Generation and Reservoirs Statistics

November 13, 2016

PUBLIC UTILITIES COMMISSION OF SRI LANKA

Daily Generation Mix in MWh


87
0%
5,416
18%

8,736
29%

CEB Hydro

CEB Thermal Oil


CEB Coal
9,250
30%

IPP Thermal
6,990
23%

Total Generation
30,479 MWh
Note: Generation from other SPPs (Mini Hydro, Solar and Biomass) is not included

Cumulative Dispatch -January 1 to November 13, 2016


For Current Month
Category
CEB Hydro
CEB Thermal Oil
CEB Coal
IPP Thermal
SPP Wind
Total

Dispatch (MWh)
108,425.0
114,390.0
150,550.0
80,990.0
1,909.1
456,264.1

23.76%
25.07%
33.00%
17.75%
0.42%

Dispatch (GWh)
3,160
1,931
4,459
1,774
922
12,245

25.81%
15.77%
36.41%
14.48%
7.53%

For Current Year


Category
CEB Hydro
CEB Thermal Oil
CEB Coal
IPP Thermal
Renewable
Total

SPP Wind

Wimalasurendra
Old Laxapana
Canyon
New Laxapana
Polpitiya
Kotmale
Victoria
Randenigala
Rantambe
Ukuwela
Bowatenna
Upper Kotmale
Samanalawewa
Kukule
Inginiyagala
Udawalawe
Nilambe
Puttalam Coal I
Puttalam Coal II
Puttalam Coal III
Uthura Janani
Sapugaskanda B
Sapugaskanda A
Barge CEB
Asia Power
KCCP
Northern Power
Westcoast
Sojitz - Kelanitissa
ACE Embilipitiya
KPS GT 7
KPS Small GTs
Wimalasurendra
Old Laxapana
Canyon
New Laxapana
Polpitiya
Kotmale
Victoria
Randenigala
Rantambe
Ukuwela
Bowatenna
Upper Kotmale
Samanalawewa
Kukule
Inginiyagala
Udawalawe
Nilambe
Puttalam Coal I
Puttalam Coal II
Puttalam Coal III
Uthura Janani
Sapugaskanda B
Sapugaskanda A
Barge CEB
Asia Power
KCCP
Northern Power
Westcoast
Sojitz - Kelanitissa
ACE Embilipitiya
KPS GT 7
KPS Small GTs

Plant Dispatch on
November 13, 2016

MWh
8000

7000

6000

5000

4000

3000

2000

1000

Rated Generation Capacity

Plant Loading at Night Peak on

Installed Capacity
Available Generation

Available Capacity
Actual generation

November 13, 2016

MW
300

250

200

150

100

50

Night Peak Load

Contribution to the Night Peak in MW


3.7
0%
244.5
13%
890.1
47%

383
20%

CEB Hydro
CEB Thermal Oil
CEB Coal
IPP Thermal

364.6
20%

Night Peak
Day Peak
Minimum Demand

SPP Wind

1,885.9 MW
1,380.2 MW
938.0 MW

Note: Contribution from other SPPs (Mini Hydro, Solar and Biomass) is not included

Reservoir Levels -

as at 06.00 Hr on November 14, 2016

100%

180

90%

159.7

80%

120

63%

56%

58%

50%

80
35%

53.1

100

93

89.2

40%
30%

140

69%

70%
60%

160

154

60

27%
47.2

20%

40

10%

20

0%

0
Castlereigh

Maussakelle
Kotmale
% of Total Capacity

Total Reservoir Level(GWh) 596.3


% of Total capacity
47.38%

Victoria
Randenigala Samanalawewa
Reservoir level (GWh)

Comparison of Total Reservoir Storage Levels with Past Years


GWh
1400.0
1200.0
1000.0
800.0
600.0
400.0
200.0
0.0
1-Jan

1-Feb

1-Mar

1-Apr
2012

1-May

1-Jun

2013

1-Jul

2014

1-Aug

2015

1-Sep

1-Oct

1-Nov

2016

Variation of Major Hydro Reservoir Levels in GWh- 2016


GWh
500.0
450.0
400.0
350.0
300.0
250.0
200.0
150.0
100.0
50.0
0.0
1-Jan

1-Feb
Castlereigh

1-Mar

1-Apr

Maussakelle

1-May

1-Jun

Kotmale

1-Jul
Victoria

1-Aug

1-Sep

Randenigala

1-Oct

1-Nov

Samanalawewa

Variation of Demand 2016


MW
3000.0

2500.0

2000.0

1500.0

1000.0

500.0

0.0
1-Jan

1-Feb

1-Mar

1-Apr
Nigh Peak

1-May

1-Jun

1-Jul

Day Peak

1-Aug

1-Sep

1-Oct

1-Nov

Minimum Demand

Comparison of Cumulative Dispatch from January 1 - November 13, 2016


GWh
14,000

12,000
262
10,000

8,000

1,774

299
1,201

239
2,579

4,459

4,039
6,000

4,000

2,770
1,004

1,931

1,688

2,000

3,913

3,160

2,750
2014
CEB Hydro

2015
CEB Thermal Oil

CEB Coal

2016
IPP Thermal

Wind

Daily Load Curve -

November 12, 2016

2500

2000

1500

1000

500

CEB Coal

CEB Thermal Oil

IPP Thermal

CEB Hydro

Power Station

Capacity (MW)

Primary Fuel

CEB Hydro
Victoria
Ukuwela
Kotmale

Randenigala
Rantambe
Bowatenna
Nilambe
Upper Kotmale
Old Laxapana
New Laxapana
Polpitiya
Wimalasurendra
Canyon
Samanalawewa
Kukuleganga
Inginiyagala
Udawalawe

210
40
201
122
49
40
3.2
150
50
115
75
50
60
120
75
10
6

CEB Thermal
Sapugaskanda 1
72
Sapugaskanda 2
72
Kelanitissa Small Gas Turbines
68
GT 7 - Kelanitissa
115
Kelanitissa CCY
165
Lakvijaya (Puttalam Coal)
285
Lakvijaya (Puttalam Coal) Stage II 285
Lakvijaya (Puttalam Coal) Stage III285
Uthuru Janani
24
Barge CEB
60
Private Thermal (IPPs)
Asia Power
Sojitz - Kelanitissa
West Coast
Northern Power
ACE Embilipitiya

51
163
270
27
100

Heavy Fuel
Heavy Fuel
Auto Diesel
Auto Diesel
Naptha & Diesel
Coal
Coal
Coal
Heavy Fuel
Furnace Oil

Heavy Fuel
Auto Diesel
Low Sulphur Furnace oil
Auto Diesel
Furnace Oil