You are on page 1of 56

PEMBINAAN JEJANTAS PEJALAN KAKI DI HADAPAN SEKOLAH RAJA PEREMPUAN TAAYAH, IPOH,

DAERAH KINTA, PERAK DARUL RIDZUAN

PRELIMINARY WORK
Item
No.

Description
THE SITE
The site of the Works is situated on PEMBINAAN
JEJANTAS PEJALAN KAKI DI HADAPAN SEKOLAH RAJA
PEREMPUAN TAAYAH, IPOH, DAERAH KINTA, PERAK
DARUL RIDZUAN
The Contractor is referred to the Site Plan for the exact
location, dimensions and area of the site.
The Contractor shall be deemed to have visited the
site and satisfied himself as to the means of
communication, access site, the extent and nature of
work and the site, the nature of sub-soil, the conditions
under whichthe work shall be carried conditions
affecting the supply of labour, materials and goods
matters which might effect the Contract, as no claims
on the grounds of knowledge in this respect will be
entertained.

POSSESSION OF THE SITE

Possession of the site shall be given to the Contractor


in accordance with the Letter of Acceptance of Tender.
The Contractor shall accept the site as found on the
Date for of the site and at his own expense clear the
area of the site of
Before taking possession of the site and before
commencing work, the Contractor shall check actual
levels and dimensions those shown on the drawings
and immediately inform the Architect the event of the
alleged discrepancy.

Page 1

Qty

Unit

PEMBINAAN JEJANTAS PEJALAN KAKI DI HADAPAN SEKOLAH RAJA PEREMPUAN TAAYAH, IPOH,
DAERAH KINTA, PERAK DARUL RIDZUAN

PW-1

PRELIMINARY WORK
Item
No.
A

Description

Qty

DESCRIPTION OF THE WORKS


The works included in this Contract hereinafter
referred to as comprise the construction and
completion of Proposed Pedestrian BridgePEMBINAAN
JEJANTAS PEJALAN KAKI DI HADAPAN SEKOLAH RAJA
PEREMPUAN TAAYAH, IPOH, DAERAH KINTA, PERAK
DARUL RIDZUAN
The works comprises the following :i)Structural works consisting of precast concrete piles,
concrete pilecap, frame and finishes
ii)External works comprising Site Clearance &
Earthworks.

GENERAL COSTS
The Contractor shall allow for all costs incurred in
respect of :
(i)Workpeople and site staff and any items of
expenditure
are not allowed for elsewhere, such as Holidays with
Public Holidays with Pay, Employees Provident Fund
contributions,
SOCSO
travelling time
(ii)Materials and
goodscontributions,
and costs in connection
and
and
any
cost
due
to
importing
labour
from other
therewith,including for preparatory and temporary
states,
countries,
etc.
bonuses,
and
for
work
in dirty in,
work (eg. Conveyance, delivery, unloading, carrying
conditions,
including
for preparatory
and
temporary
storing, returning
packages,
handling,
hoisting
and
work,
and
for
due
to
wet
or
inclement
weather,
and for
placing or lowering).
working in shifts overtime (if permitted so to do by the
Architect) as may necessary for the completion of the
(iii)Fitting
and
fixingfor
materials
and goods in position.
Works on or
before
Completion.

Page 2

Unit

PEMBINAAN JEJANTAS PEJALAN KAKI DI HADAPAN SEKOLAH RAJA PEREMPUAN TAAYAH, IPOH,
DAERAH KINTA, PERAK DARUL RIDZUAN
(iv)Use of plant, tools and vehicles including
maintenance,
supply of fuel and other equipment necessary for the
execution and completion of the Works and all idle
time dismantling of the removing plant etc. off the
Site.
(v)Waste on materials and goods.

PW-2

PRELIMINARY WORK
Item
No.

Description

Qty

DESCRIPTION OF THE WORKS (Cont'd)


A
(vi)Establishment charges, supervision, attendance,
overhead
charges including supply of samples, testing of
materials goods, testing and commissioning of all
installations and production of charts, programmes
and drawings all as in the Contract Documents, profit
and all taxes and import
(vii) Complying with the requirements of the Contract
Document, whether any requirement may or may not
be particularly or described, provided that the same is
reasonably to inferred therefrom, and any other
obligation necessary proper execution and completion
of the Works.
Wherever the term 'plant' appears in the Document,
such plant held to include all necessary mechanical
plant.
MATERIALS, GOODS AND WORKMANSHIP
B

Page 3

Unit

PEMBINAAN JEJANTAS PEJALAN KAKI DI HADAPAN SEKOLAH RAJA PEREMPUAN TAAYAH, IPOH,
DAERAH KINTA, PERAK DARUL RIDZUAN
Materials, goods and workmanship shall be of the best
quality respective kinds, and those for which there is
an British Standard Code of Practice shall comply
therewith unless otherwise stated. Preambles and
descriptions of materials, goods and workmanship
given in any one section or trade shall apply
throughout this Document unless otherwise stated
describe.

Figured dimensions shall be followed in preference to


scaled and all dimensions and particulars shall be
taken from the actual where possible.
C

TEMPORARY ACCESS
The Contractor shall allow for access to and on the site
necessary temporary roads, tracks, hardstandings,
crossings, for meeting the requirements of the
Authorities including paying and for removal and
reinstatement of any fences, hedges, etc. original
conditions approved by the Architect.

PW-3

PRELIMINARY WORK
Item
No.
Description
A HOARDING
The 3.6m high temporary hoarding has been erected
on site by Contractor. The Contractor shall maintain
the existing hoarding and shall be removed upon
completion of the Works
B

SIGNBOARD
The Contractor shall adapt the existing signboard to
include Contractor's name and upon completion of the
Works dismantle dispose off site.
TEMPORARY BUILDINGS AND PORTABLE CABINS,
ETC.

Page 4

Qty

Unit

PEMBINAAN JEJANTAS PEJALAN KAKI DI HADAPAN SEKOLAH RAJA PEREMPUAN TAAYAH, IPOH,
DAERAH KINTA, PERAK DARUL RIDZUAN
All temporary buildings and portable cabins, etc. shall
be situated approved positions and the Contractor
shall allow for dismantling, and re-erecting them in
new positions, during the execution of if necessary.
The Contractor shall provide the following :
(i)Proper sheds, etc. for the storage of materials,
goods,
and for the execution of work which may be prepared
(ii)The contractor shall note that workers are not
permitted
overnight at the site. In this respect, the contractors
shall arrange alternative accommodation for the work
people.
(iii) All necessary sanitary accommondation for the
workpeople
site staff and the Contractor shall deodorise the
ground removal. Portable toilet cubicles would be
preferred.

PLANT AND MACHINERY


The Contractor shall provide and install at plant and
machinery proper carrying out of the Works including
all necessary hoists, cranes, ladders, staging, tackle,
tarpaulins, tools, vehicles and (mechanical and
otherwise) and allow for altering, adapting and them
as necessary and eventually removing and making
good.

PW-4

PRELIMINARY WORK
Item
No.
Description
A HOARDING
The 3.6m high temporary hoarding has been erected
on site by Contractor. The Contractor shall maintain
the existing hoarding and shall be removed upon
completion of the Works
B

SIGNBOARD

Page 5

Qty

Unit

PEMBINAAN JEJANTAS PEJALAN KAKI DI HADAPAN SEKOLAH RAJA PEREMPUAN TAAYAH, IPOH,
DAERAH KINTA, PERAK DARUL RIDZUAN
The Contractor shall adapt the existing signboard to
include Contractor's name and upon completion of the
Works dismantle dispose off site.

TEMPORARY BUILDINGS AND PORTABLE CABINS,


ETC.
All temporary buildings and portable cabins, etc. shall
be situated approved positions and the Contractor
shall allow for dismantling, and re-erecting them in
new positions, during the execution of if necessary.
The Contractor shall provide the following :
(i)Proper sheds, etc. for the storage of materials,
goods,
and for the execution of work which may be prepared
(ii)The contractor shall note that workers are not
permitted
overnight at the site. In this respect, the contractors
shall arrange alternative accommodation for the work
people.
(iii) All necessary sanitary accommondation for the
workpeople
site staff and the Contractor shall deodorise the
ground removal. Portable toilet cubicles would be
preferred.

PLANT AND MACHINERY


The Contractor shall provide and install at plant and
machinery proper carrying out of the Works including
all necessary hoists, cranes, ladders, staging, tackle,
tarpaulins, tools, vehicles and (mechanical and
otherwise) and allow for altering, adapting and them
as necessary and eventually removing and making
good.

PW-5

PRELIMINARY WORK
Item
No.
A INSURANCE

Description

Qty

Page 6

Unit

PEMBINAAN JEJANTAS PEJALAN KAKI DI HADAPAN SEKOLAH RAJA PEREMPUAN TAAYAH, IPOH,
DAERAH KINTA, PERAK DARUL RIDZUAN
All insurance policies shall be effected with Berjaya
Sompo Insurance and all insurance policies together
with all receipts for premiums shall be submitted and
deposited with the Employer before the
commencement of the Works.

i)Insurance against injury to persons


Without prejudice to his liability to indemnity the
Employer under Clause 18 of the Conditions of
Contract, the Contractor shall be responsible for
obtaining such insurance policies cover all his
liabilities.
The contractor shall maintain and shall cause any
subcontractor to maintain a Workmen's Compensation
Insurance Policy in accordance with the Workmen's
Compensation and the Workmen's Compensation
(Amendment) Act.
"Employer Liability Insurance Policy" shall be effected
maintained by the Contractor and any sub-contractor
of personal injuries or death to employees who are
"Workmen" within the meaning of the Workmen's
Compensation Ordinance or Enactment or alternatively
endorsement Workmen's Compensation Insurance
Policy shall be cover these employees without
diminishing the Contractor's liabilities.
The Workmen's Compensation Insurance shall be
subject the Architect's satisfaction that the wages
declared are and adequate.
Notwithstanding anything stated to the contrary,
nothing the said policies or any endorsement therein
shall effect right of any person entitled to
compensation by virtue Workmen's Compensation Act
or Legislation of the Government of Malaysia.

ii)Insurance against injury to property (Contractor's


Liability)

PW-6

PRELIMINARY WORK
Item
Qty
Page 7

Unit

PEMBINAAN JEJANTAS PEJALAN KAKI DI HADAPAN SEKOLAH RAJA PEREMPUAN TAAYAH, IPOH,
DAERAH KINTA, PERAK DARUL RIDZUAN
No.

Description
iii) Insurance against injury of property (Employer's
Liability)
No provisional sum has been allowed in Specification
for the insurance premium for such insurance in the
joint names
of the Employer and Contractor
SETTING OUT AND LEVELLING
The contractor shall engage a licensed Surveyor in
establishing and setting out the works and pay all fees
in connection herewith. Before commencement of the
Works the Contractor shall submit Engineering two (2)
copies of certified setting out plan prepared by
licensed Surveyor.

WATCHING
The contractor shall allow for all necessary watching
for the security of the Works and the protection of the
public including shelter watchmen so required.

MAINTENANCE AND PROTECTION OF PUBLIC


PROPERTY,ETC
The Contractor shall maintain and protect public and
private carriageways, footways, kerbs, pipes, ducts,
sewers, service overhead cables, etc. and keep
approaches to the site clear of throughout the
execution of the Works, and make good or pay
reinstatement of any damage caused thereto directly
or indirectly the execution of the Works.
The Contractor shall allow for taking all responsible
precautions ensure the efficient protection of all drains
and waterways against pollution arising out of or by
reason of the execution of the Works.

PW-7

Page 8

Qty

Unit

PEMBINAAN JEJANTAS PEJALAN KAKI DI HADAPAN SEKOLAH RAJA PEREMPUAN TAAYAH, IPOH,
DAERAH KINTA, PERAK DARUL RIDZUAN

PRELIMINARY WORK
Item
No.
Description
A ANNOYANCE TO NEIGHBOURS, ETC.
The Contractor shall stop executing any work which is
likely to annoyance or inconvenience to occupants in
the vicinity and carry such works at such times during
normal working hours as the may direct and shall
organise his work so as not to provide grounds for
complaint.
The Contractor shall carry out the Works in such
manner to mininise inconvenience and nuisance to
persons living in neighbouring and to the public.
The Contractor shall take the utmost precautions in
minimising arising from the works. The Contractor shall
indemnify the Employer respect of any claims or
proceedings arising out of his neglect care to ensure
the noise from the work does not constitute a
nuisance.
Immediately upon receipt of any form of complaint,
from adjoining property owners or Authorities, the
Contractor shall notify the of the nature of such
complaint and submit corrective measures intends to
employ. The Contractor shall be held solely responsible
any damage caused to the adjoining and adjacent
properties through the carrying out of the works under
this Contract and shall make and compensate such
damage to the satisfaction of such adjoining owners
and tenants to the satisfaction of the Architect.
The Contractor shall indemnify the Employer against
any claim injunction arising from interference to the
adjoining owners.

PW-8

Page 9

Qty

Unit

PEMBINAAN JEJANTAS PEJALAN KAKI DI HADAPAN SEKOLAH RAJA PEREMPUAN TAAYAH, IPOH,
DAERAH KINTA, PERAK DARUL RIDZUAN

PRELIMINARY WORK
Item
No.
Description
A TEMPORARY SCAFFOLDING
The Contractor shall provide all temporary standing
scaffolding, approved type, erected to the approval of
the Architect and in with the relevant Bye-laws with
staging, planked footways, guardrails the like, as
required.
Tubular scaffolding if deemed necessary, shall be steel,
light pre-fabricated of 38mm nominal bore, with clamp
type fittings, equivalent to the requirements of BS :
1139.
Scaffolding shall be arranged so as to allow adequate
working between the surface to be worked and the
scaffolding.
The Contractor shall be fully responsible for the design
and the of the scaffolding and obtain approval from the
relevant Authorities and for submitting design details if
required.

TEMPORARY ELECTRICITY SUPPLY


The Contractor shall arrange seperate metering
system for assessing the charges for testing and
commissioning of mechanical and installations.
If temporary power supply is unavailable from TNB or
the available is not sufficient to meet the requirements
of this project the Contractor shall use Generator Set
subject to the approval of TNB and Chief Electrical
Inspectorate of Malaysia.

Clear away and make good all work disturbed on


completion.
CLEANING OF THE WORKS

Page 10

Qty

Unit

PEMBINAAN JEJANTAS PEJALAN KAKI DI HADAPAN SEKOLAH RAJA PEREMPUAN TAAYAH, IPOH,
DAERAH KINTA, PERAK DARUL RIDZUAN
On completion of the Works and before the issue of the
Certificate Practical Completion of the Works, the
Contractor shall
a)Remove all remaining debris and rubbish from the
buildings
the site. Such removal shall be carried out
continuously, the structure under construction shall at
all times be maintained in a tidy condition.
b)Clean all exposed surfaces of concrete, timber,
c)Clean and dry and re-polish all floor finishes.

PW-9

PRELIMINARY WORK
Item
No.

Description

Qty

PRELIMINARY WORK SUMMERY


PW-1
PW-2
PW-3
PW-4
PW-5
PW-6
PW-7
PW-8
PW-9

Page 11

Unit

PEMBINAAN JEJANTAS PEJALAN KAKI DI HADAPAN SEKOLAH RAJA PEREMPUAN TAAYAH, IPOH,
DAERAH KINTA, PERAK DARUL RIDZUAN

PW-10

PILING WORK
Item
No.

Description
Method of Measurement

Qty

Page 12

Unit

PEMBINAAN JEJANTAS PEJALAN KAKI DI HADAPAN SEKOLAH RAJA PEREMPUAN TAAYAH, IPOH,
DAERAH KINTA, PERAK DARUL RIDZUAN
A

Contrary to the Standard Method of Measurement


Building Works, precast reinforced concrete piles in
this Bill will be described, measured and valued in
accordance with these definitions, rules and
statements set out in the following paragraphs
i)The supply of piles shall be in linear metre
as actual length delivered to site.
ii)The handing, transporting and pitching of
piles shall be enumerated.
iii)The dirving of piles shall be measured in
linear metre from the shoe point when set i.e. the
dirven end of the pile to the shoe point when pitched.
iv)Joints between pile lengths shall be
enumerated.
v)All basic piles shall be in lengths of 6.00
metre unless otherwise instructed by the Engineer and
extension piles in lengths
exceeding 3.00 metre but not exceeding 6.00 metre
and only one joint shall be
measured for every extension pile. All extension piles
used shall be endosed by the Clerk-of Works.
vi)Cutting off tops of piles at required cut off
level shall be enumerated.

PL-1

PILING WORK
Item
No.

Description

Qty
Page 13

Unit

PEMBINAAN JEJANTAS PEJALAN KAKI DI HADAPAN SEKOLAH RAJA PEREMPUAN TAAYAH, IPOH,
DAERAH KINTA, PERAK DARUL RIDZUAN
The Contractor shall allow for the following :
A

i)All labour, materials, plant and tools including


followers if necessary and all supervision for the
complete pile installation on level and undulating
ground inclusive of all wastages.
ii)All necessary excavation works incidental
to piling including removal of all obstructions. No.
extension of time will be allowed for obstructions
encountered during piling operations.
iii)All necessary platform, temporary staging
and temporary work and altering, adapting and
maintaining the same for the complete foundation pile
installation.
iv)Marking each pile with its length in linear
metre at 1.00 metre intervals for its whole length.
v)Re-dirving of heaved piles.
vi)Driving through old foundations, etc. and all
types of sub-soil strata.
vii)Driving ends of piles using followers.
viii)Handing, transporting and pitching piles
either singly or in clusters.
ix)Additional joints, splices as may be required.
x)All necessary materials and equipment for
the alignment and positioning of the piling equipment
over undulating surfaces of the site.
xi)Replacement of incorrectly driven piles.
xii)Replacement of damaged, defective or faulty
piles and piles which fail under tests.

PL-2

PILING WORK

Page 14

PEMBINAAN JEJANTAS PEJALAN KAKI DI HADAPAN SEKOLAH RAJA PEREMPUAN TAAYAH, IPOH,
DAERAH KINTA, PERAK DARUL RIDZUAN
Item
No.
A

Description

Qty

Unit

Piling Equipment
Allow for the provision of all necessary piling
equipment, plant, tools and foe their transportation to
the site, handling, assembling and removal off the site
after completion of operation

Supply and deliver to site the following size precast


reinforced concrete piles Grade 45 with SIRIM approval
or other equal and approval

200 x 200mm Preliminary test initial pile in length


6.00m

no

Ditto in 6.00m extension pile

no

120

240

200 x 200mm initial pile in length 6.00m (in 20 nos.)


D
E

Ditto in 6.00m extension pile (in 20nos.)


Handle, transport and pitch the following precast
reinforced concrete piles

200 x 200mm initial pile in length 6.00m

120

Ditto in 6.00m extension pile

240

PL-3

Page 15

PEMBINAAN JEJANTAS PEJALAN KAKI DI HADAPAN SEKOLAH RAJA PEREMPUAN TAAYAH, IPOH,
DAERAH KINTA, PERAK DARUL RIDZUAN

PILING WORK
Item
No.
Description
A Jointing the following precast reinforced concrete piles
by using 12mm Mild Steel plate with 4 number Y12480mm anchorage bars wlded to the end plates and 1
preformed hole and installed strictly in accordance
with manufacturer's instruction.

Qty

Unit

no

20

no

no

no

no

Cut-off head of precast reinforced concrete piles to the


required cut off level including stripping 610mm length
of concrete and bend back exposes reinforcement bars
into pile caps

Test load including provision of all kentledges,


hydraulic jack, deflection gauges, temporary staging
and equipment required and all necessary and
supervision during test period attendance and
removal upon completion

Test load of 200 KN (45 tons) on 200 x 200mm working


pile twice the working load

Subsequent test load of 450 KN (45 tons) on 200 x


200mm
Supply of labour and equipment for dynamic pile
testing by using Pile Driving Analyser (PDA) and data
assessment on site and carry out Computer CAPWAP
Analysis on field data including preparation of
engineering report

Page 16

PEMBINAAN JEJANTAS PEJALAN KAKI DI HADAPAN SEKOLAH RAJA PEREMPUAN TAAYAH, IPOH,
DAERAH KINTA, PERAK DARUL RIDZUAN

PL-4

PILING WORK
Item
No.

Description

Qty

PILING WORK SUMMERY


PL-1
PL-2
PL-3
PL-4

Page 17

Unit

PEMBINAAN JEJANTAS PEJALAN KAKI DI HADAPAN SEKOLAH RAJA PEREMPUAN TAAYAH, IPOH,
DAERAH KINTA, PERAK DARUL RIDZUAN

PL-5

STRUCTURAL WORK
Item
No.

Description

Qty

Unit

Excavation commencing from formation level


A

Excavate pit and get out for pile cap not exceeding
1.50m deep

m3

Excavate, load, haul and dispose to Contractor's dump


site as approved by S.O any material except rock at
piers.

22

m3

28.4

m3

To supply single span UHPC U-beam40m beam to site


from " Dura Technology" (Rate shall include all relevant
assembly works, temp. support, post-tensioning work,
grouting, temporary formwork and supervision cost).

Cost RM 2,500
20% Profit
RM3,000
D

To prepare and lunch all relevant temporary supports


or working platform in order to allowed beam
launching work to be carried out. (Rate shall include
removal of all temporary falsework or systems after
completion).
L.S

Page 18

PEMBINAAN JEJANTAS PEJALAN KAKI DI HADAPAN SEKOLAH RAJA PEREMPUAN TAAYAH, IPOH,
DAERAH KINTA, PERAK DARUL RIDZUAN

ST-1

STRUCTURAL WORK
Item
No.

Description

Qty

Unit

10

m2

CONCRETE WORKS
Plain concrete (Grade 15-40mm aggregates):A

50mm thick under pile caps


Vibrated reinforced concrete Grade 40in

Pile cap

10

m3

Column

18

m3

Pier

11

m3

Padfooting

m3

FORMWORK FOR:
F

Class F1 for pile cap

22

m2

Class F3 for pier column, pier head and others

69

m2

Hot rolled steel deformed reinforcement high


yield 60,minimum yield stress 460 NI/mm2 in

In Pile Cap:H

16mm diameter.

320

Page 19

kg

PEMBINAAN JEJANTAS PEJALAN KAKI DI HADAPAN SEKOLAH RAJA PEREMPUAN TAAYAH, IPOH,
DAERAH KINTA, PERAK DARUL RIDZUAN

In Column:J

10mm diameter.

550

kg

2266

kg

20mm diameter.

ST-2

STRUCTURAL WORK
Item
No.

Description

Qty

Unit

Hot rolled steel deformed reinforcement high


yield 60,minimum yield stress 460 NI/mm2 in

Pier:16mm diameter.

934

kg

20mm diameter.

216

kg

Padfooting:20mm diameter.

572

kg

PRECAST CONCRETE
D

Supply, Install pre-cast stair case according


engineering drawing

L.S

Supply, Install pre-cast slab according engineering


drawing

L.S

Page 20

PEMBINAAN JEJANTAS PEJALAN KAKI DI HADAPAN SEKOLAH RAJA PEREMPUAN TAAYAH, IPOH,
DAERAH KINTA, PERAK DARUL RIDZUAN

ST-3

STRUCTURAL WORK
Item
No.

Description

Qty

STRUCTURAL WORK SUMMERY


ST-1
ST-2
ST-3

Page 21

Unit

PEMBINAAN JEJANTAS PEJALAN KAKI DI HADAPAN SEKOLAH RAJA PEREMPUAN TAAYAH, IPOH,
DAERAH KINTA, PERAK DARUL RIDZUAN

ST-4

FINISHES WORK
Item
No.

Description

Qty

Unit

TILE FINISHING
Lay only 300mm x 300mm homogenous tiles
(supply by others) in design, colour and pattern
including bedding on and including cement mortar
(1:3) backings to overall thicknesses of 25mm
thick;bedding, jointingborder, to be selected by the
Architect,
bedded on screed (measured separately) and
pointed in neat tinted cement, to
STAIRCASE
A

Tread, 255mm wide

173

Undercut riser, 167mm high

173

Extra over for nosing tile to selection

173

Landing, 1000mm wide

Waiting, 1500mm wide

Page 22

PEMBINAAN JEJANTAS PEJALAN KAKI DI HADAPAN SEKOLAH RAJA PEREMPUAN TAAYAH, IPOH,
DAERAH KINTA, PERAK DARUL RIDZUAN
MAIN BRIDGE
F

Slab

88

m2

Ditto 300 mm

80

FW-1

FINISHES WORK
Item
No.

Description

Qty

Unit

EXTERNAL FINISHES
ROOF COVERING
Metal deck cladding roof cover (0.48mm thk.-beralun)
including roof truss, frame, gutter at both side and
necessary fixtures as shown in the drawing for:

Main span (40m)

Staircase

UPVC main discharge pipes (vertical and horizontal)


from roof to manholes clw vent cowls, mosquito proof
nettings, fittings, connection, pipe sleeves, excavation,
formwork, concrete, brackets/ supports, etc. complying
to specifications and drawings.

157

m2

97

m2

L.S

Page 23

PEMBINAAN JEJANTAS PEJALAN KAKI DI HADAPAN SEKOLAH RAJA PEREMPUAN TAAYAH, IPOH,
DAERAH KINTA, PERAK DARUL RIDZUAN

FW-2

FINISHES WORK
Item
No.

Description

Qty

FINISHES WORK SUMMERY

FW-1
FW-2

Page 24

Unit

PEMBINAAN JEJANTAS PEJALAN KAKI DI HADAPAN SEKOLAH RAJA PEREMPUAN TAAYAH, IPOH,
DAERAH KINTA, PERAK DARUL RIDZUAN

FW-3

SUMMARY OF BILL OF QUANTITIES


Item
No.

Description

Page No.

01

PRELIMINARY

PW-10

Page10

02

PILING WORK

PL-5

Page15

03

STRUCTURAL WORK

ST-4

Page19

04

FINISHES WORK

FW-3

Page22

Page 25

PEMBINAAN JEJANTAS PEJALAN KAKI DI HADAPAN SEKOLAH RAJA PEREMPUAN TAAYAH, IPOH,
DAERAH KINTA, PERAK DARUL RIDZUAN

Page 26

PEMBINAAN JEJANTAS PEJALAN KAKI DI HADAPAN SEKOLAH RAJA PEREMPUAN TAAYAH, IPOH,
DAERAH KINTA, PERAK DARUL RIDZUAN

Rate

RM

0.00

0.00

Page 27

PEMBINAAN JEJANTAS PEJALAN KAKI DI HADAPAN SEKOLAH RAJA PEREMPUAN TAAYAH, IPOH,
DAERAH KINTA, PERAK DARUL RIDZUAN

0.00

Rate

RM

16,000.00

Page 28

PEMBINAAN JEJANTAS PEJALAN KAKI DI HADAPAN SEKOLAH RAJA PEREMPUAN TAAYAH, IPOH,
DAERAH KINTA, PERAK DARUL RIDZUAN

16,000.00

Rate

RM

Page 29

PEMBINAAN JEJANTAS PEJALAN KAKI DI HADAPAN SEKOLAH RAJA PEREMPUAN TAAYAH, IPOH,
DAERAH KINTA, PERAK DARUL RIDZUAN

8,000.00
8,000.00

Rate

RM

9,000.00

4,000.00

Page 30

PEMBINAAN JEJANTAS PEJALAN KAKI DI HADAPAN SEKOLAH RAJA PEREMPUAN TAAYAH, IPOH,
DAERAH KINTA, PERAK DARUL RIDZUAN

20,000.00

16,000.00
49,000.00

Rate

RM

9,000.00

Page 31

PEMBINAAN JEJANTAS PEJALAN KAKI DI HADAPAN SEKOLAH RAJA PEREMPUAN TAAYAH, IPOH,
DAERAH KINTA, PERAK DARUL RIDZUAN

4,000.00

20,000.00

16,000.00
49,000.00

Rate

RM

Page 32

PEMBINAAN JEJANTAS PEJALAN KAKI DI HADAPAN SEKOLAH RAJA PEREMPUAN TAAYAH, IPOH,
DAERAH KINTA, PERAK DARUL RIDZUAN

20,000.00

50,000.00

70,000.00

Rate

RM
Page 33

PEMBINAAN JEJANTAS PEJALAN KAKI DI HADAPAN SEKOLAH RAJA PEREMPUAN TAAYAH, IPOH,
DAERAH KINTA, PERAK DARUL RIDZUAN
Rate

RM
20,000.00

6,800.00

10,000.00

5,000.00

41,800.00

Page 34

PEMBINAAN JEJANTAS PEJALAN KAKI DI HADAPAN SEKOLAH RAJA PEREMPUAN TAAYAH, IPOH,
DAERAH KINTA, PERAK DARUL RIDZUAN

Rate

RM

0.00

0.00

Page 35

PEMBINAAN JEJANTAS PEJALAN KAKI DI HADAPAN SEKOLAH RAJA PEREMPUAN TAAYAH, IPOH,
DAERAH KINTA, PERAK DARUL RIDZUAN

Rate

RM
0.00

10,000.00

Page 36

PEMBINAAN JEJANTAS PEJALAN KAKI DI HADAPAN SEKOLAH RAJA PEREMPUAN TAAYAH, IPOH,
DAERAH KINTA, PERAK DARUL RIDZUAN
10000.00

20,000.00

Rate

RM

0.00
16,000.00
8000.00
49000.00
49000.00
70000.00
41800.00
0.00
20000.00

Page 37

PEMBINAAN JEJANTAS PEJALAN KAKI DI HADAPAN SEKOLAH RAJA PEREMPUAN TAAYAH, IPOH,
DAERAH KINTA, PERAK DARUL RIDZUAN

253,800.00

Rate

RM

Page 38

PEMBINAAN JEJANTAS PEJALAN KAKI DI HADAPAN SEKOLAH RAJA PEREMPUAN TAAYAH, IPOH,
DAERAH KINTA, PERAK DARUL RIDZUAN

0.00

0.00

Rate

RM
Page 39

PEMBINAAN JEJANTAS PEJALAN KAKI DI HADAPAN SEKOLAH RAJA PEREMPUAN TAAYAH, IPOH,
DAERAH KINTA, PERAK DARUL RIDZUAN

0.00

0.00

Page 40

PEMBINAAN JEJANTAS PEJALAN KAKI DI HADAPAN SEKOLAH RAJA PEREMPUAN TAAYAH, IPOH,
DAERAH KINTA, PERAK DARUL RIDZUAN

Rate

RM

5,000.00

12.00

24.00

12.00

24.00

20.00

2,400.00

20.00

4,800.00

11.50

1,380.00

11.50

2,760.00

16,388.00

Page 41

PEMBINAAN JEJANTAS PEJALAN KAKI DI HADAPAN SEKOLAH RAJA PEREMPUAN TAAYAH, IPOH,
DAERAH KINTA, PERAK DARUL RIDZUAN

Rate

RM

12.00

36.00

12.00

240.00

6,000.00

6,000.00

4,500.00

4,500.00

600.00

2,400.00

Page 42

PEMBINAAN JEJANTAS PEJALAN KAKI DI HADAPAN SEKOLAH RAJA PEREMPUAN TAAYAH, IPOH,
DAERAH KINTA, PERAK DARUL RIDZUAN

13,140.00

Rate

RM

0.00
0.00
16,388.00
13,140.00

Page 43

PEMBINAAN JEJANTAS PEJALAN KAKI DI HADAPAN SEKOLAH RAJA PEREMPUAN TAAYAH, IPOH,
DAERAH KINTA, PERAK DARUL RIDZUAN

29,528.00

Rate

RM

15.00

45.00

15.00

330.00

3,000.00

85,200.00

80,000.00

Page 44

PEMBINAAN JEJANTAS PEJALAN KAKI DI HADAPAN SEKOLAH RAJA PEREMPUAN TAAYAH, IPOH,
DAERAH KINTA, PERAK DARUL RIDZUAN

165,575.00

Rate

RM

12.00

124.08

340.00

3,277.60

340.00

6,248.63

340.00

3,750.20

340.00

2,380.00

40.00

886.40

45.00

3,117.45

3.00

960.66

Page 45

PEMBINAAN JEJANTAS PEJALAN KAKI DI HADAPAN SEKOLAH RAJA PEREMPUAN TAAYAH, IPOH,
DAERAH KINTA, PERAK DARUL RIDZUAN

3.00

1,651.13

3.00

6,797.28
29,193.43

Rate

3.00

RM

2,800.66

3.00

649.26

3.00

1,714.86

60,000.00

30,000.00

Page 46

PEMBINAAN JEJANTAS PEJALAN KAKI DI HADAPAN SEKOLAH RAJA PEREMPUAN TAAYAH, IPOH,
DAERAH KINTA, PERAK DARUL RIDZUAN

95,164.78

Rate

RM

165,575.00
29,193.43
95,164.78

Page 47

PEMBINAAN JEJANTAS PEJALAN KAKI DI HADAPAN SEKOLAH RAJA PEREMPUAN TAAYAH, IPOH,
DAERAH KINTA, PERAK DARUL RIDZUAN

289,933.21

Rate

RM

15.00

2,595.00

12.00

2,076.00

11.00

1,903.00

15.00

72.00

15.00

75.00

Page 48

PEMBINAAN JEJANTAS PEJALAN KAKI DI HADAPAN SEKOLAH RAJA PEREMPUAN TAAYAH, IPOH,
DAERAH KINTA, PERAK DARUL RIDZUAN

25.00

2200.00

15.00

1,200.00

10,121.00

Rate

RM

48.00

7,539.82

48.00

4,674.69

400.00

Page 49

PEMBINAAN JEJANTAS PEJALAN KAKI DI HADAPAN SEKOLAH RAJA PEREMPUAN TAAYAH, IPOH,
DAERAH KINTA, PERAK DARUL RIDZUAN

12,614.51

Rate

RM

10,121.00
12,614.51

Page 50

PEMBINAAN JEJANTAS PEJALAN KAKI DI HADAPAN SEKOLAH RAJA PEREMPUAN TAAYAH, IPOH,
DAERAH KINTA, PERAK DARUL RIDZUAN

22,735.51

Amount(RM)

253,800.00
29,528.00
289,933.21
22,735.51

Page 51

PEMBINAAN JEJANTAS PEJALAN KAKI DI HADAPAN SEKOLAH RAJA PEREMPUAN TAAYAH, IPOH,
DAERAH KINTA, PERAK DARUL RIDZUAN

595,996.72

Page 52

BILL OF QUANTITY
PEMBINAAN JEJANTAS PEJALAN KAKI DI
HADAPAN SEKOLAH RAJA PEREMPUAN
TAAYAH, IPOH, DAERAH KINTA, PERAK
DARUL RIDZUAN

ITY

N KAKI DI
EMPUAN
A, PERAK

You might also like