1.
Candidate's Name
2.
Nationality
3.
Proposed Project Position
INSPECTOR
4.
Candidate's Employer
5.
Date candidate will be assigned
to this project
:
6.
Candidate's fluency in written
and spoke English
7.
Candidate's current job title
8.
Number of years candidates has been in:
Current job title &/or related field
9.
Current work location
10. Educational qualifications
& Science
University name
Technological University
Year degree awarded
I.
Professional training/certifications
:
:
:
On Transferable Iqama
Immediate
:
:
Fluent
VENDOR INSPECTOR
:
:
:
9 YEARS PLUS
SAUDI ARABIA
B. Tech From Royal Institute of Tech
:
Jawaharlal Nehru
2007
:
11.
11.1
I. (1) Position: QA/QC MECHANICAL INSPECTOR(TPI)
(2) Company/Project name: WORLEY PARSON
Responsibilities:
Familiar in construction, QA/QC Inspection of static equipments used in
Process plants such as Heat exchanger, Pressure Vessels, Boiler,
Process Towers/Columns, Chemical Reactor, Piping systems, Storage tanks,
Valves, Pressure relief valves, and other processing equipments
(As per ASME Quality management systems)
Familiar and conversant with the Boiler and Pressure Vessels Codes ASME
Section II Part A, B, C & D, Section V, Section VIII Division 1, Section IX, ASME
31.3, ASME B16. 5, ASME B36.1, ASME B36.19 & Other international codes
TEMA, API 660, 661 , IS 2825 , AWS ETC.,
Familiar with In-service pressure vessel and Piping inspection code such as
API 510, API 570, API 571, API 572, API 574 , API 576, API 577, API 578
Carrying out inspection of all incoming materials like Plate, Pipes and all type
OF FITINGS.
Reviewing projects Quality procedure's, Specification's and acting according
to
the quality inspection test plan (QITP).
Monitoring fabrication stage & installation stage of Pipe line, Storage Tank,
Etc.
Carry out inspection of weld (visual), R.T Film Interpretation, Monitoring &
inspecting filler metal ware house.
Monitoring welding/NDT Equipment are calibrated periodically in project site
by contractor.
Reviewing and approving NDT reports, Witnessing and Monitoring pre-heating
and post- weld heat treatment, RT,PT, MT,PMI and UT activities at project site
as per the specification.
Witnessing Pneumatic and hydro test & Leak test.
Punch listing for new erected lines and verification of punch items and
reinstatement items.
MCC test pack final walk through as per the system.
Witnessing/Monitoring WELDING/WELDING REPAIRS AND NDT Hold
points/activities are performed and completed as per the project
specifications/Quality Plan by the Contractors/Sub contractors in timely and
accurate manner.
Anticipate and take corrective actions to prevent quality problems, failures,
defective works and deficient reports.
(3) Duration (from-to): July 2016-Aug 2016
Vacuum Test Inspection of Bottom plate Welds and Bottom to Shell Corner
weld.
Execute NDT (RT, PT, and MT) as per API 650.
Reviewing and approving NDT reports, Witnessing and Monitoring pre-heating
and post- weld heat treatment, RT,PT, MT,PMI and UT activities at project site
as per the specification requirement, Review the RT films.
Inspection of Peaking of shell vertical joints.
Inspection of banding of shell horizontal joints.
Inspection of shell plumb ness from top of the shell to tank bottom.
Final Visual and Dimensional Inspection of complete tanks.
Preparation of such recording documents after each inspection.
Preparation of Hydro test package.
Verification of gauges calibration and review calibration certificates.
Inspection of Hydro test (water filling) of Tanks as per API 650.
Inspection of hydro test, pneumatic test combination as per API 650.
Inspection of Tank Box up.
Preparation of Final Record Books.
(3) Duration (from-to):
Witnessing air blowing, steam blowing, water ,chemical ,oil flushing& Leak
testing
(3) Duration (from-to):