Insert Heading
Outline
Soft Soil Behaviour
Characteristics & Issues
Investigation & Interpretation
Design Considerations
Treatment Options
Observational Approach
Risk Management
Soil
Particles
Saturated Soil
BBA
Y2C
CKE
BBA
Y2C
Y2C
Vietnam
Y2C
GUP
Raleigh Deviation
SCCP
Sunshine Motorway
10
Y2C
11
Depth (m)
10
15
20
250
OCR
1
5 0
150 0
Liquidity Index
1
20
cv (m2/yr)
2
4
6
Cr
80
C
0.01
0.02
0.03 0
0.2
Cc
0.4
0.6
0.0
0.0
1.0
1.0
2.0
2.0
3.0
3.0
4.0
4.0
5.0
5.0
6.0
6.0
7.0
7.0
8.0
8.0
9.0
9.0
10.0
10.0
11.0
11.0
12.0
12.0
13.0
13.0
14.0
14.0
15.0
15.0
16.0
16.0
17.0
17.0
18.0
18.0
19.0
19.0
20.0
20.0
21.0
21.0
22.0
22.0
23.0
23.0
24.0
24.0
25.0
25.0
26.0
27.0
28.0
Depth (m)
26.0
Field Shear Vane
Shear Vane Residual
(Su/Su(NC))^1/m
p' / v'
Moisture Content
Liquid Limit
Plastic Limit
27.0
BAC
12
28.0
Design Considerations
Stability (short & long terms)
Settlement (total & differential)
Construction program / time constraints
Design life and durability
Functionality / serviceability
Maintenance
13
Design Considerations
Use of wick drains to speed up consolidation settlement
Dp
No. W. D.
Settlement
Time (log)
t1
t2
With W. D.
t1 << t2
Dp (Max. Drainage Path)
14
Design Considerations
Use of surcharge to reduce preload time & long term creep settlement
H
HS
F.S.L.
HF
HS
HF
t1 t2 t3
HF = Preload Height
HS HF = Surcharge Height
t1, t2 < t3
Ss
Ss < Ss
Ss
S
15
Design Considerations
Ladd 1989 reduction of C as a result of increase in OCR
16
Design Considerations
Use of piles / columns to eliminate settlement and control differential settlement
17
Design Considerations
Design Process
Checks
Settlement
Stability
Treatment options
No treatment
Preload & Surcharge
Preload and surcharge with wick drains
Rigid / semi-rigid inclusions
18
Treatment Options
Above Ground:
Embankment reinforcement high strength geotextile
Light weight fill geoform, bottom ash
Stabilisation berm
Below Ground:
"Soft" inclusions wick drains, vacuum consolidation, electro-osmosis
"Semi-rigid" inclusions sand compaction piles, stone columns DR/VR, deep
soil mixing
"Rigid" inclusions concrete injected columns, CFA piles, timber piles,
reinforced concrete driven piles
19
Treatment Options
Preload, surcharge & wick drains
20
Treatment Options
Rigid & semi-rigid inclusions
21
Treatment Options
High Strength Geotextile
Y2C
Raleigh Deviation
22
Treatment Options
Light Weight Fill
PAVEMENT
UM 150mm THICK LIGHTLY
ORCED CONCRETE SLAB
MINIMUM 200mm
THICK SAND BED
SELECT FILL
MINIMUM 1000mm
AT CENTRE OF ROAD
450mm Dia. CMC PILES
OR EQUIVALENT
EPS-BLOCK GEOFOAM
FOUNDATION SOIL
(WITH FOUNDATION TREATMENT)
WICK
HDPE MEMBRANE
PILE L
CMC CURTAIN WI
CONTROLLED
BAC
23
Treatment Options
Stabilising Berm
Y2C
24
Treatment Options
Wick Drains
Y2C
25
Treatment Options
Vacuum Consolidation
BBA
26
Treatment Options
Stone Columns DR
WM7
27
Treatment Options
Stone Columns VR
28
Treatment Options
Sand Compaction Piles
CKE
29
Treatment Options
Deep Soil Mixing
30
Treatment Options
Concrete Injected Columns
BH2Y
31
Treatment Options
CFA Columns
GUP
32
Treatment Options
Driven Piles
CWL
Y2C
33
Observational Approach
Instrumentation & monitoring
Settlement plates
Surface pins
Settlement stakes
Piezometers & observation wells
Inclinometers
Performance
Pore pressure dissipation
Rate and magnitude of settlement
Embankment stability
Back analysis
Calibration of geotechnical model
Adjustment of design and construction
Prediction of long term performance
34
Observational Approach
Settlement
Instrumented embankment
35
Observational Approach
Pore pressure
36
Risk Management
Risk Management
Geotechnical investigation
Interpretation
Initial Geotechnical
Investigations
Geotechnical model
First Pass
Design
Construction
Additional
Geotechnical
Investigations
Instrumentation &
Monitoring
Trial Embankments
Calibration of Design
Modification of
Construction
Prediction of Long
Term Performance
NG
OK
Finish
37
Thank You!