '
=
1112.9159 mm
Provide overall depth ' D ' =
1250
mm
Thus, effective depth (d)

1197.5
mm
Singly reinforced section is adeqate.

Calculation of Ast :
M

st x Ast x j x d

Therefore Ast req


Provide

12
bars of
Therefore Ast prov. =

3731.3771 mm2
25

dia.
5890.4862 mm2

Check for shear :


Design shear ' V ' =
Percentage of steel ' Pt '
Therefore ' Pt '

150.0
=

t
100 Ast
bd

0.6558649

Page 23

Hence ok

PROJECT: FOUR LANING OF THE STRETCH OF NH-17B FROM VARUNPURI TO SADA


JUNCTION ON EPC MODE
TITLE: DESIGN OF CASTING BED FOR PRE-TENSIONED BEAM
REV:
R0
DOC. NO: 9401/TS/DN-01
DSN:

AUD

CHK:

RKM

Permissible shear stresses c perm. =

DATE:

0.3598768 N/mm2

Actual shear stresses c act. =

V
bd
= 1.6701461 N/mm2

Design shear ' Vs ' =


Using

sv

Shear reinforcement reqd.

117.67857 t

12

Asv

22/12/2015

mm dia

legged stirrups.

678.58401 mm2
275 N/mm2

Spacing of stirrups 's'

=
=

sv * Asv * d
Vs
189.89541 mm

Spacing of stirrups shall be lesser of following :


i)
ii)
iii)
iv)

189.89541 mm
983.9468 mm
450 mm
898.125 mm

Therefore the spacing of stirrups ' s ' =


Provide

12

189.89541 mm

mm dia

legged stirrups.

Since the overall depth is greater than 750 mm, provide side face reinf.
Side face reinforcement on both face =

Provide

10
bars of
Therefore Ast prov.

0.1 percent of bxD


937.5 mm2

12

dia.

1130.9734 mm

Page 24

Hence ok

150

mm c/c

PROJECT: FOUR LANING OF THE STRETCH OF NH-17B FROM VARUNPURI TO SADA


JUNCTION ON EPC MODE
TITLE: DESIGN OF CASTING BED FOR PRE-TENSIONED BEAM
REV:
R0
DOC. NO: 9401/TS/DN-01
DSN:

AUD

CHK:

RKM

DATE:

22/12/2015

Design of Dead End Block :Loading on Beam :


150.0 t

150.0 t
3m

150

4.5 m

Maximum B.M.
Maximum shear

=
=

113
150

150 t

t-m
t

Please input the following data :


Design bending moment M
Assume width of beam ' b '

=
=

113 t-m
890 mm

Material used :

Perm. Stresses
in bending

Concrete

M 35

Steel

11.5 N/mm2

Fe 500
1

275 N/mm2
27

Design constants :
m

k
j
j

=
=
=

Q
Q

=
=

1
1 + ( 3 st / 280 )
0.25
1 - (k / 3)
0.92
1/2 * cbc * k * j
1.3339476

Q b d2

d req.
using

280
3 cbc
8.115942

973.44603 mm
25

dia. Bars.

Page 25

PROJECT: FOUR LANING OF THE STRETCH OF NH-17B FROM VARUNPURI TO SADA


JUNCTION ON EPC MODE
TITLE: DESIGN OF CASTING BED FOR PRE-TENSIONED BEAM
REV:
R0
DOC. NO: 9401/TS/DN-01
DSN:

AUD

CHK:

RKM

mm
mm
1250

DATE:

22/12/2015

Taking clear cover


=
Overall depth ' D '
=
Provide overall depth ' D '

40
1025.946
=

Thus, effective depth (d)

=
1197.5
mm
Singly reinforced section is adeqate.

mm

Calculation of Ast
M

Therefore Ast req


Provide
12
Therefore Ast prov.

st x Ast x j x d
=
bars of

3731.3771 mm2
25
dia.

5890.4862 mm2

Hence ok

Check for shear :


Design shear ' V '
Percentage of steel ' Pt '

=
=

Therefore ' Pt '

=
Permissible shear stresses c perm.
Actual shear stresses c act.

150.0
100 Ast
bd
0.5526951
=
=
=

Design shear ' Vs '


Using
Asv =
sv =

12

mm dia

0.358 N/mm2
V
bd
1.4074265 N/mm2

111.845255 t

legged stirrups.

sv * Asv * d
Vs
199.79944 mm

678.58401 mm2

275 N/mm2
Spacing of stirrups 's'

=
Spacing of stirrups shall be lesser of following :
i)
ii)
iii)
iv)

199.79944 mm
829.1687 mm
450 mm
898.125 mm

Page 26

Shear reinforcement reqd.

PROJECT: FOUR LANING OF THE STRETCH OF NH-17B FROM VARUNPURI TO SADA


JUNCTION ON EPC MODE
TITLE: DESIGN OF CASTING BED FOR PRE-TENSIONED BEAM
REV:
R0
DOC. NO: 9401/TS/DN-01
DSN:

AUD

CHK:

RKM

Therefore the spacing of stirrups ' s ' =


Provide

12

mm dia

DATE:

22/12/2015

199.79944 mm
6

legged stirrups.

Since the overall depth is greater than 750 mm, provide side face reinf.
Side face reinforcement on both face =

0.1 percent of bxD


=

Provide

10

Therefore Ast prov. =

bars of

12

1112.5 mm2

dia.

1130.9734 mm

Page 27

Hence ok

150

mm c/c

PROJECT: FOUR LANING OF THE STRETCH OF NH-17B FROM VARUNPURI TO SADA


JUNCTION ON EPC MODE
TITLE: DESIGN OF CASTING BED FOR PRE-TENSIONED BEAM
REV:
R0
DOC. NO: 9401/TS/DN-01
DSN:

AUD

CHK:

RKM

DATE:

22/12/2015

Design of Casting Bed Pedestal-I :i) Check For Slender Ratio of Pedestal

(As per IRC:21-2000,Cl.306.1, page 58)

Ht. of Column =

0.15

Leff

0.3

r min.

0.6

m2

Ixx

0.0180

m4

0.0500

m4

0.173

(As per Table-13of IRC:21)

0.6

Iyy

2xL

Imin
A

Area

rmin

Slenderness Ratio =

1.0

Leff
rmin

1.73

<

12

IT IS A PEDESTAL COLUMN

ii) Check For Allowable pressure on Loaded Area


cc

co A1
A2

(As per IRC:21-2000,Cl.307.1, page 65)


Grade of Concrete = M 35

here;
co

Permissible direct compressive stress in concrete at the bearing area of base


N/mm2
=
9
(As per IRC:21-2000,Table-9, page 18)

A1

Dispersed concentric area which is geometrically similar to the loaded area


that can be contain in the plane of A1 (maxm. Width of dispersion beyond the
loaded area face shall be limited to twice the height)
m2
=
1.170

A2

=
=
=
A1
A2

Loaded area
1
x
m2
0.6
=

Allowable Bearing Pressure


cc
=

27

0.6

1.1700
0.6000

1.396

1.396424

Page 28

<

12.57

2 Hence ok

N/mm2

PROJECT: FOUR LANING OF THE STRETCH OF NH-17B FROM VARUNPURI TO SADA


JUNCTION ON EPC MODE
TITLE: DESIGN OF CASTING BED FOR PRE-TENSIONED BEAM
REV:
R0
DOC. NO: 9401/TS/DN-01
DSN:

AUD

Developed Bearing Pressure


P
=
4
A
=
0.6
Pressure (P/A) =
0.07

CHK:

RKM

DATE:

22/12/2015

<

12.57

N/mm2

tons
m2
N/mm2

iii) Longitudinal Reinforcement for Pedestal

Hence ok

(As per IRC:21-2000,Cl.306.2, page 58)

Area of Long. Reinforcement = 0.15 % of gross c/s area


2
=
900 mm
Provide
Area of one bar
Total area

12
=

mm dia bar
113.14 mm2

1131.43 mm2

10 nos

900 mm2

>

iv) Transverse Reinforcement for Pedestal

Hence ok

(As per IRC:21-2000,Cl.306.3, page 60)

Diametre - Minimum
a) 8 mm
b) 3 mm
Pitch of Transverse reinforcement shall not exceed
=
OR
Lesser of the following two dimensions;
a) The least lateral dimensionsof the column
=
b) 12 times the diameter of the smallest long. Reinforcement in the column
=
Provided
12 mm
@
100
mm c/c

300
600

mm

144

mm

Design of Casting Bed Pedestal-II :i) Check For Slender Ratio of Pedestal
Ht. of Column =
Leff
=
0.3
r min.

(As per IRC:21-2000,Cl.306.1, page 58)


0.15 m

2xL

(As per Table-13of IRC:21)

Imin
A

0.35

Area

0.35

m2

Ixx

0.0036

m4

Iyy

0.0292

m4

1.0

Page 29

mm

PROJECT: FOUR LANING OF THE STRETCH OF NH-17B FROM VARUNPURI TO SADA


JUNCTION ON EPC MODE
TITLE: DESIGN OF CASTING BED FOR PRE-TENSIONED BEAM
REV:
R0
DOC. NO: 9401/TS/DN-01
DSN:

rmin

0.101

AUD

CHK:

RKM

DATE:

22/12/2015

m
Leff

Slenderness Ratio =

rmin
=

2.97

<

12

IT IS A PEDESTAL COLUMN

ii) Check For Allowable pressure on Loaded Area


cc

here;
co

co A1
A2

(As per IRC:21-2000,Cl.307.1, page 65)


Grade of Concrete = M 35

Permissible direct compressive stress in concrete at the bearing area of base


N/mm2
9
(As per IRC:21-2000,Table-9, page 18)

A1 = dispersed concentric area which is geometrically similar to the loaded area


that can be contain in the plane of A1 (maxm. Width of ispersion beyond the
loaded area face shall be limited to twice the height)
m2
=
0.845
A2 = Loaded area
=
1
0.35
x
m2
=
0.35
A1
A2

0.8450
0.3500

Allowable Bearing Pressure


cc
=

Developed Bearing Pressure


P=
2
tons
A=
0.35
m2
Pressure (P/A) =
0.06

1.554 =

1.554

<

13.98

N/mm2

<

13.98

N/mm2

iii) Longitudinal Reinforcement for Pedestal

Hence ok

N/mm2

Hence ok

(As per IRC:21-2000,Cl.306.2, page 58)

Area of Long. Reinforcement = 0.15 % of gross c/s area


2
=
525 mm
Provide

12

mm dia bar

Area of one bar

113.14 mm2

Total area

1131.43 mm2

10 nos

>

Page 30

525 mm2

Hence ok

PROJECT: FOUR LANING OF THE STRETCH OF NH-17B FROM VARUNPURI TO SADA


JUNCTION ON EPC MODE
TITLE: DESIGN OF CASTING BED FOR PRE-TENSIONED BEAM
REV:
R0
DOC. NO: 9401/TS/DN-01
DSN:

AUD

iv) Transverse Reinforcement for Pedestal

CHK:

RKM

DATE:

22/12/2015

(As per IRC:21-2000,Cl.306.3, page 60)

Diametre - Minimum
a) 8 mm
b) 3 mm
Pitch of Transverse reinforcement shall not exceed
=
OR
Lesser of the following two dimensions;
a) The least lateral dimensionsof the column
=
350
b) 12 times the diameter of the smallest long. Reinforcement in the column
=
144
Provided
12 mm
@
100
mm c/c

Page 31

300
mm
mm

mm

PROJECT: FOUR LANING OF THE STRETCH OF NH-17B FROM VARUNPURI TO SADA


JUNCTION ON EPC MODE
TITLE: DESIGN OF CASTING BED FOR PRE-TENSIONED BEAM
REV:
R0
DOC. NO: 9401/TS/DN-01
DSN:

AUD

CHK:

RKM

DATE:

22/12/2015

To locate C.G of strand : (from bottom of beam )


For Beam at Mid Span

2
7
7
7

55
55
55
75
No of Strands =

Total no of strands =
Dia of strands =
U.T.S. of strands =

23
15.2
26.592

We will design the casting bed for


ie

0.80

23

nos
mm
ton
0.80

of U.T.S.

26.592

21.2736
=
say

Therefore, total force =

21.2736

23

Elongation in strands =

P
A

x
x

L
E

Span of girder (max)


No. of girders in single bed
Hence,

102.4
21.27

A=

140

Elongation in strands

C.G. of strands =

m
ton

E=

2.00E+05

mm2
778

489.29
600

per strand

ton
ton

25 m
4 nos

L=
P=

ton

Mpa
IS 14268

mm

7 X 75 +7 X 130 +7 X 185 +2 X 240


23
=
139.57

mm

(from soffit of beam)

To locate C.G of strand : (from bottom of beam )


For Beam at Mid Span

2
7
7
7

55
55
55
75
No of Strands =

Total no of strands =
Dia of strands =
U.T.S. of strands =

23
15.2
26.592

We will design the casting bed for


ie

0.80

23

nos
mm
ton
0.80

of U.T.S.

26.592

21.2736
=
say

Therefore, total force =

21.2736

23

Elongation in strands =

P
A

x
x

L
E

Span of girder (max)


No. of girders in single bed

=
=

Hence,

L=
P=

102.4
21.27

A=

140

Elongation in strands
C.G. of strands =

ton
489.29
600

per strand

ton
ton

25 m
4 nos

m
ton

E=

2.00E+05

mm2

Mpa
IS 14268

778

mm

7 X 75 +7 X 130 +7 X 185 +2 X 240


23
=

139.57

mm

(from soffit of beam)

325

250

325

1900

1.276
A

200

0.624

C
4500

To Locate C.G. of trough :


Area Mkd

(from bottom )

Area

A
B
C

m2

y
m
1.050
1.050
0.100

0.5525
0.5525
0.9
A =
y
A

Y=

Ay
m3
0.580
0.580
0.09
Ay=

2.005
=

1.250
2.005

0.624

1.250

m3

Geometric properties of trough :


Length of trough (L) =

102.4

Area =

2.01

Ixx =

1 X 1.93 X 0.325

m2
+

1.9 X 0.325 X 0.32642

X2

12
( 0.23 X 3.85 )
12

0.503

0.717

m4

1 X 0.3253 x 1.7
12

Iyy =

+ ( 3.85 X 0.2 X 0.5242 )

0.214

X2

0.33 X 1.70 X 2.08752


( 4.53 X 0.2 )
12

rmin =

0.010

6.344
0.717
2.01

4.8152102

1.519

0.562

m3

1.149

m3

m4
=

0.60

0.717

Minimum section modulus :


ZTxx =

Ixx
yTmax

ZBxx =

Ixx
yBmax

1.276
=

0.717
0.624

Zyy =

Iyy

6.344

xmax

2.819

m3

2.25

Force to be taken by strut action by trough =


=

Prestressing force
600
ton

To calculate the eccentricity of prestressing force :


Ht of pedestal
Ht of shuttering
Bottom slab thk.
C.G. of strands from soffit of beam =
unsupportted length to be considered

=
=
=

150 mm
139 mm
200 mm
139.57 mm
=
25

Therefore, eccentricity of prestressing force (e x)

=
=

628.57
4.999

mm

623.566

Minimum eccentricity : ( as per IS:456 -2000,clause 25.4 )


About x - axis :
ex

unsupported length
500

= 102400
500
= 204.8
=
268.1

+
+

lateral dimension
30
( subjected to minimum of

20

mm)

lateral dimension
30
( subjected to minimum of

20

mm)

1900
30
63.333
mm

About y - axis :
ey

unsupported length
500
= 102400
500
= 204.8
=
355

+
+

4500
30
150
mm

We will design the trough as a compression member subjected to biaxial bending with,
ex =

268.1

mm

ey =

354.8

mm

Therefore, Axial force


Mx =
My =

=
213
161

slenderness ration of the section =

600 ton
t-m
t-m
Effective length
min Lateral dim.
= 0.65 x L
b OR D
=
66.56
OR
1.7
= 39.152941
OR

66.56
4.5
14.79111111

From Clause B-3.3 of IS 456-2000


Max permissible stresses are to be reduced by the Reduction coefficient Cr

>

12
Section is Slender

Cr

1.25

leff

48b
b

=
=

Least lateral dimension


1.7

Cr

0.4343137

Material used :
M 35
Permissible stresses: (As per IS:456-2000)
cbc =
st =

&

cc =
sc=

4.9946078 N/mm2
119.43627 N/mm2

m=

280
3cbc

Fe 500

280
14.983824

3.908823529 N/mm2
82.51960784 N/mm2

18.686819

Using uncracked section theory


Direct stresses cc(cal) =

P
Ac

1.5m Asc

=
=

600
18.69

where,
P = Axial force
m = modular ratio
Asc = area of steel

ton

We will provide minimum steel (ie 0.8 % of c/s area of concrete)


Therefore, Asc =

Ac

0.8

= net area of concrete


=
2.01
=

1.99

Therefore, cc)cal

2.01
100

0.016 m2

0.016

m2
=
1988960
=

2.46

6000000
1.5

18.69

N/mm2

Bending stresses ( about X-X axis)


cbcx =
=

Mxx
=
Zxx
3.79 N/mm2

2128800000
561540889.257921

Bending stresses ( about Y-Y axis)


Myy

cbcy =

Zyy
=

1608800000
2819416203.7037

0.571 N/mm2

Total bending stresses :


=
=
=

cbcx
3.79
4.36

+
+
N/mm2

cbcy
0.571

CHECK :
1)

Maximum stresses

(cc)cal
=
2.46
6.822
=
> 4.9946078

+
+

cbcx
3.79
N/mm2
N/mm2

+
+

cbcy
0.571
Not Safe.

16040

2)

Minimum stresses

cbcx

=
=
=
<
ie

3)

0.75

3.313004679

2.46

N/mm2
Hence O.K.

2.48

Resultant tension in concrete is not to be greater than 35% of resultant compression.


ie

4)

cbcy
(cc)cal
+
+
3.79
0.571
N/mm2
1.90
0.75
x 7 days modulus of rupture of concrete

(cc)cal
(cc)perm
2.46
3.91

35
100

+
+

6.82

cbcx
4.36
4.99

+
(cbc)perm

cbcy

2.39 N/mm2

>

1.90 N/mm2

<=
=
>

Hence O.K.

1
1.50
1

Not Safe.