You are on page 1of 5

Exploration & Production

GENERAL SPECIFICATION
PIPELINES - RISERS
GS EP PLR 105

Design of submarine pipelines as per ISO 13623

03

01/2011

Addition of DNV-RP-J202 for CO2 pipelines

02

10/2009

Updating to revised ISO 13623: 2009

01

10/2005

Addition of EP root to GS identification

00

10/2003

First issue

Rev.

Date

Owner: EP/TDO/TEC

Notes

Managing entity: EP/TDO/TEC/PLR

This document is the property of Total. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.

Exploration & Production


General Specification

Date: 01/2011

GS EP PLR 105

Rev: 03

Contents
1. Scope ....................................................................................................................... 3
2. Reference documents ............................................................................................. 3
3. Amendments to the ISO 13623 - for offshore pipeline sections ......................... 4
3.1

General ..............................................................................................................................4

3.2

Amendments to 3.1.23 - SMYS ......................................................................................4

3.3

Amendments to 5.1 - System definition ..........................................................................4

3.4

Amendments to 5.4 - Overpressure................................................................................4

3.5

Amendments to 6.1 - Design principles ..........................................................................4

3.6

Amendments to 6.3.2.2 - Temperature ...........................................................................4

3.7

Amendments to 6.4.2.2 - Yielding...................................................................................5

3.8

Amendments to 6.7.3 and to 11 - Testing....................................................................5

3.9

Amendments to 6.14 - Fabricated Components .............................................................5

3.10

Amendments to 13.4 .6 - Testing of modified pipelines ..................................................5

4. Other references ..................................................................................................... 5

This document is the property of Total. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.

Page 2/5

Exploration & Production


General Specification

Date: 01/2011

GS EP PLR 105

Rev: 03

1. Scope
This General Specification is applicable in conjunction with the GS EP PLR 100 when the
ISO 13623 is the Applicable Prime Reference for the design of a submarine pipeline system.
Any contradictions between the GS EP PLR 100 and the ISO 13623 shall
commencement of the design and their resolutions shall be approved by Company.

at

the

2. Reference documents
The reference documents listed below form an integral part of this General Specification. Unless
otherwise stipulated, the applicable version of these documents, including relevant appendices
and supplements, is the latest revision published at the EFFECTIVE DATE of the CONTRACT.
Standards
Reference
ISO 13623

Title
Petroleum and natural gas industries - Pipeline transportation
systems

Professional Documents
Reference
DNV-RP-J202

Title
Design and Operation of CO2 Pipeline

Regulations
Reference

Title

Not applicable

Codes
Reference

Title

Not applicable

Other documents
Reference

Title

Not applicable

This document is the property of Total. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.

Page 3/5

Exploration & Production


General Specification

Date: 01/2011

GS EP PLR 105

Rev: 03

Total General Specifications


Reference

Title

GS EP PLR 100

Submarine pipeline systems

GS EP PLR 401

Installation of submarine pipelines

GS EP PLR 420

Site welding of carbon steel pipelines to API 1104 (sweet service)

GS EP PLR 421

Site welding of carbon steel pipelines to API 1104 (mild,


intermediate and severe sour service)

GS EP PLR 501

Hydrostatic testing of pipelines

3. Amendments to the ISO 13623 - for offshore pipeline sections


3.1 General
Where conveyed fluids are overwhelmingly CO2, recommended practice DNV-RP-J202 shall be
applied and used in conjunction with the APR.

3.2 Amendments to 3.1.23 - SMYS


The SMYS (y) addressed by the ISO 13623 is the transverse value.
In some circumstances - such as for reeled pipe and for pipelaying stress analysis - the
longitudinal one may be required.
De-rating for wall thicknesses above 31.8 mm (1"1/4) and temperatures above 50C is
mandatory and information shall be provided in a first approach by the selected pipe suppliers.

3.3 Amendments to 5.1 - System definition


Battery limits shall be defined as GS EP PLR 100.

3.4 Amendments to 5.4 - Overpressure


When assessing the effects from an over pressure, the incidental/accidental pressure shall be
determined further to a process study combined with an hydraulic analysis.
In a first approach, an overpressure equal to 1.1 times the design pressure can be retained refer also to 6.3.2.2 of the ISO 13623.

3.5 Amendments to 6.1 - Design principles


Reliability-based limit state design is at present time not permitted by Company for offshore
pipelines and risers designed under the ISO 13623.

3.6 Amendments to 6.3.2.2 - Temperature


The minimum temperature reached further to an anticipated blowdown shall be calculated.
The method (thermodynamic equations and software) used for this calculation and the
calculation itself shall be approved by Company.

This document is the property of Total. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.

Page 4/5

Exploration & Production


General Specification

Date: 01/2011

GS EP PLR 105

Rev: 03

In some circumstances, a supplementary temperature margin may be required by Company.

3.7 Amendments to 6.4.2.2 - Yielding


Longitudinal straining is limited to 2%. Consequences on material characteristics are to be
determined and presented to Company for acceptance, but this does not address straining
induced during reeling operation.

3.8 Amendments to 6.7.3 and to 11 - Testing


The pressure level shall be equal to the strength test pressure.
The strength test and the leak tests (if any) shall - as far as practicable - be combined in one
single test.
The duration of the pressure tests shall not be less than 24 h.

3.9 Amendments to 6.14 - Fabricated Components


Welded branch connections and any other pipeline items shall have a life duration at least
equal to the design life duration of the pipeline.
Welding shall be performed as per GS EP PLR 420 or GS EP PLR 421, as applicable.

3.10 Amendments to 13.4 .6 - Testing of modified pipelines


When leak tests are required, leak tests of 8 hours at 1.1 times the MAOP have to be
considered.

4. Other references
Following Total General Specifications are applicable: GS EP PLR 401 and GS EP PLR 501.

This document is the property of Total. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.