Professional Documents
Culture Documents
G1
G2
G4
G5
G6
G7
B1
B2
B3
RB1
B1L
B2L
B3L
RB2
EKSTRA
5
5
5
3
3
3
8
3
2
3
8
3
2
3
BAWAH
5
5
3
2
2
0
0
2
0
2
0
2
0
0
5
5
5
3
3
3
5
3
2
3
5
3
2
3
EXTRA
D
5
5
3
2
2
0
0
2
0 POLOS
2
0
2
0
0
2
2
2
SENGKANG
TUMPUAN
LAPANGAN
JARAK
D
JARAK
10
100
10
10
100
10
10
100
10
10
100
10
10
100
10
10
100
10
10
100
10
10
100
10
8
100
8
10
100
10
10
100
10
10
100
10
8
100
8
10
100
10
150
150
150
150
150
150
150
150
150
150
150
150
150
150
G1
G2
G4
G5
G6
G7
B1
B2
B3
RB1
B1L
B2L
B3L
RB2
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.008
0.01
0.01
0.01
0.008
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.008
0.01
0.01
0.01
0.008
0.01
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
no
BALOK
jumlah
bentang
kolom
9
9
2
4
3
4
2
3
9
8
9
3
6
4
2
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
34.400
17.200
38.400
115.200
5.200
3.600
6.400
5.200
137.600
76.000
51.600
10.400
33.600
43.200
19.200
36
18
48
128
6
4
8
6
144
80
54
12
36
48
24
51.600
25.800
42.240
126.720
5.720
3.960
4.160
3.380
254.560
133.000
87.720
6.760
57.120
47.520
21.120
1
9.7
2.67
4
1
7.6
1
1.23
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
5.400
18.600
13.620
7.200
2.400
14.400
2.400
1.660
9
19.4
16.02
8
4
15.2
4
2.46
8.100
20.460
8.853
4.680
1.560
25.200
2.640
1.826
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
BALOK LT.02
B1 (30 x 60)
B1L (30 x 60)
B2 (30 x 40)
B2 (30 x 40)
B2 (30 x 40)
B2L (30 x 40)
B3 (15 x 25)
B3 (15 x 25)
G1 (35 x 75)
G2 (35 x 70)
G4 (30 x 70)
B3 (15 x 25)
G4 (30 x 70)
G6 (30 x 40)
G7 (30 x 40)
4
2
24
32
2
1
4
2
16
10
6
4
6
12
12
0.6
0.6
0.4
0.4
0.4
0.4
0.25
0.25
0.75
0.7
0.7
0.25
0.7
0.4
0.4
0.3
0.3
0.3
0.3
0.3
0.3
0.15
0.15
0.35
0.35
0.3
0.15
0.3
0.3
0.3
m2
1.54
0.18
0.18
0.12
0.12
0.12
0.12
0.0375
0.0375
0.2625
0.245
0.21
0.0375
0.21
0.12
0.12
1
2
3
4
5
6
7
8
BALOK Elv.6.7
B1 (30 x 60)
B2 (30 x 40)
B3 (15 x 25)
B3 (15 x 25)
B3 (15 x 25)
G2 (35 x 70)
G7 (30 x 40)
G7 (30 x 40)
9
2
6
2
4
2
4
2
0.6
0.4
0.25
0.25
0.25
0.7
0.4
0.4
0.3
0.3
0.15
0.15
0.15
0.35
0.3
0.3
0.18
0.12
0.0375
0.0375
0.0375
0.245
0.12
0.12
no
BALOK
jumlah
h
m
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
1
2
3
1
2
BALOK LT.3
B1 (30 x 60)
B1 (30 x 60)
B1 (30 x 60)
B1L (30 x 60)
B2 (30 x 40)
B2 (30 x 40)
B2 (30 x 40)
B2L (30 x 40)
B3 (15 x 25)
B3 (15 x 25)
B3 (15 x 25)
G1 (35 x 75)
G1 (35 x 75)
G2 (35 x 70)
G4 (30 x 70)
G4 (30 x 70)
G6 (30 x 40)
G6 (30 x 40)
G7 (30 x 40)
1
2
3
2
18
34
4
1
2
2
1
16
4
6
8
2
3
12
12
b
m
A
m2
bentang
m
kolom
m
LUAS BEKISTING
(B +(2 H ))xL
m2
0.4
0.4
0.4
0.6
0.4
0.4
0.4
0.4
0.25
0.25
0.25
0.75
0.75
0.7
0.7
0.7
0.4
0.4
0.4
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.15
0.15
0.15
0.35
0.35
0.35
0.3
0.3
0.3
0.3
0.3
0.12
0.12
0.12
0.18
0.12
0.12
0.12
0.12
0.0375
0.0375
0.0375
0.2625
0.2625
0.245
0.21
0.21
0.12
0.12
0.12
6
1.15
9
9
2
4
1.65
3.7
3
1.7
4
9
6
8
9
6
3
4
2
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
5.6
1.5
25.8
17.2
28.8
122.4
5
3.3
5.2
2.6
3.6
137.6
22.4
45.6
68.8
11.2
7.8
43.2
19.2
6
2.3
27
18
36
136
6.6
3.7
6
3.4
4
144
24
48
72
12
9
48
24
6.16
1.65
28.38
25.8
31.68
134.64
5.5
3.63
3.38
1.69
2.34
254.56
41.44
79.8
116.96
19.04
8.58
47.52
21.12
0.15
0.15
0.15
0.15
0.15
0.15
0.0225
0.0225
0.0225
2
2.85
1.93
0
0
0
4
14.25
19.3
4
14.25
19.3
1.8
6.4125
8.685
0.15
0.15
0.15
0.15
0.0225
0.0225
2
2.85
0
0
4
14.25
4
14.25
1.8
6.4125
no
1
2
3
4
5
6
7
8
B.
B.
B.
B.
LATAI
LATAI
LATAI
LATAI
(15
(15
(15
(15
x
x
x
x
BALOK
15)
15)
15)
15)
jumlah
8
2
4
2
2
6
6
5
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
bentang
kolom
m2
0.5
0.5
0.5
0.5
0.5
0.25
0.25
0.25
0.3
0.3
0.3
0.3
0.3
0.15
0.15
0.15
0.0225
0.0225
0.0225
0.0225
0.15
0.15
0.15
0.15
0.15
0.0375
0.0375
0.0375
0
0
0
0
1.93
0.6
3
8
9
6
4
4
8
9
6
12
0.4
0.4
0.4
0.4
0.4
0
0
0
19.3
1.2
6
24
19.3
1.2
6
24
8.685
0.54
2.7
10.8
72
12
16
8
16
54
36
60
89.44
14.56
18.72
9.36
19.76
35.1
23.4
39
Volume
Beton
V
m3
0.12
0.12
0.12
0.12
0.13
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.13
0.12
0.12
6.192
3.096
4.608
13.824
0.624
0.432
0.240
0.195
36.120
18.620
10.836
0.390
7.056
5.184
2.304
0.972
2.232
0.511
0.270
0.090
3.528
0.288
0.199
BALOK
Satuan
BALOK LT.02
B1 (30 x 60)
B1L (30 x 60)
B2 (30 x 40)
B2 (30 x 40)
B2 (30 x 40)
B2L (30 x 40)
B3 (15 x 25)
B3 (15 x 25)
G1 (35 x 75)
G2 (35 x 70)
G4 (30 x 70)
B3 (15 x 25)
G4 (30 x 70)
G6 (30 x 40)
G7 (30 x 40)
BALOK Elv.6.7
B1 (30 x 60)
B2 (30 x 40)
B3 (15 x 25)
B3 (15 x 25)
B3 (15 x 25)
G2 (35 x 70)
G7 (30 x 40)
G7 (30 x 40)
Berat tul
pinggang
per meter
D tul.
pinggang
D Tul.
Atas
D Tul.
Bawah
0.013
0.013
0.016
0.016
0.016
0.016
0.016
0.016
0.013
0.013
0.016
0.016
0.016
0.013
0.016
0.016
0.016
0.016
0.016
0.016
0.016
0.016
0.016
0.013
0.013
0.016
0.016
0.016
0.013
0.016
0.016
0.016
1.042
1.042
0.016
0.016
0.013
0.013
0.013
0.016
0.016
0.016
0.016
0.016
0.013
0.013
0.013
0.016
0.016
0.016
1.042
0.01
0.013
0.013
0.013
0.013
0.013
0.617
1.042
1.042
1.042
1.042
Berat tul
Jml Tul.
Jml Tul.
Pokok per
Atas
Pinggang
meter
Menerus
buah
buah
1.58
1.58
1.58
1.58
1.58
1.58
1.04
1.04
1.58
1.58
1.58
1.04
1.58
1.58
1.58
2
2
8
8
3
3
3
3
2
2
5
5
5
2
5
3
3
1.58
1.58
1.04
1.04
1.04
1.58
1.58
1.58
4
2
2
2
8
3
2
2
2
5
3
3
Tebal
Pelat
Volume
Beton
BALOK
V
m
Satuan
BALOK LT.3
0.672 B1 (30 x 60)
0.18 B1 (30 x 60)
3.096 B1 (30 x 60)
3.096 B1L (30 x 60)
3.456 B2 (30 x 40)
14.688 B2 (30 x 40)
0.6 B2 (30 x 40)
0.396 B2L (30 x 40)
0.195 B3 (15 x 25)
0.0975 B3 (15 x 25)
0.135 B3 (15 x 25)
36.12 G1 (35 x 75)
5.88 G1 (35 x 75)
11.172 G2 (35 x 70)
14.448 G4 (30 x 70)
2.352 G4 (30 x 70)
0.936 G6 (30 x 40)
5.184 G6 (30 x 40)
2.304 G7 (30 x 40)
D tul.
pinggang
D Tul.
Atas
D Tul.
Bawah
0.013
0.013
0.013
0.013
0.016
0.016
0.016
0.016
0.016
0.016
0.016
0.016
0.013
0.013
0.013
0.016
0.016
0.016
0.016
0.016
0.016
0.016
0.016
0.016
0.016
0.016
0.016
0.016
0.016
0.016
0.016
0.013
0.013
0.013
0.016
0.016
0.016
0.016
0.016
0.016
0.016
0.016
m3
0.01
0.01
0.013
0.013
0.013
0.008
0.008
0.008
0.008
0.008
0.008
0.008
0.008
0.008
0.008
0.008
0.008
Berat tul
pinggang
per meter
Berat tul
Jml Tul.
Jml Tul.
Pokok per
Atas
Pinggang
meter
Menerus
buah
1.04236786
1.04236786
1.04236786
1.04236786
0.61678571
0.61678571
1.04236786
1.04236786
1.04236786
1.578971429
1.578971429
1.578971429
1.578971429
1.578971429
1.578971429
1.578971429
1.578971429
1.042367857
1.042367857
1.042367857
1.578971429
1.578971429
1.578971429
1.578971429
1.578971429
1.578971429
1.578971429
1.578971429
0.394742857
0.394742857
0.394742857
0.394742857
0.394742857
0.394742857
buah
2
2
2
2
4
4
2
2
2
8
8
8
8
3
3
3
3
2
2
2
5
5
5
5
5
3
3
3
2
2
2
2
2
2
Volume
Beton
V
m3
LATAI
LATAI
LATAI
LATAI
BALOK
x
x
x
x
15)
15)
15)
15)
0.008
0.008
0.008
0.008
D tul.
pinggang
Satuan
RING BALK Elv. 11.5
10.32 RB1 (30 x 50)
1.68 RB1 (30 x 50)
2.16 RB2 (30 x 50)
1.08 RB2 (30 x 50)
2.28 RB2 (30 x 50)
2.025 B3 (25 x 15)
1.35 B3 (25 x 15)
2.25 B3 (25 x 15)
0.008
0.008
0.008
0.008
D Tul.
Atas
D Tul.
Bawah
0.016
0.016
0.016
0.016
0.016
0.013
0.013
0.013
0.016
0.016
0.016
0.016
0.016
0.013
0.013
0.013
0.394742857
0.394742857
0.394742857
0.394742857
Berat tul
pinggang
per meter
2
2
2
2
Berat tul
Jml Tul.
Jml Tul.
Pokok per
Atas
Pinggang
meter
Menerus
buah
1.578971429
1.578971429
1.578971429
1.578971429
1.578971429
1.042367857
1.042367857
1.042367857
buah
3
3
3
3
3
2
2
2
Jml Tul.
Atas
Ekstra
Jml Tul.
Bawah
Menerus
Jml Tul.
Bawah
Ekstra
Overlab tul
pinggang
buah
buah
buah
0
0
2
2
2
2
0
0
5
5
3
0
3
2
0
5
5
3
3
3
3
2
2
5
5
5
2
5
3
3
0
0
2
2
2
2
0
0
5
5
3
0
3
2
0
0.598
0.598
0
2
0
0
0
5
0
0
5
3
2
2
2
5
3
3
0
2
0
0
0
5
0
0
0.598
0.46
0.598
0.598
0.598
0.598
Overlab
tul pokok
BALOK
0.736
0.736
0.736
0.736
0.736
0.736
0.598
0.598
0.736
0.736
0.736
0.598
0.736
0.736
0.736
BALOK LT.02
B1 (30 x 60)
B1L (30 x 60)
B2 (30 x 40)
B2 (30 x 40)
B2 (30 x 40)
B2L (30 x 40)
B3 (15 x 25)
B3 (15 x 25)
G1 (35 x 75)
G2 (35 x 70)
G4 (30 x 70)
B3 (15 x 25)
G4 (30 x 70)
G6 (30 x 40)
G7 (30 x 40)
0.736
0.736
0.598
0.598
0.598
0.736
0.736
0.736
BALOK Elv.6.7
B1 (30 x 60)
B2 (30 x 40)
B3 (15 x 25)
B3 (15 x 25)
B3 (15 x 25)
G2 (35 x 70)
G7 (30 x 40)
G7 (30 x 40)
Pjg Tul.
pinggang
Pjg Tul.
Atas
Pjg Tul.
Bawah
Berat Tul.
Pinggang
kg
36.598
18.598
36.736
18.736
48.736
128.736
6.736
4.736
8.598
6.598
144.736
80.736
54.736
12.598
36.736
48.736
24.736
36.736
18.736
48.736
128.736
6.736
4.736
8.598
6.598
144.736
80.736
54.736
12.598
36.736
48.736
24.736
76.297
38.772
9.736
20.136
16.618
8.598
4.598
15.936
4.736
3.196
9.736
20.136
16.618
8.598
4.598
15.936
4.736
3.196
144.460
80.598
54.598
36.598
9.598
15.798
356.403
168.026
113.822
76.297
20.009
32.9346548
Jml Tul.
Atas
Ekstra
Jml Tul.
Bawah
Menerus
Jml Tul.
Bawah
Ekstra
Overlab tul
pinggang
buah
buah
buah
0
0
0
0
2
2
2
2
0
0
0
5
5
5
3
3
2
2
0
5
5
5
5
3
3
3
3
2
2
2
5
5
5
5
5
3
3
3
2
2
2
2
2
2
0
0
0
0
2
2
2
2
0
0
0
5
5
5
3
3
2
2
0
0.598
0.598
0.598
0.598
0.46
0.46
0.598
0.598
0.598
Overlab
tul pokok
0.736
0.736
0.736
0.736
0.736
0.736
0.736
0.736
0.598
0.598
0.598
0.736
0.736
0.736
0.736
0.736
0.736
0.736
0.736
BALOK
Pjg Tul.
pinggang
Pjg Tul.
Atas
Pjg Tul.
Bawah
Berat Tul.
Pinggang
kg
BALOK LT.3
B1 (30 x 60)
B1 (30 x 60)
B1 (30 x 60)
B1L (30 x 60)
B2 (30 x 40)
B2 (30 x 40)
B2 (30 x 40)
B2L (30 x 40)
B3 (15 x 25)
B3 (15 x 25)
B3 (15 x 25)
G1 (35 x 75)
G1 (35 x 75)
G2 (35 x 70)
G4 (30 x 70)
G4 (30 x 70)
G6 (30 x 40)
G6 (30 x 40)
G7 (30 x 40)
6.598
2.898
27.598
18.598
36
136
6.6
3.7
6
3.4
4
144.46
24.46
48.598
72.598
12.598
9
48
24
6.736
3.036
27.736
18.736
36.736
136.736
7.336
4.436
6.598
3.998
4.598
144.736
24.736
48.736
72.736
12.736
9.736
48.736
24.736
6.736
3.036
27.736
18.736
36.736
136.736
7.336
4.436
6.598
3.998
4.598
144.736
24.736
48.736
72.736
12.736
9.736
48.736
24.736
13.7550862
6.0415641
57.5345362
38.7719148
4.368
14.618
19.668
4.368
14.618
19.668
0
0
0
4.368
14.618
4.368
14.618
0
0
356.403457
60.3463143
101.313986
151.347643
26.2635005
0
0
0
2
2
2
2
0.368 B.
0.368 B.
0.368 B.
0.368 B.
Jml Tul.
Atas
Ekstra
Jml Tul.
Bawah
Menerus
Jml Tul.
Bawah
Ekstra
Overlab tul
pinggang
buah
buah
buah
2
2
0
0
0
3
3
3
3
3
2
2
2
2
2
0
0
0
Overlab
tul pokok
LATAI
LATAI
LATAI
LATAI
(15
(15
(15
(15
BALOK
x
x
x
x
15)
15)
15)
15)
19.668
1.568
6.368
24.368
19.668
1.568
6.368
24.368
0
0
0
0
Pjg Tul.
pinggang
Pjg Tul.
Atas
Pjg Tul.
Bawah
Berat Tul.
Pinggang
kg
72.736
12.736
16.736
8.736
16.736
54.598
36.598
60.598
72.736
12.736
16.736
8.736
16.736
54.598
36.598
60.598
0
0
0
0
0
0
0
0
Pembang
Berat Tul.
Atas
Menerus
Berat Tul.
Atas Ekstra
Berat Tul.
Bawah
Menerus
Berat Tul.
Bawah
Ekstra
Berat Tul.
Pokok
Jarak
Beugel
Tumpuan
Jarak
Beugel
Lapangan
kg
Kg
kg
Kg
kg
76.953
203.270
10.63595154
7.478
0.000
0.000
571.3350217
318.700
129.640
0.000
87.008
76.95275154
0
830.363
423.359
615.622
1626.164
85.088
59.824
35.849
27.510
3784.414
2080.223
1237.368
52.527
830.363
615.622
234.345
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
219.857
254.353
69.288
35.849
19.171
410.372
44.868
30.278
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
464.041
236.669
230.858
609.811
31.908
22.434
17.925
13.755
1142.670
637.399
432.133
26.264
290.025
230.858
117.172
122.983
95.383
34.644
17.925
9.586
125.812
22.434
15.139
76.953
203.270
10.63595154
7.478
571.3350217
318.700
129.640
87.008
76.95275154
0
31.79416869
62.90622171
290.025
147.918
230.858
609.811
31.908
22.434
17.925
13.755
1142.670
637.399
432.133
26.264
290.025
230.858
117.172
76.864
95.383
34.644
17.925
9.586
125.812
22.434
15.139
31.79416869
62.90622171
BALOK
D Tul. Begel
Tumpuan
m
BALOK LT.02
B1 (30 x 60)
B1L (30 x 60)
B2 (30 x 40)
B2 (30 x 40)
B2 (30 x 40)
B2L (30 x 40)
B3 (15 x 25)
B3 (15 x 25)
G1 (35 x 75)
G2 (35 x 70)
G4 (30 x 70)
B3 (15 x 25)
G4 (30 x 70)
G6 (30 x 40)
G7 (30 x 40)
BALOK Elv.6.7
B1 (30 x 60)
B2 (30 x 40)
B3 (15 x 25)
B3 (15 x 25)
B3 (15 x 25)
G2 (35 x 70)
G7 (30 x 40)
G7 (30 x 40)
0.01
0.01
0.01
0.01
0.01
0.01
0.008
0.008
0.01
0.01
0.01
0.008
0.01
0.01
0.01
0.01
0.01
0.008
0.008
0.008
0.01
0.01
0.01
Berat Tul.
Atas
Menerus
Berat Tul.
Atas Ekstra
Berat Tul.
Bawah
Menerus
Berat Tul.
Bawah
Ekstra
Berat Tul.
Pokok
Jarak
Beugel
Tumpuan
Jarak
Beugel
Lapangan
kg
Kg
kg
Kg
kg
53.17975771
23.96878629
218.9717577
147.9180434
174.0152832
647.7067118
34.7500032
21.01295177
13.75508624
8.334773386
9.585614814
1142.670043
195.2871863
384.7637577
574.2403291
100.5489006
46.11859749
230.8582546
117.1723118
0
0
0
0
58.0050944
215.9022373
11.5833344
7.004317257
0
0
0
571.3350217
97.64359314
192.3818789
172.2720987
30.16467017
15.37286583
76.95275154
0
152.022456
68.3604084
626.861106
423.358828
464.040755
1727.2179
92.6666752
56.0345381
27.5101725
16.6695468
19.1712296
3784.41359
646.207873
1255.60526
1644.3725
287.690642
122.982927
615.622012
234.344624
85.08761234
0
38.35005806
0
350.3548123
0
236.6688695
0
174.0152832 58.0050944
647.7067118 215.9022373
34.7500032 11.5833344
21.01295177 7.004317257
13.75508624
0
8.334773386
0
9.585614814
0
1142.670043 571.3350217
195.2871863 97.64359314
384.7637577 192.3818789
574.2403291 172.2720987
100.5489006 30.16467017
46.11859749 15.37286583
230.8582546 76.95275154
117.1723118
0
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
3.4484736
11.54070217
15.52760503
0
3.4484736
0 11.54070217
0 15.52760503
0 6.8969472
0 23.0814043
0 31.0552101
0.1
0.1
0.1
3.4484736
11.54070217
0
3.4484736
0 11.54070217
0 6.8969472
0 23.0814043
0.1
0.1
BALOK
D Tul. Begel
Tumpuan
m
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
BALOK LT.3
B1 (30 x 60)
B1 (30 x 60)
B1 (30 x 60)
B1L (30 x 60)
B2 (30 x 40)
B2 (30 x 40)
B2 (30 x 40)
B2L (30 x 40)
B3 (15 x 25)
B3 (15 x 25)
B3 (15 x 25)
G1 (35 x 75)
G1 (35 x 75)
G2 (35 x 70)
G4 (30 x 70)
G4 (30 x 70)
G6 (30 x 40)
G6 (30 x 40)
G7 (30 x 40)
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.008
0.008
0.008
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.008
0.008
0.008
0.008
0.008
0 15.52760503
0
1.2379136
0 5.027445029
0 19.23818789
0 31.0552101
0 2.4758272
0 10.0548901
0 38.4763758
0.1
0.1
0.1
0.1
0.15 B.
0.15 B.
0.15 B.
0.15 B.
Berat Tul.
Atas
Menerus
Berat Tul.
Atas Ekstra
Berat Tul.
Bawah
Menerus
Berat Tul.
Bawah
Ekstra
Berat Tul.
Pokok
Jarak
Beugel
Tumpuan
Jarak
Beugel
Lapangan
kg
Kg
kg
Kg
kg
344.5441975 114.8480658
60.32934034 20.10978011
79.27699749
0
41.3816832
0
79.27699749
0
113.8224005
0
76.29715767
0
126.3308148
0
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
LATAI
LATAI
LATAI
LATAI
(15
(15
(15
(15
x
x
x
x
15)
15)
15)
15)
BALOK
0.008
0.008
0.008
0.008
D Tul. Begel
Tumpuan
m
0.01
0.01
0.01
0.01
0.01
0.008
0.008
0.008
Jml Begel
Panjang
Begel
Berat tul
beugel
Berat Total
Tulangan
buah
kg
kg
kg
Koef beton
Koef bekisting
besi polos
0.01
0.01
0.01
0.01
0.01
0.01
0.008
0.008
0.01
0.01
0.01
0.008
0.01
0.01
0.01
0.617
0.617
0.617
0.617
0.617
0.617
0.395
0.395
0.617
0.617
0.617
0.395
0.617
0.617
0.617
0.617
0.617
0.617
0.617
0.617
0.617
0.395
0.395
0.617
0.617
0.617
0.395
0.617
0.617
0.617
288.6666667
145.333
322.000
962
45.333
32
55.33333333
45.33333333
1148.667
635.333
432.000
88.66666667
282
362
162
1.7
1.7
1.3
1.3
1.3
1.3
0.688
0.688
4.2
4
3.8
0.688
3.8
1.3
1.3
302.67731
152.38719
258.1865
771.35221
36.349238
25.658286
15.027597
12.311767
2975.621
1567.4581
1012.5154
24.080367
660.94757
290.25936
129.89507
1133.041
575.746
873.809
2397.516
121.437
85.482
50.877
39.822
6760.035
3647.681
2249.883
76.607
1491.311
905.881
364.240
182.985
185.964
189.629
173.431
194.610
197.876
211.986
204.215
187.155
195.901
207.630
196.429
211.354
174.746
158.090
8.333
8.333
9.167
9.167
9.167
9.167
17
17.3
7.048
7.143
8.095
17
8.1
9.2
9.167
0.01
0.01
0.008
0.008
0.008
0.01
0.01
0.01
0.617
0.617
0.395
0.395
0.395
0.617
0.617
0.617
0.617
0.617
0.395
0.395
0.395
0.617
0.617
0.617
47
157
115.5
62
22
122
22
15.83333333
1.7
1.3
0.688
0.688
0.688
4
1.3
1.3
49.281179
125.88596
31.367846
16.838151
5.9748279
300.99143
17.640071
12.695506
269.138
380.239
100.656
52.687
25.146
711.363
62.508
42.974
276.891
170.358
197.075
195.138
279.401
201.634
217.042
215.732
8.333
9.167
17.333
17.333
17.333
7.143
9.167
9.167
D Tul.
Berat tul
Begel
beugel per
Lapangan
meter
m
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.008
0.008
0.008
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.61678571
0.61678571
0.61678571
0.61678571
0.61678571
0.61678571
0.61678571
0.61678571
0.39474286
0.39474286
0.39474286
0.61678571
0.61678571
0.61678571
0.61678571
0.61678571
0.61678571
0.61678571
0.61678571
0.616786
0.616786
0.616786
0.616786
0.616786
0.616786
0.616786
0.616786
0.394743
0.394743
0.394743
0.616786
0.616786
0.616786
0.616786
0.616786
0.616786
0.616786
0.616786
Jml Begel
Panjang
Begel
Berat tul
beugel
Berat Total
Tulangan
buah
kg
kg
kg
48.66666667
14.5
217
145.3333333
242
1022
43.66666667
29.5
45.33333333
23.66666667
32
1148.666667
188.6666667
382
575.3333333
95.33333333
67
362
162
1.3
1.3
1.3
1.7
1.3
1.3
1.3
1.3
0.688
0.688
0.688
4.2
4.2
4
3.8
3.8
1.3
1.3
1.3
39.021976 191.0444324905
11.626411
79.9868191571
173.99525
800.8563563
152.38719 575.7460182048
194.04079 658.0815409143
819.4615 2546.6793980572
35.012869 127.6795442476
23.653732
79.6882702
12.311767
39.8219390381
6.4274664
23.0970131333
8.6906587
27.8618883714
2975.621 6760.0345874286
488.741 1134.9488731429
942.44857 2198.0538308143
1348.458 2992.8305467762
223.4409 511.1315467762
53.722036 176.7049623429
290.25936 905.8813694857
129.89507 364.2396949714
Koef beton
Koef bekisting
besi polos
284.29231 9.1666666667
444.371218 9.1666666667
258.674534 9.1666666667
185.964476 8.3333333333
190.417113 9.1666666667
173.385035 9.1666666667
212.79924 9.1666666667
201.233006 9.1666666667
204.215072 17.3333333333
236.892442 17.3333333333
206.384358 17.3333333333
187.154889 7.0476190476
193.018516 7.0476190476
196.746673 7.1428571429
207.144971 8.0952380952
217.317835 8.0952380952
188.787353 9.1666666667
174.745635 9.1666666667
158.090145 9.1666666667
0.488 6.8064195
0.488 23.260618
0.488 31.36732
13.7033667048 152.25963 20
46.3420219429 144.536521 20
62.4225301333 143.74791 20
0.488 6.8064195
0.488 23.260618
13.7033667048 152.25963 20
46.3420219429 144.536521 20
0.39474286
0.39474286
0.39474286
0.39474286
D Tul.
Berat tul
Begel
beugel per
Lapangan
meter
m
0.01
0.01
0.01
0.01
0.01
0.008
0.008
0.008
0.61678571
0.61678571
0.61678571
0.61678571
0.61678571
0.39474286
0.39474286
0.39474286
0.394743 162.8333333
0.394743
12
0.394743
52
0.394743
202
0.488 31.36732
0.488 2.3116142
0.488 10.016995
0.488 38.912172
62.4225301333 143.74791 20
4.7874413714 177.312643 20
20.0718848 148.680628 20
77.3885476571 143.312125 20
Jml Begel
Panjang
Begel
Berat tul
beugel
Berat Total
Tulangan
buah
kg
kg
kg
0.616786 575.3333333
0.616786 95.33333333
0.616786
122
0.616786
62
0.616786 128.6666667
0.394743
452
0.394743
302
0.394743
502
1.5
1.5
1.5
1.5
1.5
0.688
0.688
0.688
532.28607 1451.0705980572
88.200357 249.0785980571
112.87179 271.4257806857
57.361071 140.1244378286
119.03964 277.5936378286
122.75555
350.4003558
82.018092 234.6124072286
136.33471 388.9963386571
Koef beton
Koef bekisting
besi polos
140.607616 8.6666666667
148.26107 8.6666666667
125.660084 8.6666666667
129.74485 8.6666666667
121.751596 8.6666666667
173.037213 17.3333333333
173.786968 17.3333333333
172.887262 17.3333333333
B.
Uraian
Uraian
SNI
Volume
Satuan
6.192
3.096
4.608
13.824
0.624
0.432
0.240
0.195
36.120
18.620
10.836
0.390
7.056
5.184
2.304
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
Volume
Satuan
0.972
2.232
0.511
0.270
0.090
3.528
0.288
0.199
m
m
m
m
m
m
m
m
Harga Satuan
2
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
B1
B1L
B2
B2
B2
B2L
B3
B3
G1
G2
G4
B3
G4
G6
G7
SNI
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
7,602,222.54
7,649,318.75
7,977,361.73
7,089,426.18
7,393,724.87
8,184,707.69
11,809,619.52
11,686,796.77
7,132,557.13
7,310,463.83
7,892,564.15
11,563,741.81
7,951,407.96
7,577,600.89
7,555,903.03
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
9,086,389.00
7,749,795.84
10,742,351.41
10,493,941.68
11,704,626.93
7,401,062.88
8,487,626.81
8,466,924.80
47,072,961.94
23,682,290.86
36,759,682.87
98,004,227.48
4,613,684.32
3,535,793.72
2,834,308.69
2,278,925.37
257,627,963.56
136,120,836.44
85,523,825.14
4,509,859.31
56,105,134.57
39,282,283.01
17,408,800.58
Rp
8,831,970.11
17,297,544.32
5,486,655.98
2,833,364.25
1,053,416.42
26,110,949.83
2,444,436.52
1,686,611.42
Rp
D.
E.
Uraian
Pekerjaan Balok Lantai
1
B1 (30 x 60)
2
B1 (30 x 60)
3
B1 (30 x 60)
4
B1L (30 x 60)
5
B2 (30 x 40)
6
B2 (30 x 40)
7
B2 (30 x 40)
8
B2L (30 x 40)
9
B3 (15 x 25)
10
B3 (15 x 25)
11
B3 (15 x 25)
12
G1 (35 x 75)
13
G1 (35 x 75)
14
G2 (35 x 70)
15
G4 (30 x 70)
16
G4 (30 x 70)
17
G6 (30 x 40)
18
G6 (30 x 40)
19
G7 (30 x 40)
Volume
Satuan
Harga Satuan
0.672
0.180
3.096
3.096
3.456
14.688
0.600
0.396
0.195
0.098
0.135
36.120
5.880
11.172
14.448
2.352
0.936
5.184
2.304
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
9,550,503.00
12,080,518.12
9,145,619.17
6,953,926.14
7,333,476.62
7,797,635.70
8,420,569.33
8,237,767.31
11,686,796.77
12,203,256.07
11,721,081.91
7,132,557.13
7,225,230.58
7,323,825.65
7,884,891.53
8,045,671.60
8,041,066.26
7,819,139.70
7,555,903.03
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
6,417,938.02
2,174,493.26
28,314,836.95
21,529,355.32
25,344,495.19
114,531,673.23
5,052,341.60
3,262,155.85
2,278,925.37
1,189,817.47
1,582,346.06
257,627,963.56
42,484,355.82
81,821,780.11
113,920,912.81
18,923,419.59
7,526,438.01
40,534,420.23
17,408,800.58
Rp
B.LATAI
B.LATAI
B.LATAI
0.090
0.321
0.434
m
m
m
Rp
Rp
Rp
11,976,475.40
11,854,413.20
11,841,949.38
Rp
Rp
Rp
1,077,882.79
3,800,821.23
5,142,366.52
Rp
B.LATAI
B.LATAI
B.LATAI
0.090
0.321
0.434
m
m
m
Rp
Rp
Rp
10,887,704.91
10,776,739.27
11,841,949.38
Rp
Rp
979,893.44
3,455,292.03
5,142,366.52
3
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
B1
B1
B1
B1L
B2
B2
B2
B2L
B3
B3
B3
G1
G1
G2
G4
G4
G6
G6
G7
Rp
0.027
0.135
0.540
m
m
m
Rp
Rp
Rp
12,372,433.27
11,919,909.99
11,835,061.88
Rp
Rp
Rp
334,055.70
1,609,187.85
6,390,933.41
Rp
Uraian
RING
1
2
3
4
5
6
7
8
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
A.4.1.1.a.1.
RB1
RB1
RB2
RB2
RB2
B3
B3
B3
Volume
Satuan
10.320
1.680
2.160
1.080
2.280
2.025
1.350
2.250
m
m
m
m
m
m
m
m
Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
7,101,458.92
7,192,276.96
6,835,072.89
6,272,392.55
6,157,545.47
11,194,036.94
11,205,886.68
11,191,666.99
73,287,056.10
12,083,025.30
14,763,757.44
6,774,183.95
14,039,203.67
22,667,924.80
15,127,947.01
25,181,250.73
TOTAL HARGA
PEKERJAAN BALOK
Rp
Rp
Harga Total
815,360,577.86
Harga Total
74,337,380.14
Harga Total
791,926,469.04
10,021,070.54
17,911,728.95
17,911,728.95
Harga Total
183,924,349.01
1,003,783,617.53
No.
SNI
KODE
KOEF
SAT.
URAIAN PEKERJAAN
III
A.4.1.1
a. Harga satuan pekerjaan beton lantai 2
1.
A.4.1.1.a.1
8.354
0.275
2.860
0.984
0.412
0.425
0.347
3.467
1.733
140.608
2.109
413
681
1,021
215
0.156
3.033
17.333
m3
A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
2.
A.4.1.1.a.1
L.01
L.02
L.02
L.02
L.03
L.04
8.408
0.275
2.860
1.038
0.418
0.428
0.347
3.467
1.733
148.261
2.224
384
692
1,039
215
0.156
3.03
17.33
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)
10%
m3
A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F
Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)
10%
3.
A.4.1.1.a.1
L.01
L.02
L.02
L.02
L.03
L.04
8.250
0.275
2.860
0.880
0.402
0.419
0.347
3.467
1.733
125.660
1.885
384
692
1,039
215
0.156
3.03
17.33
4.
A.4.1.1.a.1
m3
A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F
Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)
m3
10%
Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)
m3
8.222
0.275
2.86
0.852
A
OH
OH
OH
OH
Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
L.01
L.02
L.02
L.02
L.03
L.04
8.278
0.275
2.860
0.908
0.405
0.421
0.347
3.467
1.733
129.745
1.946
384
692
1,039
215
0.156
3.033
17.33
5.
A.4.1.1.a.1
RB2 (30 x 50)
L.01
L.02
L.02
L.02
10%
0.399
0.418
0.35
3.47
1.73
121.752
1.826
384
692
1,039
215
0.16
3.033
17.33
6.
A.4.1.1.a.1
B3 (25 x 15)
L.01
L.02
L.02
L.02
L.03
L.04
14.301
0.275
5.72
1.211
0.721
0.724
0.693
6.933
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)
m3
A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
10%
7.
A.4.1.1.a.1
B3 (25 x 15)
L.01
L.02
L.02
L.02
L.03
L.04
14.307
0.275
5.7
1.217
0.722
0.725
0.7
7
3
173.787
2.607
384
692
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)
m3
A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
10%
8.
A.4.1.1.a.1
B3 (25 x 15)
L.01
L.02
L.02
L.02
L.03
L.04
14.300
0.275
5.720
1.210
0.721
0.724
0.69
6.9
3.5
172.887
2.593
384
692
1,039
215
0.312
6.067
Kg
ltr
m3
Lbr
Btg
C
D
E
F
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)
m3
A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
10%
Btg
C
D
E
F
10%
marang
Harga Bahan/Upah
Maksimum Rp
65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00
7,101,458.92
968,489.06
543,026.47
23,375.00
243,100.00
83,661.53
39,180.41
36,145.66
5,487,382.69
728,000.00
48,533.33
17,333.33
1,827,899.01
30,582.16
511,087.50
211,596.43
287,392.59
3,225.00
920,400.00
485,333.33
416,000.00
8.667
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
m2
14.061
m3
1
10
8.667
140.608
beton K-250
bekisting
tulangan
jumlah
Satuan
1.65
5.72
0.98
8.354 OH
0.275 0.275 OH
2.86 2.860 OH
0.98
0.984 OH
0.028
0.286
0.098
0.412 OH
0.083
0.286
0.056
0.425 OH
0.04
0.4
0.2
0.347 m3
3.467 Kg
1.733 Ltr
0.150
384
692
1039
215
0.018
2.109 Kg
384 Kg
692 Kg
1039 Kg
215 ltr
0.156 m3
6,455,871.75 Plywood 9 mm
645,587.17 Dolken diameter 8 / 4rm
7,101,458.92
3.033 Lbr
17.333 Btg
65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00
7,192,276.96
977,294.36
546,508.79
23,375.00
243,100.00
88,215.34
39,689.36
36,405.88
5,561,139.24
728,000.00
48,533.33
17,333.33
1,927,393.91
32,246.78
475,200.00
215,014.29
292,459.26
3,225.00
920,400.00
485,333.33
416,000.00
8.667
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
m2
1
beton K-250
1.65
0.275
0.028
0.083
14.826
m3
1
10
8.667
148.261
bekisting
tulangan
jumlah
1.038
5.72
8.408
0.275
2.860
2.860
1.038
1.038
0.286
0.104
0.418
0.286
0.059
0.428
Satuan
OH
OH
OH
OH
OH
OH
0.347
3.467
1.733
m3
Kg
Ltr
2.224
384
692
1039
215
0.156
3.033
17.333
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00
6,835,072.89
951,291.93
536,225.34
23,375.00
243,100.00
74,767.75
38,186.40
35,637.44
5,262,410.70
728,000.00
48,533.33
17,333.33
1,633,581.09
27,331.07
475,200.00
215,014.29
292,459.26
3,225.00
920,400.00
485,333.33
416,000.00
8.667
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
m2
1
beton K-250
1.65
0.275
0.028
0.083
12.566
m3
1
10
8.667
125.660
bekisting
tulangan
jumlah
5.72
0.88
8.250
0.275
2.86
2.860
0.88
0.880
0.286
0.088
0.402
0.286
0.050
0.419
Satuan
OH
OH
OH
OH
OH
OH
0.347
3.467
1.733
m3
Kg
Ltr
1.885
384
692
1039
215
0.156
3.033
17.333
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
6,272,392.55
8.667
12.974
65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
m2
1
beton K-250
1.65
0.275
0.028
0.083
m3
1
10
8.667
129.745
bekisting
tulangan
jumlah
5.72
0.91
8.278
0.275
2.86
2.860
0.91
0.908
0.286
0.091
0.405
0.286
0.052
0.421
Satuan
OH
OH
OH
OH
OH
OH
0.347
3.467
1.733
m3
Kg
Ltr
1.946
384
692
1039
215
0.156
3.033
17.333
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
6,157,545.47
946,795.21
534,446.98
23,375.00
243,100.00
72,442.20
8.667
m3
per
dari V2
Koefisien
Pekerja
m2
1
beton K-250
1.65
12.175
m3
1
10
8.667
121.752
bekisting
tulangan
jumlah
0.85
5.72
8.222
Satuan
OH
65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
0.275
0.028
0.083
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
2.86
0.286
0.286
0.85
0.085
0.049
11,194,036.94
1,672,179.31
929,581.93
23,375.00
486,200.00
102,957.14
68,506.97
61,558.27
8,504,217.90
1,456,000.00
97,066.67
17.333
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
m2
1
beton K-250
1.65
0.275
0.028
0.083
0.275
2.860
0.852
0.399
0.418
OH
OH
OH
OH
OH
0.347
3.467
1.733
m3
Kg
Ltr
1.826
384
692
1039
215
0.156
3.033
17.333
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
17.304
m3
1
10
17.333
173.037
bekisting
tulangan
jumlah
1.21
11.44
14.301
0.275
5.72
5.720
1.21
1.211
0.572
0.121
0.721
0.572
0.069
0.724
Satuan
OH
OH
OH
OH
OH
OH
65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
11,205,886.68
1,673,041.91
929,923.07
23,375.00
486,200.00
103,403.25
68,556.83
61,583.76
8,514,127.80
1,456,000.00
97,066.67
34,666.67
2,259,230.59
37,798.67
475,200.00
215,014.29
17.333
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
m2
1
beton K-250
1.65
0.275
0.028
0.083
0.693
6.933
3.467
m3
Kg
Ltr
2.596
384
692
1039
215
0.312
6.067
34.667
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
17.379
m3
1
10
17.333
173.787
bekisting
tulangan
jumlah
11.44
1.22
14.307
0.275
5.72
5.720
1.22
1.217
0.572
0.122
0.722
0.572
0.070
0.725
0.693
6.933
3.467
Satuan
OH
OH
OH
OH
OH
OH
m3
Kg
Ltr
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
10,187,169.71 Plywood 9 mm
1,018,716.97 Dolken diameter 8 / 4rm
11,205,886.68
2.607
384
692
1039
215
0.312
6.067
34.667
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
11,191,666.99
1,672,006.79
929,513.70
23,375.00
486,200.00
102,867.92
68,497.00
61,553.17
8,502,235.93
1,456,000.00
97,066.67
34,666.67
2,247,534.40
37,602.98
475,200.00
215,014.29
292,459.26
3,225.00
1,840,800.00
970,666.67
17.333
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
m2
1
beton K-250
1.65
0.275
0.028
0.083
17.289
m3
1
10
17.333
172.887
bekisting
tulangan
jumlah
1.21
11.44
14.300
0.275
5.72
5.720
1.21
1.210
0.572
0.121
0.721
0.572
0.069
0.724
Satuan
OH
OH
OH
OH
OH
OH
0.693
6.933
3.467
m3
Kg
Ltr
2.593
384
692
1039
Kg
Kg
Kg
Kg
215
0.312
6.067
34.667
ltr
m3
Lbr
Btg
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
beton K-250bekisting
1.65
0.66
0.275
0.33
0.028
0.033
0.083
0.033
tulangan jumlah
0.07
2.380
0.275
0.330
0.07
0.070
0.007
0.068
0.004
0.120
Satuan
OH
OH
OH
OH
OH
OH
0.347
3.467
1.733
m3
Kg
Ltr
2.109
413
681
1021
215
0.156
Kg
Kg
Kg
Kg
ltr
m3
0.04
0.4
0.2
0.150
413
681
1,021
215
0.018
3.033
17.333
Lbr
Btg
No.
SNI
KODE
KOEF
SAT.
III
A.4.1.1
b. Harga satuan pekerjaan beton lantai Elv.6.7
1.
URAIAN PEKERJAAN
HARGA SATUAN PEKERJAAN
A.4.1.1.a.1
9.088
0.275
2.750
1.938
0.497
0.469
0.333
3.333
1.667
276.891
4.153
384
692
1,039
215
0.150
2.917
16.667
BETON
m3
A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
2.
A.4.1.1.a.1
B2 (30 x 40)
L.01
L.02
L.02
L.02
L.03
L.04
8.893
0.275
3.025
1.193
0.450
0.454
0.367
3.667
1.833
170.358
2.555
384
692
1,039
215
0.165
3.21
18.33
3.
A.4.1.1.a.1
10%
m3
A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F
Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)
m3
10%
Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)
m3
14.456
0.275
5.720
1.366
A
OH
OH
OH
OH
Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
B3 (15 x 25)
L.01
L.02
L.02
L.02
L.03
L.04
14.47
0.275
5.72
1.38
0.74
0.73
0.333
6.933
3.467
197.075
2.956
384
692
1,039
215
0.312
6.07
34.67
4.
A.4.1.1.a.1
B3 (15 x 25)
L.01
L.02
L.02
L.02
10%
0.737
0.733
0.693
6.933
3.467
195.138
2.927
384
692
1,039
215
0.312
6.067
34.67
5.
A.4.1.1.a.1
B3 (15 x 25)
L.01
L.02
L.02
L.02
L.03
L.04
15.046
0.275
5.72
1.956
0.796
0.767
0.69
6.93
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)
m3
A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
10%
6.
A.4.1.1.a.1
G2 (35 x 70)
L.01
L.02
L.02
L.02
L.03
L.04
7.776
0.275
2.36
1.411
0.405
0.399
0.286
2.857
1.429
201.634
3.025
384
692
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)
m3
A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
10%
7.
A.4.1.1.a.1
G7 (30 x 40)
L.01
L.02
L.02
L.02
L.03
L.04
9.219
0.275
3.0
1.519
0.482
0.472
0.4
4
2
217.042
3.256
384
692
1,039
215
0.17
Kg
ltr
m3
Lbr
Btg
C
D
E
F
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)
m3
A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
10%
8.
A.4.1.1.a.1
G7 (30 x 40)
L.01
L.02
L.02
L.02
L.03
L.04
9.210
0.275
3.025
1.510
0.482
0.472
0.37
3.7
1.8
215.732
3.236
384
692
1,039
215
0.165
3.208
18
Lbr
Btg
C
D
E
F
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)
m3
A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
10%
10%
rang
Harga
Bahan/Upah
Maksimum Rp
91 kg Besi + Bekisting)
65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00
9,086,389.00
1,099,652.71
590,735.25
23,375.00
233,750.00
164,749.95
47,198.23
39,844.28
7,160,700.93
700,000.00
46,666.67
16,666.67
3,599,578.66
60,223.72
475,200.00
215,014.29
292,459.26
3,225.00
885,000.00
466,666.67
400,000.00
8.333
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
m2
27.689
m3
1
10
8.333
276.891
beton K-250
bekisting
tulangan
jumlah
Satuan
1.94
1.65
5.5
9.088 OH
0.275 0.275 OH
2.75 2.750 OH
1.94
1.938 OH
0.275
0.194
0.028
0.497 OH
0.275
0.111
0.083
0.469 OH
0.04
0.4
0.2
0.333 m3
3.333 Kg
1.667 Ltr
0.150
384
692
1039
215
0.018
0.35
4.153 Kg
384 Kg
692 Kg
1039 Kg
215 ltr
0.150 m3
2.917 Lbr
58 kg Besi + Bekisting)
65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00
75 kg Besi + Bekisting)
7,749,795.84
1,041,162.01
578,012.94
23,375.00
257,125.00
101,363.08
42,726.31
38,559.68
6,004,106.94
770,000.00
51,333.33
18,333.33
2,214,655.50
37,052.89
475,200.00
215,014.29
292,459.26
3,225.00
973,500.00
513,333.33
440,000.00
16.667 Btg
9.167
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
m2
1
beton K-250
1.65
0.275
0.028
0.083
17.036
m3
1
10
9.167
170.358
bekisting
tulangan
jumlah
1.193
6.05
8.893
0.275
3.025
3.025
1.193
1.193
0.303
0.119
0.450
0.303
0.068
0.454
Satuan
OH
OH
OH
OH
OH
OH
0.367
3.667
1.833
m3
Kg
Ltr
2.555
384
692
1039
215
0.165
3.208
18.333
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
10,742,351.41
17.333
19.708
65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00
38 kg Besi + Bekisting)
65,000.00
85,000.00
85,000.00
85,000.00
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
m2
1
beton K-250
1.65
0.275
0.028
0.083
m3
1
10
17.333
197.075
bekisting
tulangan
jumlah
11.44
1.38
14.470
0.275
5.72
5.720
1.38
1.380
0.572
0.138
0.738
0.572
0.079
0.734
10,493,941.68
1,697,606.30
939,637.80
23,375.00
486,200.00
116,107.12
17.333
m3
per
dari V2
Koefisien
Pekerja
0.333
6.933
3.467
m3
Kg
Ltr
2.956
384
692
1039
215
0.312
6.067
34.667
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
19.514
m2
1
beton K-250
1.65
Satuan
OH
OH
OH
OH
OH
OH
m3
1
10
17.333
195.138
bekisting
tulangan
jumlah
11.44
1.37
14.456
Satuan
OH
01 kg Besi + Bekisting)
65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
0.275
0.028
0.083
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
5.72
0.572
0.572
1.37
0.137
0.078
11,704,626.93
1,794,550.44
977,977.29
23,375.00
486,200.00
166,243.38
75,580.14
65,174.62
9,910,076.49
1,456,000.00
97,066.67
17.333
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
m2
1
beton K-250
1.65
0.275
0.028
0.083
0.275
5.720
1.366
0.737
0.733
OH
OH
OH
OH
OH
0.693
6.933
3.467
m3
Kg
Ltr
2.927
384
692
1039
215
0.312
6.067
34.667
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
27.940
m3
1
10
17.333
279.401
bekisting
tulangan
jumlah
1.96
11.44
15.046
0.275
5.72
5.720
1.96
1.956
0.572
0.196
0.796
0.572
0.112
0.767
Satuan
OH
OH
OH
OH
OH
OH
34 kg Besi + Bekisting)
65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
7,401,062.88
921,533.77
505,421.87
23,375.00
200,357.14
119,972.00
38,461.49
33,946.26
5,806,705.21
600,000.00
40,000.00
14,285.71
2,621,237.07
43,855.31
475,200.00
215,014.29
7.143
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
m2
1
beton K-250
1.65
0.275
0.028
0.083
0.693
6.933
3.467
m3
Kg
Ltr
4.191
384
692
1039
215
0.312
6.067
34.667
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
20.163
m3
1
10
7.143
201.634
bekisting
tulangan
jumlah
4.71428571
1.41
7.776
0.275
2.36
2.357
1.41
1.411
0.236
0.141
0.405
0.236
0.081
0.399
Satuan
OH
OH
OH
OH
OH
OH
0.286
2.857
1.429
m3
Kg
Ltr
42 kg Besi + Bekisting)
65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
6,728,238.98 Plywood 9 mm
672,823.90 Dolken diameter 8 / 4rm
7,401,062.88
8,487,626.81
1,094,871.93
599,254.15
23,375.00
257,125.00
129,140.05
45,830.80
40,146.93
6,621,152.44
770,000.00
51,333.33
18,333.33
2,821,547.24
47,206.66
475,200.00
215,014.29
292,459.26
3,225.00
973,500.00
3.025
384
692
1039
215
0.129
2.500
14.286
9.167
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
m2
1
beton K-250
1.65
0.275
0.028
0.083
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
21.704
m3
1
10
9.167
217.042
bekisting
tulangan
jumlah
6.05
1.52
9.219
0.275
3.03
3.025
1.52
1.519
0.303
0.152
0.482
0.303
0.087
0.472
Satuan
OH
OH
OH
OH
OH
OH
0.367
3.667
1.833
m3
Kg
Ltr
3.256
384
692
Kg
Kg
Kg
1039
215
0.165
3.208
18.333
Kg
ltr
m3
Lbr
Btg
1
10
9.167
215.732
bekisting
tulangan
jumlah
1.51
6.05
9.210
0.275
3.03
3.025
1.51
1.510
0.303
0.151
0.482
0.303
0.086
0.472
Satuan
OH
OH
OH
OH
OH
OH
0.367
3.667
1.833
m3
Kg
Ltr
3.236
384
692
1039
215
0.165
3.208
Kg
Kg
Kg
Kg
ltr
m3
Lbr
32 kg Besi + Bekisting)
65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00
8,466,924.80
1,093,364.94
598,658.17
23,375.00
257,125.00
128,360.68
45,743.69
40,102.40
6,603,839.42
770,000.00
51,333.33
18,333.33
2,804,519.11
46,921.76
475,200.00
215,014.29
292,459.26
3,225.00
973,500.00
513,333.33
440,000.00
9.167
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
m2
1
beton K-250
1.65
0.275
0.028
0.083
21.573
m3
18.333
Btg
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
beton K-250bekisting
1.65
0.66
0.275
0.33
0.033
0.028
0.033
0.083
tulangan jumlah
0.07
2.380
0.275
0.330
0.07
0.070
0.007
0.068
0.004
0.120
Satuan
OH
OH
OH
OH
OH
OH
0.333
3.333
1.667
m3
Kg
Ltr
4.153
413
681
1021
215
0.150
2.917
Kg
Kg
Kg
Kg
ltr
m3
Lbr
0.04
0.4
0.2
0.150
413
681
1,021
215
0.018
0.35
16.667
Btg
No.
SNI
KODE
KOEF
SAT.
URAIAN PEKERJAAN
III
A.4.1.1
d. Harga satuan pekerjaan balok latai
A.4.1.1.a.1
15.916
0.275
6.600
1.066
0.795
0.804
0.800
8.000
4.000
152.260
2.284
384
692
1,039
215
0.360
7.000
40.000
m3
A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
2.
A.4.1.1.a.1
L.01
L.02
L.02
L.02
L.03
L.04
15.862
0.275
6.600
1.012
0.789
0.801
0.800
8.000
4.000
144.537
2.168
384
692
1,039
215
0.360
7.00
40.00
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)
##
m3
A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F
Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)
##
3.
A.4.1.1.a.1
L.01
L.02
L.02
L.02
L.03
L.04
15.86
0.275
6.60
1.01
0.79
0.80
0.800
8.000
4.000
143.748
2.156
384
692
1,039
215
0.360
7.00
40.00
m3
A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F
Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)
m3
##
A.4.1.1.a.1
B. LATAI (15 x 15)
Tenaga
15.916
0.275
6.600
1.066
0.795
0.804
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)
m3
15.862
0.275
6.60
1.012
0.789
A
OH
OH
OH
OH
OH
Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
0.800
8.000
4.000
152.260
2.284
384
692
1,039
215
0.360
7.000
40.00
A.4.1.1.a.1
B. LATAI (15 x 15)
L.01
L.02
L.02
L.02
L.03
##
0.801
0.80
8.00
4.00
144.537
2.168
384
692
1,039
215
0.36
7.000
40.00
A.4.1.1.a.1
L.01
L.02
L.02
L.02
L.03
L.04
15.856
0.275
6.60
1.006
0.789
0.800
0.800
8.000
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)
m3
A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
##
A.4.1.1.a.1
L.01
L.02
L.02
L.02
L.03
L.04
16.091
0.275
6.6
1.241
0.812
0.814
0.8
8
4
177.313
2.660
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)
m3
A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
##
A.4.1.1.a.1
L.01
L.02
L.02
L.02
L.03
L.04
15.891
0.275
6.600
1.041
0.792
0.802
0.80
8.0
4.0
148.681
2.230
384
692
1,039
215
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)
m3
A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
##
A.4.1.1.a.1
L.01
L.02
L.02
L.02
L.03
L.04
15.853
0.275
6.600
1.003
0.788
0.800
0.80
8.0
4.0
143.312
2.150
384
692
1,039
215
0.360
7.000
40
m3
Lbr
Btg
C
D
E
F
m3
A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
##
##
marang
Harga Bahan/Upah
Maksimum Rp
65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00
11,976,475.40
1,853,314.70
1,034,528.13
23,375.00
561,000.00
90,594.48
75,485.27
68,331.83
9,034,390.21
1,680,000.00
112,000.00
40,000.00
1,979,375.19
33,116.47
475,200.00
215,014.29
292,459.26
3,225.00
2,124,000.00
1,120,000.00
960,000.00
20.000
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
15.226
m2
m3
1
10
20.000
152.260
beton K-250
bekisting
tulangan
jumlah
Satuan
1.07
1.65
13.2
15.916 OH
0.275 0.275 OH
6.60 6.600 OH
1.07
1.066 OH
0.660
0.107
0.028
0.795 OH
0.083
0.660
0.061
0.804 OH
1
0.04
0.4
0.2
0.800 m3
8.000 Kg
4.000 Ltr
0.150
384
692
1039
215
2.284 Kg
384 Kg
692 Kg
1039 Kg
215 ltr
0.360 m3
7.000 Lbr
40.000 Btg
65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00
11,854,413.20
1,844,429.27
1,031,014.12
23,375.00
561,000.00
85,999.23
74,971.68
68,069.24
8,932,310.01
1,680,000.00
112,000.00
40,000.00
1,878,974.77
31,436.69
475,200.00
215,014.29
292,459.26
3,225.00
2,124,000.00
1,120,000.00
960,000.00
20.000
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
m2
1
beton K-250
1.65
0.275
0.028
0.083
14.454
m3
1
10
20.000
144.537
bekisting
tulangan
jumlah
13.20
1.012
15.862
0.275
6.600
6.600
1.012
1.012
0.660
0.101
0.789
0.660
0.058
0.801
Satuan
OH
OH
OH
OH
OH
OH
0.800
8.000
4.000
m3
Kg
Ltr
2.168
384
692
1039
215
0.360
7.000
40.000
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00
11,841,949.38
1,843,521.97
1,030,655.30
23,375.00
561,000.00
85,530.01
74,919.24
68,042.43
8,921,886.55
1,680,000.00
112,000.00
40,000.00
1,868,722.84
31,265.17
475,200.00
215,014.29
292,459.26
3,225.00
2,124,000.00
1,120,000.00
960,000.00
20.000
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
m2
1
beton K-250
1.65
0.275
0.028
0.083
14.375
m3
1
10
20.000
143.748
bekisting
tulangan
jumlah
1.01
13.2
15.856
0.275
6.60
6.600
1.01
1.006
0.660
0.101
0.789
0.660
0.057
0.800
10,887,704.91
1,853,314.70
20.000
m3
m2
15.226
m3
Satuan
OH
OH
OH
OH
OH
OH
0.800
8.000
4.000
m3
Kg
Ltr
2.156
384
692
1039
215
0.360
7.000
40.000
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
1
beton K-250
1.65
0.275
0.028
0.083
1
10
20.000
152.260
bekisting
tulangan
jumlah
13.2
1.07
15.916
0.275
6.60
6.600
1.07
1.066
0.660
0.107
0.795
0.660
0.061
0.804
10,776,739.27
1,844,429.27
1,031,014.12
23,375.00
561,000.00
85,999.23
74,971.68
20.000
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
0.800
8.000
4.000
m3
Kg
Ltr
2.284
384
692
1039
215
0.360
7.000
40.000
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
14.454
m2
1
beton K-250
1.65
0.275
Satuan
OH
OH
OH
OH
OH
OH
m3
1
10
20.000
144.537
bekisting
tulangan
jumlah
1.01
13.2
15.862
0.275
Satuan
OH
OH
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
0.028
0.083
2,100,000.00
14,000.00
1.01
0.101
0.058
65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
6.60
0.660
0.660
11,841,949.38
1,843,521.97
1,030,655.30
23,375.00
561,000.00
85,530.01
74,919.24
68,042.43
8,921,886.55
1,680,000.00
112,000.00
20.000
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
m2
1
beton K-250
1.65
0.275
0.028
0.083
6.600
1.012
0.789
0.801
OH
OH
OH
OH
0.800
8.000
4.000
m3
Kg
Ltr
2.168
384
692
1039
215
0.360
7.000
40.000
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
14.375
m3
1
10
20.000
143.748
bekisting
tulangan
jumlah
1.01
13.2
15.856
0.275
6.60
6.600
1.01
1.006
0.660
0.101
0.789
0.660
0.057
0.800
Satuan
OH
OH
OH
OH
OH
OH
12,372,433.27
1,882,138.20
1,045,927.25
23,375.00
561,000.00
105,501.02
77,151.29
69,183.63
9,365,528.41
1,680,000.00
112,000.00
40,000.00
2,305,064.36
38,565.50
20.000
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
m3
Kg
Ltr
2.156
384
692
1039
215
0.360
7.000
40.000
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
17.731
m2
1
beton K-250
1.65
0.275
0.028
0.083
0.800
8.000
4.000
m3
1
10
20.000
177.313
bekisting
tulangan
jumlah
13.2
1.24
16.091
0.275
6.60
6.600
1.24
1.241
0.660
0.124
0.812
0.660
0.071
0.814
0.800
8.000
Satuan
OH
OH
OH
OH
OH
OH
m3
Kg
65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
11,247,666.61 Plywood 9 mm
1,124,766.66 Dolken diameter 8 / 4rm
12,372,433.27
11,919,909.99
1,849,197.06
1,032,899.69
23,375.00
561,000.00
88,464.97
75,247.26
68,210.14
8,987,084.75
1,680,000.00
112,000.00
40,000.00
1,932,848.17
32,338.04
475,200.00
215,014.29
292,459.26
3,225.00
20.000
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
m2
1
beton K-250
1.65
0.275
0.028
0.083
4.000
Ltr
2.660
384
692
1039
215
0.360
7.000
40.000
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
14.868
m3
1
10
20.000
148.681
bekisting
tulangan
jumlah
1.04
13.2
15.891
0.275
6.60
6.600
1.04
1.041
0.660
0.104
0.792
0.660
0.059
0.802
0.800
8.000
4.000
2.230
384
Satuan
OH
OH
OH
OH
OH
OH
m3
Kg
Ltr
Kg
Kg
65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00
11,835,061.88
1,843,020.60
1,030,457.02
23,375.00
561,000.00
85,270.71
74,890.26
68,027.61
8,916,126.56
1,680,000.00
112,000.00
40,000.00
1,863,057.63
31,170.39
475,200.00
215,014.29
292,459.26
3,225.00
2,124,000.00
1,120,000.00
960,000.00
692
1039
215
0.360
7.000
40.000
Kg
Kg
ltr
m3
Lbr
Btg
1
10
20.000
143.312
bekisting
tulangan
jumlah
1.00
13.2
15.853
0.275
6.60
6.600
1.00
1.003
0.660
0.100
0.788
0.660
0.057
0.800
Satuan
OH
OH
OH
OH
OH
OH
20.000
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
m2
1
beton K-250
1.65
0.275
0.028
0.083
14.331
m3
0.800
8.000
4.000
m3
Kg
Ltr
2.150
384
692
1039
215
0.360
7.000
Kg
Kg
Kg
Kg
ltr
m3
Lbr
40.000
Btg
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
beton K-250bekisting
1.65
0.66
0.275
0.33
0.033
0.028
0.083
0.033
tulangan jumlah
0.07
2.380
0.275
0.330
0.07
0.070
0.007
0.068
0.004
0.120
Satuan
OH
OH
OH
OH
OH
OH
0.800
8.000
4.000
m3
Kg
Ltr
2.284
413
681
1021
215
Kg
Kg
Kg
Kg
ltr
0.04
0.4
0.2
0.150
413
681
1,021
215
0.360
7.000
40.000
m3
Lbr
Btg
No.
SNI
KODE
KOEF
SAT.
URAIAN PEKERJAAN
III
A.4.1.1
b. Harga satuan pekerjaan beton lantai 3
1.
A.4.1.1.a.1
9.690
0.275
3.025
1.990
0.530
0.499
0.367
3.667
1.833
284.292
4.264
384
692
1,039
215
0.165
3.208
18.333
m3
A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
2.
A.4.1.1.a.1
B1 (30 x 60)
L.01
L.02
L.02
L.02
L.03
L.04
10.811
0.275
3.025
3.111
0.642
0.563
0.367
3.667
1.833
444.371
6.666
384
692
1,039
215
0.165
3.21
18.33
3.
A.4.1.1.a.1
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)
10%
m3
A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F
Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)
m3
10%
Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)
m3
8.452
0.275
2.750
1.302
A
OH
OH
OH
OH
Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
B1 (30 x 60)
L.01
L.02
L.02
L.02
L.03
L.04
9.51
0.275
3.03
1.81
0.51
0.49
0.367
3.667
1.833
258.675
3.880
384
692
1,039
215
0.165
3.21
18.33
4.
A.4.1.1.a.1
B1L (30 x 60)
L.01
L.02
L.02
L.02
10%
0.433
0.432
0.333
3.333
1.667
185.964
2.789
384
692
1,039
215
0.150
2.917
16.67
5.
A.4.1.1.a.1
B2 (30 x 40)
L.01
L.02
L.02
L.02
L.03
L.04
9.033
0.275
3.03
1.333
0.464
0.462
0.37
3.67
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)
m3
A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
10%
6.
A.4.1.1.a.1
B2 (30 x 40)
L.01
L.02
L.02
L.02
L.03
L.04
8.914
0.275
3.03
1.214
0.452
0.455
0.367
3.667
1.833
173.385
2.601
384
692
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)
m3
A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
10%
7.
A.4.1.1.a.1
B2 (30 x 40)
L.01
L.02
L.02
L.02
L.03
L.04
9.190
0.275
3.0
1.490
0.479
0.471
0.4
4
2
212.799
3.192
384
692
1,039
215
0.17
3.2
18
Kg
ltr
m3
Lbr
Btg
C
D
E
F
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)
m3
A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
10%
8.
A.4.1.1.a.1
L.01
L.02
L.02
L.02
L.03
L.04
9.109
0.275
3.025
1.409
0.471
0.466
0.37
3.7
1.8
201.233
3.018
384
692
1,039
215
0.165
3.208
18
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)
10%
m3
A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F
Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)
10%
A.4.1.1.a.1
m3
A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F
Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)
m3
14.748
A
OH
Tenaga
Pekerja
B3 (15 x 25)
L.01
L.02
L.02
L.02
L.03
L.04
14.520
0.275
5.720
1.430
0.743
0.737
0.69
6.9
3.5
204.215
3.063
384
692
1,039
215
0.312
6.067
35
10 A.4.1.1.a.1
B3 (15 x 25)
L.01
10%
0.275
5.720
1.658
0.766
0.750
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)
m3
14.535
0.275
5.720
1.445
0.744
0.738
A
OH
OH
OH
OH
OH
OH
Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
0.69
6.9
3.5
236.892
3.553
384
692
1,039
215
0.312
6.067
35
11
A.4.1.1.a.1
B3 (15 x 25)
L.01
L.02
L.02
L.02
L.03
L.04
10%
12 A.4.1.1.a.1
G1 (35 x 75)
L.01
L.02
L.02
L.02
L.03
L.04
7.612
0.275
2.326
1.310
0.392
0.390
0.28
2.8
1.4
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)
m3
A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
10%
13 A.4.1.1.a.1
G1 (35 x 75)
L.01
L.02
L.02
L.02
L.03
L.04
7.653
0.275
2.326
1.351
0.396
0.393
0.28
2.8
1.4
193.019
2.895
384
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F
m3
A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
10%
14 A.4.1.1.a.1
G2 (35 x 70)
L.01
L.02
L.02
L.02
L.03
L.04
7.742
0.275
2.357
1.377
0.401
0.397
0.29
2.9
1.4
196.747
2.951
384
692
1,039
215
0.129
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)
m3
A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
10%
15 A.4.1.1.a.1
G4 (30 x 70)
L.01
L.02
L.02
L.02
L.03
L.04
8.443
0.275
2.671
1.450
0.440
0.433
0.32
3.2
1.6
207.145
3.107
384
692
1,039
215
0.146
2.833
16
Lbr
Btg
C
D
E
F
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)
m3
A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
10%
16 A.4.1.1.a.1
G4 (30 x 70)
L.01
L.02
L.02
L.02
L.03
L.04
8.514
0.275
2.671
1.521
0.447
0.437
0.32
3.2
1.6
217.318
3.260
384
692
1,039
215
0.146
2.833
16
10%
m3
A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F
Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)
10%
17 A.4.1.1.a.1
m3
A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F
Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)
m3
8.923
A
OH
Tenaga
Pekerja
G6 (30 x 40)
L.01
L.02
L.02
L.02
L.03
L.04
9.022
0.275
3.025
1.322
0.463
0.461
0.37
3.7
1.8
188.787
2.832
384
692
1,039
215
0.165
3.208
18
18 A.4.1.1.a.1
G6 (30 x 40)
L.01
10%
0.275
3.025
1.223
0.453
0.455
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)
m3
8.807
0.275
3.025
1.107
0.441
0.449
A
OH
OH
OH
OH
OH
OH
Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
0.37
3.7
1.8
174.746
2.621
384
692
1,039
215
0.165
3.208
18
19 A.4.1.1.a.1
G7 (30 x 40)
L.01
L.02
L.02
L.02
L.03
L.04
10%
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)
10%
rang
Harga
Bahan/Upah
Maksimum Rp
92 kg Besi + Bekisting)
65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00
9,550,503.00
1,172,243.30
629,853.00
23,375.00
257,125.00
169,153.92
50,302.94
42,433.44
7,510,032.16
770,000.00
51,333.33
18,333.33
3,695,800.03
61,833.58
475,200.00
215,014.29
292,459.26
3,225.00
973,500.00
513,333.33
440,000.00
9.167
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
m2
28.429
m3
1
10
9.167
284.292
beton K-250
bekisting
tulangan
jumlah
Satuan
1.99
1.65
6.05
9.690 OH
0.275 0.275 OH
3.03 3.025 OH
1.99
1.990 OH
0.303
0.199
0.028
0.530 OH
0.303
0.114
0.083
0.499 OH
0.04
0.4
0.2
0.367 m3
3.667 Kg
1.833 Ltr
0.150
384
692
1039
215
0.018
4.264 Kg
384 Kg
692 Kg
1039 Kg
215 ltr
0.165 m3
8,682,275.46 Plywood 9 mm
868,227.55 Dolken diameter 8 / 4rm
9,550,503.00
71 kg Besi + Bekisting)
65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00
75 kg Besi + Bekisting)
12,080,518.12
1,356,414.09
702,688.90
23,375.00
257,125.00
264,400.87
60,948.19
47,876.12
9,625,875.11
770,000.00
51,333.33
18,333.33
5,776,825.83
96,650.74
475,200.00
215,014.29
292,459.26
3,225.00
973,500.00
513,333.33
440,000.00
3.208 Lbr
18.333 Btg
9.167
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
m2
1
beton K-250
1.65
0.275
0.028
0.083
44.437
m3
1
10
9.167
444.371
bekisting
tulangan
jumlah
3.111
6.05
10.811
0.275
3.025
3.025
3.111
3.111
0.303
0.311
0.642
0.303
0.178
0.563
9,145,619.17
9.167
25.867
Satuan
OH
OH
OH
OH
OH
OH
0.367
3.667
1.833
m3
Kg
Ltr
6.666
384
692
1039
215
0.165
3.208
18.333
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00
64 kg Besi + Bekisting)
65,000.00
85,000.00
85,000.00
85,000.00
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
m2
1
beton K-250
1.65
0.275
0.028
0.083
m3
1
10
9.167
258.675
bekisting
tulangan
jumlah
6.05
1.81
9.511
0.275
3.03
3.025
1.81
1.811
0.303
0.181
0.512
0.303
0.103
0.489
Satuan
OH
OH
OH
OH
OH
OH
0.367
3.667
1.833
m3
Kg
Ltr
3.880
384
692
1039
215
0.165
3.208
18.333
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
6,953,926.14
995,042.13
549,363.84
23,375.00
233,750.00
110,648.86
8.333
m3
per
dari V2
Koefisien
Pekerja
m2
1
beton K-250
1.65
18.596
m3
1
10
8.333
185.964
bekisting
tulangan
jumlah
1.30
5.5
8.452
Satuan
OH
17 kg Besi + Bekisting)
65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
0.275
0.028
0.083
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
2.75
0.275
0.275
1.30
0.130
0.074
7,333,476.62
1,064,239.89
587,139.79
23,375.00
257,125.00
113,298.18
44,060.24
39,241.68
6,269,236.73
770,000.00
51,333.33
9.167
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
m2
1
beton K-250
1.65
0.275
0.028
0.083
0.275
2.750
1.302
0.433
0.432
OH
OH
OH
OH
OH
0.333
3.333
1.667
m3
Kg
Ltr
2.789
384
692
1039
215
0.150
2.917
16.667
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
19.042
m3
1
10
9.167
190.417
bekisting
tulangan
jumlah
1.33
6.05
9.033
0.275
3.03
3.025
1.33
1.333
0.303
0.133
0.464
0.303
0.076
0.462
Satuan
OH
OH
OH
OH
OH
OH
85 kg Besi + Bekisting)
65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
7,797,635.70
1,044,644.48
579,390.19
23,375.00
257,125.00
103,164.10
42,927.60
38,662.59
6,044,115.25
770,000.00
51,333.33
18,333.33
2,254,005.46
37,711.25
475,200.00
215,014.29
9.167
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
m2
1
beton K-250
1.65
0.275
0.028
0.083
0.367
3.667
1.833
m3
Kg
Ltr
2.856
384
692
1039
215
0.165
3.208
18.333
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
17.339
m3
1
10
9.167
173.385
bekisting
tulangan
jumlah
6.05
1.21
8.914
0.275
3.03
3.025
1.21
1.214
0.303
0.121
0.452
0.303
0.069
0.455
Satuan
OH
OH
OH
OH
OH
OH
0.367
3.667
1.833
m3
Kg
Ltr
99 kg Besi + Bekisting)
65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
7,088,759.73 Plywood 9 mm
708,875.97 Dolken diameter 8 / 4rm
7,797,635.70
8,420,569.33
1,089,990.53
597,323.65
23,375.00
257,125.00
126,615.55
45,548.65
40,002.67
6,565,072.51
770,000.00
51,333.33
18,333.33
2,766,390.13
46,283.83
475,200.00
215,014.29
292,459.26
3,225.00
973,500.00
513,333.33
440,000.00
2.601
384
692
1039
215
0.165
3.208
18.333
9.167
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
m2
1
beton K-250
1.65
0.275
0.028
0.083
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
21.280
m3
1
10
9.167
212.799
bekisting
tulangan
jumlah
1.49
6.05
9.190
0.275
3.03
3.025
1.49
1.490
0.303
0.149
0.479
0.303
0.085
0.471
Satuan
OH
OH
OH
OH
OH
OH
0.367
3.667
1.833
m3
Kg
Ltr
3.192
384
692
1039
215
Kg
Kg
Kg
Kg
ltr
33 kg Besi + Bekisting)
65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00
8,237,767.31
1,076,683.57
592,061.02
23,375.00
257,125.00
119,733.64
44,779.49
39,609.42
6,412,195.80
770,000.00
51,333.33
18,333.33
2,616,029.07
43,768.18
475,200.00
215,014.29
292,459.26
3,225.00
973,500.00
513,333.33
440,000.00
0.165
3.208
18.333
m3
Lbr
Btg
1
10
9.167
201.233
bekisting
tulangan
jumlah
1.41
6.05
9.109
0.275
3.03
3.025
1.41
1.409
0.303
0.141
0.471
0.303
0.080
0.466
Satuan
OH
OH
OH
OH
OH
OH
0.367
3.667
1.833
m3
Kg
Ltr
3.018
384
692
1039
215
0.165
3.208
18.333
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
9.167
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
m2
1
beton K-250
1.65
0.275
0.028
0.083
20.123
m3
15 kg Besi + Bekisting)
65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00
92 kg Besi + Bekisting)
65,000.00
11,686,796.77
1,708,049.44
943,767.86
23,375.00
486,200.00
121,507.97
70,580.30
62,618.31
8,916,311.26
1,456,000.00
97,066.67
34,666.67
2,654,795.94
44,416.78
475,200.00
215,014.29
292,459.26
3,225.00
1,840,800.00
970,666.67
832,000.00
17.333
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
m2
1
beton K-250
1.65
0.275
0.028
0.083
20.422
m3
1
10
17.333
204.215
bekisting
tulangan
jumlah
11.44
1.43
14.520
0.275
5.72
5.720
1.43
1.430
0.572
0.143
0.743
0.572
0.082
0.737
12,203,256.07
1,745,644.75
958,636.06 per
17.333
m3
m2
1
23.689
m3
10
Satuan
OH
OH
OH
OH
OH
OH
0.693
6.933
3.467
m3
Kg
Ltr
3.063
384
692
1039
215
0.312
6.067
34.667
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
84 kg Besi + Bekisting)
65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
17.333
236.892
bekisting
tulangan
jumlah
11.44
1.66
14.748
0.275
5.72
5.720
1.66
1.658
0.572
0.166
0.766
0.572
0.095
0.750
beton K-250
1.65
0.275
0.028
0.083
11,721,081.91
1,710,545.20
944,754.88
23,375.00
486,200.00
122,798.69
70,724.56
62,692.07
17.333
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
m2
1
beton K-250
1.65
0.275
-
Satuan
OH
OH
OH
OH
OH
OH
0.693
6.933
3.467
m3
Kg
Ltr
3.553
384
692
1039
215
0.312
6.067
34.667
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
20.638
m3
1
10
17.333
206.384
bekisting
tulangan
jumlah
11.44
1.44
14.535
0.275
5.72
5.720
Satuan
OH
OH
OH
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00
55 kg Besi + Bekisting)
65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
Tukang Besi
Kepala Tukang
Mandor
0.572
0.572
0.028
0.083
1.44
0.144
0.083
7,132,557.13
897,553.13
494,748.33
23,375.00
197,685.71
111,357.16
37,200.09
33,186.84
5,586,589.72
592,000.00
39,466.67
14,095.24
7.048
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
OH
OH
OH
0.693
6.933
3.467
m3
Kg
Ltr
3.096
384
692
1039
215
0.312
6.067
34.667
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
18.715
m2
1
beton K-250
1.65
0.275
0.028
0.083
1.445
0.744
0.738
m3
1
10
7.048
187.155
bekisting
tulangan
jumlah
4.65142857
1.31
7.612
0.275
2.33
2.326
1.31
1.310
0.233
0.131
0.392
0.233
0.075
0.390
Satuan
OH
OH
OH
OH
OH
OH
0.282
2.819
1.410
m3
Kg
Ltr
2.807
384
692
1039
215
0.127
2.467
14.095
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
7,225,230.58
904,299.23
497,416.28
23,375.00
197,685.71
114,846.02
37,590.02
33,386.20
5,664,092.21
592,000.00
39,466.67
14,095.24
2,509,240.71
41,981.53
475,200.00
7.048
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
m2
1
beton K-250
1.65
0.275
0.028
0.083
19.302
m3
1
10
7.048
193.019
bekisting
tulangan
jumlah
4.65142857
1.35
7.653
0.275
2.33
2.326
1.35
1.351
0.233
0.135
0.396
0.233
0.077
0.393
Satuan
OH
OH
OH
OH
OH
OH
0.282
2.819
1.410
m3
Kg
Ltr
2.895
384
692
1039
215
0.127
2.467
14.095
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
47 kg Besi + Bekisting)
65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
7,323,825.65
915,911.33
503,198.31
23,375.00
200,357.14
117,064.27
38,136.51
33,780.10
5,742,111.98
600,000.00
40,000.00
14,285.71
2,557,706.75
42,792.40
475,200.00
215,014.29
292,459.26
3,225.00
758,571.43
7.143
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
m2
1
beton K-250
1.65
0.275
0.028
0.083
19.675
m3
1
10
7.143
196.747
bekisting
tulangan
jumlah
4.71428571
1.38
7.742
0.275
2.36
2.357
1.38
1.377
0.236
0.138
0.401
0.236
0.079
0.397
Satuan
OH
OH
OH
OH
OH
OH
0.286
2.857
1.429
m3
Kg
Ltr
2.951
384
692
Kg
Kg
Kg
1039
215
0.129
2.500
14.286
Kg
ltr
m3
Lbr
Btg
1
10
8.095
207.145
bekisting
tulangan
jumlah
5.34285714
1.45
8.443
0.275
2.67
2.671
1.45
1.450
0.267
0.145
0.440
0.267
0.083
0.433
Satuan
OH
OH
OH
OH
OH
OH
0.324
3.238
1.619
m3
Kg
Ltr
3.107
384
692
1039
215
0.146
2.833
Kg
Kg
Kg
Kg
ltr
m3
Lbr
45 kg Besi + Bekisting)
65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00
7,884,891.53
1,001,103.15
548,786.68
23,375.00
227,071.43
123,251.26
41,813.71
36,805.07
6,166,980.06
680,000.00
45,333.33
16,190.48
2,692,884.63
45,054.03
475,200.00
215,014.29
292,459.26
3,225.00
859,714.29
453,333.33
388,571.43
8.095
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
m2
1
beton K-250
1.65
0.275
0.028
0.083
20.714
m3
16.190
Btg
1
10
8.095
217.318
bekisting
tulangan
jumlah
1.52
5.34285714
8.514
0.275
2.67
2.671
1.52
1.521
0.267
0.152
0.447
0.267
0.087
0.437
Satuan
OH
OH
OH
OH
OH
OH
0.324
3.238
1.619
m3
Kg
Ltr
3.260
384
692
1039
215
0.146
2.833
16.190
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
18 kg Besi + Bekisting)
65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00
8,045,671.60
1,012,807.03
553,415.33
23,375.00
227,071.43
129,304.11
42,490.21
37,150.95
6,301,439.88
680,000.00
45,333.33
16,190.48
2,825,131.85
47,266.63
475,200.00
215,014.29
292,459.26
3,225.00
859,714.29
453,333.33
388,571.43
8.095
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
m2
1
beton K-250
1.65
0.275
0.028
0.083
21.732
m3
87 kg Besi + Bekisting)
65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00
46 kg Besi + Bekisting)
65,000.00
8,041,066.26
1,062,364.85
586,398.25
23,375.00
257,125.00
112,328.47
43,951.86
39,186.27
6,247,695.38
770,000.00
51,333.33
18,333.33
2,454,235.59
41,061.25
475,200.00
215,014.29
292,459.26
3,225.00
973,500.00
513,333.33
440,000.00
9.167
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
18.879
m2
1
beton K-250
1.65
0.275
0.028
0.083
m3
1
10
9.167
188.787
bekisting
tulangan
jumlah
1.32
6.05
9.022
0.275
3.03
3.025
1.32
1.322
0.303
0.132
0.463
0.303
0.076
0.461
Satuan
OH
OH
OH
OH
OH
OH
0.367
3.667
1.833
m3
Kg
Ltr
2.832
384
692
1039
215
0.165
3.208
18.333
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
7,819,139.70
1,046,209.85
580,009.26 per
9.167
m3
m2
1
17.475
m3
10
90 kg Besi + Bekisting)
65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
beton K-250
1.65
0.275
0.028
0.083
9.167
174.746
bekisting
tulangan
jumlah
6.05
1.22
8.923
0.275
3.03
3.025
1.22
1.223
0.303
0.122
0.453
0.303
0.070
0.455
Satuan
OH
OH
OH
OH
OH
OH
0.367
3.667
1.833
m3
Kg
Ltr
2.621
384
692
1039
215
0.165
3.208
18.333
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
7,555,903.03
1,027,047.71
572,431.02
23,375.00
257,125.00
94,063.64
41,910.49
38,142.56
9.167
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
m2
1
beton K-250
1.65
0.275
-
15.809
m3
1
10
9.167
158.090
bekisting
tulangan
jumlah
6.05
1.11
8.807
0.275
3.03
3.025
Satuan
OH
OH
OH
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00
Tukang Besi
Kepala Tukang
Mandor
0.028
0.083
0.303
0.303
1.11
0.111
0.063
1.107
0.441
0.449
OH
OH
OH
0.367
3.667
1.833
m3
Kg
Ltr
2.371
384
692
1039
215
0.165
3.208
18.333
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
beton K-250bekisting
1.65
0.66
0.275
0.33
0.033
0.028
0.033
0.083
tulangan jumlah
0.07
2.380
0.275
0.330
0.07
0.070
0.007
0.068
0.004
0.120
Satuan
OH
OH
OH
OH
OH
OH
0.367
3.667
1.833
m3
Kg
Ltr
4.264
413
681
1021
215
0.165
Kg
Kg
Kg
Kg
ltr
m3
0.04
0.4
0.2
0.150
413
681
1,021
215
0.018
0.35
2
3.208
18.333
Lbr
Btg
No.
SNI
KODE
KOEF
SAT.
URAIAN PEKERJAAN
III
A.4.1.1
a. Harga satuan pekerjaan beton lantai 2
1.
A.4.1.1.a.1
8.431
0.275
2.750
1.281
0.431
0.431
0.333
3.333
1.667
182.985
2.745
384
692
1,039
215
0.150
2.917
16.667
m3
A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
2.
A.4.1.1.a.1
L.01
L.02
L.02
L.02
L.03
L.04
8.452
0.275
2.750
1.302
0.433
0.432
0.333
3.333
1.667
185.964
2.789
384
692
1,039
215
0.150
2.92
16.67
3.
A.4.1.1.a.1
###
m3
A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F
Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)
m3
###
Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)
m3
8.914
0.275
3.025
A
OH
OH
OH
Tenaga
Pekerja
Tukang batu
Tukang Kayu
B2 (30 x 40)
L.01
L.02
L.02
L.02
L.03
L.04
9.03
0.275
3.03
1.33
0.46
0.46
0.333
3.667
1.833
189.629
2.844
384
692
1,039
215
0.165
3.21
18.33
4.
A.4.1.1.a.1
B2 (30 x 40)
L.01
L.02
L.02
###
1.214
0.452
0.455
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)
m3
9.062
0.275
3.03
1.362
0.467
0.463
A
OH
OH
OH
OH
OH
OH
B
Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
0.367
3.667
1.833
173.431
2.601
384
692
1,039
215
0.165
3.208
18.33
5.
A.4.1.1.a.1
B2 (30 x 40)
L.01
L.02
L.02
L.02
L.03
L.04
###
6.
A.4.1.1.a.1
L.01
L.02
L.02
L.02
L.03
L.04
9.085
0.275
3.03
1.385
0.469
0.465
0.367
3.667
1.833
197.876
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F
m3
A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
###
7.
A.4.1.1.a.1
B3 (15 x 25)
L.01
L.02
L.02
L.02
L.03
L.04
14.574
0.275
5.7
1.484
0.748
0.740
0.7
7
3
211.986
3.180
384
692
1,039
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)
m3
A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
###
8.
A.4.1.1.a.1
B3 (15 x 25)
L.01
L.02
L.02
L.02
L.03
L.04
14.520
0.275
5.720
1.430
0.743
0.737
0.69
6.9
3.5
204.215
3.063
384
692
1,039
215
0.312
6.067
35
ltr
m3
Lbr
Btg
C
D
E
F
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)
m3
A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
###
9.
A.4.1.1.a.1
G1 (35 x 75)
L.01
L.02
L.02
L.02
L.03
L.04
7.612
0.275
2.33
1.310
0.392
0.390
0.282
2.819
1.410
187.155
2.807
384
692
1,039
215
0.127
2.467
14.10
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)
###
m3
A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
10. A.4.1.1.a.1
G2 (35 x 70)
L.01
L.02
L.02
L.02
L.03
L.04
7.736
0.275
2.357
1.371
0.401
0.40
0.286
2.857
1.429
195.901
2.939
384
692
1,039
215
0.129
2.50
14.29
###
m3
A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F
Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)
###
11. A.4.1.1.a.1
m3
A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F
Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)
m3
14.465
A
OH
Tenaga
Pekerja
G4 (30 x 70)
L.01
L.02
L.02
L.02
L.03
L.04
8.446
0.275
2.671
1.453
0.440
0.433
0.324
3.238
1.619
207.630
3.114
384
692
1,039
215
0.146
2.833
16.19
12. A.4.1.1.a.1
B3 (15 x 25)
L.01
###
0.275
5.7
1.375
0.738
0.734
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)
m3
8.472
0.275
2.671
1.479
0.443
A
OH
OH
OH
OH
OH
Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
0.7
7
3
196.429
2.946
384
692
1,039
215
0.31
6.1
35
13. A.4.1.1.a.1
G4 (30 x 70)
L.01
L.02
L.02
L.02
L.03
###
0.435
0.32
3.2
1.6
211.354
3.170
384
692
1,039
215
0.146
2.833
16
14. A.4.1.1.
G6 (30 x 40)
L.01
L.02
L.02
L.02
L.03
L.04
8.923
0.275
3.025
1.223
0.45
0.46
0.37
3.7
1.8
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
C
D
E
F
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)
m3
A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
###
15. A.4.1.1.a.1
G7 (30 x 40)
L.01
L.02
L.02
L.02
L.03
L.04
8.807
0.275
3.025
1.107
0.441
0.449
0.367
3.667
1.833
158.090
2.371
384
692
1,039
Kg
Kg
Kg
Kg
ltr
Kg
m3
Lbr
Btg
C
D
E
F
m3
A
OH
OH
OH
OH
OH
OH
B
m3
Kg
Ltr
Kg
Kg
Kg
Kg
Kg
Tenaga
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Bahan
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
###
ltr
m3
Lbr
Btg
C
D
E
F
Air
Kayu Klas II Balok
Plywood 9 mm
Dolken diameter 8 / 4rm
PERALATAN
Jumlah A + B + C
Overhead & Profit (contoh 10%)
Harga Satuan Pekerjaan (D+E)
###
emarang
Harga Bahan/Upah
Maksimum Rp
7,602,222.54
991,613.79
548,008.00
23,375.00
233,750.00
108,875.84
40,953.48
36,651.48
5,919,497.60
700,000.00
46,666.67
16,666.67
2,378,799.91
39,799.15
475,200.00
215,014.29
292,459.26
3,225.00
885,000.00
466,666.67
400,000.00
8.333
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
m2
18.298
m3
1
10
8.333
182.985
beton K-250
bekisting
tulangan
jumlah
Satuan
1.65
5.5
1.28
8.431 OH
0.275 0.275 OH
2.75 2.750 OH
1.28
1.281 OH
0.028
0.275
0.128
0.431 OH
0.083
0.275
0.073
0.431 OH
0.04
0.4
0.2
0.333 m3
3.333 Kg
1.667 Ltr
0.150
384
692
1039
215
0.018
0.35
2.745 Kg
384 Kg
692 Kg
1039 Kg
215 ltr
0.150 m3
2.917 Lbr
65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00
7,649,318.75
995,042.13
549,363.84
23,375.00
233,750.00
110,648.86
41,151.64
36,752.79
5,958,884.01
700,000.00
46,666.67
16,666.67
2,417,538.19
40,447.27
475,200.00
215,014.29
292,459.26
3,225.00
885,000.00
466,666.67
400,000.00
8.333
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
18.596
m2
1
beton K-250
1.65
0.275
0.028
0.083
16.667 Btg
m3
1
10
8.333
185.964
bekisting
tulangan
jumlah
1.302
5.50
8.452
0.275
2.750
2.750
1.302
1.302
0.275
0.130
0.433
0.275
0.074
0.432
Satuan
OH
OH
OH
OH
OH
OH
0.333
3.333
1.667
m3
Kg
Ltr
2.789
384
692
1039
215
0.150
2.917
16.667
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
9.167
18.963
65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
m2
1
beton K-250
1.65
0.275
0.028
0.083
m3
1
10
9.167
189.629
bekisting
tulangan
jumlah
6.05
1.33
9.027
0.275
3.03
3.025
1.33
1.327
0.303
0.133
0.463
0.303
0.076
0.461
Satuan
OH
OH
OH
OH
OH
OH
0.333
3.667
1.833
m3
Kg
Ltr
2.844
384
692
1039
215
0.165
3.208
18.333
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
65,000.00
85,000.00
85,000.00
7,089,426.18
1,044,697.85
579,411.30 per
23,375.00 dari V2
257,125.00 Koefisien
9.167
m3
m2
1
beton K-250
17.343
m3
1
10
9.167
173.431
bekisting
tulangan
jumlah
Satuan
1.65
0.275
0.028
0.083
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
6.05
3.03
0.303
0.303
1.21
1.21
0.121
0.069
8.914
0.275
3.025
1.214
0.452
0.455
OH
OH
OH
OH
OH
OH
0.367
3.667
1.833
m3
Kg
Ltr
2.601
384
692
1039
215
0.165
3.208
18.333
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
7,393,724.87
1,069,064.19
589,047.70
23,375.00
257,125.00
115,793.15
44,339.09
39,384.25
6,324,660.68
9.167
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
m2
1
beton K-250
1.65
0.275
-
19.461
m3
1
10
9.167
194.610
bekisting
tulangan
jumlah
1.36
6.05
9.062
0.275
3.03
3.025
1.36
1.362
Satuan
OH
OH
OH
OH
0.028
0.083
Kepala Tukang
Mandor
0.303
0.303
0.136
0.078
0.467
0.463
OH
OH
0.367
3.667
1.833
m3
Kg
Ltr
2.919
384
692
1039
215
0.165
3.208
18.333
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
8,184,707.69
1,072,821.13
590,533.50
23,375.00
257,125.00
117,736.11
44,556.24
39,495.28
6,367,822.23
770,000.00
51,333.33
18,333.33
2,572,385.69
9.167
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Kayu Klas III (Terentang)
m2
1
beton K-250
1.65
0.275
0.028
0.083
19.788
m3
1
10
9.167
197.876
bekisting
tulangan
jumlah
6.05
1.39
9.085
0.275
3.03
3.025
1.39
1.385
0.303
0.139
0.469
0.303
0.079
0.465
Satuan
OH
OH
OH
OH
OH
OH
0.367
m3
3.667
1.833
Kg
Ltr
2.968
384
692
1039
215
0.165
3.208
18.333
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
11,809,619.52
1,716,990.24
947,303.77
23,375.00
486,200.00
126,131.85
71,097.09
62,882.53
9,019,027.51
1,456,000.00
97,066.67
34,666.67
2,755,821.94
46,107.02
475,200.00
215,014.29
292,459.26
17.333
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
m2
1
beton K-250
1.65
0.275
0.028
0.083
21.199
m3
1
10
17.333
211.986
bekisting
tulangan
jumlah
1.48
11.44
14.574
0.275
5.72
5.720
1.48
1.484
0.572
0.148
0.748
0.572
0.085
0.740
0.693
6.933
3.467
3.180
Satuan
OH
OH
OH
OH
OH
OH
m3
Kg
Ltr
Kg
65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
10,736,017.75 Plywood 9 mm
1,073,601.77 Dolken diameter 8 / 4rm
11,809,619.52
11,686,796.77
1,708,049.44
943,767.86
23,375.00
486,200.00
121,507.97
70,580.30
62,618.31
8,916,311.26
1,456,000.00
97,066.67
34,666.67
2,654,795.94
44,416.78
475,200.00
215,014.29
292,459.26
3,225.00
1,840,800.00
970,666.67
832,000.00
384
692
1039
215
0.312
6.067
34.667
Kg
Kg
Kg
ltr
m3
Lbr
Btg
1
10
17.333
204.215
bekisting
tulangan
jumlah
1.43
11.44
14.520
0.275
5.72
5.720
1.43
1.430
0.572
0.143
0.743
0.572
0.082
0.737
Satuan
OH
OH
OH
OH
OH
OH
17.333
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
m2
1
beton K-250
1.65
0.275
0.028
0.083
20.422
m3
0.693
6.933
3.467
m3
Kg
Ltr
3.063
384
692
1039
215
0.312
Kg
Kg
Kg
Kg
ltr
m3
6.067
34.667
Lbr
Btg
1
10
7.048
187.155
bekisting
tulangan
jumlah
1.31
4.65142857
7.612
0.275
2.33
2.326
1.31
1.310
0.233
0.131
0.392
0.233
0.075
0.390
Satuan
OH
OH
OH
OH
OH
OH
0.282
2.819
1.410
m3
Kg
Ltr
2.807
384
692
1039
215
0.127
2.467
Kg
Kg
Kg
Kg
ltr
m3
Lbr
65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00
7,132,557.13
897,553.13
494,748.33
23,375.00
197,685.71
111,357.16
37,200.09
33,186.84
5,586,589.72
592,000.00
39,466.67
14,095.24
2,433,013.56
40,706.19
475,200.00
215,014.29
292,459.26
3,225.00
748,457.14
394,666.67
338,285.71
7.048
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
m2
1
beton K-250
1.65
0.275
0.028
0.083
18.715
m3
65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00
7,310,463.83
914,938.67
502,813.64
23,375.00
200,357.14
116,561.24
38,080.29
33,751.36
5,730,937.54
600,000.00
40,000.00
14,285.71
2,546,716.19
42,608.52
475,200.00
215,014.29
292,459.26
3,225.00
758,571.43
400,000.00
342,857.14
14.095
Btg
m3
1
10
7.143
195.901
bekisting
tulangan
jumlah
1.37
4.71428571
7.736
0.275
2.36
2.357
1.37
1.371
0.236
0.137
0.401
0.236
0.078
0.397
Satuan
OH
OH
OH
OH
OH
OH
0.286
2.857
1.429
m3
Kg
Ltr
2.939
384
692
1039
215
0.129
2.500
14.286
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
7.143
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
m2
1
beton K-250
1.65
0.275
0.028
0.083
19.590
65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
15.00
5,900,000.00
160,000.00
24,000.00
7,892,564.15
1,001,661.67
549,007.56
23,375.00
227,071.43
123,540.11
41,846.00
36,821.58
6,173,396.65
680,000.00
45,333.33
16,190.48
2,699,195.63
45,159.62
475,200.00
215,014.29
292,459.26
3,225.00
859,714.29
453,333.33
388,571.43
8.095
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
m2
1
beton K-250
1.65
0.275
0.028
0.083
m3
1
10
8.095
207.630
bekisting
tulangan
jumlah
1.45
5.34285714
8.446
0.275
2.67
2.671
1.45
1.453
0.267
0.145
0.440
0.267
0.083
0.433
Satuan
OH
OH
OH
OH
OH
OH
0.324
3.238
1.619
m3
Kg
Ltr
3.114
384
692
1039
215
0.146
2.833
16.190
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
65,000.00
20.763
11,563,741.81
1,699,091.74
940,225.26 per
17.333
m3
m2
1
19.643
m3
10
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
17.333
196.429
bekisting
tulangan
jumlah
11.44
1.38
14.465
0.275
5.72
5.720
1.38
1.375
0.572
0.138
0.738
0.572
0.079
0.734
beton K-250
1.65
0.275
0.028
0.083
Satuan
OH
OH
OH
OH
OH
OH
0.693
6.933
3.467
m3
Kg
Ltr
2.946
384
692
1039
215
0.312
6.067
34.667
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
7,951,407.96
1,005,945.17
550,701.60
23,375.00
227,071.43
125,755.39
42,093.59
8.095
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
m2
1
beton K-250
1.65
0.275
21.135
m3
1
10
8.095
211.354
bekisting
tulangan
jumlah
5.34285714
1.48
8.472
0.275
Satuan
OH
OH
65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
0.028
0.083
2.67
0.267
0.267
1.48
0.148
0.085
7,577,600.89
1,046,209.85
580,009.26
23,375.00
257,125.00
103,973.65
43,018.08
38,708.85
5,842,518.23
770,000.00
51,333.33
18,333.33
9.167
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
m2
1
beton K-250
1.65
0.275
0.028
0.083
2.671
1.479
0.443
0.435
OH
OH
OH
OH
0.324
3.238
1.619
m3
Kg
Ltr
3.170
384
692
1039
215
0.146
2.833
16.190
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
17.475
m3
1
10
9.167
174.746
bekisting
tulangan
jumlah
1.22
6.05
8.923
0.275
3.03
3.025
1.22
1.223
0.303
0.122
0.453
0.303
0.070
0.455
Satuan
OH
OH
OH
OH
OH
OH
65,000.00
85,000.00
85,000.00
85,000.00
95,000.00
85,000.00
2,100,000.00
14,000.00
10,000.00
13,000.00
14,500.00
1,237.50
310.71
281.48
7,555,903.03
1,027,047.71
572,431.02
23,375.00
257,125.00
94,063.64
41,910.49
38,142.56
5,841,955.04
770,000.00
51,333.33
18,333.33
2,055,171.89
34,384.61
475,200.00
215,014.29
292,459.26
9.167
m3
per
dari V2
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
m2
1
beton K-250
1.65
0.275
0.028
0.083
0.367
3.667
1.833
m3
Kg
Ltr
2.621
384
692
1039
215
0.165
3.208
18.333
Kg
Kg
Kg
Kg
ltr
m3
Lbr
Btg
15.809
m3
1
10
9.167
158.090
bekisting
tulangan
jumlah
6.05
1.11
8.807
0.275
3.03
3.025
1.11
1.107
0.303
0.111
0.441
0.303
0.063
0.449
Satuan
OH
OH
OH
OH
OH
OH
0.367
3.667
1.833
m3
Kg
Ltr
2.371
Kg
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
6,869,002.75 Plywood 9 mm
686,900.28 Dolken diameter 8 / 4rm
7,555,903.03
384
692
1039
215
0.165
3.208
18.333
Kg
Kg
Kg
ltr
m3
Lbr
Btg
Koefisien
Pekerja
Tukang batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Kayu Klas III (Terentang)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton Polos
Kawat Beton
Portland Semen
Pasir Beton
Kerikil Beton
Air
Kayu Klas II Balok
Plywood 9 mm
beton K-250bekisting
1.65
0.66
0.275
0.33
0.028
0.033
0.083
0.033
tulangan jumlah
0.07
2.380
0.275
0.330
0.07
0.070
0.007
0.068
0.004
0.120
Satuan
OH
OH
OH
OH
OH
OH
0.333
3.333
1.667
m3
Kg
Ltr
2.745
413
681
1021
215
0.150
2.917
Kg
Kg
Kg
Kg
ltr
m3
Lbr
0.04
0.4
0.2
0.150
413
681
1,021
215
0.018
0.35
16.667
Btg