Professional Documents
Culture Documents
Department of Education
Region V-Bicol
SCHOOLS DIVISION OFFICE
Paracale District
SCHOOL
IMPROVEM
ENT PLAN
SY 2016-2017 to 2018-2019
0 | Page
I.
EXECUTIVE SUMMARY
DEPED
II.
INTRODUCTION
The state shall protect and promote the right of all citizens to quality
education at all levels and shall take appropriate steps to make such
education accessible to all (Article IV of the Philippine Constitution)
The benefit of the pupils is the main element being appropriately responded to in
the conceptualization of this school improvement plan.
Enrolment By Gender
Female
Male
100
10
17
33
34
78
68
0
19
0
18
Severely Wasted
Wasted
Overweight
Obese
Normal
In Kinder to Grade 3, 31% (94 out of 295) of the learners fall outside
the normal health status, while in Grade 4 to 6, 19% (37 out of 189)
of the learners fall outside the normal health status.
3. Learners Materials
Grade
Level
Subject Area
Excess
LMS
Shortage
LMS
MTB
FILIPINO
ENGLISH
AP
MATH
MAPEH
ENGLISH
AP
MAPEH
ENGLISH
MATH
SCIENCE
FILIPINO
HEKASI
EPP
MSEP
ENGLISH
MATH
SCIENCE
FILIPINO
HEKASI
EPP
MUSIKA/SINING/PE
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
88
88
8
10
10
10
80
80
80
49
16
36
46
56
86
86
39
17
20
27
16
64
53/64/50
III
V
VI
No. of Teachers
5. Funding Sources
Categor
y of
Awardee
(Student
,
Teacher,
School
Head,
School)
Title of
Award
Award
Giving Body
Level
(Internatio
nal,
National,
Region,
Division or
School
level)
District
Press
Conferen
ce
DepEdParac
ale
DepEd Paracale
Pupil
Division
Press
Conferen
ce
DepEdCama
rines Norte
Division
Pupil
Regional
Press
Conferen
ce
DepEd
Bicol
Regional
Pupil
NAT 6
Filipino
Science
English
HEKASI
Math
9. Literacy Level
Number of Learners by Literacy Level, 2015
92
146
164
118
125
159
156
164
82
Frustration
Instructional
226
113
63
Independent
The results of Phil-IRI post test both in English and Filipino shows an
increase on the number of learners in the instructional and independent
level this can be attributed to the reading program implemented by each
grade level. It shows an improvement in the pupils literacy.
SBM
Level
DEVELO
11.
CFSS Points:
27
Qualitative
Interpretation:
CHILD-FRIENDLY
SCHOOL
The school got a total point of 27 in the ChildFriendly School survey making the school fall under
the qualitative interpretation as CHILD-FRIENDLY
SCHOOL.
12.
Stakeholders Participation
13.
Learner-Teacher Ratio
14.
Learner-Teacher Ratio
74
61
64
64
Standard
53
15.
Learner-Classroom Ratio
Learner-Classroom Ratio, SY 2015
38
37
31
30
32
33
27
16.
Toilet-Pupil Ratio
Male
female
17.
Pupil-Seat Ratio
Pupil-Seat Ratio, SY 2015
18.
Baseline
Endline
V.
PLANNING WORKSHEET
Priority Improvement
Project Objectives
Area
PROVISION OF EQUITABLE ACCESS
1. Enrolment
a.
Enroll 100%
school-aged
children
of
Root Cause
1km Distance of
home to school.
Transfer
of
residence due to
lack
of
opportunity
to
earn a living
Lack
of
information and
dissemination
Lack of interest
due to poverty
and hunger.
Family problem
Sickness
Interventions/
Solution
Home Visitation
Institutionalization
of
Feeding
Program
for
PARDO
Information
dissemination
School
and
Barangay council
partnership
Program/Ac
Cond
Activ
Opla
Child
Cond
Regis
Adop
Advo
disse
tarpa
poste
paren
Hous
to en
enrol
2. Learning
Materials
(Textbooks)
a.
Attain
1:1
pupil/Textbook
ratio
Request
for
additional textbook
Partnership
with
NGO
Update
then sub
textbook
utilizes
existing
textbook
reproduce
Cond
Cond
Prep
Instr
Purc
be
prep
Ass
the p
3. Instructional
Materials
through
indigenization
(LRMDS)
a. Develop
teacher-made
instructional
materials.
4. School
Learning
Equipment/Appara
tuses
Purchase
Science
equipments/ap
paratuses,
gardening
tools, sports
equipment and
multi-media
equipment
Low MPL in
Science
Poor performance
in sports
competition
Lack of interest in
studying
Conduct
seminar/worksh
op on the use of
indigenous
materials
Prepare/develop
teacher
made
IMs
Allocate fund for
the procurement
of supplies used
in making IMs
Create
an
LRMDS
Committee
Allocate funds
from MOOE
Implement DoIt-Yourself
Utilize multimedia
equipment in
conducting
lesson
Mobilize
PTA reso
sending
other st
Conduct
activity
Impleme
School
Procure
equipme
from MO
Request
Supply O
Prepare le
to Supply
Solicit to S
Private/ A
Fund raisi
5. Seat
6. Water and
Facilities
(WATSAN)
a.
Toilet
7. Hand-washing
Tooth-brushing
Facilities
a.
& a.
8. School Clinic
a.
Construct
a
genderized
comfort room
Construct
handwashing/toothbrus
hing facilities
Use/rehabilitate
existing structure
to become school
clinic
Absenteeism
Poor hygiene
Poor hygiene
Absenteeism
of
pupils due to illness
related to proper
hygiene
No room is used for
the
first
aid
treatment of pupils
Request
additional seats
from the Supply
Office
of
the
Division.
Construct
additional
chairs/benches
Conduct
Fund
Raising Activity
Request
assistance
from
the LGU (SEF) or
other
organizations
Provide 1 hand
washing/tooth
brushing facility
Assign p
fund rais
Prepare
program
(SEF)
Allocate
Conduct F
Solicitatio
Project T
convene
activity
PLANNING WORKSHEET
Priority
Project
Improvement
Objectives
Area
QUALITY and RELEVANCE
1.
NAT Result
a.
Improve NAT 6
results by 2%
Root Cause
Poor
reading
comprehension skills
Lack
of
equipment/apparatus
es
especially
in
Intervention/ Solution
Implement/strengthen
the ECARP
Provide
equipment/
apparatuses
Develop teacher made
Program
be
Conduc
instruct
Allocate
MOOE/s
raising
2. Nutritional
Status
3. Health
Nutrition
Program
a.
Improve
nutritional
status
children
the
of
and
a.
Provide measure
for the health
&well-being
of
the pupils
4. Pupils
Participation
to
different
curricular/
co-curricular
activities
a.
Participate and
win the top 3
place in any
contests
or
competition
5. School-Based
Assessment
Program
a. Diagnostic
Test
b. Quarterly
Test
c. Year-End
Test
6. Staff
Development
Training
Development
Technical
Assistance
Absenteeism
Poor performance
in class
Poor
personal
hygiene
Methods/strategies
used in teaching
Lack of motivation
from the teachers
a.
a.
7. Student
Publication
8. Computer
Literacy
Program
Science
Lack of instructional
materials
Less than 180 days of
teacher-pupils
contact hours
Presence
of
malnourished
children
due
to
poverty
Remedial
lessons
were not conducted
Absenteeism due to
high
incidence
of
child labor
Poor
classroom
condition
Lacks
of
study
habit/no follow up at
home
because
of
illiterate parents.
Illness
Absenteeism
Poverty
Poor performance in
class
1.
Evaluate pupils
performance in
all
learning
competencies
in 8 subject
areas
Enhance
teaching
efficiency and
competence of
teachers
through various
trainings and
seminars and
attendance in
post graduate
studies
Low performance of
pupils
Low performance of
pupils
a. Publish
school
paper
at
least twice a
year
Equip
pupils/teachers
with
basic
computer
literacy
.
Lack of funds
Lack of training/
knowledge of school
paper adviser
Poor participation in
press conference
Lack of knowledge or
technical know-how
of teachers/pupils on
how
to
operate
computer
Poor
quality
of
IMs or reviewer
Maximize
human
resources
Feeding Program
Implement
Project
WATCH
Give
assignment/
reinforcement
to
develop study habits.
Coordinate with parents
if absences cannot be
avoided
Structure properly the
classrooms
Conduct
an
action
research
to
improve
reading comprehension
Determin
Weight a
Purchase
weighing
Procure
for Gulay
Purchase
material
Train/review
potential
pupils
Conduct
school-based
contest to select the
best pupils
Implement Time-on-Task
Policy
Assign
will prep
Assign
area of
Coordin
baranga
stakeho
provisio
Orient
giving a
Intensiv
supervi
Conduc
activitie
pupils
Assign
have ar
the
review/
Ask th
parents
Conduct Assessment as
scheduled
Conduct
formative
assessment
in
every
lesson
Review classes
Conduct school-based
INSET/LAC SESSION
Send teachers to
trainings for
professional
advancement
Encourage/motivate to
enroll in post graduate
studies
Coaching/Mentoring
Prepare
Assign
manage
Allocate
for traini
Action Pl
Conduct trainings on
school-based journalism
Send teachers to
trainings in school paper
Orientation
of
Pupils/Teachers
on
Computer Literacy
Maintain the computer
functional.
seeks r
for
training
parents
Conduc
Solicit t
Sector,
Hands-o
comput
Prepare
Tutorial
coordin
Attend
reports submitted
PLANNING WORKSHEET
Priority
Improvement
Area
GOVERNANCE
1. School
Based
Management
Project
Objectives
a.
improve SBM
Level of Practice
Root Cause
Reassignment
school heads
Lack
of
documents
Intervention/ Solution
of
Program
be
SBM
2. Instructional
Supervision
a.
Enhance the
teaching
competencies of
teachers
Lack of trainings of
teachers/none at all
Newly-appointed
teachers
Poor
teaching/learning
performance
Implement
supervisory
plan
Intensify
classroom
observation
Conduct INSET/SLAC on
teaching
strategies/
approaches
3. Internal/Extern
al Stakeholders
Participation
a.
b.
Increase
stakeholders
participation/
Strengthen
partnerships
through
Resource
Mobilization
Attain 75-100%
parents
participation in
meetings/
programs
Poor
physical
facilities of school
Less
than
50%
attendance
during
meetings/programs
Lack of funds
4. National
Greening
Program
(Gulayansa
Paaralan,
Tree
Planting,
Solid Waste
manageme
nt
a.
Implement
National
Greening
Program
Undernourished
children
Lack of knowledge
on NGP
Uncooperative
parents
Conduct an orientation
on NGP
Implement
the
program/conduct
fund
raising for sustainability
of the projects
Encourage
parents
involvement
Tree Planting
Reduce,
Reuse
and
Recycle
Con
to
stak
Crea
com
com
Orga
docu
crite
plan
exec
work
tapp
stren
capa
eval
prac
cond
mee
teac
Observe
teachers
Check LP
Provide
assistan
possible
Prepare
create c
Make an
plan/sch
Assign
charge
Particip
in their
Send
request
Encoura
stakeho
and
Brigada
through
organiz
Send le
parents
Plan
encoura
of pare
Work or
Prepare
program
pictoria
Create
charge i
Make an
Conduct
with S
Parents
5. School
Disaster
Risk
Reduction
Manageme
nt
a.
Conduct
Disaster
Reduction
Management
Activity
Unsafe environment
Lack
of
knowledge/trainings
Attend
trainings
and
seminars
Conduct regular fire and
earthquake drill in the
school
Safe/child
friendly
classrooms
6. Fiscal
Manageme
nt
7. Physical
Facilities
(School
Building/
Classroom)
a.
a.
Disburse and
liquidate
monthly
operational
expenses
incurred
Improve
physical
learning
environment
conducive
to
teaching
and
learning
Poor performance of
pupils
Lack of Funds
absenteeism
Provide
School
Transparency Board
Have approved ASB and
APP
8. Child Friendly
School System
a.
Absenteeism
Poor
performance of
pupils
9. National Drug
Education
Program
(NDEP)
a. Enhance
pupils/parents
knowledge
on
National
Drug
Education
Program (NDEP)
10. Titling/Survey
of school Sites
Ignorance
pupils/parents
of
Lack of funds
Incomplete
documents
Information
Dissemination
Conduct orientation on
pupils/parents and other
stakeholders about NDEP
School Sites Titling and
Registration Expenses
Conduct
pupils, t
Provide
kit/first a
Remove
material
the class
Repair
of
facilities
Attends
fiscal ma
Liquidat
MOOE b
Designa
Awards C
Repair o
faciaboa
classroo
Repair/re
windows
Repainti
exterior/
buildings
Repainti
buildings
Repainti
and land
ground
Construc
boxes
Repair/re
genderiz
Enclose
concrete
Con
Build
relat
stak
Removin
Sore/haz
inside th
Improve
of the sc
Put
Film
Prov
in ev
Inte
Less
Prep
supp
Secu
need
plan
Surv
scho
Feasibility
Magnitude
Strategic
Importance
Urgency
Program/Project
A. Pupils
Development
1.
Supplementary
Feeding Program
2.
ECARP/PHIL-IRI
3.
School-Based
Assessment
Physical Target
Indicator (Output
level)
2016
2017
2018
2019
2020
2016
Improved
nutritional status
58
44
30
16
15,000.00
Improved pupils
reading abilities
Improved
performance
level of pupils
560
565
570
575
580
1,680.00
560
565
570
575
580
15,800.00
Sub-Total
32,480.00
B. Physical
Development
1.
2.
Construction of
School Buildings
3-classroom
building
Constructed
3-classroom
building.
Replaced/
repaired
window panes
of 6
classrooms
Repainted the
exterior and
interior wall
and roofing of
school
buildings
Repaired
roofing,
faciaboard
and ceilings
of classrooms
Repaired/reha
bilitated
genderized
CR
Enclosed
school with
concrete
perimeter
fence
Replacement/repa
ir of windows of 6
classrooms.
3.
4.
5.
6.
Painting of
exterior/ interior
wall and roofing
of all school
buildings.
Repair of roofing,
faciaboard and
ceilings of
classrooms
Repair/rehabilitat
e genderized CR
Enclose the
school with
concrete
perimeter fence
3
rooms
2 rooms
1
building
1
buildin
g
3 room
1
buildi
ng
2
room
1
buildi
ng
2
room
1
buildin
g
2 room
8
building
s
1
buildin
g
3
rooms
3
rooms
2
rooms
33,075.00
50,000.00
2
Rooms
5,510.00
1 bldg
2 rooms
2
rooms
1
bldg.
1 bldg
-
3 spans
3
spans
1 plant
boxes
3
spans
20,000.00
3
spans
3
spans
20,000.00
7.
Construct
additional plant
boxes
1 plant
boxes
Constructed
additional
plant boxes
Sub-Total
128,585.0
0
C. Staff Development
1.
2.
Conduct seminar
workshop
SchoolBased
INSET
SLAC
GADVAWC
DRRM
Send teachers to
DepEd initiated
seminar/workshop
Conducted
Seminar/Work
shop
14
14
14
14
14
5,000.00
16,600.00
Enhanced
teaching
competence
of teachers
Sub-Total
D. Curriculum
Development
1. Project PRIME
GOLD
2. LRMDS
3. Multi-Media
Device
5,400.00
27,000.00
Utilization of
Instructional
Materials
Sub-Total
32,000.00
32,000.00
Prepar
ed by:
ROSALI
E A.
CEPED
A
School
Principa
l1
Time
Frame
1. ECARP
Identify pupils
reading level
JuneMarch
2. Supplementary
Feeding Program
Identify pupils
nutritional status
3. BrigadaEskwela
Encourage parents
Dep. Ed Programs
JulyDec
Resources
Persons
Materials
Involved
Teacher
Phil-IRI
Forms
Reading
materials
Teacher,
PTA
Weighing
Scale
Foods
Indicators
Phil-IRI pre
test results
Pupils
nutritional
status by
July 2016
100%
4. LRMDS
5. National Greening
Program
GulayansaPaarala
n
Tree Planting
Solid Waste
Management
participation on
Bayanihan
May
March
Encourage
teachers to
develop teacher
made IMs
June
March
Conduct PTA
meetings, create
committees,
implement the
program thru
different
organizations (e.g.
YES-O, SPG, 4 ps)
PTA,
Teacher,
SH
Garden/
Carpentry
tools
parents
participation
Action Plan
Teacher,
SH
Bond/color
ed paper,
computer
ink
June
March
Work Plan
PTA, Pupils
Organizati
ons
Teacher,
SH
Garden
tools,
vegetable
seeds
TRACK
agnostic and Achievement
FREQUENCY
once a year
PERSONS INVOLVED
Pupils, Teachers, School Head
FUNDING
27,360.00
st
riodical Examination
ational
Achievement
4 times a year
Once a year
31,600.00
1, 000.00
st/LAPG
il-IRI
CD
Twice a year
3 times a year
3,600.00
1,500.00
PALANASELEMENTARY SCHOOL
QUARTER
DATE
upils Development:
1. Conduct School-Based
ing
Program
(SBFP)
rove the nutritional status
upils)
2. Implement ECARP to
ove/enhance the reading
of pupils
Reproduction
of
test
materials, periodicalTest
and LAPG/NAT (improve
the performance of pupils
inLAPG and NAT6)
Early registration (attain
:
:
2ndQuarter
(April June, 2016)
May 1, 2016
ACCOMPLISHME
NT/ STATUS TO
DATE
ISSUES/PROBLEMS/R
EASONS FOR
UNDERACHIEVEMEN
T
RECOMMENDATIONS/
ACTION POINTS
Accomplished last
November to
March, 2016
Cooperation among
parents of the
recipient pupil
Intensify information
dissemination
Conducted last
REMARK
HECK
DONE
On-going
To be implemented
SY 2017-2018
hysical Development:
ernance
1. School Based
Management(Improve SBM level
of practice)
2. Instructional
Supervision/Technical
Assistance-(Enhance
the teaching
competencies of
Teachers)
3. Internal/External
Stakeholders
Participation-
On-going ( to be
implemented on
April, 2016)
On-going
On-process ( to be
implemented on
May, 2016)
May-June, 2016
SY 2017-2018
On-process (to be
implemented on 2nd
quarter of 2016)
On-going
On-going
On-process
to be implemented
on October, 2016
5 teachers
attended Regional
& National
Trainings
On-going
On-going
(Increase
stakeholders
participation/
Strengthen
partnerships through
Resource
Mobilization
4. Child Friendly School
System -(provide
safe and motivating
environment to all
school children)
5. National Drug
Education Program
(NDEP)
6. Survey and titling of
school sites
On-going
On-going
On-going
On-going
of Project
evelopment:
onduct Schoolding Program
rove
the
tatus of pupils)
ement ECARP
e/enhance the
l of pupils
ction of test
periodicalTest
6. (improve the
e of pupils in
AT6)
registration
% enrolment of
ge children)
daEskwela
% participation
stakeholders)
ation in coctivities.
um
ent:
lement project
D.
Learning by
gh
Projects/
Objectives
and Target
Date of
Monitoring
Accomplishme
nts Status to
date
ISSUES/PROBL
EMS/CHALLEN
GES
Year
RECOMMENDATIO
NS/
ACTION POINTS
Sig
SPT
Tea
on of
al Materials)
cal
ment:
ofing,
and ceilings of
ruct plant
placement of
of Grade III-A,
A classrooms
ng of
nterior wall of
ng of plant box
scaping of
ound
tion of school
r fence
velopment:
uct INSET
LAC
RR
-VAWC
SLAC session
er to Grade III
s
teachers
to
initiated
workshop
e
sed
ent- (Improve
of practice)
onal
on/Technical
ce-(Enhance
hing
ncies of
)
External
ders
tion-(Increase
ders
tion/
en
hips
through
Mobilization
ndly School
(provide safe
vating
ment to all
hildren)
Drug
on Program
and titling of
ites
Prepared by: (School Planning Team)
RANDY N. SERRANO
AGUSTO SOLIS
PB RENO G. PISALBON
School Head
Parent Representative
ROY S. ZAMUDIO
JONA MAE G. LABADAN
Member, SDRRMC
Pupil Representative
WILFREDO J. GAVARRA
Assistant Schools Division Superintendent
OIC Office of the Schools Division Superintendent