Professional Documents
Culture Documents
19-Sep-2012
Transmission Surveyor
Subhan
Team
Request by
PT.POCA tech
Fitriana/Idham/Dedy
1. Link Description:
Near End
Far End
Site ID
161590
161396
Site Name
Sangatta 5
Kabo Jaya
Address
SANGATTA
Area
2. Site Description
161590
Near End
Latitude:
0.52151
Longitude:
Site Type
117.5318
Green Field
Existing Tower:
Elevation
m Determined by:
Tower Type:
SST
m
Tower Height:
cm
42
mm
cm
SST
161396
Far End
Latitude:
55
0.53073
Longitude:
Site Type
Existing Tower:
117.53306
Green Field
Yes
Elevation
10
m Determined by:
Tower Type:
Roof Top
m
Tower Height:
cm
55
X
m
mm
cm
Roof Top
67
3. Line of Sight :
Near End Name
N.E->F.E
Azimuth()
Height
(mAGL)
F.E->N.E
Azimuth()
Height
(mAGL)
Dist.
161590
281.87
35
161396
101.87
44
2.54
LOS status
LOS
*usually only one FE, if can't LOS, propose another feasible far end
Huawei Confidential
Page 1
Site
161590
View to
FE
212004
Site
161590
Huawei Confidential
Page 2
Site
161369
Huawei Confidential
Page 3
Proposed MW
to 161590
/36m/ azimut
281.87
n // a
Self Build
\
212771 Antenna or Tower location (Far End)
Page 4
Huawei Confidential
4. Path profile
\
60
E lev ation ( m )
50
40
30
20
10
0
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
Kabo Jaya
Latitude
00 31 50.63 N
Longitude
117 31 59.02 E
Azimuth
187.83
Elevation
8 m ASL
Antenna CL 44.0 m AGL
Apr 21 12
Huawei Confidential
Near End
Tower owner:
Operator
Site ID:
Site Name:
NO
1
Protelindo
HCPT
161590
Sangatta 5
Tower height
SST 42 M
Operator
Site ID:
Site Name:
Tower 2
NO
1
2
3
4
5
6
7
8
9
10
11
12
TOWER LEG
A
A
A
A
A
A
B
B
B
C
C
C
C
C
C
D
D
D
D
B
Type
GSM
No Lable
No Lable
No Lable
No Lable
No Lable
GSM
No Lable
No Lable
No Lable
No Lable
No Lable
No Lable
No Lable
No Lable
GSM
No Lable
No Lable
No Lable
Propose
TOWER LEG
A
A
A
A
A
B
B
C
C
C
C
C
D
D
D
D
D
Type
HCPT
161396
Kabo Jaya
Tower height
SST 42 m
Proposed
Huawei Confidential
Panorama Photograph
Site Name:
161590 / Sangatta 5
Near End to 0o
Huawei Confidential
Panorama Photograph
Site Name:
161590 / Sangatta 5
Huawei Confidential
Panorama Photograph
Site Name:
161590 / Sangatta 5
Huawei Confidential
Panorama Photograph
Site Name:
161590 / Sangatta 5
10
Huawei Confidential
Panorama Photograph
Site Name:
161590 / Sangatta 5
11
Huawei Confidential
Panorama Photograph
Site Name:
161590 / Sangatta 5
12
Huawei Confidential
Panorama Photograph
Site Name:
Far End to
0o
Far End to
30o
13
Huawei Confidential
Panorama Photograph
Site Name:
Far End to
60o
Far End to
90o
14
Huawei Confidential
Panorama Photograph
Site Name:
Far End to
120o
Far End to
150o
15
Huawei Confidential
Panorama Photograph
Site Name:
Far End to
180o
Far End to
210o
16
Huawei Confidential
Panorama Photograph
Site Name:
Far End to
240o
Far End to
270o
17
Huawei Confidential
Panorama Photograph
Site Name:
Far End to
300o
Far End to
330o
18
Huawei Confidential
Wave Guid
Window Photo
N/A
Self Build
ACPDB Photo
N/A
19
Huawei Confidential
Wave Guid
Window Photo
N/A
Self Build
ACPDB Photo
N/A
20
Huawei Confidential
TR/MW
Site Evaluation Form
Site Number:
Site Name:
161590
Sangatta 5
General Information :
Common Site Rank :
Cluster :
Rollout Type :
Preferred
Rural
Sharing Tower
TR site rank:
Controller :
Priority :
Approved
RP Latitude :
Altitude (AMSL):
0.52151
8
RP Longitude :
117.5318
TR #
MW
161590_161396
TR site
rank
LOS
required
YES
Azimuth
Antenna
Diameter
281.87
Parties
Transmission Planner
Name
Name
Date
Date
Signature
Signature
Antenna
Centerline
35
Upper / A Site
161590
Lower / B
Site
161396
TR / MW Planning
Technical Site Survey Report
161590
Site ID
Sangatta 5
Site Name
1. General information
Common Site Rank:
1st
TP Quality
Cluster
Rural
Controller
RP Latitude: S3.15068
0.52151
Approved
RP Longitude:
117.5318
Drawing
LOS required
Reference #
Yes no
Yes no
Yes no
Yes no
LOS
status
LOS
Date of TSS:
19-Sep-12
MW rank
161590
Azimuth
281.87
Antenna
diameter
0
Antenna
centerline
35
LL rank
Capacity
Equipment type
Equipment model
Configuration
The Transmission Planner is responsible for checking the Detailed Site Sketch (which is completed at the
Technical Site Survey by Construction) for all required Transmission Planning Information. Any additions or
changes to this configuration after the date on the Construction Technical Site Survey Document must be
transmitted to all departments so that the information can be incorporation into the drawings.
5. Parties
Transmission/Microwave Planner
___________________________
Name
___________________________
Date
___________________________
Name
___________________________
Date
___________________________
signature
___________________________
signature
Distance
(km)
Protect
style
Cap.
(E1)
Freq.
(MHz)
Shift Freq.
Subband
Antenna
dimeter
TX Channels
2.54
14
Huawei Confidential
Date
Revision
Name
Signature
Date
###
Huawei Confidential