You are on page 1of 5

History

You are here:


1.

Home

2.

History

Station Janaeletrik Sultan Salahuddin Abdul Aziz or Kapar Energy Vetures


Located 56km west of Kuala Lumpur , off the coastal road between Port Klang and Kuala
Selangor facing the straits of Malacca.
SJSSAA is the 2nd largest power plant in Malaysia with a generating capacity of 2420MW.
The only power station in Malaysia with triple fuel firing capability(gas, oil and coal)
Planning for the power plant started in late 1970 by NEB while the construction work commenced
in 1981. It was constructed on a reclaimed mangrove swampland.
The plant is officially opened by Sultan Selangor on 14/3/1987.
After about 20year of operation under LLN and TNB, KEV is formed as an IPP on 9th July 2004
and fully run with the equity of 60% TNB and 40% Malakoff.

Vision

KEV The IPP of Choice! Our Nations Pride

Mission

Prudent utilization of natural resources to generate electricity safely, continously, effectively and
efficiently for the benefit of mankind whilst preserving the environment.

Shared Values
Excellence
Integrity
Commitment
Caring
Sharing

Generating fasilities
Phase

Capacity

GF 1 (thermal)

2 x 300 MW

GF 2 (thermal)

2 x 300 MW

GF 3 (thermal)

2 x 500 MW

GF 4 Gas Turbines

2 x 110 MW

TOTAL CAPACITY 2420 MW

Generating Facility 1

Construction began in 1981


Nominal capacity:
2 units x 300 MW
Conventional Thermal
Front firing
Fuel Gas / Oil
Manufacturers: Boiler Riley Mitsui Turbine MHI
Commissioned in 1985 & 1986
Initial commissioning in oil
Unit 2 gas firing commissioned in 1991, Unit 1 in 1994

Generating Facility 2

Construction began in 1985


Nominal capacity: 2 units x 300 MW
Conventional Thermal
Opposite firing
Fuel Coal / Gas / Oil
Manufacturers: Boiler IHI Turbine MHI
Commissioned in 1988 (Unit 3), 1989 (Unit 4)
Gas commissioning for Units 3 & 4 in 1999

Generating Facility 3

Construction began in 1995


Nominal capacity: 2 units x 500 MW

Conventional Thermal
Opposite firing
Fuel Coal / Gas / Oil (25% rated load)
Manufacturers: Boiler IHI Turbine GE
Taking over in year 2000

Gas turbine

9 open cycle gas turbines were installed in 1993-94 (all but 2 units have since been
decommissioned, sold or relocated)
Current nominal capacity:
2 units x 110MW
Open Cycle Mode
Manufacturer : Nuovo Pignone
Type : GE Frame 9
Commissioned
GT 8 Aug 94
GT 9 Sept 94
Fuel : Gas / Distillate

Safety, Quality, Health &


Environment
KEV Commitment to the EIA process was in place since 1979, long before it became a legal
requirement in 1988
EIA studies were conducted :
Jun 1979 : Phase 1
Sep 1982 : Phase 2
Oct 1989 : Post EIA
Phase 1&2
Aug 1991 : Phase 3 & 4
All environmentally sensitive areas are identified and monitored to ensure all environmental
standards set by the Department of Environment (DOE) are well met