You are on page 1of 34

KE

EP
E
RJ
K
A
AE
1 Tipe KK1 (IWF.250.125.9.6)
RJ
N
A
AT
AA
PN
AT
A
P
S
A
2 Tipe KK2 (IWF.250.125.9.6)
M
S
A
T
PA
TI
3 Tipe KK3 (IWF.250.125.9.6)

4 Tipe KK4 (IWF.250.125.9.6)

5 Tipe KKJ (IWF.250.125.9.6)

TOTAL PANJANG BAJA IWF.250.125.9.6


6 Gording (Doble C 125.50.20.3,2)

7 Detail A

8 Detail C

8 Detail D

8 Detail E

PERHITUNGAN
=(Panjang x Berat) baja IWF x jumlah
=30.4 m x 29,6 kg/m x 7
= 6298.88 kg

HASIL
6298.88

SATUAN
kg

30.4

20.2
=(Panjang x Berat) baja IWF x jumlah
=20.2 m x 29,6 kg/m x 7
= 1195.84 kg

1195.84

kg

1337.92

m3

=(Panjang x Berat) baja IWF x jumlah


=11.3 m x 29,6 kg/m x 4
= 1337.92 kg
m3

m2

541.68

=(Panjang x Berat) baja IWF x jumlah


=6.1 m x 29,6 kg/m x 3
= 541.68 kg

m3

m3

m2

1864.8

m3

=(Panjang x Berat) baja IWF x jumlah


=15.75 m x 29,6 kg/m x 4
= 1864.8 kg
m3

m2

11239.12

A IWF.250.125.9.6

11239.12

Berat = 6,76 kg/m


50
45
42.5
40
38.3
37
35.2
33.4

7225.088
= panjang total x berat
= 101492 m x 6,76 kg/m
=7225.088 kg

31.6
29.8
28.1
Trackstang 12 = 15%Kuda-kuda Baja
Murbaut M16 = 15%Kuda-kuda Baja
=15% x 2249,6
= 379,82

410.9
379.82

kg

224.96

kg

224.96

kg

plat baja
=luas x tebal x 7850 x jumlah

Regel GIP 4''


Angkur 4M19
diambil 10%Kuda-kuda Baja
=10% x 2249,6
=224,96

plat baja
=luas x tebal x 7850 x jumlah

Regel GIP 4''


Angkur 4M19
diambil 10%Kuda-kuda Baja
=10% x 2249,6
=224,96

plat baja
=luas x tebal x 7850 x jumlah

Regel GIP 4''


Angkur 4M19
diambil 10%Kuda-kuda Baja
=10% x 2249,6
=224,96

224.96

kg

12.3

22
19.1
16.5
13.8
12.3
11.1
9.34
7.54

5.74
3.94
2.14

123.5

1068.8

SNI

KOEF

SAT.

A.4.2.1.2

1
L.01
L.02
L.03
L.04

0
0
0
0
1

A.4.2.1.3 100

kg

0.100
0.100
0.001
0.005
1.000
0.100
0.800

A.4.5.2.36

A.4.5.2.32

A
OH
OH
OH
OH
B
ltr
ltr
C
jam
D
E
F

1 m'
A
0.25 OH
0.15 OH
0.015 OH
0.013 OH
B
1.1 Buah
0.05 Kg
C
D
E
F
1 m2
A
0.2 OH
0.1 OH
0.01 OH
0.01 OH
B
1.02 m2
0.2 Kg
C

A.4.2.1.1

#REF!

D
E
F
1 kg
A.
0.06 OH
0.06 OH
0.006 OH
0.003 OH
B.
1.15 Kg
C.
D.
E.
F.
1 Kg
0.06
0.06
0.006
0.003
1.15

#REF!

1 Kg
0.06
0.06
0.006
0.003
1.15

#REF!

#REF!

A.
OH
OH
OH
OH
B.
kg
C.
D.
E.
F.

1 Kg
A.
0.06 OH
0.06 OH
0.006 OH
0.003 OH
B.
1 kg
C.
D.
E.
F.
1 Kg

A.
OH
OH
OH
OH
B.
kg
C.
D.
E.
F.

#REF!

A.
0.06 OH
0.06 OH
0.006 OH
0.003 OH
B.
1 kg
C.
D.
E.
F.
1 Kg
A.
0.06 OH
0.06 OH
0.006 OH
0.003 OH
B.
1 kg
C.
D.
E.
F.

URAIAN PEKERJAAN
kg
A
OH
OH
OH
OH
B
kg
C
D
E
F
Pengerjaan Pekerjaan Perakitan (Kuda-kuda Baja)
Tenaga
Pekerja
Tukang Besi
Kepala Tukang
Mandor
Bahan
Solar
Minyak Pelumas
PERALATAN
Sewa Alat
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)
Pemasangan Nok Genteng Metal
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Bahan
Nok Genteng
Paku Biasa 1/2" - 1"
PERALATAN
Jumlah A + B + C
Overhead & Profit (10%)
Harga Satuan Pekerjaan (D+E)
Pemasangan Atap Genteng Metal
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Bahan
Genteng Metal
Paku Biasa " - 1"
PERALATAN

Pemasangan Rangka Kuda-kuda


Tenaga
Pekerja
Tukang Besi
Kepala Tukang
Mandor
Bahan
Besi Baja IWF
PERALATAN
Jumlah A + B + C
Overhead & Prof
0
Harga Satuan Pekerjaan (D+E)

Jumlah A + B + C
Overhead & Profit (10%)
Harga Satuan Pekerjaan (D+E)
Gording C.150.50.20.3,2
Tenaga
Pekerja
Tukang Besi
Kepala Tukang
Mandor
Bahan
Baja Profl Canal
Peralatan
Jumlah A+B+C
Overhead & Profit (10%)
Harga Satuan Pekerjaan (D+E)
Trackstang 12
Tenaga
Pekerja
Tukang Besi
Kepala Tukang
Mandor
Bahan
Trackstang 12
Peralatan
Jumlah A + B + C
Overhead & Profit (10%)
Harga Satuan Pekerjaan (D+E)
Murbaut M16
Tenaga
Pekerja
Tukang Besi
Kepala Tukang
Mandor
Bahan
Murbaut M16
Peralatan
Jumlah A + B + C
Overhead & Profit (10%)
Harga Satuan Pekerjaan (D+E)
Regel GIP 4''
Tenaga
Pekerja
Tukang Besi
Kepala Tukang
Mandor
Bahan
Regel GIP 4''
Peralatan
Jumlah A + B + C
Overhead & Profit (10%)
Harga Satuan Pekerjaan (D+E)
Pelat baja 12mm

Tenaga
Pekerja
Tukang Besi
Kepala Tukang
Mandor
Bahan
Pelat baja 12mm
Peralatan
Jumlah A + B + C
Overhead & Profit (10%)
Harga Satuan Pekerjaan (D+E)
Angkur M19
Tenaga
Pekerja
Tukang Besi
Kepala Tukang
Mandor
Bahan
Angkur M19
Peralatan
Jumlah A + B + C
Overhead & Profit (10%)
Harga Satuan Pekerjaan (D+E)

HARGA
BAHAN/UPAH
Rp.
Rangka Kuda-kuda Baja IWF
55,000
75,000
85,000
75,000
12,800

Pekerjaan (D+E)

56,000
76,000
80,000
70,000
11,250
38,000
50,000

56,000
76,000
80,000
70,000
21,000
12,000

56,000
76,000
80,000
70,000
50,000
12,000

JUMLAH
Rp.
25,581
8,535
3,300
4,500
510
225
14,720
14,720
23,255
2,326
25,581
75,548
13,630
5,600
7,600
80
350
15,050
11,250
3,800
40,000
40,000
68,680
6,868
75,548
51,210
27,510
14,000
11,400
1,200
910
23,700
23,100
600
51,210
5,121
56,331
81,070
20,300
11,200
7,600
800
700
53,400
51,000
2,400

25,916

13,000

73,700
7,370
81,070
25,916
8,610
3,360
4,560
480
210
14,950
14,950

56,000
76,000
80,000
70,000

23,560
2,356
25,916
25,916
8,610
3,360
4,560
480
210

13,000

14,950

56,000
76,000
80,000
70,000

23,560
2,356
25,916
25,916
8,610
3,360
4,560
480
210

13,000

14,950

56,000
76,000
80,000
70,000

23,560
2,356
25,916
25,916
8,610
3,360
4,560
480
210

13,000

14,950

56,000
76,000
80,000
70,000

23,560
2,356
25,916
25,916

56,000
76,000
80,000
70,000

8,610
3,360
4,560
480
210

13,000

14,950

56,000
76,000
80,000
70,000

23,560
2,356
25,916
25,916
8,610
3,360
4,560
480
210

13,000

14,950
23,560
2,356
25,916

No.

Uraian Pekerjaan

SNI

Volume

Satuan

Harga Satuan
(Rp)

Pek. Struktur Atap


11239.12

kg

25,580.50

593.56

m2

81,070.00

A.4.2.1.1

7225.09

kg

27,736.50

Trackstang 12

A.4.2.1.2

1685.87

kg

25,580.50

Murbaut M16

A.4.2.1.2

1685.87

kg

25,580.50

Baseplat 2xT=12mm

A.4.2.1.2

180.86

kg

25,580.50

Angkur M19

A.4.2.1.2

1123.91

kg

25,580.50

Kuda-kuda Baja IWF

A.4.2.1.2

Atap Metal Roof

A.4.5.2.32

Gording 2C.150.50.20.3,2

Total Pek. Struktur Atap


dinding
kolom

90989.8
7915022.5

1.1607469 kolom kg1


1.15193 kolom kg2
1.097215
1.628013 kolom kg3

0.23
0.23
0.22
0.33

dinding kg1

6.05
7.32

dinding kg2
dinding kg3

15.072

0.84

0.25
0.21

0.23

0.13
0.15

0.17

0.18

0.6

0.054

0.43

13.36
10.66
6.05
30.07

180.864

Jumlah Harga

(Rp)

Harga Total
(Rp)

287,502,309.16
48,119,649.78
200,398,653.31
43,125,346.37
43,125,346.37
4,626,591.55
28,750,230.92
655,648,127.46
Kuda-kuda
Kuda-kuda
Kuda-kuda
Kuda-kuda
Kuda-kuda

0.092859752 m3
0.0460772 m3
0.0877772 m3
0.06512052 m3
0.291834672
ples
12.09025744
14.63908858

1 profl IWF
2 IWF 250x1
KG1 (BG 20x
KG2 (BG 20x
KG3 (BG 20x
1180
K1
KG2
KG3
gording
1
2
3

2249.60
282.56
0.75
0.53
0.95
3287.9
l
15.2
11.052
9.82
p
32.9
27.52
11.8

luas
27.5
5.4
11.8

jml

418
59.6808
115.876
Panjang ttl
10
329
4
110.08
10
118

Trackstang 12
1.5
1.5
0.9

8
2
2

pnjang tot
17
204
15
45
15
27

Murbaut M16
pinggir
tengah

1.5
0.9

6
2

5
5

45
9

10
8

12
10

120
80

0.375

12

4.5

12

0.02304

12
6

0.08699 682.8746
0.01044
81.954
764.8286

#REF!
Baseplat 2xT=12mm

jml
0.00192

#REF! l
0.007249
0.00174
Angkur M19
p

3,020.467

180.864

jml

jml
1.94

12

1,454.844

0.14548439

0.87290634

0.30204665

0.6040933

12

7.2491196

23.28

kg
kg
kg

PANJANG BALOK
kode
balok

Uk. Balok(bxh)
(B)m1

(H)m1

panjang 1/4panjang 3/4

PANJANG

Lokasi

Ki

Tgh

Ka

Berat

(L)m1

Tulangan
Atas

bh

bh

bh

Kg/m1

B20x25

0.2

0.25

16

14.94

Beugel

0.1

0.15

0.1
0.39

PANJANG BALOK
Uk. Balok(bxh)
(B)m1

(H)m1

PANJANG

Lokasi

Ki

Tgh

Ka

Berat

(L)m1

Tulangan
Atas

bh

bh

bh

Kg/m1

Bawah
0.2

0.25

16

10.676

0.1

0.15

0.1
0.39

PANJANG BALOK

(B)m1

(H)m1

7.47

0.1
38.35

0.15
50.8

m1
2.669

m1
5.338

2.669

5.338

1.58

Uk. Balok(bxh)

3.735

1.5787

Beugel

kode
balok

m1
7.47

panjang 1/4panjang 3/4

16

B20x25

m1
3.735

1.58

kode
balok

1.5787

16
Bawah

0.1
0.15
27.69 36.586667
panjang 1/4panjang 3/4

PANJANG

Lokasi

Ki

Tgh

Ka

Berat

(L)m1

Tulangan
Atas

bh

bh

bh

Kg/m1

a
m1
2.364

b
m1
4.728

1.5787

16
Bawah
B20x25

0.2

0.25

16

9.456

Beugel

0.1

Type

KG1

jumlah
kolom

4.728

0.1
24.64

0.15
32.52

1.58

0.15

0.1

Dimensi kolom (m)

2.364

0.39

Dimensi tulangan (mm)


utama
sengkang
tumpuan lapangan

0.2

0.2

1.1607469

16

0.2

0.2

1.15193

16

0.2

0.2

1.097215

0.2

0.2

1.628013

Jarak sengkang (m)


tumpuan

lapangan

0.1

0.15

0.1

0.15

16

0.1

0.15

16

0.1

0.15

jumlah

KG2
jumlah
KG2
jumlah

KG3
jumlah

panjang 1/4L

panjang sa total pjg besi

c
m1
3.735

Ki

m1

3.735

Tgh

brt bs
Ka

Berat Tot

Kg
11.79

Kg
23.59

Kg
11.79

Kg
47.17

jml bs tul
(btg)
2

11.79

23.59

11.79

47.17

brt bs
sub tot
(kg)

122.02

0.55

8.32

11.03

8.32

27.68

brt
sambunga
n 10%
(kg)

berat tul
tot (kg)

12.20

134.22

brt
sambunga
n 10%
(kg)

berat tul
tot (kg)

8.74

96.12

brt
sambunga
n 10%
(kg)

berat tul
tot (kg)

38.35 =jml
panjang 1/4L

panjang sa total pjg besi

c
m1
2.669

Ki

m1

2.669

Tgh

brt bs
Ka

Berat Tot

Kg
8.43

Kg
16.85

Kg
8.43

Kg
33.71

jml bs tul
(btg)
2

8.43

16.85

8.43

33.71

brt bs
sub tot
(kg)

87.38

0.55

6.01

7.94

6.01

19.96

27.69 =jml
panjang 1/4L
c
m1
2.364

panjang sa total pjg besi


d
m1

Ki
Kg
7.46

Tgh
Kg
14.93

brt bs
Ka
Kg
7.46

Berat Tot
Kg
29.86

jml bs tul
(btg)
2

brt bs
sub tot
(kg)

2.364

7.46

14.93

7.46

29.86

2
77.47

0.55

5.35

7.06

5.35

17.76

7.75

85.21

24.64 =jml

Panjang tulangan (m)


sengkang
utama
sengkang
tengah

Jumlah tulangan
sengkang
utama
tumpuan lapangan

1.9927469

0.4

1.79193

0.4

1.929215

0.4

2.268013

0.4

6.8037345 4.8691563

hook
panjang
sengkang sengkang +
(m)
hook (m)

per meter
utama
sengkang

Berat tulangan (kg)


per kolom
utama

0.096

0.496

1.578

0.394

12.575

4.8397667

0.192

0.592

1.578

0.394

11.307

6.486075 4.6573833

0.096

0.496

1.578

0.394

12.174

9.140065

0.192

0.592

1.578

0.394

14.311

6.75965

6.42671

Berat tulangan (kg)


per kolom
sengkang
2.283

Volume
Keperluan
2
bekisting (m ) beton
per lantai
utama
sengkang
(m3)
12.575

2.283

0.93

0.05

14.858

2.708

11.307

2.708

0.92

0.05

2.180

12.174

14.016
2.180

0.88

0.04

2.60

0.13

14.353

3.634

28.623

7.269
35.892

no

uraian pekerjaan

BALOK BG(20X25)
KG1
KG2
KG3

lebar (b)
(m)

jumlah

4
1
1
2

0.2

panjang
luas
tinggi (h)
panjang total beton
as to as (p)
begesting
(m)
beton (m)
(m3)
(m)
(m2)
0.25

3 A.4.2.1.3

35.07
14.94
10.676
9.456

100
L.01
L.02
L.03
L.04

35.072
14.94
10.676
9.456

17.54

315.55

berat besi
(kg/m3)
179.944

Pengerjaan Pekerjaan Perakitan (Kuda-kuda Baja)


Tenaga
Pekerja
56,000.00
Tukang Besi
76,000.00
Kepala Tukang
80,000.00
Mandor
70,000.00

75,328.00
13,430.00
5,500.00
7,500.00
80.00
350.00

Bahan

15,050.00

ltr

Solar

11,250.00

11,250.00

0.1

ltr

Minyak Pelumas

38,000.00

3,800.00

PERALATAN

0.100
0.100
0.001
0.005

0.800

kg
A
OH
OH
OH
OH

1.75

berat besi
(kg)

jam

40,000

Sewa Alat

50,000

Jumlah A + B + C

Overhead & Profit (con

Harga Satuan Pekerjaan (D+E)

40,000
68,480.00

10%

6,848.00
75,328.00

You might also like