Professional Documents
Culture Documents
EP
E
RJ
K
A
AE
1 Tipe KK1 (IWF.250.125.9.6)
RJ
N
A
AT
AA
PN
AT
A
P
S
A
2 Tipe KK2 (IWF.250.125.9.6)
M
S
A
T
PA
TI
3 Tipe KK3 (IWF.250.125.9.6)
7 Detail A
8 Detail C
8 Detail D
8 Detail E
PERHITUNGAN
=(Panjang x Berat) baja IWF x jumlah
=30.4 m x 29,6 kg/m x 7
= 6298.88 kg
HASIL
6298.88
SATUAN
kg
30.4
20.2
=(Panjang x Berat) baja IWF x jumlah
=20.2 m x 29,6 kg/m x 7
= 1195.84 kg
1195.84
kg
1337.92
m3
m2
541.68
m3
m3
m2
1864.8
m3
m2
11239.12
A IWF.250.125.9.6
11239.12
7225.088
= panjang total x berat
= 101492 m x 6,76 kg/m
=7225.088 kg
31.6
29.8
28.1
Trackstang 12 = 15%Kuda-kuda Baja
Murbaut M16 = 15%Kuda-kuda Baja
=15% x 2249,6
= 379,82
410.9
379.82
kg
224.96
kg
224.96
kg
plat baja
=luas x tebal x 7850 x jumlah
plat baja
=luas x tebal x 7850 x jumlah
plat baja
=luas x tebal x 7850 x jumlah
224.96
kg
12.3
22
19.1
16.5
13.8
12.3
11.1
9.34
7.54
5.74
3.94
2.14
123.5
1068.8
SNI
KOEF
SAT.
A.4.2.1.2
1
L.01
L.02
L.03
L.04
0
0
0
0
1
A.4.2.1.3 100
kg
0.100
0.100
0.001
0.005
1.000
0.100
0.800
A.4.5.2.36
A.4.5.2.32
A
OH
OH
OH
OH
B
ltr
ltr
C
jam
D
E
F
1 m'
A
0.25 OH
0.15 OH
0.015 OH
0.013 OH
B
1.1 Buah
0.05 Kg
C
D
E
F
1 m2
A
0.2 OH
0.1 OH
0.01 OH
0.01 OH
B
1.02 m2
0.2 Kg
C
A.4.2.1.1
#REF!
D
E
F
1 kg
A.
0.06 OH
0.06 OH
0.006 OH
0.003 OH
B.
1.15 Kg
C.
D.
E.
F.
1 Kg
0.06
0.06
0.006
0.003
1.15
#REF!
1 Kg
0.06
0.06
0.006
0.003
1.15
#REF!
#REF!
A.
OH
OH
OH
OH
B.
kg
C.
D.
E.
F.
1 Kg
A.
0.06 OH
0.06 OH
0.006 OH
0.003 OH
B.
1 kg
C.
D.
E.
F.
1 Kg
A.
OH
OH
OH
OH
B.
kg
C.
D.
E.
F.
#REF!
A.
0.06 OH
0.06 OH
0.006 OH
0.003 OH
B.
1 kg
C.
D.
E.
F.
1 Kg
A.
0.06 OH
0.06 OH
0.006 OH
0.003 OH
B.
1 kg
C.
D.
E.
F.
URAIAN PEKERJAAN
kg
A
OH
OH
OH
OH
B
kg
C
D
E
F
Pengerjaan Pekerjaan Perakitan (Kuda-kuda Baja)
Tenaga
Pekerja
Tukang Besi
Kepala Tukang
Mandor
Bahan
Solar
Minyak Pelumas
PERALATAN
Sewa Alat
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)
Pemasangan Nok Genteng Metal
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Bahan
Nok Genteng
Paku Biasa 1/2" - 1"
PERALATAN
Jumlah A + B + C
Overhead & Profit (10%)
Harga Satuan Pekerjaan (D+E)
Pemasangan Atap Genteng Metal
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Bahan
Genteng Metal
Paku Biasa " - 1"
PERALATAN
Jumlah A + B + C
Overhead & Profit (10%)
Harga Satuan Pekerjaan (D+E)
Gording C.150.50.20.3,2
Tenaga
Pekerja
Tukang Besi
Kepala Tukang
Mandor
Bahan
Baja Profl Canal
Peralatan
Jumlah A+B+C
Overhead & Profit (10%)
Harga Satuan Pekerjaan (D+E)
Trackstang 12
Tenaga
Pekerja
Tukang Besi
Kepala Tukang
Mandor
Bahan
Trackstang 12
Peralatan
Jumlah A + B + C
Overhead & Profit (10%)
Harga Satuan Pekerjaan (D+E)
Murbaut M16
Tenaga
Pekerja
Tukang Besi
Kepala Tukang
Mandor
Bahan
Murbaut M16
Peralatan
Jumlah A + B + C
Overhead & Profit (10%)
Harga Satuan Pekerjaan (D+E)
Regel GIP 4''
Tenaga
Pekerja
Tukang Besi
Kepala Tukang
Mandor
Bahan
Regel GIP 4''
Peralatan
Jumlah A + B + C
Overhead & Profit (10%)
Harga Satuan Pekerjaan (D+E)
Pelat baja 12mm
Tenaga
Pekerja
Tukang Besi
Kepala Tukang
Mandor
Bahan
Pelat baja 12mm
Peralatan
Jumlah A + B + C
Overhead & Profit (10%)
Harga Satuan Pekerjaan (D+E)
Angkur M19
Tenaga
Pekerja
Tukang Besi
Kepala Tukang
Mandor
Bahan
Angkur M19
Peralatan
Jumlah A + B + C
Overhead & Profit (10%)
Harga Satuan Pekerjaan (D+E)
HARGA
BAHAN/UPAH
Rp.
Rangka Kuda-kuda Baja IWF
55,000
75,000
85,000
75,000
12,800
Pekerjaan (D+E)
56,000
76,000
80,000
70,000
11,250
38,000
50,000
56,000
76,000
80,000
70,000
21,000
12,000
56,000
76,000
80,000
70,000
50,000
12,000
JUMLAH
Rp.
25,581
8,535
3,300
4,500
510
225
14,720
14,720
23,255
2,326
25,581
75,548
13,630
5,600
7,600
80
350
15,050
11,250
3,800
40,000
40,000
68,680
6,868
75,548
51,210
27,510
14,000
11,400
1,200
910
23,700
23,100
600
51,210
5,121
56,331
81,070
20,300
11,200
7,600
800
700
53,400
51,000
2,400
25,916
13,000
73,700
7,370
81,070
25,916
8,610
3,360
4,560
480
210
14,950
14,950
56,000
76,000
80,000
70,000
23,560
2,356
25,916
25,916
8,610
3,360
4,560
480
210
13,000
14,950
56,000
76,000
80,000
70,000
23,560
2,356
25,916
25,916
8,610
3,360
4,560
480
210
13,000
14,950
56,000
76,000
80,000
70,000
23,560
2,356
25,916
25,916
8,610
3,360
4,560
480
210
13,000
14,950
56,000
76,000
80,000
70,000
23,560
2,356
25,916
25,916
56,000
76,000
80,000
70,000
8,610
3,360
4,560
480
210
13,000
14,950
56,000
76,000
80,000
70,000
23,560
2,356
25,916
25,916
8,610
3,360
4,560
480
210
13,000
14,950
23,560
2,356
25,916
No.
Uraian Pekerjaan
SNI
Volume
Satuan
Harga Satuan
(Rp)
kg
25,580.50
593.56
m2
81,070.00
A.4.2.1.1
7225.09
kg
27,736.50
Trackstang 12
A.4.2.1.2
1685.87
kg
25,580.50
Murbaut M16
A.4.2.1.2
1685.87
kg
25,580.50
Baseplat 2xT=12mm
A.4.2.1.2
180.86
kg
25,580.50
Angkur M19
A.4.2.1.2
1123.91
kg
25,580.50
A.4.2.1.2
A.4.5.2.32
Gording 2C.150.50.20.3,2
90989.8
7915022.5
0.23
0.23
0.22
0.33
dinding kg1
6.05
7.32
dinding kg2
dinding kg3
15.072
0.84
0.25
0.21
0.23
0.13
0.15
0.17
0.18
0.6
0.054
0.43
13.36
10.66
6.05
30.07
180.864
Jumlah Harga
(Rp)
Harga Total
(Rp)
287,502,309.16
48,119,649.78
200,398,653.31
43,125,346.37
43,125,346.37
4,626,591.55
28,750,230.92
655,648,127.46
Kuda-kuda
Kuda-kuda
Kuda-kuda
Kuda-kuda
Kuda-kuda
0.092859752 m3
0.0460772 m3
0.0877772 m3
0.06512052 m3
0.291834672
ples
12.09025744
14.63908858
1 profl IWF
2 IWF 250x1
KG1 (BG 20x
KG2 (BG 20x
KG3 (BG 20x
1180
K1
KG2
KG3
gording
1
2
3
2249.60
282.56
0.75
0.53
0.95
3287.9
l
15.2
11.052
9.82
p
32.9
27.52
11.8
luas
27.5
5.4
11.8
jml
418
59.6808
115.876
Panjang ttl
10
329
4
110.08
10
118
Trackstang 12
1.5
1.5
0.9
8
2
2
pnjang tot
17
204
15
45
15
27
Murbaut M16
pinggir
tengah
1.5
0.9
6
2
5
5
45
9
10
8
12
10
120
80
0.375
12
4.5
12
0.02304
12
6
0.08699 682.8746
0.01044
81.954
764.8286
#REF!
Baseplat 2xT=12mm
jml
0.00192
#REF! l
0.007249
0.00174
Angkur M19
p
3,020.467
180.864
jml
jml
1.94
12
1,454.844
0.14548439
0.87290634
0.30204665
0.6040933
12
7.2491196
23.28
kg
kg
kg
PANJANG BALOK
kode
balok
Uk. Balok(bxh)
(B)m1
(H)m1
PANJANG
Lokasi
Ki
Tgh
Ka
Berat
(L)m1
Tulangan
Atas
bh
bh
bh
Kg/m1
B20x25
0.2
0.25
16
14.94
Beugel
0.1
0.15
0.1
0.39
PANJANG BALOK
Uk. Balok(bxh)
(B)m1
(H)m1
PANJANG
Lokasi
Ki
Tgh
Ka
Berat
(L)m1
Tulangan
Atas
bh
bh
bh
Kg/m1
Bawah
0.2
0.25
16
10.676
0.1
0.15
0.1
0.39
PANJANG BALOK
(B)m1
(H)m1
7.47
0.1
38.35
0.15
50.8
m1
2.669
m1
5.338
2.669
5.338
1.58
Uk. Balok(bxh)
3.735
1.5787
Beugel
kode
balok
m1
7.47
16
B20x25
m1
3.735
1.58
kode
balok
1.5787
16
Bawah
0.1
0.15
27.69 36.586667
panjang 1/4panjang 3/4
PANJANG
Lokasi
Ki
Tgh
Ka
Berat
(L)m1
Tulangan
Atas
bh
bh
bh
Kg/m1
a
m1
2.364
b
m1
4.728
1.5787
16
Bawah
B20x25
0.2
0.25
16
9.456
Beugel
0.1
Type
KG1
jumlah
kolom
4.728
0.1
24.64
0.15
32.52
1.58
0.15
0.1
2.364
0.39
0.2
0.2
1.1607469
16
0.2
0.2
1.15193
16
0.2
0.2
1.097215
0.2
0.2
1.628013
lapangan
0.1
0.15
0.1
0.15
16
0.1
0.15
16
0.1
0.15
jumlah
KG2
jumlah
KG2
jumlah
KG3
jumlah
panjang 1/4L
c
m1
3.735
Ki
m1
3.735
Tgh
brt bs
Ka
Berat Tot
Kg
11.79
Kg
23.59
Kg
11.79
Kg
47.17
jml bs tul
(btg)
2
11.79
23.59
11.79
47.17
brt bs
sub tot
(kg)
122.02
0.55
8.32
11.03
8.32
27.68
brt
sambunga
n 10%
(kg)
berat tul
tot (kg)
12.20
134.22
brt
sambunga
n 10%
(kg)
berat tul
tot (kg)
8.74
96.12
brt
sambunga
n 10%
(kg)
berat tul
tot (kg)
38.35 =jml
panjang 1/4L
c
m1
2.669
Ki
m1
2.669
Tgh
brt bs
Ka
Berat Tot
Kg
8.43
Kg
16.85
Kg
8.43
Kg
33.71
jml bs tul
(btg)
2
8.43
16.85
8.43
33.71
brt bs
sub tot
(kg)
87.38
0.55
6.01
7.94
6.01
19.96
27.69 =jml
panjang 1/4L
c
m1
2.364
Ki
Kg
7.46
Tgh
Kg
14.93
brt bs
Ka
Kg
7.46
Berat Tot
Kg
29.86
jml bs tul
(btg)
2
brt bs
sub tot
(kg)
2.364
7.46
14.93
7.46
29.86
2
77.47
0.55
5.35
7.06
5.35
17.76
7.75
85.21
24.64 =jml
Jumlah tulangan
sengkang
utama
tumpuan lapangan
1.9927469
0.4
1.79193
0.4
1.929215
0.4
2.268013
0.4
6.8037345 4.8691563
hook
panjang
sengkang sengkang +
(m)
hook (m)
per meter
utama
sengkang
0.096
0.496
1.578
0.394
12.575
4.8397667
0.192
0.592
1.578
0.394
11.307
6.486075 4.6573833
0.096
0.496
1.578
0.394
12.174
9.140065
0.192
0.592
1.578
0.394
14.311
6.75965
6.42671
Volume
Keperluan
2
bekisting (m ) beton
per lantai
utama
sengkang
(m3)
12.575
2.283
0.93
0.05
14.858
2.708
11.307
2.708
0.92
0.05
2.180
12.174
14.016
2.180
0.88
0.04
2.60
0.13
14.353
3.634
28.623
7.269
35.892
no
uraian pekerjaan
BALOK BG(20X25)
KG1
KG2
KG3
lebar (b)
(m)
jumlah
4
1
1
2
0.2
panjang
luas
tinggi (h)
panjang total beton
as to as (p)
begesting
(m)
beton (m)
(m3)
(m)
(m2)
0.25
3 A.4.2.1.3
35.07
14.94
10.676
9.456
100
L.01
L.02
L.03
L.04
35.072
14.94
10.676
9.456
17.54
315.55
berat besi
(kg/m3)
179.944
75,328.00
13,430.00
5,500.00
7,500.00
80.00
350.00
Bahan
15,050.00
ltr
Solar
11,250.00
11,250.00
0.1
ltr
Minyak Pelumas
38,000.00
3,800.00
PERALATAN
0.100
0.100
0.001
0.005
0.800
kg
A
OH
OH
OH
OH
1.75
berat besi
(kg)
jam
40,000
Sewa Alat
50,000
Jumlah A + B + C
40,000
68,480.00
10%
6,848.00
75,328.00