Equipo formulador:
Representantes de la Municipalidad
Sub Gerente (e) de Promocin de Trasporte Urbano,
Trnsito y Seguridad Vial
Cmdt. PNP : Juan Eliseo Vsquez Rojas
Practicante
Jhonattan Luis Arvalo Vsquez
Septiembre 2016
NDICE
1.
RESUMEN EJECUTIVO...............................................................................5
1.1.
1.2.
1.3.
1.4.
1.4.1.
1.4.2.
1.5.
COSTOS DE LA ALTERNATIVA............................................................6
1.6.
BENEFICIOS...........................................................................................7
1.7.
1.8.
1.9.
IMPACTO AMBIENTAL..........................................................................8
1.10.
2.
SELECCIN DE LA ALTERNATIVA...................................................8
ASPECTOS GENERALES...........................................................................9
2.1.
2.2.
IDENTIFICACIN.......................................................................................10
3.1.
3.1.1.
Situacin Actual............................................................................10
3.1.2.
3.1.3.
3.1.4.
3.2.
3.2.1.
3.2.2.
3.3.
4.
MARCO DE REFERENCIA....................................................................9
3.3.1.
3.3.2.
FORMULACIN Y EVALUACIN..............................................................15
4.1.
4.2.
ANLISIS DE LA DEMANDA..............................................................15
3
4.2.1.
Definicin de la demanda............................................................15
4.2.2.
Caractersticas de la demanda....................................................15
4.2.3.
Determinacin de la demanda.....................................................15
4.3.
5.
ANLISIS DE LA OFERTA..................................................................17
4.3.1.
Identificacin de la oferta............................................................17
4.3.2.
4.3.3.
4.3.4.
4.3.5.
Proyeccin de la oferta................................................................18
4.4.
4.5.
4.6.
4.6.1.
4.6.2.
4.7.
COSTOS INCREMENTALES...............................................................26
4.8.
BENEFICIOS.........................................................................................27
4.9.
EVALUACIN ECONMICA...............................................................27
4.10.
ANLISIS DE SENSIBILIDAD..........................................................29
4.11.
ANLISIS DE SOSTENIBILIDAD.....................................................30
4.11.1.
4.11.2.
De la Operacin y Mantenimiento...........................................30
4.11.3.
De la participacin de la Municipalidad..................................30
4.11.4.
4.12.
IMPACTO AMBIENTAL.....................................................................30
4.13.
ALTERNATIVA SELECCIONADA.....................................................31
CONCLUSIONES Y ANEXOS....................................................................32
5.1.
CONCLUSIONES Y RECOMENDACIONES.......................................32
5.2.
ANEXOS...............................................................................................33
5.2.1.
RESUMEN EJECUTIVO
1. RESUMEN EJECUTIVO
1.1.
Proyecto: Alternativa 1
1.1.2.
Proyecto: Alternativa 2
COSTOS DE LA ALTERNATIVA
1.6.
BENEFICIOS
Los beneficios que genera este proyecto son de tipo social al contribuir
al cuidado de la vida de los ciudadanos; las mismas que detallan:
a. Las herramientas necesarias de auto proteccin a la poblacin
(conductores, ocupantes de los vehculos y los peatones) que
se desplaza por las vas terrestres, al tener y usar las calles y
avenidas con la adecuada sealizacin; el cual, minimizara los
riesgos latentes de inseguridad vial que contribuyen y determinan la
participacin en un accidente de trnsito.
b. Asimismo, permitir ahorrar los gastos en la Salud Pbica,
problemas econmicos y familiares, responsabilidades Penales,
Administrativas y Civiles, que resultan de la participacin de un
accidente de trnsito.
c. Proporcionar un ordenamiento del trnsito vehicular y peatonal.
1.7.
1.8.
1.9.
IMPACTO AMBIENTAL
1.10.
SELECCIN DE LA ALTERNATIVA
ASPECTOS GENERALES
2. ASPECTOS GENERALES
2.1.
Unidad
Formuladora:
GERENCIA
DE
DESARROLLO
ECONOMICO, GESTION AMBIENTAL Y TURISMO.
2.3.
PARTICIPACIN DE LAS ENTIDADES INVOLUCRADAS Y DE
BENEFICIARIOS
MARCO DE REFERENCIA
Texto nico ordenado del Reglamento Nacional de Trnsitocdigo de transito D.S. N016-2009-MTC
3. IDENTIFICACIN
3.1.
1.1.3.
Situacin Actual
10
1.1.4.
Distritos
Provincia
San Martin
Departamento :
San Martin
Pas
Per
PLANO DE LOCALIZACIN
DEPARTAMENTO
PROVINCIA
Temporalidad
El problema de la falta y mantenimiento de sealizacin en las
vas terrestres de la localidad de Tarapoto, Morales y la Banda
de Shilcayo; es en forma permanente, producto del deterioro
prematuro de los dispositivos de Control de Trnsito, el mismo
que es causada por las condiciones que presenta la
infraestructura vial, la Condiciones climatolgicas y el
desplazamiento vehicular.
Relevancia.
Al no existir el pintado y una adecuada sealizacin en las
pistas, este hecho incrementa los riesgos latentes de
Seguridad vial afectando en los usuarios de las vas
11
1.1.6.
Grado de Avance
El pintado en algunos sectores no existe y en otros no se ha
realizado el mantenimiento de los dispositivos de control, con el
cual se demuestra que los problemas estn en una etapa
avanzada, esto origina el mal estar en los peatones y
conductores que transitan estas calles.
Intereses de los grupos involucrados
3.2.
Intereses
Provincial: Brindar servicios
eficientes bajo su liderazgo
Distrital: Mejorar el servicio
en la medida que existan
concertacin entre Gobiernos
Locales
Que
se
pinten
mantenimiento,
adecuadamente
sealizacin de trnsito.
12
las
Que
se
pinten,
adecuadamente
las
sealizacin de trnsito.
1.1.7.
N
Causa 1:
Causa 2:
Causa 3:
1.1.8.
Efecto 2:
Efecto 3:
3.3.
Problema Central
Objetivo Central
1.1.9.
1.1.10.
14
4. FORMULACIN Y EVALUACIN
4.1.
ANLISIS DE LA DEMANDA
1.1.11.
Definicin de la demanda
Caractersticas de la demanda
Determinacin de la demanda
UBIGEO
2016
SAN MARTIN
Total
220901
TARAPOTO
74193
220909
LA BANDA DE SHILCAYO
42635
MORALES
30943
220910
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
TARAPOTO
74193
76608
80377
85693
92836
102197
114317
129939
150080
176140
206725
LA BANDA DE SHILCAYO
42635
45849
51128
59126
70904
88175
113709
152063
210879
303264
436123
MORALES
30943
34506
40633
50529
66352
92011
134737
208352
340231
586696
1011700
147,772
156,962
172,139
195,348
230,092
282,382
362,763
490,355
701,190
1,066,100
1,654,548
Total
DISTRITOS
TARAPOTO
M2 por
pintar al
ao
6464.65
19393.95
LA BANDA DE SHILCAYO
389.22
1167.66
MORALES
240.00
762.00
7107.87
21323.61
Total
2016
2017
2018
2019
2020
2021
2022
2023
2024
147772
156962
172139
195348
230092
282382
362763
490355
701190
2025
2026
1066100
1654548
21323.61 21323.61 21323.61 21323.61 21323.61 21323.61 21323.61 21323.61 21323.61 21323.61
21323.61
16
4.3.
ANLISIS DE LA OFERTA
1.1.14.
Identificacin de la oferta
Persona
l
Pintado de
Vas
M2
da/persona
50
Total
M2 /da
150
Oferta M2
mensual
Oferta M2
anual
4500
13500
Observaciones
Tarapoto, Morales, La
banda de Shilcayo
Cantidad disponible
Cantidad en uso
Pinta Raya
1.1.16.
Fecha
de
adquisicin
Estado
Utilizado en
Buena
Pintado
Personal
Pintado de
Vas
1.1.17.
M2
da/persona
50
Total
M2
/da
Oferta M2
mensual
Oferta M2
anual
4500
13500
150
Observaciones
Tarapoto, Morales, La
banda de Shilcayo
Proyeccin de la oferta
2016
Servicio
Poblacin
2018
m2 pintados
4.4.
2017
13500
13500
13500
2019
2020
2021
2022
2023
2024
2025
2026
19534
230092 282382 362763 490355 701190 1066100 1654548
8
13500
13500
13500
13500
13500
13500
13500
13500
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
21323.61 21323.61 21323.61 21323.61 21323.61 21323.61 21323.61 21323.61 21323.61 21323.61 21323.61
oferta
13500
13500
13500
13500
13500
13500
13500
13500
13500
13500
13500
Demanda - Oferta
25000
20000
15000
10000
5000
0
2016
2017
2018
2019
2020
2021
demanda
2022
2023
2024
2025
2026
oferta
4.5.
18
2016
septiembre
octubre
Noviembre
Diciembre
SEMANA
SEMANA
SEMANA
SEMANA
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
ACTIVIDADES
RECOLECCIN DE DATOS
Visitas de zonas donde se ubica el proyecto
Estudios bsicos
Elaboracin de Formatos y toma de informacin
PROCESAMIENTO Y ANLISIS DE DATOS
Seleccionar Datos
Procesamientos de datos
Analizar e Interpretacin de Datos
ELABORACIN DEL INFORME
Redaccin del Informe
Elaboracin de captulos : Aspectos Generales
Realizacin de Anlisis
Diseo y desarrollo de la Alternativa del proyecto
Elaboracin de costo y presupuesto
Elaboracin de los captulos de formulacin
Presentacin del perfil
Revisin del perfil
Levantamiento de Observaciones
Correccin
Aprobacin
Aprobacin del perfil
Elaboracin de expediente tcnico
Aprobacin del expediente
4.6.
1.1.19.
19
1.1.20.
Fase
I:
1.1
1.1.1
1.1.2
1.1.3
1.1.4
1.1.5
1.2
1.2.1
1.2.2
1.2.3
1.2.4
1.2.5
1.2.6
1.2.7
1.2.8
1.2.9
Inversion
Personal
Capacitacion de la Mano de Obra*
Plantilleros*
Trazadores
Operario de maquina Pinta-raya*
Capataz (supervisa la obra)*
Insumos, Materiales y accesorios de
consumo
Pintura de trafico color blanco base
disolvente
Unidad de
Medida
unidad
Unidad
Unidad
Unidad
Unidad
Precio
Unitario
( S/)
1000.00
850.00
850.00
850.00
850.00
Galones
75.00
Galones
30.00
Galones
75.00
Galones
Unidad
75.00
280.00
kilos
Galones
Galones
Bolsa
10.00
10.50
9.80
13.00
Cantidades
0
0
0
0
0
79
7
48
7
36
0
28
6
99
0
90
30
30
mes
Productos/Metas/categoria de inversion
Cant.
Ao
0
Presupuesto (S/.)
Total
(S/.)
Ao 0
1
1
1
1
1
3
3
3
3
3
0
0
0
0
0
179,32
5
43,830
81,000
1
1
3
3
6,300
5,040
1
1
1
1
3
3
3
3
29,700
2,835
882
1,170
Post inversion
Personal
Capacitacion de la Mano de Obra*
Plantilleros*
Trazadores
Operario de maquina Pinta-raya*
Capataz (supervisa la obra)*
Insumos, Materiales y accesorios de
consumo
Pintura de trafico color blanco base
disolvente
Disolvente para trafico
Pintura de trafico color amarillo base
disolvente
Pintura de trafico color negro base
unidad
Unidad
Unidad
Unidad
Unidad
800.00
850.00
850.00
850.00
850.00
Galones
75.00
Galones
30.00
Galones
Galones
75.00
75.00
0
0
0
0
0
79
7
48
7
36
0
28
1
1
1
1
1
3
3
3
3
3
0
0
0
0
0
179,32
5
43,830
1
1
3
3
81,000
6,300
Ao 1
Ao 2
Ao 3
Ao 4
Ao 5
Ao 6
Ao 7
Ao 8
Ao 9
Ao
10
TOTAL
350,0
82
0
0
0
0
0
0
350,0
82
179,3
25
43,83
0
81,00
0
350,082.
00
0.00
0.00
0.00
0.00
0.00
0.00
350,082.
00
179,325.0
0
6,300
5,040
29,70
0
2,835
882
1,170
8,752
358,8
34
6,300.00
5,040.00
20
43,830.00
81,000.00
350,0
82
0
0
0
0
0
0
350,0
82
179,3
25
43,83
0
81,00
0
6,300
350,0
82
0
0
0
0
0
0
350,0
82
179,3
25
43,83
0
81,00
0
6,300
350,0
82
0
0
0
0
0
0
350,0
82
179,3
25
43,83
0
81,00
0
6,300
350,0
82
0
0
0
0
0
0
350,0
82
179,3
25
43,83
0
81,00
0
6,300
350,0
82
0
0
0
0
0
0
350,0
82
179,3
25
43,83
0
81,00
0
6,300
350,0
82
0
0
0
0
0
0
350,0
82
179,3
25
43,83
0
81,00
0
6,300
350,0
82
0
0
0
0
0
0
350,0
82
179,3
25
43,83
0
81,00
0
6,300
350,0
82
0
0
0
0
0
0
350,0
82
179,3
25
43,83
0
81,00
0
6,300
350,0
82
0
0
0
0
0
0
350,0
82
179,3
25
43,83
0
81,00
0
6,300
350,0
82
0
0
0
0
0
0
350,0
82
179,3
25
43,83
0
81,00
0
6,300
29,700.00
2,835.00
882.00
1,170.00
8,752.05
358,834.
05
3,500,82
0.00
0.00
0.00
0.00
0.00
0.00
0.00
3,500,82
0.00
1,793,250.
00
438,300.0
0
810,000.0
0
63,000.00
Unidad
280.00
kilos
Galones
Galones
Bolsa
10.00
10.50
9.80
13.00
6
99
0
90
30
30
5,040
1
1
1
1
3
3
3
3
29,700
2,835
882
1,170
358,8
34
5,040
29,70
0
2,835
882
1,170
350,0
82
5,040
29,70
0
2,835
882
1,170
350,0
82
5,040
29,70
0
2,835
882
1,170
350,0
82
5,040
29,70
0
2,835
882
1,170
350,0
82
Ao 1
Ao 2
Ao 3
Ao 4
5,040
29,70
0
2,835
882
1,170
350,0
82
5,040
29,70
0
2,835
882
1,170
350,0
82
5,040
29,70
0
2,835
882
1,170
350,0
82
5,040
29,70
0
2,835
882
1,170
350,0
82
5,040
29,70
0
2,835
882
1,170
350,0
82
5,040
29,70
0
2,835
882
1,170
350,0
82
Presupuesto (S/.)
Ao 5 Ao 6 Ao 7
Ao 8
Ao 9
Ao
10
50,400.00
297,000.0
0
28,350.00
8,820.00
11,700.00
3,859,65
4.05
Productos/Metas/categoria de inversion
Unida
d de
Medid
Precio
Unitar
io
unida
d
Unida
d
Unida
d
Unida
d
Unida
d
1000.
00
850.0
0
850.0
0
850.0
0
850.0
0
Fase I: Inversion
1.1 Personal
1.1.1 Capacitacion de la Mano de Obra*
1.1.2 Plantilleros*
1.1.3 Trazadores
1.1.4 Operario de maquina Pinta-raya*
1.1.5 Capataz (supervisa la obra)*
Insumos, Materiales y accesorios
1.2 de consumo
Pintura de trafico color blanco base
1.2.1 disolvente
1.2.2 Disolvente para trafico
Pintura de trafico color amarillo base
1.2.3 disolvente
Pintura de trafico color negro base
1.2.4 disolvente
1.2.5 Seal de romper muelle
1.2.6 Micro esferas reflectantes
1.2.7 Combustible (Gasolina 90 octanos)
1.2.8 Combustible (Gasolina 84 octanos)
1.2.9 Bolsa de yeso x 18 kg.
IMPREVISTO 2.5%
SUB TOTAL INVERSION
Fase
II:
Post inversion
2.1 Personal
2.1.1 Capacitacion de la Mano de Obra*
Galon
es
Galon
es
Galon
es
Galon
es
Unida
d
75.00
30.00
75.00
75.00
280.0
0
Cantidades
A Total
o0
esm
2.3.6
2.3.7
2.3.8
2.2.9
disolvente
Seal de romper muelle
nt.Ca
2.3.5
FC
0.00
0.00
0.00
0.00
0.00
296,694.5
0
151,977.94
179,3
25
43,83
0
81,00
0
0
296,6
94
151,9
78
37,14
6
68,64
8
28
6,300
5,339
5,339.25
3
3
4,271
25,17
1
4,271.40
5,040
29,70
0
25,170.75
2,403
2,402.66
747
747.50
992
7,417
304,1
12
991.58
7,417.36
304,111.8
6
2,966,944
.95
0.00
0.00
79
7
48
7
36
0
kilos
Galon
es
Galon
es
10.00
10.50
90
2,835
9.80
30
882
Bolsa
13.00
30
1,170
800.0
TOTAL
296,694.5
0
0.00
6
99
0
unida
Ao 0
296,6
94
0
0.84
75
0.84
75
0.84
75
0.84
75
0.84
75
0.84
75
0.84
75
0.84
75
0.84
75
37,145.93
68,647.50
296,6
94
0
0
21
296,6
94
0
0
296,6
94
0
0
296,6
94
0
0
296,6
94
0
0
296,6
94
0
0
296,6
94
0
0
296,6
94
0
0
296,6
94
0
0
296,6
94
0
0
2.1.2 Plantilleros*
2.1.3 Trazadores
2.1.4 Operario de maquina Pinta-raya*
2.1.5 Capataz (supervisa la obra)*
Insumos, Materiales y accesorios
2.2 de consumo
Pintura de trafico color blanco base
2.3.1 disolvente
2.3.2 Disolvente para trafico
Pintura de trafico color amarillo base
2.3.3 disolvente
Pintura de trafico color negro base
2.3.4 disolvente
2.3.5 Seal de romper muelle
2.3.6 Micro esferas reflectantes
2.3.7 Combustible (Gasolina 90 octanos)
2.3.8 Combustible (Gasolina 84 octanos)
2.2.9 Bolsa de yeso x 18 kg.
TOTAL (PRE INVERSION,
INVERSION, POST INVERSION)
d
Unida
d
Unida
d
Unida
d
Unida
d
Galon
es
Galon
es
Galon
es
Galon
es
Unida
d
0
850.0
0
850.0
0
850.0
0
850.0
0
75.00
30.00
75.00
75.00
280.0
0
0.00
0.00
0.00
3
3
0
296,6
94
151,9
78
37,14
6
68,64
8
0
296,6
94
151,9
78
37,14
6
68,64
8
0
296,6
94
151,9
78
37,14
6
68,64
8
0
296,6
94
151,9
78
37,14
6
68,64
8
0
296,6
94
151,9
78
37,14
6
68,64
8
0
296,6
94
151,9
78
37,14
6
68,64
8
0
296,6
94
151,9
78
37,14
6
68,64
8
0
296,6
94
151,9
78
37,14
6
68,64
8
0
296,6
94
151,9
78
37,14
6
68,64
8
0.00
2,966,944
.95
1,519,779.
38
179,3
25
43,83
0
81,00
0
0
296,6
94
151,9
78
37,14
6
68,64
8
28
6,300
5,339
5,339
5,339
5,339
5,339
5,339
5,339
5,339
5,339
5,339
53,392.50
3
3
4,271
25,17
1
4,271
25,17
1
4,271
25,17
1
4,271
25,17
1
4,271
25,17
1
4,271
25,17
1
4,271
25,17
1
4,271
25,17
1
4,271
25,17
1
4,271
25,17
1
42,714.00
5,040
29,70
0
251,707.50
2,403
2,403
2,403
2,403
2,403
2,403
2,403
2,403
2,403
2,403
24,026.63
747
747
747
747
747
747
747
747
747
747
7,474.95
992
296,6
94
992
296,6
94
992
296,6
94
992
296,6
94
992
296,6
94
992
296,6
94
992
296,6
94
992
296,6
94
992
296,6
94
992
296,6
94
9,915.75
3,271,056
.81
79
7
48
7
36
0
kilos
Galon
es
Galon
es
10.00
6
99
0
10.50
90
2,835
9.80
30
882
Bolsa
13.00
30
1,170
0.84
75
0.84
75
0.84
75
0.84
75
0.84
75
0.84
75
0.84
75
0.84
75
0.84
75
304,1
12
Inversion
1.1 Personal
Insumos, Materiales y accesorios de
1.2 consumo
Imprevistos 2.5%
TOTAL INVERSION
FASE
II
Post Inversion
1.1 Personal
686,475.00
Productos/Metas/categoria de inversion
Fase
I:
371,459.25
Ao 0
350082.
00
Ao 1
Ao 2
Ao 3
Ao 4
Ao 5
Ao 6
Ao 7
Ao 8
Ao 9
Ao 10
TOTAL
350082.0
0
0.00
350082.
00
0.00
350082.0
0
8752.05
358834.
05
350082.
00
350082.
00
350082.
00
350082.
00
350082.
00
350082.
00
350082.
00
350082.
00
350082.
00
350082.
00
8752.05
358834.0
5
3500820.
00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
22
TOTAL(s/.)
350082.
00
350082.
00
350082.
00
350082.
00
350082.
00
350082.
00
350082.
00
350082.
00
Inversion
Imprevistos 2.5%
TOTAL INVERSION
350082.
00
350082.
00
Ao 7
Ao 8
Ao 9
Ao 10
3500820.
00
3859654.
05
Ao 1
Ao 2
Ao 3
Ao 4
Ao 5
Ao 6
TOTAL
296694.5
0
7417.36
304111.
86
304111.
86
TOTAL(s/.)
296694.
50
296694.
50
296694.
50
296694.
50
296694.
50
296694.
50
296694.
50
296694.
50
296694.
50
296694.
50
7417.36
304111.8
6
2966944.
95
0.00
296694.
50
296694.
50
0.00
296694.
50
296694.
50
0.00
296694.
50
296694.
50
0.00
296694.
50
296694.
50
0.00
296694.
50
296694.
50
0.00
296694.
50
296694.
50
0.00
296694.
50
296694.
50
0.00
296694.
50
296694.
50
0.00
296694.
50
296694.
50
0.00
296694.
50
296694.
50
0.00
2966944.
95
3271056.
81
Precio
Unitari
o ( S/)
esmes
Unidad de
Medida
Cant.
Productos/Metas/categoria de
inversion
Presupuesto (S/.)
Total
(S/.)
Inversion
Personal
unidad
1000.0
0
1.1.2
Unidad
850.00
1.1.3
Trazadores
Unidad
850.00
1.1.1
350082.
00
350082.
00
0.00
296694.5
0
1.1 Personal
Insumos, Materiales y accesorios de
1.2 consumo
Fase
I:
1.1
350082.
00
350082.
00
0.00
296694.
50
Post Inversion
350082.
00
350082.
00
Presupuesto (S/.)
Ao 0
296694.
50
1.1 Personal
Insumos, Materiales y accesorios de
1.2 consumo
FASE II
350082.
00
350082.
00
Productos/Metas/categoria de inversion
Fase I:
350082.
00
350082.
00
3,000
15,30
0
15,30
0
Ao 0
Ao 1
Ao 2
Ao 3
Ao 4
Ao 5
Ao 6
Ao 7
Ao 8
Ao 9
Ao 10
TOTAL
398,982
48,900
398,982.00
48,900.00
3,000
3,000.00
15,300
15,300.00
15,300
15,300.00
23
1.1.4
1.1.5
1.2
Unidad
Unidad
850.00
850.00
2
1
2
2
3
3
unidad
37689.
00
Galones
75.00
797
Galones
30.00
487
Galones
75.00
360
1.2.4
1.2.5
Galones
Unidad
75.00
280.00
28
6
1
1
3
3
1.2.6
1.2.7
1.2.8
1.2.9
kilos
Galones
Galones
Bolsa
10.00
10.50
9.80
13.00
990
90
30
30
1
1
1
1
3
3
3
3
1.2.2
1.2.3
10,20
0
5,100
75,37
8
179,3
25
43,83
0
81,00
0
6,300
5,040
29,70
0
2,835
882
1,170
IMPREVISTO 2.5%
SUB TOTAL INVERSION
Fase
II:
2.1
Post inversion
Personal
10,200
5,100
75,378.0
0
75,378.0
0
75,378.0
0
10,200.00
5,100.00
350,082
350,082.00
179,325
179,325.00
43,830
43,830.00
81,000
81,000.00
6,300
5,040
6,300.00
5,040.00
29,700
2,835
882
1,170
9,975
484,335
75,378.00
75,378.00
75,378.00
413,68
2
48,900
413,68
2
48,900
413,68
2
48,900
413,68
2
48,900
413,68
2
48,900
413,68
2
48,900
413,68
2
48,900
413,68
2
48,900
413,68
2
48,900
413,68
2
48,900
29,700.00
2,835.00
882.00
1,170.00
9,974.55
484,334.55
4,136,820.0
0
489,000.00
3,000
3,000
3,000
3,000
3,000
3,000
3,000
3,000
3,000
3,000
30,000.00
15,300
15,300
15,300
15,300
15,300
15,300
15,300
15,300
15,300
15,300
153,000.00
15,300
15,300
15,300
15,300
15,300
15,300
15,300
15,300
15,300
15,300
153,000.00
10,200
5,100
10,200
5,100
10,200
5,100
10,200
5,100
10,200
5,100
10,200
5,100
10,200
5,100
10,200
5,100
10,200
5,100
10,200
5,100
102,000.00
51,000.00
14,700
14,700
14,700
14,700
14,700
14,700
14,700
14,700
14,700
14,700
147,000.00
2.1.1
unidad
1000.0
0
2.1.2
Plantilleros*
Unidad
850.00
2.1.3
Trazadores
Unidad
850.00
2.1.4
2.1.5
Unidad
Unidad
850.00
850.00
2
1
2
2
3
3
estimadoves
estimadomes
estimadoves
1000.0
0
6,000
6,000
6,000
6,000
6,000
6,000
6,000
6,000
6,000
6,000
6,000
60,000.00
10.00
120
7,200
7,200
7,200
7,200
7,200
7,200
7,200
7,200
7,200
7,200
7,200
72,000.00
250.00
1,500
75.00
797
1,500
350,08
2
179,32
5
1,500
350,08
2
179,32
5
1,500
350,08
2
179,32
5
1,500
350,08
2
179,32
5
1,500
350,08
2
179,32
5
1,500
350,08
2
179,32
5
1,500
350,08
2
179,32
5
1,500
350,08
2
179,32
5
1,500
350,08
2
179,32
5
15,000.00
3,500,820.0
0
Galones
1,500
350,08
2
179,32
5
Galones
30.00
487
43,830
43,830
43,830
43,830
43,830
43,830
43,830
43,830
43,830
43,830
438,300.00
Galones
75.00
360
81,000
81,000
81,000
81,000
81,000
81,000
81,000
81,000
81,000
81,000
810,000.00
2.2
Combistuble
2.2
2.3.1
2.3.2
2.3.3
Repuesto
Insumos, Materiales y accesorios
de consumo
Pintura de trafico color blanco base
disolvente
Disolvente para trafico
Pintura de trafico color amarillo base
disolvente
3,000
15,30
0
15,30
0
10,20
0
5,100
179,3
25
43,83
0
81,00
0
24
1,793,250.00
2.3.4
2.3.5
Galones
Unidad
75.00
280.00
28
6
1
1
3
3
2.3.6
2.3.7
2.3.8
2.2.9
kilos
Galones
Galones
Bolsa
10.00
10.50
9.80
13.00
990
90
30
30
1
1
1
1
3
3
3
3
6,300
5,040
29,70
0
2,835
882
1,170
484,335
6,300
5,040
6,300
5,040
6,300
5,040
6,300
5,040
6,300
5,040
6,300
5,040
6,300
5,040
6,300
5,040
6,300
5,040
63,000.00
50,400.00
29,700
2,835
882
1,170
413,68
2
29,700
2,835
882
1,170
413,68
2
29,700
2,835
882
1,170
413,68
2
29,700
2,835
882
1,170
413,68
2
29,700
2,835
882
1,170
413,68
2
29,700
2,835
882
1,170
413,68
2
29,700
2,835
882
1,170
413,68
2
29,700
2,835
882
1,170
413,68
2
29,700
2,835
882
1,170
413,68
2
29,700
2,835
882
1,170
413,68
2
297,000.00
28,350.00
8,820.00
11,700.00
4,621,154.5
5
Cantidades
0Ao
Unidad de
Medida
esmes
Productos/Metas/categoria de
inversion
.Cant
6,300
5,040
Presupuesto (S/.)
Total
(S/.)
TC
unidad
1000.0
0
Unidad
850.00
1.1.3 Trazadores
Unidad
850.00
Unidad
Unidad
850.00
850.00
2
1
2
2
3
3
3,000
15,30
0
15,30
0
10,20
0
5,100
unidad
797
Galones
30.00
487
Galones
75.00
360
Galones
75.00
28
6,300
Unidad
280.00
kilos
10.00
990
5,040
29,70
0
Galones
10.50
90
2,835
Galones
9.80
30
882
Bolsa
13.00
30
1,170
Ao 6
Ao 7
Ao 8
Ao 9
Ao 10
TOTAL
0.630
9,639
9,639.00
0.630
9,639
9,639.00
0.630
0.909
6,426
4,636
63,882.8
6
63,882.8
6
63,882.8
6
6,426.00
4,635.90
0.847
5
0.847
5
0.847
5
0.847
5
0.847
5
0.847
5
0.847
5
0.847
5
0.847
5
75.00
Ao 5
2,727.00
0.847
5
Galones
Ao 4
2,727
75,37
8
179,3
25
43,83
0
81,00
0
Ao 3
0.909
Ao 2
329,761
33,067
Ao 1
329,761.4
0
33,066.90
Fase I: Inversion
1.1 Personal
1.1.1 Capacitacion de la Mano de Obra
Plantilleros (diseador de marcas en la
1.1.2 calzada)
Ao 0
63,882.86
63,882.86
296,694
63,882.86
296,694.5
0
151,978
151,977.94
37,146
37,145.93
68,648
68,647.50
5,339
5,339.25
4,271
4,271.40
25,171
25,170.75
2,403
2,402.66
747
747.50
992
991.58
25
8,244
340,87
0
340,87
0
340,87
0
340,87
0
340,87
0
340,87
0
340,87
0
340,87
0
340,87
0
340,87
0
33,067
33,067
33,067
33,067
33,067
33,067
33,067
33,067
33,067
33,067
8,244.03
401,888.2
8
3,408,696
.45
330,669.0
0
0.909
2,727
2,727
2,727
2,727
2,727
2,727
2,727
2,727
2,727
2,727
27,270.00
0.630
9,639
9,639
9,639
9,639
9,639
9,639
9,639
9,639
9,639
9,639
96,390.00
0.630
9,639
9,639
9,639
9,639
9,639
9,639
9,639
9,639
9,639
9,639
96,390.00
0.630
0.909
6,426
4,636
6,426
4,636
6,426
4,636
6,426
4,636
6,426
4,636
6,426
4,636
6,426
4,636
6,426
4,636
6,426
4,636
6,426
4,636
11,108
11,108
11,108
11,108
11,108
11,108
11,108
11,108
11,108
11,108
64,260.00
46,359.00
111,082.5
0
5,085
5,085
5,085
5,085
5,085
5,085
5,085
5,085
5,085
5,085
50,850.00
4,752
4,752
4,752
4,752
4,752
4,752
4,752
4,752
4,752
4,752
47,520.00
1,271
296,69
4
151,97
8
1,271
296,69
4
151,97
8
1,271
296,69
4
151,97
8
1,271
296,69
4
151,97
8
1,271
296,69
4
151,97
8
1,271
296,69
4
151,97
8
1,271
296,69
4
151,97
8
1,271
296,69
4
151,97
8
1,271
296,69
4
151,97
8
1,271
296,69
4
151,97
8
12,712.50
2,966,944
.95
1,519,779.
38
37,146
37,146
37,146
37,146
37,146
37,146
37,146
37,146
37,146
37,146
371,459.25
68,648
68,648
68,648
68,648
68,648
68,648
68,648
68,648
68,648
68,648
686,475.00
5,339
5,339
5,339
5,339
5,339
5,339
5,339
5,339
5,339
5,339
53,392.50
4,271
4,271
4,271
4,271
4,271
4,271
4,271
4,271
4,271
4,271
42,714.00
25,171
25,171
25,171
25,171
25,171
25,171
25,171
25,171
25,171
25,171
251,707.50
2,403
2,403
2,403
2,403
2,403
2,403
2,403
2,403
2,403
2,403
24,026.63
747
747
747
747
747
747
747
747
747
747
7,474.95
992
340,87
0
992
340,87
0
992
340,87
0
992
340,87
0
992
340,87
0
992
340,87
0
992
340,87
0
992
340,87
0
992
340,87
0
992
340,87
0
9,915.75
3,810,584
.73
IMPREVISTO 2.5%
401,888
Fase
II:
Post inversion
2.1 Personal
2.1.1 Capacitacion de la Mano de Obra*
unidad
1000.0
0
2.1.2 Plantilleros*
Unidad
850.00
2.1.3 Trazadores
Unidad
850.00
Unidad
Unidad
850.00
850.00
2
1
2
2
3
3
estimadoves
estimadomes
estimadoves
1000.0
0
6,000
10.00
120
7,200
250.00
1,500
Galones
75.00
797
Galones
30.00
487
Galones
75.00
360
179,3
25
43,83
0
81,00
0
Galones
75.00
28
6,300
Unidad
280.00
kilos
10.00
990
5,040
29,70
0
Galones
10.50
90
2,835
Galones
9.80
30
882
Bolsa
13.00
30
1,170
Combistuble
Repuesto
Insumos, Materiales y accesorios
2.2 de consumo
Pintura de trafico color blanco base
2.3.1 disolvente
3,000
15,30
0
15,30
0
10,20
0
5,100
0.847
5
0.847
5
0.847
5
0.847
5
0.847
5
0.847
5
0.847
5
0.847
5
0.847
5
401,888
Productos/Metas/categoria de
inversion
Fase
I: Inversion
0.847
5
0.660
0
0.847
5
Presupuesto (S/.)
Ao 0
Ao 1
Ao 2
Ao 3
Ao 4
474360.00
26
Ao 5
Ao 6
Ao 7
Ao 8
Ao 9
Ao 10
TOTAL
474360.0
0
1.1 Personal
48900.00
48900.00
75378.00
75378.00
350082.0
0
350082.00
Imprevistos 2.5%
9974.55
TOTAL INVERSION
FASE
II Post Inversion
484334.55
413682.0
0
2.1 Personal
Operacin y mantenimiento de la
2.2 maquina Pinta raya
Insumos, Materiales y accesorios de
2.3 consumo
TOTAL(s/.)
48900.00
14700.00
350082.0
0
413682.0
484334.55
0
413682.
00 413682.00 413682.00 413682.00
48900.0
0
48900.00
48900.00
48900.00
14700.0
0
14700.00
14700.00
14700.00
350082.
00 350082.00 350082.00 350082.00
413682.
00 413682.00 413682.00 413682.00
413682.
00
48900.0
0
14700.0
0
350082.
00
413682.
00
413682.
00
48900.0
0
14700.0
0
350082.
00
413682.
00
413682.
00
48900.0
0
14700.0
0
350082.
00
413682.
00
413682.
00
48900.0
0
14700.0
0
350082.
00
413682.
00
Ao 7
Ao 8
Ao 9
413682.
00
48900.0
0
14700.0
0
350082.
00
413682.
00
9974.55
484334.5
5
4136820.
00
489000.0
0
147000.0
0
3500820.
00
4621154.
55
Presupuesto (S/.)
Productos/Metas/categoria de inversion
Fase
I: Inversion
1.1 Personal
1.2 Equipamiento del servicio
1.3 Insumos, Materiales y accesorios de consumo
Imprevistos 2.5%
TOTAL INVERSION
FASE
II Post Inversion
2.1 Personal
Operacin y mantenimiento de la maquina
2.2 Pinta raya
2.3 Insumos, Materiales y accesorios de consumo
Ao 0
393644.
25
33066.9
0
63882.8
6
296694.
50
Ao 1
Ao 2
Ao 3
Ao 4
Ao 5
Ao 6
Ao 10
TOTAL
393644.25
33066.90
63882.86
296694.50
8244.03
401888.
28
8244.03
340869.
65
33066.9
0
11108.2
5
296694.
50
340869.
65
33066.9
0
11108.2
5
296694.
50
340869.
65
33066.9
0
11108.2
5
296694.
50
27
340869.
65
33066.9
0
11108.2
5
296694.
50
340869.
65
33066.9
0
11108.2
5
296694.
50
340869.
65
33066.9
0
11108.2
5
296694.
50
340869.
65
33066.9
0
11108.2
5
296694.
50
340869.
65
33066.9
0
11108.2
5
296694.
50
340869.
65
33066.9
0
11108.2
5
296694.
50
340869.
65
33066.9
0
11108.2
5
296694.
50
401888.28
3408696.4
5
330669.00
111082.50
2966944.9
5
TOTAL(s/.)
401888.
28
340869.
65
340869.
65
340869.
65
28
340869.
65
340869.
65
340869.
65
340869.
65
340869.
65
340869.
65
340869. 3810584.7
65
3
4.7.
Costos incrementales
Descripcion
0
3588
34
A. INVERSION
B. POST INVERSION
C. TOTAL COSTOS CON PROYECTO (A+B)
D. COSTOS DE OPERACIN Y MANTENIMIENTO SIN
PROYECTO
COSTOS INCREMENTALES
10
0
3588
34
3500
82
3500
82
3500
82
3500
82
3500
82
3500
82
3500
82
3500
82
3500
82
3500
82
3500
82
3500
82
3500
82
3500
82
3500
82
3500
82
3500
82
3500
82
3500
82
3500
82
0
3588
34
0
3500
82
0
3500
82
0
3500
82
0
3500
82
0
3500
82
0
3500
82
0
3500
82
0
3500
82
0
3500
82
0
3500
82
10
Descripcion
0
3041
12
A. INVERSION
B. POST INVERSION
C. TOTAL COSTOS CON PROYECTO (A+B)
D. COSTOS DE OPERACIN Y MANTENIMIENTO SIN
PROYECTO
COSTOS INCREMENTALES
0
3041
12
2957
03
2957
03
2957
03
2957
03
2957
03
2957
03
2957
03
2957
03
2957
03
2957
03
2957
03
2957
03
2957
03
2957
03
2957
03
2957
03
2957 29570
03
3
2957 29570
03
3
0
3041
12
0
2957
03
0
2957
03
0
2957
03
0
2957
03
0
2957
03
0
2957
03
0
2957
03
0
2957
03
0
0
2957 29570
03
3
Alternativa 2:
Costos incrementales Alternativa 2
(En nuevo soles a precios de mercado)
Aos
Descripcion
A. INVERSION
B. POST INVERSION
C. TOTAL COSTOS CON PROYECTO (A+B)
D. COSTOS DE OPERACIN Y MANTENIMIENTO SIN
PROYECTO
COSTOS INCREMENTALES
0
4843
35
10
0
4843
35
4136
82
4136
82
4136
82
4136
82
4136
82
4136
82
4136
82
4136
82
4136
82
4136
82
4136
82
4136
82
4136
82
4136
82
4136
82
4136
82
4136
82
4136
82
4136
82
4136
82
0
4843
35
0
4136
82
0
4136
82
0
4136
82
0
4136
82
0
4136
82
0
4136
82
0
4136
82
0
4136
82
0
4136
82
0
4136
82
29
Descripcion
0
4018
88
A. INVERSION
B. POST INVERSION
C. TOTAL COSTOS CON PROYECTO (A+B)
D. COSTOS DE OPERACIN Y MANTENIMIENTO SIN
PROYECTO
COSTOS INCREMENTALES
4.8.
34087
0
34087
0
0
0
0
0
0
0
0
0
0
0
4018 34087 34087 34087 34087 34087 34087 34087 34087 34087
88
0
0
0
0
0
0
0
0
0
0
34087
0
Beneficios Incrementales
Estn dados por la diferencia entre la situacin con proyecto y la
situacin sin proyecto, en ese sentido, los beneficios incrementales
estn conformados por los beneficios con proyecto mencionados
en el punto anterior.
4.9.
10
BENEFICIOS
EVALUACIN ECONMICA
Alternativa 1:
Metodologa de Costos efectividad de la alternativa 1
(En Nuevo Soles a Precios Sociales)
Aos
Descripcion
0
10
2957
03
2957
03
2957
03
2957
03
2957
03
2957
03
2957
03
2957
03
2957
03
2957
03
2957
03
2957
03
2957
03
2957
03
2957
03
2957
03
2957
03
2957
03
2957
03
2957
03
0
2957
03
0
2957
03
0
2957
03
0
2957
03
0
2957
03
0
2957
03
0
2957
03
0
2957
03
0
2957
03
0
2957
03
304112
A. INVERSION
B. POST INVERSION
C. TOTAL COSTOS CON PROYECTO (A+B)
D. COSTOS DE OPERACIN Y MANTENIMIENTO SIN
PROYECTO
304112
COSTOS INCREMENTALES
total Valor Actual de los Costos Sociales
Netos - VACSN
304112
204557
5
147,772
13.842
78
Indicador de Efectividad
Costo de Efectividad
Alternativa 2
Metodologa de Costos efectividad de la alternativa 2
(En Nuevo Soles a Precios Sociales)
Aos
Descripcion
0
40188
8
10
0
40188
8
3408
70
3408
70
3408
70
3408
70
3408
70
3408
70
3408
70
3408
70
3408
70
3408
70
3408
70
3408
70
3408
70
3408
70
3408
70
3408
70
3408
70
3408
70
3408
70
3408
70
COSTOS INCREMENTALES
0
40188
8
0
3408
70
0
3408
70
0
3408
70
0
3408
70
0
3408
70
0
3408
70
0
3408
70
0
3408
70
0
3408
70
0
3408
70
Tasa de Descuento
total Valor Actual de los Costos Sociales Netos
- VACSN
11%
24093
49
A. INVERSION
B. POST INVERSION
C. TOTAL COSTOS CON PROYECTO (A+B)
D. COSTOS DE OPERACIN Y MANTENIMIENTO SIN
PROYECTO
Indicador de Efectividad
Costo de Efectividad
147,772
16.304
5
4.10.
ANLISIS DE SENSIBILIDAD
Alternativa 1
(C/E)
120%
16.611
15.919
15.227
14.535
13.843
13.151
12.459
11.766
11.074
115%
110%
105%
100%
95%
90%
85%
80%
32
Alternativ
a 2 (C/E)
19.565
18.750
17.935
17.120
16.305
15.489
14.674
13.859
13.044
Analisis de sensibilidad
25.000
20.000
15.000
10.000
5.000
0.000
Alternativa 1 (C/E)
Alternativa 2 (C/E)
4.11.
ANLISIS DE SOSTENIBILIDAD
De la Operacin y Mantenimiento.
De la participacin de la Municipalidad
33
IMPACTO AMBIENTAL
ALTERNATIVA SELECCIONADA
5. CONCLUSIONES Y ANEXOS
5.1.
CONCLUSIONES Y RECOMENDACIONES
36
5.2.
ANEXOS
1.1.25.
SECTOR A:
JR. ALFONSO UGARTE C-01 HASTA LA C-09
DESCRIPCIN
METRADOS SEALIZACIN VIAL
MARCA RETROREFLECTIVA EN EL PAVIMENTO
UND
METRADO
M2
190.43
SECTOR B:
Desde el puente Atunpampa hasta el Ovalo del grifo melcochita (A. Ugarte
C/16)
DESCRIPCIN
UND
METRADO
M2
290.62
SECTOR C:
37
Del Ovalo del Jr. Alfonso Ugarte hasta el Ovalo Jimnez Pimentel lado
derecho.
DESCRIPCIN
UND
METRADO
M2
185.00
SECTOR D:
Del Ovalo Jr. Jimnez Pimentel hasta el Ovalo Jr. Alfonso Ugarte lado
Izquierdo.
DESCRIPCIN
METRADOS SEALIZACION VIAL
MARCA HORIZONTALES RETROREFLECTIVA EN EL PAVIMENTO
SECTOR E:
38
UND
METRAD
O
M2
185.00
Av. Aviacin desde el Ovalo Jimnez Pimentel hasta el Ovalo Jr. Jorge
Chvez.
DESCRIPCION
UND
METRAD
O
M2
195.62
SECTOR F:
Av. Aviacin desde el Ovalo Jr. Jorge Chvez hasta el Ovalo Jr. Jimnez
Pimentel.
DESCRIPCIN
UND
METRAD
O
M2
195.62
SECTOR G:
39
Va de Evitamiento, del Ovalo del Jr. Jimnez Pimentel hasta el Ovalo del
Jr. Jorge Chvez.
DESCRIPCIN
SEALIZACIN VIAL
MARCA HORIZONTALES RETROREFLECTIVA EN EL PAVIMENTO
UND
METRAD
O
m2
220.00
SECTOR H:
Va de Evitamiento, del Ovalo del Jr. Jorge Chvez hasta el Ovalo del Jr.
Jimnez Pimentel.
DESCRIPCIN
SEALIZACIN VIAL
MARCA HORIZONTALES RETROREFLECTIVA EN EL PAVIMENTO
SECTOR I:
40
UND
METRAD
O
M2
220.00
- Del Ovalo del Jr. Jimnez Pimentel Hasta la Plaza mayor, pintado de 02
carriles
(Doble sentido de circulacin).
DESCRIPCIN
SEALIZACIN VIAL
MARCA HORIZONTALES RETROREFLECTIVA EN EL PAVIMENTO
UND
METRAD
O
m2
420.00
SECTOR J
Va de Evitamiento, desde el Puente Shilcayo hasta el Jr. Jorge Chvez
C/1 y Jr. Jos Olaya C/1.
DESCRIPCIN
SEALIZACIN VIAL
MARCA HORIZONTALES RETROREFLECTIVA EN EL PAVIMENTO
41
UND
METRAD
O
m2
66.33
SECTOR K
Av. Lima, desde el Jr. Martnez de Compan hasta el Jr. Brasil.
DESCRIPCIN
SEALIZACIN VIAL
MARCA HORIZONTALES RETROREFLECTIVA EN EL PAVIMENTO
UND
METRAD
O
m2
497.79
SECTOR L
Av. Circunvalacin, desde el Jr. Ramrez Hurtado hasta psje. Paraso y Av.
Lima.
DESCRIPCIN
UND
METRAD
O
m2
892.14
SEALIZACIN VIAL
MARCA HORIZONTALES RETROREFLECTIVA EN EL PAVIMENTO
SECTOR M
Jr. Progreso desde la Av. Micaela Bastidas hasta el Jr. Colon.
DESCRIPCIN
UND
42
METRAD
O
SEALIZACIN VIAL
MARCA HORIZONTALES RETROREFLECTIVA EN EL PAVIMENTO
m2
278.74
SECTOR N
Jr. Manco Inca, desde el Jr. Orellana hasta la Va de Evitamiento.
DESCRIPCIN
UND
METRAD
O
m2
326.90
UND
METRAD
O
m2
234.76
SEALIZACIN VIAL
MARCA HORIZONTALES RETROREFLECTIVA EN EL PAVIMENTO
SECTOR :
Jr. M. Sucre desde el Jr. Orellana hasta el Jr. Bolognesi.
DESCRIPCIN
SEALIZACIN VIAL
MARCA HORIZONTALES RETROREFLECTIVA EN EL PAVIMENTO
SECTOR O:
Jr. A.B. Legua desde el Jr. M. Compan hasta Av. Circunvalacin
(MINSA).
43
DESCRIPCIN
SEALIZACIN VIAL
MARCA HORIZONTALES RETROREFLECTIVA EN EL PAVIMENTO
UND
METRAD
O
m2
342.56
SECTOR P
Va de Evitamiento, del Ovalo del Jr. Jorge Chvez hasta el Ovalo del
Periodista.
DESCRIPCIN
SEALIZACION VIAL
MARCA HORIZONTALES RETROREFLECTIVA EN EL PAVIMENTO
UND
METRAD
O
m2
185.00
44
DESCRIPCIN
SEALIZACIN VIAL
MARCA HORIZONTALES RETROREFLECTIVA EN EL
PAVIMENTO
45
UND
METRADO
m2
38.70
DESCRIPCION
SEALIZACION VIAL
MARCA HORIZONTALES RETROREFLECTIVA EN EL PAVIMENTO
UND
METRAD
O
m2
50.68
DESCRIPCION
SEALIZACION VIAL
MARCA HORIZONTALES RETROREFLECTIVA EN EL
PAVIMENTO
46
UND
METRAD
O
m2
54.24
DESCRIPCION
SEALIZACION VIAL
MARCA HORIZONTALES RETROREFLECTIVA EN EL PAVIMENTO
UND
METRAD
O
m2
62.8
SECTORES ADICIONALES
Sector 1 Jr. Ramrez Hurtados c-03 y Jr. Bolognesi c-01
DESCRIPCIN
SEALIZACION VIAL
MARCA HORIZONTALES RETROREFLECTIVA EN EL PAVIMENTO
47
UND
METRAD
O
M2
62.00
DESCRIPCIN
UND
METRADO
SEALIZACIN VIAL
MARCA HORIZONTALES RETROREFLECTIVA EN EL PAVIMENTO
m2
419.68
DESCRIPCIN
SEALIZACIN VIAL
MARCA HORIZONTALES RETROREFLECTIVA EN EL PAVIMENTO
UND
METRAD
O
m2
386.12
DESCRIPCION
SEALIZACION VIAL
MARCA HORIZONTALES RETROREFLECTIVA EN EL PAVIMENTO
UND
METRAD
O
m2
162.72
DESCRIPCIN
SEALIZACIN VIAL
MARCA HORIZONTALES RETROREFLECTIVA EN EL PAVIMENTO
UND
METRAD
O
m2
186.28
DESCRIPCIN
SEALIZACIN VIAL
MARCA HORIZONTALES RETROREFLECTIVA EN EL PAVIMENTO
UND
METRAD
O
M2
114.92
DESCRIPCIN
SEALIZACION VIAL
MARCA HORIZONTALES RETROREFLECTIVA EN EL PAVIMENTO
UND
METRAD
O
m2
99.20
DESCRIPCION
UND
50
METRAD
O
SEALIZACION VIAL
MARCA HORIZONTALES RETROREFLECTIVA EN EL PAVIMENTO
m2
71.36
Sector W:
Jr. 1 de ABRIL c-5 y c- 6 semforo de 4 caras, lnea central y
separador de carril
DESCRIPCION
SEALIZACION VIAL
MARCA HORIZONTALES RETROREFLECTIVA EN EL PAVIMENTO
UND
METRAD
O
m2
104.92
SECTOR X:
JR. M. MURRIETA C-02 Y PSJE ABELARDO RAMIREZ C-02 SEPARADOR
DE CARRIL
DESCRIPCION
UND
SEALIZACION VIAL
51
METRAD
O
m2
113.74
UND
METRAD
O
m2
140.26
SECTORES MORALES
Sector Y: Av. Per hasta la Salaverry
DESCRIPCIN
SEALIZACIN VIAL
MARCA HORIZONTALES RETROREFLECTIVA EN EL PAVIMENTO
Sector Z:
Jr. Salaverry cuadra 01 hasta la quebrada Amorarca (estacin
de Bomberos).
DESCRIPCIN
UND
SEALIZACION VIAL
52
METRADO
53
m2
113.74