You are on page 1of 195

ATAS

G1
G2
G4
G5
G6
G7
B1
B2
B3
RB1
B1L
B2L
B3L
RB2

EKSTRA
5
5
5
3
3
3
8
3
2
3
8
3
2
3

BAWAH
5
5
3
2
2
0
0
2
0
2
0
2
0
0

5
5
5
3
3
3
5
3
2
3
5
3
2
3

EXTRA

D
5
5
3
2
2
0
0
2
0 POLOS
2
0
2
0
0

2
2
2

SENGKANG
TUMPUAN
LAPANGAN
JARAK
D
JARAK
10
100
10
10
100
10
10
100
10
10
100
10
10
100
10
10
100
10
10
100
10
10
100
10
8
100
8
10
100
10
10
100
10
10
100
10
8
100
8
10
100
10

150
150
150
150
150
150
150
150
150
150
150
150
150
150

G1
G2
G4
G5
G6
G7
B1
B2
B3
RB1
B1L
B2L
B3L
RB2

0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.008
0.01
0.01
0.01
0.008
0.01

0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.008
0.01
0.01
0.01
0.008
0.01

0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15

Pujo Widodo/Barokat Z.Alam

PERHITUNGAN VOLUME PEKERJAAN BALOK

Pembangunan Gedung Fakultas Bahasa Dan Seni Universitas Negeri Semarang


HSPK SEPTEMBER 2016

no

BALOK

jumlah

bentang

kolom

Panjang Panjang total LUAS BEKISTING


total
(As to As)
(B +(2 H ))xL
m
m
m2

9
9
2
4
3
4
2
3
9
8
9
3
6
4
2

0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4

34.400
17.200
38.400
115.200
5.200
3.600
6.400
5.200
137.600
76.000
51.600
10.400
33.600
43.200
19.200

36
18
48
128
6
4
8
6
144
80
54
12
36
48
24

51.600
25.800
42.240
126.720
5.720
3.960
4.160
3.380
254.560
133.000
87.720
6.760
57.120
47.520
21.120

1
9.7
2.67
4
1
7.6
1
1.23

0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4

5.400
18.600
13.620
7.200
2.400
14.400
2.400
1.660

9
19.4
16.02
8
4
15.2
4
2.46

8.100
20.460
8.853
4.680
1.560
25.200
2.640
1.826

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

BALOK LT.02
B1 (30 x 60)
B1L (30 x 60)
B2 (30 x 40)
B2 (30 x 40)
B2 (30 x 40)
B2L (30 x 40)
B3 (15 x 25)
B3 (15 x 25)
G1 (35 x 75)
G2 (35 x 70)
G4 (30 x 70)
B3 (15 x 25)
G4 (30 x 70)
G6 (30 x 40)
G7 (30 x 40)

4
2
24
32
2
1
4
2
16
10
6
4
6
12
12

0.6
0.6
0.4
0.4
0.4
0.4
0.25
0.25
0.75
0.7
0.7
0.25
0.7
0.4
0.4

0.3
0.3
0.3
0.3
0.3
0.3
0.15
0.15
0.35
0.35
0.3
0.15
0.3
0.3
0.3

m2
1.54
0.18
0.18
0.12
0.12
0.12
0.12
0.0375
0.0375
0.2625
0.245
0.21
0.0375
0.21
0.12
0.12

1
2
3
4
5
6
7
8

BALOK Elv.6.7
B1 (30 x 60)
B2 (30 x 40)
B3 (15 x 25)
B3 (15 x 25)
B3 (15 x 25)
G2 (35 x 70)
G7 (30 x 40)
G7 (30 x 40)

9
2
6
2
4
2
4
2

0.6
0.4
0.25
0.25
0.25
0.7
0.4
0.4

0.3
0.3
0.15
0.15
0.15
0.35
0.3
0.3

0.18
0.12
0.0375
0.0375
0.0375
0.245
0.12
0.12

Pujo Widodo/Barokat Z.Alam

no

BALOK

PERHITUNGAN VOLUME PEKERJAAN BALOK

jumlah

h
m

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
1
2
3
1
2

BALOK LT.3
B1 (30 x 60)
B1 (30 x 60)
B1 (30 x 60)
B1L (30 x 60)
B2 (30 x 40)
B2 (30 x 40)
B2 (30 x 40)
B2L (30 x 40)
B3 (15 x 25)
B3 (15 x 25)
B3 (15 x 25)
G1 (35 x 75)
G1 (35 x 75)
G2 (35 x 70)
G4 (30 x 70)
G4 (30 x 70)
G6 (30 x 40)
G6 (30 x 40)
G7 (30 x 40)

1
2
3
2
18
34
4
1
2
2
1
16
4
6
8
2
3
12
12

BALOK LATAI Elv. 2.65


B. LATAI (15 x 15)
2
B. LATAI (15 x 15)
5
B. LATAI (15 x 15)
10
BALOK LATAI Elv. 6.65
B. LATAI (15 x 15)
2
B. LATAI (15 x 15)
5

b
m

A
m2

bentang
m

Panjang Panjang total


total
(As to As)

kolom
m

LUAS BEKISTING
(B +(2 H ))xL
m2

0.4
0.4
0.4
0.6
0.4
0.4
0.4
0.4
0.25
0.25
0.25
0.75
0.75
0.7
0.7
0.7
0.4
0.4
0.4

0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.15
0.15
0.15
0.35
0.35
0.35
0.3
0.3
0.3
0.3
0.3

0.12
0.12
0.12
0.18
0.12
0.12
0.12
0.12
0.0375
0.0375
0.0375
0.2625
0.2625
0.245
0.21
0.21
0.12
0.12
0.12

6
1.15
9
9
2
4
1.65
3.7
3
1.7
4
9
6
8
9
6
3
4
2

0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4

5.6
1.5
25.8
17.2
28.8
122.4
5
3.3
5.2
2.6
3.6
137.6
22.4
45.6
68.8
11.2
7.8
43.2
19.2

6
2.3
27
18
36
136
6.6
3.7
6
3.4
4
144
24
48
72
12
9
48
24

6.16
1.65
28.38
25.8
31.68
134.64
5.5
3.63
3.38
1.69
2.34
254.56
41.44
79.8
116.96
19.04
8.58
47.52
21.12

0.15
0.15
0.15

0.15
0.15
0.15

0.0225
0.0225
0.0225

2
2.85
1.93

0
0
0

4
14.25
19.3

4
14.25
19.3

1.8
6.4125
8.685

0.15
0.15

0.15
0.15

0.0225
0.0225

2
2.85

0
0

4
14.25

4
14.25

1.8
6.4125

Pujo Widodo/Barokat Z.Alam


3
4
5
6

no

1
2
3
4
5
6
7
8

B.
B.
B.
B.

LATAI
LATAI
LATAI
LATAI

(15
(15
(15
(15

x
x
x
x

BALOK

15)
15)
15)
15)

PERHITUNGAN VOLUME PEKERJAAN BALOK


10
2
2
3

jumlah

RING BALK Elv. 11.5


RB1 (30 x 50)
RB1 (30 x 50)
RB2 (30 x 50)
RB2 (30 x 50)
RB2 (30 x 50)
B3 (25 x 15)
B3 (25 x 15)
B3 (25 x 15)

8
2
4
2
2
6
6
5

0.15
0.15
0.15
0.15

0.15
0.15
0.15
0.15

bentang

kolom

m2

0.5
0.5
0.5
0.5
0.5
0.25
0.25
0.25

0.3
0.3
0.3
0.3
0.3
0.15
0.15
0.15

0.0225
0.0225
0.0225
0.0225

0.15
0.15
0.15
0.15
0.15
0.0375
0.0375
0.0375

0
0
0
0

1.93
0.6
3
8

9
6
4
4
8
9
6
12

0.4
0.4
0.4
0.4
0.4
0
0
0

19.3
1.2
6
24

19.3
1.2
6
24

8.685
0.54
2.7
10.8

Panjang Panjang total LUAS BEKISTING


total
(As to As)
(B +(2 H ))xL
m
m
m2
68.8
11.2
14.4
7.2
15.2
54
36
60

72
12
16
8
16
54
36
60

89.44
14.56
18.72
9.36
19.76
35.1
23.4
39

Pujo Widodo/Barokat Z.Alam

PERHITUNGAN VOLUME PEKERJAAN BALOK

Pembangunan Gedung Fakultas Bahasa Dan Seni Universitas Negeri Sema


HSPK SEPTEMBER 2016
Tebal
Pelat

Volume
Beton

V
m3

0.12
0.12
0.12
0.12
0.13
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.13
0.12
0.12

6.192
3.096
4.608
13.824
0.624
0.432
0.240
0.195
36.120
18.620
10.836
0.390
7.056
5.184
2.304

0.972
2.232
0.511
0.270
0.090
3.528
0.288
0.199

BALOK
Satuan
BALOK LT.02
B1 (30 x 60)
B1L (30 x 60)
B2 (30 x 40)
B2 (30 x 40)
B2 (30 x 40)
B2L (30 x 40)
B3 (15 x 25)
B3 (15 x 25)
G1 (35 x 75)
G2 (35 x 70)
G4 (30 x 70)
B3 (15 x 25)
G4 (30 x 70)
G6 (30 x 40)
G7 (30 x 40)
BALOK Elv.6.7
B1 (30 x 60)
B2 (30 x 40)
B3 (15 x 25)
B3 (15 x 25)
B3 (15 x 25)
G2 (35 x 70)
G7 (30 x 40)
G7 (30 x 40)

Berat tul
pinggang
per meter

D tul.
pinggang

D Tul.
Atas

D Tul.
Bawah

0.013
0.013

0.016
0.016
0.016
0.016
0.016
0.016
0.013
0.013
0.016
0.016
0.016
0.013
0.016
0.016
0.016

0.016
0.016
0.016
0.016
0.016
0.016
0.013
0.013
0.016
0.016
0.016
0.013
0.016
0.016
0.016

1.042
1.042

0.016
0.016
0.013
0.013
0.013
0.016
0.016
0.016

0.016
0.016
0.013
0.013
0.013
0.016
0.016
0.016

1.042

0.01
0.013
0.013
0.013

0.013

0.013

0.617
1.042
1.042
1.042

1.042

Berat tul
Jml Tul.
Jml Tul.
Pokok per
Atas
Pinggang
meter
Menerus
buah

buah

1.58
1.58
1.58
1.58
1.58
1.58
1.04
1.04
1.58
1.58
1.58
1.04
1.58
1.58
1.58

2
2

8
8
3
3
3
3
2
2
5
5
5
2
5
3
3

1.58
1.58
1.04
1.04
1.04
1.58
1.58
1.58

4
2
2
2

8
3
2
2
2
5
3
3

Pujo Widodo/Barokat Z.Alam

Tebal
Pelat

Volume
Beton

BALOK

V
m

Satuan
BALOK LT.3
0.672 B1 (30 x 60)
0.18 B1 (30 x 60)
3.096 B1 (30 x 60)
3.096 B1L (30 x 60)
3.456 B2 (30 x 40)
14.688 B2 (30 x 40)
0.6 B2 (30 x 40)
0.396 B2L (30 x 40)
0.195 B3 (15 x 25)
0.0975 B3 (15 x 25)
0.135 B3 (15 x 25)
36.12 G1 (35 x 75)
5.88 G1 (35 x 75)
11.172 G2 (35 x 70)
14.448 G4 (30 x 70)
2.352 G4 (30 x 70)
0.936 G6 (30 x 40)
5.184 G6 (30 x 40)
2.304 G7 (30 x 40)

PERHITUNGAN VOLUME PEKERJAAN BALOK

D tul.
pinggang

D Tul.
Atas

D Tul.
Bawah

0.013
0.013
0.013
0.013

0.016
0.016
0.016
0.016
0.016
0.016
0.016
0.016
0.013
0.013
0.013
0.016
0.016
0.016
0.016
0.016
0.016
0.016
0.016

0.016
0.016
0.016
0.016
0.016
0.016
0.016
0.016
0.013
0.013
0.013
0.016
0.016
0.016
0.016
0.016
0.016
0.016
0.016

m3

0.01
0.01
0.013
0.013
0.013

BALOK LATAI Elv. 2.65


0.09 B. LATAI (15 x 15)
0.320625 B. LATAI (15 x 15)
0.43425 B. LATAI (15 x 15)
BALOK LATAI Elv. 6.65
0.09 B. LATAI (15 x 15)
0.320625 B. LATAI (15 x 15)

0.008
0.008
0.008
0.008
0.008
0.008

0.008
0.008
0.008
0.008
0.008
0.008

Berat tul
pinggang
per meter

Berat tul
Jml Tul.
Jml Tul.
Pokok per
Atas
Pinggang
meter
Menerus
buah

1.04236786
1.04236786
1.04236786
1.04236786

0.61678571
0.61678571
1.04236786
1.04236786
1.04236786

1.578971429
1.578971429
1.578971429
1.578971429
1.578971429
1.578971429
1.578971429
1.578971429
1.042367857
1.042367857
1.042367857
1.578971429
1.578971429
1.578971429
1.578971429
1.578971429
1.578971429
1.578971429
1.578971429
0.394742857
0.394742857
0.394742857
0.394742857
0.394742857
0.394742857

buah
2
2
2
2

4
4
2
2
2

8
8
8
8
3
3
3
3
2
2
2
5
5
5
5
5
3
3
3
2
2
2
2
2
2

Pujo Widodo/Barokat Z.Alam


0.43425 B.
0.027 B.
0.135 B.
0.54 B.
Tebal
Pelat
m

Volume
Beton
V
m3

LATAI
LATAI
LATAI
LATAI

PERHITUNGAN VOLUME PEKERJAAN BALOK


(15
(15
(15
(15

BALOK

x
x
x
x

15)
15)
15)
15)

0.008
0.008
0.008
0.008
D tul.
pinggang

Satuan
RING BALK Elv. 11.5
10.32 RB1 (30 x 50)
1.68 RB1 (30 x 50)
2.16 RB2 (30 x 50)
1.08 RB2 (30 x 50)
2.28 RB2 (30 x 50)
2.025 B3 (25 x 15)
1.35 B3 (25 x 15)
2.25 B3 (25 x 15)

0.008
0.008
0.008
0.008

D Tul.
Atas

D Tul.
Bawah

0.016
0.016
0.016
0.016
0.016
0.013
0.013
0.013

0.016
0.016
0.016
0.016
0.016
0.013
0.013
0.013

0.394742857
0.394742857
0.394742857
0.394742857
Berat tul
pinggang
per meter

2
2
2
2

Berat tul
Jml Tul.
Jml Tul.
Pokok per
Atas
Pinggang
meter
Menerus
buah
1.578971429
1.578971429
1.578971429
1.578971429
1.578971429
1.042367857
1.042367857
1.042367857

buah
3
3
3
3
3
2
2
2

Pujo Widodo/Barokat Z.Alam

PERHITUNGAN VOLUME PEKERJAAN BALOK

ni Universitas Negeri Semarang


016

Pembangunan Gedung Fakultas Bahas


HSPK SEPT

Jml Tul.
Atas
Ekstra

Jml Tul.
Bawah
Menerus

Jml Tul.
Bawah
Ekstra

Overlab tul
pinggang

buah

buah

buah

0
0
2
2
2
2
0
0
5
5
3
0
3
2
0

5
5
3
3
3
3
2
2
5
5
5
2
5
3
3

0
0
2
2
2
2
0
0
5
5
3
0
3
2
0

0.598
0.598

0
2
0
0
0
5
0
0

5
3
2
2
2
5
3
3

0
2
0
0
0
5
0
0

0.598

0.46
0.598
0.598
0.598

0.598

Overlab
tul pokok

BALOK

0.736
0.736
0.736
0.736
0.736
0.736
0.598
0.598
0.736
0.736
0.736
0.598
0.736
0.736
0.736

BALOK LT.02
B1 (30 x 60)
B1L (30 x 60)
B2 (30 x 40)
B2 (30 x 40)
B2 (30 x 40)
B2L (30 x 40)
B3 (15 x 25)
B3 (15 x 25)
G1 (35 x 75)
G2 (35 x 70)
G4 (30 x 70)
B3 (15 x 25)
G4 (30 x 70)
G6 (30 x 40)
G7 (30 x 40)

0.736
0.736
0.598
0.598
0.598
0.736
0.736
0.736

BALOK Elv.6.7
B1 (30 x 60)
B2 (30 x 40)
B3 (15 x 25)
B3 (15 x 25)
B3 (15 x 25)
G2 (35 x 70)
G7 (30 x 40)
G7 (30 x 40)

Pjg Tul.
pinggang

Pjg Tul.
Atas

Pjg Tul.
Bawah

Berat Tul.
Pinggang

kg

36.598
18.598

36.736
18.736
48.736
128.736
6.736
4.736
8.598
6.598
144.736
80.736
54.736
12.598
36.736
48.736
24.736

36.736
18.736
48.736
128.736
6.736
4.736
8.598
6.598
144.736
80.736
54.736
12.598
36.736
48.736
24.736

76.297
38.772

9.736
20.136
16.618
8.598
4.598
15.936
4.736
3.196

9.736
20.136
16.618
8.598
4.598
15.936
4.736
3.196

144.460
80.598
54.598
36.598

9.598

15.798

356.403
168.026
113.822
76.297

20.009

32.9346548

Pujo Widodo/Barokat Z.Alam

PERHITUNGAN VOLUME PEKERJAAN BALOK

Jml Tul.
Atas
Ekstra

Jml Tul.
Bawah
Menerus

Jml Tul.
Bawah
Ekstra

Overlab tul
pinggang

buah

buah

buah

0
0
0
0
2
2
2
2
0
0
0
5
5
5
3
3
2
2
0

5
5
5
5
3
3
3
3
2
2
2
5
5
5
5
5
3
3
3
2
2
2
2
2
2

0
0
0
0
2
2
2
2
0
0
0
5
5
5
3
3
2
2
0

0.598
0.598
0.598
0.598

0.46
0.46
0.598
0.598
0.598

Overlab
tul pokok

0.736
0.736
0.736
0.736
0.736
0.736
0.736
0.736
0.598
0.598
0.598
0.736
0.736
0.736
0.736
0.736
0.736
0.736
0.736

BALOK

Pjg Tul.
pinggang

Pjg Tul.
Atas

Pjg Tul.
Bawah

Berat Tul.
Pinggang

kg

BALOK LT.3
B1 (30 x 60)
B1 (30 x 60)
B1 (30 x 60)
B1L (30 x 60)
B2 (30 x 40)
B2 (30 x 40)
B2 (30 x 40)
B2L (30 x 40)
B3 (15 x 25)
B3 (15 x 25)
B3 (15 x 25)
G1 (35 x 75)
G1 (35 x 75)
G2 (35 x 70)
G4 (30 x 70)
G4 (30 x 70)
G6 (30 x 40)
G6 (30 x 40)
G7 (30 x 40)

BALOK LATAI Elv. 2.65


0.368 B. LATAI (15 x 15)
0.368 B. LATAI (15 x 15)
0.368 B. LATAI (15 x 15)
0.368 BALOK LATAI Elv. 6.65
0.368 B. LATAI (15 x 15)
0.368 B. LATAI (15 x 15)

6.598
2.898
27.598
18.598
36
136
6.6
3.7
6
3.4
4
144.46
24.46
48.598
72.598
12.598
9
48
24

6.736
3.036
27.736
18.736
36.736
136.736
7.336
4.436
6.598
3.998
4.598
144.736
24.736
48.736
72.736
12.736
9.736
48.736
24.736

6.736
3.036
27.736
18.736
36.736
136.736
7.336
4.436
6.598
3.998
4.598
144.736
24.736
48.736
72.736
12.736
9.736
48.736
24.736

13.7550862
6.0415641
57.5345362
38.7719148

4.368
14.618
19.668

4.368
14.618
19.668

0
0
0

4.368
14.618

4.368
14.618

0
0

356.403457
60.3463143
101.313986
151.347643
26.2635005
0
0
0

Pujo Widodo/Barokat Z.Alam

PERHITUNGAN VOLUME PEKERJAAN BALOK

2
2
2
2

0.368 B.
0.368 B.
0.368 B.
0.368 B.

Jml Tul.
Atas
Ekstra

Jml Tul.
Bawah
Menerus

Jml Tul.
Bawah
Ekstra

Overlab tul
pinggang

buah

buah

buah

2
2
0
0
0

3
3
3
3
3
2
2
2

2
2
0
0
0

Overlab
tul pokok

LATAI
LATAI
LATAI
LATAI

(15
(15
(15
(15

BALOK

x
x
x
x

15)
15)
15)
15)

19.668
1.568
6.368
24.368

19.668
1.568
6.368
24.368

0
0
0
0

Pjg Tul.
pinggang

Pjg Tul.
Atas

Pjg Tul.
Bawah

Berat Tul.
Pinggang

kg

72.736
12.736
16.736
8.736
16.736
54.598
36.598
60.598

72.736
12.736
16.736
8.736
16.736
54.598
36.598
60.598

RING BALK Elv. 11.5


0.736 RB1 (30 x 50)
0.736 RB1 (30 x 50)
0.736 RB2 (30 x 50)
0.736 RB2 (30 x 50)
0.736 RB2 (30 x 50)
0.598 B3 (25 x 15)
0.598 B3 (25 x 15)
0.598 B3 (25 x 15)

0
0
0
0
0
0
0
0

Pujo Widodo/Barokat Z.Alam

PERHITUNGAN VOLUME PEKERJAAN BALOK

edung Fakultas Bahasa Dan Seni Universitas Negeri Semarang


HSPK SEPTEMBER 2016

Pembang

Berat Tul.
Atas
Menerus

Berat Tul.
Atas Ekstra

Berat Tul.
Bawah
Menerus

Berat Tul.
Bawah
Ekstra

Berat Tul.
Pokok

Jarak
Beugel
Tumpuan

Jarak
Beugel
Lapangan

kg

Kg

kg

Kg

kg

76.953
203.270
10.63595154
7.478
0.000
0.000
571.3350217
318.700
129.640
0.000
87.008
76.95275154
0

830.363
423.359
615.622
1626.164
85.088
59.824
35.849
27.510
3784.414
2080.223
1237.368
52.527
830.363
615.622
234.345

0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15

219.857
254.353
69.288
35.849
19.171
410.372
44.868
30.278

0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15

464.041
236.669
230.858
609.811
31.908
22.434
17.925
13.755
1142.670
637.399
432.133
26.264
290.025
230.858
117.172

122.983
95.383
34.644
17.925
9.586
125.812
22.434
15.139

76.953
203.270
10.63595154
7.478

571.3350217
318.700
129.640
87.008
76.95275154
0

31.79416869

62.90622171

290.025
147.918
230.858
609.811
31.908
22.434
17.925
13.755
1142.670
637.399
432.133
26.264
290.025
230.858
117.172

76.864
95.383
34.644
17.925
9.586
125.812
22.434
15.139

31.79416869

62.90622171

BALOK

D Tul. Begel
Tumpuan
m

BALOK LT.02
B1 (30 x 60)
B1L (30 x 60)
B2 (30 x 40)
B2 (30 x 40)
B2 (30 x 40)
B2L (30 x 40)
B3 (15 x 25)
B3 (15 x 25)
G1 (35 x 75)
G2 (35 x 70)
G4 (30 x 70)
B3 (15 x 25)
G4 (30 x 70)
G6 (30 x 40)
G7 (30 x 40)
BALOK Elv.6.7
B1 (30 x 60)
B2 (30 x 40)
B3 (15 x 25)
B3 (15 x 25)
B3 (15 x 25)
G2 (35 x 70)
G7 (30 x 40)
G7 (30 x 40)

0.01
0.01
0.01
0.01
0.01
0.01
0.008
0.008
0.01
0.01
0.01
0.008
0.01
0.01
0.01

0.01
0.01
0.008
0.008
0.008
0.01
0.01
0.01

Pujo Widodo/Barokat Z.Alam

PERHITUNGAN VOLUME PEKERJAAN BALOK

Berat Tul.
Atas
Menerus

Berat Tul.
Atas Ekstra

Berat Tul.
Bawah
Menerus

Berat Tul.
Bawah
Ekstra

Berat Tul.
Pokok

Jarak
Beugel
Tumpuan

Jarak
Beugel
Lapangan

kg

Kg

kg

Kg

kg

53.17975771
23.96878629
218.9717577
147.9180434
174.0152832
647.7067118
34.7500032
21.01295177
13.75508624
8.334773386
9.585614814
1142.670043
195.2871863
384.7637577
574.2403291
100.5489006
46.11859749
230.8582546
117.1723118

0
0
0
0
58.0050944
215.9022373
11.5833344
7.004317257
0
0
0
571.3350217
97.64359314
192.3818789
172.2720987
30.16467017
15.37286583
76.95275154
0

152.022456
68.3604084
626.861106
423.358828
464.040755
1727.2179
92.6666752
56.0345381
27.5101725
16.6695468
19.1712296
3784.41359
646.207873
1255.60526
1644.3725
287.690642
122.982927
615.622012
234.344624

85.08761234
0
38.35005806
0
350.3548123
0
236.6688695
0
174.0152832 58.0050944
647.7067118 215.9022373
34.7500032 11.5833344
21.01295177 7.004317257
13.75508624
0
8.334773386
0
9.585614814
0
1142.670043 571.3350217
195.2871863 97.64359314
384.7637577 192.3818789
574.2403291 172.2720987
100.5489006 30.16467017
46.11859749 15.37286583
230.8582546 76.95275154
117.1723118
0

0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1

3.4484736
11.54070217
15.52760503

0
3.4484736
0 11.54070217
0 15.52760503

0 6.8969472
0 23.0814043
0 31.0552101

0.1
0.1
0.1

3.4484736
11.54070217

0
3.4484736
0 11.54070217

0 6.8969472
0 23.0814043

0.1
0.1

BALOK

D Tul. Begel
Tumpuan
m

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15

BALOK LT.3
B1 (30 x 60)
B1 (30 x 60)
B1 (30 x 60)
B1L (30 x 60)
B2 (30 x 40)
B2 (30 x 40)
B2 (30 x 40)
B2L (30 x 40)
B3 (15 x 25)
B3 (15 x 25)
B3 (15 x 25)
G1 (35 x 75)
G1 (35 x 75)
G2 (35 x 70)
G4 (30 x 70)
G4 (30 x 70)
G6 (30 x 40)
G6 (30 x 40)
G7 (30 x 40)

BALOK LATAI Elv. 2.65


0.15 B. LATAI (15 x 15)
0.15 B. LATAI (15 x 15)
0.15 B. LATAI (15 x 15)
BALOK LATAI Elv. 6.65
0.15 B. LATAI (15 x 15)
0.15 B. LATAI (15 x 15)

0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.008
0.008
0.008
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.008
0.008
0.008
0.008
0.008

Pujo Widodo/Barokat Z.Alam


15.52760503
1.2379136
5.027445029
19.23818789

PERHITUNGAN VOLUME PEKERJAAN BALOK

0 15.52760503
0
1.2379136
0 5.027445029
0 19.23818789

0 31.0552101
0 2.4758272
0 10.0548901
0 38.4763758

0.1
0.1
0.1
0.1

0.15 B.
0.15 B.
0.15 B.
0.15 B.

Berat Tul.
Atas
Menerus

Berat Tul.
Atas Ekstra

Berat Tul.
Bawah
Menerus

Berat Tul.
Bawah
Ekstra

Berat Tul.
Pokok

Jarak
Beugel
Tumpuan

Jarak
Beugel
Lapangan

kg

Kg

kg

Kg

kg

344.5441975 114.8480658
60.32934034 20.10978011
79.27699749
0
41.3816832
0
79.27699749
0
113.8224005
0
76.29715767
0
126.3308148
0

344.5441975 114.8480658 918.784527


60.32934034 20.10978011 160.878241
79.27699749
0 158.553995
41.3816832
0 82.7633664
79.27699749
0 158.553995
113.8224005
0 227.644801
76.29715767
0 152.594315
126.3308148
0 252.66163

0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1

LATAI
LATAI
LATAI
LATAI

(15
(15
(15
(15

x
x
x
x

15)
15)
15)
15)

BALOK

0.008
0.008
0.008
0.008
D Tul. Begel
Tumpuan
m

RING BALK Elv. 11.5


0.15 RB1 (30 x 50)
0.15 RB1 (30 x 50)
0.15 RB2 (30 x 50)
0.15 RB2 (30 x 50)
0.15 RB2 (30 x 50)
0.15 B3 (25 x 15)
0.15 B3 (25 x 15)
0.15 B3 (25 x 15)

0.01
0.01
0.01
0.01
0.01
0.008
0.008
0.008

Pujo Widodo/Barokat Z.Alam

PERHITUNGAN VOLUME PEKERJAAN BALOK

Pembangunan Gedung Fakultas Bahasa Dan Seni Universitas Negeri Semarang


HSPK SEPTEMBER 2016
D Tul.
Berat tul
Begel
beugel per
Lapangan
meter

Jml Begel

Panjang
Begel

Berat tul
beugel

Berat Total
Tulangan

buah

kg

kg

kg

Koef beton
Koef bekisting
besi polos

0.01
0.01
0.01
0.01
0.01
0.01
0.008
0.008
0.01
0.01
0.01
0.008
0.01
0.01
0.01

0.617
0.617
0.617
0.617
0.617
0.617
0.395
0.395
0.617
0.617
0.617
0.395
0.617
0.617
0.617

0.617
0.617
0.617
0.617
0.617
0.617
0.395
0.395
0.617
0.617
0.617
0.395
0.617
0.617
0.617

288.6666667
145.333
322.000
962
45.333
32
55.33333333
45.33333333
1148.667
635.333
432.000
88.66666667
282
362
162

1.7
1.7
1.3
1.3
1.3
1.3
0.688
0.688
4.2
4
3.8
0.688
3.8
1.3
1.3

302.67731
152.38719
258.1865
771.35221
36.349238
25.658286
15.027597
12.311767
2975.621
1567.4581
1012.5154
24.080367
660.94757
290.25936
129.89507

1133.041
575.746
873.809
2397.516
121.437
85.482
50.877
39.822
6760.035
3647.681
2249.883
76.607
1491.311
905.881
364.240

182.985
185.964
189.629
173.431
194.610
197.876
211.986
204.215
187.155
195.901
207.630
196.429
211.354
174.746
158.090

8.333
8.333
9.167
9.167
9.167
9.167
17
17.3
7.048
7.143
8.095
17
8.1
9.2
9.167

0.01
0.01
0.008
0.008
0.008
0.01
0.01
0.01

0.617
0.617
0.395
0.395
0.395
0.617
0.617
0.617

0.617
0.617
0.395
0.395
0.395
0.617
0.617
0.617

47
157
115.5
62
22
122
22
15.83333333

1.7
1.3
0.688
0.688
0.688
4
1.3
1.3

49.281179
125.88596
31.367846
16.838151
5.9748279
300.99143
17.640071
12.695506

269.138
380.239
100.656
52.687
25.146
711.363
62.508
42.974

276.891
170.358
197.075
195.138
279.401
201.634
217.042
215.732

8.333
9.167
17.333
17.333
17.333
7.143
9.167
9.167

Pujo Widodo/Barokat Z.Alam

D Tul.
Berat tul
Begel
beugel per
Lapangan
meter

PERHITUNGAN VOLUME PEKERJAAN BALOK

m
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.008
0.008
0.008
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01

0.61678571
0.61678571
0.61678571
0.61678571
0.61678571
0.61678571
0.61678571
0.61678571
0.39474286
0.39474286
0.39474286
0.61678571
0.61678571
0.61678571
0.61678571
0.61678571
0.61678571
0.61678571
0.61678571

0.616786
0.616786
0.616786
0.616786
0.616786
0.616786
0.616786
0.616786
0.394743
0.394743
0.394743
0.616786
0.616786
0.616786
0.616786
0.616786
0.616786
0.616786
0.616786

Jml Begel

Panjang
Begel

Berat tul
beugel

Berat Total
Tulangan

buah

kg

kg

kg

48.66666667
14.5
217
145.3333333
242
1022
43.66666667
29.5
45.33333333
23.66666667
32
1148.666667
188.6666667
382
575.3333333
95.33333333
67
362
162

1.3
1.3
1.3
1.7
1.3
1.3
1.3
1.3
0.688
0.688
0.688
4.2
4.2
4
3.8
3.8
1.3
1.3
1.3

39.021976 191.0444324905
11.626411
79.9868191571
173.99525
800.8563563
152.38719 575.7460182048
194.04079 658.0815409143
819.4615 2546.6793980572
35.012869 127.6795442476
23.653732
79.6882702
12.311767
39.8219390381
6.4274664
23.0970131333
8.6906587
27.8618883714
2975.621 6760.0345874286
488.741 1134.9488731429
942.44857 2198.0538308143
1348.458 2992.8305467762
223.4409 511.1315467762
53.722036 176.7049623429
290.25936 905.8813694857
129.89507 364.2396949714

Koef beton
Koef bekisting
besi polos

284.29231 9.1666666667
444.371218 9.1666666667
258.674534 9.1666666667
185.964476 8.3333333333
190.417113 9.1666666667
173.385035 9.1666666667
212.79924 9.1666666667
201.233006 9.1666666667
204.215072 17.3333333333
236.892442 17.3333333333
206.384358 17.3333333333
187.154889 7.0476190476
193.018516 7.0476190476
196.746673 7.1428571429
207.144971 8.0952380952
217.317835 8.0952380952
188.787353 9.1666666667
174.745635 9.1666666667
158.090145 9.1666666667

0.008 0.39474286 0.394743 35.33333333


0.008 0.39474286 0.394743
120.75
0.008 0.39474286 0.394743 162.8333333

0.488 6.8064195
0.488 23.260618
0.488 31.36732

13.7033667048 152.25963 20
46.3420219429 144.536521 20
62.4225301333 143.74791 20

0.008 0.39474286 0.394743 35.33333333


0.008 0.39474286 0.394743
120.75

0.488 6.8064195
0.488 23.260618

13.7033667048 152.25963 20
46.3420219429 144.536521 20

Pujo Widodo/Barokat Z.Alam


0.008
0.008
0.008
0.008

0.39474286
0.39474286
0.39474286
0.39474286

D Tul.
Berat tul
Begel
beugel per
Lapangan
meter
m
0.01
0.01
0.01
0.01
0.01
0.008
0.008
0.008

0.61678571
0.61678571
0.61678571
0.61678571
0.61678571
0.39474286
0.39474286
0.39474286

PERHITUNGAN VOLUME PEKERJAAN BALOK

0.394743 162.8333333
0.394743
12
0.394743
52
0.394743
202

0.488 31.36732
0.488 2.3116142
0.488 10.016995
0.488 38.912172

62.4225301333 143.74791 20
4.7874413714 177.312643 20
20.0718848 148.680628 20
77.3885476571 143.312125 20

Jml Begel

Panjang
Begel

Berat tul
beugel

Berat Total
Tulangan

buah

kg

kg

kg

0.616786 575.3333333
0.616786 95.33333333
0.616786
122
0.616786
62
0.616786 128.6666667
0.394743
452
0.394743
302
0.394743
502

1.5
1.5
1.5
1.5
1.5
0.688
0.688
0.688

532.28607 1451.0705980572
88.200357 249.0785980571
112.87179 271.4257806857
57.361071 140.1244378286
119.03964 277.5936378286
122.75555
350.4003558
82.018092 234.6124072286
136.33471 388.9963386571

Koef beton
Koef bekisting
besi polos

140.607616 8.6666666667
148.26107 8.6666666667
125.660084 8.6666666667
129.74485 8.6666666667
121.751596 8.6666666667
173.037213 17.3333333333
173.786968 17.3333333333
172.887262 17.3333333333

Pujo Widodo/Barokat Z.Alam

PERHITUNGAN VOLUME PEKERJAAN BALOK

Pujo Widodo/Barokat Z.Alam

PERHITUNGAN VOLUME PEKERJAAN BALOK

Pujo Widodo/Barokat Z.Alam

PERHITUNGAN VOLUME PEKERJAAN BALOK

RAB PEKERJAAN BALOK

Pujo Widodo/Barokat Z.Alam

Pembangunan Gedung Fakultas Bahasa Dan Seni Universitas Negeri Semarang


HSPK SEPTEMBER 2016
No
A.

Pekerjaan Balok Lantai


1 B1 (30 x 60)
2 B1L (30 x 60)
3 B2 (30 x 40)
4 B2 (30 x 40)
5 B2 (30 x 40)
6 B2L (30 x 40)
7 B3 (15 x 25)
8 B3 (15 x 25)
9 G1 (35 x 75)
10 G2 (35 x 70)
11 G4 (30 x 70)
12 B3 (15 x 25)
13 G4 (30 x 70)
14 G6 (30 x 40)
15 G7 (30 x 40)
No

B.

Uraian

Uraian

SNI

Volume

Satuan

6.192
3.096
4.608
13.824
0.624
0.432
0.240
0.195
36.120
18.620
10.836
0.390
7.056
5.184
2.304

m
m
m
m
m
m
m
m
m
m
m
m
m
m
m

Volume

Satuan

0.972
2.232
0.511
0.270
0.090
3.528
0.288
0.199

m
m
m
m
m
m
m
m

Harga Satuan

Harga pekerjaan balok

2
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.

B1
B1L
B2
B2
B2
B2L
B3
B3
G1
G2
G4
B3
G4
G6
G7

SNI

Pekerjaan Balok Elv. 6.7


1 B1 (30 x 60)
A.4.1.1.a.1. B1
2 B2 (30 x 40)
A.4.1.1.a.1. B1L
3 B3 (15 x 25)
A.4.1.1.a.1. B2
4 B3 (15 x 25)
A.4.1.1.a.1. B2
5 B3 (15 x 25)
A.4.1.1.a.1. B2
6 G2 (35 x 70)
A.4.1.1.a.1. B2L
7 G7 (30 x 40)
A.4.1.1.a.1. B3
8 G7 (30 x 40)
A.4.1.1.a.1. B3

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

7,602,222.54
7,649,318.75
7,977,361.73
7,089,426.18
7,393,724.87
8,184,707.69
11,809,619.52
11,686,796.77
7,132,557.13
7,310,463.83
7,892,564.15
11,563,741.81
7,951,407.96
7,577,600.89
7,555,903.03

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

9,086,389.00
7,749,795.84
10,742,351.41
10,493,941.68
11,704,626.93
7,401,062.88
8,487,626.81
8,466,924.80

47,072,961.94
23,682,290.86
36,759,682.87
98,004,227.48
4,613,684.32
3,535,793.72
2,834,308.69
2,278,925.37
257,627,963.56
136,120,836.44
85,523,825.14
4,509,859.31
56,105,134.57
39,282,283.01
17,408,800.58

Rp

Harga pekerjaan balok


Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

8,831,970.11
17,297,544.32
5,486,655.98
2,833,364.25
1,053,416.42
26,110,949.83
2,444,436.52
1,686,611.42

Rp

RAB PEKERJAAN BALOK

Pujo Widodo/Barokat Z.Alam

Pembangunan Gedung Fakultas Bahasa Dan Seni Universitas Negeri Semarang


HSPK SEPTEMBER 2016
No
C.

D.

E.

Uraian
Pekerjaan Balok Lantai
1
B1 (30 x 60)
2
B1 (30 x 60)
3
B1 (30 x 60)
4
B1L (30 x 60)
5
B2 (30 x 40)
6
B2 (30 x 40)
7
B2 (30 x 40)
8
B2L (30 x 40)
9
B3 (15 x 25)
10
B3 (15 x 25)
11
B3 (15 x 25)
12
G1 (35 x 75)
13
G1 (35 x 75)
14
G2 (35 x 70)
15
G4 (30 x 70)
16
G4 (30 x 70)
17
G6 (30 x 40)
18
G6 (30 x 40)
19
G7 (30 x 40)

Volume

Satuan

Harga Satuan

Harga pekerjaan balok

0.672
0.180
3.096
3.096
3.456
14.688
0.600
0.396
0.195
0.098
0.135
36.120
5.880
11.172
14.448
2.352
0.936
5.184
2.304

m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

9,550,503.00
12,080,518.12
9,145,619.17
6,953,926.14
7,333,476.62
7,797,635.70
8,420,569.33
8,237,767.31
11,686,796.77
12,203,256.07
11,721,081.91
7,132,557.13
7,225,230.58
7,323,825.65
7,884,891.53
8,045,671.60
8,041,066.26
7,819,139.70
7,555,903.03

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

6,417,938.02
2,174,493.26
28,314,836.95
21,529,355.32
25,344,495.19
114,531,673.23
5,052,341.60
3,262,155.85
2,278,925.37
1,189,817.47
1,582,346.06
257,627,963.56
42,484,355.82
81,821,780.11
113,920,912.81
18,923,419.59
7,526,438.01
40,534,420.23
17,408,800.58

Rp

B.LATAI
B.LATAI
B.LATAI

0.090
0.321
0.434

m
m
m

Rp
Rp
Rp

11,976,475.40
11,854,413.20
11,841,949.38

Rp
Rp
Rp

1,077,882.79
3,800,821.23
5,142,366.52

Rp

B.LATAI
B.LATAI
B.LATAI

0.090
0.321
0.434

m
m
m

Rp
Rp
Rp

10,887,704.91
10,776,739.27
11,841,949.38

Rp
Rp

979,893.44
3,455,292.03
5,142,366.52

3
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.

BALOK LATAI Elv. 2.65


1 B. LATAI (15 x 15) A.4.1.1.a.1.
2 B. LATAI (15 x 15) A.4.1.1.a.1.
3 B. LATAI (15 x 15) A.4.1.1.a.1.
BALOKBALOK LATAI Elv. 6.65
1 B. LATAI (15 x 15) A.4.1.1.a.1.
2 B. LATAI (15 x 15) A.4.1.1.a.1.
3 B. LATAI (15 x 15) A.4.1.1.a.1.

B1
B1
B1
B1L
B2
B2
B2
B2L
B3
B3
B3
G1
G1
G2
G4
G4
G6
G6
G7

Rp

RAB PEKERJAAN BALOK

Pujo Widodo/Barokat Z.Alam


4
5
6

B. LATAI (15 x 15) A.4.1.1.a.1. B.LATAI


B. LATAI (15 x 15) A.4.1.1.a.1. B.LATAI
B. LATAI (15 x 15) A.4.1.1.a.1. B.LATAI

0.027
0.135
0.540

m
m
m

Rp
Rp
Rp

12,372,433.27
11,919,909.99
11,835,061.88

Rp
Rp
Rp

334,055.70
1,609,187.85
6,390,933.41

Rp

Pembangunan Gedung Fakultas Bahasa Dan Seni Universitas Negeri Semarang


HSPK SEPTEMBER 2016
No
F

Uraian
RING
1
2
3
4
5
6
7
8

BALK Elv. 11.5


RB1 (30 x 50)
RB1 (30 x 50)
RB2 (30 x 50)
RB2 (30 x 50)
RB2 (30 x 50)
B3 (25 x 15)
B3 (25 x 15)
B3 (25 x 15)

A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.

RB1
RB1
RB2
RB2
RB2
B3
B3
B3

Volume

Satuan

10.320
1.680
2.160
1.080
2.280
2.025
1.350
2.250

m
m
m
m
m
m
m
m

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

7,101,458.92
7,192,276.96
6,835,072.89
6,272,392.55
6,157,545.47
11,194,036.94
11,205,886.68
11,191,666.99

Harga pekerjaan balok


Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

73,287,056.10
12,083,025.30
14,763,757.44
6,774,183.95
14,039,203.67
22,667,924.80
15,127,947.01
25,181,250.73

TOTAL HARGA
PEKERJAAN BALOK

Rp

Rp

Pujo Widodo/Barokat Z.Alam

Harga Total

815,360,577.86

Harga Total

74,337,380.14

RAB PEKERJAAN BALOK

Pujo Widodo/Barokat Z.Alam

Harga Total

791,926,469.04

10,021,070.54

17,911,728.95

RAB PEKERJAAN BALOK

Pujo Widodo/Barokat Z.Alam

17,911,728.95

Harga Total

183,924,349.01

1,003,783,617.53

RAB PEKERJAAN BALOK

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG


Pembangunan Gedung Fakultas Bahasa Dan Seni Universitas Negeri Semarang
HSPK SEPTEMBER 2016

No.

SNI

KODE

KOEF

SAT.

URAIAN PEKERJAAN

III
A.4.1.1
a. Harga satuan pekerjaan beton lantai 2
1.

A.4.1.1.a.1

a.1. RB1 (30 x 50)


L.01
L.02
L.02
L.02
L.03
L.04

8.354
0.275
2.860
0.984
0.412
0.425
0.347
3.467
1.733
140.608
2.109
413
681
1,021
215
0.156
3.033
17.333

m3

Membuat Balok Beton Bertulang (140,608 kg Besi + Bekisting

A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C

Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG


D
E
F

2.

A.4.1.1.a.1

RB1 (30 x 50)

L.01
L.02
L.02
L.02
L.03
L.04

8.408
0.275
2.860
1.038
0.418
0.428
0.347
3.467
1.733
148.261
2.224
384
692
1,039
215
0.156
3.03
17.33

Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)

10%

m3

Membuat Balok Beton Bertulang (148.251 kg Besi + Bekisting

A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F

Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)

10%

Pujo Widodo/Barokat Z. Alam

3.

HARGA SATUAN PEKERJAAN BETON BERTULANG

A.4.1.1.a.1

RB2 (30 x 50)

L.01
L.02
L.02
L.02
L.03
L.04

8.250
0.275
2.860
0.880
0.402
0.419
0.347
3.467
1.733
125.660
1.885
384
692
1,039
215
0.156
3.03
17.33

4.

A.4.1.1.a.1

m3

Membuat Balok Beton Bertulang (125,660 kg Besi + Bekisting

A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F

Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)

m3

Membuat Balok Beton Bertulang (129,745 kg Besi + Bekisting

10%

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG


A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F

Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)

m3

Membuat Balok Beton Bertulang (121,752 kg Besi + Bekisting

8.222
0.275
2.86
0.852

A
OH
OH
OH
OH

Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi

RB2 (30 x 50)

L.01
L.02
L.02
L.02
L.03
L.04

8.278
0.275
2.860
0.908
0.405
0.421
0.347
3.467
1.733
129.745
1.946
384
692
1,039
215
0.156
3.033
17.33

5.

A.4.1.1.a.1
RB2 (30 x 50)

L.01
L.02
L.02
L.02

10%

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG


L.03
L.04

0.399
0.418
0.35
3.47
1.73
121.752
1.826
384
692
1,039
215
0.16
3.033
17.33

6.

A.4.1.1.a.1

B3 (25 x 15)

L.01
L.02
L.02
L.02
L.03
L.04

14.301
0.275
5.72
1.211
0.721
0.724
0.693
6.933

OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F

Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)

m3

Membuat Balok Beton Bertulang (173,037 kg Besi + Bekisting

A
OH
OH
OH
OH
OH
OH
B
m3
Kg

Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"

10%

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG


3.467
173.037
2.596
384
692
1,039
215
0.312
6.067
34.667

7.

A.4.1.1.a.1

B3 (25 x 15)

L.01
L.02
L.02
L.02
L.03
L.04

14.307
0.275
5.7
1.217
0.722
0.725
0.7
7
3
173.787
2.607
384
692

Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F

Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)

m3

Membuat Balok Beton Bertulang (173,787 kg Besi + Bekisting

A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg

Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton

10%

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG


1,039
215
0.31
6.1
35

8.

A.4.1.1.a.1

B3 (25 x 15)

L.01
L.02
L.02
L.02
L.03
L.04

14.300
0.275
5.720
1.210
0.721
0.724
0.69
6.9
3.5
172.887
2.593
384
692
1,039
215
0.312
6.067

Kg
ltr
m3
Lbr
Btg
C
D
E
F

Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)

m3

Membuat Balok Beton Bertulang (172,887 kg Besi + Bekisting

A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr

Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm

10%

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG


35

Btg
C
D
E
F

Dolken diameter 8 / 4rm


PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)

10%

HARGA SATUAN PEKERJAAN BETON BERTULANG

Pujo Widodo/Barokat Z. Alam

marang

Harga Bahan/Upah
Maksimum Rp

Jumlah Harga Maksimum


Rp

0,608 kg Besi + Bekisting)

65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00

7,101,458.92
968,489.06
543,026.47
23,375.00
243,100.00
83,661.53
39,180.41
36,145.66
5,487,382.69
728,000.00
48,533.33
17,333.33
1,827,899.01
30,582.16
511,087.50
211,596.43
287,392.59
3,225.00
920,400.00
485,333.33
416,000.00

8.667
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok

m2

14.061
m3

1
10
8.667
140.608
beton K-250
bekisting
tulangan
jumlah
Satuan
1.65
5.72
0.98
8.354 OH
0.275 0.275 OH
2.86 2.860 OH
0.98
0.984 OH
0.028
0.286
0.098
0.412 OH
0.083
0.286
0.056
0.425 OH
0.04
0.4
0.2

0.347 m3
3.467 Kg
1.733 Ltr
0.150

384
692
1039
215
0.018

2.109 Kg
384 Kg
692 Kg
1039 Kg
215 ltr
0.156 m3

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG


0.35
2

6,455,871.75 Plywood 9 mm
645,587.17 Dolken diameter 8 / 4rm
7,101,458.92

3.033 Lbr
17.333 Btg

8.251 kg Besi + Bekisting)

65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00

7,192,276.96
977,294.36
546,508.79
23,375.00
243,100.00
88,215.34
39,689.36
36,405.88
5,561,139.24
728,000.00
48,533.33
17,333.33
1,927,393.91
32,246.78
475,200.00
215,014.29
292,459.26
3,225.00
920,400.00
485,333.33
416,000.00

8.667
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

Kayu Klas III (Terentang)


Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
6,538,433.60 Plywood 9 mm
653,843.36 Dolken diameter 8 / 4rm
7,192,276.96

m2
1

beton K-250
1.65
0.275
0.028
0.083

14.826
m3

1
10
8.667
148.261
bekisting
tulangan
jumlah
1.038
5.72
8.408
0.275
2.860
2.860
1.038
1.038
0.286
0.104
0.418
0.286
0.059
0.428

Satuan
OH
OH
OH
OH
OH
OH

0.347
3.467
1.733

m3
Kg
Ltr

2.224
384
692
1039
215
0.156
3.033
17.333

Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg

Pujo Widodo/Barokat Z. Alam

5,660 kg Besi + Bekisting)

65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00

9,745 kg Besi + Bekisting)

HARGA SATUAN PEKERJAAN BETON BERTULANG

6,835,072.89
951,291.93
536,225.34
23,375.00
243,100.00
74,767.75
38,186.40
35,637.44
5,262,410.70
728,000.00
48,533.33
17,333.33
1,633,581.09
27,331.07
475,200.00
215,014.29
292,459.26
3,225.00
920,400.00
485,333.33
416,000.00

8.667
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

m2
1

beton K-250
1.65
0.275
0.028
0.083

12.566
m3

1
10
8.667
125.660
bekisting
tulangan
jumlah
5.72
0.88
8.250
0.275
2.86
2.860
0.88
0.880
0.286
0.088
0.402
0.286
0.050
0.419

Satuan
OH
OH
OH
OH
OH
OH

0.347
3.467
1.733

m3
Kg
Ltr

1.885
384
692
1039
215
0.156
3.033
17.333

Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg

Kayu Klas III (Terentang)


Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
6,213,702.63 Plywood 9 mm
621,370.26 Dolken diameter 8 / 4rm
6,835,072.89

6,272,392.55

8.667

12.974

Pujo Widodo/Barokat Z. Alam

65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00

1,752 kg Besi + Bekisting)


65,000.00
85,000.00
85,000.00
85,000.00

HARGA SATUAN PEKERJAAN BETON BERTULANG


955,991.45
538,083.91
23,375.00
243,100.00
77,198.19
38,458.03
35,776.32
5,316,401.10
728,000.00
48,533.33
17,333.33
1,686,683.05
28,219.50
475,200.00
215,014.29
292,459.26
3,225.00
920,400.00
485,333.33
416,000.00

m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

m2
1

beton K-250
1.65
0.275
0.028
0.083

m3

1
10
8.667
129.745
bekisting
tulangan
jumlah
5.72
0.91
8.278
0.275
2.86
2.860
0.91
0.908
0.286
0.091
0.405
0.286
0.052
0.421

Satuan
OH
OH
OH
OH
OH
OH

0.347
3.467
1.733

m3
Kg
Ltr

1.946
384
692
1039
215
0.156
3.033
17.333

Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg

Kayu Klas III (Terentang)


Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
6,272,392.55 Plywood 9 mm
627,239.25 Dolken diameter 8 / 4rm
6,899,631.80

6,157,545.47
946,795.21
534,446.98
23,375.00
243,100.00
72,442.20

8.667
m3
per
dari V2
Koefisien
Pekerja

m2
1

beton K-250
1.65

12.175
m3

1
10
8.667
121.752
bekisting
tulangan
jumlah
0.85
5.72
8.222

Satuan
OH

Pujo Widodo/Barokat Z. Alam


95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00

3,037 kg Besi + Bekisting)

65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00

HARGA SATUAN PEKERJAAN BETON BERTULANG


37,926.48
35,504.55
5,210,750.26
728,000.00
48,533.33
17,333.33
1,582,770.74
26,480.97
475,200.00
215,014.29
292,459.26
3,225.00
920,400.00
485,333.33
416,000.00

0.275
0.028
0.083

Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

2.86
0.286
0.286

0.85
0.085
0.049

Kayu Klas III (Terentang)


Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
6,157,545.47 Plywood 9 mm
615,754.55 Dolken diameter 8 / 4rm
6,773,300.02

11,194,036.94
1,672,179.31
929,581.93
23,375.00
486,200.00
102,957.14
68,506.97
61,558.27
8,504,217.90
1,456,000.00
97,066.67

17.333
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

m2
1

beton K-250
1.65
0.275
0.028
0.083

0.275
2.860
0.852
0.399
0.418

OH
OH
OH
OH
OH

0.347
3.467
1.733

m3
Kg
Ltr

1.826
384
692
1039
215
0.156
3.033
17.333

Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg

17.304
m3

1
10
17.333
173.037
bekisting
tulangan
jumlah
1.21
11.44
14.301
0.275
5.72
5.720
1.21
1.211
0.572
0.121
0.721
0.572
0.069
0.724

Satuan
OH
OH
OH
OH
OH
OH

Pujo Widodo/Barokat Z. Alam


10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00

3,787 kg Besi + Bekisting)

65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71

HARGA SATUAN PEKERJAAN BETON BERTULANG


34,666.67
2,249,483.77
37,635.59
475,200.00
215,014.29
292,459.26
3,225.00
1,840,800.00
970,666.67
832,000.00

Kayu Klas III (Terentang)


Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
10,176,397.22 Plywood 9 mm
1,017,639.72 Dolken diameter 8 / 4rm
11,194,036.94

11,205,886.68
1,673,041.91
929,923.07
23,375.00
486,200.00
103,403.25
68,556.83
61,583.76
8,514,127.80
1,456,000.00
97,066.67
34,666.67
2,259,230.59
37,798.67
475,200.00
215,014.29

17.333
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos

m2
1

beton K-250
1.65
0.275
0.028
0.083

0.693
6.933
3.467

m3
Kg
Ltr

2.596
384
692
1039
215
0.312
6.067
34.667

Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg

17.379
m3

1
10
17.333
173.787
bekisting
tulangan
jumlah
11.44
1.22
14.307
0.275
5.72
5.720
1.22
1.217
0.572
0.122
0.722
0.572
0.070
0.725
0.693
6.933
3.467

Satuan
OH
OH
OH
OH
OH
OH
m3
Kg
Ltr

Pujo Widodo/Barokat Z. Alam


281.48
15.00
5,900,000.00
160,000.00
24,000.00

HARGA SATUAN PEKERJAAN BETON BERTULANG


292,459.26
3,225.00
1,840,800.00
970,666.67
832,000.00

Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
10,187,169.71 Plywood 9 mm
1,018,716.97 Dolken diameter 8 / 4rm
11,205,886.68

2.607
384
692
1039
215
0.312
6.067
34.667

Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg

2,887 kg Besi + Bekisting)

65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00

11,191,666.99
1,672,006.79
929,513.70
23,375.00
486,200.00
102,867.92
68,497.00
61,553.17
8,502,235.93
1,456,000.00
97,066.67
34,666.67
2,247,534.40
37,602.98
475,200.00
215,014.29
292,459.26
3,225.00
1,840,800.00
970,666.67

17.333
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton

m2
1

beton K-250
1.65
0.275
0.028
0.083

17.289

m3
1
10
17.333
172.887
bekisting
tulangan
jumlah
1.21
11.44
14.300
0.275
5.72
5.720
1.21
1.210
0.572
0.121
0.721
0.572
0.069
0.724

Satuan
OH
OH
OH
OH
OH
OH

0.693
6.933
3.467

m3
Kg
Ltr

2.593
384
692
1039

Kg
Kg
Kg
Kg

Pujo Widodo/Barokat Z. Alam


24,000.00

HARGA SATUAN PEKERJAAN BETON BERTULANG


832,000.00 Air
Kayu Klas II Balok
10,174,242.72 Plywood 9 mm
1,017,424.27 Dolken diameter 8 / 4rm
11,191,666.99

215
0.312
6.067
34.667

ltr
m3
Lbr
Btg

HARGA SATUAN PEKERJAAN BETON BERTULANG

Pujo Widodo/Barokat Z. Alam

Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok

beton K-250bekisting
1.65
0.66
0.275
0.33
0.028
0.033
0.083
0.033

tulangan jumlah
0.07
2.380
0.275
0.330
0.07
0.070
0.007
0.068
0.004
0.120

Satuan
OH
OH
OH
OH
OH
OH

0.347
3.467
1.733

m3
Kg
Ltr

2.109
413
681
1021
215
0.156

Kg
Kg
Kg
Kg
ltr
m3

0.04
0.4
0.2
0.150
413
681
1,021
215
0.018

Pujo Widodo/Barokat Z. Alam


Plywood 9 mm
Dolken diameter 8 / 4rm

HARGA SATUAN PEKERJAAN BETON BERTULANG


0.35
2

3.033
17.333

Lbr
Btg

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG


Pembangunan Gedung Fakultas Bahasa Dan Seni Universitas Negeri Semarang
HSPK SEPTEMBER 2016

No.

SNI

KODE

KOEF

SAT.

III
A.4.1.1
b. Harga satuan pekerjaan beton lantai Elv.6.7
1.

URAIAN PEKERJAAN
HARGA SATUAN PEKERJAAN

A.4.1.1.a.1

a.1. B1 (30 x 60)


L.01
L.02
L.02
L.02
L.03
L.04

9.088
0.275
2.750
1.938
0.497
0.469
0.333
3.333
1.667
276.891
4.153
384
692
1,039
215
0.150
2.917
16.667

BETON

m3

Membuat Balok Beton Bertulang (276.891 kg Besi + Bekisting

A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D

Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG


E
F

2.

A.4.1.1.a.1

B2 (30 x 40)

L.01
L.02
L.02
L.02
L.03
L.04

8.893
0.275
3.025
1.193
0.450
0.454
0.367
3.667
1.833
170.358
2.555
384
692
1,039
215
0.165
3.21
18.33

3.

A.4.1.1.a.1

Overhead & Profit (contoh 10%)


Harga Satuan Pekerjaan (D+E)

10%

m3

Membuat Balok Beton Bertulang (170,358 kg Besi + Bekisting

A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F

Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)

m3

Membuat Balok Beton Bertulang (197,075 kg Besi + Bekisting

10%

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG


A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F

Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)

m3

Membuat Balok Beton Bertulang (195,138 kg Besi + Bekisting

14.456
0.275
5.720
1.366

A
OH
OH
OH
OH

Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi

B3 (15 x 25)

L.01
L.02
L.02
L.02
L.03
L.04

14.47
0.275
5.72
1.38
0.74
0.73
0.333
6.933
3.467
197.075
2.956
384
692
1,039
215
0.312
6.07
34.67

4.

A.4.1.1.a.1
B3 (15 x 25)

L.01
L.02
L.02
L.02

10%

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG


L.03
L.04

0.737
0.733
0.693
6.933
3.467
195.138
2.927
384
692
1,039
215
0.312
6.067
34.67

5.

A.4.1.1.a.1

B3 (15 x 25)

L.01
L.02
L.02
L.02
L.03
L.04

15.046
0.275
5.72
1.956
0.796
0.767
0.69
6.93

OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F

Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)

m3

Membuat Balok Beton Bertulang (279,401 kg Besi + Bekisting

A
OH
OH
OH
OH
OH
OH
B
m3
Kg

Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"

10%

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG


3.47
279.401
4.191
384
692
1,039
215
0.31
6.067
34.67

6.

A.4.1.1.a.1

G2 (35 x 70)

L.01
L.02
L.02
L.02
L.03
L.04

7.776
0.275
2.36
1.411
0.405
0.399
0.286
2.857
1.429
201.634
3.025
384
692

Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F

Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)

m3

Membuat Balok Beton Bertulang (201,634 kg Besi + Bekisting

A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg

Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton

10%

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG


1,039
215
0.129
2.500
14.286

7.

A.4.1.1.a.1

G7 (30 x 40)

L.01
L.02
L.02
L.02
L.03
L.04

9.219
0.275
3.0
1.519
0.482
0.472
0.4
4
2
217.042
3.256
384
692
1,039
215
0.17

Kg
ltr
m3
Lbr
Btg
C
D
E
F

Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)

m3

Membuat Balok Beton Bertulang (217,042 kg Besi + Bekisting

A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3

Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok

10%

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG


3.2
18

8.

A.4.1.1.a.1

G7 (30 x 40)

L.01
L.02
L.02
L.02
L.03
L.04

9.210
0.275
3.025
1.510
0.482
0.472
0.37
3.7
1.8
215.732
3.236
384
692
1,039
215
0.165
3.208
18

Lbr
Btg
C
D
E
F

Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)

m3

Membuat Balok Beton Bertulang (215,732 kg Besi + Bekisting

A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D

Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C

10%

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG


E
F

Overhead & Profit (contoh 10%)


Harga Satuan Pekerjaan (D+E)

10%

HARGA SATUAN PEKERJAAN BETON BERTULANG

Pujo Widodo/Barokat Z. Alam

rang

Harga
Bahan/Upah
Maksimum Rp

91 kg Besi + Bekisting)

65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00

Jumlah Harga Maksimum


Rp

9,086,389.00
1,099,652.71
590,735.25
23,375.00
233,750.00
164,749.95
47,198.23
39,844.28
7,160,700.93
700,000.00
46,666.67
16,666.67
3,599,578.66
60,223.72
475,200.00
215,014.29
292,459.26
3,225.00
885,000.00
466,666.67
400,000.00

8.333
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

Kayu Klas III (Terentang)


Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
8,260,353.64 Plywood 9 mm

m2

27.689
m3

1
10
8.333
276.891
beton K-250
bekisting
tulangan
jumlah
Satuan
1.94
1.65
5.5
9.088 OH
0.275 0.275 OH
2.75 2.750 OH
1.94
1.938 OH
0.275
0.194
0.028
0.497 OH
0.275
0.111
0.083
0.469 OH
0.04
0.4
0.2

0.333 m3
3.333 Kg
1.667 Ltr
0.150

384
692
1039
215
0.018
0.35

4.153 Kg
384 Kg
692 Kg
1039 Kg
215 ltr
0.150 m3
2.917 Lbr

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG


2

826,035.36 Dolken diameter 8 / 4rm


9,086,389.00

58 kg Besi + Bekisting)

65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00

75 kg Besi + Bekisting)

7,749,795.84
1,041,162.01
578,012.94
23,375.00
257,125.00
101,363.08
42,726.31
38,559.68
6,004,106.94
770,000.00
51,333.33
18,333.33
2,214,655.50
37,052.89
475,200.00
215,014.29
292,459.26
3,225.00
973,500.00
513,333.33
440,000.00

16.667 Btg

9.167
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

m2
1

beton K-250
1.65
0.275
0.028
0.083

17.036
m3

1
10
9.167
170.358
bekisting
tulangan
jumlah
1.193
6.05
8.893
0.275
3.025
3.025
1.193
1.193
0.303
0.119
0.450
0.303
0.068
0.454

Satuan
OH
OH
OH
OH
OH
OH

0.367
3.667
1.833

m3
Kg
Ltr

2.555
384
692
1039
215
0.165
3.208
18.333

Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg

Kayu Klas III (Terentang)


Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
7,045,268.95 Plywood 9 mm
704,526.89 Dolken diameter 8 / 4rm
7,749,795.84

10,742,351.41

17.333

19.708

Pujo Widodo/Barokat Z. Alam

65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00

38 kg Besi + Bekisting)
65,000.00
85,000.00
85,000.00
85,000.00

HARGA SATUAN PEKERJAAN BETON BERTULANG


1,699,834.94
940,519.18
23,375.00
486,200.00
117,259.70
70,105.50
62,375.55
8,065,939.07
700,000.00
97,066.67
34,666.67
2,561,976.69
42,863.84
475,200.00
215,014.29
292,459.26
3,225.00
1,840,800.00
970,666.67
832,000.00

m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

m2
1

beton K-250
1.65
0.275
0.028
0.083

m3

1
10
17.333
197.075
bekisting
tulangan
jumlah
11.44
1.38
14.470
0.275
5.72
5.720
1.38
1.380
0.572
0.138
0.738
0.572
0.079
0.734

Kayu Klas III (Terentang)


Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
9,765,774.01 Plywood 9 mm
976,577.40 Dolken diameter 8 / 4rm
10,742,351.41

10,493,941.68
1,697,606.30
939,637.80
23,375.00
486,200.00
116,107.12

17.333
m3
per
dari V2
Koefisien
Pekerja

0.333
6.933
3.467

m3
Kg
Ltr

2.956
384
692
1039
215
0.312
6.067
34.667

Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg

19.514

m2
1

beton K-250
1.65

Satuan
OH
OH
OH
OH
OH
OH

m3
1
10
17.333
195.138
bekisting
tulangan
jumlah
11.44
1.37
14.456

Satuan
OH

Pujo Widodo/Barokat Z. Alam


95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00

01 kg Besi + Bekisting)
65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00

HARGA SATUAN PEKERJAAN BETON BERTULANG


69,976.68
62,309.69
8,796,335.39
1,456,000.00
97,066.67
34,666.67
2,536,794.32
42,442.52
475,200.00
215,014.29
292,459.26
3,225.00
1,840,800.00
970,666.67
832,000.00

0.275
0.028
0.083

Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

5.72
0.572
0.572

1.37
0.137
0.078

Kayu Klas III (Terentang)


Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
10,493,941.68 Plywood 9 mm
1,049,394.17 Dolken diameter 8 / 4rm
11,543,335.85

11,704,626.93
1,794,550.44
977,977.29
23,375.00
486,200.00
166,243.38
75,580.14
65,174.62
9,910,076.49
1,456,000.00
97,066.67

17.333
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

m2
1

beton K-250
1.65
0.275
0.028
0.083

0.275
5.720
1.366
0.737
0.733

OH
OH
OH
OH
OH

0.693
6.933
3.467

m3
Kg
Ltr

2.927
384
692
1039
215
0.312
6.067
34.667

Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg

27.940
m3

1
10
17.333
279.401
bekisting
tulangan
jumlah
1.96
11.44
15.046
0.275
5.72
5.720
1.96
1.956
0.572
0.196
0.796
0.572
0.112
0.767

Satuan
OH
OH
OH
OH
OH
OH

Pujo Widodo/Barokat Z. Alam


10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00

34 kg Besi + Bekisting)

65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71

HARGA SATUAN PEKERJAAN BETON BERTULANG


34,666.67
3,632,208.31
60,769.64
475,200.00
215,014.29
292,459.26
3,225.00
1,840,800.00
970,666.67
832,000.00

Kayu Klas III (Terentang)


Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
11,704,626.93 Plywood 9 mm
1,170,462.69 Dolken diameter 8 / 4rm
12,875,089.62

7,401,062.88
921,533.77
505,421.87
23,375.00
200,357.14
119,972.00
38,461.49
33,946.26
5,806,705.21
600,000.00
40,000.00
14,285.71
2,621,237.07
43,855.31
475,200.00
215,014.29

7.143
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos

m2
1

beton K-250
1.65
0.275
0.028
0.083

0.693
6.933
3.467

m3
Kg
Ltr

4.191
384
692
1039
215
0.312
6.067
34.667

Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg

20.163
m3

1
10
7.143
201.634
bekisting
tulangan
jumlah
4.71428571
1.41
7.776
0.275
2.36
2.357
1.41
1.411
0.236
0.141
0.405
0.236
0.081
0.399

Satuan
OH
OH
OH
OH
OH
OH

0.286
2.857
1.429

m3
Kg
Ltr

Pujo Widodo/Barokat Z. Alam


281.48
15.00
5,900,000.00
160,000.00
24,000.00

42 kg Besi + Bekisting)
65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00

HARGA SATUAN PEKERJAAN BETON BERTULANG


292,459.26
3,225.00
758,571.43
400,000.00
342,857.14

Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
6,728,238.98 Plywood 9 mm
672,823.90 Dolken diameter 8 / 4rm
7,401,062.88

8,487,626.81
1,094,871.93
599,254.15
23,375.00
257,125.00
129,140.05
45,830.80
40,146.93
6,621,152.44
770,000.00
51,333.33
18,333.33
2,821,547.24
47,206.66
475,200.00
215,014.29
292,459.26
3,225.00
973,500.00

3.025
384
692
1039
215
0.129
2.500
14.286

9.167
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton

m2
1

beton K-250
1.65
0.275
0.028
0.083

Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg

21.704
m3

1
10
9.167
217.042
bekisting
tulangan
jumlah
6.05
1.52
9.219
0.275
3.03
3.025
1.52
1.519
0.303
0.152
0.482
0.303
0.087
0.472

Satuan
OH
OH
OH
OH
OH
OH

0.367
3.667
1.833

m3
Kg
Ltr

3.256
384
692

Kg
Kg
Kg

Pujo Widodo/Barokat Z. Alam


160,000.00
24,000.00

HARGA SATUAN PEKERJAAN BETON BERTULANG


513,333.33 Kerikil Beton
440,000.00 Air
Kayu Klas II Balok
7,716,024.38 Plywood 9 mm
771,602.44 Dolken diameter 8 / 4rm
8,487,626.81

1039
215
0.165
3.208
18.333

Kg
ltr
m3
Lbr
Btg

1
10
9.167
215.732
bekisting
tulangan
jumlah
1.51
6.05
9.210
0.275
3.03
3.025
1.51
1.510
0.303
0.151
0.482
0.303
0.086
0.472

Satuan
OH
OH
OH
OH
OH
OH

0.367
3.667
1.833

m3
Kg
Ltr

3.236
384
692
1039
215
0.165
3.208

Kg
Kg
Kg
Kg
ltr
m3
Lbr

32 kg Besi + Bekisting)

65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00

8,466,924.80
1,093,364.94
598,658.17
23,375.00
257,125.00
128,360.68
45,743.69
40,102.40
6,603,839.42
770,000.00
51,333.33
18,333.33
2,804,519.11
46,921.76
475,200.00
215,014.29
292,459.26
3,225.00
973,500.00
513,333.33
440,000.00

9.167
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

Kayu Klas III (Terentang)


Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
7,697,204.36 Plywood 9 mm

m2
1

beton K-250
1.65
0.275
0.028
0.083

21.573
m3

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG


769,720.44 Dolken diameter 8 / 4rm
8,466,924.80

18.333

Btg

HARGA SATUAN PEKERJAAN BETON BERTULANG

Pujo Widodo/Barokat Z. Alam

Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm

beton K-250bekisting
1.65
0.66
0.275
0.33
0.033
0.028
0.033
0.083

tulangan jumlah
0.07
2.380
0.275
0.330
0.07
0.070
0.007
0.068
0.004
0.120

Satuan
OH
OH
OH
OH
OH
OH

0.333
3.333
1.667

m3
Kg
Ltr

4.153
413
681
1021
215
0.150
2.917

Kg
Kg
Kg
Kg
ltr
m3
Lbr

0.04
0.4
0.2
0.150
413
681
1,021
215
0.018
0.35

HARGA SATUAN PEKERJAAN BETON BERTULANG

Pujo Widodo/Barokat Z. Alam


Dolken diameter 8 / 4rm

16.667

Btg

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG


Pembangunan Gedung Fakultas Bahasa Dan Seni Universitas Negeri Semarang
HSPK SEPTEMBER 2016

No.

SNI

KODE

KOEF

SAT.

URAIAN PEKERJAAN

III
A.4.1.1
d. Harga satuan pekerjaan balok latai

BALOK LATAI Elv. 2.65


1.

A.4.1.1.a.1

a.1. B. LATAI (15 x 15)


L.01
L.02
L.02
L.02
L.03
L.04

15.916
0.275
6.600
1.066
0.795
0.804
0.800
8.000
4.000
152.260
2.284
384
692
1,039
215
0.360
7.000
40.000

m3

Membuat Balok Beton Bertulang (152,260 kg Besi + Bekisting

A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg

Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG


C
D
E
F

2.

A.4.1.1.a.1

B. LATAI (15 x 15)

L.01
L.02
L.02
L.02
L.03
L.04

15.862
0.275
6.600
1.012
0.789
0.801
0.800
8.000
4.000
144.537
2.168
384
692
1,039
215
0.360
7.00
40.00

PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)

##

m3

Membuat Balok Beton Bertulang (144,573 kg Besi + Bekisting

A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F

Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)

##

Pujo Widodo/Barokat Z. Alam

3.

HARGA SATUAN PEKERJAAN BETON BERTULANG

A.4.1.1.a.1

B. LATAI (15 x 15)

L.01
L.02
L.02
L.02
L.03
L.04

15.86
0.275
6.60
1.01
0.79
0.80
0.800
8.000
4.000
143.748
2.156
384
692
1,039
215
0.360
7.00
40.00

m3

Membuat Balok Beton Bertulang (143,748 kg Besi + Bekisting

A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F

Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)

m3

Membuat Balok Beton Bertulang (152.260 kg Besi + Bekisting

##

BALOK LATAI Elv. 6.65


1

A.4.1.1.a.1
B. LATAI (15 x 15)

Tenaga

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG


L.01
L.02
L.02
L.02
L.03
L.04

15.916
0.275
6.600
1.066
0.795
0.804

OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F

Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)

m3

Membuat Balok Beton Bertulang (144,537 kg Besi + Bekisting

15.862
0.275
6.60
1.012
0.789

A
OH
OH
OH
OH
OH

Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang

0.800
8.000
4.000
152.260
2.284
384
692
1,039
215
0.360
7.000
40.00

A.4.1.1.a.1
B. LATAI (15 x 15)

L.01
L.02
L.02
L.02
L.03

##

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG


L.04

0.801
0.80
8.00
4.00
144.537
2.168
384
692
1,039
215
0.36
7.000
40.00

A.4.1.1.a.1

B. LATAI (15 x 15)

L.01
L.02
L.02
L.02
L.03
L.04

15.856
0.275
6.60
1.006
0.789
0.800
0.800
8.000

OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F

Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)

m3

Membuat Balok Beton Bertulang (143,748 kg Besi + Bekisting

A
OH
OH
OH
OH
OH
OH
B
m3
Kg

Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"

##

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG


4.000
143.748
2.156
384
692
1,039
215
0.360
7.000
40.000

A.4.1.1.a.1

B. LATAI (15 x 15)

L.01
L.02
L.02
L.02
L.03
L.04

16.091
0.275
6.6
1.241
0.812
0.814
0.8
8
4
177.313
2.660

Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F

Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)

m3

Membuat Balok Beton Bertulang (177,313 kg Besi + Bekisting

A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg

Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton

##

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG


384
692
1,039
215
0.36
7.0
40

A.4.1.1.a.1

B. LATAI (15 x 15)

L.01
L.02
L.02
L.02
L.03
L.04

15.891
0.275
6.600
1.041
0.792
0.802
0.80
8.0
4.0
148.681
2.230
384
692
1,039
215

Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F

Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)

m3

Membuat Balok Beton Bertulang (148,681 kg Besi + Bekisting

A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr

Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air

##

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG


0.360
7.000
40

A.4.1.1.a.1

B. LATAI (15 x 15)

L.01
L.02
L.02
L.02
L.03
L.04

15.853
0.275
6.600
1.003
0.788
0.800
0.80
8.0
4.0
143.312
2.150
384
692
1,039
215
0.360
7.000
40

m3
Lbr
Btg
C
D
E
F

Kayu Klas II Balok


Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)

m3

Membuat Balok Beton Bertulang (143,312 kg Besi + Bekisting

A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D

Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C

##

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG


E
F

Overhead & Profit (contoh 10%)


Harga Satuan Pekerjaan (D+E)

##

HARGA SATUAN PEKERJAAN BETON BERTULANG

Pujo Widodo/Barokat Z. Alam

marang

Harga Bahan/Upah
Maksimum Rp

2,260 kg Besi + Bekisting)

65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00

Jumlah Harga Maksimum


Rp

11,976,475.40
1,853,314.70
1,034,528.13
23,375.00
561,000.00
90,594.48
75,485.27
68,331.83
9,034,390.21
1,680,000.00
112,000.00
40,000.00
1,979,375.19
33,116.47
475,200.00
215,014.29
292,459.26
3,225.00
2,124,000.00
1,120,000.00
960,000.00

20.000
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air

15.226

m2

m3
1
10
20.000
152.260
beton K-250
bekisting
tulangan
jumlah
Satuan
1.07
1.65
13.2
15.916 OH
0.275 0.275 OH
6.60 6.600 OH
1.07
1.066 OH
0.660
0.107
0.028
0.795 OH
0.083
0.660
0.061
0.804 OH
1

0.04
0.4
0.2

0.800 m3
8.000 Kg
4.000 Ltr
0.150

384
692
1039
215

2.284 Kg
384 Kg
692 Kg
1039 Kg
215 ltr

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG


0.018
0.35
2

Kayu Klas II Balok


10,887,704.91 Plywood 9 mm
1,088,770.49 Dolken diameter 8 / 4rm
11,976,475.40

0.360 m3
7.000 Lbr
40.000 Btg

4,573 kg Besi + Bekisting)

65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00

11,854,413.20
1,844,429.27
1,031,014.12
23,375.00
561,000.00
85,999.23
74,971.68
68,069.24
8,932,310.01
1,680,000.00
112,000.00
40,000.00
1,878,974.77
31,436.69
475,200.00
215,014.29
292,459.26
3,225.00
2,124,000.00
1,120,000.00
960,000.00

20.000
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

Kayu Klas III (Terentang)


Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
10,776,739.27 Plywood 9 mm
1,077,673.93 Dolken diameter 8 / 4rm
11,854,413.20

m2
1

beton K-250
1.65
0.275
0.028
0.083

14.454

m3
1
10
20.000
144.537
bekisting
tulangan
jumlah
13.20
1.012
15.862
0.275
6.600
6.600
1.012
1.012
0.660
0.101
0.789
0.660
0.058
0.801

Satuan
OH
OH
OH
OH
OH
OH

0.800
8.000
4.000

m3
Kg
Ltr

2.168
384
692
1039
215
0.360
7.000
40.000

Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg

Pujo Widodo/Barokat Z. Alam

3,748 kg Besi + Bekisting)

65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00

2.260 kg Besi + Bekisting)

HARGA SATUAN PEKERJAAN BETON BERTULANG

11,841,949.38
1,843,521.97
1,030,655.30
23,375.00
561,000.00
85,530.01
74,919.24
68,042.43
8,921,886.55
1,680,000.00
112,000.00
40,000.00
1,868,722.84
31,265.17
475,200.00
215,014.29
292,459.26
3,225.00
2,124,000.00
1,120,000.00
960,000.00

20.000
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

m2
1

beton K-250
1.65
0.275
0.028
0.083

14.375

m3
1
10
20.000
143.748
bekisting
tulangan
jumlah
1.01
13.2
15.856
0.275
6.60
6.600
1.01
1.006
0.660
0.101
0.789
0.660
0.057
0.800

Kayu Klas III (Terentang)


Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
10,765,408.52 Plywood 9 mm
1,076,540.85 Dolken diameter 8 / 4rm
11,841,949.38

10,887,704.91
1,853,314.70

20.000
m3

m2

15.226
m3

Satuan
OH
OH
OH
OH
OH
OH

0.800
8.000
4.000

m3
Kg
Ltr

2.156
384
692
1039
215
0.360
7.000
40.000

Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg

Pujo Widodo/Barokat Z. Alam


65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00

4,537 kg Besi + Bekisting)


65,000.00
85,000.00
85,000.00
85,000.00
95,000.00

HARGA SATUAN PEKERJAAN BETON BERTULANG


1,034,528.13
23,375.00
561,000.00
90,594.48
75,485.27
68,331.83
9,034,390.21
1,680,000.00
112,000.00
40,000.00
1,979,375.19
33,116.47
475,200.00
215,014.29
292,459.26
3,225.00
2,124,000.00
1,120,000.00
960,000.00

per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

1
beton K-250
1.65
0.275
0.028
0.083

1
10
20.000
152.260
bekisting
tulangan
jumlah
13.2
1.07
15.916
0.275
6.60
6.600
1.07
1.066
0.660
0.107
0.795
0.660
0.061
0.804

Kayu Klas III (Terentang)


Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
10,887,704.91 Plywood 9 mm
1,088,770.49 Dolken diameter 8 / 4rm
11,976,475.40

10,776,739.27
1,844,429.27
1,031,014.12
23,375.00
561,000.00
85,999.23
74,971.68

20.000
m3
per
dari V2
Koefisien
Pekerja
Tukang batu

0.800
8.000
4.000

m3
Kg
Ltr

2.284
384
692
1039
215
0.360
7.000
40.000

Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg

14.454

m2
1

beton K-250
1.65
0.275

Satuan
OH
OH
OH
OH
OH
OH

m3
1
10
20.000
144.537
bekisting
tulangan
jumlah
1.01
13.2
15.862
0.275

Satuan
OH
OH

Pujo Widodo/Barokat Z. Alam


85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00

HARGA SATUAN PEKERJAAN BETON BERTULANG


68,069.24
8,932,310.01
1,680,000.00
112,000.00
40,000.00
1,878,974.77
31,436.69
475,200.00
215,014.29
292,459.26
3,225.00
2,124,000.00
1,120,000.00
960,000.00

Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

0.028
0.083

2,100,000.00
14,000.00

1.01
0.101
0.058

Kayu Klas III (Terentang)


Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
10,776,739.27 Plywood 9 mm
1,077,673.93 Dolken diameter 8 / 4rm
11,854,413.20

3,748 kg Besi + Bekisting)

65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00

6.60
0.660
0.660

11,841,949.38
1,843,521.97
1,030,655.30
23,375.00
561,000.00
85,530.01
74,919.24
68,042.43
8,921,886.55
1,680,000.00
112,000.00

20.000
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

m2
1

beton K-250
1.65
0.275
0.028
0.083

6.600
1.012
0.789
0.801

OH
OH
OH
OH

0.800
8.000
4.000

m3
Kg
Ltr

2.168
384
692
1039
215
0.360
7.000
40.000

Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg

14.375
m3

1
10
20.000
143.748
bekisting
tulangan
jumlah
1.01
13.2
15.856
0.275
6.60
6.600
1.01
1.006
0.660
0.101
0.789
0.660
0.057
0.800

Satuan
OH
OH
OH
OH
OH
OH

Pujo Widodo/Barokat Z. Alam


10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00

7,313 kg Besi + Bekisting)


65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00

HARGA SATUAN PEKERJAAN BETON BERTULANG


40,000.00
1,868,722.84
31,265.17
475,200.00
215,014.29
292,459.26
3,225.00
2,124,000.00
1,120,000.00
960,000.00

Kayu Klas III (Terentang)


Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
10,765,408.52 Plywood 9 mm
1,076,540.85 Dolken diameter 8 / 4rm
11,841,949.38

12,372,433.27
1,882,138.20
1,045,927.25
23,375.00
561,000.00
105,501.02
77,151.29
69,183.63
9,365,528.41
1,680,000.00
112,000.00
40,000.00
2,305,064.36
38,565.50

20.000
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"

m3
Kg
Ltr

2.156
384
692
1039
215
0.360
7.000
40.000

Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg

17.731

m2
1

beton K-250
1.65
0.275
0.028
0.083

0.800
8.000
4.000

m3
1
10
20.000
177.313
bekisting
tulangan
jumlah
13.2
1.24
16.091
0.275
6.60
6.600
1.24
1.241
0.660
0.124
0.812
0.660
0.071
0.814
0.800
8.000

Satuan
OH
OH
OH
OH
OH
OH
m3
Kg

Pujo Widodo/Barokat Z. Alam


1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00

8,681 kg Besi + Bekisting)

65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00

HARGA SATUAN PEKERJAAN BETON BERTULANG


475,200.00
215,014.29
292,459.26
3,225.00
2,124,000.00
1,120,000.00
960,000.00

Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
11,247,666.61 Plywood 9 mm
1,124,766.66 Dolken diameter 8 / 4rm
12,372,433.27

11,919,909.99
1,849,197.06
1,032,899.69
23,375.00
561,000.00
88,464.97
75,247.26
68,210.14
8,987,084.75
1,680,000.00
112,000.00
40,000.00
1,932,848.17
32,338.04
475,200.00
215,014.29
292,459.26
3,225.00

20.000
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen

m2
1

beton K-250
1.65
0.275
0.028
0.083

4.000

Ltr

2.660
384
692
1039
215
0.360
7.000
40.000

Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg

14.868
m3

1
10
20.000
148.681
bekisting
tulangan
jumlah
1.04
13.2
15.891
0.275
6.60
6.600
1.04
1.041
0.660
0.104
0.792
0.660
0.059
0.802
0.800
8.000
4.000
2.230
384

Satuan
OH
OH
OH
OH
OH
OH
m3
Kg
Ltr
Kg
Kg

Pujo Widodo/Barokat Z. Alam


5,900,000.00
160,000.00
24,000.00

3,312 kg Besi + Bekisting)

65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00

HARGA SATUAN PEKERJAAN BETON BERTULANG


2,124,000.00 Pasir Beton
1,120,000.00 Kerikil Beton
960,000.00 Air
Kayu Klas II Balok
10,836,281.81 Plywood 9 mm
1,083,628.18 Dolken diameter 8 / 4rm
11,919,909.99

11,835,061.88
1,843,020.60
1,030,457.02
23,375.00
561,000.00
85,270.71
74,890.26
68,027.61
8,916,126.56
1,680,000.00
112,000.00
40,000.00
1,863,057.63
31,170.39
475,200.00
215,014.29
292,459.26
3,225.00
2,124,000.00
1,120,000.00
960,000.00

692
1039
215
0.360
7.000
40.000

Kg
Kg
ltr
m3
Lbr
Btg

1
10
20.000
143.312
bekisting
tulangan
jumlah
1.00
13.2
15.853
0.275
6.60
6.600
1.00
1.003
0.660
0.100
0.788
0.660
0.057
0.800

Satuan
OH
OH
OH
OH
OH
OH

20.000
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

Kayu Klas III (Terentang)


Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
10,759,147.16 Plywood 9 mm

m2
1

beton K-250
1.65
0.275
0.028
0.083

14.331
m3

0.800
8.000
4.000

m3
Kg
Ltr

2.150
384
692
1039
215
0.360
7.000

Kg
Kg
Kg
Kg
ltr
m3
Lbr

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG


1,075,914.72 Dolken diameter 8 / 4rm
11,835,061.88

40.000

Btg

HARGA SATUAN PEKERJAAN BETON BERTULANG

Pujo Widodo/Barokat Z. Alam

Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air

beton K-250bekisting
1.65
0.66
0.275
0.33
0.033
0.028
0.083
0.033

tulangan jumlah
0.07
2.380
0.275
0.330
0.07
0.070
0.007
0.068
0.004
0.120

Satuan
OH
OH
OH
OH
OH
OH

0.800
8.000
4.000

m3
Kg
Ltr

2.284
413
681
1021
215

Kg
Kg
Kg
Kg
ltr

0.04
0.4
0.2
0.150
413
681
1,021
215

Pujo Widodo/Barokat Z. Alam


Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm

HARGA SATUAN PEKERJAAN BETON BERTULANG


0.018
0.35
2

0.360
7.000
40.000

m3
Lbr
Btg

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG


Pembangunan Gedung Fakultas Bahasa Dan Seni Universitas Negeri Semarang
HSPK SEPTEMBER 2016

No.

SNI

KODE

KOEF

SAT.

URAIAN PEKERJAAN

III
A.4.1.1
b. Harga satuan pekerjaan beton lantai 3
1.

A.4.1.1.a.1

a.1. B1 (30 x 60)


L.01
L.02
L.02
L.02
L.03
L.04

9.690
0.275
3.025
1.990
0.530
0.499
0.367
3.667
1.833
284.292
4.264
384
692
1,039
215
0.165
3.208
18.333

m3

Membuat Balok Beton Bertulang (284,292 kg Besi + Bekisting

A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C

Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG


D
E
F

2.

A.4.1.1.a.1

B1 (30 x 60)

L.01
L.02
L.02
L.02
L.03
L.04

10.811
0.275
3.025
3.111
0.642
0.563
0.367
3.667
1.833
444.371
6.666
384
692
1,039
215
0.165
3.21
18.33

3.

A.4.1.1.a.1

Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)

10%

m3

Membuat Balok Beton Bertulang (444,371 kg Besi + Bekisting

A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F

Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)

m3

Membuat Balok Beton Bertulang (258,675 kg Besi + Bekisting

10%

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG


A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F

Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)

m3

Membuat Balok Beton Bertulang (195,964 kg Besi + Bekisting

8.452
0.275
2.750
1.302

A
OH
OH
OH
OH

Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi

B1 (30 x 60)

L.01
L.02
L.02
L.02
L.03
L.04

9.51
0.275
3.03
1.81
0.51
0.49
0.367
3.667
1.833
258.675
3.880
384
692
1,039
215
0.165
3.21
18.33

4.

A.4.1.1.a.1
B1L (30 x 60)

L.01
L.02
L.02
L.02

10%

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG


L.03
L.04

0.433
0.432
0.333
3.333
1.667
185.964
2.789
384
692
1,039
215
0.150
2.917
16.67

5.

A.4.1.1.a.1

B2 (30 x 40)

L.01
L.02
L.02
L.02
L.03
L.04

9.033
0.275
3.03
1.333
0.464
0.462
0.37
3.67

OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F

Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)

m3

Membuat Balok Beton Bertulang (190,417 kg Besi + Bekisting

A
OH
OH
OH
OH
OH
OH
B
m3
Kg

Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"

10%

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG


1.83
190.417
2.856
384
692
1,039
215
0.17
3.208
18.33

6.

A.4.1.1.a.1

B2 (30 x 40)

L.01
L.02
L.02
L.02
L.03
L.04

8.914
0.275
3.03
1.214
0.452
0.455
0.367
3.667
1.833
173.385
2.601
384
692

Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F

Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)

m3

Membuat Balok Beton Bertulang (173,385 kg Besi + Bekisting

A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg

Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton

10%

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG


1,039
215
0.165
3.208
18.333

7.

A.4.1.1.a.1

B2 (30 x 40)

L.01
L.02
L.02
L.02
L.03
L.04

9.190
0.275
3.0
1.490
0.479
0.471
0.4
4
2
212.799
3.192
384
692
1,039
215
0.17
3.2
18

Kg
ltr
m3
Lbr
Btg
C
D
E
F

Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)

m3

Membuat Balok Beton Bertulang (212,799 kg Besi + Bekisting

A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg

Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm

10%

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG


C
D
E
F

8.

A.4.1.1.a.1

B2L (30 x 40)

L.01
L.02
L.02
L.02
L.03
L.04

9.109
0.275
3.025
1.409
0.471
0.466
0.37
3.7
1.8
201.233
3.018
384
692
1,039
215
0.165
3.208
18

PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)

10%

m3

Membuat Balok Beton Bertulang (201,233 kg Besi + Bekisting

A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F

Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)

10%

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG

A.4.1.1.a.1

m3

Membuat Balok Beton Bertulang (204,215 kg Besi + Bekisting

A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F

Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)

m3

Membuat Balok Beton Bertulang (236,892 kg Besi + Bekisting

14.748

A
OH

Tenaga
Pekerja

B3 (15 x 25)

L.01
L.02
L.02
L.02
L.03
L.04

14.520
0.275
5.720
1.430
0.743
0.737
0.69
6.9
3.5
204.215
3.063
384
692
1,039
215
0.312
6.067
35

10 A.4.1.1.a.1
B3 (15 x 25)

L.01

10%

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG


L.02
L.02
L.02
L.03
L.04

0.275
5.720
1.658
0.766
0.750

OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F

Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)

m3

Membuat Balok Beton Bertulang (206,384 kg Besi + Bekisting

14.535
0.275
5.720
1.445
0.744
0.738

A
OH
OH
OH
OH
OH
OH

Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

0.69
6.9
3.5
236.892
3.553
384
692
1,039
215
0.312
6.067
35

11

A.4.1.1.a.1
B3 (15 x 25)

L.01
L.02
L.02
L.02
L.03
L.04

10%

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG


0.69
6.9
3.5
206.384
3.096
384
692
1,039
215
0.312
6.067
35

12 A.4.1.1.a.1

G1 (35 x 75)

L.01
L.02
L.02
L.02
L.03
L.04

7.612
0.275
2.326
1.310
0.392
0.390
0.28
2.8
1.4

B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F

Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)

m3

Membuat Balok Beton Bertulang (187,155 kg Besi + Bekisting

A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr

Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting

10%

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG


187.155
2.807
384
692
1,039
215
0.127
2.467
14

13 A.4.1.1.a.1

G1 (35 x 75)

L.01
L.02
L.02
L.02
L.03
L.04

7.653
0.275
2.326
1.351
0.396
0.393
0.28
2.8
1.4
193.019
2.895
384

Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F

Besi Beton Polos


Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)

m3

Membuat Balok Beton Bertulang (193, 019 kg Besi + Bekisting

A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg

Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen

10%

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG


692
1,039
215
0.127
2.467
14

14 A.4.1.1.a.1

G2 (35 x 70)

L.01
L.02
L.02
L.02
L.03
L.04

7.742
0.275
2.357
1.377
0.401
0.397
0.29
2.9
1.4
196.747
2.951
384
692
1,039
215
0.129

Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F

Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)

m3

Membuat Balok Beton Bertulang (196,747 kg Besi + Bekisting

A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3

Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok

10%

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG


2.500
14

15 A.4.1.1.a.1

G4 (30 x 70)

L.01
L.02
L.02
L.02
L.03
L.04

8.443
0.275
2.671
1.450
0.440
0.433
0.32
3.2
1.6
207.145
3.107
384
692
1,039
215
0.146
2.833
16

Lbr
Btg
C
D
E
F

Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)

m3

Membuat Balok Beton Bertulang (207,145 kg Besi + Bekisting

A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D

Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C

10%

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG


E
F

16 A.4.1.1.a.1

G4 (30 x 70)

L.01
L.02
L.02
L.02
L.03
L.04

8.514
0.275
2.671
1.521
0.447
0.437
0.32
3.2
1.6
217.318
3.260
384
692
1,039
215
0.146
2.833
16

Overhead & Profit (contoh 10%)


Harga Satuan Pekerjaan (D+E)

10%

m3

Membuat Balok Beton Bertulang (217,318 kg Besi + Bekisting

A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F

Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)

10%

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG

17 A.4.1.1.a.1

m3

Membuat Balok Beton Bertulang (188,787 kg Besi + Bekisting

A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F

Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)

m3

Membuat Balok Beton Bertulang (174,746 kg Besi + Bekisting

8.923

A
OH

Tenaga
Pekerja

G6 (30 x 40)

L.01
L.02
L.02
L.02
L.03
L.04

9.022
0.275
3.025
1.322
0.463
0.461
0.37
3.7
1.8
188.787
2.832
384
692
1,039
215
0.165
3.208
18

18 A.4.1.1.a.1
G6 (30 x 40)

L.01

10%

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG


L.02
L.02
L.02
L.03
L.04

0.275
3.025
1.223
0.453
0.455

OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F

Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)

m3

Membuat Balok Beton Bertulang (158,090 kg Besi + Bekisting

8.807
0.275
3.025
1.107
0.441
0.449

A
OH
OH
OH
OH
OH
OH

Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

0.37
3.7
1.8
174.746
2.621
384
692
1,039
215
0.165
3.208
18

19 A.4.1.1.a.1
G7 (30 x 40)

L.01
L.02
L.02
L.02
L.03
L.04

10%

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG


0.37
3.7
1.8
158.090
2.371
384
692
1,039
215
0.165
3.208
18

B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F

Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)

10%

HARGA SATUAN PEKERJAAN BETON BERTULANG

Pujo Widodo/Barokat Z. Alam

rang

Harga
Bahan/Upah
Maksimum Rp

Jumlah Harga Maksimum


Rp

92 kg Besi + Bekisting)

65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00

9,550,503.00
1,172,243.30
629,853.00
23,375.00
257,125.00
169,153.92
50,302.94
42,433.44
7,510,032.16
770,000.00
51,333.33
18,333.33
3,695,800.03
61,833.58
475,200.00
215,014.29
292,459.26
3,225.00
973,500.00
513,333.33
440,000.00

9.167
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok

m2

28.429
m3

1
10
9.167
284.292
beton K-250
bekisting
tulangan
jumlah
Satuan
1.99
1.65
6.05
9.690 OH
0.275 0.275 OH
3.03 3.025 OH
1.99
1.990 OH
0.303
0.199
0.028
0.530 OH
0.303
0.114
0.083
0.499 OH
0.04
0.4
0.2

0.367 m3
3.667 Kg
1.833 Ltr
0.150

384
692
1039
215
0.018

4.264 Kg
384 Kg
692 Kg
1039 Kg
215 ltr
0.165 m3

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG


0.35
2

8,682,275.46 Plywood 9 mm
868,227.55 Dolken diameter 8 / 4rm
9,550,503.00

71 kg Besi + Bekisting)
65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00

75 kg Besi + Bekisting)

12,080,518.12
1,356,414.09
702,688.90
23,375.00
257,125.00
264,400.87
60,948.19
47,876.12
9,625,875.11
770,000.00
51,333.33
18,333.33
5,776,825.83
96,650.74
475,200.00
215,014.29
292,459.26
3,225.00
973,500.00
513,333.33
440,000.00

3.208 Lbr
18.333 Btg

9.167
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

m2
1

beton K-250
1.65
0.275
0.028
0.083

44.437
m3

1
10
9.167
444.371
bekisting
tulangan
jumlah
3.111
6.05
10.811
0.275
3.025
3.025
3.111
3.111
0.303
0.311
0.642
0.303
0.178
0.563

Kayu Klas III (Terentang)


Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
10,982,289.20 Plywood 9 mm
1,098,228.92 Dolken diameter 8 / 4rm
12,080,518.12

9,145,619.17

9.167

25.867

Satuan
OH
OH
OH
OH
OH
OH

0.367
3.667
1.833

m3
Kg
Ltr

6.666
384
692
1039
215
0.165
3.208
18.333

Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg

Pujo Widodo/Barokat Z. Alam

65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00

64 kg Besi + Bekisting)
65,000.00
85,000.00
85,000.00
85,000.00

HARGA SATUAN PEKERJAAN BETON BERTULANG


1,142,770.05
618,196.91
23,375.00
257,125.00
153,911.35
48,599.36
41,562.43
7,171,429.19
770,000.00
51,333.33
18,333.33
3,362,768.94
56,261.71
475,200.00
215,014.29
292,459.26
3,225.00
973,500.00
513,333.33
440,000.00

m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

m2
1

beton K-250
1.65
0.275
0.028
0.083

m3

1
10
9.167
258.675
bekisting
tulangan
jumlah
6.05
1.81
9.511
0.275
3.03
3.025
1.81
1.811
0.303
0.181
0.512
0.303
0.103
0.489

Satuan
OH
OH
OH
OH
OH
OH

0.367
3.667
1.833

m3
Kg
Ltr

3.880
384
692
1039
215
0.165
3.208
18.333

Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg

Kayu Klas III (Terentang)


Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
8,314,199.25 Plywood 9 mm
831,419.92 Dolken diameter 8 / 4rm
9,145,619.17

6,953,926.14
995,042.13
549,363.84
23,375.00
233,750.00
110,648.86

8.333
m3
per
dari V2
Koefisien
Pekerja

m2
1

beton K-250
1.65

18.596
m3

1
10
8.333
185.964
bekisting
tulangan
jumlah
1.30
5.5
8.452

Satuan
OH

Pujo Widodo/Barokat Z. Alam


95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00

17 kg Besi + Bekisting)

65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00

HARGA SATUAN PEKERJAAN BETON BERTULANG


41,151.64
36,752.79
5,958,884.01
700,000.00
46,666.67
16,666.67
2,417,538.19
40,447.27
475,200.00
215,014.29
292,459.26
3,225.00
885,000.00
466,666.67
400,000.00

0.275
0.028
0.083

Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

2.75
0.275
0.275

1.30
0.130
0.074

Kayu Klas III (Terentang)


Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
6,953,926.14 Plywood 9 mm
695,392.61 Dolken diameter 8 / 4rm
7,649,318.75

7,333,476.62
1,064,239.89
587,139.79
23,375.00
257,125.00
113,298.18
44,060.24
39,241.68
6,269,236.73
770,000.00
51,333.33

9.167
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

m2
1

beton K-250
1.65
0.275
0.028
0.083

0.275
2.750
1.302
0.433
0.432

OH
OH
OH
OH
OH

0.333
3.333
1.667

m3
Kg
Ltr

2.789
384
692
1039
215
0.150
2.917
16.667

Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg

19.042
m3

1
10
9.167
190.417
bekisting
tulangan
jumlah
1.33
6.05
9.033
0.275
3.03
3.025
1.33
1.333
0.303
0.133
0.464
0.303
0.076
0.462

Satuan
OH
OH
OH
OH
OH
OH

Pujo Widodo/Barokat Z. Alam


10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00

85 kg Besi + Bekisting)

65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71

HARGA SATUAN PEKERJAAN BETON BERTULANG


18,333.33
2,475,422.46
41,415.72
475,200.00
215,014.29
292,459.26
3,225.00
973,500.00
513,333.33
440,000.00

Kayu Klas III (Terentang)


Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
7,333,476.62 Plywood 9 mm
733,347.66 Dolken diameter 8 / 4rm
8,066,824.28

7,797,635.70
1,044,644.48
579,390.19
23,375.00
257,125.00
103,164.10
42,927.60
38,662.59
6,044,115.25
770,000.00
51,333.33
18,333.33
2,254,005.46
37,711.25
475,200.00
215,014.29

9.167
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos

m2
1

beton K-250
1.65
0.275
0.028
0.083

0.367
3.667
1.833

m3
Kg
Ltr

2.856
384
692
1039
215
0.165
3.208
18.333

Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg

17.339
m3

1
10
9.167
173.385
bekisting
tulangan
jumlah
6.05
1.21
8.914
0.275
3.03
3.025
1.21
1.214
0.303
0.121
0.452
0.303
0.069
0.455

Satuan
OH
OH
OH
OH
OH
OH

0.367
3.667
1.833

m3
Kg
Ltr

Pujo Widodo/Barokat Z. Alam


281.48
15.00
5,900,000.00
160,000.00
24,000.00

99 kg Besi + Bekisting)

65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00

HARGA SATUAN PEKERJAAN BETON BERTULANG


292,459.26
3,225.00
973,500.00
513,333.33
440,000.00

Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
7,088,759.73 Plywood 9 mm
708,875.97 Dolken diameter 8 / 4rm
7,797,635.70

8,420,569.33
1,089,990.53
597,323.65
23,375.00
257,125.00
126,615.55
45,548.65
40,002.67
6,565,072.51
770,000.00
51,333.33
18,333.33
2,766,390.13
46,283.83
475,200.00
215,014.29
292,459.26
3,225.00
973,500.00
513,333.33
440,000.00

2.601
384
692
1039
215
0.165
3.208
18.333

9.167
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air

m2
1

beton K-250
1.65
0.275
0.028
0.083

Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg

21.280
m3

1
10
9.167
212.799
bekisting
tulangan
jumlah
1.49
6.05
9.190
0.275
3.03
3.025
1.49
1.490
0.303
0.149
0.479
0.303
0.085
0.471

Satuan
OH
OH
OH
OH
OH
OH

0.367
3.667
1.833

m3
Kg
Ltr

3.192
384
692
1039
215

Kg
Kg
Kg
Kg
ltr

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG


Kayu Klas II Balok
7,655,063.03 Plywood 9 mm
765,506.30 Dolken diameter 8 / 4rm
8,420,569.33

33 kg Besi + Bekisting)
65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00

8,237,767.31
1,076,683.57
592,061.02
23,375.00
257,125.00
119,733.64
44,779.49
39,609.42
6,412,195.80
770,000.00
51,333.33
18,333.33
2,616,029.07
43,768.18
475,200.00
215,014.29
292,459.26
3,225.00
973,500.00
513,333.33
440,000.00

0.165
3.208
18.333

m3
Lbr
Btg

1
10
9.167
201.233
bekisting
tulangan
jumlah
1.41
6.05
9.109
0.275
3.03
3.025
1.41
1.409
0.303
0.141
0.471
0.303
0.080
0.466

Satuan
OH
OH
OH
OH
OH
OH

0.367
3.667
1.833

m3
Kg
Ltr

3.018
384
692
1039
215
0.165
3.208
18.333

Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg

9.167
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

Kayu Klas III (Terentang)


Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
7,488,879.37 Plywood 9 mm
748,887.94 Dolken diameter 8 / 4rm
8,237,767.31

m2
1

beton K-250
1.65
0.275
0.028
0.083

20.123
m3

Pujo Widodo/Barokat Z. Alam

15 kg Besi + Bekisting)

65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00

92 kg Besi + Bekisting)
65,000.00

HARGA SATUAN PEKERJAAN BETON BERTULANG

11,686,796.77
1,708,049.44
943,767.86
23,375.00
486,200.00
121,507.97
70,580.30
62,618.31
8,916,311.26
1,456,000.00
97,066.67
34,666.67
2,654,795.94
44,416.78
475,200.00
215,014.29
292,459.26
3,225.00
1,840,800.00
970,666.67
832,000.00

17.333
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

m2
1

beton K-250
1.65
0.275
0.028
0.083

20.422
m3

1
10
17.333
204.215
bekisting
tulangan
jumlah
11.44
1.43
14.520
0.275
5.72
5.720
1.43
1.430
0.572
0.143
0.743
0.572
0.082
0.737

Kayu Klas III (Terentang)


Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
10,624,360.70 Plywood 9 mm
1,062,436.07 Dolken diameter 8 / 4rm
11,686,796.77

12,203,256.07
1,745,644.75
958,636.06 per

17.333
m3

m2
1

23.689
m3

10

Satuan
OH
OH
OH
OH
OH
OH

0.693
6.933
3.467

m3
Kg
Ltr

3.063
384
692
1039
215
0.312
6.067
34.667

Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg

Pujo Widodo/Barokat Z. Alam


85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00

84 kg Besi + Bekisting)

65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00

HARGA SATUAN PEKERJAAN BETON BERTULANG


23,375.00
486,200.00
140,951.00
72,753.35
63,729.34
9,348,224.40
1,456,000.00
97,066.67
34,666.67
3,079,601.75
51,524.11
475,200.00
215,014.29
292,459.26
3,225.00
1,840,800.00
970,666.67
832,000.00

dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

17.333
236.892
bekisting
tulangan
jumlah
11.44
1.66
14.748
0.275
5.72
5.720
1.66
1.658
0.572
0.166
0.766
0.572
0.095
0.750

beton K-250
1.65
0.275
0.028
0.083

Kayu Klas III (Terentang)


Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
11,093,869.16 Plywood 9 mm
1,109,386.92 Dolken diameter 8 / 4rm
12,203,256.07

11,721,081.91
1,710,545.20
944,754.88
23,375.00
486,200.00
122,798.69
70,724.56
62,692.07

17.333
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu

m2
1

beton K-250
1.65
0.275
-

Satuan
OH
OH
OH
OH
OH
OH

0.693
6.933
3.467

m3
Kg
Ltr

3.553
384
692
1039
215
0.312
6.067
34.667

Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg

20.638
m3

1
10
17.333
206.384
bekisting
tulangan
jumlah
11.44
1.44
14.535
0.275
5.72
5.720

Satuan
OH
OH
OH

Pujo Widodo/Barokat Z. Alam

2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00

55 kg Besi + Bekisting)

65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00

HARGA SATUAN PEKERJAAN BETON BERTULANG


8,944,983.80
1,456,000.00
97,066.67
34,666.67
2,682,996.66
44,888.60
475,200.00
215,014.29
292,459.26
3,225.00
1,840,800.00
970,666.67
832,000.00

Tukang Besi
Kepala Tukang
Mandor

0.572
0.572

0.028
0.083

1.44
0.144
0.083

Kayu Klas III (Terentang)


Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
10,655,529.01 Plywood 9 mm
1,065,552.90 Dolken diameter 8 / 4rm
11,721,081.91

7,132,557.13
897,553.13
494,748.33
23,375.00
197,685.71
111,357.16
37,200.09
33,186.84
5,586,589.72
592,000.00
39,466.67
14,095.24

7.048
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

OH
OH
OH

0.693
6.933
3.467

m3
Kg
Ltr

3.096
384
692
1039
215
0.312
6.067
34.667

Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg

18.715

m2
1

beton K-250
1.65
0.275
0.028
0.083

1.445
0.744
0.738

m3
1
10
7.048
187.155
bekisting
tulangan
jumlah
4.65142857
1.31
7.612
0.275
2.33
2.326
1.31
1.310
0.233
0.131
0.392
0.233
0.075
0.390

Satuan
OH
OH
OH
OH
OH
OH

Pujo Widodo/Barokat Z. Alam


13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00

HARGA SATUAN PEKERJAAN BETON BERTULANG


2,433,013.56
40,706.19
475,200.00
215,014.29
292,459.26
3,225.00
748,457.14
394,666.67
338,285.71

Kayu Klas III (Terentang)


Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
6,484,142.85 Plywood 9 mm
648,414.28 Dolken diameter 8 / 4rm
7,132,557.13

0.282
2.819
1.410

m3
Kg
Ltr

2.807
384
692
1039
215
0.127
2.467
14.095

Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg

019 kg Besi + Bekisting)

65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50

7,225,230.58
904,299.23
497,416.28
23,375.00
197,685.71
114,846.02
37,590.02
33,386.20
5,664,092.21
592,000.00
39,466.67
14,095.24
2,509,240.71
41,981.53
475,200.00

7.048
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting

m2
1

beton K-250
1.65
0.275
0.028
0.083

19.302
m3

1
10
7.048
193.019
bekisting
tulangan
jumlah
4.65142857
1.35
7.653
0.275
2.33
2.326
1.35
1.351
0.233
0.135
0.396
0.233
0.077
0.393

Satuan
OH
OH
OH
OH
OH
OH

0.282
2.819
1.410

m3
Kg
Ltr

Pujo Widodo/Barokat Z. Alam


310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00

HARGA SATUAN PEKERJAAN BETON BERTULANG


215,014.29
292,459.26
3,225.00
748,457.14
394,666.67
338,285.71

Besi Beton Polos


Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
6,568,391.44 Plywood 9 mm
656,839.14 Dolken diameter 8 / 4rm
7,225,230.58

2.895
384
692
1039
215
0.127
2.467
14.095

Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg

47 kg Besi + Bekisting)

65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00

7,323,825.65
915,911.33
503,198.31
23,375.00
200,357.14
117,064.27
38,136.51
33,780.10
5,742,111.98
600,000.00
40,000.00
14,285.71
2,557,706.75
42,792.40
475,200.00
215,014.29
292,459.26
3,225.00
758,571.43

7.143
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton

m2
1

beton K-250
1.65
0.275
0.028
0.083

19.675
m3

1
10
7.143
196.747
bekisting
tulangan
jumlah
4.71428571
1.38
7.742
0.275
2.36
2.357
1.38
1.377
0.236
0.138
0.401
0.236
0.079
0.397

Satuan
OH
OH
OH
OH
OH
OH

0.286
2.857
1.429

m3
Kg
Ltr

2.951
384
692

Kg
Kg
Kg

Pujo Widodo/Barokat Z. Alam


160,000.00
24,000.00

HARGA SATUAN PEKERJAAN BETON BERTULANG


400,000.00 Kerikil Beton
342,857.14 Air
Kayu Klas II Balok
6,658,023.31 Plywood 9 mm
665,802.33 Dolken diameter 8 / 4rm
7,323,825.65

1039
215
0.129
2.500
14.286

Kg
ltr
m3
Lbr
Btg

1
10
8.095
207.145
bekisting
tulangan
jumlah
5.34285714
1.45
8.443
0.275
2.67
2.671
1.45
1.450
0.267
0.145
0.440
0.267
0.083
0.433

Satuan
OH
OH
OH
OH
OH
OH

0.324
3.238
1.619

m3
Kg
Ltr

3.107
384
692
1039
215
0.146
2.833

Kg
Kg
Kg
Kg
ltr
m3
Lbr

45 kg Besi + Bekisting)

65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00

7,884,891.53
1,001,103.15
548,786.68
23,375.00
227,071.43
123,251.26
41,813.71
36,805.07
6,166,980.06
680,000.00
45,333.33
16,190.48
2,692,884.63
45,054.03
475,200.00
215,014.29
292,459.26
3,225.00
859,714.29
453,333.33
388,571.43

8.095
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

Kayu Klas III (Terentang)


Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
7,168,083.21 Plywood 9 mm

m2
1

beton K-250
1.65
0.275
0.028
0.083

20.714
m3

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG


716,808.32 Dolken diameter 8 / 4rm
7,884,891.53

16.190

Btg

1
10
8.095
217.318
bekisting
tulangan
jumlah
1.52
5.34285714
8.514
0.275
2.67
2.671
1.52
1.521
0.267
0.152
0.447
0.267
0.087
0.437

Satuan
OH
OH
OH
OH
OH
OH

0.324
3.238
1.619

m3
Kg
Ltr

3.260
384
692
1039
215
0.146
2.833
16.190

Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg

18 kg Besi + Bekisting)

65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00

8,045,671.60
1,012,807.03
553,415.33
23,375.00
227,071.43
129,304.11
42,490.21
37,150.95
6,301,439.88
680,000.00
45,333.33
16,190.48
2,825,131.85
47,266.63
475,200.00
215,014.29
292,459.26
3,225.00
859,714.29
453,333.33
388,571.43

8.095
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

Kayu Klas III (Terentang)


Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
7,314,246.91 Plywood 9 mm
731,424.69 Dolken diameter 8 / 4rm
8,045,671.60

m2
1

beton K-250
1.65
0.275
0.028
0.083

21.732
m3

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG

87 kg Besi + Bekisting)

65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00

46 kg Besi + Bekisting)

65,000.00

8,041,066.26
1,062,364.85
586,398.25
23,375.00
257,125.00
112,328.47
43,951.86
39,186.27
6,247,695.38
770,000.00
51,333.33
18,333.33
2,454,235.59
41,061.25
475,200.00
215,014.29
292,459.26
3,225.00
973,500.00
513,333.33
440,000.00

9.167
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

18.879

m2
1

beton K-250
1.65
0.275
0.028
0.083

m3
1
10
9.167
188.787
bekisting
tulangan
jumlah
1.32
6.05
9.022
0.275
3.03
3.025
1.32
1.322
0.303
0.132
0.463
0.303
0.076
0.461

Satuan
OH
OH
OH
OH
OH
OH

0.367
3.667
1.833

m3
Kg
Ltr

2.832
384
692
1039
215
0.165
3.208
18.333

Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg

Kayu Klas III (Terentang)


Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
7,310,060.23 Plywood 9 mm
731,006.02 Dolken diameter 8 / 4rm
8,041,066.26

7,819,139.70
1,046,209.85
580,009.26 per

9.167
m3

m2
1

17.475
m3

10

Pujo Widodo/Barokat Z. Alam


85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00

90 kg Besi + Bekisting)

65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00

HARGA SATUAN PEKERJAAN BETON BERTULANG


23,375.00
257,125.00
103,973.65
43,018.08
38,708.85
6,062,098.97
770,000.00
51,333.33
18,333.33
2,271,693.25
38,007.18
475,200.00
215,014.29
292,459.26
3,225.00
973,500.00
513,333.33
440,000.00

dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

beton K-250
1.65
0.275
0.028
0.083

9.167
174.746
bekisting
tulangan
jumlah
6.05
1.22
8.923
0.275
3.03
3.025
1.22
1.223
0.303
0.122
0.453
0.303
0.070
0.455

Satuan
OH
OH
OH
OH
OH
OH

0.367
3.667
1.833

m3
Kg
Ltr

2.621
384
692
1039
215
0.165
3.208
18.333

Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg

Kayu Klas III (Terentang)


Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
7,108,308.82 Plywood 9 mm
710,830.88 Dolken diameter 8 / 4rm
7,819,139.70

7,555,903.03
1,027,047.71
572,431.02
23,375.00
257,125.00
94,063.64
41,910.49
38,142.56

9.167
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu

m2
1

beton K-250
1.65
0.275
-

15.809
m3

1
10
9.167
158.090
bekisting
tulangan
jumlah
6.05
1.11
8.807
0.275
3.03
3.025

Satuan
OH
OH
OH

Pujo Widodo/Barokat Z. Alam

2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00

HARGA SATUAN PEKERJAAN BETON BERTULANG


5,841,955.04
770,000.00
51,333.33
18,333.33
2,055,171.89
34,384.61
475,200.00
215,014.29
292,459.26
3,225.00
973,500.00
513,333.33
440,000.00

Tukang Besi
Kepala Tukang
Mandor

Kayu Klas III (Terentang)


Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
6,869,002.75 Plywood 9 mm
686,900.28 Dolken diameter 8 / 4rm
7,555,903.03

0.028
0.083

0.303
0.303

1.11
0.111
0.063

1.107
0.441
0.449

OH
OH
OH

0.367
3.667
1.833

m3
Kg
Ltr

2.371
384
692
1039
215
0.165
3.208
18.333

Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg

HARGA SATUAN PEKERJAAN BETON BERTULANG

Pujo Widodo/Barokat Z. Alam

Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok

beton K-250bekisting
1.65
0.66
0.275
0.33
0.033
0.028
0.033
0.083

tulangan jumlah
0.07
2.380
0.275
0.330
0.07
0.070
0.007
0.068
0.004
0.120

Satuan
OH
OH
OH
OH
OH
OH

0.367
3.667
1.833

m3
Kg
Ltr

4.264
413
681
1021
215
0.165

Kg
Kg
Kg
Kg
ltr
m3

0.04
0.4
0.2
0.150
413
681
1,021
215
0.018

HARGA SATUAN PEKERJAAN BETON BERTULANG

Pujo Widodo/Barokat Z. Alam


Plywood 9 mm
Dolken diameter 8 / 4rm

0.35
2

3.208
18.333

Lbr
Btg

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG


Pembangunan Gedung Fakultas Bahasa Dan Seni Universitas Negeri Semarang
HSPK SEPTEMBER 2016

No.

SNI

KODE

KOEF

SAT.

URAIAN PEKERJAAN

III
A.4.1.1
a. Harga satuan pekerjaan beton lantai 2
1.

A.4.1.1.a.1

a.1. B1 (30 x 60)


L.01
L.02
L.02
L.02
L.03
L.04

8.431
0.275
2.750
1.281
0.431
0.431
0.333
3.333
1.667
182.985
2.745
384
692
1,039
215
0.150
2.917
16.667

m3

Membuat Balok Beton Bertulang (182,985 kg Besi + Bekisting

A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D

Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG


E
F

2.

A.4.1.1.a.1

B1L (30 x 60)

L.01
L.02
L.02
L.02
L.03
L.04

8.452
0.275
2.750
1.302
0.433
0.432
0.333
3.333
1.667
185.964
2.789
384
692
1,039
215
0.150
2.92
16.67

3.

A.4.1.1.a.1

Overhead & Profit (contoh 10%)


Harga Satuan Pekerjaan (D+E)

###

m3

Membuat Balok Beton Bertulang (185,964 kg Besi + Bekisting

A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F

Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)

m3

Membuat Balok Beton Bertulang (189,629 kg Besi + Bekisting

###

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG


A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F

Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)

m3

Membuat Balok Beton Bertulang (173,431 kg Besi + Bekisting

8.914
0.275
3.025

A
OH
OH
OH

Tenaga
Pekerja
Tukang batu
Tukang Kayu

B2 (30 x 40)

L.01
L.02
L.02
L.02
L.03
L.04

9.03
0.275
3.03
1.33
0.46
0.46
0.333
3.667
1.833
189.629
2.844
384
692
1,039
215
0.165
3.21
18.33

4.

A.4.1.1.a.1
B2 (30 x 40)

L.01
L.02
L.02

###

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG


L.02
L.03
L.04

1.214
0.452
0.455

OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F

Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)

m3

Membuat Balok Beton Bertulang (194,610 kg Besi + Bekisting

9.062
0.275
3.03
1.362
0.467
0.463

A
OH
OH
OH
OH
OH
OH
B

Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan

0.367
3.667
1.833
173.431
2.601
384
692
1,039
215
0.165
3.208
18.33

5.

A.4.1.1.a.1
B2 (30 x 40)

L.01
L.02
L.02
L.02
L.03
L.04

###

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG


0.37
3.67
1.83
194.610
2.919
384
692
1,039
215
0.17
3.208
18.33

6.

A.4.1.1.a.1

B2L (30 x 40)

L.01
L.02
L.02
L.02
L.03
L.04

9.085
0.275
3.03
1.385
0.469
0.465
0.367
3.667
1.833
197.876

m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F

Kayu Klas III (Terentang)


Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)

m3

Membuat Balok Beton Bertulang (197,876 kg Besi + Bekisting

A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg

Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos

###

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG


2.968
384
692
1,039
215
0.165
3.208
18.333

7.

A.4.1.1.a.1

B3 (15 x 25)

L.01
L.02
L.02
L.02
L.03
L.04

14.574
0.275
5.7
1.484
0.748
0.740
0.7
7
3
211.986
3.180
384
692
1,039

Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F

Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)

m3

Membuat Balok Beton Bertulang (211,986 kg Besi + Bekisting

A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg

Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton

###

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG


215
0.31
6.1
35

8.

A.4.1.1.a.1

B3 (15 x 25)

L.01
L.02
L.02
L.02
L.03
L.04

14.520
0.275
5.720
1.430
0.743
0.737
0.69
6.9
3.5
204.215
3.063
384
692
1,039
215
0.312
6.067
35

ltr
m3
Lbr
Btg
C
D
E
F

Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)

m3

Membuat Balok Beton Bertulang (204,215 kg Besi + Bekisting

A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C

Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN

###

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG


D
E
F

9.

A.4.1.1.a.1

G1 (35 x 75)

L.01
L.02
L.02
L.02
L.03
L.04

7.612
0.275
2.33
1.310
0.392
0.390
0.282
2.819
1.410
187.155
2.807
384
692
1,039
215
0.127
2.467
14.10

Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)

###

m3

Membuat Balok Beton Bertulang (187,155 kg Besi + Bekisting

A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D

Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG


E
F

10. A.4.1.1.a.1

G2 (35 x 70)

L.01
L.02
L.02
L.02
L.03
L.04

7.736
0.275
2.357
1.371
0.401
0.40
0.286
2.857
1.429
195.901
2.939
384
692
1,039
215
0.129
2.50
14.29

Overhead & Profit (contoh 10%)


Harga Satuan Pekerjaan (D+E)

###

m3

Membuat Balok Beton Bertulang (195,901 kg Besi + Bekisting

A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F

Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)

###

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG

11. A.4.1.1.a.1

m3

Membuat Balok Beton Bertulang (207,630 kg Besi + Bekisting

A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F

Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)

m3

Membuat Balok Beton Bertulang (196,423 kg Besi + Bekisting

14.465

A
OH

Tenaga
Pekerja

G4 (30 x 70)

L.01
L.02
L.02
L.02
L.03
L.04

8.446
0.275
2.671
1.453
0.440
0.433
0.324
3.238
1.619
207.630
3.114
384
692
1,039
215
0.146
2.833
16.19

12. A.4.1.1.a.1
B3 (15 x 25)

L.01

###

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG


L.02
L.02
L.02
L.03
L.04

0.275
5.7
1.375
0.738
0.734

OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F

Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)

m3

Membuat Balok Beton Bertulang (211,354 kg Besi + Bekisting

8.472
0.275
2.671
1.479
0.443

A
OH
OH
OH
OH
OH

Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang

0.7
7
3
196.429
2.946
384
692
1,039
215
0.31
6.1
35

13. A.4.1.1.a.1
G4 (30 x 70)

L.01
L.02
L.02
L.02
L.03

###

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG


L.04

0.435
0.32
3.2
1.6
211.354
3.170
384
692
1,039
215
0.146
2.833
16

14. A.4.1.1.

G6 (30 x 40)

L.01
L.02
L.02
L.02
L.03
L.04

8.923
0.275
3.025
1.223
0.45
0.46
0.37
3.7
1.8

OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F

Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)

m3

Membuat Balok Beton Bertulang (174,745 kg Besi + Bekisting

A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr

Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting

###

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG


174.746
2.621
384
692
215
1,039
0.165
3.208
18

15. A.4.1.1.a.1

G7 (30 x 40)

L.01
L.02
L.02
L.02
L.03
L.04

8.807
0.275
3.025
1.107
0.441
0.449
0.367
3.667
1.833
158.090
2.371
384
692
1,039

Kg
Kg
Kg
Kg
ltr
Kg
m3
Lbr
Btg
C
D
E
F

Besi Beton Polos


Kawat Beton
Portland Semen
Pasir Beton
Air
Kerikil Beton
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)

m3

Membuat Balok Beton Bertulang (158,090 kg Besi + Bekisting

A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg

Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton

###

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG


215
0.165
3.208
18.333

ltr
m3
Lbr
Btg
C
D
E
F

Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)

###

HARGA SATUAN PEKERJAAN BETON BERTULANG

Pujo Widodo/Barokat Z. Alam

emarang

Harga Bahan/Upah
Maksimum Rp

82,985 kg Besi + Bekisting)


65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00

Jumlah Harga Maksimum


Rp

7,602,222.54
991,613.79
548,008.00
23,375.00
233,750.00
108,875.84
40,953.48
36,651.48
5,919,497.60
700,000.00
46,666.67
16,666.67
2,378,799.91
39,799.15
475,200.00
215,014.29
292,459.26
3,225.00
885,000.00
466,666.67
400,000.00

8.333
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

Kayu Klas III (Terentang)


Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
6,911,111.40 Plywood 9 mm

m2

18.298
m3

1
10
8.333
182.985
beton K-250
bekisting
tulangan
jumlah
Satuan
1.65
5.5
1.28
8.431 OH
0.275 0.275 OH
2.75 2.750 OH
1.28
1.281 OH
0.028
0.275
0.128
0.431 OH
0.083
0.275
0.073
0.431 OH
0.04
0.4
0.2

0.333 m3
3.333 Kg
1.667 Ltr
0.150

384
692
1039
215
0.018
0.35

2.745 Kg
384 Kg
692 Kg
1039 Kg
215 ltr
0.150 m3
2.917 Lbr

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG


2

691,111.14 Dolken diameter 8 / 4rm


7,602,222.54

85,964 kg Besi + Bekisting)

65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00

7,649,318.75
995,042.13
549,363.84
23,375.00
233,750.00
110,648.86
41,151.64
36,752.79
5,958,884.01
700,000.00
46,666.67
16,666.67
2,417,538.19
40,447.27
475,200.00
215,014.29
292,459.26
3,225.00
885,000.00
466,666.67
400,000.00

8.333
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

18.596

m2
1

beton K-250
1.65
0.275
0.028
0.083

16.667 Btg

m3
1
10
8.333
185.964
bekisting
tulangan
jumlah
1.302
5.50
8.452
0.275
2.750
2.750
1.302
1.302
0.275
0.130
0.433
0.275
0.074
0.432

Satuan
OH
OH
OH
OH
OH
OH

0.333
3.333
1.667

m3
Kg
Ltr

2.789
384
692
1039
215
0.150
2.917
16.667

Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg

Kayu Klas III (Terentang)


Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
6,953,926.14 Plywood 9 mm
695,392.61 Dolken diameter 8 / 4rm
7,649,318.75

89,629 kg Besi + Bekisting)


7,977,361.73

9.167

18.963

Pujo Widodo/Barokat Z. Alam

65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00

HARGA SATUAN PEKERJAAN BETON BERTULANG


1,063,332.69
586,781.01
23,375.00
257,125.00
112,829.01
44,007.80
39,214.87
6,188,814.35
700,000.00
51,333.33
18,333.33
2,465,171.58
41,244.22
475,200.00
215,014.29
292,459.26
3,225.00
973,500.00
513,333.33
440,000.00

m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

m2
1

beton K-250
1.65
0.275
0.028
0.083

m3

1
10
9.167
189.629
bekisting
tulangan
jumlah
6.05
1.33
9.027
0.275
3.03
3.025
1.33
1.327
0.303
0.133
0.463
0.303
0.076
0.461

Satuan
OH
OH
OH
OH
OH
OH

0.333
3.667
1.833

m3
Kg
Ltr

2.844
384
692
1039
215
0.165
3.208
18.333

Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg

Kayu Klas III (Terentang)


Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
7,252,147.03 Plywood 9 mm
725,214.70 Dolken diameter 8 / 4rm
7,977,361.73

73,431 kg Besi + Bekisting)

65,000.00
85,000.00
85,000.00

7,089,426.18
1,044,697.85
579,411.30 per
23,375.00 dari V2
257,125.00 Koefisien

9.167
m3

m2
1

beton K-250

17.343
m3

1
10
9.167
173.431
bekisting
tulangan
jumlah

Satuan

Pujo Widodo/Barokat Z. Alam


85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00

HARGA SATUAN PEKERJAAN BETON BERTULANG


103,191.69
42,930.69
38,664.17
6,044,728.33
770,000.00
51,333.33
18,333.33
2,254,608.45
37,721.33
475,200.00
215,014.29
292,459.26
3,225.00
973,500.00
513,333.33
440,000.00

1.65
0.275
0.028
0.083

Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

6.05
3.03
0.303
0.303

1.21
1.21
0.121
0.069

Kayu Klas III (Terentang)


Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
7,089,426.18 Plywood 9 mm
708,942.62 Dolken diameter 8 / 4rm
7,798,368.80

8.914
0.275
3.025
1.214
0.452
0.455

OH
OH
OH
OH
OH
OH

0.367
3.667
1.833

m3
Kg
Ltr

2.601
384
692
1039
215
0.165
3.208
18.333

Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg

94,610 kg Besi + Bekisting)

65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00

7,393,724.87
1,069,064.19
589,047.70
23,375.00
257,125.00
115,793.15
44,339.09
39,384.25
6,324,660.68

9.167
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi

m2
1

beton K-250
1.65
0.275
-

19.461
m3

1
10
9.167
194.610
bekisting
tulangan
jumlah
1.36
6.05
9.062
0.275
3.03
3.025
1.36
1.362

Satuan
OH
OH
OH
OH

Pujo Widodo/Barokat Z. Alam


2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00

HARGA SATUAN PEKERJAAN BETON BERTULANG


770,000.00
51,333.33
18,333.33
2,529,934.38
42,327.75
475,200.00
215,014.29
292,459.26
3,225.00
973,500.00
513,333.33
440,000.00

0.028
0.083

Kepala Tukang
Mandor

0.303
0.303

0.136
0.078

Kayu Klas III (Terentang)


Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
7,393,724.87 Plywood 9 mm
739,372.49 Dolken diameter 8 / 4rm
8,133,097.36

0.467
0.463

OH
OH

0.367
3.667
1.833

m3
Kg
Ltr

2.919
384
692
1039
215
0.165
3.208
18.333

Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg

97,876 kg Besi + Bekisting)

65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00

8,184,707.69
1,072,821.13
590,533.50
23,375.00
257,125.00
117,736.11
44,556.24
39,495.28
6,367,822.23
770,000.00
51,333.33
18,333.33
2,572,385.69

9.167
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Kayu Klas III (Terentang)

m2
1

beton K-250
1.65
0.275
0.028
0.083

19.788
m3

1
10
9.167
197.876
bekisting
tulangan
jumlah
6.05
1.39
9.085
0.275
3.03
3.025
1.39
1.385
0.303
0.139
0.469
0.303
0.079
0.465

Satuan
OH
OH
OH
OH
OH
OH

0.367

m3

Pujo Widodo/Barokat Z. Alam


14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00

HARGA SATUAN PEKERJAAN BETON BERTULANG


43,037.99
475,200.00
215,014.29
292,459.26
3,225.00
973,500.00
513,333.33
440,000.00

Paku Biasa 2" - 5"


Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
7,440,643.36 Plywood 9 mm
744,064.34 Dolken diameter 8 / 4rm
8,184,707.69

3.667
1.833

Kg
Ltr

2.968
384
692
1039
215
0.165
3.208
18.333

Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg

11,986 kg Besi + Bekisting)

65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48

11,809,619.52
1,716,990.24
947,303.77
23,375.00
486,200.00
126,131.85
71,097.09
62,882.53
9,019,027.51
1,456,000.00
97,066.67
34,666.67
2,755,821.94
46,107.02
475,200.00
215,014.29
292,459.26

17.333
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton

m2
1

beton K-250
1.65
0.275
0.028
0.083

21.199

m3
1
10
17.333
211.986
bekisting
tulangan
jumlah
1.48
11.44
14.574
0.275
5.72
5.720
1.48
1.484
0.572
0.148
0.748
0.572
0.085
0.740
0.693
6.933
3.467
3.180

Satuan
OH
OH
OH
OH
OH
OH
m3
Kg
Ltr
Kg

Pujo Widodo/Barokat Z. Alam


15.00
5,900,000.00
160,000.00
24,000.00

04,215 kg Besi + Bekisting)

65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00

HARGA SATUAN PEKERJAAN BETON BERTULANG


3,225.00
1,840,800.00
970,666.67
832,000.00

Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
10,736,017.75 Plywood 9 mm
1,073,601.77 Dolken diameter 8 / 4rm
11,809,619.52

11,686,796.77
1,708,049.44
943,767.86
23,375.00
486,200.00
121,507.97
70,580.30
62,618.31
8,916,311.26
1,456,000.00
97,066.67
34,666.67
2,654,795.94
44,416.78
475,200.00
215,014.29
292,459.26
3,225.00
1,840,800.00
970,666.67
832,000.00

384
692
1039
215
0.312
6.067
34.667

Kg
Kg
Kg
ltr
m3
Lbr
Btg

1
10
17.333
204.215
bekisting
tulangan
jumlah
1.43
11.44
14.520
0.275
5.72
5.720
1.43
1.430
0.572
0.143
0.743
0.572
0.082
0.737

Satuan
OH
OH
OH
OH
OH
OH

17.333
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok

m2
1

beton K-250
1.65
0.275
0.028
0.083

20.422
m3

0.693
6.933
3.467

m3
Kg
Ltr

3.063
384
692
1039
215
0.312

Kg
Kg
Kg
Kg
ltr
m3

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG


10,624,360.70 Plywood 9 mm
1,062,436.07 Dolken diameter 8 / 4rm
11,686,796.77

6.067
34.667

Lbr
Btg

1
10
7.048
187.155
bekisting
tulangan
jumlah
1.31
4.65142857
7.612
0.275
2.33
2.326
1.31
1.310
0.233
0.131
0.392
0.233
0.075
0.390

Satuan
OH
OH
OH
OH
OH
OH

0.282
2.819
1.410

m3
Kg
Ltr

2.807
384
692
1039
215
0.127
2.467

Kg
Kg
Kg
Kg
ltr
m3
Lbr

87,155 kg Besi + Bekisting)

65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00

7,132,557.13
897,553.13
494,748.33
23,375.00
197,685.71
111,357.16
37,200.09
33,186.84
5,586,589.72
592,000.00
39,466.67
14,095.24
2,433,013.56
40,706.19
475,200.00
215,014.29
292,459.26
3,225.00
748,457.14
394,666.67
338,285.71

7.048
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

Kayu Klas III (Terentang)


Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
6,484,142.85 Plywood 9 mm

m2
1

beton K-250
1.65
0.275
0.028
0.083

18.715
m3

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG


648,414.28 Dolken diameter 8 / 4rm
7,132,557.13

95,901 kg Besi + Bekisting)

65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00

7,310,463.83
914,938.67
502,813.64
23,375.00
200,357.14
116,561.24
38,080.29
33,751.36
5,730,937.54
600,000.00
40,000.00
14,285.71
2,546,716.19
42,608.52
475,200.00
215,014.29
292,459.26
3,225.00
758,571.43
400,000.00
342,857.14

14.095

Btg

m3
1
10
7.143
195.901
bekisting
tulangan
jumlah
1.37
4.71428571
7.736
0.275
2.36
2.357
1.37
1.371
0.236
0.137
0.401
0.236
0.078
0.397

Satuan
OH
OH
OH
OH
OH
OH

0.286
2.857
1.429

m3
Kg
Ltr

2.939
384
692
1039
215
0.129
2.500
14.286

Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg

7.143
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

Kayu Klas III (Terentang)


Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
6,645,876.21 Plywood 9 mm
664,587.62 Dolken diameter 8 / 4rm
7,310,463.83

m2
1

beton K-250
1.65
0.275
0.028
0.083

19.590

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG

07,630 kg Besi + Bekisting)

65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00

7,892,564.15
1,001,661.67
549,007.56
23,375.00
227,071.43
123,540.11
41,846.00
36,821.58
6,173,396.65
680,000.00
45,333.33
16,190.48
2,699,195.63
45,159.62
475,200.00
215,014.29
292,459.26
3,225.00
859,714.29
453,333.33
388,571.43

8.095
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

m2
1

beton K-250
1.65
0.275
0.028
0.083

m3

1
10
8.095
207.630
bekisting
tulangan
jumlah
1.45
5.34285714
8.446
0.275
2.67
2.671
1.45
1.453
0.267
0.145
0.440
0.267
0.083
0.433

Satuan
OH
OH
OH
OH
OH
OH

0.324
3.238
1.619

m3
Kg
Ltr

3.114
384
692
1039
215
0.146
2.833
16.190

Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg

Kayu Klas III (Terentang)


Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
7,175,058.32 Plywood 9 mm
717,505.83 Dolken diameter 8 / 4rm
7,892,564.15

96,423 kg Besi + Bekisting)

65,000.00

20.763

11,563,741.81
1,699,091.74
940,225.26 per

17.333
m3

m2
1

19.643
m3

10

Pujo Widodo/Barokat Z. Alam


85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00

HARGA SATUAN PEKERJAAN BETON BERTULANG


23,375.00
486,200.00
116,875.34
70,062.54
62,353.59
8,813,400.82
1,456,000.00
97,066.67
34,666.67
2,553,578.93
42,723.34
475,200.00
215,014.29
292,459.26
3,225.00
1,840,800.00
970,666.67
832,000.00

dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

17.333
196.429
bekisting
tulangan
jumlah
11.44
1.38
14.465
0.275
5.72
5.720
1.38
1.375
0.572
0.138
0.738
0.572
0.079
0.734

beton K-250
1.65
0.275
0.028
0.083

Kayu Klas III (Terentang)


Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
10,512,492.55 Plywood 9 mm
1,051,249.26 Dolken diameter 8 / 4rm
11,563,741.81

Satuan
OH
OH
OH
OH
OH
OH

0.693
6.933
3.467

m3
Kg
Ltr

2.946
384
692
1039
215
0.312
6.067
34.667

Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg

11,354 kg Besi + Bekisting)

65,000.00
85,000.00
85,000.00
85,000.00
95,000.00

7,951,407.96
1,005,945.17
550,701.60
23,375.00
227,071.43
125,755.39
42,093.59

8.095
m3
per
dari V2
Koefisien
Pekerja
Tukang batu

m2
1

beton K-250
1.65
0.275

21.135
m3

1
10
8.095
211.354
bekisting
tulangan
jumlah
5.34285714
1.48
8.472
0.275

Satuan
OH
OH

Pujo Widodo/Barokat Z. Alam


85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00

74,745 kg Besi + Bekisting)

65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00

HARGA SATUAN PEKERJAAN BETON BERTULANG


36,948.17
6,222,607.53
680,000.00
45,333.33
16,190.48
2,747,596.72
45,969.41
475,200.00
215,014.29
292,459.26
3,225.00
859,714.29
453,333.33
388,571.43

Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

0.028
0.083

2.67
0.267
0.267

1.48
0.148
0.085

Kayu Klas III (Terentang)


Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
7,228,552.69 Plywood 9 mm
722,855.27 Dolken diameter 8 / 4rm
7,951,407.96

7,577,600.89
1,046,209.85
580,009.26
23,375.00
257,125.00
103,973.65
43,018.08
38,708.85
5,842,518.23
770,000.00
51,333.33
18,333.33

9.167
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

m2
1

beton K-250
1.65
0.275
0.028
0.083

2.671
1.479
0.443
0.435

OH
OH
OH
OH

0.324
3.238
1.619

m3
Kg
Ltr

3.170
384
692
1039
215
0.146
2.833
16.190

Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg

17.475
m3

1
10
9.167
174.746
bekisting
tulangan
jumlah
1.22
6.05
8.923
0.275
3.03
3.025
1.22
1.223
0.303
0.122
0.453
0.303
0.070
0.455

Satuan
OH
OH
OH
OH
OH
OH

Pujo Widodo/Barokat Z. Alam


13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00

58,090 kg Besi + Bekisting)

65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48

HARGA SATUAN PEKERJAAN BETON BERTULANG


2,271,693.25
38,007.18
475,200.00
215,014.29
60,518.52
15,585.00
973,500.00
513,333.33
440,000.00

Kayu Klas III (Terentang)


Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
6,888,728.08 Plywood 9 mm
688,872.81 Dolken diameter 8 / 4rm
7,577,600.89

7,555,903.03
1,027,047.71
572,431.02
23,375.00
257,125.00
94,063.64
41,910.49
38,142.56
5,841,955.04
770,000.00
51,333.33
18,333.33
2,055,171.89
34,384.61
475,200.00
215,014.29
292,459.26

9.167
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton

m2
1

beton K-250
1.65
0.275
0.028
0.083

0.367
3.667
1.833

m3
Kg
Ltr

2.621
384
692
1039
215
0.165
3.208
18.333

Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg

15.809
m3

1
10
9.167
158.090
bekisting
tulangan
jumlah
6.05
1.11
8.807
0.275
3.03
3.025
1.11
1.107
0.303
0.111
0.441
0.303
0.063
0.449

Satuan
OH
OH
OH
OH
OH
OH

0.367
3.667
1.833

m3
Kg
Ltr

2.371

Kg

Pujo Widodo/Barokat Z. Alam


15.00
5,900,000.00
160,000.00
24,000.00

HARGA SATUAN PEKERJAAN BETON BERTULANG


3,225.00
973,500.00
513,333.33
440,000.00

Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
6,869,002.75 Plywood 9 mm
686,900.28 Dolken diameter 8 / 4rm
7,555,903.03

384
692
1039
215
0.165
3.208
18.333

Kg
Kg
Kg
ltr
m3
Lbr
Btg

HARGA SATUAN PEKERJAAN BETON BERTULANG

Pujo Widodo/Barokat Z. Alam

Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm

beton K-250bekisting
1.65
0.66
0.275
0.33
0.028
0.033
0.083
0.033

tulangan jumlah
0.07
2.380
0.275
0.330
0.07
0.070
0.007
0.068
0.004
0.120

Satuan
OH
OH
OH
OH
OH
OH

0.333
3.333
1.667

m3
Kg
Ltr

2.745
413
681
1021
215
0.150
2.917

Kg
Kg
Kg
Kg
ltr
m3
Lbr

0.04
0.4
0.2
0.150
413
681
1,021
215
0.018
0.35

Pujo Widodo/Barokat Z. Alam


Dolken diameter 8 / 4rm

HARGA SATUAN PEKERJAAN BETON BERTULANG


2

16.667

Btg

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG

Pujo Widodo/Barokat Z. Alam

HARGA SATUAN PEKERJAAN BETON BERTULANG