PPPL-BHUJ-LEAN QC/VCCQC-12

PPPL-BHUJ-LEAN QC/VCCQC-12

2
Page 2 of2 20

PPPL-BHUJ-LEAN QC/VCCQC-12

PPPL-BHUJ-LEAN QC/VCCQC-12

Printing
Plant

Corrugated
Plant
Biscuit
Plant

PPPL-BHUJ-LEAN QC/VCCQC-12

Lean Quality Circle

PIONEER

PPPL-BHUJ-LEAN QC/VCCQC-12

Member

Leader
PRAVIN
YADAV

SANJAY
GUSAI

Facilitator
ATUL DER

Member
JASWANT
PANCHAL

Member
ASHWIN
PUROHIT
7
PPPL-BHUJ-LEAN QC/VCCQC-12

 In the year 2009 our management guided us to start some projects


for the development of Workers (Team mates). We had started this
activity and it was named as Team-mates Development Project
(TDP). In this process they were also solving work relates
problems with less resources and short time.
 In the magazine Quality Circle India of Jan-10 to March-10 a
article
on
Lean
Quality
Circle
by Mr. D. K. Srivastava was published.
 Followed by a training programme on Lean Manufacturing at Our
Khopoli plant by Mr. D. K. Srivastava, which was the first training
programme conducted on Lean Manufacturing by our QCFI.
QCFI.
PPPL-BHUJ-LEAN QC/VCCQC-12

Lean means to get more, from less resources


Lean means the ability to achieve more with fewer
resources by eliminating waste.
Lean is about speed and getting it right the first
time.
Lean is about eliminating waste.
Lean is about uninterrupted flow of work.
Less time, inventory, space, people and money

PPPL-BHUJ-LEAN QC/VCCQC-12

Lean Quality Circle


 With minimum documentations:
 Steps for Problem solving
1) Define the problem.
2) Measure the problem.
3) Analysis the problem.
4) Improve the problem.
5) Control the problem.

PPPL-BHUJ-LEAN QC/VCCQC-12

10

To reduce Wheat
flour dusting in
cutting line for
cracker variety
PPPL-BHUJ-LEAN QC/VCCQC-12

11

Gauge roll-2

Wheat flour
hopper
Brush

Cutting roll

sheet
Gauge roll-3
Gauge roll-1

Cutting line
PPPL-BHUJ-LEAN QC/VCCQC-12

12

To removed the stacked biscuits from cutting


roll, we had to use more wheat flour dusting
between 20 to 22 kg.
kg./MT production and due
to these dusting, we were facing the problem
of Blister in the Biscuits.
Biscuits.
Biscuits
Cutting roll

13
PPPL-BHUJ-LEAN QC/VCCQC-12

Sr. no

Month

Wheat flour
dusting used in
Kg per MT of
bis. Production

Aug-11

19.35

BEFORE

Sep-11

16.7

BEFORE

OCT-11

16.5

BEFORE

Nov-11

17.4

BEFORE

PPPL-BHUJ-LEAN QC/VCCQC-12

14

Date

12

Wastage

Raw biscuit Finished Bis


( Kg ).
(Kgs.)

TOTAL
(Kgs.)

05/09/2011

0.5

8.5

06/09/2011

0.75

7.75

8.5

07/09/2011

0.8

9.25

10.05

08/09/2011

0.65

8.25

8.9

10
WASTAGE TOTAL IN KG.

Wastage

8
6
4
2

09/09/2011

0.45

7.75

10/09/2011

0.66

10.25

8.2

10.91
PPPL-BHUJ-LEAN
QC/VCCQC-12

DAYS

15

Due to more dusting of Wheat Flour


on cracker sheet, the problem of
blister can be occurred and also it
may reduced the biscuit shining, so
in short it effects the biscuit quality.
PPPL-BHUJ-LEAN QC/VCCQC-12

16

Wheat flour dusting to be reduced from 22kg.


/MT biscuits to 6 kg/ Per MT biscuits
production.

PPPL-BHUJ-LEAN QC/VCCQC-12

17

Quality Loss due to wheat flour


dusting.
Chances of blister high due to more
wheat flour dusting.

Biscuits sticking on the die


roll, creates production loss.
One team mates per shift
engaged in monitoring the
hopper of Wheat flour dusting.
PPPL-BHUJ-LEAN QC/VCCQC-12

18

Root cause Analysis


Blisters in the biscuits
Due to more wheat floor dusting
Due to biscuits sticking on die roll
Due to wet surface of the cup

PPPL-BHUJ-LEAN QC/VCCQC-12

19

We have installed two air pipes on


cutting roll. These two air pipes
with 2mm holes in a raw blow the
continuously air on top surface of
cutting roll to dry the cups so it
eliminates the problem of biscuit
sticking on cutting roll.

PPPL-BHUJ-LEAN QC/VCCQC-12

20

We have used 1/2 pipe parallel to cutting


roll and
Hole sizesize-2 mm and 4 mm chamfering on
hole.
Distance between two holes (pitch) is 50 mm
and .
Air used: compressed dry air with PR.
6kg/cm2
PPPL-BHUJ-LEAN QC/VCCQC-12

21

Air pipe

Air flows
Cutting roll

Air pipe

22
PPPL-BHUJ-LEAN QC/VCCQC-12

Date

Wastage at Finished
TOTAL
raw
biscuits in WASTAGE
biscuits
Kg
KG.

12/09/2011

0.25

1.5

1.75

13/09/2011

0.1

2.1

14/09/2011

0.1

1.5

1.6

15/09/2011

0.15

1.75

1.9

16/09/2011

0.2

1.55

1.75

17/09/2011

0.1

1.85

1.95

IN KGS.

We had implemented the solution for the 15 days


period and observed the below mentioned reduction
in the wheat floor dusting.
2.5
2
1.5
1
0.5
0

DATE
PPPL-BHUJ-LEAN QC/VCCQC-12

23

Wheat flour
dusting used in
STAGE
Kg per MT of
bis. Production

Sr. No

Month

DEC-11

6.8

AFTER

JAN-12

6.2

AFTER

FEB-12

6.1

AFTER

MAR-12

5.9

PPPL-BHUJ-LEAN QC/VCCQC-12

AFTER
24

25

1
2

19.35
16.7

6.8
6.2

20
Wastage in Kgs.

MONTHS

Wheat flour dusting


used in Kg per MT of
bis. Production Before

Wheat flour dusting


used in Kg per MT of
bis. Production
After

15
10
5

16.5

6.1
0

17.4

5.9
PPPL-BHUJ-LEAN QC/VCCQC-12

4
25

Daily avg.
production

30

SAVING IN
SAVING IN
WHEAT FLOUR RUPEES /
DUSTING/ MT
MT

11.24

224.8

PER DAY
PER MONTH
SAVING IN
SAVING
RS.

6744

168600

PPPL-BHUJ-LEAN QC/VCCQC-12

26

After fitted two pipes we are


getting following benefits.
Biscuit sticking on cutting roll
problem solved
Wheat flour dusting reduced.
Batter shining on top surface
of biscuits
Improvement in biscuits
Quality
PPPL-BHUJ-LEAN QC/VCCQC-12

27

AFTER
(KGS)

SAVING
(KGS)

DAY

BEFORE
(KGS)

1.75

7.25

8.5

2.1

6.4

10.05

1.6

8.45

8.9

1.9

8.2

1.75

6.45

10.91

1.95

8.96

12
10
8
6
4
2
0

BEFORE
AFTER

PPPL-BHUJ-LEAN QC/VCCQC-12

28

Wheat flour
dusting used in
STAGE
Kg per MT of bis.
Production

Sr. No

Month

APRIL-12

6.1

AFTER

MAY-12

AFTER

JUNE-12

5.4

AFTER

JULY-12
PPPL-BHUJ-LEAN QC/VCCQC-12

AFTER
29

10
10

10

10

PPPL-BHUJ-LEAN QC/VCCQC-12

30