Professional Documents
Culture Documents
RESIDENTE
SUPERVISIN
UBICACIN
CONTRATISTA
ENTIDAD
MONTO CONTRATADO
9,896,174.03
FECHA DE INICIO
6/13/2013
PLAZO DE EJECUCIN
180 DAS CALENDARIO
FECHA DE TERMINO PROG
12/10/2013
AMPLIACIN PLAZO N 01
NUEVA FECHA DE TERMINO
AMPLIACIN PLAZO N 02
NUEVA FECHA DE TERMINO
VALORIZACIN
01
02
03
04
05
06
07
08
09
10
JUNIO
JULIO
AGOSTO
SEPTIEMBRE
OCTUBRE
NOVIEMBRE
DICIEMBRE
ENERO
FEBRERO
MARZO
2013
2013
2013
2013
2013
2013
2013
2013
2013
2013
A POTABLE Y
DISTRITO DE CULLHUAS - JUNIN
Jun-13
Jul-13
Aug-13
Sep-13
Oct-13
Nov-13
Dec-13
Jan-14
Feb-14
17
31
31
30
31
30
10
180
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
:
: PVC UF
:
:
:
:
:
:
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
160 mm
m
m
m
m
m2
:
:
0.00
0.000000
0.000000
Bz.
0
PRUEBA DE ALINEAMIENTO
Fecha:
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
:
3- 8
: PVC UF
:
160 mm
:
37.50 m
:
1.20 m
:
1.50 m
:
1.20 m
:
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
28.20
0.001131
27.143361
Bz.
3
PRUEBA DE ALINEAMIENTO
Fecha:
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
:
:
: PVC UF
8 - 8A
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
:
:
:
:
:
160 mm
53.25 m
1.50 m
1.70 m
1.20 m
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
40.04
0.001131
27.143361
Bz.
8
PRUEBA DE ALINEAMIENTO
Fecha:
REGION
PROVINCIA
DISTRITO
JUNIN
HUANCAYO
CULLHUAS
LOCALIDAD
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
:
8 - 8B
: PVC UF
:
160 mm
:
53.30 m
:
1.50 m
:
1.20 m
:
1.20 m
:
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
40.08
0.001131
27.143361
Bz.
8
PRUEBA DE ALINEAMIENTO
Fecha:
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
: 8B
- 14
: PVC UF
:
160 mm
:
53.30 m
:
1.20 m
:
1.20 m
:
1.20 m
:
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
40.08
0.001131
27.143361
Bz.
8B
PRUEBA DE ALINEAMIENTO
Fecha:
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
:
:
: PVC UF
14 - 14A
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
:
:
:
:
:
160 mm
53.30 m
1.20 m
1.30 m
1.20 m
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
40.08
0.001131
27.143361
Bz.
14
PRUEBA DE ALINEAMIENTO
Fecha:
UBICACIN:
REGION
PROVINCIA
DISTRITO
JUNIN
HUANCAYO
CULLHUAS
LOCALIDAD
SUPERVISOR:
CONSORCIO SANTA ROSA
RESIDENTE:
ING. FLAVIO J. VIA Y RADA VALLADOLID
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
: 14A
- 13
: PVC UF
:
160 mm
:
53.60 m
:
1.30 m
:
1.40 m
:
1.20 m
:
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
40.31
0.001131
27.143361
Bz.
14A
PRUEBA DE ALINEAMIENTO
Fecha:
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
: 8A
- 7
: PVC UF
:
160 mm
:
53.25 m
:
1.70 m
:
1.70 m
:
1.20 m
:
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
40.04
0.001131
27.143361
PRUEBA DE NIVELACION
Bz.
8A
PRUEBA DE ALINEAMIENTO
Fecha:
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
:
:
5 - 5A
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
: PVC UF
:
160 mm
:
54.50 m
:
1.40 m
:
1.20 m
:
1.20 m
:
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
40.98
0.001131
27.143361
Bz.
5
PRUEBA DE ALINEAMIENTO
Fecha:
REGION
PROVINCIA
DISTRITO
JUNIN
HUANCAYO
CULLHUAS
LOCALIDAD
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
: 5A
- 6
: PVC UF
:
160 mm
:
54.50 m
:
1.20 m
:
1.57 m
:
1.20 m
:
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
40.98
0.001131
27.143361
Bz.
5A
PRUEBA DE ALINEAMIENTO
Fecha:
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
:
6 - 6A
: PVC UF
:
160 mm
:
53.40 m
:
1.20 m
:
1.80 m
:
1.20 m
:
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
40.16
0.001131
27.143361
Bz.
6
PRUEBA DE ALINEAMIENTO
Fecha:
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
:
: 6A
: PVC UF
:
- 7
160 mm
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
:
:
:
:
53.40 m
1.80 m
2.34 m
1.20 m
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
40.16
0.001131
27.143361
Bz.
6A
PRUEBA DE ALINEAMIENTO
Fecha:
DISTRITO
CULLHUAS
LOCALIDAD
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
:
7 - 7A
: PVC UF
:
160 mm
:
48.00 m
:
2.34 m
:
1.20 m
:
1.20 m
:
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
36.10
0.001131
27.143361
Bz.
7
PRUEBA DE ALINEAMIENTO
Fecha:
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
: 7A
- 13
: PVC UF
:
160 mm
:
60.00 m
:
1.20 m
:
1.40 m
:
1.20 m
:
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
45.12
0.001131
27.143361
Bz.
7A
PRUEBA DE ALINEAMIENTO
Fecha:
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
:
:
10 - 10A
: PVC UF
:
160 mm
:
61.00 m
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
:
:
:
1.20 m
1.20 m
1.20 m
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
45.87
0.001131
27.143361
Bz.
10
PRUEBA DE ALINEAMIENTO
Fecha:
DISTRITO
CULLHUAS
LOCALIDAD
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
: 10A
- 11
: PVC UF
:
160 mm
:
53.00 m
:
1.20 m
:
1.20 m
:
1.20 m
:
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
39.86
0.001131
27.143361
Bz.
10A
PRUEBA DE ALINEAMIENTO
Fecha:
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
:
11 - 11A
: PVC UF
:
160 mm
:
60.00 m
:
1.20 m
:
1.20 m
:
1.20 m
:
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
45.12
0.001131
27.143361
Bz.
11
PRUEBA DE ALINEAMIENTO
Fecha:
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
:
: 11A
- 12
: PVC UF
:
160 mm
:
49.60 m
:
1.20 m
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
:
:
1.20 m
1.20 m
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
37.30
0.001131
27.143361
Bz.
11A
PRUEBA DE ALINEAMIENTO
Fecha:
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
: 12A
- 12
: PVC UF
:
160 mm
:
50.00 m
:
1.20 m
:
1.20 m
:
1.20 m
:
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
37.60
0.001131
27.143361
Bz.
12A
PRUEBA DE ALINEAMIENTO
Fecha:
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
:
13 - 13A
: PVC UF
:
160 mm
:
61.00 m
:
1.40 m
:
1.20 m
:
1.20 m
:
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
45.87
0.001131
27.143361
Bz.
13
PRUEBA DE ALINEAMIENTO
Fecha:
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
: 13A
- 12
: PVC UF
:
160 mm
:
54.25 m
:
1.20 m
:
1.20 m
:
1.20 m
:
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
40.80
0.001131
27.143361
Bz.
13A
PRUEBA DE ALINEAMIENTO
Fecha:
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
:
12 - 12B
: PVC UF
:
160 mm
:
66.20 m
:
1.20 m
:
1.20 m
:
1.20 m
:
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
49.78
0.001131
27.143361
Bz.
12
PRUEBA DE ALINEAMIENTO
Fecha:
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
: 12B
- 18
: PVC UF
:
160 mm
:
54.00 m
:
1.20 m
:
1.68 m
:
1.20 m
:
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
40.61
0.001131
27.143361
Bz.
12B
PRUEBA DE ALINEAMIENTO
Fecha:
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
:
13 - 13B
: PVC UF
:
160 mm
:
60.00 m
:
1.40 m
:
1.20 m
:
1.20 m
:
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
:
:
45.12
0.001131
27.143361
CONCLUSIN
Bz.
13
PRUEBA DE ALINEAMIENTO
Fecha:
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
: 13B
- 19
: PVC UF
:
160 mm
:
59.50 m
:
1.20 m
:
1.20 m
:
1.20 m
:
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
44.74
0.001131
27.143361
Bz.
13B
PRUEBA DE ALINEAMIENTO
Fecha:
OBRA:
MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y
UBICACIN:
SUPERVISOR:
REGION
JUNIN
CONSORCIO SANTA ROSA
PROVINCIA
HUANCAYO
RESIDENTE:
DISTRITO
CULLHUAS
ING. FLAVIO J. VIA Y RADA VALLADOLID
LOCALIDAD
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
:
19 - 19A
: PVC UF
:
160 mm
:
54.75 m
:
1.20 m
:
1.20 m
:
1.20 m
:
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
41.17
0.001131
27.143361
Bz.
19
PRUEBA DE ALINEAMIENTO
Fecha:
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
: 19A
- 18
: PVC UF
:
160 mm
:
54.75 m
:
1.20 m
:
1.68 m
:
1.20 m
:
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
41.17
0.001131
27.143361
27.14
PRUEBA DE NIVELACION
Bz.
19A
PRUEBA DE ALINEAMIENTO
Fecha:
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
11 - 11B
: PVC UF
:
160 mm
:
60.25 m
:
1.20 m
:
1.20 m
:
1.20 m
:
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
45.31
0.001131
27.143361
Bz.
11
PRUEBA DE ALINEAMIENTO
Fecha:
UBICACIN:
REGION
PROVINCIA
DISTRITO
JUNIN
HUANCAYO
CULLHUAS
LOCALIDAD
SUPERVISOR:
CONSORCIO SANTA ROSA
RESIDENTE:
ING. FLAVIO J. VIA Y RADA VALLADOLID
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
: 11B
- 17
: PVC UF
:
160 mm
:
60.25 m
:
1.20 m
:
1.20 m
:
1.20 m
:
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
45.31
0.001131
27.143361
Bz.
11B
PRUEBA DE ALINEAMIENTO
Fecha:
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
:
17 - 17A
: PVC UF
:
160 mm
:
51.50 m
:
1.20 m
:
1.96 m
:
1.20 m
:
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
38.73
0.001131
27.143361
Bz.
17
PRUEBA DE ALINEAMIENTO
Fecha:
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
:
: 17A
: PVC UF
:
- 18
160 mm
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
:
:
:
:
61.00 m
1.96 m
1.20 m
1.20 m
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
45.87
0.001131
27.143361
Bz.
17A
PRUEBA DE ALINEAMIENTO
Fecha:
DISTRITO
CULLHUAS
LOCALIDAD
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
:
18 - 18A
: PVC UF
:
160 mm
:
99.40 m
:
1.68 m
:
1.20 m
:
1.20 m
:
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
74.75
0.001131
27.143361
Bz.
18
PRUEBA DE ALINEAMIENTO
Fecha:
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
: 18A
- 29
: PVC UF
:
160 mm
:
72.00 m
:
1.20 m
:
1.20 m
:
1.20 m
:
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
54.14
0.001131
27.143361
Bz.
18A
PRUEBA DE ALINEAMIENTO
Fecha:
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
:
:
24 - 24A
: PVC UF
:
160 mm
:
54.00 m
:
1.20 m
:
1.20 m
Dimetro Buzn
rea de Buzn
:
:
1.20 m
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
40.61
0.001131
27.143361
Bz.
24
PRUEBA DE ALINEAMIENTO
Fecha:
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
: 24A
- 29
: PVC UF
:
160 mm
:
53.40 m
:
1.20 m
:
1.20 m
:
1.20 m
:
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
40.16
0.001131
27.143361
Bz.
24A
PRUEBA DE ALINEAMIENTO
Fecha:
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
:
29 - 32
: PVC UF
:
160 mm
:
63.40 m
:
1.20 m
:
1.20 m
:
1.20 m
:
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
47.68
0.001131
27.143361
Bz.
29
PRUEBA DE ALINEAMIENTO
Fecha:
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
:
32 - 30
: PVC UF
:
160 mm
:
64.00 m
:
1.20 m
:
1.20 m
:
1.20 m
:
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
48.13
0.001131
27.143361
Bz.
32
PRUEBA DE ALINEAMIENTO
Fecha:
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
:
30 - 28
: PVC UF
:
160 mm
:
65.00 m
:
1.20 m
:
1.20 m
:
1.20 m
:
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
48.88
0.001131
27.143361
Bz.
30
PRUEBA DE ALINEAMIENTO
Fecha:
A HIDRULICA DESAGE
001
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
: Pasaje 01
:
6/3/2013
:
:
:
:
:
:
lts / da
m3/hora
lts / da
>
FALLO
0.00
DE NIVELACION
Fecha:
Bz.
0
0.00 m
7/23/2013
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
A HIDRULICA DESAGE
002
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
: Calle 01
:
6/3/2013
:
:
:
:
0.132
:
0.133
:
0.001
lts / da
m3/hora
lts / da
<
DE NIVELACION
APROBADO
Bz.
8
37.50 m
7/23/2013
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
A HIDRULICA DESAGE
003
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
: Calle 01
:
6/3/2013
Hora de Inicio
Hora de Termino
Tiempo Prueba
Lectura Uno
Lectura Dos
Altura Descendida
:
:
:
:
:
:
lts / da
m3/hora
lts / da
0.132
0.133
0.001
(2)
Volumen Exfiltrado Permisible
lts/da (1)
40.04
<
DE NIVELACION
APROBADO
Fecha:
Bz.
8A
53.25 m
7/23/2013
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
A HIDRULICA DESAGE
004
ENTIDAD:
: Pasaje 02
:
6/3/2013
:
:
:
:
0.132
:
0.133
:
0.001
lts / da
m3/hora
lts / da
<
DE NIVELACION
APROBADO
Fecha:
Bz.
8B
53.30 m
7/23/2013
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
A HIDRULICA DESAGE
005
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
: Pasaje 02
:
6/3/2013
:
:
:
:
0.132
:
0.133
:
0.001
lts / da
m3/hora
lts / da
<
DE NIVELACION
APROBADO
Bz.
14
53.30 m
7/23/2013
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
A HIDRULICA DESAGE
006
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
: Calle 02
:
6/3/2013
Hora de Inicio
Hora de Termino
Tiempo Prueba
Lectura Uno
Lectura Dos
Altura Descendida
:
:
:
:
:
:
lts / da
m3/hora
lts / da
0.132
0.133
0.001
(2)
Volumen Exfiltrado Permisible
lts/da (1)
40.08
<
DE NIVELACION
APROBADO
Fecha:
Bz.
14A
53.30 m
7/23/2013
A HIDRULICA DESAGE
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
007
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
: Calle 02
:
6/3/2013
:
:
:
:
0.132
:
0.133
:
0.001
lts / da
m3/hora
lts / da
<
DE NIVELACION
APROBADO
Fecha:
Bz.
13
53.60 m
7/23/2013
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
A HIDRULICA DESAGE
008
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
: Calle 01
:
6/3/2013
:
:
:
:
0.132
:
0.133
:
0.001
lts / da
m3/hora
lts / da
<
APROBADO
DE NIVELACION
Fecha:
Bz.
7
53.25 m
7/23/2013
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
A HIDRULICA DESAGE
009
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
: Calle 01
Fecha de Prueba
Hora de Inicio
Hora de Termino
Tiempo Prueba
Lectura Uno
Lectura Dos
Altura Descendida
:
:
:
:
:
:
:
6/3/2013
lts / da
m3/hora
lts / da
0.132
0.133
0.001
(2)
Volumen Exfiltrado Permisible
lts/da
40.98
<
DE NIVELACION
APROBADO
Fecha:
Bz.
5A
54.50 m
7/23/2013
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
A HIDRULICA DESAGE
010
ENTIDAD:
: Calle 01
:
6/3/2013
:
:
:
:
0.132
:
0.133
:
0.001
lts / da
m3/hora
lts / da
<
DE NIVELACION
APROBADO
Fecha:
Bz.
6
54.50 m
7/23/2013
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
A HIDRULICA DESAGE
011
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
: Calle 01
:
6/3/2013
:
:
:
:
0.132
:
0.133
:
0.001
lts / da
m3/hora
lts / da
<
DE NIVELACION
APROBADO
Bz.
6A
53.40 m
7/23/2013
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
A HIDRULICA DESAGE
012
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
: Calle 01
:
6/3/2013
:
Hora de Termino
Tiempo Prueba
Lectura Uno
Lectura Dos
Altura Descendida
:
:
:
:
:
lts / da
m3/hora
lts / da
0.132
0.133
0.001
(2)
Volumen Exfiltrado Permisible
lts/da (1)
40.16
<
DE NIVELACION
Fecha:
Bz.
7
53.40 m
7/23/2013
A HIDRULICA DESAGE
APROBADO
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
013
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
: Pasaje 03
:
6/3/2013
:
:
:
:
0.132
:
0.133
:
0.001
lts / da
m3/hora
lts / da
<
DE NIVELACION
APROBADO
Fecha:
Bz.
7A
48.00 m
7/23/2013
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
A HIDRULICA DESAGE
014
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
: Pasaje 03
:
6/3/2013
:
:
:
:
0.132
:
0.133
:
0.001
lts / da
m3/hora
lts / da
<
DE NIVELACION
APROBADO
Bz.
13
60.00 m
7/23/2013
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
A HIDRULICA DESAGE
015
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
: Calle 02
:
6/3/2013
:
:
Tiempo Prueba
Lectura Uno
Lectura Dos
Altura Descendida
:
:
:
:
lts / da
m3/hora
lts / da
0.132
0.133
0.001
(2)
Volumen Exfiltrado Permisible
lts/da (1)
45.87
<
DE NIVELACION
Fecha:
Bz.
10A
61.00 m
7/23/2013
A HIDRULICA DESAGE
APROBADO
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
016
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
: Calle 02
:
6/3/2013
:
:
:
:
0.132
:
0.133
:
0.001
lts / da
m3/hora
lts / da
<
DE NIVELACION
APROBADO
Fecha:
Bz.
11
53.00 m
7/23/2013
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
A HIDRULICA DESAGE
017
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
: Calle 02
:
6/3/2013
:
:
:
:
0.132
:
0.133
:
0.001
lts / da
m3/hora
lts / da
<
DE NIVELACION
APROBADO
Bz.
11A
60.00 m
7/23/2013
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
A HIDRULICA DESAGE
018
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
: Calle 02
:
6/3/2013
:
:
:
Lectura Uno
Lectura Dos
Altura Descendida
:
:
:
0.132
0.133
0.001
lts / da
m3/hora
lts / da
<
DE NIVELACION
APROBADO
Fecha:
Bz.
12
49.60 m
7/23/2013
A HIDRULICA DESAGE
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
019
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
: Pasaje 04
:
6/3/2013
:
:
:
:
0.132
:
0.133
:
0.001
lts / da
m3/hora
lts / da
<
DE NIVELACION
APROBADO
Fecha:
Bz.
12
50.00 m
7/23/2013
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
A HIDRULICA DESAGE
020
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
: Calle 02
:
6/3/2013
:
:
:
:
0.132
:
0.133
:
0.001
lts / da
m3/hora
lts / da
<
DE NIVELACION
APROBADO
Fecha:
Bz.
13A
61.00 m
7/23/2013
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
A HIDRULICA DESAGE
021
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
: Calle 02
:
6/3/2013
:
:
:
:
0.132
:
0.133
:
0.001
lts / da
m3/hora
lts / da
<
DE NIVELACION
APROBADO
Fecha:
Bz.
12
54.25 m
7/23/2013
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
A HIDRULICA DESAGE
022
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
(1)
: Pasaje 04
:
6/3/2013
:
:
:
:
0.132
:
0.133
:
0.001
lts / da
m3/hora
lts / da
<
DE NIVELACION
APROBADO
Fecha:
Bz.
12B
66.20 m
7/23/2013
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
A HIDRULICA DESAGE
023
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
: Pasaje 04
:
6/3/2013
:
:
:
:
0.132
:
0.133
:
0.001
lts / da
m3/hora
lts / da
<
DE NIVELACION
APROBADO
Fecha:
Bz.
18
54.00 m
7/23/2013
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
A HIDRULICA DESAGE
024
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
: Pasaje 03
:
6/3/2013
:
:
:
:
0.132
:
0.133
:
0.001
lts / da
m3/hora
lts / da
<
DE NIVELACION
APROBADO
Fecha:
Bz.
13B
60.00 m
7/23/2013
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
A HIDRULICA DESAGE
025
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
(1)
: Pasaje 03
:
6/3/2013
:
:
:
:
0.132
:
0.133
:
0.001
lts / da
m3/hora
lts / da
<
DE NIVELACION
APROBADO
Fecha:
Bz.
19
59.50 m
7/23/2013
A HIDRULICA DESAGE
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
026
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
: Calle 03
:
6/3/2013
:
:
:
:
0.132
:
0.133
:
0.001
lts / da
m3/hora
lts / da
<
DE NIVELACION
APROBADO
Fecha:
Bz.
19A
54.75 m
7/23/2013
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
A HIDRULICA DESAGE
027
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
: Pasaje 27
:
6/3/2013
:
:
:
:
0.132
:
0.133
:
0.001
lts / da
m3/hora
lts / da
<
APROBADO
<
APROBADO
41.17
DE NIVELACION
Fecha:
Bz.
18
54.75 m
7/23/2013
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
A HIDRULICA DESAGE
028
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
(1)
: Pasaje 05
:
6/3/2013
:
:
:
:
0.132
:
0.133
:
0.001
lts / da
m3/hora
lts / da
<
DE NIVELACION
APROBADO
Fecha:
Bz.
11B
60.25 m
A HIDRULICA DESAGE
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
029
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
: Pasaje 05
:
6/3/2013
:
:
:
:
0.132
:
0.133
:
0.001
lts / da
m3/hora
lts / da
<
DE NIVELACION
APROBADO
Fecha:
Bz.
17
60.25 m
7/23/2013
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
A HIDRULICA DESAGE
030
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
: Calle 03
:
6/3/2013
:
:
:
:
0.132
:
0.133
:
0.001
lts / da
m3/hora
lts / da
<
DE NIVELACION
APROBADO
Bz.
17A
51.50 m
7/23/2013
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
A HIDRULICA DESAGE
031
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
: Calle 03
:
6/3/2013
:
Hora de Termino
Tiempo Prueba
Lectura Uno
Lectura Dos
Altura Descendida
:
:
:
:
:
lts / da
m3/hora
lts / da
0.132
0.133
0.001
(2)
Volumen Exfiltrado Permisible
lts/da (1)
45.87
<
DE NIVELACION
Fecha:
Bz.
18
61.00 m
7/23/2013
A HIDRULICA DESAGE
APROBADO
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
032
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
: Pasaje 04
:
6/3/2013
:
:
:
:
0.132
:
0.133
:
0.001
lts / da
m3/hora
lts / da
<
DE NIVELACION
APROBADO
Fecha:
Bz.
18A
99.40 m
7/23/2013
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
A HIDRULICA DESAGE
033
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
: Pasaje 04
:
6/3/2013
:
:
:
:
0.132
:
0.133
:
0.001
lts / da
m3/hora
lts / da
<
DE NIVELACION
APROBADO
Fecha:
Bz.
29
72.00 m
7/23/2013
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
A HIDRULICA DESAGE
034
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
: Calle 04
:
6/3/2013
:
:
:
:
0.132
Lectura Dos
Altura Descendida
:
:
0.133
0.001
lts / da
m3/hora
lts / da
<
DE NIVELACION
APROBADO
Fecha:
Bz.
24A
54.00 m
7/23/2013
A HIDRULICA DESAGE
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
035
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
: Calle 04
:
6/3/2013
:
:
:
:
0.132
:
0.133
:
0.001
lts / da
m3/hora
lts / da
<
DE NIVELACION
APROBADO
Fecha:
Bz.
29
53.40 m
7/23/2013
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
A HIDRULICA DESAGE
036
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
: Calle 04
:
6/3/2013
:
:
:
:
0.132
:
0.133
:
0.001
lts / da
m3/hora
lts / da
<
DE NIVELACION
APROBADO
Fecha:
Bz.
32
63.40 m
7/23/2013
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
A HIDRULICA DESAGE
037
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
: Calle 04
:
6/3/2013
:
:
:
:
0.132
:
0.133
:
0.001
lts / da
m3/hora
lts / da
<
DE NIVELACION
APROBADO
Fecha:
Bz.
30
64.00 m
7/23/2013
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
A HIDRULICA DESAGE
038
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
(1)
: Calle 04
:
6/3/2013
:
:
:
:
0.132
:
0.133
:
0.001
lts / da
m3/hora
lts / da
<
DE NIVELACION
APROBADO
Fecha:
Bz.
28
65.00 m
7/23/2013
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
CONTRATISTA:
A&E MINEROS CIVILES S.A.C
SUPERVISOR:
CONSORCIO SANTA ROSA
RESIDENTE:
ING. FLAVIO J. VIA Y RADA VALL
F= n x d P
410 x 25
Donde
: Vp
n
d
P
DATOS
Tubera PVC
Dimetro Tubera
Clase
Presin Prueba
Tramo
:
:
:
:
:
:
:
:
:
:
2"
63 mm
7.5
160 m.c.a.
01
Longitud
313.7
:
:
:
53
2
0
11/9/2013
Hora de Inicio
:
Hora de Trmino
:
09:19:00
10:19:00
55
uniones
accesorios
conexiones
Fecha de Prueba
RESULTADOS
Vol. Permisible
:
:
Vol. Perdido
Matriz
Conexiones
4.30
Balde
Tirante perdido
Vol. Perdido
Vol. Perdido
4.30
:
:
:
:
0.355 m
0.043 m
0.004256142 m
4.256141505 lt/h
CONCLUSIONES
Matriz
Conexiones
OK
OK
RESIDENTE
CONTRATISTA:
A&E MINEROS CIVILES S.A.C
SUPERVISOR:
CONSORCIO SANTA ROSA
RESIDENTE:
ING. FLAVIO J. VIA Y RADA VALL
F= n x d P
410 x 25
Donde
: Vp
n
d
P
DATOS
Tubera PVC
Dimetro Tubera
Clase
Presin Prueba
Tramo
:
:
:
:
:
:
Fecha de Prueba
2"
63 mm
7.3
160 m.c.a.
02
Longitud
:
:
:
:
25
uniones
:
accesorios
:
conexiones
:
:
11/12/2013
Hora de Inicio
:
Hora de Trmino
:
112
19
6
0
10:12:00
11:12:00
RESULTADOS
Vol. Permisible
:
:
Matriz
Conexiones
1.95
Vol. Perdido
1.95
:
Balde
Tirante perdido
Vol. Perdido
Vol. Perdido
CONCLUSIONES
:
:
:
:
0.355 m
0.02 m
0.001979601 m
1.9796007 lt/h
Matriz
Conexiones
OK
FALLO
RESIDENTE
CONTRATISTA:
A&E MINEROS CIVILES S.A.C
SUPERVISOR:
CONSORCIO SANTA ROSA
RESIDENTE:
ING. FLAVIO J. VIA Y RADA VALL
F= n x d P
410 x 25
Donde
: Vp
n
d
P
DATOS
Tubera PVC
Dimetro Tubera
Clase
Presin Prueba
Tramo
:
:
:
:
:
:
:
:
:
:
2"
63 mm
7.5
160 m.c.a.
03
Longitud
n
385
Fecha de Prueba
RESULTADOS
Vol. Permisible
77
uniones
:
accesorios
:
conexiones
:
:
11/14/2013
Hora de Inicio
:
Hora de Trmino
:
:
:
Matriz
65
4
8
17:14:00
18:14:00
Conexiones
6.02
Vol. Perdido
6.02
:
Balde
Tirante perdido
Vol. Perdido
Vol. Perdido
CONCLUSIONES
:
:
:
:
0.355 m
0.075 m
0.007423503 m
7.423502625 lt/h
Matriz
Conexiones
OK
FALLO
RESIDENTE
CONTRATISTA:
A&E MINEROS CIVILES S.A.C
SUPERVISOR:
CONSORCIO SANTA ROSA
RESIDENTE:
ING. FLAVIO J. VIA Y RADA VALL
F= n x d P
410 x 25
Donde
: Vp
n
d
P
DATOS
Tubera PVC
Dimetro Tubera
Clase
Presin Prueba
Tramo
:
:
:
:
:
:
1.5 "
48 mm
10
150 m.c.a.
04
Longitud
Fecha de Prueba
RESULTADOS
Vol. Permisible
193
uniones
:
accesorios
:
conexiones
:
:
11/16/2013
Hora de Inicio
:
Hora de Trmino
:
33
5
0
:
:
38
Matriz
08:52:00
09:52:00
Conexiones
2.17
Vol. Perdido
2.17
:
Balde
Tirante perdido
Vol. Perdido
Vol. Perdido
CONCLUSIONES
:
:
:
:
0.355 m
0.075 m
0.007423503 m
7.423502625 lt/h
Matriz
Conexiones
OK
FALLO
RESIDENTE
CONTRATISTA:
A&E MINEROS CIVILES S.A.C
SUPERVISOR:
CONSORCIO SANTA ROSA
RESIDENTE:
ING. FLAVIO J. VIA Y RADA VALL
F= n x d P
410 x 25
Donde
: Vp
n
d
P
DATOS
Tubera PVC
Dimetro Tubera
Clase
Presin Prueba
Tramo
:
:
:
:
:
:
:
:
:
:
1.5 "
48 mm
10
150 m.c.a.
05
Longitud
Fecha de Prueba
220
51
uniones
:
accesorios
:
conexiones
:
:
11/22/2013
Hora de Inicio
:
Hora de Trmino
:
RESULTADOS
Vol. Permisible
:
:
Vol. Perdido
Matriz
37
4
10
15:58:00
16:58:00
Conexiones
2.95
Balde
Tirante perdido
Vol. Perdido
Vol. Perdido
CONCLUSIONES
2.95
:
:
:
:
0.355 m
0.075 m
0.007423503 m
7.423502625 lt/h
Matriz
Conexiones
OK
FALLO
RESIDENTE
CONTRATISTA:
A&E MINEROS CIVILES S.A.C
SUPERVISOR:
CONSORCIO SANTA ROSA
RESIDENTE:
ING. FLAVIO J. VIA Y RADA VALL
F= n x d P
410 x 25
Donde
: Vp
n
d
P
DATOS
Tubera PVC
Dimetro Tubera
Clase
Presin Prueba
Tramo
:
:
:
:
:
:
:
:
:
:
1.5 "
48 mm
10
150 m.c.a.
06
Longitud
103
:
:
:
18
5
0
12/9/2013
Hora de Inicio
:
Hora de Trmino
:
14:12:00
15:12:00
23
uniones
accesorios
conexiones
Fecha de Prueba
RESULTADOS
Vol. Permisible
:
:
Matriz
Conexiones
1.29
Vol. Perdido
1.29
:
Balde
Tirante perdido
Vol. Perdido
Vol. Perdido
CONCLUSIONES
:
:
:
:
0.355 m
0.075 m
0.007423503 m
7.423502625 lt/h
Matriz
Conexiones
OK
FALLO
RESIDENTE
CONTRATISTA:
Err:509
SUPERVISOR:
CONSORCIO SANTA ROSA
RESIDENTE:
ING. FLAVIO J. VIA Y RADA VALL
F= n x d P
410 x 25
Donde
: Vp
n
d
P
DATOS
Tubera PVC
Dimetro Tubera
Clase
Presin Prueba
Tramo
:
:
:
:
:
:
Fecha de Prueba
RESULTADOS
Vol. Permisible
:
:
:
:
1.5 "
48 mm
10
150 m.c.a.
Matriz
Conexiones
8.56
Vol. Perdido
8.56
:
Balde
0.355 m
Tirante perdido
Vol. Perdido
Vol. Perdido
CONCLUSIONES
:
:
:
0.075 m
0.007423503 m
7.423502625 lt/h
Matriz
Conexiones
OK
OK
RESIDENTE
CONTRATISTA:
Err:509
SUPERVISOR:
CONSORCIO SANTA ROSA
RESIDENTE:
ING. FLAVIO J. VIA Y RADA VALL
F= n x d P
410 x 25
Donde
: Vp
n
d
P
DATOS
Tubera PVC
Dimetro Tubera
Clase
Presin Prueba
Tramo
:
:
:
:
:
:
:
:
:
:
1.5 "
48 mm
10
150 m.c.a.
Fecha de Prueba
RESULTADOS
Vol. Permisible
3/14/2013
Hora de Inicio
:
Hora de Trmino
:
:
:
Matriz
16:43:00
17:43:00
Conexiones
8.56
Vol. Perdido
8.56
:
Balde
Tirante perdido
Vol. Perdido
Vol. Perdido
CONCLUSIONES
:
:
:
:
0.355 m
0.075 m
0.007423503 m
7.423502625 lt/h
Matriz
Conexiones
OK
OK
RESIDENTE
CONTRATISTA:
Err:509
SUPERVISOR:
CONSORCIO SANTA ROSA
RESIDENTE:
ING. FLAVIO J. VIA Y RADA VALL
F= n x d P
410 x 25
Donde
: Vp
n
d
P
DATOS
Tubera PVC
Dimetro Tubera
Clase
:
:
:
:
:
:
:
:
1.5 "
48 mm
10
Presin Prueba
Tramo
Fecha de Prueba
:
:
150 m.c.a.
RESULTADOS
Vol. Permisible
:
:
Vol. Perdido
Matriz
Conexiones
8.56
Balde
Tirante perdido
Vol. Perdido
Vol. Perdido
CONCLUSIONES
8.56
:
:
:
:
0.355 m
0.075 m
0.007423503 m
7.423502625 lt/h
Matriz
Conexiones
OK
OK
RESIDENTE
CONTRATISTA:
Err:509
SUPERVISOR:
CONSORCIO SANTA ROSA
RESIDENTE:
ING. FLAVIO J. VIA Y RADA VALL
F= n x d P
410 x 25
Donde
: Vp
n
d
P
DATOS
Tubera PVC
Dimetro Tubera
Clase
Presin Prueba
Tramo
:
:
:
:
:
:
Fecha de Prueba
RESULTADOS
Vol. Permisible
:
:
:
:
1.5 "
48 mm
10
150 m.c.a.
Matriz
Conexiones
8.56
Vol. Perdido
:
Balde
Tirante perdido
Vol. Perdido
Vol. Perdido
CONCLUSIONES
8.56
:
:
:
:
0.355 m
0.075 m
0.007423503 m
7.423502625 lt/h
Matriz
Conexiones
OK
OK
RESIDENTE
POTABLE
da admisible (lts/h)
ones, accesorios y conexiones
n prueba (m.c.a.)
SUPERVISOR
POTABLE
da admisible (lts/h)
ones, accesorios y conexiones
n prueba (m.c.a.)
OK
SUPERVISOR
POTABLE
da admisible (lts/h)
ones, accesorios y conexiones
n prueba (m.c.a.)
OK
SUPERVISOR
POTABLE
da admisible (lts/h)
ones, accesorios y conexiones
n prueba (m.c.a.)
SUPERVISOR
POTABLE
da admisible (lts/h)
ones, accesorios y conexiones
n prueba (m.c.a.)
POTABLE
SUPERVISOR
da admisible (lts/h)
ones, accesorios y conexiones
n prueba (m.c.a.)
SUPERVISOR
POTABLE
da admisible (lts/h)
ones, accesorios y conexiones
n prueba (m.c.a.)
ACRAQUIA
SUPERVISOR
POTABLE
da admisible (lts/h)
ones, accesorios y conexiones
n prueba (m.c.a.)
ACRAQUIA
SUPERVISOR
POTABLE
da admisible (lts/h)
ones, accesorios y conexiones
n prueba (m.c.a.)
ACRAQUIA
SUPERVISOR
POTABLE
da admisible (lts/h)
ones, accesorios y conexiones
n prueba (m.c.a.)
ACRAQUIA
SUPERVISOR
N
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
17A
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
TRAMO
BZ INICIO
0Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 -
DIAMETRO
DISTANCIA
D. PLANO
FECHA
BZ FINAL
0
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
- Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
160
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
0.00
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
6/3/2013
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 -
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 -
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 -
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
12/30/1899
Err:509
Err:509
Err:509
1
2
3
4
5
6
7
8
9
10
11
12
13
14
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 -
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
LUGAR
Pasaje 01
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
VOL. PERMISIBLE
0.00
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
VOL. REAL
CONCLUSION
0.00 FALLO
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
OBSERVACION
0
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
0.00 Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
0.00
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
VERIFICAR
OBSERVADO
CORREGIR
OBSERVADO
OBSERVADO
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
PIHUAS
C2
C4
C10
C10A
C5
C5A
C7
C7A
C6
C6A
C11
C11A
C16
C16A
C17
C17A
C18
C18A
C12A
C24
C24A
C19
C19A
C25
C25A
C22
C22A
C28
C28A
C28B
C29
C29A
C29B
C34
C35
C36
C37
C37A
1
3
8
3
8
8A
8A
14
8
8B
8B
7
5
5A
5A
6
6
6A
6A
7
7
7A
7A
13
14
14A
14A
13
13
13 A
13A
12
11
11A
11A
12A
12
12
12
12B
10
10A
12B
18
10A
11
11
11B
13
13B
11B
17
13B
19
19
19A
18
17
18A
17A
19A
18
17A
18A
18
29
24
24A
29
32
30
24A
29
32
30
28
92
37.3
52.6
52.6
52.45
52.45
53.7
53.7
52.8
52.8
53.5
53.5
52.2
52.2
54.2
54.2
59.5
50
55
61
59.35
56.4
56.4
60.45
60.45
58.9
58.9
53.33
53.33
99.8
55.45
55.45
71.4
52.7
52.7
64.5
64.5
63.5
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
:
: PVC UF
:
:
:
:
:
:
mm
m
m
m
m
m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
0.00 lts / da
0.000000 m3/hora
0.000000 lts / da
:
:
:
:
:
:
:
:
>
Volumen Exfiltrado
lts/da (1)
0.00
0.00
PRUEBA DE NIVELACION
Bz.
0
0.00 m
PRUEBA DE ALINEAMIENTO
Fecha:
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
:
: PVC UF
:
:
:
:
:
:
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
mm
m
m
m
m
m2
:
:
0.00 lts / da
0.000000 m3/hora
0.000000 lts / da
:
:
:
:
:
:
:
:
>
Volumen Exfiltrado
lts/da (1)
0.00
PRUEBA DE NIVELACION
Bz.
0
0.00 m
PRUEBA DE ALINEAMIENTO
Fecha:
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
:
8 - 8A
: PVC UF
:
160 mm
:
53.25 m
:
1.50 m
:
1.70 m
:
1.20 m
:
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
:
:
40.04 lts / da
0.000000 m3/hora
0.000000 lts / da
:
:
:
:
:
:
:
:
CONCLUSIN
Volumen Exfiltrado
lts/da (1)
40.04
<
PRUEBA DE NIVELACION
Bz.
8
53.25 m
PRUEBA DE ALINEAMIENTO
Fecha:
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
:
8 - 8B
: PVC UF
:
160 mm
:
53.30 m
:
1.50 m
:
1.20 m
:
1.20 m
:
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
40.08 lts / da
0.000000 m3/hora
0.000000 lts / da
:
:
:
:
:
:
:
:
<
Volumen Exfiltrado
lts/da (1)
40.08
PRUEBA DE NIVELACION
Bz.
8
53.30 m
PRUEBA DE ALINEAMIENTO
Fecha:
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
: 8B
- 14
: PVC UF
:
160 mm
:
53.30 m
:
1.20 m
:
1.20 m
:
1.20 m
:
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
40.08 lts / da
0.000000 m3/hora
0.000000 lts / da
:
:
:
:
:
:
:
:
<
Volumen Exfiltrado
lts/da (1)
40.08
PRUEBA DE NIVELACION
Bz.
8B
53.30 m
PRUEBA DE ALINEAMIENTO
Fecha:
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
:
14 - 14A
: PVC UF
:
160 mm
:
53.30 m
:
1.20 m
:
1.30 m
:
1.20 m
:
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
:
:
40.08 lts / da
0.000000 m3/hora
0.000000 lts / da
:
:
:
:
:
:
:
:
CONCLUSIN
Volumen Exfiltrado
lts/da (1)
40.08
<
PRUEBA DE NIVELACION
Bz.
14
53.30 m
PRUEBA DE ALINEAMIENTO
Fecha:
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
: 14A
- 13
: PVC UF
:
160 mm
:
53.60 m
:
1.30 m
:
1.40 m
:
1.20 m
:
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
40.31 lts / da
0.000000 m3/hora
0.000000 lts / da
:
:
:
:
:
:
:
:
<
Volumen Exfiltrado
lts/da (1)
40.31
PRUEBA DE NIVELACION
Bz.
14A
53.60 m
PRUEBA DE ALINEAMIENTO
Fecha:
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
: 8A
- 7
: PVC UF
:
160 mm
:
53.25 m
:
1.70 m
:
1.70 m
:
1.20 m
:
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
40.04 lts / da
0.000000 m3/hora
0.000000 lts / da
:
:
:
:
:
:
:
:
<
Volumen Exfiltrado
lts/da (1)
40.04
PRUEBA DE NIVELACION
Bz.
8A
53.25 m
PRUEBA DE ALINEAMIENTO
Fecha:
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
:
5 - 5A
: PVC UF
:
160 mm
:
54.50 m
:
1.40 m
:
1.20 m
:
1.20 m
:
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
:
:
40.98 lts / da
0.000000 m3/hora
0.000000 lts / da
:
:
:
:
:
:
:
:
CONCLUSIN
Volumen Exfiltrado
lts/da
40.98
<
PRUEBA DE NIVELACION
Bz.
5
54.50 m
PRUEBA DE ALINEAMIENTO
Fecha:
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
: 5A
- 6
: PVC UF
:
160 mm
:
54.50 m
:
1.20 m
:
1.57 m
:
1.20 m
:
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
40.98 lts / da
0.000000 m3/hora
0.000000 lts / da
:
:
:
:
:
:
:
:
Volumen Exfiltrado
lts/da (1)
40.98
<
PRUEBA DE NIVELACION
Bz.
5A
54.50 m
PRUEBA DE ALINEAMIENTO
Fecha:
OBRA:
MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE Y
UBICACIN:
SUPERVISOR:
ENTIDAD:
REGION
JUNIN
CONSORCIO SANTA ROSA
PROVINCIA
HUANCAYO
RESIDENTE:
CONTRATISTA:
DISTRITO
CULLHUAS
ING. FLAVIO J. VIA Y RADA VALLADOLID
LOCALIDAD
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
:
6 - 6A
: PVC UF
:
160 mm
:
53.40 m
:
1.20 m
:
1.80 m
:
1.20 m
:
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
40.16 lts / da
0.000000 m3/hora
0.000000 lts / da
:
:
:
:
:
:
:
:
<
Volumen Exfiltrado
lts/da (1)
40.16
PRUEBA DE NIVELACION
Bz.
6
53.40 m
PRUEBA DE ALINEAMIENTO
Fecha:
JUNIN
HUANCAYO
CULLHUAS
LOCALIDAD
ANEXOS
ENTIDAD:
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
: 6A
- 7
: PVC UF
:
160 mm
:
53.40 m
:
1.80 m
:
2.34 m
:
1.20 m
:
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
40.16 lts / da
0.000000 m3/hora
0.000000 lts / da
:
:
:
:
:
:
:
:
<
Volumen Exfiltrado
lts/da (1)
40.16
PRUEBA DE NIVELACION
Bz.
6A
53.40 m
PRUEBA DE ALINEAMIENTO
Fecha:
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
:
:
: PVC UF
7 - 7A
:
:
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
:
:
:
:
:
160 mm
48.00 m
2.34 m
1.20 m
1.20 m
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
Hora de Inicio
Hora de Termino
Tiempo Prueba
Lectura Uno
Lectura Dos
Altura Descendida
36.10 lts / da
0.000000 m3/hora
0.000000 lts / da
:
:
:
:
:
:
Volumen Exfiltrado
lts/da (1)
36.10
<
PRUEBA DE NIVELACION
Bz.
7
48.00 m
PRUEBA DE ALINEAMIENTO
Fecha:
ENTIDAD:
REGION
PROVINCIA
DISTRITO
JUNIN
HUANCAYO
CULLHUAS
LOCALIDAD
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
: 7A
- 13
: PVC UF
:
160 mm
:
60.00 m
:
1.20 m
:
1.40 m
:
1.20 m
:
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
45.12 lts / da
0.000000 m3/hora
0.000000 lts / da
:
:
:
:
:
:
:
:
<
Volumen Exfiltrado
lts/da (1)
45.12
PRUEBA DE NIVELACION
Bz.
7A
60.00 m
PRUEBA DE ALINEAMIENTO
Fecha:
CULLHUAS
LOCALIDAD
ANEXOS
ENTIDAD:
CONTRATISTA:
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
:
10 - 10A
: PVC UF
:
160 mm
:
61.00 m
:
1.20 m
:
1.20 m
:
1.20 m
:
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
45.87 lts / da
0.000000 m3/hora
0.000000 lts / da
:
:
:
:
:
:
:
:
<
Volumen Exfiltrado
lts/da (1)
45.87
Bz.
10
61.00 m
PRUEBA DE ALINEAMIENTO
Fecha:
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
:
: 10A
: PVC UF
:
- 11
160 mm
:
:
:
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
:
:
:
:
53.00 m
1.20 m
1.20 m
1.20 m
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
Hora de Termino
Tiempo Prueba
Lectura Uno
Lectura Dos
Altura Descendida
39.86 lts / da
0.000000 m3/hora
0.000000 lts / da
:
:
:
:
:
Volumen Exfiltrado
lts/da (1)
39.86
<
PRUEBA DE NIVELACION
Bz.
10A
53.00 m
PRUEBA DE ALINEAMIENTO
Fecha:
ENTIDAD:
PROVINCIA
DISTRITO
HUANCAYO
CULLHUAS
LOCALIDAD
ANEXOS
RESIDENTE:
CONTRATISTA:
ING. FLAVIO J. VIA Y RADA VALLADOLID
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
:
11 - 11A
: PVC UF
:
160 mm
:
60.00 m
:
1.20 m
:
1.20 m
:
1.20 m
:
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
45.12 lts / da
0.000000 m3/hora
0.000000 lts / da
:
:
:
:
:
:
:
:
<
Volumen Exfiltrado
lts/da (1)
45.12
PRUEBA DE NIVELACION
Bz.
11
60.00 m
PRUEBA DE ALINEAMIENTO
Fecha:
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
: 11A
- 12
: PVC UF
:
160 mm
:
49.60 m
:
1.20 m
:
1.20 m
:
1.20 m
:
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
37.30 lts / da
0.000000 m3/hora
0.000000 lts / da
:
:
:
:
:
:
:
:
<
Volumen Exfiltrado
lts/da (1)
37.30
Bz.
11A
49.60 m
PRUEBA DE ALINEAMIENTO
Fecha:
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
:
: 12A
- 12
: PVC UF
:
160 mm
:
50.00 m
:
1.20 m
:
1.20 m
:
:
:
:
:
:
Dimetro Buzn
rea de Buzn
:
:
1.20 m
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
Lectura Dos
Altura Descendida
37.60 lts / da
0.000000 m3/hora
0.000000 lts / da
:
:
Volumen Exfiltrado
lts/da (1)
37.60
<
PRUEBA DE NIVELACION
Bz.
12A
50.00 m
PRUEBA DE ALINEAMIENTO
Fecha:
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
:
13 - 13A
: PVC UF
:
160 mm
:
61.00 m
:
1.40 m
:
1.20 m
:
1.20 m
:
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
45.87 lts / da
0.000000 m3/hora
0.000000 lts / da
:
:
:
:
:
:
:
:
<
Volumen Exfiltrado
lts/da (1)
45.87
PRUEBA DE NIVELACION
Bz.
13
61.00 m
PRUEBA DE ALINEAMIENTO
Fecha:
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
: 13A
- 12
: PVC UF
:
160 mm
:
54.25 m
:
1.20 m
:
1.20 m
:
1.20 m
:
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
40.80 lts / da
0.000000 m3/hora
0.000000 lts / da
Bz.
13A
:
:
:
:
:
:
:
:
<
Volumen Exfiltrado
lts/da (1)
40.80
54.25 m
PRUEBA DE ALINEAMIENTO
Fecha:
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
:
12 - 12B
: PVC UF
:
160 mm
:
66.20 m
:
1.20 m
:
1.20 m
:
1.20 m
:
1.13 m2
RESULTADOS
:
:
:
:
:
:
:
:
CONCLUSIN
:
:
49.78 lts / da
0.000000 m3/hora
0.000000 lts / da
Volumen Exfiltrado
lts/da (1)
49.78
<
PRUEBA DE NIVELACION
Bz.
12
66.20 m
PRUEBA DE ALINEAMIENTO
Fecha:
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
: 12B
- 18
: PVC UF
:
160 mm
:
54.00 m
:
1.20 m
:
1.68 m
:
1.20 m
:
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
40.61 lts / da
0.000000 m3/hora
0.000000 lts / da
:
:
:
:
:
:
:
:
<
Volumen Exfiltrado
lts/da (1)
40.61
PRUEBA DE NIVELACION
Bz.
12B
54.00 m
PRUEBA DE ALINEAMIENTO
Fecha:
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
:
13 - 13B
: PVC UF
:
160 mm
:
60.00 m
:
1.40 m
:
1.20 m
:
1.20 m
:
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
45.12 lts / da
0.000000 m3/hora
0.000000 lts / da
:
:
:
:
:
:
:
:
<
Volumen Exfiltrado
lts/da (1)
45.12
PRUEBA DE NIVELACION
Bz.
13
60.00 m
PRUEBA DE ALINEAMIENTO
Fecha:
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
: 13B
- 19
: PVC UF
:
160 mm
:
59.50 m
:
1.20 m
:
1.20 m
:
1.20 m
:
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
44.74 lts / da
0.000000 m3/hora
0.000000 lts / da
:
:
:
:
:
:
:
:
<
Volumen Exfiltrado
lts/da (1)
Volumen Exfiltrado
lts/da (1)
44.74
<
PRUEBA DE NIVELACION
Bz.
13B
59.50 m
PRUEBA DE ALINEAMIENTO
Fecha:
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
19 - 19A
: PVC UF
:
160 mm
:
54.75 m
:
1.20 m
:
1.20 m
:
1.20 m
:
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
41.17 lts / da
0.000000 m3/hora
0.000000 lts / da
:
:
:
:
:
:
:
:
Volumen Exfiltrado
lts/da (1)
41.17
<
PRUEBA DE NIVELACION
Bz.
19
54.75 m
PRUEBA DE ALINEAMIENTO
Fecha:
UBICACIN:
REGION
PROVINCIA
DISTRITO
LOCALIDAD
JUNIN
HUANCAYO
CULLHUAS
SUPERVISOR:
ENTIDAD:
CONSORCIO SANTA ROSA
RESIDENTE:
CONTRATISTA:
ING. FLAVIO J. VIA Y RADA VALLADOLID
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
: 19A
- 18
: PVC UF
:
160 mm
:
54.75 m
:
1.20 m
:
1.68 m
:
1.20 m
:
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
41.17 lts / da
0.000000 m3/hora
0.000000 lts / da
:
:
:
:
:
:
:
:
<
Volumen Exfiltrado
lts/da (1)
41.17
PRUEBA DE NIVELACION
Bz.
19A
54.75 m
PRUEBA DE ALINEAMIENTO
Fecha:
CULLHUAS
LOCALIDAD
ANEXOS
ENTIDAD:
CONTRATISTA:
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
:
11 - 11B
: PVC UF
:
160 mm
:
60.25 m
:
1.20 m
:
1.20 m
:
1.20 m
:
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
45.31 lts / da
0.000000 m3/hora
0.000000 lts / da
:
:
:
:
:
:
:
:
<
Volumen Exfiltrado
lts/da (1)
45.31
Bz.
11
60.25 m
PRUEBA DE ALINEAMIENTO
Fecha:
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
:
: 11B
- 17
: PVC UF
:
160 mm
:
60.25 m
:
:
:
:
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
:
:
:
1.20 m
1.20 m
1.20 m
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
Tiempo Prueba
Lectura Uno
Lectura Dos
Altura Descendida
45.31 lts / da
0.000000 m3/hora
0.000000 lts / da
:
:
:
:
Volumen Exfiltrado
lts/da (1)
45.31
<
PRUEBA DE NIVELACION
Bz.
11B
60.25 m
PRUEBA DE ALINEAMIENTO
Fecha:
LOCALIDAD
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
:
17 - 17A
: PVC UF
:
160 mm
:
51.50 m
:
1.20 m
:
1.96 m
:
1.20 m
:
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
38.73 lts / da
0.000000 m3/hora
0.000000 lts / da
:
:
:
:
:
:
:
:
<
Volumen Exfiltrado
lts/da (1)
38.73
PRUEBA DE NIVELACION
Bz.
17
51.50 m
PRUEBA DE ALINEAMIENTO
Fecha:
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
: 17A
- 18
: PVC UF
:
160 mm
:
61.00 m
:
1.96 m
:
1.20 m
:
1.20 m
:
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
45.87 lts / da
0.000000 m3/hora
0.000000 lts / da
Bz.
17A
:
:
:
:
:
:
:
:
<
Volumen Exfiltrado
lts/da (1)
45.87
61.00 m
PRUEBA DE ALINEAMIENTO
Fecha:
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
:
18 - 18A
: PVC UF
:
160 mm
:
99.40 m
:
1.68 m
:
1.20 m
:
1.20 m
:
1.13 m2
:
:
:
:
:
:
:
:
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
74.75 lts / da
0.000000 m3/hora
0.000000 lts / da
Volumen Exfiltrado
lts/da (1)
74.75
<
PRUEBA DE NIVELACION
Bz.
18
99.40 m
PRUEBA DE ALINEAMIENTO
Fecha:
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
: 18A
- 29
: PVC UF
:
160 mm
:
72.00 m
:
1.20 m
:
1.20 m
:
1.20 m
:
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
54.14 lts / da
0.000000 m3/hora
0.000000 lts / da
:
:
:
:
:
:
:
:
Volumen Exfiltrado
lts/da (1)
54.14
<
PRUEBA DE NIVELACION
Bz.
18A
72.00 m
PRUEBA DE ALINEAMIENTO
Fecha:
7/23/2013
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
:
24 - 24A
: PVC UF
:
160 mm
:
54.00 m
:
1.20 m
:
1.20 m
:
1.20 m
:
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
40.61 lts / da
0.000000 m3/hora
0.000000 lts / da
Bz.
24
:
:
:
:
:
:
:
:
<
Volumen Exfiltrado
lts/da (1)
40.61
54.00 m
PRUEBA DE ALINEAMIENTO
Fecha:
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
: 24A
- 29
: PVC UF
:
160 mm
:
53.40 m
:
1.20 m
:
1.20 m
:
1.20 m
:
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
:
:
40.16 lts / da
0.000000 m3/hora
:
:
:
:
:
:
:
:
0.000000 lts / da
CONCLUSIN
(2)
Volumen Exfiltrado
lts/da (1)
40.16
<
PRUEBA DE NIVELACION
Bz.
24A
53.40 m
PRUEBA DE ALINEAMIENTO
Fecha:
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
:
29 - 32
: PVC UF
:
160 mm
:
63.40 m
:
1.20 m
:
1.20 m
:
1.20 m
:
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
47.68 lts / da
0.000000 m3/hora
0.000000 lts / da
:
:
:
:
:
:
:
:
<
Volumen Exfiltrado
lts/da (1)
47.68
PRUEBA DE NIVELACION
Bz.
29
63.40 m
PRUEBA DE ALINEAMIENTO
Fecha:
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
:
32 - 30
: PVC UF
:
160 mm
:
64.00 m
:
1.20 m
:
1.20 m
:
1.20 m
:
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
48.13 lts / da
0.000000 m3/hora
0.000000 lts / da
:
:
:
:
:
:
:
:
<
Volumen Exfiltrado
lts/da (1)
48.13
PRUEBA DE NIVELACION
Bz.
32
64.00 m
PRUEBA DE ALINEAMIENTO
Fecha:
ANEXOS
Ve = 0.0047 Di x L
Donde
: Ve
Di
L
DATOS
Tramo
Tubera
Dimetro
Longitud Tramo
Altura de Bz. 1
Altura de Bz. 2
Dimetro Buzn
rea de Buzn
:
:
30 - 28
: PVC UF
:
160 mm
:
65.00 m
:
1.20 m
:
1.20 m
:
1.20 m
:
1.13 m2
RESULTADOS
:
Volumen Exfiltrado Permisible
Volumen Exfiltrado Real
CONCLUSIN
:
:
48.88 lts / da
0.000000 m3/hora
0.000000 lts / da
:
:
:
:
:
:
:
:
<
Volumen Exfiltrado
lts/da (1)
<
Volumen Exfiltrado
lts/da (1)
48.88
PRUEBA DE NIVELACION
Bz.
30
65.00 m
PRUEBA DE ALINEAMIENTO
Fecha:
SAGE
001
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
era (mm)
FALLO
0.00
Fecha:
Bz.
0
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
SAGE
002
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
era (mm)
Calle 01
FALLO
Fecha:
Bz.
0
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
SAGE
003
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
era (mm)
Calle 01
APROBADO
Fecha:
Bz.
8A
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
SAGE
004
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
era (mm)
(1)
Pasaje 02
APROBADO
Fecha:
Bz.
8B
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
SAGE
005
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
era (mm)
Pasaje 02
APROBADO
Fecha:
Bz.
14
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
SAGE
006
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
era (mm)
Calle 02
APROBADO
Fecha:
Bz.
14A
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
SAGE
007
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
era (mm)
(1)
Calle 02
APROBADO
Fecha:
Bz.
13
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
SAGE
008
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
era (mm)
Calle 01
APROBADO
Fecha:
Bz.
7
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
SAGE
009
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
era (mm)
Calle 01
APROBADO
Fecha:
Bz.
5A
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
SAGE
010
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
era (mm)
(1)
Calle 01
SAGE
APROBADO
Fecha:
Bz.
6
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
011
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
era (mm)
Calle 01
APROBADO
Fecha:
Bz.
6A
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
SAGE
012
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
era (mm)
Calle 01
APROBADO
Fecha:
Bz.
7
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
SAGE
013
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
era (mm)
Pasaje 03
APROBADO
Fecha:
Bz.
7A
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
SAGE
ENTIDAD:
014
era (mm)
Pasaje 03
APROBADO
Fecha:
Bz.
13
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
SAGE
015
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
era (mm)
Calle 02
APROBADO
Bz.
10A
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
SAGE
016
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
era (mm)
Calle 02
APROBADO
Fecha:
Bz.
11
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
SAGE
017
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
era (mm)
Calle 02
APROBADO
Fecha:
Bz.
11A
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
SAGE
018
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
era (mm)
Calle 02
APROBADO
Bz.
12
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
SAGE
019
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
era (mm)
Pasaje 04
APROBADO
Fecha:
Bz.
12
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
SAGE
020
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
era (mm)
Calle 02
APROBADO
Fecha:
Bz.
13A
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
SAGE
021
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
era (mm)
Calle 02
APROBADO
Fecha:
Bz.
12
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
SAGE
022
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
era (mm)
Pasaje 04
APROBADO
Fecha:
Bz.
12B
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
SAGE
023
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
era (mm)
Pasaje 04
APROBADO
Fecha:
Bz.
18
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
SAGE
024
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
era (mm)
Pasaje 03
APROBADO
Fecha:
Bz.
13B
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
SAGE
025
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
era (mm)
Pasaje 03
APROBADO
APROBADO
Fecha:
Bz.
19
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
SAGE
026
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
era (mm)
(1)
Calle 03
SAGE
APROBADO
Fecha:
Bz.
19A
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
027
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
era (mm)
Pasaje 27
APROBADO
Fecha:
Bz.
18
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
SAGE
028
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
era (mm)
Pasaje 05
APROBADO
Bz.
11B
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
SAGE
029
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
era (mm)
Pasaje 05
APROBADO
Fecha:
Bz.
17
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
SAGE
030
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
era (mm)
Calle 03
APROBADO
Fecha:
Bz.
17A
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
SAGE
031
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
era (mm)
Calle 03
APROBADO
Fecha:
Bz.
18
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
SAGE
032
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
era (mm)
Pasaje 04
APROBADO
Fecha:
Bz.
18A
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
SAGE
033
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
(1)
era (mm)
Pasaje 04
6/3/2013
APROBADO
Fecha:
Bz.
29
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
SAGE
034
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
era (mm)
Calle 04
APROBADO
Fecha:
Bz.
24A
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
SAGE
035
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
era (mm)
Calle 04
(2)
Volumen Exfiltrado Permisible
lts/da (1)
40.16
APROBADO
Fecha:
Bz.
29
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
SAGE
036
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
era (mm)
Calle 04
APROBADO
Fecha:
Bz.
32
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
SAGE
037
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
era (mm)
Calle 04
APROBADO
Fecha:
Bz.
30
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
SAGE
038
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE CULLHUAS
CONTRATISTA:
era (mm)
Calle 04
APROBADO
APROBADO
Fecha:
Bz.
28
RESIDENTE DE OBRA
SUPERVISOR DE OBRA