RECLAMATION PLAN
No specific land use objective has been identified for the project limits of the mining area.
Thus, the goal of this Reclamation Plan is to stabilize the affected area in a manner that will
promote natural drainage without the risk of significant erosion.
Reclamation will occur only after the completion of the majority of wind farm construction
is completed.
The Reclamation Plan is shown on Drawing C-003. Reclamation will include removal of
gravel-paved surfaces, including the access road, the stockpile/loading area, and the pad for the
crusher plant. All areas disturbed by the mining operations, including the access road, mine,
stockpile/loading area, spoil area, earth dikes, and sediment trap, will then be topsoiled and seeded
in accordance with the specifications shown on Drawing ES-001. Temporary erosion control mat,
also shown on ES-001, will be used to stabilize the topsoil and seed placed on the sideslopes of the
mine.
5-1
J:\11175332.00000\WORD\DRAFT\Galloo Island\Mining Permit\MINED LAND USE PLAN.doc
LEGEND
- --------
ROAD
BUILDING
EXISTING CONTOUR
290
TREE
- 290
==
TREELINE
'YVYYrYYrYYYYVYY\.
LJ
1.
PROPOSED CONTOUR
MINING PROJECT BOUNDARY
SCALE IN FEET
WARNING
IT IS A VIOLATION OF SECTION 7209,
SUBDIVISION 2. OF THE NEW YORK STATE
EDUCATION LAW FOR ANY PERSON OTHER
THAN WHOSE SEAL APPEARS ON THlS
DRAWING. TO ALTER IN ANY WAY AN ITEM
ON THlS DRAWING. IF AN ITEM IS ALTERED,
THE ALTERING ENGINEER SHALL AFFIX TO
TO-THE TTEM HIS SEAL AND THE NOTATION
"ALTERED BY" FOLLOWED BY HIS SIGNATURE
AND THE DATE OF SUCH ALTERATION. AND
NO. DATE
DESCRIPTION
NO.
DATE
RFVISIONS
I URS Corporation I
DESIGNED BY:
ELB
DRAWN BY:
ELB
CHECKED BY:
KJS
JEW
TOWN OF HOUNSFIELD,
JEFFERSON COUNTY, NEW YORK
DESCRIPTION
PROJ. ENGR.
HOUNSFIELD
WIND FARM PROJECT
MINING PERMIT APPLICATION
RECLAMATION PLAN