Hook-up and commissioning works at nuclear power plants (NPP) with water-to-water power reactors. Personnel qualification requirements. Personnel
certification.
34-37-790-85
- . . .
WWW.RUSSIANGOST.COM
OST 34-37-789-85
Hook-up and commissioning works at nuclear power plants (NPP) with water-to-water power reactors. Personnel qualification requirements. Personnel
qualification and training.
34-37-789-85
- . .
.
WWW.RUSSIANGOST.COM
OST 34-37-804-85
Hook-up and commissioning works at nuclear power plants (NPP) with water-to-water power reactors. Reporting documentation. Certificates of work
completion at separate stages of hook-up and commissioning works.
34-37-804-85
- . .
.
WWW.RUSSIANGOST.COM
OST 34-37-808-85
Hook-up and commissioning works at nuclear power plants (NPP) with water-to-water power reactors. Reporting documentation. Certificates on unit
readiness for separate stages of hook-up and commissioning works.
34-37-808-85
- . .
.
WWW.RUSSIANGOST.COM
OST 34-37-806-85
Hook-up and commissioning works at nuclear power plants (NPP) with water-to-water power reactors. Reporting documentation. Equipment acceptance
certificates.
34-37-806-85
- . .
.
WWW.RUSSIANGOST.COM
OST 34-37-809-85
Hook-up and commissioning works at nuclear power plants (NPP) with water-to-water power reactors. Reporting documentation. General provisions.
34-37-809-85
- . . .
WWW.RUSSIANGOST.COM
OST 34-37-807-85
Hook-up and commissioning works at nuclear power plants (NPP) with water-to-water power reactors. Reporting documentation. Hook-up and
commissioning works log.
34-37-807-85
- . .
.
WWW.RUSSIANGOST.COM
WWW.RUSSIANGOST.COM
OST 34-37-810-85
Hook-up and commissioning works at nuclear power plants (NPP) with water-to-water power reactors. Reporting documentation. Requirements for hookup and commissioning works completion reports.
34-37-810-85
- . .
.
WWW.RUSSIANGOST.COM
OST 34-37-805-85
Hook-up and commissioning works at nuclear power plants (NPP) with water-to-water power reactors. Reporting documentation. Unit acceptance for
operation certificate.
34-37-805-85
- . .
.
WWW.RUSSIANGOST.COM
OST 34-37-783-85
Hook-up and commissioning works at nuclear power plants (NPP) with water-to-water power reactors. Terms and definitions.
34-37-783-85
- . .
WWW.RUSSIANGOST.COM
OST 34-37-801-85
Hook-up and commissioning works at nuclear power plants (NPP) with water-to-water power reactors. Terms and definitions. Requirements for
instruments, materials and equipment for hook-up and commissioning works.
34-37-801-85
- . .
, .
WWW.RUSSIANGOST.COM
OST 34-37-812-85
Hook-up and commissioning works at nuclear power plants (NPP) with water-to-water power reactors. Terms and definitions. Technical documentation.
Equipment operating instructions requirements.
34-37-812-85
- . .
.
WWW.RUSSIANGOST.COM
OST 34-37-799-85
Hook-up and commissioning works at nuclear power plants (NPP) with water-to-water power reactors. Terms and definitions. Technical documentation.
General requirements.
34-37-799-85
- . . .
WWW.RUSSIANGOST.COM
OST 34-37-811-85
Hook-up and commissioning works at nuclear power plants (NPP) with water-to-water power reactors. Terms and definitions. Technical documentation.
Process flow diagrams.
34-37-811-85
- . .
.
WWW.RUSSIANGOST.COM
WWW.RUSSIANGOST.COM
OST 34-37-800-85
Hook-up and commissioning works at nuclear power plants (NPP) with water-to-water power reactors. Terms and definitions. Technical documentation.
Requirements for content of Program and testing methods document.
34-37-800-85
- . .
" ".
WWW.RUSSIANGOST.COM
OST 34-37-803-85
Hook-up and commissioning works at nuclear power plants (NPP) with water-to-water power reactors. Terms and definitions. Technical documentation.
Requirements for content of commissioning personnel real-time documentation.
34-37-803-85
- . .
.
WWW.RUSSIANGOST.COM
OST 34-37-802-85
Hook-up and commissioning works at nuclear power plants (NPP) with water-to-water power reactors. Terms and definitions. Technical documentation.
Requirements for manufacturing systems operation.
34-37-802-85
- . .
.
WWW.RUSSIANGOST.COM
OST 34-37-796-85
Hook-up and commissioning works at nuclear power plants (NPP) with water-to-water power reactors. Volume and sequence of hook-up and
commissioning works. First criticality.
34-37-796-85
- .
. .
WWW.RUSSIANGOST.COM
OST 34-37-793-85
Hook-up and commissioning works at nuclear power plants (NPP) with water-to-water power reactors. Volume and sequence of hook-up and
commissioning works. First inspection of nuclear steam generating plant main equipment.
34-37-793-85
- .
. .
WWW.RUSSIANGOST.COM
OST 34-37-791-85
Hook-up and commissioning works at nuclear power plants (NPP) with water-to-water power reactors. Volume and sequence of hook-up and
commissioning works. General provisions.
34-37-791-85
- .
. .
WWW.RUSSIANGOST.COM
OST 34-37-792-85
Hook-up and commissioning works at nuclear power plants (NPP) with water-to-water power reactors. Volume and sequence of hook-up and
commissioning works. Hydraulic testing and 1st circuit washing.
34-37-792-85
- .
. .
WWW.RUSSIANGOST.COM
WWW.RUSSIANGOST.COM
OST 34-37-794-85
Hook-up and commissioning works at nuclear power plants (NPP) with water-to-water power reactors. Volume and sequence of hook-up and
commissioning works. Nuclear steam generating plant running in.
34-37-794-85
- .
. .
WWW.RUSSIANGOST.COM
OST 34-37-797-85
Hook-up and commissioning works at nuclear power plants (NPP) with water-to-water power reactors. Volume and sequence of hook-up and
commissioning works. Power start-up and unit designed capacity adaptation.
34-37-797-85
- .
. .
WWW.RUSSIANGOST.COM
OST 34-37-795-85
Hook-up and commissioning works at nuclear power plants (NPP) with water-to-water power reactors. Volume and sequence of hook-up and
commissioning works. Second inspection of nuclear steam generating plant main equipment.
34-37-795-85
- .
. .
WWW.RUSSIANGOST.COM
OST 34-70-915-86
Hook-up and commissioning works at nuclear power plants (NPP) with water-to-water power reactors. Warranty tests.
34-70-915-86
- . .
WWW.RUSSIANGOST.COM
OST 5.8035-70
Hoops for beams and tubes. Design, dimensions and technical requirements.
5.8035-70
. , .
WWW.RUSSIANGOST.COM
OST 37.002.0947-82
Hopper bootable electric vibration device (vibrating hoppers) with bowls diameters of 200-630 mm. Types, Main parameters and Dimensions
37.002.0947-82
() 200-630 . , .
WWW.RUSSIANGOST.COM
OST 108.023.107-85
Horizontal capsular hydraulic turbines. Types, Main parameters and dimensions.
108.023.107-85
. , .
WWW.RUSSIANGOST.COM
WWW.RUSSIANGOST.COM
OST 1 52229-77
Horizontal clamp. Design and dimensions.
1 52229-77
. .
WWW.RUSSIANGOST.COM
OST 1 52226-77
Horizontal contact-breakers. Design and dimensions.
1 52226-77
. .
WWW.RUSSIANGOST.COM
OST 37.002.1130-86
Horizontal electrodes with lofted flat contact surface. Design and dimensions.
37.002.1130-86
. .
WWW.RUSSIANGOST.COM
OST 37.002.1131-86
Horizontal electrodes with lowered flat contact surface. Design and dimensions.
37.002.1131-86
. .
WWW.RUSSIANGOST.COM
OST 1 52777-86
Horizontal Fittings. Design and dimensions.
1 52777-86
. .
WWW.RUSSIANGOST.COM
OST 4-054.043-78
Horizontal forging machines stamping. Typical technological process, die designing, workplace arrangement.
4-054.043-78
. . .
WWW.RUSSIANGOST.COM
OST 2-D63-2-75
Horizontal handles of selection. Design and dimensions.
2-63-2-75
. .
WWW.RUSSIANGOST.COM
WWW.RUSSIANGOST.COM
OST 1 51155-83
Horizontal Hydraulic Cylinders. Design and dimensions.
1 51155-83
. .
WWW.RUSSIANGOST.COM
OST 3-156-70
Horizontal multi-purpose dividing head. Construction and basic dimensions.
3-156-70
. .
WWW.RUSSIANGOST.COM
OST 1 76191-73
Horizontal plunger die-casting machines. Diameters clearances of moulding pair .
1 76191-73
. .
WWW.RUSSIANGOST.COM
OST 3-2756-75
Horizontal pulling single-acting hydraulic cylinders. Construction and basic dimensions.
3-2756-75
. .
WWW.RUSSIANGOST.COM
OST 3-2757-75
Horizontal pulling single-acting hydraulic cylinders. Construction and basic dimensions.
3-2757-75
. .
WWW.RUSSIANGOST.COM
OST 3-2755-75
Horizontal pushing single-acting hydraulic cylinders. Construction and basic dimensions.
3-2755-75
. .
WWW.RUSSIANGOST.COM
OST 3-6294-87
Horizontal steel round forgings. Typical hot die forging technological process.
3-6294-87
. .
WWW.RUSSIANGOST.COM
WWW.RUSSIANGOST.COM
OST 1 52296-78
Horizontal Stop for fixing of profiles and walls of re-adjustable tools to assembly flat knots. Design and dimensions.
1 52296-78
. .
WWW.RUSSIANGOST.COM
OST 26-2091-93
Horizontal support vessels and equipment. Design.
26-2091-93
. .
WWW.RUSSIANGOST.COM
OST 3-5038-81
Horizontal swing clamps for assembling and welding devices. Design and dimensions.
3-5038-81
- . .
WWW.RUSSIANGOST.COM
OST 14-25-211-87
Horizontal-grate machines. Norms of specific fuel consumption.
14-25-211-87
. .
WWW.RUSSIANGOST.COM
OST 49-109-76
Horn. horn - bone and bone- hard rubber mouthpieces.
49-109-76
, - -.
WWW.RUSSIANGOST.COM
OST 24.140.09-86
Horns for locomotives and track machines. Technical conditions
24.140.09-86
. .
WWW.RUSSIANGOST.COM
OST 3-2411-74
Hose adapter of drainage machines. Connecting dimensions.
3-2411-74
. .
WWW.RUSSIANGOST.COM
WWW.RUSSIANGOST.COM
OST 5-5445-80
Hose dampening joints. Technical specifications.
5-5445-80
. .
WWW.RUSSIANGOST.COM
OST 3-399-70
Hose Fittings.
3-399-70
.
WWW.RUSSIANGOST.COM
OST 5.5444-80
Hose joints for liquefied gas collection and distribution. Technical specifications.
5.5444-80
. .
WWW.RUSSIANGOST.COM
OST 3-403-70
Hose Nipples.
3-403-70
.
WWW.RUSSIANGOST.COM
OST 3-4865-80
Hose pipe adapting joints. Construction and dimensions.
3-4865-80
. .
WWW.RUSSIANGOST.COM
OST 105-1015-83
Hoses of pneumatic actuator of mobile machine brake. Specifications.
105-1015-83
. .
WWW.RUSSIANGOST.COM
OST 4G 0.022.186-69
Hoses type P3 (limit OTU 22-118-66 ).
4 0.022.186-69
3 ( 22-118-66).
WWW.RUSSIANGOST.COM
WWW.RUSSIANGOST.COM
OST 1 11885-86
Hoses. Design and dimensions.
1 11885-86
. .
WWW.RUSSIANGOST.COM
OST 17-500-85
Hosiery from seamless hosiery machine. Typical production process.
17-500-85
- . .
WWW.RUSSIANGOST.COM
OST 17-850-80
Hospital female topcoat.
17-850-80
.
WWW.RUSSIANGOST.COM
OST 4G 0.052.013-70
Hostess carts. Selection Guide.
4 0.052.013-70
-. .
WWW.RUSSIANGOST.COM
OST 1 42187-84
Hot air drier for tube bodies. Standard working operations.
1 42187-84
. .
WWW.RUSSIANGOST.COM
OST 3-4007-78
Hot and chemical passive tin, tin zinc coatings. Technical requirements, acceptance rules, inspection methods.
3-4007-78
, - . , , .
WWW.RUSSIANGOST.COM
OST 4-020.121-78
Hot rolled steel beam channels with flange toed in.
4-020.121-78
.
WWW.RUSSIANGOST.COM