Professional Documents
Culture Documents
Railway Electrification and Double - Double Tracking of java Main Line Project - Pac
Surveyor
:
Serial No:
Location
:
Date
:
Instrument :
Weather :
Angle
Horizontal
No
Sta
Target
'
Sketch :
Horizontal
"
Average
'
Horizontal Distance
"
Remark
46,545
DATA STAKING O
Railway Electrification and Double - Double Tracking of java Main Line Project - P
Surveyor
:
Serial No:
Location
:
Date
:
Instrument :
Weather :
Angle
No
Sta
Target
'
Sketch :
Horizontal Distance
Coordinate
'
"
LONGITUDINAL SECTION
Railway Electrification and Double - Double Tracking
Package B1 : Railway Facility Construction for
Surveyor
Location
Date
No
Sketch :
:
:
:
Sta
Backsight Forward
(BT)
(BT)
HI
LONGITUDINAL SECTION
nd Double - Double Tracking of java Main Line Project
way Facility Construction for Bekasi to Cikarang
AH
(+)
(-)
AVG
COREC
ELEVASI
Remark
Kilometer
Rail Level
Track Center
Remark
Kilometer
Rail Level
Track Center
Remark
Gauge Different
Alignment Deviation
Longitudinal Level Deviation
Cross Level Deviation
Twist
:
:
:
:
:
+ 5 mm to - 2 mm
+ 5 mm to - 5 mm
+ 7 mm to - 7 mm
+ 6 mm to - 6 mm
+ 6 mm to - 6 mm
on straight
for 10 m span
for 10 m span
at spot
for 5 m span