You are on page 1of 22
PROPOSED G+M+7+R COMMERCIAL BUILDING ON PLOT NO.C-364, SECTOR ME-10 TOWER CRANE FOUNDATION Structural Design Calculations Reference 10133 /D/ 02 Dee 2010 Rev.0 ‘Modern Engineering Consultants Mh Proposed G+M+7+R Commercial building on PlotnoC-364 Tower Crane Foundation Page des mm chk pe STRUCTURAL DESIGN CALCULATIONS Sea revision 0 INDEX a S.No | Description Page A__| Preamble - 2 B_| Design Basis _ 2 _| Reference Drawings 3 D_| Design Summary 3 E_| Load Built up 4 F | Pile cap design Cheek for 750mm Dia Pile capacity 5 Rebar Calculation 7 Check for bond stress E 9 G_| Check for Punching Shear u H_| References/Enclosures 14 Page 2 des mm chk pe Proposed G+M+7+R Commercial building on PlotnoC-364 . date Dec 10 STRUCTURAL DESIGN CALCULATIONS, ref 10133/D/02 revision 0 Preamble This note deals with the design of the pile cap for Tower Crane Yongmao STTS5/13A, having lift capacity 6.0MT for the full free standing height of 46.25 m (as per the Tower Crane manufacturer). A tower crane is to be installed for construction of G+M+7+R Commercial building that a part of this project. The location of crane [STT 55/13A] has been referred from client drawing, ‘The Tower crane is supported at pile foundation (750mm dia) through the pile cap of size 3.1m x 3.1m x 2.0m thickness. The loads from the Tower Crane (as provided in the manufacturer's brochure) for full free standing height are applied on the pile cap. The pile cap is designed based on the fundamental principle. Steel reinforcement of pile cap is calculated based on the fundamental principle. Check for punching shear is done for the maximum axial leg load. The provision of rebar in flexure, pile capacity & shear stress has been checked out near the tower Crane base and its vicinity. Design Basis Design Standard Concrete Foundation BS 8110, Part 1 — 1997 Cover to Reinforcement Pile Cap —75 mm Material Properties Grade of Concrete = €30 for Pile cap Reinforcement steel fy (Characteristic Strength) 460 N/mm? Tower Crane Foundation Page 3 des mm chk pe Proposed G+M+7+R Commercial building on PlotnoC-364 th STRUCTURAL DESIGN CALCULATIONS date Dec 10 ref. 10133/D/02 revision 0 Loads Refer Enclosed Manufacturer's data sheets Pile Capacity ~ Refer Enclosed soil report sheets ~ Report: ABU 1071/10 750mm dia Pile Reference Drawings AD366/ME-10/023-RO AD366/ME-10/029-RO Design Drawings 10133/SK/02-RO Design Summary Pile capacity Compression Tension 2580 kN 619 kN Site Layout & Tower Crane Location Pile Cap Dimensions Layout Tower Crane foundation & details ‘The pile cap size of 3.1m x 3.1m x 2.0m thickness & 750 dia pile is recommended to take care of loads of the free standing Tower Crane of 46,25m height. ‘The provision of rebar in flexure, local punch checks have been carried out & enclosed with the provisions the arrangements are considered adequate. Propose pile Proposed pile cap 750mm dia — 4Nos 3.1x3.1x20m T 25 — 100 Spacing B/W Top & Bottom Additional local steel around anchors eee Mm Proposed G+M+7+R Commercial Building on Plot No.C-364 [des mm Fn pe ‘Tower crane Foundation ldate —Dee-10, STRUCTURAL DESIGN CALCULATIONS ref 1013/0002 revision _0. Loag Buy vp ROT NO! C-2 bb, SECTOR ME-\0 Tower Come — Youamo fT Sshian THE Mi FOR CEH@D FAN LVL. KO TER WRNUPR CTURER CATALOG UE L Cory Steer ENelaED. TOWER COANE I Oem TiN Vertical = bas. pen HoLiontaL = Bras el Memeny V129 4 han TYOWER CRANE OVTOF OPELATION, Vermesl = Babi ual WORZONTAL — 1959) MOMENT = RRA AT tag P\Le DATA Diameter OF PILE = T5°mm anod PILE CAPCITY ComppectioN = 25¢0 EN eENdg\oN = b\4 EN pee Proposed G+M+7+R Commercial Building on Plot No.C-364 [des mm ‘chk pe ‘Tower crane Foundation ldate —Dee-10 STRUCTURAL DESIGN CALCULATIONS let. 10133702 revision 0. MECH FoR Capcity OF PILE S\2E oF RUE CAR = BL YK aL yam 15° mm OF CPANE Dikmevwee OF PILE = o Women p +? ae VE i | 7 La 4 4 fren] oO ° TOWER CRANE a Wem, leq L\boxis | dom, pm Plan view Lombs oN PILE a ee Dtce (tl) Pvere momenr = ARAHF » ae COANE OUTOR OPEEATION dy x2. Véb EN " J) AwtaL vepxient force = Shen Lyconne wt of OFEENTION Proposed G+M+7+R Commercial Building on Plot No.C-364 Tower crane Foundation [page & ldes mm chk pe ldate —Dec-10 STRUCTURAL DESIGN CALCULATIONS let, 101331102 revision _0. VELTICAL force PILE Saha 134 kN Ay Cel wt oF P\LE CAP BYXSixa xar = AgoOs en Pee PILE Aboot 4 = \ao uN Tsomm > Plre TPTAL VEpxical Fopce ON PILE/ = VEL + 124 4120 Coompreccrorl J = loho WS 2Eko WN TRL Ventical fon ce ON PILE a S b+ 14 4]20 Crenaien) = - 529 N => S22un é Ay (oy) Pee Mm Proposed G+M+7+R Commercial Building on Plot No.C-364 des mm chk pe Tower crane Foundation laste Dec-10 STRUCTURAL DESIGN CALCULATIONS let. 101337002 revision 0 DER AR CALCULATION PILE CAP - MRA \Vm MOMENT (eax) = Raasar elon Ly chant out oF LER ce = ARAA XVb = Sse wll CL! yy Be eNO! pA Aqg? ay be My = Sq kon] a Sure \ be \coo we BBse phe B= ooo mm AO Xio09 KAAS Az Qooo~1s— AS x He Oogy A= 14, 2.5mm —— ze 4 Avsall 0:35 Ho-4) ze 0494 Vee Limixiy Value 2 O54 NEM Das dye A = Bssé4 x10 OFS KAdo x OFLA VT = Awe tam [trot Powyat Tar-\00 By rop A porrom Tower crane Foundation ate STRUCTURAL DESIGN CALCULATIONS re. pase Mm Proposed G+M+7+R Commercial Building on Plot No.C-364 ies'mm ch pe PLE CAP REINFORCEMENT | Provpe T35—190 (44 ob Mrtmy) Bly TOR A BeT TSM Myrninum BT 5) OB YE Ay = OB y \o00 x Rod \eo FAM Lt = Qhoomn? Dee-10 10133/0/02 ° | ‘Tower crane Foundation STRUCTURAL DESIGN CALCULATIONS M Proposed G+M+7+R Commercial Building on Plot No.C-364 ate ref P Jdes mm chk pe Dee-10 1013/02 ° al GUeoF GNepetE = C30 NEAL DEPTH oF PILE CAP = {oo 0mm, Defer Tower Chane MANUERCTURERL dice Ts, Tower CoANE FIRING RNGLES 7 | \box\L Bece PLATE > Ano rare (mm) Cueen For BOND ons ack arab aan ake EMBEDDED LENGTH INTO @NCRETE = T0° Mm Effective Aeew = (beng) X40 = Ax evo mm Dona sTREX (uPLipt) = = Fle \ase& Kot Aad 000 = soar > oe ay oe 30 53 Nao WENCE THE DEGON ULT mete] ANCHORAGE BOND LTREdL \4 LEKS THAN, ACTUAL, = [aaaad | . (= fet as Wwe sy AVL exif comp rescion) VUT mate Fe! cee 2&4 NKDe( UPLIFT) 5 pase 10 Proposed G+M+7+R Commercial Building on Plot No.C-364 {es mm Tower crane Foundation chk pe line Deed STRUCTURAL DESIGN CALCULATIONS fe 10133002 revision 0 Bova grec (gowd ThevdT) = _W1e4-2 x10 44 ¢ 000 = B4enja > 035 Vy ae > 0-25V30 18a RENCE “WHE BESIQN VUTIMATE AN eHOPAGE Bond Qtpess \4 Less THAN ACTUAL: Prope AN EHOP fatesxal OL ® Wwo \evers ON ERG LEG, CHPRCITY OF BNC HOP = g AQK AAU KOASXAbO = S433 eN Syvep an tom (ol EmReRrer LENGTH OF CEANE LEG = Too mm, NTO GoncRETE © @ Wwo Levee Poowae BMicrord &T25 IN ON tpct leq. Te THE Embesaep LENGTH OF CRANE LEQ Lf MoRE THAN Joo mm, MORE ADEQUATE: pase Proposed G+M+7+R Commercial Building on Plot No.C-364 des mm chk pe ‘Tower crane Foundation léate —Dee-10 STRUCTURAL DESIGN CALCULATIONS et 1013/0102 revision 0 CECE Foe PUN CHING ayean VUTIATE AKA lea jeg Mens VPLLET = \asd a ww MUP ROAN THRUST = VIER EN TOWER GAWE LEG Liwoxis Te Feunvetie BAKa (wale) PURTE AdoXKa40) PUINCH\NG SWEAR deeds = la5d 4X07 [Bessiorie Awe] Kavo-se} = OLEAN |gt <.0:5105finm? [ne _ 750 15.50 1961 619 2580 619) 900 15.80 2823 742 3566 742 1000 16.00 3486 825 ail 825 Care must be taken to ensure that the pile configuration does not lead to overstressing of the ground. Piles should be placed at least twice the lateral dimension apart centre to centre. ‘Theoretical methods give an approximate working load and advice should be taken form specialist piling contractors as to the actual working loads of the various proprietary piles available before foundation designs are finalised. It should be noted that these theoretical values are likely to only be achieved where a dry method of drilling is used to form the piles, as the use of water, or bentonite slutty, can have a softening effect on the mudstone and gypsum. The actual values obtainable should therefore be proven on site through the testing of instrumented test piles, formed using the chosen piling system, At the allowable bearing pressure given above, the settlement of piles will be small and differential settlement will be minimal. However, load-settlement characteristics of piles assumed in design should be checked by random pile tests Notes: OOOO Notes GATE BARRIER 1. ALL DIMENSIONS ARE IN MA “1 Existing fS Existing | Substation MATERIAL STOCK — 40 R ee Nd Existing Building ye C363 yay eve] oe oa x “ EASTERN ‘ Proposed Site oe C- 364% vo rod rT ICONSULTANT 1 Grcnces a acc shana one onan sez ORLA A UR me [ese scroee-10 4 & Pe sae Preto , oe ionanaen wont Her SS a= El = eee nator ROAD S om =e 1524 1. ALL DIMENSIONS AREIN CM Tt FASTERN Oso 70, YD, LAE. AD-366/ME-10RI29 o

You might also like