RAILWAY ELECTRIFICATION AND DOUBLE-DOUBLE TRACKING OF JAVA MAIN LINE PROJECT

PACKAGE B1: RAILWAY FACILITY CONSTRUCTION FOR BEKASI TO CIKARANG

Interface Diagram

External

Internal
Interfacing Parties

Interfacing Parties

Civil Works

Directorate General
of Railways (DGR)

Building Works

The Engineers

Substation System
Works

Road Authorities

Overhead Contact
System Works

Police Authorities

Power Distribution
System Works

Track work

Utilities Agencies

Signalling System
Works

Environmental
Agencies

Telecommunication
System Works

River Authorities
PT. KAI

Att-3-Page 1 of 1
B1/CON/TRK/0009 Rev0

MITSUBISHI-SUMITOMO JOINT OPERATION.