V.Total Cost
Cod
Description
Unit
m2
m3
B00
B00
B00
A.2.3 Earthwork section in excavation in all kinds of soil for bottom floor slab
of 200mm. disposal of surplus soil out of site as directed by engineer.
m2
m3
m3
B00
B00
B00
B00
B00
B00
B00
m3
m2
B. Construction works
B.1 Footing
B.1.1 Lay in foundation, cement concrete 1:4:8 proportions blinding of 5cm
thick under wall.
Page 2 of 20
m2
Unit rate
B
B00
B00
Cod
Description
B.1.2.2 R.C.C Strip foundation with cement concrete 1:1.5:3 (1 cement : 2
clean coarse sand : 4 stone aggregate of 25mm down) , including 10
numbers 14mm dia steel bars (BS 4461) and 6mm stirrups @200 mm
centers including centering complete. No: 00.04.2
Unit
m3
B.1.3 Construct stone wall in foundation, 40cm thickness bedded and jointed
with cement sand mortar of 1:3 proportion (1 cement: 3 clean coarse
sand). Face of wall should be in plumb. Corner stone should be good
stones dressed to correct angles and laid as headers and stretchers.
Bond stones shall be provided 100cm c/c vertically and horizontally.
Wall should be laid in courses of 40cm height. All the gaps between
stones shall be filled with cement mortar and wall should be kept moist
and protected from sun for a period of at least 10 days. Up to a height
of 150 cm
m3
B00
m3
B.2.7 R.C.C.work for cover slab 100 mm thick with cement concrete 1:2:4 (1
cement: 2 clean coarse sand : 4 stone aggregate of 25mm down),
including reinforcement with mesh fabric BRC A252 (BS 4483:2005)
wires 10 mm dia @200x200 mm c/c, weight of bar 0.617Kg/m with
30mm side and end laps including centering and shuttering complete.
m3
B00
B.2.8 R.C.C.work for floor slab 200mm thick with cement concrete 1:2:4 (1
cement: 2 clean coarse sand : 4 stone aggregate of 25mm down),
including reinforcement with mesh fabric BRC A252 (BS 4483:2005)
wires 12 mm dia @150x150 mm c/c, weight of bar 0888kg/m with
30mm side and end laps including centering and shuttering complete.
m3
B.4 Dressed Stone Wall
B.4.3 Squared stone masonry 400 mm thick bedded and jointed with cement
sand mortar of 1:3 proportion (1 cement: 3 clean coarse sand). Face of
wall should be in plumb. Corner stone should be good stones dressed
to correct angles and laid as headers and stretchers. Bond stones shall
be provided 1000 mm c/c vertically and horizontally well dressed . Wall
should be laid in courses of 400 mm height. All the gaps between
stones shall be filled with cement mortar and wall should be kept moist
and protected from sun for a period of at least 10 days. Up to a height
of 2000 mm
m3
B.3. Footing treatment
B00
B00
B00
B00
B.3.1 1000g polythene damp proof membrane laid under floor bed with
30mm side and end laps.
m2
m2
B5 Plastering
Page 3 of 20
Unit rate
B
B00
Cod
Description
B.5.4 Apply three layers of plastering each layer is 20mm thick on internal
faces of the walls of retaining water structures, first two layers are
cement mortar, Cement type : ordinary portland cement with design
mix with cement sand mortar (1:3) Clean, dry sand should be used. It
should be well-graded,comprising particles of different sizes.
Cement should have been recently manufactured and have
been protected from water vapour during storage and transport.
The water used in the mix needs to be clean, preferably of
drinking-water quality. third layer of water proofing materail shoul be
used as finishing
Unit
B00
B.5.5 Floor screed gently sloping towards the center( 30mm of edge and
10mm of the center
m2
B00
H.1.1 Man hole cover:Supply and locable steel door of 0.5m x0.5 using
appropriate frames and a metal plate 4mm
No
B00
m2
Lsum
B00
H.1.3 Make provision for all form work and curing of concrete and masonry
work
No
B00
H.1.4 Gate valve and draw-off pipe: Supply 3/4 inch sockect , elbow ,nonreturn (original peggler) , elbow ,1.5m long 3/4'' pipe and extend the
draw off out of the chamber.
Lsum
B00
H.1.5 Down Pipes : Supply and install 3 inch down pipes and Make provision
for a elbows , skill fully connecting the down pipes to the gutters using
the elbows
B00
H.1.6 Supply removable external steel ladder( 3.0m long and 0.4m wide),
The steps should be at 0.4m interval
No
B00
H.1.7 Over Flow Pipes : Supply and install 1.5 inch pipe and Make provision
for a elbows
H.1.8 Gutters: Supply and install 28gauge galvanized iron sheet gutters
200mmx150mmx150mm and
hooks/gutter holders and other
accessories on roof eave of total length 30m long.The contractor is
advised to make provision for a minimum overlap of 30cm. Make
provision for ordinary end gutters (closed end without opening) and end
gutters with opening for down pipe to direct the water into the tank. The
gutter holders must be spaced at intervals of not more than 1m apart.
No
m
H.1.9 Wash Out :Supply and install 2m long 1.5 inch G.I. pipe with a plug
and an elbow at the centre . The wash out pipe should pass through
the tap chamber and fitted with a non-return valve located withing the
tap chamber
Total one water harvesting tank
Total of Three water Harvesting Tank
Page 4 of 20
Lsum
No
Unit rate
Cod
Description
Unit
m2
B01
B01
M3
B01
B01
B01
B01
B01
B. Construction works
B.1. Footings
B.1.1 Lay in foundation, cement concrete 1:4:8 proportions blinding
of 5cm thick under wall.
m2
B01
m3
B01
B01
B01
B01
B01
Page 5 of 20
m3
m3
m3
m3
Unit rate
B
B01
Cod
Description
B.2.6 R.C.C. work in ring beam 200x200 mm with cement concrete
1:2:4 (1 cement: 2 clean coarse sand : 4 stone aggregate of
25mm down), including high yield deformed 6x12mm dia steel
bars (BS 4461) as principle reinforcement and 8 mm dia
stirrups @200 mm c/c including centering and shuttering
complete.
B01
B.2.13 R.C.C.work for floor slab 100 mm thick with cement concrete
1:2:4 (1 cement: 2 clean coarse sand : 4 stone aggregate of
25mm down), including reinforcement with 2 layers of mesh
fabric BRC A252 (BS 4483:2005) wires 8mm dia @300x300m
c/c, weight 3.95 Kg/m2 with 30mm side and end laps including
scum baffle and weir as per drawings, centering and
shuttering complete.
Unit
m3
m3
External Slab
B.2.13 R.C.C.work for floor slab 100 mm thick with cement concrete
1:2:4 (1 cement: 2 clean coarse sand : 4 stone aggregate of
25mm down), including reinforcement with 2 layers of mesh
fabric BRC A252 (BS 4483:2005) wires 8mm dia @300x300m
c/c, weight 3.95 Kg/m2 with 30mm side and end laps including
scum baffle and weir as per drawings, centering and
shuttering complete.
Work top Desk / Table for the Laboratory
B.2.10 R.C.C. worktop slab of 80 mm thick with cement concrete
1:2:4 (1 cement : 2 clean coarse sand : 4 stone aggregate of
25mm down), including high yield deformed 8mm dia steel
bars (BS 4461) @100 mm c/c in both directions including
formation of manholes and RCC covers as per drawings,
centering and shuttering complete.
B01
B01
B01
B01
B01
B.4. Walls
B.4.2 Concrete hollow block walling (strength not less than
12N/sqcm) in super structure 200 mm thick up to a heigth of
4000 mm with cement sand mortar Ratio(1:3) for walls and
gables
B01
B01
B01
B.5. Plasters
B.5.1 36mm thick plastering on internal & External faces of the
walls, columns & beams with cement sand mortar (1:3)
gauged in three coats included surface smoothing
m3
m3
m2
m2
m2
B01
B01
B01
B01
B01
m2
B01
B01
B01
B01
Page 6 of 20
Unit rate
B
B01
Cod
Description
D.2.1 Supply and fix of purpose made aluminium casement windows
complete with opening accessories, steel hinges, iron
mongery with matching screws and burglar proofing with min.
10mm dia bars including bedding and pointing around frames
in cement mortar. Completed with 6 mm thick clear sheet
glass, cutting and glasing to aluminium casement in panes
and steel mosquito net with aluminium frame (ID A1 in the
drawings). Measured for actual surfaces with minimum
500x500 mm size.
Unit
m2
B01
m2
B01
D.5 Windowsills
D.5.1 Provide and fix precast concrete sill ( 0.25m X 0.10m x 1.2
wide ) thick on all external windows as per the design
drawings for Windows
m3
B01
B01
B02
No
B01
B01
B01
B01
B01
B01
B01
No
E.3. Paintings
E.3.1 Prepare surfaces with thorough claning and smoothing with
filler, prime and apply three coat of acrilic matte emulsion to
internal and external plastered walls & concrete until all
surfaces are perfectly uniform. Thorough cleaning of all
surfaces after painting. Colour to be agreed with the
contracting authority before painting.
m2
m2
m2
m2
Page 7 of 20
Unit rate
Cod
Description
F.1.3 Construction of 600x600 mm (internal dimensions) water
supply or drainage system inspection chamber. The chamber
depth will be appraised on site according with the mandatory
slopes of the pipes. Including excavations, 50 mm sand
blinding, mass concrete footing, sandcrete solid blocks
walling, internal rendering, RCC cover slab with manhole and
cover, thorough connection of all the pipes.
Unit
each
F.2.1 Supply and fix best quality porcelain European sitting type with
built in P trap included porcelain wall flush tank, water supply
gate valves, side handheld bidet faucet with flex pipe,
connection with water supply using uPVC high density (PPR),
connection with sewage system using 75mm PVC pipe with
inspection Y, all special pieces included to achieve a perfectly
functioning assembly.
each
F.2.2 Supply and fix best quality porcelain wasbasin approx 600 mm
wide included P trap, mixer type tap, water supply gate valves,
connection with water supply using uPVC high density (PPR),
connection with sewage system using 50 mm PVC pipe, all
special pieces included to achieve a perfectly functioning
assembly.
F.2.3 Supply and fix best quality porcelain shower tray approx
700x700 mm wide included mixer type tap and shower
stainless steel shower head, connection with water supply
using uPVC high density (PPR), connection with sewage
system using 50 mm PVC pipe, all special pieces included to
achieve a perfectly functioning assembly.
each
each
F.2.6 Supply and fix stainless steel sink with two bowls approx size
340x400x210 mm and side worktop approx size 400x500 mm,
included stainless steel P trap, mixer type tap, water supply
gate valves, connection with water supply using uPVC high
density (PPR), connection with sewage system using 50 mm
PVC pipe, all special pieces included to achieve a perfectly
functioning assembly.
each
F.2.9 supply and install 6 inch pipe for sewerage work connecting
between the Champers with all accessories and connection
W-01 Supply materials and erect steel frame structure 4 m Height
with all foundation (1x1x0.2)m3 works for steel tower legs (Min
50x30 concrete anchoring of the Steel tower legs ), painting
the Steel frames with anti-rust paint and with 3 coats finishing
oil paint. The work shall include water tanks erection.
each
W-02 Supply and install Two PVC water tanks on top of the steel
tower price including all piping and fittings, Valves, float valves
and drain pipe, with a capacity of: each one is1000 LT
each
W-04 Supply materials and erect two water pump (1 horse Power)
with steel cage and cover for protection. The work includes the
connection between water tanks and main water collection
point using all accessories and according engineer
instructions.
each
I. Electrical Supply
I.0.1 Supply of materials and works testing electrical l wiring for all
the building as per the design drawings. All wiring shall be
through PVC electrical conduit pipes (Dia. 12mm) with all
needed connecting fixtures and PVC boxes. Switches types
(European origin or equivalent) wiring shall be single core PVC
insulated wire (European origin or equivalent) size (1.5mm2)
for lighting lines and 2.5 mm2 for main feeder from distribution
board.. The price shall include fixing the pipe in the wall or
roofing with good plaster finishing ,as per electrical drawing
details.
Ls
I.0.2 Supply of material and works to fix and operate single tube 4
Unit
I.0.3 Supply and fix 20 amp switch one way one gang complete
with wiring as per the drawing
Unit
I.0.4 Supply and fix 35 amp single socket outlet complete with
wiring as per the design drawings
Unit
Page 8 of 20
Unit rate
Cod
Unit
Description
Building B02 Male GuestHouse
B02
B02
B02
B02
B02
B02
m2
B02
B02
B02
B02
B02
B02
M3
B. Construction works
B.1. Footings
B.1.1 Lay in foundation, cement concrete 1:4:8 proportions blinding
of 5cm thick under wall.
m2
B02
m3
B02
B02
B02
B02
Page 9 of 20
m3
m3
m3
Unit rate
B
B02
Cod
Description
B.2.4 R.C.C. work in lintel continuous over doors and windows
150x200 mm with cement concrete 1:2:4 (1 cement : 2 clean
coarse sand : 4 stone aggregate of 25mm down), including
high yield deformed 2x10mm dia steel bars (BS 4461) and
6mmdia stirrups @200 mm c/c including centering and
shuttering complete.
B02
B02
Unit
m3
m3
B.2.13 R.C.C.work for floor slab 100 mm thick with cement concrete
1:2:4 (1 cement: 2 clean coarse sand : 4 stone aggregate of
25mm down), including reinforcement with 2 layers of mesh
fabric BRC A252 (BS 4483:2005) wires 8mm dia @300x300m
c/c, weight 3.95 Kg/m2 with 30mm side and end laps including
scum baffle and weir as per drawings, centering and
shuttering complete.
m3
B02
External Slab
B.2.13 R.C.C.work for floor slab 100 mm thick with cement concrete
1:2:4 (1 cement: 2 clean coarse sand : 4 stone aggregate of
25mm down), including reinforcement with 2 layers of mesh
fabric BRC A252 (BS 4483:2005) wires 8mm dia @300x300m
c/c, weight 3.95 Kg/m2 with 30mm side and end laps including
scum baffle and weir as per drawings, centering and
shuttering complete.
m3
B02
B02
B02
B02
B02
B02
B02
B02
B02
B02
B02
B02
m2
m2
m2
B02
B02
B02
Page 10 of 20
Unit rate
B
B02
Cod
Description
D.2.1 Supply and fix of purpose made aluminium casement windows
complete with opening accessories, steel hinges, iron
mongery with matching screws and burglar proofing with min.
10mm dia bars including bedding and pointing around frames
in cement mortar. Completed with 6 mm thick clear sheet
glass, cutting and glasing to aluminium casement in panes
and steel mosquito net with aluminium frame (ID A1 in the
drawings). Measured for actual surfaces with minimum
500x500 mm size.
B02
D.5 Windowsills
D.5.1 Provide and fix precast concrete sill ( 0.25m X 0.10m x 1.2
wide ) thick on all external windows as per the design
drawings for Windows
B02
B02
B02
B02
B02
Unit
m2
m3
No
B02
B02
E.3. Paintings
E.3.1 Prepare surfaces with thorough claning and smoothing with
filler, prime and apply three coat of acrilic matte emulsion to
internal and external plastered walls & concrete until all
surfaces are perfectly uniform. Thorough cleaning of all
surfaces after painting. Colour to be agreed with the
contracting authority before painting.
No
m2
m2
m2
m2
Page 11 of 20
Unit rate
Cod
Description
F.1.3 Construction of 600x600 mm (internal dimensions) water
supply or drainage system inspection chamber. The chamber
depth will be appraised on site according with the mandatory
slopes of the pipes. Including excavations, 50 mm sand
blinding, mass concrete footing, sandcrete solid blocks
walling, internal rendering, RCC cover slab with manhole and
cover, thorough connection of all the pipes.
Unit
each
F.2.1 Supply and fix best quality porcelain European sitting type with
built in P trap included porcelain wall flush tank, water supply
gate valves, side handheld bidet faucet with flex pipe,
connection with water supply using uPVC high density (PPR),
connection with sewage system using 75mm PVC pipe with
inspection Y, all special pieces included to achieve a perfectly
functioning assembly.
each
F.2.2 Supply and fix best quality porcelain wasbasin approx 600 mm
wide included P trap, mixer type tap, water supply gate valves,
connection with water supply using uPVC high density (PPR),
connection with sewage system using 50 mm PVC pipe, all
special pieces included to achieve a perfectly functioning
assembly.
F.2.3 Supply and fix best quality porcelain shower tray approx
700x700 mm wide included mixer type tap and shower
stainless steel shower head, connection with water supply
using uPVC high density (PPR), connection with sewage
system using 50 mm PVC pipe, all special pieces included to
achieve a perfectly functioning assembly.
each
each
F.2.6 Supply and fix stainless steel sink with two bowls approx size
340x400x210 mm and side worktop approx size 400x500 mm,
included stainless steel P trap, mixer type tap, water supply
gate valves, connection with water supply using uPVC high
density (PPR), connection with sewage system using 50 mm
PVC pipe, all special pieces included to achieve a perfectly
functioning assembly.
each
F.2.7 supply and install 6 inch pipe for sewerage work connecting
between the Champers with all accessories and connection
W-04 Supply materials and erect two water pump (1 horse Power)
with steel cage and cover for protection. The work includes the
connection between water tanks and main water collection
point using all accessories and according engineer
instructions.
No
Unit
I. Electrical Supply
I.0.1 Supply of materials and works testing electrical l wiring for all
Page 12 of 20
Unit rate
Cod
Description
Unit
Unit rate
V. Qty
V.Total CoSt
B03
B03
m2
131.32 $
131.32
m3
39.756 $
278.29
m3
32.83 $
820.75
B03
B03
B. Construction works
B03
B03
B.1. Footings
B.1.1 Lay in foundation, cement concrete 1:4:8 proportions blinding of 5cm
thick under wall.
m2
49.8 $
2,241.00
B03
B.1.2 Vibrated mass concrete under stone wall foundatins with cement
concrete 1:2:4 (1 cement : 2 clean coarse sand : 4 stone aggregate
of 25mm down) complete.
m3
9.96 $
498.00
B03
16.6 $
747.00
m3
0.4 $
m3
6.64 $
m3
1.08 $
m3
2.49 $
m3
3.32 $
m3
11.42 $
m3
4.46 $
B03
B03
B.2.2 R.C.C. work for ground beam 400x200mm with cement concrete
1:2:4 (1 cement : 2 clean coarse sand : 4 stone aggregate of 25mm
down) , including 6 numbers 12mm dia steel bars (BS 4461) and
6mm stirrups @200 mm centers including centering and shuttering
complete.
B03
B.2.3 R.C.C. work for column with mix proportion of 1:2:4 (1 cement : 2
clean coarse sand : 4 stone aggregate of 25mm down) and including
high yield deformed steel, 4 numbers 14mm dia vertical bar (BS
4461) and 8mm dia stirrup @200 mm c/c including centering and
shuttering complete.
B03
B.2.4 R.C.C. work in lintel continuous over doors and windows 150x200
mm with cement concrete 1:2:4 (1 cement : 2 clean coarse sand : 4
stone aggregate of 25mm down), including high yield deformed
2x10mm dia steel bars (BS 4461) and 6mmdia stirrups @200 mm c/c
including centering and shuttering complete.
B03
B.2.6 R.C.C. work in ring beam 200x200 mm with cement concrete 1:2:4 (1
cement: 2 clean coarse sand : 4 stone aggregate of 25mm down),
including high yield deformed 6x12mm dia steel bars (BS 4461) as
principle reinforcement and 8 mm dia stirrups @200 mm c/c including
centering and shuttering complete.
B03
B.2.13 R.C.C.work for floor slab 100 mm thick with cement concrete 1:2:4 (1
cement: 2 clean coarse sand : 4 stone aggregate of 25mm down),
including reinforcement with 2 layers of mesh fabric BRC A252 (BS
4483:2005) wires 8mm dia @300x300m c/c, weight 3.95 Kg/m2 with
30mm side and end laps including scum baffle and weir as per
drawings, centering and shuttering complete.
B03
External Slab
B.2.13 R.C.C.work for floor slab 100 mm thick with cement concrete 1:2:4 (1
cement: 2 clean coarse sand : 4 stone aggregate of 25mm down),
including reinforcement with 2 layers of mesh fabric BRC A252 (BS
4483:2005) wires 8mm dia @300x300m c/c, weight 3.95 Kg/m2 with
30mm side and end laps including scum baffle and weir as per
drawings, centering and shuttering complete.
312.20
B03
B03
m2
114.2 $
571.00
B03
B03
B.4. Walls
B.4.2 Concrete hollow block walling (strength not less than 12N/sqcm) in
super structure 200 mm thick up to a heigth of 4000 mm with cement
sand mortar Ratio(1:3) for walls and gables
m2
197.62 $
3,161.92
B.5. Plasters
B.5.1 36mm thick plastering on internal & External faces of the walls,
columns & beams with cement sand mortar (1:3) gauged in three
coats included surface smoothing
m2
408.92 $
1,226.76
m2
143 $
1,859.00
m2
18.2 $
1,820.00
m3
0.315 $
22.05
No
1 $
200.00
No
5 $
600.00
m2
157 $
2,355.00
m2
114.2 $
913.60
m2
395.24 $
790.48
B03
B03
B03
B03
B03
B03
B03
B03
B03
B03
B03
B03
Supply and fix standard flush wooden door internal quality; single leaf
with three steel hinges, ironmongeries with cylinder lock.
Bedded, jointed and pointed in cement mortar. Width between 600900 mm
heigth between 1900-2100 mm. Actual dimension to be verified on
site.
B03
B03
B03
B03
B03
E. Finishes
E.1. Floorings & tilings
E.1.3 Supply and placing of porcelain tiles 400x400 mm 10 mm thick on
floors, with skirting of 100 mm high, 400mm wide. Type colour and
finishing to be agreed with the contracting authority before purchase.
B03
B03
E.2 Ceiling
E.2.2 Supply and fix approved 12 mm thick plasterboard ceiling on steel
structure brandering at 600 centres both ways
B03
B03
E.3. Paintings
E.3.1 Prepare surfaces with thorough claning and smoothing with filler,
prime and apply three coat of acrilic matte emulsion to internal and
external plastered walls & concrete until all surfaces are perfectly
uniform. Thorough cleaning of all surfaces after painting. Colour to be
agreed with the contracting authority before painting.
B03
B03
each
3 $
each
2 $
each
2 $
each
2 $
each
2 $
each
2 $
70 $
W-02
W-04
I.0.1
Supply and install 0ne PVC water tanks on top of the steel tower
price including all piping and fittings, Valves, float valves and drain
pipe, with a capacity of:1000 litre
Supply materials and erect two water pump (1 horse Power) with
steel cage and cover for protection. The work includes the connection
between water tanks and main water collection point using all
accessories and according engineer instructions.
Supply of materials and works testing electrical l wiring for all the
building as per the design drawings. All wiring shall be through PVC
electrical conduit pipes (Dia. 12mm) with all needed connecting
fixtures and PVC boxes. Switches types (European origin or
equivalent) wiring shall be single core PVC insulated wire (European
origin or equivalent) size (1.5mm2) for lighting lines and 2.5 mm2 for
main feeder from distribution board.. The price shall include fixing
the pipe in the wall or roofing with good plaster finishing ,as per
electrical drawing details.
I.0.2
Supply of material and works to fix and operate single tube 4 ft.
fluorescent light fitting ordinary type without reflector of (European
origin or equivalent) complete with starter and fluorescent tube
(European origin or equivalent).
I.0.3
Supply and fix 20 amp switch one way one gang complete with wiring
as per the drawing
I.0.4
Supply and fix 35 amp single socket outlet complete with wiring as
per the design drawings
I.0.5
I.0.6
I.0.7
I.0.8
Unit
No
Unit
150
Ls
1 $
Unit
11 $
Unit
11 $
Unit
Unit
Unit
Unit
12
2
1
5
$
$
$
$
1 $
Unit
I.0.9
1 $
ls
1 $
I.0.10 Provide and fix all the necessary connections to connect the MDB to
the Main electricity Network Supply.
Total B03
27,312.27
Cod
Description
B04
B04
B04
B04
m2
m3
m3
m2
B. Construction works
B04
B04
B04
B04
B04
B04
B04
B04
B04
B04
B04
B04
B04
m2
E. Finishes
E.1. Floorings & tilings
E.1.2 30mm thick cement and sand screed on floor slab, trowelled
smooth
E.3. Paintings
m2
B04
B04
B04
B04
B04
B04
No
Total
cod
Description
Unit
Qty
Page 20 of 20
Eng rate
Eng tot