SAUDI ARAMCO ID/PID FORM REV 1 - 010109

Rev 4

COS 03/31/2010
SATIP No.

SAUDI ARAMCO TYPICAL INSPECTION PLAN


CENTRIFUGAL PUMP

APPROVED DATE

SATIP-G-005-01

PROJECT TITLE:

ITEM
NO.

1.0

MECHANICAL-Rotating Equipment

CONTRACTOR/SUBCONTRACTOR

PROJECT PHASE
& ACTIVITY CODE

DOCUMENT REVIEW

31-Aug-11

DISCIPLINE:

TASK / ACTIVITY

QUALITY
PROCEDURE

QUALITY
RECORD

INSPECTION RESPONSIBILITY
ASSIGNMENTS
CNTRCTR

REMARKS

SAUDI
ARAMCO

Centrifugal Pump Installation is a Special Process per Schedule Q. An installation procedure shall include elements from checklists below, at a minimum.
Review of Material & Equipt Storage,
Handling and Preservation Procedure-

SAIC-G-2001

SAIC-G-2001

RH

RH

2.1

Equipment Verification and Visual


Inspection of Centrifugal Pumps

SAIC-G-2002

SAIC-G-2002

2.2

Equip Handling, Storage & Preservation

SAIC-G-2003

SAIC-G-2003

2.3

Verification, Visual inspection and


storage/Preservation of Electrical and
instrumentation components

See Remarks

See Remarks

Refer to respective SATIPs (Electrical & Instrumentation)


(SATIP-P-113-01/02/03, P-116-06 , P-515-01, J-100-01, J200-01, J-300-01, J-400-01, J-902-03)

Concrete Foundation Installation

See Remarks

See Remarks

See SATIP-Q-001-02

SAIC-M-2006

SAIC-M-2006

SAIC-G-2021

SAIC-G-2021

Use SATR-G-2005

Use SATR-G-2004

1.1
2.0

3.0

Per Schedule Q, attach III, Para.

MATERIAL RECEIVING

INSTALLATION

3.1

Verification of Equip Support Structure or


Foundation (Pre-Installation)
Mounting Plate ( Base plate and
Soleplate) Installation and Leveling

3.2
3.3
3.4

Preliminary Pump / Driver Alignment

SAIC-G-2022

SAIC-G-2022

3.5

Grouting of Machinery Support

See Remarks

See Remarks

3.6

Inspection of Auxiliary Piping Installation

SAIC-G-2004

SAIC-G-2004

3.7

Relief Valve Installation

See Remarks

See Remarks

Refer to SATIP-J-600-01

3.8

Welding

See Remarks

See Remarks

See SATIP-W-011-01

SAIC-G-2005

SAIC-G-2005

SAIC-L-2014

SAIC-L-2014

Pump Suction & Discharge Piping


Connection
Flange Joint, gasket verification and bolt
tightening

3.9
3.10

See SATIP-Q-010-01 or Q-011-01whichever is applicable


H

Use SATR-L-2001 - See Note 3 of General Notes for SA's


Responsibility.
Refer to the applicable SATIP: SATIP-P-113-06,
P-113-01, P-113-02, P-113-03, P-116-06

3.11

Electric Motor (Driver) Installation

See Remarks

See Remarks

3.12

Skid Mounted Aux. Electrical System


installation

See Remarks

See Remarks

Refer to SATIP-P-515-01

3.13

Skid Mounted Aux. Instrumentation


Systems installation

See Remarks

See Remarks

Refer to SATIP-J-902-03

Final Pump/Driver Alignment

SAIC-G-2022

SAIC-G-2022

4.0
4.1

PRE-COMMISSIONING

Page 1 of 2

Use SATR-G-2004

SAUDI ARAMCO ID/PID FORM REV 1 - 010109

Rev 4

COS 03/31/2010
SATIP No.

SAUDI ARAMCO TYPICAL INSPECTION PLAN


CENTRIFUGAL PUMP

APPROVED DATE

SATIP-G-005-01

PROJECT TITLE:

ITEM
NO.
4.2
1.0

31-Aug-11

DISCIPLINE:

MECHANICAL-Rotating Equipment

CONTRACTOR/SUBCONTRACTOR

PROJECT PHASE
& ACTIVITY CODE

DOCUMENT REVIEW

4.3
4.3

TASK / ACTIVITY

QUALITY
PROCEDURE

INSPECTION RESPONSIBILITY
ASSIGNMENTS

QUALITY
RECORD

CNTRCTR

REMARKS

SAUDI
ARAMCO

Instrumentation and Electrical PreRefer to the respective SATIPs for Electrical &
Remarks
See Remarks
Centrifugal Pump
is a SpecialSee
Process
per Schedule
Q. An installation procedure shall include elements
from checklists
below, at a minimum.
Commissioning
priorInstallation
MCC
Instrumentation
noted above.
Final Inspection/walkthrough (by
SAIC-G-2007 SAIC-G-2007
H
W
Use SATR-A-2011
Contractor)
Final Inspection for mechanical
Form SA-6133 Form SA-6133
H
completion acceptance

GENERAL NOTES
1

The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust the levels
of Saudi Aramco participation based upon the Contractors performance.

Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization

Witness:
QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC organization representative
is not present.

Hold:

If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.

QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in attendance.

LEGEND
H

Hold Point for QC Inspection/ Test

Witness Inspection/Test

Surveillance

R
RH
I

Page 2 of 2

Review of Documents
Review and Approval of Documents
100% Contractor Inspection