Introduction
Job Title

Structure, Member Design - Geotechnics Piles v2015.01.xlsx

Calc Title

Structure, Member Design - Geotechnics Piles

Job No.

jXXX

By

XX

Date

12/12/2016

Convention
SD

Structure Design

MD

Member Design

CD

Connection Design

Unless explicitly designated in the sheet name as a subset to another sheet, all sheets
are independent of each other (i.e. no cell links between them). However, data can be
transferred between sheets when required.
Indicates that cell is referenced by a macro, hence do not change its position.
Unless of course, the macro code is changed.
Indicates that cell is referenced by a macro through a link cell, hence its position
can be changed, but it should not be altered, added to or deleted.
Disclaimer

This software is provided "as is" and any expressed or implied warranties, including, but
not limited to, the implied warranties of merchantability and fitness for a particular
purpose are disclaimed. In no event shall the author or any of his contributors be liable
for any direct, indirect, incidental, special, exemplary, or consequential damages
(including, but not limited to, procurement of substitute goods or services; loss of use,
data, or profits; or business interruption) however caused and on any theory of liability,
whether in contract, strict liability, or tort (including negligence or otherwise) arising in
any way out of the use of this software, even if advised of the possibility of such
damage. Without limiting the foregoing, the author makes no warranty that: - (i) the
software will meet your requirements, (ii) the software will be uninterrupted, timely,
secure or error-free, (iii) the results that may be obtained from the use of the software
will be effective, accurate or reliable, (iv) the quality of the software will meet your
expectations (v) any errors in the software will be corrected. Software and its
documentation made available: - (i) could include technical or other mistakes,
inaccuracies or typographical errors and the author may make changes to the software
or documentation made available, (ii) may be out of date and the author and his
contributors make no commitment to update such materials. The author and his
contributors assume no responsibility for errors or omissions in the software or
documentation available. In no event shall the author or his contributors be liable to you
or any third parties for any special, punitive, incidental, indirect or consequential
damages of any kind, or any damages whatsoever, including, without limitation, those
resulting from loss of use, data or profits, whether or not the author or his contributors
has been advised of the possibility of such damages, and on any theory of liability,
arising out of or in connection with the use of this software. The use of the software is
done at your own discretion and risk and with agreement that you will be solely
responsible for any damage to your computer system or loss of data that results from
such activities. No advice or information, whether oral or written, obtained by you from
the author or his contributors shall create any warranty for the software.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.
2

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

Worksheet Company Signature


Company

CONSULTING
Engineering Calculation Sheet
ENG
Consulting Engineers
INEERS
AR UP
Ove Arup and Partners
E N G I N E E Consulting Engineers
RS
whitbybird
whitbybird
E N G Consulting Engineers
INEERS
CONSULTING
Engineering Calculation Sheet
ENG
Consulting Engineers
INEERS
CONSULTING
Engineering Calculation Sheet
ENG
Consulting Engineers
INEERS
CONSULTING
Engineering Calculation Sheet
ENG
Consulting Engineers
INEERS
CONSULTING
Engineering Calculation Sheet
ENG
Consulting Engineers
INEERS
CONSULTING
Engineering Calculation Sheet
ENG
Consulting Engineers
INEERS

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.
3

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Structure, Member Design - Piles


Item

Verification

1 Negative skin friction load

Tomlinson

2 Undrained overall pile capacity

Tomlinson

3 Drained overall pile effective capacity

Tomlinson

4 Empirical overall pile effective capacity


5 Pile axial compression capacity

G&P
SELF / G&P

6 Pile axial tension capacity

SELF

7 Pile detailing requirements

SELF

8 Undrained overall pile group capacity

SELF

9 Drained overall pile group capacity

SELF

10 Empirical overall pile group capacity

SELF

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.
4

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.
5

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.
6

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.
7

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.
8

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.
9

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Author Contact
email: info@maverickengineers.com

Job No.

Bovis Lend Lease


Principal Contractors

Sheet No.

jXXX

Rev.

Bovis Lend Lease


Principal Contractors

M
Member/Location
e
m
D
Drg. Ref.
Job
Title Structure, Member Design - Geotechnics Piles v2015.01.xlsx
Job Title Structure, Member Design - Geotechnics
b
r
e
g
M
D
C
Made by
Date
Chd.
Structure,
Member Design - Geotechnics Piles
XX
12/12/2016
Structure, Member Design - Geotechnics Piles
r.h
a
/R
t
d
L
e
.
o
f
c.b
Soil
Properties
a
y
t
Note
when adding or subtracting from following table, all cells and combo boxes which refer to its range must be updated;
i
o
Inserting
further soils within the extremes of the table should automatically update referencing cells and combo boxes, and hence is the recommended approach;
n

Category

Material

Dry Bulk Unit


Weight, dry
(kN/m3)

Rock

Hard Igneous

30.0

30.0

Undrained
Shear
Strength
(Lower
Limit), Su,ll
(kPa)
N/A

Rock

Hard Gneissic

30.0

30.0

N/A

N/A

0.0

34.0

YET

YET

10000

10000

Rock

Hard Limestone

29.0

29.0

N/A

N/A

0.0

40.0

YET

YET

4000

4000

Rock

Soft Limestone

20.0

20.0

N/A

N/A

0.0

34.0

YET

YET

600

600

Rock

Hard Sandstone

27.0

27.0

N/A

N/A

0.0

34.0

YET

YET

4000

4000

Rock

Soft Sandstone

24.0

24.0

N/A

N/A

0.0

30.5

YET

YET

2000

2000

Rock

Very Soft Sandstone

21.0

21.0

N/A

N/A

0.0

27.0

YET

YET

600

1000

Rock

Schist

YET

YET

N/A

N/A

0.0

23.5

YET

YET

3000

3000

Rock

Slate

28.0

28.0

N/A

N/A

0.0

30.5

YET

YET

3000

3000

Rock

Hard Shale

23.0

23.5

N/A

N/A

0.0

27.0

YET

YET

2000

2000

Rock

Soft Shale

21.5

22.0

N/A

N/A

0.0

20.0

YET

YET

600

1000

Rock

Hard Siltstone

YET

YET

N/A

N/A

0.0

34.0

YET

YET

2000

2000

Rock

Soft Siltstone

YET

YET

N/A

N/A

0.0

27.0

YET

YET

600

1000

Rock

Hard Mudstone

YET

YET

N/A

N/A

0.0

YET

YET

YET

2000

2000

Rock

Soft Mudstone

YET

YET

N/A

N/A

0.0

YET

YET

YET

600

1000

Rock

Keuper Marl Grade I

YET

YET

N/A

N/A

0.0

27.0

YET

YET

300

500

Rock

Keuper Marl Grade II

YET

YET

N/A

N/A

0.0

25.3

YET

YET

200

300

Rock

Keuper Marl Grade III

YET

YET

N/A

N/A

0.0

23.5

YET

YET

100

200

Rock

Keuper Marl Grade IVa

YET

YET

N/A

N/A

0.0

21.8

YET

YET

50

100

Rock

Keuper Marl Grade IVb

YET

YET

N/A

N/A

0.0

20.0

YET

YET

50

Rock

Chalk Grade I

20.0

20.0

N/A

N/A

0.0

34.0

YET

YET

1000

1500

Rock

Chalk Grade II

17.9

18.6

N/A

N/A

0.0

32.6

YET

YET

750

1000

Rock

Chalk Grade III

15.8

17.2

N/A

N/A

0.0

31.2

YET

YET

500

750

Rock

Chalk Grade IV

13.7

15.8

N/A

N/A

0.0

29.8

YET

YET

250

500

Rock

Chalk Grade V

11.6

14.4

N/A

N/A

0.0

28.4

YET

YET

125

250

Rock

Chalk Grade VI

9.5

13.0

N/A

N/A

0.0

27.0

YET

YET

125

Gravel

Dense Gravel

18.0

21.0

N/A

N/A

0.0

40.0

30

50

600

600

Gravel

Dense Sand and Gravel

21.0

23.0

N/A

N/A

0.0

40.0

30

50

600

600

Gravel

Medium Dense Gravel

17.0

20.5

N/A

N/A

0.0

37.5

10

30

200

600

Gravel

Medium Dense Sand and Gravel

20.0

22.3

N/A

N/A

0.0

37.5

10

30

200

600

Gravel

Loose Gravel

16.0

20.0

N/A

N/A

0.0

35.0

10

200

Gravel

Loose Sand and Gravel

19.0

21.5

N/A

N/A

0.0

35.0

10

200

Gravel

Very Loose Sand and Gravel

15.0

19.0

N/A

N/A

0.0

30.0

Sand

Compact Sand

21.0

22.5

N/A

N/A

0.0

40.0

30

50

300

300

Sand

Medium Dense Sand

19.5

21.5

N/A

N/A

0.0

37.5

10

30

100

300

Sand

Loose Sand

18.0

20.5

N/A

N/A

0.0

35.0

10

100

Sand

Very Loose Sand

15.0

19.0

N/A

N/A

0.0

30.0

Clay

Very Stiff Clay

21.0

21.0

150.0

300.0

YET

YET

33

67

300

600

Clay

Stiff Clay

19.0

19.0

100.0

150.0

YET

YET

22

33

150

300

Clay

Firm Clay

18.0

18.0

50.0

75.0

YET

YET

11

17

75

150

Clay

Soft Clay and Silt

17.0

17.0

20.0

40.0

YET

YET

75

Clay

Very Soft Clay and Silt

16.0

16.0

0.0

20.0

YET

YET

Silt

Silt

18.0

18.0

N/A

N/A

YET

25.0

YET

YET

Saturated
Bulk Unit
Weight, sat
(kN/m3)

Undrained
Shear
Strength
(Upper
Limit), Su,ul
(kPa)
N/A

YET

Allowable
Bearing
Capacity
(Lower
Limit), BCll,a
(kPa)
10000

Allowable
Bearing
Capacity
(Upper
Limit), BCul,a
(kPa)
10000

Effective
Angle of
Shear
Resistance, '
(Degrees)

SPT
(Lower
Limit), Nll

SPT
(Upper
Limit), Nul

0.0

40.0

YET

Effective
Cohesion, c'
(kPa)

Job No.

Sheet No.

jXXX

Rev.
2

Member/Location

Piles v2015.01.Drg. Ref.


Made by

XX

Date

12/12/2016 Chd.

Silt

Top Soil

17.5

20.5

N/A

N/A

YET

25.0

YET

YET

Silt

River Mud

16.0

19.5

N/A

N/A

Silt

Peat and Organic Soils

12.0

12.0

N/A

N/A

YET

7.5

YET

YET

YET

15.0

YET

YET

Other

Made Ground

15.0

19.0

N/A

Other

User Defined

20.0

20.0

157.5

N/A

0.0

30.0

YET

YET

25

50

180.0

0.0

38.0

35

40

350

400

Job No.

CONSULTING
Engineering Calculation Sheet
ENG
Consulting Engineers
INEERS

Sheet No.

jXXX

Rev.
1

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.


Made by

Structure, Member Design - Geotechnics Piles

XX

Date

12/12/2016 Chd.

Material Properties
Characteristic strength of concrete, fcu ( 60N/mm2; HSC N/A)

40 N/mm2

Yield strength of longitudinal steel, fy

460 N/mm2

Yield strength of shear link steel, fyv

460 N/mm2

Type of concrete and density, c

OK

24 kN/m3

Factor of Safety
Factor of safety (overall base (effective) bearing and shaft (effective) friction), FOS 1 (usually
2.5 to 3.0)
2.0
Factor of safety (base (effective) bearing), FOS2 (usually 3.5)

3.0

Factor of safety (shaft (effective) friction), FOS3 (usually 1.0 to 1.5)

1.5

Loading factor, K (between 1.40 and 1.60 depending on DL to LL ratio)

1.50

BS8110

Note loading factor K multiplies SLS loads for ULS loads for section (reinforcement) design;

cl. 2.4.3.1.1

Soil Description
Water unit weight, w = 9.81kN/m3

9.8 kN/m3

Soil name
Dry bulk unit weight, dry

20.0 kN/m3

Saturated bulk unit weight, sat

20.0 kN/m3

Undrained shear strength, Su(z)

22.5
+
Note that Su can be obtained from SPT (Stroud) or SPT (Fukuoka) values;
Effective cohesion, c'

22.5z kPa
Tomlinson
0.0 kPa

Effective angle of shear resistance, '

38.0 degrees

Note that ' can be obtained from SPT (Peck) or CPT (Durgunoglu and Mitchell) values;
Effective angle of friction on shaft, '
SPT, N(z)
Factor for SPT, N value (base effective bearing), KSPT,b

Tomlinson

25.1 degrees
5

Pile (drilled shaft) in sands with L 10m, Qb' 2900kPa

5.0z
250
57.5L/10

Quiros and Reese

Pile (drilled shaft) in sands with L > 10m, Qb' 2900kPa

57.5

Quiros and Reese

Pile (drilled shaft) in sands with L 10m, Qb' 2900kPa

100

Shioi and Fukui

Pile in undrained cohesive soils

200

Neoh

Pile (driven displacement) in non-plastic silts

38L/D 300

Pile (driven displacement) in sands and gravels

38L/D 380

Pile in drained cohesionless soils


Factor for SPT, N value (shaft effective friction), KSPT,s
Pile in undrained cohesive or drained cohesionless soils

400

Meyerhof
Neoh

2.0
2.0

Neoh

CONSULTING
Engineering Calculation Sheet
ENG
Consulting Engineers
INEERS

Job No.

Sheet No.

jXXX

Rev.
2

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Analysis Method
Undrained, drained or empirical analysis ?
For clays, perform undrained, drained and empirical analyses;
For sands / gravels, perform drained and empirical analyses;
For rocks, perform drained and empirical analyses;
Gross (effective) bearing capacity limit, qflimit(z=L-L0) or qflimit'(z=L-L0)

10166 kPa

Note that the base gross (effective) bearing capacity is limited to values up to 15000kPa

Tomlinson

because Vesic showed that at penetration depths greater than 20 pile diameters, a peak value
of base resistance is reached which is not exceeded at greater penetrations depths;
Note that this limiting value is D- and L- dependent, thus affecting the multi-D multi-L pile
capacity charts which has thus been set to be limited by the automatically calculated value;
qflimit(z=L-L0) or qflimit'(z=L-L0) = Nq,strip.v'(z=20D-L0) 15MPa
10166 kPa
48.9
v'(z=20D-L0) = psurface+dry.(Lc+20D)

. 2.4.3.1.1

v'(z=20D-L0) = psurface+(sat-w).(Lc+20D-zu)+dry.zu
v'(z=20D-L0) = psurface+(sat-w).(Lc+20D)

Shaft adhesion limit or shaft effective stress limit, S alimit(z) or alimit'(z)

Invalid kPa
208 kPa
Invalid kPa

89 kPa

Note that the shaft adhesion or the shaft effective stress is limited to 110kPa because Vesic

Tomlinson

showed that at penetration depths greater than 20 pile diameters, a peak value of skin friction
is reached which is not exceeded at greater penetrations depths;
Note that this limiting value is D- and L- dependent, thus affecting the multi-D multi-L pile

capacity charts which has thus been set to be limited by the automatically calculated value;
Salimit(z) or alimit'(z) = Ks.tan'.v'(z=20D-L0) 110kPa
89 kPa
v'(z=20D-L0) = psurface+dry.(Lc+20D)
os and Reese
Invalid kPa

'(z=20D-L
)
=
p
+(
-
).(L
+20D-z
)+
.z
oi and Fukui
208 kPa
v
0
surface
sat w
c
u
dry
u

os and Reese

v'(z=20D-L0) = psurface+(sat-w).(Lc+20D)

Invalid kPa

Include or exclude base resistance ?


Note that in general, the contribution of base resistance in bored piles should be ignored due

Gue

to difficulty of proper base cleaning, especially in wet hole (with drilling fluid); The contribution

and

of base resistance should only be used if it is constructed in dry hole, if proper inspection of
the base can be carried out or if base grouting is implemented; Furthermore, a relatively larger
base movement is required to mobilise the maximum base resistance as compared to the
displacement needed to fully mobilise shaft resistance; The base displacement of approximately
5% to 10% of the pile diameter is generally required to mobilise the ultimate base resistance

Partners

Job No.

CONSULTING
Engineering Calculation Sheet
ENG
Consulting Engineers
INEERS

Sheet No.

jXXX

Rev.
3

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.


Made by

Structure, Member Design - Geotechnics Piles

XX

Date

12/12/2016 Chd.

Pile Group Dimensions


Width of pile group (pile cap) in x, Bcap

3.000 m

Length of pile group (pile cap) in y, Lcap

3.000 m

Pile Dimensions
Pile section shape
Pile shaft diameter (circular) or width (square), D
Pile shaft cross sectional area, Aps = D2/4 (circular) or D2 (square)
Pile base diameter (circular) or width (square), Db

441786 mm2
750 mm

Pile base cross sectional area, Apb = D /4 (circular) or D (square)


2
b

750 mm

441786 mm

OK
2

OK

Lc
zu

L0
z

Depth of pile cap base from ground level, Lc (>= 0.000m)

2.500 m

OK

Depth of pile z=0 level from pile cap base, L0 (>= 0.000m)

0.000 m

OK

60.000 m
Note that L0 accounts for poor ground near surface level where no contribution of shaft skin

OK

Depth of pile founding level from pile cap base, L (>=L0)

friction capacity is adopted, in fact negative skin friction is considered over L 0 length if requested;
Depth of water table from ground level, zu

3.000 m

Note that the soil beneath the water table has an effective submerged unit weight of about
half of the soil above the water table, thus reducing the drained overall pile effective capacity;
Hence use the highest water table forseeable;
Enter a negative zu value for water table above ground level, this representing a flood event
or a bridge pier within a sea or river with the ground level being the sea or river bed;
However, a water table above ground level may unconservatively decrease the overall pile
(effective) capacity utilisation, thus consider also the case when the water table is at ground level;

Job No.

CONSULTING
Engineering Calculation Sheet
ENG
Consulting Engineers
INEERS

Sheet No.

jXXX

Rev.
4

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.


Made by

Structure, Member Design - Geotechnics Piles

XX

Date

12/12/2016 Chd.

Pile Reinforcement
Pile type

40 N/mm2

Precast Driven Square RC Pile or Insitu Bored Circular RC Pile


Pile compression capacity design method
Cover to all reinforcement, cover4 (usually 75)

75 mm

Longitudinal steel reinforcement diameter, p

32 mm

Longitudinal steel reinforcement number, np

12

Longitudinal steel area provided, As,prov,p = np..p2/4

9651 mm2

Shear link diameter, link,p

10 mm

Number of links in a cross section, i.e. number of legs, n link,p


Area provided by all links in a cross-section, Asv,prov,p = nlink,p..

2
/4

2
link,p

157 mm2

Pitch of links, Sp

150 mm

Estimated steel reinforcement quantity


[ 7850 . As,prov,p / Aps ]; No laps; Links ignored;

171 kg/m3

CONSULTING
Engineering Calculation Sheet
ENG
Consulting Engineers
INEERS

Job No.

Sheet No.

jXXX

Rev.
5

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

CONSULTING
Engineering Calculation Sheet
ENG
Consulting Engineers
INEERS

Job No.

Sheet No.

jXXX

Rev.
6

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Precast (Pretensioned Spun) Driven Circular RC Pile


Effective area of concrete, Aeff
Effective prestress, fpe

33694 mm2
6.3 N/mm2

Job No.

CONSULTING
Engineering Calculation Sheet
ENG
Consulting Engineers
INEERS

Sheet No.

jXXX

Rev.
7

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.


Made by

Structure, Member Design - Geotechnics Piles

XX

Date

12/12/2016 Chd.

Insitu Bored Circular RC Pile (API Micropile)


Yield strength of API pipe, fy,API

552 N/mm2

Outer diameter of API pipe, ODAPI

177.8 mm

Wall thickness of API pipe, tAPI

9.19 mm

Cross sectional area of API pipe, AAPI = .[ODAPI2-(ODAPI-2.tAPI)2]/4

N/A mm2

Cross sectional area of grout, Ac,API = Aps-AAPI

N/A mm2

Elastic modulus of concrete, Ec = 5500.(fcu/1.5)

0.5

28402 N/mm2

Elastic modulus of steel, Es

210000 N/mm

FOSstr =
API PIPE SIZES
Grade N80 ( fy = 80,000 PSI / 552 MPa )
OD (mm)
Thickness (mm)
ID (mm)
114.3

127.0

139.7

168.3

177.8

193.7

219.1

2.0

Qult (kN)

Qall (kN)

7.37

99.56

1,367

683

7.52

111.96

1,558

779

9.19

108.62

1,878

939

11.19

104.62

2,247

1,124

12.7

101.6

2,517

1,259

7.72

124.26

1,767

883

9.17

121.36

2,076

1,038

10.54

118.62

2,361

1,180

8.94

150.42

2,471

1,235

10.59

147.12

2,896

1,448

12.06

144.18

3,268

1,634

8.05

161.7

2,370

1,185

9.19

159.42

2,687

1,344

10.36

157.08

3,008

1,504

11.51

154.78

3,319

1,660

12.65

152.5

3,623

1,811

13.72

150.36

3,904

1,952

9.52

174.66

3,041

1,520

10.92

171.86

3,461

1,731

12.7

168.3

3,986

1,993

14.27

165.16

4,440

2,220

15.86

161.98

4,891

2,446

11.43

196.24

4,116

2,058

12.7

193.7

4,546

2,273

14.15

190.8

5,029

2,515

10.03

224.44

4,078

2,039

11.05

222.4

4,473

2,237

11.89

220.72

4,796

2,398

13.84

216.82

5,536

2,768

11.43

250.14

5,185

2,592

12.57

247.86

5,677

2,838

298.4

12.42

273.56

6,160

3,080

339.7

13.06

313.58

7,398

3,699

244.5

273.0

BS8110
cl. 2.5.3

CONSULTING
Engineering Calculation Sheet
ENG
Consulting Engineers
INEERS

Job No.

Sheet No.

jXXX

Rev.
8

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.


Made by

Structure, Member Design - Geotechnics Piles

XX

Date

12/12/2016 Chd.

Pile SLS Loading (Including Negative Skin Friction)


Surcharge at surface, psurface

0 kPa

Pile SLS vertical load, Fpile,v,n

3000 kN

Pile group (pile cap) SLS vertical load, Fpilecap,v

15000 kN

Note that Fpile,v,n and Fpilecap,v can be positive (downward) or negative (upwards);
Pile SLS vertical (compressive) NSF load, Fpile,v,NSF
Note NSF = negative skin friction; Note F pile,v,NSF

0 kN
= (D or 4D).L0..[v'(z=-L0)+v'(z=0)]/2;

Consideration of NSF ?

Not Considered

NSF reduction factor,

0.30

Meyerhof

Clay
0.20-0.25

Garlanger

Silt
0.25-0.35

Garlanger

Sand
0.35-0.50
Effective vertical stress at z=-L0 level, v'(z=-L0)
Case when (zu Lc) >= MAX (Bcap, Lcap)
v'(z=-L0) = psurface+dry.Lc
Case when 0 < (zu Lc) < MAX (Bcap, Lcap)
v'(z=-L0) = psurface+dry.Lc
Case when (zu Lc) = 0
v'(z=-L0) = psurface+dry.Lc
Case when (zu Lc) < 0 and zu >= 0
v'(z=-L0) = psurface+(sat-w).(Lc-zu)+dry.zu
Case when zu < 0

50 kPa
Invalid
N/A kPa
Valid
50 kPa
Invalid
N/A kPa
Invalid
N/A kPa
Invalid

v'(z=-L0) = psurface+sat.Lc+w.(-zu)-w.(Lc+(-zu))

N/A kPa
Note that the above equation reduces to v'(z=-L0) = psurface+(sat-w).Lc;
Effective vertical stress at z=0 level, v'(z=0)
Case when (zu Lc L0) >= MAX (Bcap, Lcap)
v'(z=0) = psurface+dry.(Lc+L0)
Case when 0 < (zu Lc L0) < MAX (Bcap, Lcap)
v'(z=0) = psurface+dry.(Lc+L0)
Case when (zu Lc L0) = 0
v'(z=0) = psurface+dry.(Lc+L0)
Case when (zu Lc L0) < 0 and zu >= 0
v'(z=0) = psurface+(sat-w).(Lc+L0-zu)+dry.zu
Case when zu < 0

50 kPa
Invalid
N/A kPa
Valid
50 kPa
Invalid
N/A kPa
Invalid
N/A kPa
Invalid

v'(z=0) = psurface+sat.(Lc+L0)+w.(-zu)-w.(Lc+L0+(-zu))

N/A kPa
Note that the above equation reduces to v'(z=0) = psurface+(sat-w).(Lc+L0);
Total pile SLS vertical (compressive) load (per pile), Fpile,v,comp

3000 kN

Note Fpile,v,comp = MAX(0, Fpile,v,n)+Fpile,v,NSF;


Total pile SLS vertical (tensile) load (per pile), Fpile,v,tens
Note Fpile,v,tens = ABS(MIN(0, Fpile,v,n));

0 kN

Garlanger

Job No.

CONSULTING
Engineering Calculation Sheet
ENG
Consulting Engineers
INEERS

Sheet No.

jXXX

Rev.
9

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.


Made by

Structure, Member Design - Geotechnics Piles

XX

Date

12/12/2016 Chd.

Executive Summary
Undrained overall pile capacity

N/A

N/A

Drained overall pile effective capacity

N/A

N/A

Empirical overall pile effective capacity

89%

OK

Pile axial compression capacity

68%

OK

Pile axial tension capacity

0%

Pile detailing requirements

OK
OK

Undrained overall pile group capacity

N/A

N/A

Drained overall pile group capacity

N/A

N/A

Empirical overall pile group capacity

N/A

N/A

Overall utilisation summary

89%

% Vertical reinforcement in pile

2.18

Estimated pile steel reinforcement quantity

171

kg/m3

3500

units/tonne

900

units/m3

[Note that steel quantity in kg/m can be obtained from 78.5 x % rebar];
3

Material cost:

concrete, c

300

units/m3

Reinforced concrete material cost = c+(est. rebar quant).s

steel, s

CONSULTING
Engineering Calculation Sheet
ENG
Consulting Engineers
INEERS

Job No.

Sheet No.

jXXX

Rev.

10

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Undrained Overall Pile Capacity


Undrained shear strength at z=0 level, Su(z=0)

N/A kPa

Undrained shear strength at z=L-L0 level, Su(z=L-L0)

N/A kPa

Base bearing capacity, Qb = (Db2/4 or Db2).qf(z=L-L0)

N/A kN

Gross bearing capacity, qf(z=L-L0) = Nc.Su(z=L-L0) (<=qflimit(z=L-L0))


Note gross bearing capacity set to 0.0kPa if base resistance excluded;
Bearing capacity factor, Nc = 9.0
Shaft friction capacity, Qs = (D or 4D).(L-L0).Sa
Average shaft adhesion, Sa = [Sa(z=0)+Sa(z=L-L0)]/2
Sa(z=0) = F.(z=0).Su(z=0) (<=Salimit(z))

N/A kPa
N/A

Terzaghi
Meyerhof

N/A kN
N/A kPa
N/A kPa

Sa(z=L-L0) = F.(z=L-L0).Su(z=L-L0) (<=Salimit(z))

N/A kPa
Note that Sa(z=0) is the shaft adhesion at z=0 level and S a(z=L-L0)
is the shaft adhesion at z=L-L0 level;
Shaft adhesion factor, (z=0)

0.80

McClelland, Nordlund

Shaft adhesion factor, (z=L-L0)

0.80

McClelland, Nordlund

Shaft adhesion length factor, F = function (L/D)

1.00

Note that is 0.30 (under-reamed base piles);


Note that is 0.30-0.60 (stiff over-consolidated clays);

Tomlinson
Whitaker and Cooke

Note that is 0.30 (heavily fissured clay);


Note that is 0.45 (very stiff clays, Su >= 150kPa);

Tomlinson

Note that is 0.45-0.60 (firm to stiff clays, eg. London Clay);

Tomlinson

Neoh

Note that is 0.45 (bored piles), 0.80 (driven piles);

Sutton

Note that is 0.50 (firm to stiff clays, Su >= 70kPa);

API

Note that is 1-[(Su-25)/90] (soft to firm clays, 25kPa < Su < 70kPa);

API

Note that is 0.80-1.00 (soft Malaysian Clay);


Note that is 1.00 (very soft clays, Su <= 25kPa);

Gue and Partners


Neoh, API

CONSULTING
Engineering Calculation Sheet
ENG
Consulting Engineers
INEERS

Job No.

Sheet No.

jXXX

Rev.

11

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Compressiv

Compressive and Tensil

Compressiv

Compressiv

land, Nordlund

land, Nordlund

ker and Cooke

and Partners

Note that B in the term L/B above is D;

CONSULTING
Engineering Calculation Sheet
ENG
Consulting Engineers
INEERS

Job No.

Sheet No.

jXXX

Rev.

12

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Pile weight minus soil weight removed, Fpile = Aps.L.(c-dry)

N/A kN
Note under-reamed base dimensions ignored in calculation of F pile as deemed negligible;
Note conservatively, dry bulk unit weight assumed for density of displaced soil;
Combined base bearing and shaft friction capacity, Pf = Qb + Qs

N/A kN

Base and Shaft Capacity Factored Individually


Compressive Undrained pile base capacity (factored), Qb / FOS2

N/A kN
mpressive and Tensile Undrained pile shaft capacity (factored), Qs / FOS3
N/A kN
Compressive Undrained pile base and shaft capacity (factored), Qb / FOS2 + Qs / FOS3 N/A kN
Base and Shaft Capacity Factored Together
Compressive Undrained pile base and shaft capacity (factored), Pf / FOS1

N/A kN

Tensile Undrained pile base and shaft capacity (factored), Qs / FOS1

N/A kN

Undrained overall pile capacity for vertical (compressive) load, MIN (Qb / FOS2 + Qs /N/A
FOSkN
, Pf / FOS1) - Fpile
3
Undrained overall pile capacity for vertical (tensile) load, MIN (Qs / FOS3, Qs / FOS1) N/A kN

Undrained overall pile capacity utilisation = MAX (Fpile,v,comp / (MIN (Qb / FOS2 + Qs / FOS
, Pf / FOS1) - FpileN/A
), Fpile,v,tens / MIN (
N/A
3

CONSULTING
Engineering Calculation Sheet
ENG
Consulting Engineers
INEERS

Job No.

Sheet No.

jXXX

Rev.

13

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Undrained Overall Pile


(Compressive) Capacity Chart

Undrained Overall Pile (Compressive) Capacity, MIN (Qb / FOS2 + Qs / FOS3, Pf / FOS1) - Fpile (kN)

CONSULTING
Engineering Calculation Sheet
ENG
Consulting Engineers
INEERS

Job No.

Sheet No.

jXXX

Rev.

14

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.


Made by

Structure, Member Design - Geotechnics Piles

XX

Date

12/12/2016 Chd.

Drained Overall Pile Effective Capacity

Lc
zu

L0
z

Effective vertical stress at pile top z=0 level, v'(z=0)


Case when (zu Lc L0) >= 0
v'(z=0) = psurface+dry.(Lc+L0)
Case when (zu Lc L0) < 0 and zu >= 0
v'(z=0) = psurface+(sat-w).(Lc+L0-zu)+dry.zu
Case when zu < 0

N/A kPa
N/A
N/A kPa
N/A
N/A kPa
N/A

v'(z=0) = psurface+sat.(Lc+L0)+w.(-zu)-w.(Lc+L0+(-zu))

N/A kPa
Note that the above equation reduces to v'(z=0) = psurface+(sat-w).(Lc+L0);
Effective vertical stress at water table z=zu-Lc-L0 level, v'(z=zu-Lc-L0)
Case when zu >= 0
v'(z=zu-Lc-L0) = psurface+dry.zu
Case when zu < 0
v'(z=zu-Lc-L0) = 0
Effective vertical stress at critical depth z=20D-L0 level, v'(z=20D-L0)
Case when (zu Lc 20D) >= 0
v'(z=20D-L0) = psurface+dry.(Lc+20D)
Case when (zu Lc 20D) < 0 and zu >= 0
v'(z=20D-L0) = psurface+(sat-w).(Lc+20D-zu)+dry.zu

N/A kPa
N/A
N/A kPa
N/A
N/A kPa
N/A kPa
N/A
N/A kPa
N/A
N/A kPa

Case when zu < 0

N/A
v'(z=20D-L0) = psurface+sat.(Lc+20D)+w.(-zu)-w.(Lc+20D+(-zu))N/A kPa
Note that the above equation reduces to v'(z=20D-L0) = psurface+(sat-w).(Lc+20D);

Effective vertical stress at pile base z=L-L0 level, v'(z=L-L0)


Unit weight, '
Case when (zu Lc L) >= MAX (Bcap, Lcap)

N/A kPa
N/A kN/m3
N/A

v'(z=L-L0) = psurface+dry.(Lc+L)

N/A kPa

' = dry

N/A kN/m3

Case when 0 < (zu Lc L) < MAX (Bcap, Lcap)

N/A

v'(z=L-L0) = psurface+dry.(Lc+L)

N/A kPa

' = zu/MAX(Bcap, Lcap) . [dry - (sat - w)] + (sat - w)

N/A kN/m3

Case when (zu Lc L) = 0

N/A

v'(z=L-L0) = psurface+dry.(Lc+L)

N/A kPa

' = sat - w

N/A kN/m3

Case when (zu Lc L) < 0 and zu >= 0

N/A

v'(z=L-L0) = psurface+(sat-w).(Lc+L-zu)+dry.zu

N/A kPa

' = sat - w

N/A kN/m3

Case when zu < 0


v'(z=L-L0) = psurface+sat.(Lc+L)+w.(-zu)-w.(Lc+L+(-zu))

N/A
N/A kPa

CONSULTING
Engineering Calculation Sheet
ENG
Consulting Engineers
INEERS

Job No.

Sheet No.

jXXX

Rev.

15

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Base effective bearing capacity, Qb' = (Db2/4 or Db2).qf'(z=L-L0)


Gross effective bearing capacity, qf'(z=L-L0) (<=qflimit'(z=L-L0))

Date

12/12/2016 Chd.

N/A kN
N/A kPa

= sc.dc.Nc,strip.c'
+ sq.dq.Nq,strip.v'(z=L-L0)

N/A kPa

+ s.d.N,strip.Db/2.'

N/A kPa

N/A kPa

Note gross effective bearing capacity set to 0.0kPa if base resistance excluded;
Note for piles bored in rock, sc.dc = 1.2, sq.dq = 1.0 and s.d = 0.7;
Note for piles bored in rock, qf' = 0.3quc, where
qf' for weak rock
qf' for medium rock
qf' for strong fresh rock

Terzaghi

Gue and Partners


Neoh

1500 kPa

Neoh

2400-7300 kPa

Neoh

10000 kPa

Neoh

Note typically for driven piles, Nq = 20 (loose sand) to 100 (very dense sand),

Neoh

and for bored piles Nq = 12 (loose sand) to 40 (very dense sand);


Equations for bearing capacity factors
Cohesion Factors
Shape factor,

N/A

EC7

Depth factor,
N/A
Note D and B in the above equation are Lc+L and Db, respectively;
Bearing capacity factor, Nc,strip
Soils Nc,strip = (Nq,strip-1).cot'
Rocks Nc,strip

N/A
N/A

EC7 (Prandtl)

N/A

Kulhawy and Goodman

Surcharge Factors
Shape factor,
N/A
Note B' and L' in the above equation are D b and Db, respectively;
Depth factor, dq

EC7

N/A

Note D and B' in the above equation are Lc+L and Db, respectively;
Bearing capacity factor, Nq,strip
Soils
Rocks Nq,strip

N/A
N/A

EC7 (Reissner)

N/A

Kulhawy and Goodman

N/A

EC7

Self Weight Factors


Shape factor,

CONSULTING
Engineering Calculation Sheet
ENG
Consulting Engineers
INEERS

Job No.

Sheet No.

jXXX

Rev.

16

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

Shaft effective friction capacity, Qs' = (D or 4D).L.a')


Equation for shaft effective stress
Soils / Rocks a'(z=0) = Ks.tan'.v'(z=0) (<=alimit'(z))

and Partners

7 (Prandtl)

y and Goodman

7 (Reissner)

y and Goodman

XX

Date

12/12/2016 Chd.

N/A kN
N/A kPa

a'(z=zu-Lc-L0) = Ks.tan'.v'(z=zu-Lc-L0) (<=alimit'(z))

N/A kPa

a'(z=20D-L0) = Ks.tan'.v'(z=20D-L0) (<=alimit'(z))

N/A kPa

a'(z=zu-Lc-L0) = Ks.tan'.v'(z=zu-Lc-L0) (<=alimit'(z))

N/A kPa

a'(z=L-L0) = Ks.tan'.v'(z=L-L0) (<=alimit'(z))

N/A kPa
Note that a'(z=0) is the shaft effective stress at z=0 level and a'(z=L-L0)
is the shaft effective stress at z=L-L 0 level;
Note a' = h'.tan' = Ksv'.tan';
Note effective cohesion, c' ignored due to disturbed soil adjacent to pile foundation;
Ks.tan'
0.43
0.5
0.5
K
.tan'
=
k
.K
.(OCR)
.tan'
=
k
.(1-sin').(OCR)
.tan'
Calculated s
0.22
Burland, Meyerhof
Ks
0
Ks
Coefficient of horizontal soil stress, kKs
1.25
Tomlinson

Overconsolidation ratio, OCR


Effective angle, ' for sandy gravel
Effective angle, ' for sand
Effective angle, ' for silts and clays
Effective angle, ' for bored pile

1.0
40.0 degrees

Neoh

32.0 degrees

Neoh

21.0-31.0 degrees

Neoh

residual angle degrees

Neoh

Manual Ks.tan'

0.43
Ks.tan
' = 0.10-0.35
Pile bored in very loose to dense sands
(Mey
K
.tan
' = 0.15-0.30
Pile bored in loose sands (Davies ands Chan)
Ks.tan
' = 0.25-0.60
Pile bored in dense sands (Davies and
Chan)
K
.tan' = 0.45
Pile CFA in chalk
s

Gue and Partners

Pile CFA in chalk with N >= 10, quc >= 4MPa


Ks.tan' = 0.80

CIRIA86

Pile bored or driven cast-in-place in chalkKs.tan' = 0.80


Ks.tan(Me
' = 0.44-1.20
Pile driven in very loose to dense sands
Rocks a'(z=0) = quc (<=alimit'(z))
N/A kPa
a'(z=L-L0) = quc (<=alimit'(z))

Neoh, Meyerhof
Gue and Partners
CIRIA574
CIRIA574
Neoh, Meyerhof
Gue and Partners

N/A kPa
Gue and Partners
Note that a'(z=0) is the shaft effective stress at z=0 level and a'(z=L-L0)
is the shaft effective stress at z=L-L 0 level;
Reduction factor,

0.30

Correlation factor,
Unconfined uniaxial compressive strength, quc

1500 kPa

0.25

CONSULTING
Engineering Calculation Sheet
ENG
Consulting Engineers
INEERS

Job No.

Sheet No.

jXXX

Rev.

17

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

and, Meyerhof

oh, Meyerhof
and Partners
and Partners

oh, Meyerhof
and Partners
and Partners

Made by

XX

Date

12/12/2016 Chd.

CONSULTING
Engineering Calculation Sheet
ENG
Consulting Engineers
INEERS

Job No.

Sheet No.

jXXX

Rev.

18

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Compressiv

Compressive and Tensil

Compressiv

Compressiv

CONSULTING
Engineering Calculation Sheet
ENG
Consulting Engineers
INEERS

Job No.

Sheet No.

jXXX

Rev.

19

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Pile weight minus soil weight removed, Fpile = Aps.L.(c-dry)


Note under-reamed base dimensions ignored in calculation of F pile

Made by

XX

Date

12/12/2016 Chd.

N/A kN
as deemed negligible;

Note conservatively, dry bulk unit weight assumed for density of displaced soil;
Combined base effective bearing and shaft effective friction capacity, P f' = Qb' + Qs' N/A kN

Base and Shaft Effective Capacity Factored Individually


Compressive Drained pile base effective capacity (factored), Qb' / FOS2
mpressive and Tensile Drained pile shaft effective capacity (factored), Qs' / FOS3

N/A kN

N/A kN
/ FOS
Compressive Drained pile base and shaft effective capacity (factored), Qb' / FOS2 + Qs' N/A
kN
3
Base and Shaft Effective Capacity Factored Together
Compressive Drained pile base and shaft effective capacity (factored), Pf' / FOS1

N/A kN

CONSULTING
Engineering Calculation Sheet
ENG
Consulting Engineers
INEERS

Job No.

Sheet No.

jXXX

Rev.

20

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Drained Overall Pile Effective (Compressive) Capacity Chart

Compressiv

Empirical Overall Pile Effective (Compressive) Capacity, MIN (Qb' / FOS2 + Qs'/ FOS3, Pf' / FOS1) - Fpile (kN)

Compressive and Tensil

Compressiv

Compressiv

CONSULTING
Engineering Calculation Sheet
ENG
Consulting Engineers
INEERS

Job No.

Sheet No.

jXXX

Rev.

21

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Empirical Overall Pile Effective Capacity


SPT at z=0 level, N(z=0)
SPT at z=L-L0 level, N(z=L-L0)

5
305

Base effective bearing capacity, Qb' = (Db2/4 or Db2).qf'(z=L-L0)

0 kN
Gross effective bearing capacity, qf'(z=L-L0)=KSPT,b.N(z=L-L0) (<=qflimit'(z=L-L00
))kPa
Note gross effective bearing capacity set to 0.0kPa if base resistance excluded;

Shaft effective friction capacity, Qs' = (D or 4D).(L-L0).a'

6985 kN

Average shaft effective stress, a' = [a'(z=0)+a'(z=L-L0)]/2

49 kPa

a'(z=0) = KSPT,s.N(z=0) (<=alimit'(z))

10 kPa

a'(z=L-L0) = KSPT,s.N(z=L-L0) (<=alimit'(z))

89 kPa
Note that a'(z=0) is the shaft effective stress at z=0 level and a'(z=L-L0)
is the shaft effective stress at z=L-L 0 level;

Pile weight minus soil weight removed, Fpile = Aps.L.(c-dry)


Note under-reamed base dimensions ignored in calculation of F pile

106 kN
as deemed negligible;

Note conservatively, dry bulk unit weight assumed for density of displaced soil;
Combined base effective bearing and shaft effective friction capacity, P f' = Qb' + Qs' 6985 kN

Base and Shaft Effective Capacity Factored Individually


Compressive Empirical pile base effective capacity (factored), Qb' / FOS2
mpressive and Tensile Empirical pile shaft effective capacity (factored), Qs' / FOS3

0 kN

4657 kN
' / FOS
Compressive Empirical pile base and shaft effective capacity (factored), Qb' / FOS2 + Q
4657
kN3
s
Base and Shaft Effective Capacity Factored Together
Compressive Empirical pile base and shaft effective capacity (factored), Pf' / FOS1
Tensile Empirical pile base and shaft effective capacity (factored), Qs' / FOS1

3492 kN
3492 kN

Empirical overall pile effective capacity for vertical (compressive) load, MIN (Q b' / FOS
+ kN
Qs' / FOS3, Pf' / FOS1) - Fpile
3386
2
Empirical overall pile effective capacity for vertical (tensile) load, MIN (Qs' / FOS3, Q3492
'
/
FOS
)
kN
s
1

Empirical overall pile effective capacity utilisation = MAX (Fpile,v,comp / (MIN (Qb' / FOS289%
+ Qs' / FOS3, Pf' / FOS
OK1) - Fpile), Fpile,v,t

CONSULTING
Engineering Calculation Sheet
ENG
Consulting Engineers
INEERS

Job No.

Sheet No.

jXXX

Rev.

22

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Empirical Overall Pile Effective (Compressive) Capacity Chart

Empirical Overall Pile Effective (Compressive) Capacity, MIN (Qb' / FOS2 + Qs'/ FOS3, Pf' / FOS1) - Fpile (kN)

CONSULTING
Engineering Calculation Sheet
ENG
Consulting Engineers
INEERS

Job No.

Sheet No.

jXXX

Rev.

23

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Pile Reinforcement Design


Precast Driven Square RC Pile or Insitu Bored Circular RC Pile
Pile Longitudinal Reinforcement Design
Percentage of reinforcement As,prov,p/Aps x 100%
Axial compression capacity, Ncap,pile,comp

2.18 %
4418 kN

SLS Design Ncap,pile,comp = 0.25fcu.Aps


4418 kN
ULS Design Ncap,pile,comp = 0.35fcu.Aps + (0.67fy-0.35fcu).As,prov,p
N/A kN
Note alternatively, SLS design including steel reinforcement can be estimated by N cap,pile,comp

Gue and Partners


BS8004

= 0.275fcu.Aps + 0.55fy.As,prov,p with 0.55fy limited to 175N/mm2;


Total pile vertical (compressive) load (per pile), Fpile,v,comp,(uls)
SLS Design Fpile,v,comp
ULS Design Fpile,v,comp,uls

3000 kN
3000 kN
N/A kN

Axial compression capacity utilisation = Fpile,v,comp,(uls)/Ncap,pile,comp

68%

Axial tension capacity, Ncap,pile,tens

2442 kN

SLS Design Ncap,pile,tens = 0.55fy.As,prov,p


ULS Design Ncap,pile,tens = 0.95fy.As,prov,p

2442 kN
N/A kN

Total pile vertical (tensile) load (per pile), Fpile,v,tens,(uls)

0 kN

SLS Design Fpile,v,tens


ULS Design Fpile,v,tens,uls
Axial tension capacity utilisation = Fpile,v,tens,(uls)/Ncap,pile,tens

OK

0 kN
N/A kN
0%

OK

Pile Shear Reinforcement Design


Note that pile shear design to be performed as per column design;
Pile Detailing Requirements
All detailing requirements met ?

OK

Min longitudinal steel reinforcement number, np (>=6 circular; >=4 square)

12

OK

Min longitudinal steel reinforcement diameter, p (>=12mm)

32 mm

OK

2.18 %
Longitudinal steel reinforcement pitch (>=75mm+p but >=100mm+p for T40; <=300mm)
143 mm
Circular pile bar pitch = .(D-2.cover4-2.link,p-p)/np
143 mm

OK

Percentage of reinforcement As,prov,p/Aps x 100% (>0.4% and <5.0%)

Square pile bar pitch = 4.(D-2.cover4-2.link,p-p)/np


Min link diameter, link,p (>=0.25p; >=8mm)
Max link pitch, Sp (<=12p, <=300mm, <=D)
Require an overall enclosing link.

OK

N/A mm
10 mm

OK

150 mm

OK

CONSULTING
Engineering Calculation Sheet
ENG
Consulting Engineers
INEERS

Job No.

Sheet No.

jXXX

Rev.

24

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Precast (Pretensioned Spun) Driven Circular RC Pile


SLS axial compression capacity, Ncap,pile,comp = 0.25.(fcu-fpe).Aeff

N/A kN

SLS total pile vertical (compressive) load (per pile), Fpile,v,comp

N/A kN

Axial compression capacity utilisation = Fpile,v,comp/Ncap,pile,comp

N/A

N/A

Insitu Bored Circular RC Pile (API Micropile)


and Partners
SLS axial compression capacity, Ncap,pile,comp

N/A kN

Reinforcement only Ncap,pile,comp = fy,API.AAPI/2.0


N/A kN
Composite section (strain compatibility) Ncap,pile,comp = 0.5fy,API.(AAPI+Ac,API.Ec/Es)/2.0N/A kN
Concrete filled CHS Ncap,pile,comp = (0.91fy,API.AAPI+0.45fcu.Ac,API)/2.0
N/A kN
SLS total pile vertical (compressive) load (per pile), Fpile,v,comp

N/A kN

Axial compression capacity utilisation = Fpile,v,comp/Ncap,pile,comp

N/A

BS8004 cl. 7.4.6.3.1


BS5400 cl. 11.3.7
N/A

CONSULTING
Engineering Calculation Sheet
ENG
Consulting Engineers
INEERS

Job No.

Sheet No.

jXXX

Rev.

25

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Accounting for Tolerance in Pile Installation

4 cl. 7.4.6.3.1

400 cl. 11.3.7

Moment induced at head due to out-of-position, M = 0.075F pile,v,comp,uls


Lateral force induced at head due to out-of-vertical, H = F pile,v,comp,uls/75

338 kNm
60 kN

CONSULTING
Engineering Calculation Sheet
ENG
Consulting Engineers
INEERS

Job No.

Sheet No.

jXXX

Rev.

26

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Group Pile Design


Undrained Analysis
Consideration of NSF ?
Total pile group SLS vertical (compressive) NSF load, Fpilegroup,v,NSF

N/A
N/A kN

Tomlinson

Pile group capacity,


N/A kN
Note D, B, L, s and sb in the above equation are L-L0, Bcap, Lcap, Sa, Su(z=L-L0)

Tomlinson

Note NSF = negative skin friction; Note F pilegroup,v,NSF = Bcap.Lcap.dry or sat.L0;

and D, respectively;
Undrained overall pile group capacity for vertical (compressive) load, Qu /N/A
FOS1kN
Undrained overall pile group capacity utilisation
Note utilisation is (Fpilecap,v + Fpilegroup,v,NSF) / (Qu / FOS1);

N/A

N/A

CONSULTING
Engineering Calculation Sheet
ENG
Consulting Engineers
INEERS

Job No.

Sheet No.

jXXX

Rev.

27

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Drained Analysis
Note there is no risk of drained overall pile group failure if FOS of individual piles
are adequate;
Empirical Analysis
Note perform undrained or drained analysis;

Gue and Partners

CONSULTING
Engineering Calculation Sheet
ENG
Consulting Engineers
INEERS

Job No.

Sheet No.

jXXX

Rev.

28

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles


Scheme Design (Cohesive Soils)

and Partners

Made by

XX

Date

12/12/2016 Chd.

CONSULTING
Engineering Calculation Sheet
ENG
Consulting Engineers
INEERS

Job No.

Sheet No.

jXXX

Rev.

29

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

CONSULTING
Engineering Calculation Sheet
ENG
Consulting Engineers
INEERS

Job No.

Sheet No.

jXXX

Rev.

30

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles


Scheme Design (Non Cohesive Soils)

Made by

XX

Date

12/12/2016 Chd.

CONSULTING
Engineering Calculation Sheet
ENG
Consulting Engineers
INEERS

Job No.

Sheet No.

jXXX

Rev.

31

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

provided that the base is properly cleaned and checked;

Pile ULS Loading (Including Negative Skin Friction)


Total pile ULS vertical (compressive) load (per pile), Fpile,v,comp,uls = K.Fpile,v,comp
Total pile ULS vertical (tensile) load (per pile), Fpile,v,tens,uls = K.Fpile,v,tens

4500 kN
0 kN

Undrained Overall Pile


(Compressive) Capacity Chart

Undrained Overall Pile (Compressive) Capacity, MIN (Qb / FOS2 + Qs / FOS3, Pf / FOS1) - Fpile (kN)

Length of Pile, L (m)

D = Db = 300mm

D = Db = 450mm

D = Db = 600mm

D = Db = 750mm

D = Db = 900mm

D = Db = 1050mm

D = Db = 1200mm

D = Db = 1350mm

D = Db = 1500mm

D = Db = 1650mm

D = Db = 1800mm

D = Db = 1950mm

D = Db = 2100mm

Note that the above equation reduces to v'(z=L-L0) = psurface+(sat-w).(Lc+L);


' = sat - w

N/A kN/m3

Note B' and L' in the above equation are D b and Db, respectively;
Depth factor,
Bearing capacity factor, N,strip
Soils N,strip = 2.0(Nq,strip-1).tan'
Rocks N,strip

N/A
N/A
N/A

EC7 (Hansen)

N/A

Kulhawy and Goodman

7 (Hansen)

y and Goodman

Note typically a' = 0.05quc, where

a' for weak rock


a' for medium rock
a' for strong rock

Neoh
100-140 kPa

Neoh

700-1000 kPa

Neoh

1000-1400 kPa

Neoh

Tensile Drained pile base and shaft effective capacity (factored), Qs' / FOS1

N/A kN

Drained overall pile effective capacity for vertical (compressive) load, MIN (Qb' / FOSN/A
+ QkN
' / FOS3, Pf' / FOS1) - Fpile
2
s
Drained overall pile effective capacity for vertical (tensile) load, MIN (Qs' / FOS3, Qs' /N/A
FOSkN
)
1

Drained overall pile effective capacity utilisation = MAX (Fpile,v,comp / (MIN (Qb' / FOS2 +N/A
Qs' / FOS3, Pf' / FOS
) - Fpile), Fpile,v,ten
N/A
1

Drained Overall Pile Effective (Compressive) Capacity Chart

Empirical Overall Pile Effective (Compressive) Capacity, MIN (Qb' / FOS2 + Qs'/ FOS3, Pf' / FOS1) - Fpile (kN)

Length of Pile, L (m)

D = Db = 300mm

D = Db = 450mm

D = Db = 600mm

D = Db = 750mm

D = Db = 900mm

D = Db = 1050mm

D = Db = 1200mm

D = Db = 1350mm

D = Db = 1500mm

D = Db = 1650mm

D = Db = 1800mm

D = Db = 1950mm

D = Db = 2100mm

Empirical Overall Pile Effective (Compressive) Capacity Chart

Empirical Overall Pile Effective (Compressive) Capacity, MIN (Qb' / FOS2 + Qs'/ FOS3, Pf' / FOS1) - Fpile (kN)

Length of Pile, L (m)

D = Db = 300mm

D = Db = 450mm

D = Db = 600mm

D = Db = 750mm

D = Db = 900mm

D = Db = 1050mm

D = Db = 1200mm

D = Db = 1350mm

D = Db = 1500mm

D = Db = 1650mm

D = Db = 1800mm

D = Db = 1950mm

D = Db = 2100mm

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.
1

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Negative Skin Friction (NSF) in Recently Laid Fill Layer And / Or Compressible Soil Stratum
Negative skin friction is a phenomenon that reduces the length of available shaft
skin friction resistance and adds an additional negative skin friction force due
to the consolidation of recently laid fill layers and / or compressible soil stratum
under their own weight or due to surcharge or ground heave;

The effects of negative skin friction need only be considered if base resistance is relied
upon within the pile design, for if it is not and the resistance of the piles is merely by
shaft skin friction, then as the piles settle with the consolidating soil, there is no NSF
effects. These are known as floating piles. It is only when the resistance of the base
is significant that the soil settles more than the piles causing inevitable downdrag forces
on the pile shaft in NSF;
Negative skin friction can be dealt with by:1 avoiding construction on recently laid fill layers and / or compressible soil stratum;
2 sleeving or slip coating pile shaft over recently laid fill layers and / or compressible
soil stratum;
3 reserving additional pile capacity for NSF;
4 carry out surcharging prior to piling and avoid free filling after piling;

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.
2

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles


Design of Piles with Lateral Loadings

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.
3

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.
4

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.
5

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.
6

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.
7

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.
8

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.
9

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

10

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

11

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles


Group Pile Design

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

12

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles


Pile Selection and Installation Method

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

13

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Diameter (m

Capacity (kN

Job No.

Ove Arup and Partners


Consulting Engineers

Sheet No.

jXXX

Rev.

14

Member/Location

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Job Title

Made by

Structure, Member Design - Geotechnics Piles

Driven
Bakau Pile

Driven
Treated
Timber
Square Pile

Driven
Prestressed Driven Steel
Concrete
H Pile
Spun Pile

Diesel Drop Diesel Drop Diesel Drop Diesel Drop


Hammer,
Hammer,
Hammer,
Hammer,
Jacked-In
Jacked-In
Jacked-In
Jacked-In

Method

Diameter (mm) 70 - 100

125 - 150

Length (m)
Joints

Driven
Reinforced
Concrete
Square Pile

Toothed PlateToothed Plate

Grade (MPa)
Capacity (kN)

Timber

5 - 10

Timber

100 - 200

XX

Bored
Micropile

Date

12/12/2016 Chd.

Bored CFA
Pile

Bored Pile

Hydraulic
Hammer,
Jacked-In

Drill (No
Casing or
Bentonite)
and Cast
Insitu

Drill (With
Drill (No
Casing and
Casing or
Bentonite
Bentonite)
Below Water
and Cast
Table) and
Insitu
Cast Insitu

200 - 400

100 - 350

300 - 900

450 - 2000

150 - 400

250 - 1000

3, 6, 9, 12

6, 9, 12

6, 12

Varies

to 25

Varies

Welded

Welded

Welded

None

None

None

Concrete

Concrete

Steel

Concrete

Concrete

Concrete

40

60, 80

250, 410

25, 35

20, 30

20, 30

250 - 1850

450 - 5200 400 - 10000 200 - 2500

800 - 7000 800 - 23000

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

15

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

16

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

17

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles


Pile Installation Stresses

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

18

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

19

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles


Pile Driving Acoustic Considerations

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

20

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

21

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

Pile Durability Considerations


Ground is considered as aggressive if either:1 pH < 4.5;
2 sulphide content > 100ppm;
3 chloride content > 200ppm;
Note corrosion rate of steel piles in undisturbed soils normally negligible;
Requirements for concrete piles in aggressive ground are:1 cement content > 380kg/m3;
2 water / cement ratio < 0.5;
3 rebar covers > 50mm;
4 concrete grade > 50MPa;

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.
1

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles


Standard Pile Foundation Details

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.
2

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.
3

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.
4

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.
5

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.
6

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.
7

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.
8

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.
9

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

10

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

11

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

12

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

13

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

14

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

15

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

16

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

17

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

18

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

19

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

20

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

21

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

22

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

23

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

24

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

25

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

26

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

Standard Pile Foundation (Cordek Corbreak) Trimming Details

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

27

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

28

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

29

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

30

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

31

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

32

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

33

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

34

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

35

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

36

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

37

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

38

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

39

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

40

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

41

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

42

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

43

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

44

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

45

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

46

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

47

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

48

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

49

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

50

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

51

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles


Piling Problems

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

52

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

53

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

54

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

55

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

56

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

57

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

58

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

59

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

60

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

61

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

62

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

63

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

64

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

65

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

66

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

67

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

68

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

69

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

70

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

71

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

72

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

73

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

74

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

Ove Arup and Partners


Consulting Engineers

Job No.

Sheet No.

jXXX

Rev.

75

Member/Location

Job Title

Structure, Member Design - Geotechnics Piles v2015.01.Drg. Ref.

Structure, Member Design - Geotechnics Piles

Made by

XX

Date

12/12/2016 Chd.

You might also like