After complete overhaul, our engineers, calculate the test load in accordance with Australian Standards
and testing the boom with 25% overload.
In this way, the machine's ability is tested to operate safely on the maximum loads.
After the testing the Six Yearly Certificate is issued.
Recent accidents have shown the importance of proper testing of the machine after overhaul. Most
likely, if the complete and proper testing had been conducted, the accident may have been averted.
Concrete boom pump 45 m on the testing for "One side support" outriggers.
__________________________________________________________________________________
To learn more about our service, or to informally discuss your technical issue with